Loading...
HomeMy WebLinkAbout3301 Youngfield Service RoadCity of Wheat Ridge Commercial Retaining Wall PERMIT - 201803203 r PERMIT NO: 201803203 ISSUED: 01/14/2019 JOB ADDRESS: 3301 Youngfield Service Rd EXPIRES: 01/14/2020 JOB DESCRIPTION: Construction of soil nail retaining wall - 10 LF height, 423 LF length, 2,630 sq ft total *** CONTACTS *** OWNER 303-279-5565 LONG PEAKS METROPOLITAN DISTRI GC (303)295-2511 M.A. Mortenson, Jr 018817 M. A. Mortenson Company *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 120 / Hotels BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 421,200.00 FEES Total Valuation 0.00 No Fees 0.00 ** TOTAL ** 0.00 *** COMMENTS *** *** CONDITIONS *** Approved per plans and red -line notes on plans. Must comply with 2012 IBC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. ** PRIOR TO FINAL INSPECTION APPROVAL - ALL FIELD AND ENGINEERING OBSERVATION REPORTS MUST BE SUBMITTED TO BUILDING DIVISION FOR REVIEW AND APPROVAL ** 11 by rn � signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed d that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or T ircle one) Date I . This permit was issued base on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po icies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit tee. 3, If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of Wheat dge COMMUNITY DEVELOPMENT Building & Inspection Services 7500 W. 291h Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 " Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits(c�ci.wheatridae.co.us FOR OFFICE USE ONLY Date: Plan/Permit # � � � � 4-7 3 Plan Review Fee: n 0 Building Permit Application Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: 3301 Youngfield Service Road, Golden, CO 80401 Property Owner (please print): Longs Peak Metropolitan District Phone: 303.770.2700 Property Owner Email: kseter@svwpc.com Tenant Name (Commercial Projects Only) NIA Property Owner Mailing Address: (if different than property address) Address: 7400 E Orchard Road, Suite 3300 City, State, Zip: Greenwood Village, CO 80111 Arch itect/Enaineer: Brierley Associates Architect/Engineer E-mail: bzietlow@bderleyassociates.com Contractor Name: MA Mortenson Co City of Wheat Ridge License #: 0 ( �?2 I J Contractor E-mail Address: dave.callas@mortenson.com For Plan Review Questions & Comments (please print): Phone: 303.703.1405 Phone: 303.295.2511 CONTACT NAME (please print): Dave Callas Phone: CONTACT EMAIL(please print): dave.callas@mortenson.com 845.489.6574 Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor AuthoriZationform } Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields. []COMMERCIAL ❑ RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. Construction of a soil nail retaining wall with a sculpted shotcrete face at northern and western property boundary of La Quinn This construction is to allow for Clear Creek Drive to be constructed to the west and for pad development to the north. i Q CWuc 0') Sq. F#.JL.F ) L�- BTUs Amps Squares Gallons For Solar: Kw # of Panels Requires Structural For Commercial Projects Only: Occupancy Type: Construction Type: Occupancy Load: Square Footage: Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ $421,200.00 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record, that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application, 1, the applicant for this building permit application, warrant the truthfulness of the information provided on the application, ORC'LE ONE: (OWNER) (CONTRA CTOR),fiowrUTHORIZED REPRESENTATIVE of (OWNER) CDNTR.4CTOR} Signature (first and lust name): -- DATE: Z Z Printed Name: % . DEPARTMENT USE ONLY ZONING COMMMENTS A- ` \ fAIM, PCZ %A, r Q�1vjV� Q � T ed< OCCUPANCY CLASSIFICATION: Revtewer.—��r w �j`�j� 2�L� k r& I t Ct CONSTRUCTION TYPE: BUI DING DEP TME COMM NTS: Reviewer IZ//:t PUBLIC WORKS COMMENTS: Reviewer: -� L' AL"T` C / ��S . /C/amu 11 C I -eek C4 Building Division Valuation: �� r' zk Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Clear Creek Crossing UbO3 La Quinta Inn Retaining Wall Wheat Ridge, Colorado IN 11/19 Soil Nall Wall Design Calculations V2 ASD Method Designed for: SubTerra Geotechnical Solutions Designed by: Brierley Associates 990 South Broadway, Suite 222 Denver, Colorado Calculation Index Ph 303-703-1405 1. Wall and soil inputs 1.1 General wall properties 1.2 Soil properties 1.3 Factors of safety, load factors, strength reduction factors 1.4 Shotcrete properties 1.5 Bearing plate properties 1.6 Soil nail properites 1.7 Shotcrete reinforcing properties behind bearing plate (initial shotcrete) 1.8 Shotcrete reinforcing properties between studs heads and bearing plate (secondary shotcretel 1.9 Shotcrete reinforcing properties for combined initial and secondary shotcrete 2. Internal failure mechanisms 2.1 Facing load 2.2 Soil nail bar tensile capacity 2.3 Facing punching primary shotcrete 2.4 Facing punching secondary shotcrete 2.5 Facing punching combined primary and secondary shotcrete 2.6 Facing flexure, primary shotcrete 2.7 Facing flexure, secondary shotcrete 2.8 Facing flexure, combined shotcrete 2.9 Minimum reinforcement ratios 2.10 Bearing plate - 3. External failure mechanisms 3.1 Basal heave 3.2 Sliding 4. Global stability _ 0'4 5. Seismic stabilityp-i o J 5.1 Pseudo -static seismic coefficient /i�5i �(?N�+ � 11 5.2 Global stability with seismic load 6. Estimated wall deformation Design References 1. Soil Nails Reference Manual, FHWA GEC 007 Federal Highway Publication No. FHWA-NHI-14-007. 2. LRFD Bridge Design Specifications, AASHTO, 7th Edition, 2014. Calculation by: BZ / City 01 Wreat Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 1. Wall and soil inputs 1.1 General wall properties Soil nail wall height#,:= 1041 Wall batter angle (from vertical)- a := atan (TIO) = 5.711 -deg 0 := a + 90- deg = 95.711 -deg Maximum back slope angle - R := 0•deg (From horizontal) Vertical surcharge pressure at top of wall - q := 0•psf 1.2 Soil properties Long-term Retained soil unit weight- ry := 125•pcf Retained soil friction angle - 4) := 34 -deg Retained soil cohesion - C":= 0•psf Retained soil ultimate bond strength - qult 8 -psi = 1152•psf Shotcrete-concrete/soil interface friction angle - 5,:= (� = 34 -deg 5.7.3 a Coulomb active earth pressure coefficient - sin (0 + �)2 Ka := 2 = 0.217 sin (0)2sin(0—S) 1+ sin (4+S)•sin(�—(3) sin(0 — 6)•Sin(0 + Eq. 5.21 City of Calculation by: BZ 2 Wheat Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 1.3 Factors of safety, load factors, strength reduction factors Table 5.1: \fiuimum Recommended Factors of Safety for the Design of Soil \;til Falls Using the ASD Method'fl tio�r. tlj T�Irmn:tae avd:.mboC naorarclamre daffea fiomahat pae:eabdmd•.a pra:�wa::w:wn of du. arawal. h:am of tDew shame: nffae rL mo:Y wward u:r;.j LRFII raroa¢obaa- a: pn:a_t^ d m AASHIO C'2:Qtj non -w.L pumanem :nusmra.. — 0-- may atter. a uije &r stays lox& red kej-rent soodmoas -th FS,, . 1.55 when uarsern is wandered r be timird dw to dr n-ulabiDtr d mff-- jenraehmsa. mfmsanoc am] -- iosil aapramce on :oil w '—M, rasp of a&r: &scar_ for jlnbal :nbdm� comp-&- ro &h. <a:e oft-p—y r.�o� hR: tDa: ue msuppwrd for � m ? da.- Defoe avl: m ic:raLd. 7'he larFu ave maybe .pied io Wesal :mrc:mc w cause awns onrutamnenz rejudmj :oil ooadmac. (4"- Minimum 1j Minimum required factors of safety (ASD) Global, permanent- FSgI_p := 1.35 Table 5.1, Note 2 Global, temporary - FSgu := 1.3 Table 5.1 Pullout- FSPo:= 2 Sliding - Hsi := 1.5 Tensile - FSt := 1.8 1.8 for Grades 60 and 75, 2.0 for Grades 95 and 150 Facing flexure - FSff := 1.5 Facing punching - FSfp := 1.5 Stud tension - FSst := 2.0 2.0 forASTMA307 studs, 1.7 forASTMA325 studs Calculation by: BZ city of 3 Wtieat Ridge \finimam Jfinim.tm Recomm. Recomm. Limit State Coudirion Symbol Factors of Fatctotz of Safen. Static Saferv. Loads Seismic Loads Overall Overall Stabilir; FSO; 15.,:1 1.1'-: O rral] Short Term Condition. FSO, 1.25-1.33'3 NA Fxcatiation Overall Basal Heave FSS; ?.04. -"53 2.3f!: Strength- Pullout Resistance FSP, 2.0 15 Geotechrucai Strength - Lateral Sliding FS_; 1.3 1 i Geotechnical Strength - Tendon Tensile Strength FSr 1.8 1.35 Structural Grades 60 and 751 Strength - Tendon Tensile Strength FS -1 2.0 150 Structural Grades 95 and 150" Strength- FacingFiestiral FS- 1.5 11 Structural Strength- FacmgPunching Shear FS17 1-5 1.1 Simctural Strength- Headed Stud Tensile FSt 1.5 Stnutural (.4.307 Bolt) _.0 Strength - I Headed Stud Tensile FStF 1.7 13 Structural (,.43^-5 Bolt) tio�r. tlj T�Irmn:tae avd:.mboC naorarclamre daffea fiomahat pae:eabdmd•.a pra:�wa::w:wn of du. arawal. h:am of tDew shame: nffae rL mo:Y wward u:r;.j LRFII raroa¢obaa- a: pn:a_t^ d m AASHIO C'2:Qtj non -w.L pumanem :nusmra.. — 0-- may atter. a uije &r stays lox& red kej-rent soodmoas -th FS,, . 1.55 when uarsern is wandered r be timird dw to dr n-ulabiDtr d mff-- jenraehmsa. mfmsanoc am] -- iosil aapramce on :oil w '—M, rasp of a&r: &scar_ for jlnbal :nbdm� comp-&- ro &h. <a:e oft-p—y r.�o� hR: tDa: ue msuppwrd for � m ? da.- Defoe avl: m ic:raLd. 7'he larFu ave maybe .pied io Wesal :mrc:mc w cause awns onrutamnenz rejudmj :oil ooadmac. (4"- Minimum 1j Minimum required factors of safety (ASD) Global, permanent- FSgI_p := 1.35 Table 5.1, Note 2 Global, temporary - FSgu := 1.3 Table 5.1 Pullout- FSPo:= 2 Sliding - Hsi := 1.5 Tensile - FSt := 1.8 1.8 for Grades 60 and 75, 2.0 for Grades 95 and 150 Facing flexure - FSff := 1.5 Facing punching - FSfp := 1.5 Stud tension - FSst := 2.0 2.0 forASTMA307 studs, 1.7 forASTMA325 studs Calculation by: BZ city of 3 Wtieat Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Minimum required factors of safety for seismic (ASD) Table 5.1 Global, seismic - FSgI_seis_min 1.1 Pullout- FSpo_seis 1.5 Sliding - FSsI seis 1.1 Tensile - FSt seis 1.35 1.35 for Grades 60 and 75, 1.5 for Grades 95 and 150 Facing flexure - FSff seis 1.1 Facing punching - FSfp_seis 1.1 Stud tension - FSst seis 1.5 1.5 forASTM A307 studs, 1.3 forASTM A325 studs 1.4 Shotcrete properties Shotcrete 28 -day unconfined compressive strength - fc := 4000 -psi Initial shotcrete (behind bearing plate) Initial shotcrete thickness -hp :_ 4 -in Facing punching factor- Cp—P := 1.0 6.6.6 eEARMIG vuTe ' ISI SHOTCRETEI --1 I --I I" Secondary shotcrete (in front of bearing plate) Secondary shotcrete thickness - hs := 6 -in Facing punching factor- CP s := 1.0 6.6.6 Calculation by: BZ c,4 Wheat Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 rhs;�hP�- _r_a PRIMARYI- SHOTCRETE _ STUDS BEARING PLATE SECONDARY—I— SHOTCRETE n =I I I—I 1.5 Bearing plate properties Bearing plate yield strength - Fy—bp := 36•ksi Bearing plate side dimension - Lbp := 8 -in Bearing plate thickness - tbp := 0.5 -in Number of studs per bearing plate - nstud := 4 Stud yield strength - Fy—stud := 51000 -psi City of Calculation by: BZ 5 Wheat Rii ge (Ruildina Divison Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Stud shaft diameter- Dsc := 1 -in 2 Stud head diameter- Dsh := 1 -in Nelson standard stud dimensions Shaft A H Diameter 75 No.8 (in.) (in.) (in.) 1/4 0.187 0.5 3/8 0 281 0 75 Stud head thickness - tsh := 0.312 -in 1/2 0.312 1.0 Stud spacing - Sst := 6 -in 5/8 0.312 1.25 Stud length (Lst) available in even inch increment: Stud length (including head) - Lst := 3 -in Studs are mild steel in accordance with ASTM A-108 for 1010-1020 and AWS D1.1 1.6 Soil nail properites Vertical soil nail spacing - SV := 5 -ft Horizontal soil nail spacing - Sh := 10 -ft (maximum in single row sections) Soil nail bar tensile strength - Fy_sn := 75000 -psi Soil nail bar cross-sectional area - Asn := 0.6•in2 Grade 75 Ain^ F ksi No.7 0.60 75 No.8 0.79 75 No.9 1.00 75 No. 10 1.27 75 Grade 150 1" 0.85 150 1-1/4" 1.25 150 Williams Form Hollow bar 32 mm 0.556 85 32X mm 0.776 85 38 mm 1.067 85 51 mm 1.795 85 DSI Hollow bar R32N 0.614 81 R32S 0.756 83 R38N 1.111 78 R51 L 1.203 84 R51 N 1.455 97 Soil nail inclination - an := 15 -deg Effective drill hole diameter- do := 6 -in = 0.5ft Cantilever distance between upper soil nail and top of shotcrete - hcant 2 -ft (maximum) 1.7 Shotcrete reinforcing properties behind bearing plate (initial shotcrete) rimary shotcrete thickness Distance from reinforcing steel to excavation side of shotcrete - he_p:= 2 -in Distance from reinforcing steel to soil side of shotcrete - hs_p := 2 -in Calculation by: BZ city of WhAt Ridge ng Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Table 6.5: Factor Cr Facing Facing Thickness. hi or hf (in.) C. F Initial 4 2.0 Initial 6 1.5 Illltlal S 1.0 Final All 1.0 Facing flexure factor- CFi_p := 2.0 hs_p II _ REINFORCEMENT---``; 1 i- 1 1 `4d BEARING PLATE-- la SHOTCRETE I— he_p Chain link mesh Table 6.5 Number of chain link mesh mats - nc1m_P := 0 From Chain Link Fence Manufacturers Institute Size Gauge Diameter Chain link mesh wire diameter- dW–P := 0.113•in 2n) 6 0.192 2 9 0.148 2 11 0.120 2-1/8 11.5 0.113 City o� Calculation by: BZ Wheat ' se Viding pivison , Brierley Associates La Quinta Inn SNW 516068-000 2 Chain link mesh wire cross-sectional area - AWire_p �'( W2 = 0.01•in2 Chain link mesh size - Sclm_P 12+1 I in (diagonal opening clear span) l 8 Sept. 28, 2018 2 Chain link mesh equivalent vertical wire spacing - Wclm� 21SCIm-p = 3.005 -in Chain link mesh vertical steel area perfoot of wall - As_CIM � AW're p.nclm_p = 0. in 2 W CIM -P ft Chain link mesh yield strength - fy_clm-P • •= 36000P si Welded wire mesh Number of welded wire mesh mats - nW� 0.028 in2/ft for 6x6 - W1.4xW1.4 := 1 0.040 in2/ft for 6x6 - W2.OxW2.0 0.058 in2/ft for 6x6 - W2.9xW2.9 Welded wire mesh yield strength - f := 70000P si 0.080 in2/ft for 6x6 - W4.OxW4.0 y -W -p 0.042 in2/ft for 4x4 - W1.4xW1.4 . 2 0.060 i n2/ft for 4x4 - W2.OxW2.0 Welded wire mesh per unit width - A •= 0.087• In 0.087 in2/ft for 4x4 - W2.9xW2.9 WWm_P ft 0.120 in2/ft for 4x4 - W4.OxW4.0 .2 Total welded wire mesh per unit width - as W -P := nW-P•AWWm_P = 0.087•n ft / Calculation by: BZ or OV 01 1 wMQt"} ip6 Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Vertical bearing bars Number of vertical rebars per soil nail - nrv2 := 0 Rebar yield strength - fY_r_p = 60000 -psi Individual vertical rebar cross-sectional area - Abar v_p 0.2•in2 0.20 in2/ft for No. 4 0.31 in2/ft for No. 5 0.44 in2/ft for No. 6 0.60 in2/ft for No. 7 0.79 in2/ft for No. 8 Vertical rebar cross-sectional area - As rv� Abar v�'nrv� = 0 in 2 Sh ft Horizontal waters Number of horizontal rebars per soil nail - nrh_p := 0 Individual horizontal rebar cross-sectional area -Abar h—P 0.2•in2 0.20 in2/ft for No. 4 0.31 in2/ft for No. 5 0.44 in2/ft for No. 6 0.60 in2/ft for No. 7 0.79 in2/ft for No. 8 Horizontal rebar cross-sectional area - As rhe .—Abar h_p nrh_p _ 0 in 2 SV ft Total steel reinforcement Equivalent WWM cross-sectional area of vertical rebar- Eq. 5.27 A,s_ry _ fy_r� As—ry _ 0 in 2 —p fy—W _P ft Equivalent WWM cross-sectional area of horizontal rebar - Eq. 5.27 _ fy_r� in 2 A s_rh p f -As = 0 ft Y_W_p Equivalent WWM cross-sectional area of chain link mesh - Eq. 5.27 fy_clm—P in `°` s_clm_p f As_clm—P = 0' ft Y_W—P Total WWM equivalent steel area, vertical at midspan - Eq. 5.28 .2 avm_p := as_w_p + A's clm_p = 0.087• m ft Calculation by: BZ Cm ,, 9 4A 1? ._,.n Vivi`on Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Total WWM equivalent steel area, vertical at nail head - Eq. 5.28 .2 m avn_p as w_p + Ass rv_p + A's_clm—P = 0.087. ft Total WWM equivalent steel area, horizontal at midspan - Eq. 5.28 2 ahm_P _ asw_p + A's _rh—P = 0.087. in ft Total WWM equivalent steel area, horizontal at nail head - .2 m ahn_p as w—P + A's,_rh—p = 0.087. ft 1.8 Shotcrete reinforcing properties between studs heads and bearing plate (secondary shotcrete) Oecondary shotcrete thickness - hs 7 6•i Distance from reinforcing steel to excavation side of shotcrete - he s := 3 -in Distance from reinforcing steel to soil side of shotcrete - hs—s := 3 -in Table 6.5: Factor CF Facing Facing Thickness. hi or hf (in.) F Initial 4 2.0 Initial 6 1. Initial 8 1.0 Final All LO Facing flexure factor- CF -s := 1.0 Calculation by: BZ Eq. 5.28 Table 6.5 Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 hs s ; REINFORCEMENT-- AlI i PRIMARY . I- SHOTCRETE STUDS- -- � �° BEARING PLATE SECONDARY - - I_ SHOTCRETE ;`L I ; • ;_ he 9� Chain link mesh Number of chain link mesh mats - nclm s 0 From Chain Link Fence Manufacturers Institute Chain link mesh wire diameter- dw s = 0.113•in Size Gauge Diameter — (in.) (in.) 2 6 0.192 2 9 0.148 2 11 0.120 2-1/8 11.5 0.113 Chain link mesh wire cross-sectional area - 2 Awire_s := r,.(dw_sl = 0.01•in2 2 J City of Calculation by: BZ t Whegt Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Chain link mesh size - (diagonal opening clear span) 1 Sclm_s 12 + 8 in 2 1SCIm s Chain link mesh equivalent vertical wire spacing - Wclm_s 2 2— = 3.005 -in 2 Chain link mesh vertical steel area per foot of wall - As clm s W ire_s CIM—S = 0' ift n CIM—S Chain link mesh yield strength - fy_clm_s 36000 -psi Welded wire mesh Number of welded wire mesh mats - nw s = 1 Welded wire mesh yield strength - fy_w_s := 50000 -psi .2 Welded wire mesh per unit width - AWWm_s := 0.087. in ft Total welded wire mesh per unit width - Calculation by: BZ 0.028 in2/ft for 6x6 - W1.4xW1.4 0.040 i n2/ft for 6x6 - W2.OxW2.0 0.058 in2/ft for 6x6 - W2.9xW2.9 0.080 in2/ft for 6x6 - W4.OxW4.0 0.042 in2/ft for 4x4 - W1.4xW1.4 0.060 in2/ft for 4x4 - W2.OxW2.0 0.087 in2/ft for 4x4 - W2.9xW2.9 0.120 in2/ft for 4x4 - W4.OxW4.0 .2 in as_w_s nw S*Awwm_s = 0.087 ft City of 2° e Wheat F?� .Building Divia�r a% Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Vertical bearing bars Number of vertical rebar per soil nail - nry s = 2 Rebar yield strength - f := 60000 -psi y_r s Individual vertical rebar cross-sectional area - Abar v s 0.2 -in 0.20 in2/ft for No. 4 – – 0.31 in2/ft for No. 5 0.44 in2/ft for No. 6 0.60 in2/ft for No. 7 0.79 in2/ft for No. 8 Vertical rebar cross-sectional area - As ry s Abar_v s'nry s = 0.04• m 2 Sh ft Horizontal walers Number of horizontal rebar per soil nail - nrh s 2 Individual horizontal rebar cross-sectional area -Abar h s 0.2 -in 0.20 in2/ft for No. 4 – – 0.31 in2/ft for No. 5 0.44 in2/ft for No. 6 0.60 in2/ft for No. 7 0.79 in2/ft for No. 8 Horizontal rebar cross-sectional area - As rh s Abar_h s'nrh s _ 0.08.— in 2 SV ft Total steel reinforcement Equivalent WWM cross-sectional area of vertical rebar - Eq. 5.27 fY_r_s Ass ry s = 'As_ry s = 0.048. in 2 fy_v –s – ft Equivalent WWM cross-sectional area of horizontal rebar - Eq. 5.27 fy_r_s in 2 A's rh s f As_rh_s = 0.096• ft y_w_s Equivalent WWM cross-sectional area of chain link mesh - Eq. 5.27 fy clm Sin A's clm s:= f – 'As_clm_s = 0 ft y_w_s Total WWM equivalent steel area, vertical at midspan - Eq. 5.28 Calculation by: BZ .2 in avm s as w s + A's rv_s + A's clin s = 0.13 City of Whe1,A Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Total WWM equivalent steel area, vertical at nail head - Eq. 5.28 .2 avn s as w s + Ass ry s + Ass clm s = 0.135• in ft Total WWM equivalent steel area, horizontal at midspan - .2 ahm s as w s+A's_rh s = 0.183•m — — — ft Total WWM equivalent steel area, horizontal at nail head - .2 ahn s as w s+ A's_rh s= 0.183• in ft 1.9 Shotcrete reinforcing properties for combined initial and secondary shotcrete Distance from reinforcing steel to excavation side of shotcrete - he—c := 3- in Distance from reinforcing steel to soil side of shotcrete - hs c := 7- in Table 6.5: Factor Q F:iClilg Facing Thickness, hi 01' hf (ill.) F Illitial 4 2.0 Initial 6 1.5 Iilitial 8 1.0 Final All 1.0 Facing flexure factor- CF—c := 1.0 Eq. 5.28 Eq. 5.28 Table 6.5 City of Calculation by: BZ ( Wht3At Ridge Brierley Associates La Quinta Inn SNW 516068-000 qhs _ . I . I _ d REINFORCEMENT PRIMARY --"'� � b. ��— I I I- SHOTCRETE _ .r a /. f I I STUDS--- BEARING PLATE-- °Q• SECONDARY SHOTCRETE 2. Internal failure mechanisms 2.1 Facing load ertical soil nailspacing Horizontal soil nailspacing - Sh = loft Maximum soil nail spacing - Smax := max(Sv,Sh) = loft oil nail wall hei ht- H =loft etained soil unitwei ht 7 = 125 pc oulomb active earth pressure coefficient - Ka = 0.217 Average tensile nail force at nail head - To := (0.5•Ka'-y•H + Ka q)•SV•Sh = 6.777 -kip Calculation by: BZ Sept. 28, 2018 5.2.1 c City of Wheaiipidge .Ruildina Dlvison Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 2.2 Soil nail bar tensile capacity T Maximum tensile nail force - Tmax o = 6.783 -kip Eq. 5.1 0.6 + 0.057• Smax 3 ft oil nail bar tensile stren th - oil nail bar cross-sectional area oil nail tensile factor of safety Fy sn = 75•9 Asn = 0.6•in FS, := 1. Check soil nail bartensile capacity (ASD) - Check := "OK" if Fy—sn•Asn Tmax = "OK" FSt "WARNING" otherwise 2.3 Facinq punching primary shotcrete Pacing unchin factor Cpl = 1 Oearinq plate side dimension Primary shotcrete thickness - hp = 4 i PUNCHING SURFACE - BEARING PLATE SHOTCRETE-- " hp j a i—IIII I I I � Equivalent punching diameter- D'c := Lbp+hp = 12. in Calculation by: BZ 6.25"" of ' %ifteat pidge 16 Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 hotcrete 28 -day unconfined compressive stren th - fc = 4000psi Nominal punching shear resistance - Eqs. 6.20 and 6.21 fc psi D'c h RFP := 0.58•kip psi •�•—ft • ft p•Cp-p = 38.414 -kip vera a tensile nail force at nail head - To = 6.777 ki racinq punchingfactor of safety FSfp = 1.5 Check punching capacity (ASD),Check :_ "OK" if S P >_ To = "OK" FS otherwise 2.4 Facing punching secondary shotcrete Not used because primary shotcrete is part of the permanent facing, see 2.5 for combined punching 2.5 Facing punching combined primary and secondary shotcrete racing unchin factor Cps = 1 tud spacing FT -7-6. i Primary shotcrete thickness - �econdary shotcrete thickness - hs = 6•i Combined shotcrete thickness - he := hp + hs = 10•in City of v",eat Ridge Calculation by: BZ 17 Building Divisor Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 i� hs -1 hp -T— PRIMARYI— SHOTCRETE ff 1 PUNCHING SURFACE - - L-11 r � STUDS TIS BEARING PLATE SECONDARY--' ; .• � ;,, SHOTCRETE �r/� �! -he Oearing plate thickness tbp = 0.5•i tud head thickness tSh = 0.312 i tud length includin head]- IL,t = 3•i l i I-�Dsih-1 City of Wheat Ridge Calculation by: BZ 18 Building Divison, Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Effective depth of conical punching surface - h,, := Lst + tbp — tsh + hp = 7.188• in Equivalent punching diameter- Dc := min( Sst+hc,2•hc) = 13.188•in Nominal punching shear resistance - Eq. 6.24 Eqs. 6.20 and 6.21 fc•psi D'c he R,Ff, := 0.58 -kip. -7r---CP s = 75.863 -kip psi ft ft — vera a tensile nail force at nail head - To = 6.777 ki racing punching factor of safety FS fp = 1.5 Check punching capacity (ASD) Check := 2.6 Facing flexure, primary shotcrete "GK" if �srPn" � To = "OK" c "WARNING" otherwise hotcrete 28 -day unconfined compressive strenqthl- Primary shotcrete thickness - hp = 4 i istance from reinforcing steel to excavation side of shotcrete - hem 7;7i i istance from reinforcing steel to soil side of shotcrete City of uVheat Ridge Calculation by: BZ (19 Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 hs �T� i f REINFORCEMENT-- '1 F1 vI I — BEARING PLATE- SHOTCRETE - Welded wire mesh yield stren th w� = 70000psi fy Vertical bending resistance, midspan - mvm •= avTnfY_w-p hs_p - avm-p fy_w- = 0.977. SiE± 1.7•fc ) ft Vertical bending resistance, nail head - mvn avn_p' fy_w-p' he_ - avn_p' fy_w-p = 0.977. kip• ft 1.7•fc ft Calculation by: BZ Eq. 6.9 Eq. 6.10 City of V,Iheat Wdge `Building Divison, .2 otal WWM equivalent steel area vertical at mids a - avm_p = 0.087• in ft 2 otal WWM equivalent steel area vertical at nail hea - avn_p = 0.087•'n ft .2 otal WWM equivalent steel area horizontal at mids a - ahm_p = 0.087•'n ft .2 otal WWM equivalent steel area horizontal at nail hea - ahn_p = 0.087• in ft Vertical bending resistance, midspan - mvm •= avTnfY_w-p hs_p - avm-p fy_w- = 0.977. SiE± 1.7•fc ) ft Vertical bending resistance, nail head - mvn avn_p' fy_w-p' he_ - avn_p' fy_w-p = 0.977. kip• ft 1.7•fc ft Calculation by: BZ Eq. 6.9 Eq. 6.10 City of V,Iheat Wdge `Building Divison, Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Horizontal bending resistance, midspan - Eq. 6.11 mhm ahm�i fy_w�' hs_p — ahm� f y—w� = 0.977. kip• ft 1.7•fc ft Horizontal bending resistance, nail head - Eq. 6.12 mhn ahn_p' fy_w,' hem — ahn�' fy w� = 0.977. kip• ft 1.7•fc ft acing flexure factor C = 2.0 Nominal bending resistance - Eq. 6.13 and 6.14 R :=min C m +m •8•Sh C m +m 8•Sv = 15.634. kip. FF Fid (vm vn) S , Fid (hm hn) S ft V h vera a tensile nail force at nail head - To = 6.777 ki Pacinq flexure factor of safe FSff = 1.5 Check flexure capacity (ASD) - Ckeck :_ "OK" if RFF > To = "OK" FSff "WARNING" otherwise Vertical bearing bar length - LV := 0.6• SV = 3 ft 6.6.5 a 3 2 Ka'ry•hcant Ka'q'hcant kip -ft Flexure due to upper cantilever - Fcant 6 + 2 = 0.036• ft Check flexure capacity (ASD) - Ckeck :_ "OK" if RFF > Fcant = "OK" FSff "WARNING" otherwise 2.7 Facing flexure, secondary shotcrete Not used because primary shotcrete is part of the permanent facing, see 2.5 for combined punching 2.8 Facing flexure, combined shotcrete hotcrete 28 -day unconfined compressive strenqthl- Primary shotcrete thickness - hp = 4•i Calculation by: BZ ��+ty o� V'u 21i • r rig Divisors/ Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 ISecondary shotcrete thickness - istance from reinforcing steel to excavation side of shotcrete - istance from reinforcing steel to soil side of shotcrete ihs s1 J REINFORCEMENT - -- PRIMARY SHOTCRETEI— �,��--�--�----�-�� STUDS-----anr,?xrt%`i. BEARING PLATE ----t SECONDARY C I— SHOTCRETE Welded wire mesh yield strength fy w s = 50000p—Si Vertical bending resistance, midspan - Eq. 6.9 avm_s' fy_w_s kip• ft avm—s �—�'—s hs —c 1.7•fc = 3.891• ft City of Calculation by: BZ (1vvheatj2jdge .2 otal WWM equivalent steel area vertical at mids a - avm s = 0.135• In — ft 2 otal WWM equivalent steel area vertical at nail hea - avn s = 0.135•'n — ft .2 otal WWM equivalent steel area horizontal at mids a in - ahm s = 0.183• — ft . 2 otal WWM equivalent steel area horizontal at nail hea - ahn s = 0.183•n2 — ft Vertical bending resistance, midspan - Eq. 6.9 avm_s' fy_w_s kip• ft avm—s �—�'—s hs —c 1.7•fc = 3.891• ft City of Calculation by: BZ (1vvheatj2jdge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Vertical bending resistance, nail head - Eq. 6.10 f h _ avn_s' fy_w_s = 1.641. kip• ft n — avn—s y—�—s e—c 1.7• fc ft Horizontal bending resistance, midspan - Eq. 6.11 ahm_s' fy_w_s kip ft mho:= ahm—s fyws hs —c 1.7•fc = 5.252 ft Horizontal bending resistance, nail head - Eq. 6.12 ahn_s' fy_w_s kip• ft m�hrr, ahn_s'fy_w_s' he c— = 2.202• — 1.7•fc ft racing flexure factor FC = 1.0 Nominal bending resistance - Eq. 6.13 and 6.14 K= min C (m + m ) 8 Sh C — (m + m ) 8 Sv = 29.816• kip. ft F, F s vm vn S F s' hm hn ' S ft V h vera a tensile nail force at nail head - To = 6.777 ki racinq flexure factor of safe FSff = 1.5 Check flexure capacity (ASD) - Check :_ "OK" if RFF > To = "OK" FSff "WARNING" otherwise Vertical bearing bar length - Lv := 0.6•Sv = 36 -in 6.6.5 a 3 2 Flexure due to upper cantilever -;= Ka'7'hcant + Ka'9'hcant = 0.036• kip. ft 6 2 ft Check flexure capacity (ASD) - "OK" if RFF > Fcant = "OK" FSff "WARNING" otherwise 2.9 Minimum reinforcement ratios Combined shotcrete hotcrete 28 -day unconfined compressive strength - fc = 4000psi City ai Calculation by: BZ (Vv ieat Ri ag, e Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Primary shotcrete thickness - 1hr, = 4•i �econdary shotcrete thickness - 2.10 Bearing plate Number of studs tud yield stren th nstud = 4 Fy_stud = 51000psi tud shaft diameter tud head diameter Dsh = 1 i Calculation by: BZ alfa=,'tit )x;24 Divisor, .2 otal WWM equivalent steel area vertical at mids a - avm s = 0.135• in — ft 2 otal WWM equivalent steel area vertical at nail hea - i avn s = 0.135• n — ft .2 otal WWM equivalent steel area horizontal at mids a - ahm s = 0.183 in ft .2 otal WWM equivalent steel area horizontal at nail hea - ahn s = 0.183 in — ft Reinforcement ratio (%) - pvm := a`m s + avm.2• 100 = 0.5- (hs + hp) 0.37 Eq. 6.6 Reinforcement ratio(%) - p — avn_s + a` n_p • 100 = 0.37 vn'— 0.5•(hs+hP) Eq. 6.6 Reinforcement ratio (%) - P .— — ahm s + ahm 2. 100 = hm '0.5•(hs + hp) 0.45 Eq. 6.6 Reinforcement ratio (%) - Phn .= ahn_s + ahn_ 100 = 0.45 0.5•(hs + hp) Eq. 6.6 f�•psi Minimum reinforcement ratio (%) - pmin := 0.24• psi = 0.253 Eq. 5.51 in previous GEC 7 fy_r s ksi Check minimum reinforcement - Check := "OK" if min(pvm,pvn,Phm>phn) > pmin = "OK" ""WARNING" I otherwise 2.10 Bearing plate Number of studs tud yield stren th nstud = 4 Fy_stud = 51000psi tud shaft diameter tud head diameter Dsh = 1 i Calculation by: BZ alfa=,'tit )x;24 Divisor, Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 tud head thickness tsh = 0.312 i tud tension factor of safe FSst = 2 2 Cross-sectional area of stud shaft- AS :_ Tr.rDscl = 0.196•in2 I\ 2 Nominal headed stud tensile strength - RFH := nstud'AS' Fy_stud = 40.055•kip Eq. 6.26 Check stud tensile capacity (ASD) -"OK" i f RFH � To = .,OK.. FSst "WARNING" otherwise 2 Cross-sectional area of stud head - AH :_ 7T•(2h) = 0.785•in2 Verify sufficient cross-sectional area of headed stud - Check :_ "OK" if AH >_ 2.5•AS = "OK" Eq. 6.28 "WARNING" otherwise C Dsh — Dsc — ec, OK if tsh — "OK" Eq. 6.29 "WARNING" otherwise Bearing plate design is based on numerical finite element model using the RISA 3D structural design software. By symmetry, the model consists of one quarter of the actural bearing plate, with one -dimension fixed boundary conditions representing the planes of symmetry in the full body. The other boundary conditions are full fixity around the edge of the center hole and one-dimensional fixit. in the Z direction for all nodes representing the washer footprint. lBearing plate yield strength lBearing plate side dimension - Oearing plate thickness - Itbp = 0.5 i vera a tensile nail force at nail head - To = 6.777 ki 1Equivalent punching diamete - D'c = 13.188•i T Bearing plate effective load - P — o = 7.144•ksf (Applied pressure in RISA by (D' cl2 numerical model) \ 2) 1110 e,Oy o) Calculation by: BZ Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Maximum bearing plate deformation - Sbp := 0.001•in Maximum bearing plate stress (Von Mises) - (Tvm max 3.2•ksi Vacing punchingfactor of safety FSfp= 1.5 (from RISA output) F b ""RCheck punching capacity (ASD) - Check :_ "OK" if Qvm max < FS fp = "OK" "WARNING" otherwise Allowable stress in bearing plate - Qbp all Fy by = 24000psi FS fp Maximum allowable surface load to bearing plate - 6bp := 120•psi (from RISA FEM analysis, output shown below) Maximum bearing plate deformation - 5.�:= 0.015•in RISA 1/4 bearing plate FEM model, 1/2" thick, mesh with boundary conditions Calculation by: BZ city cit wheaLP'idOe Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Model View O E3 ai -M i¢i -• ,Li1 �• �` <� W 0 ❑ 0 Results for LC 1, 1 - - RISA 1/4 bearing plate FEM model, 1/2" thick, deformed mesh (x100) -i(v Of Calculation by: BZ Riaje Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 0 Model View Results for LC 1.1 � Irl pi.b Vcn Ml—Top ka LCI) 1,12,9 20.E 19.3 11 197 11 s B.1 E.9 <.! 2.2 .1 RISA 1/4 bearing plate FEM model, 1/2" thick, Von Mises stresses (ksi) Calculation by: BZ Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 I s hp- 0 PRIMARY SHOTCRETE PUNCHING SURFACEI- ' ° _ III III III STUDS�� BEARING PLATE 4 d' -II I III _`4 ,+ d - CLOSURE II POUR he D, 2 Bearing plate allowable load - Pbp_all :_ "bp' (2c) ''r - Asn = 16.32 -kip Check punching capacity (ASD) - Check :_ "OK" if To < Pbp_all = "OK" "WARNING" otherwise I External failure mechanisms 3.1 Basal heave Not used due to firm foundation 3.2 Sliding Not used due to firm foundation (5.7.3a) 4. Global stability ertical soil nails acin Horizontal soil nailspacing -Sh = lOft oil nail bar tensile stren th - Fy sn = 75000 psi City y ot. Wheat &rd Calculation by: BZ g,,;, , Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 oil nail bar cross-sectional area Asn = 0.6 in etained soil unit wei ht ry = 125•pc retained soil friction angle = 34•de etained soil cohesion c =0 ps etained soil ultimate bond stren th 9ult = 8psi oil nail inclination F%-= 15•de ffective drill hole diameter- Pullout factor of safely FSpo = 2 oil nail tensile factor of safetyFSt = 1.8 ft Nominal bendinq resistance RFF = 29.816• kip. lt ft Nominal punching shear resistance - RFp = 75.863•ki racing flexure factor of safety FS f := 1. racing punching factor of safe FSS := 1. Soil nail allowable load distribution Pull out capacity Allowable pullout strength - Q 9ult 4 si FSpo P Allowable pullout load per unit length of nail - := Q•-rr•dn = 0.905• kip ft Nail tensile capacity Nail bar yield - Tnail := Fy_ . sn•Asn = 450001bf Allowable nail tension - TNL := FFSt Asn = 25 -kip FSt 15 -ft lonq soil nail Soil nail length - L:= 15•ft ,. Cit Calculation by: BZ W1) -ari. 8uik�ing Divi��;, Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 �RFF RFP Allowable nail head strength - Tfn := min = 19.877 -kip FS ff FS fp Nail length - X:= 0,0.01•m.. L Facing - Facing(X) :_ Tfn + X'9 Sh Nail yield - Yield := TNL Pullout - Pullout(x) := 9 L — 9 X Sh Sh Allowable Load Distribution / ft of Wall 1x104 9x 103 8x103 7x103 6x 103 Sx 103 4x103 � 3x103 2x103--------------- -------------• -- O 1x103 0 1.5 3 4.5 6 7.5 9 10.5 12 13.5 15 Distance from nail head (ft) Pullout ----- Facing — - Yield Global stability Calculation by: BZ C JtYOf Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Minimum required permanent global factor of safety FSg1p = 1.35 Minimum required temporary lobal factor of safe - FSgI t = 1.3 Temporary (to bottom of shotcrete with short-term soil properties) and permanent (bottom of wall at final grade with long-term soil properties) global stabilities are checked for each design section (seismic is checked below). All stability calculations are performed using the Spencer method of slices. The soil nail lengths in all analyses are reduced 6 in. from the specified lengths to account for end hardware and tails. City of Calculation by: BZ y (Wheat Ridge Global Stability Limit Equilibrium Analysis Performed with SlopeW software Single soil nail row, temporary over -excavation Soil nails: : : : : : " ..... : No. 7 Gr 75 " " 2. 1i, . " " ' .... ........ 5'x5' spacing ' ' ' ' • ' ' ' • ' .... ......... • ' ` . ' • 6" drill hole.... ... ..... Name: Bedrock 8 psi ultimate bond strength ; ; ; ; ; ; Unit Weight: 150 pcf • • • Cohesion': 1,000 psf 30 250 psf surcharge :: .... ; ... ; ; Phi _ 28 20 .......... Name: Clayey sand 10 loft Unit Weight: 125 pcf 0 Cohesion': 0 psf -10 Phi': 34 ° -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 (ft) City of Calculation by: BZ y (Wheat Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 30 20 10 0 Global Stability Limit Equilibrium Analysis Performed with SlopeW software Global Stability Limit Equilibrium Analysis Two soil nail rows, long-term Performed with SlopeW software Soil nails: Single soil nail row, long-term Soil nails: • • • • .... • • • • • • •• • .......... No. 7Gr75 •• 5'x5'spacing •'•• 6" drill hole • ' • • •••••••••• •••••••••• ` ' • • • • • • • • Name: Bedrock Unit Weight: 150 pcf 8 psi ultimate bond strength ; ; ; ; ; ; ; ; ; ; ; ; ; Unit Weight: 150 pcf Phi': 28 ° ' Cohesion': 1,000 psf • . 250 surchargb :. a'05 ; ... • . • :: :.... Phi': 28 ° 20 psf . .19 . . .. . . . ultimate bond strength250 0,2,192 1101 psi Name: Clayey sand 10 loft Unit Weight: 125 pcf 0 Cohesion': 0 psf 1 Phi': 34 ° -101 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 (ft) 30 20 10 0 Global Stability Limit Equilibrium Analysis Performed with SlopeW software Two soil nail rows, long-term Soil nails: No. 7 Gr 75 Name: Bedrock Unit Weight: 150 pcf Cohesion': 1,000 psf 5'x5' spacing Phi': 28 ° 6" drill hole8 ultimate bond strength250 0,2,192 psi psf surchargir : -10 -70 -60 -50 -40 -30 -20 -10 0 loft 10 20 30 40 50 60 70 80 90 100 110 120 (ft) Name: Clayey sand Unit Weight: 125 pcf Cohesion': 0 psf Phi': 34 ° City of Calculation by: BZ 33 Wheat Ridge Name: Bedrock Unit Weight: 150 pcf Cohesion': 1,000 psf Phi': 28 ° 10 20 30 40 50 60 70 80 90 100 110 120 (ft) Name: Clayey sand Unit Weight: 125 pcf Cohesion': 0 psf Phi': 34 ° City of Calculation by: BZ 33 Wheat Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Global Stability Limit Equilibrium Analysis Performed with SlopeW software Two soil nail rows, temporary over -excavation Soil nails: No. 7 Gr 75 5'x5' spacing 6" drill hole 8 psi ultimate bond strenath Name: Bedrock Unit Weight: 150 pcf Cohesion': 1,000 psf 30 iiiii: MP hi': 28 20 250 psf s rc rg s S .99 •••�=� Name: Clayey sand 10 10•f • _ _ _ _ Unit Weight: 125 pcf 0 Cohesion': 0 psf -10 Phi': 34 ° -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 (ft) Calculation by: BZ 1 Wheat Ridge Global Stability Limit Equilibrium Analysis Performed with SlopeW software Northwest corner, temporary over -excavation Soil nails: No. 7 Gr 75 5'x5' spacing .... . . .... 6"drill hole •••• ••••••••• • • • • • • • • • Name: Bedrock 8 psi ultimate bond strength • • .... .. ...... Unit Weight: 150 pcf • • • • • • ' • • .... ....... .... Cohesion': 1,000 psf ' .... ... Phi': 28 250 f rc r • ::::: 20 ...... • • • • • • 13 ft` ' ' ' ' Name: Clayey sand +� 10 loft Unit Weight: 125 pcf o Cohesion': 0 psf -10 Phi': 34 ° -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 (ft) City of Calculation by: BZ 1 Wheat Ridge Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Global Stability Limit Equilibrium Analysis Performed with SlopeW software Northwest corner, long-term Soil nails: No. 7 Gr 75 5'x5' spacing 6"drill hole •••••• 8 psi ultimate bond strength ' ... . ...... .... ....... Name: Bedrock Unit Weight: 150 pcf Cohesion': 1,000 psf 30 250 :::: fs rc r •• 14::::: ; : Phi': 28 ° 201— ;;;;;;; 1::::::: Name: Clayey sand 10 loft, Unit Weight: 125 pcf 0 Cohesion': 0 psf -10 Phi': 34 ° -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 (ft) Minimum permanent global factor of safety - FSgI_min_p1.99 Check :_ "OK" if FSgl_min_p > FSgI_p _ "OK" "WARNING" otherwise Minimum temporary shoring global factor of safety - FSg1 mint 1.32 Check :_ "OK" if FSgI_min_t > FSgI_t = "OK" "WARNING" otherwise 5. Seismic stability 5.1 Pseudo -static seismic coefficient Peak ground acceleration coefficient- PGA := 0.06 AASHTO Fig. 3.10. City of Calculation by: BZ (8..tiding eat i,_ J Div sz Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Horizontal Response Spectral Acceleration coefficient- S1 := 0.033 Thickness of soil layer- dl := 20•ft Thickness of weathered bedrock layer- d2:=5 -ft Thickness of bedrock layer - d3 := 100•ft — dl — d2 = 75 ft Average blow counts in ground layer one - N1 := 15 Average blow counts in ground layer one - N2 := 30 Average blowcounts in ground layerthree - N3 := 100 dl+d2+d3 Average SPT overtop 100 ft- Nbar = 44 dl d2 d3 NI N2 N3 Site Class = D, Stiff soil AASHTO Fig. 3.10.2.1-3 Eq. 4.2 Table 4.8 Site adjustment factors - Fpga = 1.6 Table 4.9 FV := 2.4 Table 4.10 Design peak ground accleration - PGAD := Fpga•PGA = 0.096 Eq. 4.3 Design site -corrected response acceleration - SID := FV•SI = 0.079 Eq. 4.4 Seismic Zone - SZ :_ "Seismic Zone 1" if SID <— 0.15 = "Seismic Zone I" 6.8.1 "Seismic Zone 2" if SID > 0.15 A SID <— 0.30 "Seismic Zone 3" if SID > 0.30 A SID :5 0.50 "Seismic Zone 4+" otherwise Maximum seismic coefficient - kmax := PGAD = 0.096 Eq. 6.31 SID = leis 0.825 Eq. 6.34 14nax Wall height adjustment factor - aseis := 1 + 0.01 • Hft (0.5.Oseis — 1) = 0.941 Eq. 6.34 Modified seismic coefficient - khl := kmax•Oxseis = 0.09 Eq. 6. City of Wheat P,,ir­�� Calculation by: BZ 36 (uildingD1,, Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Ductility reduction factor- r := 0.5 6.8.3 Modified seismic coefficient - kh2 := r•khl = 0.045 ertical soil nailspacing - jSv = Sft Horizontal soil nails acin - Sh = lOft oil nail bar tensile stren th - Fy sn = 75000psi oil nail barcross-sectional area Asn = 0.6 in etained soil unit wei ht -y = 125 pc etained soil friction an le = 34 de etained soil cohesion c = 0 ps etained soil ultimate bond strength - I9ult = 8psi oil nail inclination on = 15 de ffective drill hole diameter- Pullout factor o—Ts—a—f—e—ty---7 FSpo_seis = 1.5 oil nail tensile factor of safety-- FSt seis = 1.35 Nominal bending resistance - EEH 816. kip•ft ft Nominal punching shear resistance - RFp = 75.863•ki racing flexure factor of safety= FSff seis racing punching factor of safe - FSfp seis = 1.1 tud tension - FSst seis = 1.5 Soil nail allowable load distribution Pull out capacity City o+ Calculation by: BZ Vi/h�a3 �e Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Allowable pullout strength - Q := 9ult = 5.333 psi FSpo_seis Allowable pullout load per unit length of nail - q:= Q•7r•dn = 1.206• kip ft Nail tensile capacity Allowable nail yield load - T�1L := Fy sn Asn = 33.333 kip FSt seis 15 -ft long soil nail (includes 6" tail) Soil nail length -, := 15 -ft Allowable nail head strength - Tom,:= min RFF RFP = 27.105 -kip FSff seis FSfp_seis Nail length - X:= 0,0.01•m.. L Facing - Facwin(J.) :_ Tfn+X'9 Sh Nail yield - Yield := TNL Pullout - Pullout(>,) := L — q Sh Sh Calculation by: BZ City o; F Wh e,% F,,` s Building Di�ris Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Allowable Load Distribution / ft of Wall 1.5x 104 1.35x104 1.2x104 1.05x 104 bA y 9x 103 7.5x 103 6x 103 a� 4.5x103 - --------------- --- Cz 3x 103 __----- Q 1.5-10 0 2 4 6 8 10 12 14 16 18 20 Distance from nail head (ft) — Pullout ------ Facing — - Yield 5.2 Global stability with seismic load lobal - FSgI_seis_min = 1.10 Global Stability Limit Equilibrium Analysis Performed with SlopeW software Northwest corner, long-term Pseudo -static seismic analysis Design seismic coefficient = 0.045 Soil nails: No. 7 Gr 75 5'x5' spacing ... .. ..... 6" drill hole • : • ' ' ` :: " Name: Bedrock .. 8 psi ultimate bond strength ; ; ; Unit Weight: 150 pcf • :::::: Cohesion': 1,000 psf ... .04 30 250 f s rc r • • ' Phi': 28 ° 20 ....... 10 Name: Clayey sand loft Unit Weight: 125 pcf 0 Cohesion': 0 psf -10Phi': 34 ° -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 (ft) Calculation by: BZ City Of �hoat�'d9e Brierley Associates La Quinta Inn SNW Sept. 28, 2018 516068-000 Minimum global factor of safety - FSg1 seis 2.04 Check :_ "OK" if FSgl_seis > FSgl—seis_min = "OK" "WARNING" otherwise 6. Estimated wall deformation Table 5.12: Values of (Sh[H)t and C as Functions of Soil Conditions Variable «eathered Rock and Stiff Soil Sandi Soil Fine -Grained Soil Oh H)i 1 1000 1 ;00 1 333 C 0.8 1.2; 1. Note:'Modified from Clowerre (1990 and Bwlie et al. (1998). Estimated horizontal deflection and settlement at top of wall - b;= H = 0.36•in Table 5.12 333 Settlement extent coefficient - C := 1.5 Table 5.12 Estimated horizontal extent of settlement behind wall -Ddef C•(1 — tan(a))•H = 14ft Eq. 5-31 City of Calculation by: BZ Wheat Mge (Building Divison, 1.0 SOIL NAIL WALL MATERIALS 1.1 SOIL NAIL BARS CONSIST OF GRADE 75 NO. 7 SOLID THREAD BAR IN ACCORDANCE WITH ASTM A-615. BARS SHALL BE EITHER HOP -DIP GALVANIZED IN ACCORDANCE WITH ASTM A 1060 OR EPDXY-COATED IN ACCORDANCE WITH ASTM A 884. 1.2 WELDED WIRE MESH REINFORCEMENT SHALL BE IN ACCORDANCE WITH ASTM A-1064. WELDED WIRE MESH MAY BE UNCOATED 1.3 GROUT - GROUT MAY BE NEAT -CEMENT OR WITH SAND, WITH TYPE I, II OR III CEMENT IN ACCORDANCE WITH A5TM C-150. WATER -CEMENT RATIO SHOULD BE BETWEEN 0.4 AND 0.6 BY WEIGHT. F'C=3,000 P51 MINIMUM (28 -DAY STRENGTH) 1.4 END HARDWARE - NUTS AND WASHERS SHALL BE IN ACCORDANCE WITH SOIL NAIL MANUFACTURER'S RECOMMENDATIONS. EITHER HEX NUTS WITH BEVELED WASHERS OR DOMED NUTS WITHOUT WASHERS MAY BE USED. BEARING PLATES SHALL BE IN ACCORDANCE WITH ASTM A-36. END HARDWARE SHALL BE EITHER HOP -DIP GALVANIZED IN ACCORDANCE WITH A5TM A 1060 OR EPDXY-COATED IN ACCORDANCE WITH ASTM A 884. 1.5 SHOTCRETE - SHOTCRETE MIX SHALL CONSIST OF TYPE I, II OR III CEMENT IN ACCORDANCE WITH ASTM C-150, POTABLE WATER AND NORMAL WEIGHT AGGREGATE IN ACCORDANCE WITH ASTM C-33. FLYASH, IF USED, SHALL BE TYPE C OR F AND CONFORM TO ASTM C-6113. ADMIXTURES, IF USED, SHALL BE NON -CORROSIVE TO STEEL AND IN CONFORMANCE TO ASTM C-1141. AIR ENTRAINMENT 15 NOT REQUIRED. f'c=4,000 PSI (28 -DAY STRENGTH). 2.0 SOIL NAIL WALL CONSTRUCTION SEQUENCE 2.1 INSTALL AND TEST TWO 10' VERIFICATION TEST NAILS. 2.2 EXCAVATE THE FIRST LIFT AND INSTALL SOIL NAILS AS SHOWN. THE MAXIMUM TEMPORARILY UNSUPPORTED EXCAVATION DEPTH 15 0. SOIL NAIL LOCATIONS SHOWN ON THE ELEVATION DRAWING ARE APPROXIMATE. LEAVE TEMPORARY UNGROUTED LENGTHS ON AT LEAST 5% OF THE NAILS FOR PROOF TESTING AS SHOWN. PERFORM PROOF TESTS AS SHOWN. TOP OFF GROUT IN PROOF -TESTED NAILS. 2.3 INSTALL STRIP DRAINS BETWEEN EVERY OTHER NAIL COLUMN (10' HORIZONTAL SPACING). STRIP DRAINS SHOULD START APPROXIMATELY 2' BELOW THE TOP OF THE WALL AND SHOULD BE COMPLETED TO THE UNDERDRAIN AT THE BOTTOM OF THE WALL. 2.4 INSTALL WELDED WIRE MESH AS SHOWN ON THE DRAWINGS. USE SPACERS TO HOLD THE WELDED WIRE MESH AWAY FROM THE SOIL AS NECESSARY. OVERLAP WELDED WIRE MESH PANELS BY TWO GRIDS MINIMUM. 2.5 INSTALL PRIMARY AND SECONDARY SHOTCRETE AS SHOWN. FILL BIRDS' BEAKS WITH SHOTCRETE. WET SET BEARING PLATES IN PRIMARY SHOTCRETE BY EITHER HAND TIGHTENING NUTS OR SHOOTING BEHIND THE BEARING PLATES. 2.6 REPEAT PROCESS IN NEXT LIFT. 2.7 NOT USED. 2.8 THE SHOTCRETE FACING SHOULD BE EXPECTED TO MOVE UP TO 3/8" HORIZONTALLY AT THE TOP OF THE SOIL NAIL WALL. IF FACING MOVEMENT EXCEEDS THIS DISTANCE, BRIERLEY ASSOCIATES SHOULD BE NOTIFIED IMMEDIATELY. 2.9 QUALITY CONTROL IN ADDITION TO PULL TESTING 2.9.1 5HOTCRETE PANELS - ONE SHOTCRETE TEST PANEL SHALL BE PRODUCED IN EACH LIFT. SHOTCRETE TEST PANELS SHALL BE PRODUCED IN ACCORDANCE WITH A5TM C1140. TEST 5HOTCRETE CORES FOR COMPRESSIVE STRENGTH AT 7 AND 28 DAYS IN ACCORDANCE WITH ASTM C-39. 2.q.2 GROUT TESTING - AT LEAST ONE GROUT SAMPLE SHALL BE COLLECTED AND TESTED IN ACCORDANCE WITH A5TI'1 CIOCI. 2.q.3 HOT WEATHER SHOTCRETING - SHOTCRETE SHALL BE PLACED WHEN THE MATERIAL TEMPERATURE IS BETWEEN 50'F AND 90'F. IF AIR TEMPERATURE IS ABOVE q0'F AND RELATIVE HUMIDITY IS BELOW 10%, PROTECT SHOTCRETE WITH PLASTIC SHEETING FOR AT LEAST 4 DAYS, OTHERWISE NATURAL CURING MAY BE USED. 2.q.4 COLD WEATHER SHOTCRETING 2.9.4.1 THE GROUND ON WHICH 5HOTGRETE 15 TO BE PLACED SHALL NOT HAVE VISIBLE ICE, FROST, OR SNOW ON THE SURFACE, 2.q.4.2 THE MINIMUM SHOTCRETE TEMPERATURE AT THE PUMP SHALL BE 50' F. 2.9.4.3 DO NOT INSTALL SHOTCRETE IF THE ANTICIPATED AMBIENT AIR TEMPERATURE DURING INSTALLATION AND CURING TO AT LEAST 500 PSI COMPRESSIVE STRENGTH 15 EXPECTED TO BE LESS THAN 35' F. IF INSTALLATION AT LOWER TEMPERATURES 15 REQUIRED, BRIERLEY ASSOCIATES SHALL BE NOTIFIED AND WILL PROVIDED MINIMUM COLD WEATHER 5HOTCRETING PROCEDURES. 2.10 TOLERANCES / HORIZONTAL. LOCATION OF WELDED WIRE MESH - X2" LOCATION OF SOIL NAILS IN PLANE OF WALL - 6" SOIL NAIL VERTICAL AND HORIZONTAL ANGLE - t5' PLANENESS OF SECONDARY SHOTCRETE FACE UNDER 10' STRAIGHT EDGE - 1-1/8" SOIL NAIL WALL SHEET INDEX SNW-I GENERAL NOTES SNW-2 PLAN 5NW-3 ELEVATION SNW-4 SECTION A SNW-5 SECTION B SNW-6 DETAILS SNW-7 TESTING SNW-8 STEEL RAIL BY OTHERS raapr+ r 37230 ` 3.0 SOIL NAIL WALL DESIGN PARAMETERS 3.1 THE SOIL NAILS HAVE BEEN DESIGNED IN GENERAL ACCORDANCE WITH PROCEDURES CONTAINED IN THE FHWA "SOIL NAILS REFERENCE MANUAL, GEOTECHNICAL ENGINEERING CIRCULAR 7", REPORT NO. FHWA-NHI-14-007, FEBRUARY 2015. 3.2 THE FOLLOWING VALUES HAVE BEEN ASSUMED FOR SOIL DESIGN PARAMETERS: FRICTION ANGLE W COHESION c UNIT WEIGHT kwWGEOfi(DEG) (PSF) (PCF) mPance hY r 14, CLAYEY SAND 34 0 125 qty of Wheat F*dge Planning Oivisiott , 3.3 BEA NOTIF EDRIMMEDIATELLY IAND THE SOILNNAIL WALLE EMAY NEED DIFFR FROM HTO BEEPRE-DESIGGNEEDD, �fl�i I4SCRETION OF BRIERIATESEYH ASSOCIATES. 3.4 MINIMUM FACTORS OF SAFETY AND STRENGTH FACTORS MINIMUM GLOBAL STABILITY - F5g1=1.35 (PER TABLE 6.1, NOTE 2) PULLOUT - FSpo=2.0 NAIL YIELD REDUCTION FACTOR - F5t=1.8 _���� lI FACING FLEXURE FACTOR - F5ff=1.5 DATE: FACING PUNCHING FACTOR - FSfp=1.5 3.5 THE GROUNDWATER TABLE 15 ASSUMED TO BE BELOW THE BOTTOM OF THE SOILC IL�ALt: 4.0 SPECIAL PROVISIONS 4.1 NOT USED. 4.2 THIS DESIGN 15 VALID ONLY FOR THIS SITE AND IS TO BE CONSTRUCTED BY SUBTERRA GEOTECHNICAL SOLUTIONS ONLY. 4.3 THIS SOIL NAIL WALL DESIGN 15 VALID ONLY FOR MOIST RETAINED SOIL. IF SURFACE WATER OR GROUNDWATER IS ENCOUNTERED DURING EXCAVATION OR SOIL NAIL INSTALLATION ABOVE THE BOTTOM OF THE WALL, AND 15 NOT CONTROLLED BY THE STRIP DRAINS OR OTHER DEWATERING MEASURES, BRIERLEY ASSOCIATES SHOULD BE NOTIFIED IMMEDIATELY AND THE WALL MAY BE REDESIGNED AT THE DISCRETION OF BRIERLEY ASSOCIATES. 4.4 OTHERS ARE RESPONSIBLE FOR THE FOLLOWING: 4.4,IFIELD LOCATING ALL NEARBY UTILITIES. CONFLICTING UTILITIES MAY REQUIRE REDESIGN, AT THE DISCRETION OF BRIERLEY ASSOCIATES. 4.4.2 OBTAINING ANY NECESSARY PERMITS AND/OR EASEMENTS. 4.4.3 QUALITY CONTROL, QUALITY ASSURANCE AND CHANGED CONDITIONS. 4.4.4 PROBLEMS RESULTING FROM IMPROPER CONSTRUCTION TECHNIQUES. 4.4.5 LAYOUT AND SURVEYING. 4.5 BRIERLEY ASSOCIATES 15 NOT RESPONSIBLE FOR CONSTRUCTION SITE SAFETY. THIS INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING: 4.5.1 FALL PROTECTION. THE WALL HAS BEEN DESIGNED FOR GENERAL EXCAVATION STABILITY, IT IS THE CONTRACTOR'S RESPONSIBILITY TO EVALUATE THE SAFETY OF THE EXCAVATION AS RELATED TO FALL PROTECTION AND TO IMPLEMENT ADDITIONAL SAFETY MEASURES AS NECESSARY. 4.5.2 THE CONTRACTOR MUST BE AWARE OF AND RESPONSIBLE FOR 05HA STANDARD1926 SUBPART P, SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION EXCAVATIONS. 4.5.3 T14I5 WALL PLAN STAMPED BY A PROFE55IONAL ENGINEER REGISTERED IN THE STATE OF COLORADO MUST BE IMPLEMENTED AS SHOWN. ANY CHANGES TO THE WALL PLAN MUST BE REVIEWED AND APPROVED IN WRITING BY THE REGISTERED PROFESSIONAL ENGINEER, WHO 15 BILL ZIETLOW FOR THIS DESIGN. NOTE THAT ORAL DISCUSSIONS REGARDING CHANGES TO THE WALL PLAN ARE NOT SUFFICIENT TO BE CONSIDERED CHANGES TO THE PLAN. 4.5.4 THE CONTRACTOR MUST PROVIDE AN ON-SITE COMPETENT PERSON, AS DEFINED BY OSHA, TO EVALUATE THE GROUND CONDITIONS ENCOUNTERED DURING EXCAVATION TO DETERMINE THEIR CONFORMANCE TO THE ASSUMED GROUND CONDITIONS DESCRIBED HEREIN. 4.6 BRIERLEY ASSOCIATES HAS NOT EVALUATED THIS CONSTRUCTION SITE FOR THE PRESENCE OF HAZARDOUS MATERIALS OR ENVIRONMENTAL CONTAMINANTS. 4.7 THE PROFESSIONAL ENGINEER'S STAMPS ON THESE DRAWINGS BY BRIERLEY ASSOCIATES' ENGINEER OF RECORD APPLIES TO THE STRUCTURAL ELEMENTS OF THE 15011-�NAIL WALL ONLY. ALL OTHER STRUCTURES THAT MAY BE SHOWN, PROPOSED AND ._ EXISTING AND RELA ��LIV�V#AS, E,, F CE ON TOP OF THE WALL HAVE NOT BEEN DESIGNED OR REVIEWED BY BRIERLEY ASSOCIATE Af E55IONAL ENGINEER'S STAMP AND SIGNATURE. CommuNuy DEvuormwi CITY OF WHEAT RIDGE PUBLIC WORKS APPROVED DATE 11/9/2018 Revie pliance RECEIVED 11/9/2018 / 5th submittal M raaa�, OWNER WENT Plan a� �t CLEAR CREEK CROSSING SNW- 1 S u bTe f 1 WHEAT RIDGE, COLORADO �Of 7t�f�P/�IRa4 ... * od T!"�'.�' Of pkm v DRAWING NO. Cresting Spac*xWrnderground 7r*rQn4wr0vwqf SOIL NAIL RETAINING WALL I OF 8 Geotechnical Solution 990 SOUTH BROADWAY,SUI$A?2,DENVER C030209 adrrwEREVISION f or GENERAL NOTES AND SCHEDULES 303.703.1405 J` FAX 303.703.1404 of am CRY 0 APPROVED - DATE _ DESIGNED a EKED _ B D�rewkv1tp/0110.N011{ Cf _ DASEPT. 7, 2018 "'T518068-000 "'AS SHOWN V3 10-12-18 RAIL REMOVED FOR LATER SUBMISSION BZ -O G V2 9-28-18 RAIL ADDED TO TOP OF WALL Bz - 140. 1 DATE REVISIONS BY OKCARD FLE NAME M raaa�, N: 95T#813.2q- 5'-21(6" BEGINNING OF HAL CONTROL POI T +F_ o11- N: 7,040 825 _ �nNTP91 PnIKT p E= 1005 .37 a ,6 - _ _ _ — — — — �� E: 100837.24 I CLEANOUT a PROPERTY CLEANOUT HEADER CLEANOUT d LINE DRAIN LINE N SOIL NAILS IT ` L GHT F�LINDA E A SOIL NAIL TIONS, INCLINATIONS, AND 4KEV45 AS NECESSARY TO A OID CONFLICT 260 LF 6" PVC HEADER Observation letter from Engineer AND FPEGD 12E�J� DRAIN LINE @ 2.0% MIN. 35 LF 6" PVC HEADER DRAIN LINE a 2.0% MIN. required to be provided to Wheat Ridge Building Inspector at Final CLEANOUT Inspection. JOTCR� ° HEADER DRAIN LINE NOTES: 7 LF 8" PVC @ 2.0% MIN. FA I ° 1. MARKUPS SHOWN ON APPROVED SUBTERRA SOIL NAIL RETAINING WALL PLANS '". WR DOUBLE CURB INLET 17.2 PREPARED BY BRIERLEY ASSOCIATES, HAVE BEEN PREPARED BY MARTIN/MARTIN AS 1 REQUESTED BY THE CITY OF WHEAT RIDGE ON 11/20/18, TO PROVIDE ADDITIONAL . CONTRACTOR TO CONNECT TO INFORMATION FOR THE CONSTRUCTION OF THE HEADER DRAIN LINE ONLY. b INLET AT MINIMUM INV. 1 6.50. CONNECTION TO IN=5506. MARTIN/MARTIN HAS NOT DESIGNED NOR MADE ANY ALTERATIONS TO THE APPROVED INLET HAS BEEN PROVIDED SOIL NAIL WALL DESIGN AND ASSOCIATED CONSTRUCTION PLANS. MARTIN/MARTIN ABOVE PUBLIC STORM SEWER TAKES NO RESPONSIBILITY FOR THE DESIGN AND PERFORMANCE OF THE SOIL NAIL AND 100-YEAR HGL. GROUT AND RETAINING WALL. THE CONTRACTOR SHALL ADHERE TO THE APPROVED SOIL NAIL l° SEAL PIPE PENETRATION FOR WALL DESIGN PLANS FOR CONNECTION OF THE WEEP DRAINS, DEPTH, AND LOCATIONS .• WATERTIGHT CONNECTION. TO BE COLLECTED BY THE HEADER LINE. 135 LF 6" PVC HEADER DRAIN 2, CONTRACTOR TO INSTALL 6" PVC HEADER DRAIN LINE ADJACENT THE FACE AND I.' LINE BOTTOM OF SOIL NAIL WALL TO THE DETPH SHOWN ON THE APPROVED SUBTERRA SOIL . • Ex1STIN ` NAIL RETAINING WALL PLANS TO COLLECT THE 2" WEEP DRAINS. CONNECTION OF THE WATER WEEP DRAINS TO THE HEADER STORM LINE TO BE DETERMINED BY THE CONTRACTOR wftw =No A d. ( AND REVIEWED/ACCEPTED BY THE CITY INSPECTOR. HEADER DRAIN LINE TO SLOPE WITH BOOTOM OF WALL GRADE (2% MINIMUM) PER THE APPROVED WALL PLANS. 3. CLEANOUTS ALONG THE HEADER DRAIN LINE TO BE INSTALLED AS SHOWN ON 'd° PLAN MARKUP OR AT ADDITIONAL LOCATIONS DETERMINED BY THE CITY INSPECTOR. -. CLEANOUTS TO BE INSTALLED WITH CAST IRON VALVE BOX AND LID. CLEANOUT LIDSTV TO BE SET FLUSH AND ADJUSTED TO FINAL SIDEWALK ELEVATIONS. �, 4. CONTRACTOR TO PROVIDE CITY AND MARTIN/MARTIN AS-BUILT DRAWINGS . SHOWING HEADER DRAIN LINE HORIZONTAL LAYOUT, CLEANOUT LOCATIONS, AND 7230 INVERTS. It FT. CONIOL ' L.-J CLEANOUT !% ;��.�.;N: 7 E: 3 1 0 q6,5 I CLOUDED NOTES IN RED PROVIDED BY MARTIN/MARTIN ON DECEMBER 7, 2018. PROJECT NUMBER: 18.0180 f_ END OF W OWNER CLIENT SHEET CLEAR CREEK CROSSING sNw-2 RAIL REMOVED FOR LATER SUBMISSION BZ - CRAP is scA�E RAIL ADDED TO TOP of WALL BZ - REVISIONS BY CI( CADD FlLE NAME S u bTe r r ASSOCIATES Creating Space underground Geotechnical Solution 990 SOUTH BROADWAY, SUITE 2222, DENVER, CO 80209 303.703.1405 FAX 303.703.1404 APPROVED - DATE - DESIGNED BZ CHECKED _ ORAWN EIZ CONTRACT WHEAT RIDGE, COLORADO DRAWING NO. SOIL NAIL RETAINING WALL 2 OF a PLAN BUa 0 _ 1A SEPT, 7, 2018 P10JECT5I80G8_000 sGA`EAS SHOWN V3 70-12-18 V2 9-26-19 NO. DATE 552 TOW 5519.25 w TOW 5518.50 NOTE: STEEL RAIL FENCE NOT EXISTING OF WALL CONTROL POINT A SHOWN LIGI-IT POLE z 45'-0" LTOP FOUNDATION, H APPROXIMATE 5' 552 EAST END--.- ND OF WALL OF • • • • • • • • • • / • Syr 551 FINAL GRADE IN UNDERDRAIN FRONT OF WALL BY OTHERS BOTTOM �11WAIL71 55100+00 1+00 N w w J J TOP OF WALL 5' 15 2 6- • • • • • • •• • M 6 . ❑ ❑ ❑ ❑ • • • • • {� • • • FINAL GRADE IN • • • FRONT OF WALL UNDERDRAIN 55W �--BOTTON OF 2+00 BY OTHERS w DIFFERENT BOTTOM NAIL VERTICAL POSITIONS FOR 2-ROW WALL LESS THAN 8.5' TALL w TOW 5518.75 5525 1 CONTROL POINT B J V TOW 5518.75 51 TOP F WALL = V QI_6R bn CONTROL POINT C TYP < • ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Li❑ Cl❑(V ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ • • • • • • • • • UNDERDRAIN FINAL GRADE IN BY OTHERS ssid 3+00FRONT OF NALLBOTTOM OF WALL m 5525 LL1 5525 51J OW 518.75 Q TOP OF WALL TYP "-5'XeC-SOUTH ONT OL POINT D j END �� • • "• • J • 552®F WALL LEGEND _ p w 3723� �� F ,8 y • \� • APPROXIMATE LOCATION OF 10' LONG NAIL%��.�,.•+*�� +���,�` 5515 5`�Q[�A�fsC1```�M� RADE IN FINAL GR UNDERDRAIN BOTTOM OF WALL FRONT WALL BY OTHERS SCALE: V-O" 4+00 5510 4' 0 4' 8' SSW Cum CLIENT BRIERLEY CLEAR CREEK CROSSING SHEET S u bTe r r Geotechnical Solution ASSOCIATES creating space Underground 990 SOUTH BROADWAY, SUITE 2222, DENVER, 0080209 303.703.1405 FAX 303.703.1404 WHEAT RIDGE, COLORADO DRAYANC NO. SOIL NAIL RETAINING WALL 3 OF S ELEVATION RENS 0 V3 10-12-18 RAIL REMOVED FOR LATER SUBMISSION BZ — OR csc V2 9-28-18 RAIL ADDED TO TOP OF WALL BZ - N0. DATE REVISIONS BY CK GADO FILE NAME APPROVED - DATE _ DESIGNED BZ CHECKED _ DRAWN BZ L CONTRACT _ "SEPT. 7, 2018 PR'e .I80GB-000 —LEA5 SHOWN 5525 5520 5515 BOTTOM OF WALL - 2' BELOW FINAL GRADE 5510 SCALE: y2" = 0-0" I' 0 1' 2' —12-18 RAIL REMOVED FOR LATER SUBMISSION -28-18 RAIL ADDED TO TOP OF WALL DATE REVISIONS J^v FACING Q i 0 "90 LUw_ OC I Q > FINAL GRADE----.., CONNECT STRIP DRAINS TO UNDERDRAIN BY OTHERS STEEL RAIL FENCE (:X)NORTH WALL e EXISTING GROUND SURFACE BRIERLEY S u bTe rr ASSOCIATES Geotechnical Solution Creating Space Underground is sc 990 SOUTH BROADWAY, SUITE 2222, DENVER, CO 80209 303.703.1405 FAX 303.703.1404 RLE NAME APPROVED DALE _ DESIGNED BZ CHECKED — DRAWN BZ EXISTING LA QUINTA INN PARKING SURFACE L NAILS LOWER RDW BEHIND CLEAR CREEK CROSSING NW -4 WHEAT RIDGE, COLORADO ORAWNG NO. SOIL NAIL RETAINING WALL 4 of a SECTION A s 0 DAISEPT. 7, 2018 PR "T515068-000 "AS SHOWN STEEL RAIL FENCE e CONNECT 5TRIP' DRAINS TO UNDERDRAIN BY OTHERS (BETWEEN SOIL NAILS) BOTTOM OF WALL 2' BELOW FINAL GRADE SCALE- 12" = P-0" 1' 0 I' 2' -12-18 RAIL REMOVED FOR LATER SUBMISSION -28-18 RAIL ADDED TO TOP OF WALL DATE REVISIONS EXISTING BERM 5525 5520 NAILS IB' 551E LOWER ROW BEHIND WEST WALL 5510 OWNER CIIENT BRIERLEY S u bTL= rr ASSOCIATES Creating Space Underground GRAPHIC SCALE Gaotact�nioal Solution 990 SOUTH BROADWAY, SUITE 2222, DENVER, CO 80209 303.703.1405 FAX 303.703.1404 CAOD ]FILE NAME APPROVED DATE - DESIGNED EIZ CHECKED - DRAWN BZ EXISTING PARKING SURFACE EXISTING WATER LINE '�iq�SS,c�fA �`Er��������` CLEAR CREEK CROSSING SHIM WHEAT RIDGE, COLORADO DRAWING NO. SOIL NAIL RETAINING WALL 5 OF 8 SECTION B REVISION 0 DASEPT. 71 2015 "T5IBOGB-000 "AS 5HOWN SHOTCRETE---� FACING I ^'10 F- FINAL GRADE o u� K Q CONNECT 5TRIP' DRAINS TO UNDERDRAIN BY OTHERS (BETWEEN SOIL NAILS) BOTTOM OF WALL 2' BELOW FINAL GRADE SCALE- 12" = P-0" 1' 0 I' 2' -12-18 RAIL REMOVED FOR LATER SUBMISSION -28-18 RAIL ADDED TO TOP OF WALL DATE REVISIONS EXISTING BERM 5525 5520 NAILS IB' 551E LOWER ROW BEHIND WEST WALL 5510 OWNER CIIENT BRIERLEY S u bTL= rr ASSOCIATES Creating Space Underground GRAPHIC SCALE Gaotact�nioal Solution 990 SOUTH BROADWAY, SUITE 2222, DENVER, CO 80209 303.703.1405 FAX 303.703.1404 CAOD ]FILE NAME APPROVED DATE - DESIGNED EIZ CHECKED - DRAWN BZ EXISTING PARKING SURFACE EXISTING WATER LINE '�iq�SS,c�fA �`Er��������` CLEAR CREEK CROSSING SHIM WHEAT RIDGE, COLORADO DRAWING NO. SOIL NAIL RETAINING WALL 5 OF 8 SECTION B REVISION 0 DASEPT. 71 2015 "T5IBOGB-000 "AS 5HOWN BEARING PLA HEX NUT 7 GR 75 THREAD BAR Nq�L LENGTH qg DRILL HOLE FIELD INSTALLED GROUT a I I=T NAIL BAR a)SOIL NAIL BAR SECTION HOLE WALL NOT TO SCALE (:C)SOIL NAIL DETAIL "- NTS NOTE= SECONDARY SHOTCRETE FACING TO BE APPROVED BY THE CITY OF WHEAT RIDGE 11 STEEL RAILING DETAILS IN FORTHCOMING SEPARATE SUBMITTAL I I TUDS (4) O ENTER HOLE 0 --SOIL NAIL BAR ¢+I/4" CO O O STUD HEAD n FULL PEN. m STUD 514AFT , 3 BEARING PLATE DETAIL BEARING PLAT - -- FRONT VIEW, NTS B BEARING PLATE SECTION \,--NTS SECONDARY 5HOTCRETE WELDED WIRE MESH VERTICAL BEARING BARS (2)° I 4"x4" 142.9)(W2.9NO.4 36" I I I I STRIP DRAIN v AS MUCH AS PRACTICAL, FILL SHOTCRETE FACIN HORIZONTAL WALER BARS (2) NO.4 CONTINUOUS I I "BIRD'S BEAK" WITH SHOTGRETE (REINFORCEMENT %>:'' RETAINED SOIL n NOT SHOWN) SOIL NAIL I( I I I I I I I I 1_ ---DRILL HOLE WALL I ---DRAIN GRATE 5HOTCRETE FACING NO. 5 (2) CONTINUOUS —NO. 4 B"Xb" STIRRUP 12" OC ° a PVC CONNECTOR PIPE—` GROUT 2 OP MIN ° CONNECT TO UNDERDRAIN BY OTHERS BEARING PLATE L '4''ti}°..�'t: [} WEEP DRAIN DETAIL I I 4 I I -- SECTION VIEW, TS e a I ( I I STRIP DRAIN _1TOP OF WALL SHOTCRETE ° GEOTEXTIL PIPE PCONNECTOR SIDE VIEW N TS 2"m MIN. PRIMARY SHOTCRETE �� 12 STRIP DRAINS t' 10' OC DRAIN TO WEEP HOLES yy • DRAIN GRATE TYP. SHOTCRETE REINFORCEMENT -" SIDE VIEW, NTS 5 WEEP DRAIN DETAIL;°�NA��l\��\` - ISOMETRIC VIEW, NTS OWNER WENT S u bTe= r r Geotechnical Solution BRIERLEY ASSOCIATES Creating Space Underground 990 SOUTH BROADWAY, SUITE 2222, DENVER, CO 80209 303.703.1405 FAX 303.703.1404 CLEAR CREEK CROSSING SHEET WHEAT RIDGE, COLORADO DRAWING N0. SOIL NAIL RETAINING WALL GF 8 DETAILS REMSION O V3 10-12-18 RAIL REMOVED FOR LATER SUBMISSION Bz - 7SC&E V2 9-28-1B RAIL ADDED TO TOP OF WALL oz - NO. DATE REVISIONS BY CK CADD FILE NAME APPROVED — DATE — DESIGNED BZ CHECKED _ DRAWN gZ CONTRACT _ DAY.EPT. 7, 2018 PRIT 18065—QQQ SCALEAS gHOWN NOTESt 1. THE INTENT OF THE SOIL NAIL PULL TESTING IS TO CHECK THE ASSUMED ULTIMATE BOND STRENGTH SHOWN ON THE GENERAL NOTES SHEET. TH15 15 MORE OF A CHECK ON THE GEOTECHNICAL PROPERTIES OF THE GROUND RATHER THAN A QUALITY CONTROL METHOD RELATED TO CONSTRUCTION MATERIALS. 2. INSTALL AT LEAST TWO 10' SACRIFICIAL TEST NAILS FOR VERIFICATION TESTING. TEST EACH OF THESE NAILS IN ACCORDANCE WITH THE VERIFICATION TEST SCHEDULE. 3. PROOF TEST AT LEAST 5% OF THE PRODUCTION NAILS IN ACCORDANCE WITH THE PROOF TEST SCHEDULE. 4. THE DESIGN TEST LOAD (DTI-) FOR PROOF AND VERIFICATION TESTS SHOULD BE DETERMINED ACCORDING TO THE FOLLOWING EQUATION: DTL=(QULT X BL X 3.14 X D)/FSPO, WHERE BL AND D ARE THE ACTUAL BOND LENGTH AND DRILL HOLE DIAMETER EXPRESSED IN INCHES AND QULT (IN P51) AND FSPO ARE AS DEFINED ON THE GENERAL NOTES SHEET. THE MAXIMUM TEST LOAD SHOULD NOT EXCEED 50% OF THE YIELD OF THE TEST BAR. 5. PROVIDE RESULTS OF ALL SOIL NAIL TESTING TO 13RIERLEY ASSOCIATES. THE RESULTS SHALL INCLUDE, AT A MINIMUM, THE TEST NAIL LOCATION, TEST DATE, TEST JACK CALIBRATION DATA AND THE TEST PRESSURE, LOAD, DEFLECTION AND 14OLD TIME DATA FOR EACH LOAD STEP. (OR CRIBS PROOF TEST SCHEDULE LOAD INCREMENT HOLD TIME (MIN) AL* UNTIL STABLE 0.25DTL UNTIL STABLE 0.50DTL UNTIL STABLE 0,75DTL UNTIL STABLE I.00DTL UNTIL STABLE 1.25DTL UNTIL STABLE I.50DTL 10** -12-18 RAIL REMOVED FOR LATER SUBMISSION -28-18 RAIL ADDED TO TOP OF WALL DATE I REVISIONS BY USUALLY SINGLE SPEED HAND PUMP MAY ALSO BE ELECTRIC SOI L NAIL TEST SET UP - TS cUENT SubTerrc Geotechnical Solution AL=ALIGNMENT LOAD (-0.05DTL) READINGS AT I, 2, 3, 4, 5, 6 AND 10 MIN. AND HOLD AN ADDITIONAL 50 MIN. IF MOVEMENT BETWEEN I AND 10 MIN. EXCEEDS 0.04". READINGS EVERY 10 MIN. BRIERLEY ASSOCIATES Creating Space Underground 990 SOUTH BROADWAY, SUITE 2222, DENVER, CO 80209 303.703.1405 FAX 303.703.1404 3E510NED BZ CHECKED — DRAWN BZ L BAR tEMPpRaRYs FRFFCENG try VERIFICATION TEST SCHEDULE LOAD INCREMENT HOLD TIME (MIN) AL* 1 0.25DTL 10** 0.50DTL 10** 0.75DTL 10** I.00DTL 10** 1.25DTL 10** 1.50DTL 60*** 1.75DTL 10** 2.00DTL 10** ** READINGS AT 1, 2, 3, 4, 5, 6 AND 10 MIN. AND HOLD AN ADDITIONAL 50 MIN. IF MOVEMENT BETWEEN I AND 10 MIN. EXCEEDS 0.04". READINGS EVERY 10 MIN. *** TAKE READINGS AT I, 2, 3, 5, 6, 10, 20, 30, 50 AND 60 MIN. .a T-3 0 ~ ZERS HOLE WALL r-i'�PROOF TEST NAIL DETAIL -- TS CLEAR CREEK CROSSING WHEAT RIDGE, COLORADO SOIL NAIL RETAINING WALL SOIL NAIL TESTING I SEPT. 7, 20181x"-518068-000 SNW-7 7OF8 D� 0 AS SHOWN City of Wheat Ridge Municipal Building 7500 W. 2911' Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2846 F: 303,235.2857 October 21, 2013 The Planning & Zoning Resource Corporation Attn: Shana Hines 100 NE 5th Street Oklahoma City, OK 73104 RE: 3301 Youngfield Service Rd / Ref No. 71241-57 Dear Ms. Hines: This letter is to inform you that the property located at 3301 Youngfield Service Road is located within the corporate limits of the City of Wheat Ridge. The property is zoned Planned Commercial Development (PCD). Currently, the property is occupied by a La Quinta Inn which is a considered a permitted use on the property. Below are responses to your specific inquiries: 1 The current zoning classification for the subject Property is Planned Commercial r` ## (PQDJ. 2. Adjacent property zoning designations: North PCD South PCD East 6gricultural-Qne West PCD 1 Is the property part of a Planned Unit Development? x Yes No and Recorder. 4. Is the subject property part of an Overlay District? Yes x No www.d.wheatridge.co.us 5, The subject property is currently regulated by: Section — of the Zoning Ordinance x Planned Unit Development Ordinance No, Site Plan Approval Case No. _ gimm ommurm fiWI(MRSM01 91me- RRAMBUIrz AXEM I! � 99MIUMEWAill V. Information regarding variances, special permits/exceptions, ordinances or conditions: 9. Rebuild In the event of a casualty, in whole or in part, the structure located on the subject property: X May be rebuilt in its current form (Le, no loss of sq. footage, same footprint, with drive through(s), if applicable) N May not be rebuilt in its current form, except upon satisfaction of the following conditions, limitations or requirements. See section _ of the current zoning code/ordinance for details. 10. To the best of your knowledge, of your records show any unresolved zoning code violations. Yes, there are open violations on file in our records I X No, there are no open violations on file in our recordn 11 . To the best of your knowledge, do your records show any unresolved building code violations and/or complaints? Yes, there are open violations on file in our records I X No, there are no open violations • file in our recor(M Yes, there are open violations on file in our records I x No, there are no open violations on file in our recorQ@ Please call the undersigned at 303-235-2845, if you have questions or concerns. Name Lauren Mikulak Dept Communily Development Title: Planner 11 Email: lmikulakOci.wheatridge.co.us Ems= fa'vj� Lauren Mikulak Planner 11 7500 West 29th Avenue Wheat Ridge, Colorado 80033 303/235-2846 Fax: 303/235-2857 November 28, 2005 The City of Wheat Ridge Bank of America, N.A., Merrill Lynch Mortgage Lending, Inc. and Bear Steams Commercial Mortgage, Inc. c/o The Planning & Zoning Resource Corporation 100 NE 5"' Street Oklahoma City, OK 73104 Attn: Biba Olsen To Whom It May Concern: la Please let this letter serve as zoning and use confirmation for property located in the City of Wheat Ridge at 3301 Youngfield Service Road. What is the current zoning classification of the property? The current zoning on the property known as Lot 1, 70 West Business Center Subdivision is Planned Commercial Development (PCD). Is the current use as a hotel/motel permitted either by right or special permit or as a pre- existing use? A hotel/motel is a permitted use within the 70 West Business Center Planned Commercial Development. A combined preliminary and final development plan was approved for construction of a hotel in 1984 pursuant to Case No. WZ-84-10. In the event special or conditional use permits were required, can you provide either a copy of the permit or include a statement that one has been issued and is in effect? No conditional or special use permits were required for construction of the existing hotel facility. Are there any open or uncured zoning violations on file for this site? There are no existing zoning violations documented in the files of the Community Development Department. If you have any questions or need further clarification, do not hesitate to contact me at 303-235- 2848. incerely, Meredith Reckert, AICP Senior Planner