Loading...
HomeMy WebLinkAbout3740 Garland Streete ♦ CITY OF WHEAT RIDGE Building Inspection Division (303) 234 -5933 Inspection line (303) 235 -2855 Office • (303) 237 -8929 Fax INSPECTION NOTICE Inspection Type: Job Address: V710 r�azl2vn s� Permit Number: 19!07/ MA ❑ No one available for inspection: Time Y.' .So CUj/PM Re- Inspection required: Yes KNO When corrections have been made, cafl for re-inspection at 303 -234 -5933 Date: la li ®,ia Inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division I � (303) 234 -5933 Inspection line � (303) 235 -2855 Office • (303) 237 -8929 Fax INSPECTION NOTICE Inspection Type: iQCt91' Job Address: Permit Number: ❑ No one available for inspection: Time _ 1 3 �/PM Re- Inspection required: � No When corrections have been made, ca!/ for re-inspection at 303 -234 -5933 Date: Inspector: DO NOT REMOVE THIS NOTICE ♦ i CITY OF WHEAT RIbGE is Building Inspection bwision (36J) 234 -5933 Inspections Pine (303) 235 -2855 Office • (303) 237 -8929 Fax INSPECTION NOTICE Inspection Types -hro Job Addreiiaz f alt l ava s J Permit Numb eri AA44s _ARMe x , �7 ' C moo- V' Z A /! %. ,z'49 ricn�y�L.�Ti�ns� i s J2 rn� ❑ No one available for inspection: Time Re- Inspection required: ds No 'When corrections have been made, call for re- inspection at 303 -234 -5933 Date: Inspector DO NOT REMOVE THIS NOTICE I i CITY OF WHEAT RIDGE r Building Inspection Division f (303) 234 -5933 Inspection line (303) 235 -2855 Office • (303) 237 -8929 Fax r INSPECTION NOTICE Inspection Type: Job Address: d7y6 6AA44, 57 Permit Number: 9o7 // /> ❑ No one available for inspection: Time AM /PM Re- Inspection required: Yes No * When corrections have been made, call for re-inspection at 303 Date: _ / �l q / Inspector: > r DO NOT REMOVE THIS NOTICE e CITY OF WHEAT RIDGE !� Building Inspection Division (303) 234 -5933 Inspection line (303) 235 -2855 Office • (303) 237 -8929 Fax INSPECTION NOTICE Inspection Type: 4: Job Address: 57 Permit Number: p2o741 i ❑ No one available for inspection: Time / +'3 AM 10 Re- inspection required: Yes No_ "When corrections have been made, call for re-inspection at 303 -234 -5933 Date: ���S�to Inspector: 49 e- DO NOT REMOVE THIS NOTICE CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line ~JJ (303) 235-2855 Office ' (303) 235-2857 Fax INSPECTION NOTICE Inspection Type:rts~ Qom!` Job Address/Permit Number: 375'0 3 7- , 1T- 6)707 6'1 ~dtawr,✓fn AFk Pffn s Qom,/ii~~O ❑ No one available for inspection: Time a'. fps' AM/PM Re-Inspection required: Yes When corrections have been made, call for re-inspection at 303-234-5933 Date: -/,2 7 Inspector DO NOT REMOVE THIS NOTICE 71k,` .r i p~ry0? i E ,fir t i s,I ~SF HP ~~t~ q j AV~ f ~ 1 ' n~ N ~ O O 1 3 M g?i p~~ F F 1 s s a, /o P atly, 'x R )ASV Vh ~I S 4e ~h .`1 # ~ L ~ .A ~L. \ rya } \ ~ C~ \ J ✓ y ~l wv,A' O I i CITY OF WHEAT RIDGE Building Inspection Division r (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 235-2857 Fax INSPECTION NOTICE Inspection Type: N, ~,c_ Job Address: ~3 7410 Permit Number: d°i d 2e- mod/ GLt~ Cr,~-~S ~l> Yc 4 ❑ No one available for inspection: Time AM/PM Re-Inspection required: (6e No *When corrections have been made, call for re-inspection at 303-234-5933 Date: ? z- Inspector: DO NOT REMOVE THIS NOTICE ♦ i CITY OF WHEAT RIDGE Building Inspection Division 0( (303) 234-5933 Inspection line 303) 235-2855 Off'~~ ice o (303) 235-2857 Fax INSPECTION NOTICE Inspection Type: i1zi , Job Address: _57~//o Permit Number: v ❑ No one available for inspection: Time AM/PM Re-Inspection required: Yes No *When corrections have been made, call for re-inspection at 303-234-5933 Date: Inspector: G DO NOT REMOVE THIS NOTICE COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Number: .V q { ofwsegr~ BUILDING INSPECTION LINE-303-234-5933 Date: F r/~ a CITY OF WHEAT RIDGE V i U' I ° m 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-235-28555) C ORA00 APPLICATION Property Owner: &C" d-- Ikoh T2G C Property Address:-Z7L(C) CTC~rto,C\ C-0 660'5j Phone: 'Z~3-Kal'~} S Contractor License No.: Company: Phone: 2~ l~0 -64' g CQ OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all's measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge Building Code (U.B.C) and all other applicable Wheat Ridge Or inances, for ~rJ// rider this permit. (OWNER)(CONTRACTOR):SIGNE q qx' ( DAT (OWNER)(CONTRACTOR):PMWED ff#) 'F-tYs • 1~ DAT~ Construction Value:$ t(q,3!~; Permit Fee:$ Plan Review Fee:$ Ilse Tax-$ Total:$ Description: U--s Ors `C"Y'Q-r C-v-~C\ &c4/F-IK -T;mbi r-kn-e_ ~C)y2c d ~iv>1rv~sio,nc"cS~1 n~\ l Sq. aS,=l 4J (t2 fll Expiration Date: Expiration Date: Expiration Date: Approval: Approval: Approval: (1) This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of the City. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or abandoned for a period of 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid fora new permit. (4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem. (5) Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceeding with successive phases of the job. (6) The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. Chief Building Official Electrical License No: Plumbing License No: Mechanical License No: Company: Company: Company: