Loading...
HomeMy WebLinkAboutPBG-02-01I® ASELINE engmeermg carporxnan July 22, 2003 Meredith Reckert, Senior Planner City of Wheat Ridge 7500 West 29th Avenue Wheat Ridge, Colorado 80033 Re: Administrative PBG Plan at 50550 and 5025 Tabor Street The mylar for the PBG is enclosed. We have not yet been asked to do the grading certification. If that needs to be done, please let us know. Sincerely, Li a Padgett Project Engineer rr rir t,aEAT F?ilG% a121 I'D r it _Cu pj1,l e.T -q ;r] u. it 11445 West I-70 Frontage Road North Wheat Ridge, Colorado 80033 Tee: 303.940.9966 Fnx: 303.940.9959 haselineengineering.aom 7500 West 29th Avenue Wheat Ridge, Colorado 80033 303/ 235-2846 Fax: 3031235-2857 The City of Wheat Ridge May 21, 2003 Lisa Padgett Baseline Engineering 1658 Cole Blvd, Suite 295 Golden, Co 80401 Dear Lisa: This letter is in regard to the Planned Building Group plan submitted by your office for property located at 5025 and 5055 Tabor Street. I have reviewed the most recent version of the plan and have the following comments: 1. In the "Site Summary", please add the address for 5055 Tabor. 2. The site data adds up to 41,862 square feet, not 40,862 square feet. Please check and correct these numbers. 3. Under "Identification Sign Standards", change the reference to Article VII of the City of Wheat Ridge Code of Laws. 4. In the planned building group declaration, change the first sentence to reference Section 26-116 of the Wheat Ridge Code of Laws, instead of 26-30(C). 5. In the notary block for the owners' signatures, change the year from 2000 to 2003. 6. In the title block in the bottom right-hand corner of the page, change the reference from 1 of 2, to 1 of 1. Once the changes have been completed, please submit back to the city a blackline photographic mylar, .004 of an inch thick with matte finish on both sides. Original signatures are required in black, indelible ink, including the surveyor's seal. There are notaries available in the Community Development Department to notarize the owners' signatures, if necessary. A $10 per page recording is required at the time of mylar submittal. If you have any questions, do not hesitate to contact me at 303-235-2848. Sincerely, Meredith ReckeM AICP Senior Planner C: PBG-02-01 TRANSMITTAL date: May 20, 2003 to: Meredith Reckert, Senior Planner City of Wheat Ridge 7500 West 291h Avenue Wheat Ridge, Colorado 80033 re: Administrative PBG Plan at 50550 and 5025 Tabor Street Here is the copy of the site plan (Cl) that we discussed. Let me know if it is OK to make the mylar. I will get the surveyor to sign the mylar before I send it in to you. Do I also need to get the applicant's signature or will you do that? Thank you, "Lisa Padgett Design Engineer x204 cc: file DBASELINE engineering corporation 1658 Cole Boulevard, Suite 295 Golden, Colorado 80401 ph 303.940.9966 x204 fax 303.940.9959 DEPARTMENT OF PUBLIC WORKS City of Wheat Podge Department of Public Works 7500 WEST 29r" AVENUE WHEAT RIDGE, CO 80033 February 7, 2003 Mr. John M. McLain, P.E. Baseline Engineering Corp. 1658 Cole Blvd., Suite 295 Golden, Colorado 80401 (303) 235-2868 FAX (303) 235-2857 Re: Steve and Doug Realty, 5055 Tabor Street, Wheat Ridge, Colorado - Approval of Final Drainage Report, and Grading/Erosion Control Plan Dear Mr. McLain, This letter is to inform you that the final drainage report, and the grading/erosion control plan for the above referenced project have been reviewed and approved for construction. Please be aware of the following items regarding the construction of the project: 1. The proposed drainage facilities shall be constructed then approved by the City of Wheat Ridge prior to issuance of the Certificate of Occupancy. 2. Erosion control for the project shall be placed in conformance with the approved drainage/erosion control plan and shall be maintained as needed during the course of construction. All drainage improvements shall be constructed in conformance with the approved drainage report and plan. 4. Upon completion of the drainage improvements the engineer, Mr. John McLain, P.E., shall provide to the City of Wheat Ridge a letter of certification stating that the various improvements, as defined in the drainage report and plan, have been accurately surveyed to confirm their construction is in accordance with these documents. The certification letter shall be written and stamped by the engineer who prepared the drainage report, and shall be submitted for review and approval by the City prior to issuance of the Certificate of Occupancy. 5. It will be the responsibility of the of the contractor for the project to repair any damage to the existing public improvements on 5055 Tabor Street as a result of related construction traffic in the area. Also, the contractor will be responsible for maintaining 5055 Tabor Street on a regular basis such that they are free of construction debris and tracking from construction traffic accessing the site. 6. It will be the responsibility of the developer/owner, to provide the necessary testing, as applicable for the scope of this project, for subgrade compaction and other related material tests for those improvements to be constructed within public right-of-way. (SEE ATTACHED MATERIAL SAMPLING & TESTING REQUIREMENTS) 7. Prior to any construction of the public improvements, the necessary right-of-way construction permit(s) and respective licensing will need to be submitted for processing by the City. If you have any questions, please contact me at 303-235-2868. Sincerely, Michael Garcia Development Review Engineer cc: Greg Knudson, City Engineer Steve Nguyen, Traffic Engineer Dave Brossman, City Surveyor Chuck Braden, Engineer Tech. I Alan White, Community and Development Director Meredith Reckert, Senior Planner Darin Morgan, Chief Building Official File (3) 5055tabor approval.ltr CITY OF WHEAT RIDGE MATERIALS AND TESTING REQUIREMENTS FOR CONSTRUCTION OF PUBLIC IMPROVEMENTS DESCRIPTION Materials sampling and testing for public improvements shall be performed by an independent materials testing company at the expense of the developer, and/or utility district. Unless otherwise designated, all referenced specifications, standards or policies shall be the latest edition as revised or updated by approved supplements published and issued prior to the date of the building permit. REQUIREMENTS All materials sampling and testing shall be performed by certified, experienced and qualified materials testing technicians who work under the supervision of a registered professional engineer in the State of Colorado. All materials sampling and testing equipment shall be serviceable and calibrated. Soil classifications and moisture-density curves shall be provided to the Department of Public Works inspector prior to in-place density testing. Materials testing technicians shall furnish copies of failed test results to the inspector as promptly as the results become available. On a weekly basis when testing is being performed, the developer shall furnish the inspector with copies of all test results taken during the prior week and a cover letter, signed by the supervising registered professional engineer, which summarizes the results and discusses any failed tests or inconsistencies. The City materials testing requirements are provided in Table 720-1. All testing procedures of verification and central lab requirements shall be as specified in the Frequency Guide Schedule of the Colorado Department of Transportation Field Materials Manual. One test is required for any fraction of the specified frequency. The reference to Section 203.07 in the table is from the Colorado Department of Transportation Standard Specifications for Road and Bridge Construction. Table 720-1 City of Wheat Ridge Materials Testing Requirements Type of Test Frequency Remarks Soil Survey (Classification), 1 per 1000 feet of roadway, Surveys for roadway, sidewalk AASHTO M145 sidewalk or pipe trench and trench may be combined Moisture-Density Curve, 1 per on-site soil type AASHTO method determined AASHTO T99 or T180 1 per import material source By soil or materials type Embankment in-place density, 1 per 300 feet per lane per 8 Minimum density per soil Colorado Procedures inch loose lift classification, Section 203.07 Roadway subgrade in-place 1 per 300 feet per lane Minimum density per soil density, Colorado Procedures Classification, Section 203.07 Sidewalk subgrade in-place 1 per 300 feet of sidewalk Minimum density per soil density, Colorado Procedures Classification, Section 203.07 Pipe trench in-place density, 1 per 200 feet of trench per 2 Minimum density per soil Colorado Procedures foot vertical interval Classification, Section 203.07 Aggregate base course in-place 1 per 300 feet per lane Minimum 95% of maximum density, Colorado Procedures Density, T180 Lime treated subgrade in place 1 per 300 feet per lane No less than 95% of std. dry density, Colorado Procedures density and opt. moisture, T99 Cement treated base in place 1 per 300 feet per lane Density in accordance with density, Colorado Procedures contract documents, T134 Hot Bituminous Pavement 1 per each HBP grade and Within specifications of asphalt content and gradation Marshall blow specified Approved mix design Hot Bituminous Pavement in 1 per 100 cubic yards 92-96% of max. density except place density, Colo. Procedures Grade F to be 90-95%, T209 Concrete compressive strength 1 per 100 cubic yards PCC pavement, structural AASHTO Procedures Concrete, sidewalks and curbing Concrete air content and slump 1 per 50 cubic yards PCC pavement, structural AASHTO Procedures Concrete, sidewalks and curbing r 1~:., ~ - } ~ . ~ a.n.....rr ,.w r .r..... r a rrrrr. S~~VE ~ DOUG REALT An 4f f icial Development _ti . J LOCATED AT ~=5055 A PORTION OF OP T~ 90U1T TOWI~iSH ± h a t a 4 ^i LOT 19 S STAMJLEYHEIGHT.l' L. ■ N89 4'1)'E 1 5.13' x f 59.2 3 EX/STING 4' CHA/N-UNK FENCE ~-EX WATERS BOUT X f 58.5 EX LEC CAL TLETS SHED •~r f 58.6 x 505 1 f 5 f 5 . X L • ff' ~ 'i x x o WODD ~.Wl 1 ~ DE EX/ST/NG ~ W v ~ ~ LA1~?V AND SPR/NKLER 4 ,c ~ /~SYST£M e pnvrin~v nF ~nT ~o  ~~/r° ~ a0 .ae. p Y Y AYYY d® i11l~eMiIY YILYb ! YY 8l • Ye1tY • • ! i!Y®Y® ®.Y • iYY! eYYS a YYS N aiYtlY • IY.YO v~ o a o ~ ~S7ANDLEYBEIGR7s f 6 Q ~ ~ x ~ Qf~ ACRES EX/ST1 3 d 1 °6 ::y } . ~ ~ F. ~ rte, QO V ~ r~ ~eQ ~V~. ~/1Ll~,n.~AI VR/'WG}' .a a~ ~ a ~~v ~ ~a ~ e W4.~ a q aa. 2 a. . UNf~l~~l lr ~ a' a ' Q. a x e - e; c. a d. a ~ a ° ~ . Q4 'V ~WGJJI 1 ~ a ~NG 71.1 PI i- L LOT l9 ~ a e a ,Q o _ TQ BtilLfltN~~ a~r.n a. ° e a 4 .a a . . _ s.. - x a_ y. ~.,.e _ a.. a ~ A tL~ e ~ a d, d d. ~ a A K.. r JV25 1/1DVR S~ a ~ ~ ~ ~ 'e .a~ .a. ~ o~ 4 e FlNISHED FLOOR ElE =5460,50 ^ ~ ~ ' 5 1 x f59.3 ~ a d a O 9 - a ! a.- ~e, ''4 °O- ~ ° a o. a Q-. o qa'. ~a ~ v Y I 3. a ~QQ2 a . e a ~'o' -e .d'. e -f Y -ice x e 4 8 j.. ,ape a o. d ~N" a e °4 0. e ~ ~ a s dd a' 1 , r - a.. .o e Q' tea- 5,5.1' ~ ~ f ! ~f ~f _ - - - NORTHI~ST eORNER OF THE BUILDING t~ M11 . - SOUTHEAST QUARTER OF THE" 5.5~ FR~i PL SOUTHEAST QUARTER, SECAON 17 AT THIS CORNER LOT 1 FOUND .3" D/AMETEK ALUM/NUM LA~YBMONT CENTLTR S7AGE 2 -_V _ - CAP L.S. >OB43 m m f .r 0 LEGEND _ _ A Y® I~ ®a Ylw Y.rLLw w i s.YV a. m r • ~ EXISTING (~IIFEROUS TREE 1 0 N r m •~r EXISTING DEgDUOUS TREE j♦ i a Q ~w qnr a~ovEU "sn~ nth' 3_ t ; M - coNC~ T d d M O w r wrn ch 0 6' 10" DIAMETER PIPE FlLLE GRAPHIC SCALE NTH CONCRETE FOR POS' # DRACASE PBG-02-01 DEDAIE CEMBER 31, 2002 0 1 SITE, PLAN 20 0 20 40 CONCRETE F001ING AT ORANN i lO x m 24"x36" LJL= El SEC110N A-A 15' DEEP - - "I M swft naNq g cl C1 I M = 20 FT suir& r nog 3 N 2 DUMPSTI Cl Cl NO scuE v BENCHMARK: m to TOP OF 1.5" DIAMETER ALUMINUM CAP N AS SHOWN ELEV.= 5458.81 ASSUMED z City of Wheat Ridge of WHEgT Planning and Development Department Memorandum (4 ~~CORP~~ TO: D ann Morgan FROM: "'Meredith Reckert SUBJECT: Steve and Doug Realty - 5025 Tabor Street DATE: January 13, 2003 Attached are the following documents to be included in the building plan set for 5025 Tabor Street. We're finishing up on the pbg review - two building elevation sheets, two revised site plans (also used as the pbg plan, two grading and erosion control plans. If there are other outstanding items missing from the building permit planset, they need to know. They are very anxious to move ahead with the permit. 7500 West 29th Avenue Wheat Ridge, Colorado 80033 303/ 235-2846 Fax: 3031235-2857 The City of Wheat Ridge December 18, 2002 Doug and Steve Realty, LLC 5055 Tabor Street Wheat Ridge, CO 80033 Dear Doug and Steve: This letter is in regard to your request for approval of an administrative planned building group plan at 5055 and 5025 Tabor Street. I have reviewed the document and have the following comments: 1. Add a surveyor's certification. See attached. 2. Add a case history box with the following case number: PBG-02-01. 3. Under the landscaping note, change the citation to Section 26-502 of the Wheat Ridge Code of Laws. 4. Under the landscaping note, change the minimum amount of commercial landscaped coverage required from 10% to 20%. 5. Under the lighting note, change the citation to Section 26-503 of the Wheat Ridge Code of Laws. 6. Revise the signage note to read: "Allowable size, height and setback requirements for signage shall be in accordance to Article IV. of the City of Wheat Ridge Code of Laws". 7. On the graphical portion of the pbg, add dimensions for property boundaries prior to dedication. 8. The site data table should be revised to designate pervious services as "open space/landscaping" 9. Add a recording block for the Jefferson County Clerk and Recorders' Office. Attached are comments received from other city departments and outside agencies. All of their concerns must be addressed. The building permit submittal must contain a completed site plan that includes all proposed exterior lighting and landscaping for the portion of the lot being developed. The landscape plan must show all existing and proposed landscaping meeting the requirements of Section 26-502, including installation of a sprinkler system. The plan submitted for the pbg approval is substandard for landscape materials required such as street trees. For the development area, four street trees are required plus an additional five trees and twenty-five shrubs. Existing plant materials on the property can be counted toward these minimums. Architectural elevations for the proposed building must be included as part of the plan set. Pursuant to the city's Streetscape and Architectural Design Guidelines, no metal buildings are allowed. If you have questions concerning any of the above, do not hesitate to contact me at 303-235-2848. Sincerely, ~ Meredith Reckert, AICP Senior Planner C: PBG-02-01 case file Building permit file GIyof VA fiutge f DppaMneat of Pubk%Aurks December 13, 2002 DEPARTMENT OF PUBLIC WORKS (303) 235-2868 7500 WEST 29 AVENUE WHEAT RIDGE, CO 80033 FAX (303) 235-2857 Mr. John McLain, P.E. Baseline Consulting Engineers 1658 Cole Blvd., Suite 295 Golden, Colorado 80401 Re: Steve & Doug Proposed Facility, 5055 Tabor Street - First Review Comments of Final Drainage Study, Grading & Erosion Control Plan, Surveying Comments & Construction Plans Dear Mr. McLain, I have completed the first review of the above referenced documents for the Steve & Doug proposed site development received on November 22, 2002, and have the following comments: Drainage Study (Discussion) 1. Required at the time of building permit review. 2. Please provide P.E. seal and signature on the final approved report. Drainage Study (Appendix) 1. Required at the time of building permit review. 2. Please provide P.E. seal and signature on the final approved report. Drainage Plan 1. Required at the time of building permit review. 2. Please provide P.E. seal and signature on the final approved report. Please provide 2 signed and stamped sets of the drainage report and plan with the second submittal. Survey Comments 1. No comments at this time. Traffic Engineering A copy of the construction plans has been forwarded to the City's Traffic Engineer, Mr. Steve Nguyen, P.E., 303-235-2862 for review and has no comments at this time. Traffic Planner Comments A copy of the construction plans has been forwarded to the City's Traffic Planner, Mr. Dave Mentor, 5055tabor reviewl.Itr 303-235-2866 for review and has the following comments: 1. Tabor Street is an identified streetscape and subject to Streetscape and Architectural Design Manual requirements (See Streetscape and Architectural Design Manual). 2. This section of Tabor is identified as "Industrial Neighborhood." 3. Specific details about this type of Streetscape project are yet to be determined but will included at a minimum: Street trees, irrigated tree lawn, sod, and detached walk. 4. A maintenance agreement for the area along Tabor will need to be signed prior to Certificate of Occupancy. 5. In addition and immediately adjacent to the ROW required by the traffic engineer, a 3_5' easement will also be required. This is to accommodate the portion of the 5' wide detached sidewalk that will fall outside the newly established ROW. 6. Escrow funds for a detached 5' sidewalk with 5' irrigated tree lawn, and street trees will be required for City construction at a fixture date. 7. The rate will be $41.75 per lineal foot of frontage. (Streetscape & Architectural Design Manual). 8. At 209.55' of frontage along Tabor Street total escrow for Streetscape elements is: $8749.00. "Bare-Bones" Streetscape Costs - Industrial Neighborhood Price Price per l. f. Street Trees $525 ea $15.00 5' Tree lawn Sod $0.75 sf $3.75 5' Tree lawn Irrigation $1.67 sf $8.35 5' Detached Sidewalk $2.93 sf $14.65 Application for Minor Dumping/Landfill Permit Prior to the commencement of any onsite grading, an Application for Dumping/Landfill Permit, along with the fees due will need to be submitted for review and approval. For your information and submittal in the second review package, a copy of this permit is provided. Development Covenant A Development Covenant and escrow, in lieu of those public improvements and future streetscape item that are required along the Tabor Street frontage will need to be submitted prior to issuance of the building permit for this site. The estimate for the cost of these improvements will be provided by the Engineering Department. Right-of-Way Construction Permit(s)/Licensing Prior to any construction of the public improvements, the necessary right-of-way construction permit(s) and respective licensing will need to be submitted for processing by the City. Please return all red-lined prints with the second submittal. If you have any questions, please contact me at 303-235-2868. Sincerely, Michael Garcia Development Review Engineer 5055tabor reviewl.ltr Cc: Greg Knudson, Interim Public Works Director Steve Nguyen, Interim City Engineer Dave Brossman, City Surveyor Dave Mentor, Traffic Planner Meredith Reckert, Senior Planner File 5055tabor reviewl.ltr VALLEY WATER DISTRICT 12101 WEST 52ND AVENUE WHEAT RIDGE, COLORADO 80033 December 4, 2002 City of Wheat Ridge 7500 W. 29th Avenue Wheat Ridge, CO 80033 Attn: Meredith Reckert Dear Meredith: TELEPHONE 303-424-9661 FAx 303-424-0828 6 G In reference to Case No. PBG-02-O1/Steve and Doug Realty, Valley Water District has reviewed your inquiry and offers the following comments: 1. Valley Water District can provide water service to the development subject to Valley Water District rules and regulations. Water service tap and line will be required for each separate building structure at owners expense. 2: Valley Water District is supplied water through a master meter distributors contract with the Denver Water Department and must follow Denver Water operating rules and engineering standards. 3. Valley Water District currently has adequate capacity through their Denver Water contract at the present time to serve the project. Valley Water District in its contract with Denver Water must follow all Denver Water conservation/ drought requirements imposed. 4. Additional water main lines and fire hydrants may be needed to serve the property that meet AFPD requirements at owner's expense. 6. Owner will be required to provide necessary easements to the District that meet Denver Water Department requirements. If you have any questions, please feel free to contact me at 303- 424-9661. i~ sincerely RobeWWrt Arnold District Manager 7500 West 29th Avenue The City of Wheat Ridge, Colorado 80033 Wheat Telephone 303/ 235-2846 Nn Ridge ~ November 22, 2002 S?p02 The Wheat Ridge Department of Planning & Development has received a request for approval of a Planned Building Group plan at the property described below. Your response to the following questions and any comments on this proposal would be appreciated by December 16, 2002. No response from you by this date will constitute no objections or concerns regarding this proposal. CASE NO: PBG-02-0 I/Steve & Doug Realty LOCATION: 5055 Tabor Street REQUESTED ACTION: Approval of a planned building group plan on property zoned Light Industrial PURPOSE: Construction of an additional 4600 square foot building on the property (5025 Tabor) APPROXIMATE AREA:.93 acre of land area Issues for consideration include the following: See Attached Letter The adequacy of public facilities or services provided by your agency to serve this development. The availability of service lines to the development. The adequacy of capacities to service the development. Servicing of this proposed development subject to your rules and regulations. Specific easements that are needed on this or any other document. Any comments which would affect approval of this request by your agency. Please reply to: M. Reckert Department of Planning & Development Fax: 3031235-2857 DISTRIBUTION: XX Water District (Valley) XX Sanitation District (Fruitdale) XX Fire District (Arvada) Adjacent City Q XX Xcel Energy XX Qwest Communications State Land Use Conmrission State Geological Survey Colorado Dept. Of Transportation Colorado Div. Of Wildlife Colorado Dept. of Natural Resources Denver Regional Council of Governments Jefferson County Planning Dept. Completedby: Robert Arnold (Name, Agency/Department, Date) Valley Water District Jeffco Health Department Jeffco Schools Jeffco Commissioners XX AT&T Broadband XX WHEAT RIDGE Post Office XX WHEAT RIDGE Police Department XX WHEAT RIDGE Public Works Dept. WHEAT RIDGE Park & Rec Commission XX WHEAT RIDGE Forestry Division XX WHEAT RIDGE Building Division WHEAT RIDGE Economic Development "The Carnation City" e:\planning\foms\agendaref. frtn TO Planning and Development FROM Officer L. Gregor Police Department SUBJECT Case No:PBG-02-01 DATE November 26, 2002 I have reviewed the plans for the above listed site. Please consider the following recommendations while developing this site: LANDSCAPE: 1, All mature trees to be trimmed of branches up 6'-8' from the ground to allow for natural visual observation from surrounding areas to the parking lots and building. 2. All shrubs and bushes mature height to not exceed 36". This height reduces the risk of persons hiding. It also allows for natural visual observation onto the property both for the parking lot and building. 3. Plants/ landscape immediately next to the building should be low-growing ground cover, not to exceed 18" mature height to allow for maximum natural visual observation and eliminate concealment for potential offenders. 4. Ground cover should not include rock material. Rocks can be used to break windows in the buildings and cars. Consider using natural products such as bark or mulch. BUILDINGS: 1. The building finish should be with an anti-graffiti paint or sealant. FENCING: 1. Consider using wrought iron fence instead of cedar. By putting up a wrought iron fencing around the property, you will minimize the chance of vandalism, graffiti and climbing. The initial investment in the fence will be higher, however the long term pay-off by not having to repair the fence will be greater. SITE: 1. During construction, the property should be clearly posted with "No Trespassing" Page 1 of 2 signs. This may help deter trespasses, and allow the Police Department to cite offenders with the crime along with any others offenses that may be committed by trespassers. LIGHTING: 1. Exterior lighting around the buildings and in parking lots should be a minimum of 1.5 candle minimum maintained. This will provide for brightly lit areas that discourages criminal activity due to the illusion /perception of observation and recognition. While my recommendations do not guarantee a crime-free environment, it has been experienced that application of the concept of Crime Prevention Through Environmental Design (CPTED) will reduce the opportunity for crime to occur and will enhance the quality of life. Please consider these suggestions while developing this property. Thank you. Les Gregor Police Officer Multi-Housing Unit Page 2 of 2 City or Whcat Rldge ncpaument 0' Pcblic Wut6 December 13, 2002 DEPARTMENT OF PUBLIC WORKS 7500 WEST 29'" AVENUE WHEAT RIDGE, CO 80033 Mr. John McLain, P.E. Baseline Consulting Engineers 1658 Cole Blvd., Suite 295 Golden, Colorado 80401 (303) 235-2868 FAX (303) 235-2857 Re: Steve & Doug Proposed Facility, 5055 Tabor Street - First Review Comments of Final Drainage Study, Grading & Erosion Control Plan, Surveying Comments & Construction Plans Dear Mr. McLain, I have completed the first review of the above referenced documents for the Steve & Doug proposed site development received on November 22, 2002, and have the following comments: Drainage Study (Discussion) 1. Required at the time of building permit review. 2. Please provide P.E. seal and signature on the final approved report. Drainage Study (Appendix) 1. Required at the time of building permit review. 2. Please provide P.E. seal and signature on the final approved report. Drainage Plan 1. Required at the time of building permit review. 2. Please provide P.E. seal and signature on the final approved report. Please provide 2 signed and stamped sets of the drainage report and plan with the second submittal. Survey Comments No comments at this time. Traffic Engineering A copy of the construction plans has been forwarded to the City's Traffic Engineer, Mr. Steve Nguyen, P.E., 303-235-2862 for review and has no comments at this time. Traffic Planner Comments A copy of the construction plans has been forwarded to the City's Traffic Planner, Mr. Dave Mentor, 5055tabor reviewl.Itr 303-235-2866 for review and has the following comments: 1. Tabor Street is an identified streetscape and subject to Streetscape and Architectural Design Manual requirements (See Streetscape and Architectural Design Manual). 2. This section of Tabor is identified as "Industrial Neighborhood." 3. Specific details about this type of Streetscape project are yet to be determined but will included at a minimum: Street trees, irrigated tree lawn, sod, and detached walk. 4. A maintenance agreement for the area along Tabor will need to be signed prior to Certificate of Occupancy. 5. In addition and immediately adjacent to the ROW required by the traffic engineer, a 3.5' easement will also be required. This is to accommodate the portion of the 5' wide detached sidewalk that will fall outside the newly established ROW. 6. Escrow funds for a detached 5' sidewalk with 5' irrigated tree lawn, and street trees will be required for City construction at a future date. 7. The rate will be $41.75 per lineal foot of frontage. (Streetscape & Architectural Design Manual). 8. At 209.55' of frontage along Tabor Street total escrow for Streetscape elements is: $8749.00. "Bare-Bones" Streetscape Costs - Industrial Neighborhood Price Price per 11. Street Trees $525 ea $15.00 5' Tree lawn Sod $0.75 sf $3.75 5' Tree lawn Irrigation $1.67 sf $8.35 5' Detached Sidewalk $2.93 sf $14.65 Application for Minor Dumping/Landfill Permit Prior to the commencement of any onsite grading, an Application for Dumping/Landfill Permit, along with the fees due will need to be submitted for review and approval. For your information and submittal in the second review package, a copy of this permit is provided. Development Covenant A Development Covenant and escrow, in lieu of those public improvements and future streetscape item that are required along the Tabor Street frontage will need to be submitted prior to issuance of the building permit for this site. The estimate for the cost of these improvements will be provided by the Engineering Department. Right-of-Way Construction Permit(s)/Licensing Prior to any construction of the public improvements, the necessary right-of-way construction permit(s) and respective licensing will need to be submitted for processing by the City. Please return all red-lined prints with the second submittal. If you have any questions, please contact me at 303-235-2868. Sincerely, Michael Garcia Development Review Engineer 5055tabor reviewl.Itr Cc: Greg Knudson, Interim Public Works Director Steve Nguyen, Interim City Engineer Dave Brossman, City Surveyor Dave Mentor, Traffic Planner Meredith Reckert, Senior Planner File 5055tabor reviewl.Itr 7500 West 29th Avenue The City of Wheat Ridge, Colorado 80033 Wheat Telephone 303/ 235-2846 Ridge November 22, 2002 The Wheat Ridge Department of Planning & Development has received a request for approval of a Planned Building Group plan at the property described below. Your response to the following questions and any comments on this proposal would be appreciated by December 16, 2002. No response from you by this date will constitute no objections or concerns regarding this proposal. CASE NO: PBG-02-0 I /Steve & Doug Realty LOCATION: 5055 Tabor Street REQUESTED ACTION: Approval of a planned building group plan on property zoned Light Industrial PURPOSE: Construction of an additional 4600 square foot building on the property (5025 Tabor) APPROXIMATE AREA: .93 acre of land area Issues for consideration include the following: The adequacy of public facilities or services provided by your agency to serve this development. The availability of service lines to the development. The adequacy of capacities to service the development. Servicing of this proposed development subject to your rules and regulations. Specific easements that are needed on this or any other document. Any comments which would affect approval of this request by your agency. Please reply to: M. Reckert Department of Planning & Development Fax: 303/235-2857 DISTRIBUTION: XX Water District (Valley) XX Sanitation District (Fruitdale) XX Fire District (Arvada) Adjacent City Q XX Xcel Energy XX Qwest Communications State Land Use Commission State Geological Survey Colorado Dept. Of Transportation Colorado Div. Of Wildlife Colorado Dept. of Natural Resources Denver Regional Council of Governments Jefferson County Planning Dept. Completed by: (Name, Agency/Department, Date) Jeffco Health Department Jeffco Schools Jeffco Commissioners XX AT&T Broadband XX WHEAT RIDGE Post Office XX WHEAT RIDGE Police Department XX WHEAT RIDGE Public Works Dept. WHEAT RIDGE Park & Rec Commission XX WHEAT RIDGE Forestry Division XX WHEAT RIDGE Building Division WHEAT RIDGE Economic Development "The Carnation City" e:\pl arming\forms\agendaref.frm Cc: Greg Knudson, Interim Public Works Director Steve Nguyen, Interim City Engineer Dave Brossman, City Surveyor Dave Mentor, Traffic Planner Meredith Reckert, Senior Planner File 5055tabor reviewl.Itr L- 0 E Q - O O N O O N U) r cN G t~ J_ U ED oe) ED N 0 z 1 ..e~• WIN NUAIXMSI CORAR IX III $WIN[A51 WARIER OR INE S9UIxFASI Wta1EP. RECIIM I] (WIN l WuFIEP ALUMNI CAP LS 11.3 ~ 1 91EWN% PANNG IxT PANXC T O IR ATMs MPUCI FOR PAVxC SECRw MEEK CONCRETE PAYING -11 SfM .t DOUG REALTY PLANNED BURRING GROUP An Official Development Plan in the City of Wheat Ridge LOCATED AT 5055 @ 5015 R TABOR STREET A FORM OF I8R SOVII80ASI QUARTER OR IUR sourrou r QunR1E<, acnoN U TOWI 3 S. RANGE 63 W raw A-1/4'DANOER uuuwNM CAP ta%A= ptt Or MX[PI RiWE IN RANCE 601 P TOY 19 4A` 3 - _ J _20w- I l;ti' I J C > 9c~ I II x~ T Y1\ r)~ an TABOR V?12EI DISNANG RESESSE • ~ ~ zAgl pr A FOREIGN OF WE 19 x 010 -A A, •G ~ p I II.RI' 4SPA a Orr 1%'s .oe C~ ROTAIE EIOSnRG sEAET uwT To A A ILLAII PROPER ,.-ie---Ir app I ~ I SIDLED fLY.55 an i.1BEf STREET FORMED FLOOR OF - 516050 i a EAT, LOW ~{_y1 10.5-1 I. O' ~ d r8 dl° o ~A 4 Pgx1 IX 8£ I I J [ MfEU[XI ANA _b -Lune w~M~s ~A, sscrcn it _ Am I moo_ wwiwR la ram ~L SITE SUMMARY lWAlw: 50]5 iA4R SRIIE1, A FINAIN E L01 IR sTA'UIM HI0115 481'6]1 Ott 6 NAl ROZ ERR911 mxR, (WINIBO :aNIG ET Ax ( L OT ABA (RT"L 091 AC EBWx: W 0S K T 0 55 PNED4D OSNE : aE6TB AREA ! W9ERI AERY (101x1 I,OW 9 ORES S 9 sum 4AM IE9911x: Z4M 9 (FASNG) PABR6 IRA Rpx9pAy; I OftOttE PER y 9NT a 2 PW RAY PNNG AW9D 6ERIlS RNEIYP ERAI I ERNE (YN AD1391L) ISMOCIPANCED 10 TAX;(Mk) A9wRW: I TM IAA fOARAE N Dws OSIE10 MWi 21A4 01i B l0i 101N CBExWN: N64 n.a E Lai roTx WINES AM NAF &RU 9 11M W LOT RTx RI(AOIB xaA GamAa ALL OFOI ERxE: 3,P9 9 III8 LOT vim TINE E misnnrtRw eouu WAI MlC~OIMI~IS 4,Is'itlRYNLs BJIOEIG IBwt • I6' ) I 5 fAW fF91CE LM OIRx9FR FN0.09EE N SEEoEEN. M fE VAY AEES99E XAIBICIl (910FRALEI,AgE Wn) SPACEMM 9w YWMRp LOT I TO 6l4nxO LAffAAOM (DBFll SEAG6 E I'. r1/1 RmIRA uwwa w 10' PP ~ a All x xu1 Wr (sE NOTE) wAU TO w1GN fi11xaIW WTEWAI. 1 al APPROVED EWAL IMMINET, WAVE k w•~c %Aa tz E3'1 O 13- EM. •I 1 SITE PLAN m 0 m L7 Ct aErn ~s~~ ~ _ _J Ax]1- mrt F-I SECTION 1D• MANEIER RLAm wax c6xxRETE Fw EDST coxcRETE MILK AT as' DEEP PLAN DUMPSTER PAD DETAIL No sau M.e aMd1Utl a 1%II sum, Gwp PVn I. Me my a Mael Rb9df gpvA RAPAMI~mgwml RI cex w Ic.a II zo-w(C} Iv IM ba an RAI r~ A POROb1 W Lm 19 9AMIEY IEWOS REOEW UW FEREATEN M RT6SiI. S OR E;SE U M g E HaOPx Yi9xl 9xIT OR ATTIE SEAT WAKE A COINE)ONG O1FAW0. EEMG WA PN(I41M6T R9]® AS FGIOR W1ARR 0R AT am wEAm M I,oOR ME EGENI wNS r 0}%A OR MATTER mlllF/SE WARIER I SM SOIDFASI WARIER WANG S 69TI'11' IT Inau RIME AM ALL BAPE4S OMNED MRII RI MOVIE, 11810: 5 02411- R W27 FEET TO TM NE w W 9EER2 THENCE s 69HII' R "LING THE EOBLM LEE un LOT 4 L, OMT mm s1AGE L 14501111Y: TREAE R OOw'IY IN xsu%FEET: 11fNR M MV11- L I,AW REF. MORM S OTOW E x86 THE TEST[16T ImR OR RAY OR TABOR VOGFL 211'b FEET TO EM MY OR TEMP EAGTAI 091 NAS YOE IN IIS conic a.9ex•a am, a Calaaen ak EIEAAS ERA ERY a NASA IMP ew WNSAe6 TN6 Elm Re. ft xi$AN,IMBb ro1Wp o PRIM ~ mWhd ORR, awa d oN•a uwi n b Ne • Vod of 0 PT•atl BMEEip Gaq mfi Um ml9 pm m91M v! to rtlalin memo av MM;i m ADMEN 1 pulRU+•> vttmaT mU mx9^T ,AI Ne qm 6 mmdnel SAKI Cl n1ASAY- F wi1M9 aq MY remJe] mE NAm 11 Ne eanYVelNn.. vq msmYn u1 m 1. d .W Ar. InlIM A M 1N MA flue le al tvgllhn mE firAMI Aa Wth IN aM q m0 -I xVA•MEIMm RRm CmmnllY Oedspmml MAI 9me ei 7 ! Canty OI iK IuARRi•9 bmrvmml Tm 00nRxeR9e6 Mae me Nb~3rY a A. z000. M (9nen mme 01 m mq¢mLG) xb eu•(T) IM py MM ma eflkW edl. NY ESMMA n EVINIIN- I ME PTY E MBAs RIDGE WOE 8 LAM INN LE III RESM)ENT" ONE (1) sR,Y TREE PER 10 FEET OR sMEET FRONTAGE Iq IE55 Mxl ]Si E GROn LOT B 50A E PAINT YARI NEROx O. (1) STREET TREE PER p TaY E SWEET FRONTAX M an M6ln ax a woss LOT LoT R)my: RA AMIS TERROR IN OENEES 91x1 CwIOI YAM 9CTON 1fi-b (s) E111ERRR 1p11W§ STAI6MDS CCQ E ME MEAT R ax V mMER IIw sm eTM'OARa$ FOR YBAIUExt 9MI REFER! TO RANEE IV, Ott E MEAT PoEE 9w = Pw YN HAR NO WEE KouIREIREI VMIw 5 FOOT FRONT %TTLERI. aAl AE [1GAAE SCMEIN6 B KELMD FOR MY WI sECRAE RNCE 6 FEET x MIST (W) IEOIRIED FOR WT9DE SIOaEE ;g Asa HE W° W~ 8 P 0 Iw a 0 j A-A U t NG~ ~ O [L 3 CA V FI C1 GI U E Q i CO 7 LIE O ' N O CD N_ to a 0 (7 J_ U_ to M 0 Z SPEVE A DOUG REALTY PLANNED BUILDING GROUP An Official Development Plan in the City of Wheat Ridge LOCATED AT 5055 A 5075 N. TABOR STREET A POR ON OF iHB SOUIHRAST QUARTER OF THE EOUE®AAT QUARTER. MOM 17 70WNSEU 3 R RANGE ® W tOJ4 AQBB IAA N r 1 A PORTION OF LOT N aN Aum \ LC ETV RwewX[SI CORN [R a THE SOUTHEAST WARIER IX NET WNNE I WnR1ER, YCIIM 17 CAN 3 OIWEIER NIEMIEN CM LS. 14811, NS9 saes y RUSHED I EIE • O1fi650 UT. iturl BIE6s8 ~ DF (Allu.r ALTN1Fegd 1. MEAN PIRINM - 2 NSfALL UABIJOO QHSTpl Tm ENINANQ x WALL EROSION CpI1Ml III A. NSTALL SAW {FACE , NSFNL NAY BALE NRN OEm A. tlFIA AXD WAR 5 NSFALL dIIN AID (UTTW BAGaIL G SEED IFERAUJ IRElS 7. APPLY PANNE BASF & NINER PRO,EOE 4 UENI UP IMO PE4ID NL BNS SPaFS MaYA4 Ty, a 15 AAUINP NLAN A, w a. EMV.. slam ASavb4 Y TAW Emxo C-I/. NAVETER SPANN CAP arc OF Ni[RI IBCU IN RACY Rat n ~ to W'y ~ a. ~I I I I I rv. I I { "PI I r/ T CE 4 h ~ \I\ 4lnWC BASPt HATER DDAUtt IMO (BASS CE BEEFING) `J SLT F I mF axrt Sf N resaNDAE Wll£T Pq TAE I LAKAIOM ®UTER STAGE 1 Of GENAPEM SCALE A q 1 GRADING & EROSION CONTROL PLAN P4 C2 C2 amn A IeG- AR' a 4 a t o PONT CF CNAINCEU[NI pR na ETA NNANHI wPINlcalialn ...1mfzTH N 119]' - rA m• OMO }I/f PwrM1A I. On o CAI ANNA x wn wv 1R~~I~ W IffillJ - DoT ttLVAna TIC = iW DF PAN]IFNT iC • RP Cf CIIia G - ~ EILVAMN Oux BC • GUIDE f EOVLY aFmE THE TIE BUOEIC mMA FFE • 11,191E0 FLOOR OLENAICTION X21 NUM ELOPE EN M OR CI ET ROW OR cfa,. TY ON PANO SLSUAais ROW ONECn011. TNNCALLY N IRAEW "Al FLO1, R£CIEFL TIMNLY N OUTER #3- EUSMIO SPOT EIEVAMN fTi GtI 1. To N[ abet poclktlYn row, ad wIsrow, =bd mwava fM Oe NalmeO pw to Al taI W MEMMEt Nm d IM i EC §g~ C . Y [NN A q poje W nNA WhMA At d tFVf N ,r t $S o" r ®r aq xSmal _tNd rMo- 9TH h EbAIN f mE NoI a -uk,J to NMn .wow III m tM Ilte a A co, wy tpbMI tltl y ~ z u Iwmi rise MfaNY aocbieNe M` At "MAI'd ad m ANot !W w ranmN 99 ] NdR: ban yle atgl m sl kM F Ne o)yesE qae< Topal rW owopom SIN N, xgegolM bM eN bk:w fAaobtl} iry%] aW awa/Eel M Ee re6eVI:u1M blbM r-'4 FY 3 IM ao~ . AMP ro+ef godo, to prmbe a INI Em 1a aw -III at Ee xeAtl AM {lmbet RuroN Mr, s N*ISN am NW M oooto N to pewit aov[I aM «aYtal 3 veUmalaNm e( raeMq rotor. 6 x ptri or taryavy, si etm3¢alin mnv/a fA M obAw to "obbed awf aM vi l lY i N Ft S W n e o n o nINF !B Oap aflr ma qpY b rwNOf m mr pa a to 6fIUDN aaw wM moY rol M N tFt wUF ]0 b a MINIM T a1MRU1M TlMG MI 4v oi4 Ti4 4oN. WI 111 M IeN EAemml la Imger bm f0 Wp $ It F rmmmgN tM IM Mob"Nbt NNo mF w pmlN ANNIE 01 to lee, Ne II fi N hg [elab sbllr. Taryvay mw crust M KAAAIAO N no Eul&q pmnRA ae to M ®IM for mas iMn R l AA. 1 M m1NN ~ A io i y E MM "AyJ F rtmodL ll Irvltll fw1 of I tut m tpplkobor My AM still iaryaay my1NM mt oyIMAIIM of Alvud Rp G® fIy M NyYO veNN N a 6 PO 0. M1e Pas 6.e xetl pv ocn a t s. FA I UM eMaorIs nobtthq M1an 4M1W bEtWW orW/a s YM M smtrNM III I bM Eab a EINEI emtatl teNndo;y m III by Me WoNbOo DyaMat of Hooto of the tine of probi, S IM awYFl aM w9, I vnlrof 0.. moy W MI by IEe Dgalmnl of EHI m, o Trnyonman a At armanea seoraatbiw w IMe cmmtans araK } m SILT PENCE INSTALLATION 5ECEON DETAIL SILT FENCE EROSION BARRIER SF ILI- mom. •e~ a nm. •rvOTESa muss .xawrz ~ - r Ara nnma SECTION A-A DETAIP __1 TEf.IPI:RARV CONSTRUCTION EINTFANC, CE F1 * /N p>; URV Tx_ =S 0 z a j~tt 0 t'r ~ JF, QWW~ Aso Ll 'd 0 01. rfEimAr ¢ O 3 dam(] In, AN, 3 E, @Q W a I I.r WHI .i. Z uE~L 9RAn auE F a yrn 91, ~I~ .I OtY N W i I O ITT > K CIRnW li FI LA II~N 1. IN r,I. 4UIi ate.. ENW I-o 11 _ETA. ' E?NIL ~I STRAW BALE EROSION BARRIER ,TC E;Q L I 1 °F WHEAT LAND USL CASE PROCESSING APPLI` i.TION °F WHEAT 0 0 m Planning and Development Department 7500 West 29th Avenue, Wheat Ridge, CO 80033 got oR no° Phone (303) 235-2846 OTC OR P°° (Please print or type all information) Applican`'-tP~ l~fAddress -5655 TARaCS C Phone O 6 City IA)~IEdT ~QGE Owner STS E Address ~A M 1_ Phone - City Location of request (address) 5- 03, - ~O =1 Type of action requested (check one or more of the actions liste d below which pertain to your request.) ❑ Change of zone or zone conditions ❑ Variance / Waiver ❑ Site development plan approval ❑ Nonconforming use change ❑ Special Use Permit ❑ Flood plain special exception ❑ Conditional Use Permit ❑ Interpretation of Code ❑ Temporary Use, Buildings, Signs Lot line Adjustment ❑ Minor Subdivision (5 lots or less) Planned Building Group ❑ Subdivision (More'than 5 lots) ❑ Street Vacation ❑ Preliminary ❑ Final ❑ Other: Detailed description of the request: ~/ltn I_ taC Go Fill out the following information to the best of your knowledge. Current Zoning: I Size of Lot (acres or square footage): 0. q 4 A Cp, P-s Current use: Proposed use: C r' Ae% A4 1 Assessors Parcel Number: I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with the knowledge and consent of those persons listed above, without whose consent the requested action cannot lawfully be accomplished. Applicants other than=owners must submit power-of-attorn y from the owner hich a roved of thi action on his behalf. Signature of Applican `L Sub ribed and swo to me this day '49110)z Notary Public My cRW r 41 Public moo= Date received S Receipt No. Case o. P es' Related Case No. Zoning Z Quarter Section Map ~E d a o¢ o~ .o 4+J mo cu v O OW2 6L1~ Li ( CD tj L LO= a) r- N (u OL_ CU ul -m H oOWR ~NLL.G U wy aLU w TI:r f ~y° ~ro k 4) V Q I v ° 11 a rf r+ G .y O Fa> C I O r ZP O 0$ .C ~ 3 ~ c6 a1 ° ~ U ti Y ~ v° 'D \ l O m U w t6 M R T Vi I o w w N -H rd Id ~ O .5 1 g o Id G w o +1 v y y ° .r 'a d c $ S c OV O 1 0 d Ui w O 9 N M R..r' y o D m w n?`.. H l o •O » -.I w W $ Ern W W ° t9 $ O p~ u Fq Y '~.9 a m ~ij 'o a r 0 0 0 w W 0 w a F W ei ~ o ti J: Z q> ~j C I o- ~ 'o C d O W w v C v A m Z: Z. 2 i v u v r u w o bl M ° m m C > o c 3 ° fY; I-C4 c 6 H I m 1' W .-I C .t! -rl o y V O W y - k v p d; O m A 2 1 ti> w W o A rn 0 Y '✓Pi v v Q i °u ~ N ~ C ✓ yl .b' ro W w ° ~ > ? Q u m v ~ G w A N N ~ G W I v 3 0 H Sa A eb o a > S p .y x! -.4 to 4 a C 00".-H W .u D v: w q No y A v m 0, A 1 0° g rl w C .N O W O U m> 3 W W ° 'z °w I A i rl .H W 0♦ A o .o°~ w a a , 'CO v d p to S> ro 1 1 O O N bl W J~ W L a y d R ti T CO i W w rd V W .a iu. .g .3 m m w 'x'1' i. O ti C I 13 o t~ A o 0 W bl a ~ w N 0 o W 1 1 d N N M O at N •O 8 .0 3 a .q. m 'CC ,e o N M W 1 I tl Id bl w N JJ V M -fl Z y 2 N y -°r wo N F1 O p,' 1 W r-- o W N r AL a°. t;j oD aV1 O o0 N A w .4 N d, ~'i 1 W R$ O O\ w D -N W J ? q 3 T c y, U' W o 0 0 0 I ro w W ,-r .u o W to v V 11 b 'O w 'O I W ,R 1d N W >ti 15 a w ° e m 31 3 w 3 0 - m s V '°o C m O Id N to w I 'a h .N •.i w A W I W ° v v o Id o ,g 0 a o o V o i F w v N R, o to d w A 't3 .'i'' a o ,a m e c, v m o 'o aNi h W rl .-1 ,-i I b O N fd m td a O N C a1 a 'O v w m u y C ti ^ v q U U t3 U m i i s ?I W a C tai W a~ a A m y o A 0 W 1 1 •.pa 1~ N tl z w o .t~ u .i W a' -P 4) Z 00 ~ {Cl ^ y ^ 14 I•!I V p (d 'd O G 1 1 e1 O N 1 11 W S. A y p Yi o 3 o I I on ° o u a w In W u k A o s L^ Y CW4 > y W wm U O aI 1~Fbu AA A'tio 9 0 v u M `~v~ a;, ❑ wp poi W ` W Q a y `d 1 I tM 41 11 'O t] W Q m d 5 a R ro q Q N (~y'I fR -J I-a '6 I I 3 v W H Id .rr Id M I Fi yC. d o m ~ i°+ UC ~ qd ~ '3 ° b W- o m .V .V E .-I o v c v a 'o a s 5 m 7+ ° m'RI v 5 m y tul N V P' t cn }I J~ 0 ro w o O H d w" u O % W C. rl _ i I .V W M W I-~ u Q o W q F i o O fd HW I O W N W N y "'•O w f 7 W Id wm 71 C 2 » 43 0 ° R N o o o o A Sa q N O W W O Id W z v o H A N o W fu a W w p >1 w o 1 1 o w m N w c u W rd r+ W J I I° 2 sl H o w w W 7 a ~d o W a ro v 3 a w o w n o Id h -A Y,I 1 I q- O W W W O$ O 'o d N a I I ?I V a C.' W rl O VI 2 m La`. F w w •'.3 0 v P 4. a O o W ,n o ~.I i i o c w o r W u w .11 m > 3° w 3 9 ,a v a t 3 0 W S K o y .LI 41 Id Gf I I •m w o o u W A A 'a w A b Lai c O q 71 W -rl ro Sr F o 1 to N OI r1 v ❑ ° C tal c i P a 14 N H o u ?I .o ma ti W 'v o v w O .S ~q c W W $ 'tl 7 v' 1 - °i 9 a •o +t P. o o ° v 7 m ti~~ o W o W ° o OL r O I w 3 W Itl P F a E c O p c V „w V27-I 1 m v A rt WAIo rdw o W v° 3 o o ama~ y k"., P w v o 3 d >o c N a d aC ,I ~ ti oo~'s3 a~ ~ a ~m ci ~ o b 7 01 'O '.i C v Z H pg F ° E•I c. ra ° .vT " a ,ad yy E O a N o' ' G> yFyUu .1 ° I As ,F.CG!: woo mti r; A M LL NO O G O ° W F a o SL ,-I 3 0 I As 'o ti C ,q .o m w a 'V N q P] rn u N 3 lOOZ V t d3S p-~ ~~A2N1N~4Yp~OQ31'dls 6 J i v v H H 0 E+ in N 0 a m v ~ w 3 Ifs iF Ol v-I F: Q kl w E O 'd m U fd w w ro w ~ q m p ro H itl z o HH a E o ~ a N H a 0 o u~ a m oa s, v a m m r~ 3 a c7 w W w o ro a m ti v o w p .N o rl U 7i O A w H li O H 7 of p ~ ~ N H v 4+ 0O m i U A o ~ ro w N ro o h Rr w ~ ~ 0 m 0 /'y N q m ~ o ,G o ~ ~ V Case No.: PBG02. - Quarter Section Map N App: Last Name: Steve & Doug Realty LLC Related Cases: App: First N ame: Udick & Eaton Case Histor y: Owne r: Last Name: _ame Owner: First Nam e: App Addre ss: 5055 Tabor St. Review Body: City, State Z ip: eat Ridge, CO 80033 App: Pho ne: 303-880-5259 APN' Owner Address: ame 2nd Revie w Body: City/St ate/Zip: ame 2nd Review Date Owner Phone: same Decision-making Body Project Address: 5055.. V Approval/Denial Date: Street Name : abor Street City/State, Zip. heat Ridge, CO 80033 W Reso/Ordinance No.: Case Disposition: F Project Planner: Reckert File Lo cation: ctive Not es: r Follow- Up: o.: 17 Planned Building Group dm... 39-174-174-08-014 L. dm. Con ns of Approval: F_ District: l VDate Rec eived: 11/15/2002 Pre-App Date: 1211812001 CITY OF WHEAT RIDGE 11/15102 9.04 AN cdb UDICK & EATON RECEIPT NO-CO14129 AMOUNT FNSD ZONING APPLICATION F 250.00 ZONE PAYMENT RECEIVED AMOUNT CK 1006 250,00 TOTAL 250.00 ® ASELINE engioee ing wvpo January 3, 2002 Meredith Reckert, Senior Planner City of Wheat Ridge 7500 West 29th Avenue Wheat Ridge, Colorado 80033 Re: Administrative PBG Plan at 50550 and 5025 Tabor Street Doug Udick forwarded your comments to us and we have addressed the comments related to civil items as follows: Planning - Your 12/18/02 letter: Items 1-9 have been addressed. Since the property already has many trees and very little is being added, the landscaping information is shown on the civil site plan. We hope this format is acceptable. Public Works - Michael Garcia's letter dated 12/13/02: Two copies of the drainage study are enclosed for review. Please forward them to Mr. Garcia. Item 5 on page 2 of his letter, the 3.5' easement, has been added to the plans. Valley Water district - Robert Arnold's 12/4/02 letter: I spoke to Mr. Arnold on 12/31/02 and he stated that no water main extensions into the property would be required, unless the Fire Department asked for it, which they did not. Arvada Fire Protection District - Steve Steigleder's letter dated 01 /02103: of a set of plans 1 called Steve to see if he had received a referral, which he had not. I dropped on 12/31/02. We appreciate his quick response. Per his letter, the fire lane sign and a non combustible material note for the trash enclosure have been added. I have attached a copy of his letter for your records. Police Department - Les Gregor's letter dated 11 /26102: Lighting information, existing and proposed, had been added to the plans. Please call me if you have any questions or require further information. Sincerely, " ~ M"A y7'/- Lisa Padgett Project Engineer =ROM : AFPDDFP<? FAY. NO. : 30-34225543 Jan. 03 2003 07:34AN P2 Arvada Fire Protection District Division of Fire Prevention January 2, 2002 Ms. Lisa Padgett, Project Engineer Baseline Engineering 1658 Cole Blvd., Suite 295 Golden, CO 80401 RE: Steve and Doug Realty 5025/5055 Tabor St. Dear Ms. Padgett, Thank your for allowing our office to review the site plan for the property located at 5025/5055 Tabor St. I do apologize that we did not receive a submital from the City of Wheat Ridge. We do have four items that we would need additional information if possible. 1. What will be the construction of the access roadway into the property. The driveway will need to be an all-weather surface capable of supporting the imposed loads of 56,0001b fire apparatus. 2. The access roadway will need to be posted where possible on each side, "No Parking Fire Lane' with signs that meet City of Wheat Ridge Standards. 3. The existing fire hydrant will be sufficient. It does not appear at this time.that the building will need to be provided with an automatic sprinkler system. 4. If the trash enclosure including doors if provided will need to be of non combustible construction. If you have any questions or would need any additional information, please feel free to give me a call at 303-463-7463. Sincerely, Arvada Fire Protection District Steve S der Deputy Fire Marshal. 7300 kipiing Street Arvada, Colorado 8000x3876 • (303) 463-7655 • Fax (303) 4225549 Wheat Ridge Planning and Development Department of wHEar a PRE-APPLICATION MEETING SUMMARY m Date: ~e of °OtoRro° Attending Applicant(s): Address/Phone: Attending Owner: ~~c~ V a aL Address/Phone: Attending Staff: • ~~t~ T Crane, Rv~s~1v. ~1• QeS~c-~•a t~ Mc~~ Address or Specific Site Location: 5bS5 I lbor 5F. Existing Zoning: ~r"V%J •~a\ Existing Comp. Plan: •[3? ( BUS1r\ e sS Applicant/Owner Preliminary Proposal: prS~u~{ d L~ p ~7~ V~CC~o2~, eV4~r eS5 w u~1 bo4 co- ueEe C~ Azca~kwb - neF vn Jn cash r er w~\v n . W „A _ 1n(dkae z Ada, Cdev -ETgf.*S fob (ak-s a`c1c' ve ffuc s. Willa neighborhood meeting need to be held prior to application submittal? No Planning comments: KwwS ~~PQ\y ~f+( a ~lannec~ 13w1c1 ~toy~ jp allow 2 Se~dc ~s~(k t<s on lb\ C°YW052 tr.aA t, f aicua eo7. of t\,A \oka\ Lot, (.12e% ~anJsczP Ye9u r~~~ ~ul\ Ski p\~rs rwS} he Sib .}1~ w vc1. Sew b .\a L2-.8Scz(i~ ¢ leKi•r \iJ\„~~ S\~v`a~e, e•Ec. 7F k1.nc ~ Svbyv.c}~\ ~ ~c\~.~ ~¢(vvii ° A\\ oKit ae oY a3t +v~w%e be Suree..ed b t (o' view ob5(uc Lv~ ~~e v~v~~ys~ti( '1v.~.St ~^a r.CJCCldt¢e~ 10~ row• C.o.. bwS ~l~i\.e. . 5d be 5n' in ~re.t Cizb>.~ ~ \o' i t~ Public Works comments: ° ~re\v h I > costa. Cot`awl t Frwl CTr2,~%-6 l~~n w.\\ be ~egtawcl at ~tiw-G ~¢Vcloamork .~ytccman~ N•\\ he Ytr\~ir~a {br pub\lc l~erort,Yw,,- & be ~uo}:~ n v.i.\\ (-quxr¢a h~ ..oar aniez iced . a\n T*-< Sfirce~ C5 ' ) . -KV,% c z, 6 aa.orr p\.s\ eA W0"k a VecoreQb0\ ke haue 5' F(ee \2a,. " 5' &eN; ea S~atwa\Y-. fin. \~•r.prareA~,.av~tS ire ~t ~.ev.stv,.•e!r•s w.,,, Wvr. ¢y.,,o,a Fyr i,,,,provk.,,{S Vv k~. Q4xo b \d ( low cb v ~e~w o~FiLe spat) 9 p~rf~. spices w.~l be v ~-e~~Y~a . o~ _ ~ sQ~~ ~,kst ~f -r~,9 1~ a v7macuss,b4 ~u..a,cap~,.ea sgtce. ex}efwf \:9~k rxl mot e,uAEa Building comments: Streetscape / Architectural Design comments: Other comments: City of Wheat Ridge Planning and Development Department Memorandum TO: Alan White Michael Pesicka Meredith Reckert Mike Garcia Darin Morgan Dave Brossman Mary Austin Dave Menter Travis Crane Steve Nguyen FROM: Kathy Field SUBJECT: 12/18 Pre-App Meeting DATE: December 11, 2001 One (1) pre-app is scheduled for Tuesday, December 18' at 2:30 p.m. The applicant is Doug Udick, manager of Steve & Doug Realty (owner). He is proposing developing the property located at 5055 Tabor Street and zoned I and building a 4000 s.f storage/maintenance building for the purpose of operating a concrete contracting company. No pre-apps are scheduled for December 25' (Christmas) and January In (New Year's). HO HO HO! EATON U. INC. 5055 TABOR STREET #C WHEAT RIDGE, CO. 80033 303-431-6000 OFFICE 303-431-2700 FAX 10 December 2001 CITY OF WHEAT RIDGE PLANNING &z DEVELOPMENT DEPARTMENT ATTN: MEREDITH RECKERT, SENIOR PLANNER 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 Dear Meredith: We at Steve & Doug Realty, plan to develop our property at 5055 Tabor St., Wheat Ridge, CO 80033 for the exclusive use by our sister company Eaton U, Inc. Eaton U, Inc. is a concrete contracting company. Our plans for the property are to build a 40'X 100' steel storage &z maintenance building. We have two tandem dump trucks, two bobcat loaders, one asphalt roller and six pickup trucks. We plan to do light repair and basic maintenance on our fleet at this location. Our Prl arY motwation for brldi g t...., . his fadb , i to »rn<ri'qP a base of operation for our concrete company. In effect, office &z storage for materials &r tools required for our business. Eaton U. Inc. anticipates little or no cliental at this location as the majority of our work is gathered through the 'aid process. Doug.Vdick Manager of Steve &z Doug Realty, LLC Sincerely yours, D b 5i z Itz n ~ MF, I F~ eC~ A~ 3 9a ~ ~ R RRg 4i a~ A R a I, e F"wo is mtF q MAY mP," (,a M RUCARB BT RPMAIT OWAANI) 9Atai t. r . ,,.s• .n rat .,z~. _ ~-ono M Sqy 9 99 9 ~yRa ps $$i} ` { tp 'la M1y ~ a a j; T$Y Y F qA S i i gg a~.g 45s4 ~ r 's P~~~$5y5 7~ 9 aaa=% r -N m 4€ Dun q F11, i