Case No. WZ-07-05 was a request by Cabela's for approval of an amendment to the recorded
Final Development Plan for the property. This case has been closed as the project is not moving
forward. Should the developer wish to resurrect the FDP amendment, a new application with
fees will be required.
, City of
WheatRiidge
PUBLIC WORKS
City of Wheat Ridge Municipal Building
February 8, 2008
Katie L. Ross, P.E.
V3 Companies of Colorado, Ltd.
2399 Blake Street, Suite 130
Denver, CO 80205
303.989.8588
7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2861 F: 303.235.2857
Re: - Fifth Review Comments of the Final Drainage Report, and Grading & Erosion Control Plan for the
I'Bank located at the southeast corner of 32nd Avenue and Youngfield Street.
Dear Ms. Ross,
I have completed the fifth review of the above referenced documents received on January 30, 2008. This letter
is to inform you that all of the above-mentioned documents for this development have been reviewed and are
hereby approved for construction by the Department of Public Works.
Please be aware of the following items regarding the construction of the project:
1. Grading and Erosion Control
The erosion control for the project shall be in place prior to the commencement of any grading activities,
and maintained as needed during the course of construction. Please be advised that additional erosion
control measures may be required if deemed necessary by the City Inspector.
2. Right-of-Way Construction Permit(s)/Licensing
Prior to the construction of any improvements, utility service connections, etc. within the public Right-of-
Way, the required Right-of-Way Construction Permit(s) and respective licensing shall be submitted to the
Department of Public Works for processing. Right-of-Way Construction Permits are issued only after
approval of all required technical documents, including but not limited to, the Final Drainage Report &
Plan, Final Plat, Final Development Plan, Traffic Impact Study, Storm Sewer Plans, Street Construction
Plans, Grading & Erosion Control Plan, and easement and/or ROW dedications.
3. 2-Year Warranty Period for Public Improvements
The Contractor shall warrant all work performed within the public right-of-way for a period of two (2)
years, commencing upon completion of all constructed public improvements and Final Acceptance by the
City Inspector. Prior to the expiration of said 2-year Warranty Period, if the City Inspector deems that the
constructed public improvements are in such condition as to require repairs or replacement, the Contractor
shall complete such repair work upon request per the City of Wheat Ridge Permit Testing and Inspection
Requirements.
4. Application for Minor Grading/Fill Permit
Prior to the commencement of any onsite grading, an Application for Grading/Landfill Permit, along with
the fees due will need to be submitted for review and approval. This Permit is issued at the time of the
Building Permit.
e s
City of
~Wheat~dge
January 18, 2008
Nathan Schrock
1101 Bannock Street
Denver, Colorado 80204
RE: Cabela's Final Development Plan, Amendment No. 1
Dear Mr. Schrock:
I have completed my initial review of the amended Final Development Plan for 4000 Cabela Drive, and I
have the following comments:
1. General:
A. I have included all comments received from the referral agencies. If you have any questions
regarding these referral comments, please direct them to the agency which generated said
comment.
B. This application included a streetscape narrative which describes the character and planting
pattern of the streetscape along Cabela Drive. Please be aware that this narrative does not
convey sufficient detail, and does not constitute a true streetscape plan. While the
streetscape plan will not be a requirement of this Final Development Plan approval, it
should be noted that a streetscape plan (complete with narrative, detail or cut sheets of
fixtures and plan set for the corridor) must be reviewed and approved by the City of Wheat
Ridge prior to completion of the roadway plans. The streetscape plans should include a
narrative, detail or cut sheets of fixtures, amenities and lighting elements and a plan set
which details the location of the improvements along the corridor. It is imperative that this
streetscape plan be submitted for review and coordinated with the street construction plans.
C. It would be helpful if each page were numbered sequentially; e.g. 1 of 16, 2 of 16, etc. It has
been staff's observation that the Jefferson County Clerk and Recorder typically requires this
type of numbering convention.
2. Final Development Plan, Page One:
A. Please correct the name of the subdivision listed in the Parcel Description to read
Cabela's/Coors Subdivision Filing No. 1 Amended.
B. Please correct the title of this Final Development Plan to a unique name. Staff suggests
naming this document "Cabela's First Amended Final Development Plan".
C. Please correct portions of the legal description which are not in capitals, as the rest of the
description is in capital letters.
D. Please change the text of the Owner's Certificate to reflect a singular ownership.
CITY OF WHEAT RIDGE MUNICIPAL BUILDING 7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.234.5900 f. 303.234.5924
email: info&i.wheatridge.co.us www.ci.wheatridge.coms
I
City of
~WheatRiAc
E. Please correct line four of the Owner's Certificate to read: "...and approval of this final
development plan..."
F. Please remove the Planning Commission Certificate, as this amendment will not be
reviewed by the Planning Commission.
G. Please reword the City Council Approval to: City Approval - approved this day of
20 by the City of Wheat Ridge."
H. Please add the following to the case history box: MS-06-09, MS-06-10, SUP-07-11, WZ-07-
05.
3. Final Development Plan, Page Two:
A. As was the case with the previous Final Development Plan, the parking lot is extremely
pedestrian unfriendly. Customers will traverse through drive aisles to get to the front of the
store without any place of refuge. It is suggested that a basic pedestrian framework be
included in this site plan which will ensure the safety of the pedestrians onsite.
B. It is unclear what the cross-hatch pattern denotes in the upper-left hand corner of the page. A
verbal concern was voiced by Jefferson County, as the cross hatch pattern seems to cover
some of the County's property.
C. Please remove the sight distance triangles.
4. Final Development Plan, Page Three:
A. The landscape coverage has been changed to almost 100% native seeding. Upon next
submittal, please describe what type of native seeding is to be used, and how it will be
applied. In staff's experience, if native seeding is not installed properly, it will not thrive and
the landscape area will be full of barren spots. This is unacceptable. While staff understands
the intent of creating a drought-tolerant landscape, this objective can be better achieved by
installing low water demand turf.
5. Final Development Plan, Page Four:
A. Please remove the Aspen and Box Elder categories from the planting schedule. These trees
are not permissible.
6. Final Development Plan, Page Five:
A. No comments.
7. Final Development Plan, Page Six:
A. Please label the corrals on this page.
CITY OF WHEAT RIDGE MUNICIPAL BUILDING 7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.234.5900 f. 303.234.5924
email: info&i.wheatridge.coms www.ci.wheatridge.co.us
s di
City of
~M heatWdge
8. Final Development Plan, Page Seven:
A. In the legend, please change the label for "Streetscape Trees" to "Street trees". This change
should be made on each subsequent page.
9. Final Development Plan, Page Eight:
A. No comments.
10. Final Development Plan, Page Nine:
A. Please remove the aspen trees from this page.
11. Final Development Plan, Page Ten:
A. The northern elevation needs more detail. This elevation will be the most visible elevation
and will be viewed by over 100,000 cars daily on I-70. The treatment should reflect this
level of attention. AS proposed, it simply looks like the back of the building.
12. Final Development Plan, Page Eleven:
A. No comments.
13. Final Development Plan, Page Twelve:
A. No comments.
14. Final Development Plan, Page Thirteen:
A. Please clarify the photometric calculations. Some of the figures are unclear.
15. Final Development Plan, Page Fourteen:
A. Please clarify the photometric calculations. Some of the figures are unclear.
16. Final Development Plan, Page Fifteen:
A. Please clarify the photometric calculations. Some of the figures are unclear.
17. Final Development Plan, Page Sixteen:
CITY OF WHEAT RIDGE MUNICIPAL BUILDING 7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.234.5900 f 303.234.5924
email: info@ci.wheatridge.co.us www.ci.wheatridgexo.us
City of
WheatWdge
A. Please clarify the photometric calculations. Some of the figures are unclear.
Please make all the required corrections prior to the next submittal. If you have any questions regarding
these comments, please feel free to contact me. I can be reached at 303.235.2849 or
tcraneg,ci.wheatrid eg co.us.
Sincerely,
Travis R. Crane
Planner II
CITY OF WHEAT RIDGE MUNICIPAL BUILDING 7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.234.5900 f. 303.234.5924
email: info&i.wheatridge.coms www.ci.wheatridgexoxs
West Metro Fire Protection District
433 S. Allison Parkway
Lakewood, CO 80226
Bus: (303) 989-4307
Fax: (303) 989-6725
www.westmetrofire.org
January 17, 2008
Travis R. Crane
City of Wheat Ridge
Community Development
7500 West 29th Avenue
Wheat Ridge, CO 80033
Re: WZ-07-05/ Cabela's
Dear Travis:
RECEIVE"
JAN 2 L 2007
This property is within the West Metro Fire Protection District (WMFPD). Fire service
will be provided as long as provisions of the International Fire Code, 2006 edition,
including amendments are met in development. Water plan, hydrant locations and access
needs have been addressed. Access from 32 ad Avenue and Cabela Drive and the
underpass at Youngfield and 44th Avenue will be crucial to emergency response.
The WMFPD will service this property from Station Five, 14055 W. 20th Avenue, Station
Two, 1545 Robb Street, and Station Six, 15100 W. 6t' Avenue. Units available to
respond from the above referenced stations include two engines, one 65' telesqurt, one
medic unit and the hazardous materials unit. Additionally, two 100' elevating towers,
three 65' telesquirts, nine engines, one heavy rescue, four wildland units, seven medic
units, one safety medical officer and two district chiefs are staffed within the district at all
times. Response time to the referenced property is four minutes. The WMFPD has
attained an Insurance Service Organizations (ISO) rating of three.
The WMFPD has amended the International Fire Code and all occupancies over 3600
square feet are required to have an automatic fire detection system installed.
The fire department has amended the fire code and all buildings over 50,000 square feet
are required to have an 800 MHz radio amplification system installed for emergency
communications. Contact the fire departments communication officer to obtain
requirements (Division Chief Mark Krapf, 303-989-4307 extension 447), or the
requirements can be found at www.westmetrofire.org.
"Whatever It Takes"... To Serve
Permits shall be obtained from the fire department for core and shell, tenant
improvement, all work on fire detection systems, all work on fire suppression systems,
for the installation of bi-directional amplification systems, underground fire line
installation and for the storage of hazardous materials.
The WMFPD has no objections or concerns to the minor changes to the final
development plan for the above referenced property.
WMFPD reserves the right to provide additional comments/requirements at the time
when plans are submitted and reviewed per applicable codes and amendments.
If you have any questions contact me at 303-989-4307 extension 513 or e-mail:
dabbink(crwestmetrofire.ore.
Respectfully, j»
David Abbink, Deputy Chief/Fire Marshal
d it City of
Wheatj~I ge
PUBLIC WORKS
Memorandum
TO: Dave Brossman, Development Review Engineer
FROM: Steve Nguyen, Engineering Managers]
DATE: Monday, January 14, 2008
SUBJECT: Cabela's Development, WZ-07-05, Final Development Plan Amendment
I have reviewed the above document and the Traffic Impact Study, dated October 2007, and
would like to offer the following comments:
1. Various drainage reports and plans related to the development have been reviewed and
forwarded to Martin/Martin for revision and further review.
2. Plans and reports of roadway improvements related to the development have been
reviewed and forwarded to Martin/Martin for revision and further review.
3. Report and plan for the regional pond and Cabela Drive is under review for
coordination of other engineering plan to ensure proper matching and continuity of
drainage design and other elements.
4. Drainage report and storm sewer plan for Cabela Drive is required for review for
coordination of other engineering plan to ensure proper matching and continuity of
drainage design and other elements.
5. Please include roadway lighting plans in the next submittal for review and approval.
Design shall meet Xcel's standards, as this facility will be maintained by this agency.
6. A traffic management plan will be required for review and approval prior to Certificate
of Occupancy. This is necessary to effectively manage the store opening traffic as
stated in the Traffic impact study.
7. A traffic signal timing plans for the new roadway associated with the development will
be required for review, approval and implementation prior to Certificate of Occupancy.
This is needed for the operation on newly constructed traffic signals and adjacent
affected ones. The plans shall include initial timing and field tuning at the time of
normal traffic pattern.
8. A financial or payment plan is needed to address the construction of traffic signals at
location warranted beyond year 2008.
9. Streetscape element will need to be included in the design and construction for all
proposed streets. The design shall meet the Neighborhood Commercial standards in the
City of Wheat Ridge Streetscape and Architectural Design Manual. This will include
but not limited to major Wheat Ridge entryways, detached sidewalk, pedestrian
lighting, street furniture, planters, monument, tree lawn and related irrigation. An
established theme is expected with this plan to ties with the afore mention streetscape
components to the new bridges at SH 58 and Clear Creek. This plan submittal should
be the priority since the construction if these features will conflict with the
construction of the roadway and site improvements.
10. Sight triangle design shall satisfy City Code sec 26-603.
11. High profile evergreen trees planting should be avoided at intersection corners to
maintain intersection sight distance. Design to meet sight distance requirement.
12. High profile landscaping at islands should be designed to meet the 36"-84" window to
maintain sight distance.
13. Site circulation and parking layout should be designed with adequate geometry to
accommodate the anticipated truck route(s) in and out of the store.
14. Site access to 40th Avenue is either required to be gated or have limited access due to
proximity of the TMAC access and the anticipated truck route from the store. It is
strongly suggested to combine these access locations as one for safer traffic operation.
The combined access should be planned at a location to line up with the future access
to the south parcel across 40th Avenue.
Traffic Impact Study comments
1. Page i - Under the recommended Improvements discussed in Page I of the report
on 32"d Avenue from Alkire Street to Youngfreld Street, please detail how 32nd
Avenue east of Youngfield would be transitioned to the subject widened segment.
2. Page ii - Widen 32"d Avenue east of Youngfreld Street to beyond Xenon Street by
year 2030. Please clarify of provide additional detail on what configuration would
look like. A detail section needs to be provided if it id different than the W32/I70
EA concept drawing.
3. Page 10 - Footnote 3 is missing in Table 1.
4. Page 41 - Temp traffic management plan shall be provided prior to store opening
as discussed in FDP comment # 5.
5. Page 13 - Please update site data in table 2 if there is more definite changes to
proposed land use. The FDP Amendment shows a floor plan reduction which may
or may not change the vehicular trips.
6. Page 41 - Timing plan is needed for review, approval and implement by store
opening date as discussed in FDP comment # 6.
7. Page 43 - traffic signal conduit and junction boxes shall be included in the
construction of Cabela Drive at the intersection of 40th and La Quinta for future
traffic signal.
8. Traffic signal design and construction will need to be a part of the Cabela Drive
project for all affected signals identified in the 2008 scenario.
WheatRdge
To: Dave Brossman, Development Engineer
Stormwater Quality Management
From: William C. LaRow, Stormwater Quality Program Manager
Date: January 8, 2007
Subject: Proposed Cabela Site - Foundation and final grade, Wheat Ridge, CO.
I have reviewed the first submittal of the Stormwater Management Plan (SWMP) and its
corresponding engineering drawings dated December 4, 2007 for the above project and I
have the following comments:
Comments:
Text Narrative:
Note: For future reference, For clarity purposes it is a good idea to have the pages
numbered. Also words such as "possible", "effort", "attempt" and "may" are words that
do not belong in a SWMP. The purpose of the SWMP is to explain what will be done to
assure potential pollutants will be minimized in the effort to maintain Stormwater quality.
1. The Superintendent is not an acceptable SWMP administrator. Superintendent has
to many other responsibilities that will have higher priority.
2. Section 1.0 : Clarify applicability of the State permit reference 'T B.1"
3. Section 1.2 :The use of "the project" is not the best term to be used, in the
following sections "the project" is used in a different capacity.
4. Section 1.5 : Need to account for all activities and operations associated with the
project.
5. Section 1.8 : "May include"?
6. Section 1.9: The sediment basins (SB) need to be explained in more detail such
as details of their construction. Also, being that they are considered temporary
need further explanation of the time frame of each. Will the SB located to the SE
be abandoned and when will the inlet be in placed ?
1 of 5
A
Wheat ijdge Stormwater Quality Management
7. Section 3.0 :
• Clarify what contaminated soils means, is that expected out there?
• What specifically will be loaded and unloaded ? and the location ?
• Need to show the tentative locations of the portable toilets.
8. Section 3.2 : line e and d are not considered erosion or sediment controls.
9. Concrete Washout needs to be shown on the engineering drawings.
10. Construction materials need to be stored in the SSA.
11. Section 3.2.2 :
• Be more specific as to what "SWMP Reference Guide" is and by who.
• Hay bales are not an acceptable BMP.
• Will rock wattles be used, yes or no?
12. Section 3.2.3
• "Existing vegetation will be protected and maintained wherever possible." If this
will be done, need to show these areas on the map.
• Erosion control blankets will need to be approved by the City's Stormwater
Quality Manager.
• Stabilization BMPs will be installed within the States time requirements.
• Need to have construction fencing to assure that the VTCs are effective and to
keep non construction traffic from freely walking on to the project site.
13. Section 3.2.4
Remove the BMP "straw bales" SB and replace with an appropriate BMP.
BMP s will not automatically be removed after construction, only when final
stabilization requirements are met.
Need more details for "chemicals" under potential pollutants.
14. Section 3.3 :
• Show the tentative locations of the metal dumpsters.
• Third paragraph mentions a "designed area" this should be the SSA and shown on
the map.
• What does the spill response kit consist of?
• Onsite fueling should be conducted at the SSA, if not need to show the tentative
locations and/or describe how the onsite fueling will be done.
• What are the incidental fuels? (diesel, gasoline, or propane etc.)
• Show where these chemicals will be stored and how storage and containment will
be done.
• How will the trash receptacles be secured?
2of5
WheatR~idge Stormwater Quality Management
• More details on the location and design of the tool washout area.
15. Section 3.4.1 :
• Chemicals need to be covered from the elements.
• Any chemicals remaining in containers will need to be disposed of in accordance
to Federal, State and local regulations.
• Refer to comments #
16. Section 3.4.3
• What are the petroleum products?
• Paints need to be on pallets and covered
• Where will the surplus concrete and drum wash water be disposed of? This is
inviting illegal disposal off site.
17. Section 3.4.4 :
• Where will the manufacturers clean up recommendations be posted?
• One gallon is not a reportable quantity rule of thumb for hazardous materials.
• LEMPC is not for contacting in case of an emergency spill.
• The following entities should be notified: CDPHE and City of Wheat Ridge.
• It is advisable to have a number of a local contractor who is experienced in
chemical spills.
18. Section 4.0 :
• Completed areas shall be permanently stabilized within seven (7) calendar days
after completion. Disturbed areas where work is temporarily halted shall be
temporarily stabilized within seven (7)days of the activity ceased unless work is
to be resumed within 30 calendar days after the activity ceased. NOTE: "Once
earthwork has be un on a section, it shall be persuade until completion".
• It's expected that BMPs that are not longer required will be removed as the
projects progresses and will be annotated in the SWMP.
19. Section 5.1 : Not familiar with the .5 inch precipitation criteria. The State
requirement for inspection to occur after any precipitation event that causes
noticeable erosion.
20. Maintenance and replacement of BMPs will be done within 48 hours, or
immediately if deemed necessary by the City Inspector.
21. Do to the relative location of the site to existing streets, VTC may not be adequate
means of keeping the mud off City streets. Another BMP may need to be used to
supplement the VTC to assure that mud stays off the street.
3 of 5
WheatPu~dge Stormwater Quality Management
JIJLJIMIJI,:`~~11 111211111~, IN 1111
Engineering Drawings:
1. Need to use the City's details for all proposed BMPs.
2. Remove sheet 0003, and use the City's current erosion control notes (E-A01).
3. Remove extraneous BMP details, if they are not to be used for this project they do
not belong in the SWMP.
4. The silt fence shown on the engineering plans will work fine after the concrete is
poured, but what will be in place in the in-term ?
5. There is no mention of diversion ditches in the SWMP narrative, also need to see
the engineering details.
6. Need to show the engineering design details for the bio-swales.
7. Need to see the design of the temporary sediment basins.
8. The City does not allow for the use of hay bales.
9. Describe the dust control measures. Disturbed areas not yet ready to be seeded,
landscaped, paved, or otherwise stabilized shall be watered, or ripped as necessary
to preclude visible dust emissions.
10. Need to see the seed mix and a detailed explanation of the application of the seed
mix.
11. If any mulching is planned the contractor needs to assure a weed free seed free
mulch (to keep hay/straw from being the dominate species at the site).
12. All exposed ground surface will require surface roughing for erosion and dust
control: Also need to show these areas on the engineering drawings.
13. Tentative Stockpile locations should be shown, should be noted that they should
not be within a hundred feet of drainage ways or the Waters of the State, shall not
exceed 3:1 slope, and have dust control measures taken to contain fugitive dust.
14. Need to provide tentative schedule for temporary and permanent stabilization.
.
4of5
WheatRi~dge Stormwater Quality Management
15. S WMP requires to show existing soil conditions, this includes existing ran-off
coefficients and proposed run off coefficients, also existing vegetation if any.
16. Need an operations and maintenance plan for all post BMPs onsite, this includes
but not limited to the bio-swales.
It can not be emphasized enough the importance of having the SWMP reflect the
actual site conditions precisely, otherwise by Federal, State and local law the site is
out of compliance.
Signature: Date:
William C. LaRow, P.G., C.H.M.M.
Stormwater Quality Program Manager
City of Wheat Ridge PW Eng Dept
7500 West 29th Ave
Wheat Ridge, CO 80033
Ph (303) 235-2871
111101 111
5 of 5
City of
Wheatl~idc-e
PUBLIC WORKS
Memorandum
TO: Dave Brossman, Development Review Engineer
FROM: Steve Nguyen, Engineering Manager 5r
DATE: Thursday, January 03, 2008
SUBJECT: Cabela Development, Foundation Plan
I have reviewed the above document and have the following comments:
1. Sheet C126 -An 8-feet or wider cross-pan should be utilized at the proposed access
onto 40`h Avenue.
2. Sheet C126 -Pavement marking arrows are needed and should be placed at each end
of parking rows to regulate one-way parking circulation. This is crucial to control
mixed vehicle classes and should be implemented throughout the entire parking lot.
Sheet C 126 - The City is concerned with the proposed access onto 401h Avenue from a
traffic safety standpoint due to proximity of adjacent access to the Table Mountain
Animal Center. Additional safety concern is that this access is a part of the frequent
truck route from the store. As a result, it needs to be designed as a gated or right-in-
right-out access. Other option that could be examined to address the concern is to
combine with the adjacent drive.
4. Sheet C127 -North painted center median area should be apart of curbed island as per
previous comment generated for the Cabela Drive plan.
5. Sheet C128 -Provide lane assignment striping and signing for traffic control at the
entrance.
6. Sheet C132 - hiclude an 8-feet cross-pan detail in the detail sheet.
7. Sheet C200 - Please verify whether the 8-inch PVC storm sewer pipe to collect roof
drain on either side of the building can be supported structurally to handle traffic load.
8. Sheet C200 - Please verify whether the storm water volume convey via &eline on
40th Avenue is included in the pond design at the northeast corner of 40t Avenue and
Youngfield Service Road.
9. Sheet C211 -Grade drop inside all inlets and manholes should beat least 0.25' as per
the Wheat Ridge detail.
10. Sheet C212 - Provide a containment design to avoid contaminations from animal into
the storm sewer system as commented earlier on the drainage report and plan.
11. Sheet C220 - Replace the Storm Sewer with Underdrain detail with a legible one.
12. Sheet C504 - Pavement marking arrow should be installed at the end of each drive isle
for improved visibility. This provides an effective way to regulate circulation traffic
similar to comment Number 2.
# ~ N l T~ G®NSULTINC~ ENCealNEERS
12499 West olfiax Avea
P~1 Box 151500 - r
- - ~-~5
l~ , ;
_ - - s ~ , w
w ~ ~ i
_ 1 i E ~ 1' i i~ ' ~ ~
i i
L ~ ~
i 1
80' R.O.W. ,t- h
t.
Y. t
r
i 1 :y
5
1 4 a. i
L-
-1 -
~
rst
i
t
I
ti t t'
r'
"s. i i i t -L..
SIGHT DISTANCE L~ ~ Lr~
I [
~J
Y~1 1 Y i
1
I
l ~ r'- i ` t 2 i i ~ ~,l ~ _ _ ~ j 1 i ~ ~ i 1 1 f
~ ~ ~ ~ i i 1 - 1 ,l A i` ~ r ~ , :i -e - ~ ~ ~ 1 I li~ ~ % t ~ / % ~ i I /1 y7~ l
i 1 r' 4 ; k ''1 ~ is [[€[s:. ,t i `t ~ ~ { i f 1 I 1 1 ~
_ ~ ~l x ,,t i .~i t i i l,'' ~
i ~ s l` L- v , 7 ~ i i _ i, r`~_, 1 ;t . _ _ i t ~ } ~ ~ ~ .J ~ L ~ ~l l ter... ' ~i s
i - i 1 ~ ~ e:: 4 f
4 ~ 4 t ' 1 i
i ,yi _ `y !l -z l i ...................._...v,..............,...... 4i i i r ` ._.......z..._.........._.., _ -L ~ r
. ~ _ ~ y } 1t W t i:' ~ _ _ ~ ` v,4, r ~ i 1 i i
~`-l~ i rv , i i L i
~ 4: ~ ik i i ~'i _
~i 'i ci.. u~ 1 ' 1 c. , _ ~ 5
~i; ' 1 / ~~f; - ,i
' , s~
s:~, ~gz_ €i 3€:. ` _ ,F-. ~
Us / , / , ~l♦ „h
:::A:: :::ti %l . ~]R. \ ..............:t.....,.....:..:.. , 4 ~ 1 ~y r i ~ , ~ ' U f~ L~:::::. ...................................i............... .
::::T _ ~ :::~i:~ 5
i 't 2 t. r ~ n" A
1 . i~:4:~~::'"::ii :::Y::::::; ~ 1 y R ~ 1
F~, ~3 ,i V ' _ nr. ~S:.n u ~ it •-L 1
:::.1;:::::~::::~. ' 'n f""'i iii? . / ~iei'r:'= i
ii::5 ~:::'i' i ~ _ ih r~ _ _ !3: -~7
_..._.W~~~..... 1 .....5:::: i `i ..................3:::::~::::~e:. F , r ~ 1 is
4 - k ~ f r / t 1~ ~ ; _ t °ssi~'i
t i 11 l ~
~ f _ i`:~;ji
r!-i - ~ i E i j _ _ f r 1 ' . 'i \ M t j
. .............................._.....3.:::-___.._..._ 4 ~ ............__.._..........._....g 3
......._....__~.......s - 4 :i:3:i: a, B. ....:c:::: i::
' :::ti \ ~ i
6~' V
PARKING EVALUATION TABLE
~':::::~:::.::5:: T
REQUIRED REQUIRED 1
SPACES MIN. SIZE
w I_ i
X CAR 8.5' X 1 S'
t L'
TRUCK / RV 12' X 70' Grp' _iJ!-
~
HANDICAPPED 17 $•5' X 18' 3
WITH 5' AISLE
TOTAL 833 YiC
.u ~ l i
i
NOTE: REQUIRED NUMBER OF SPACES BASED ON A BUILDING S i
i G
Z 1
~ ~
Y
N
W
} Sheet Title
Q OVERALL SITE o ao' ao 160' Z
imam PLAN
m~ M
z W Sheet Number
w w
oU- (L L-1
NORTH SCALE:: 1"= 80'
v ~ MARTIN I MA TIN
~®r..~suLT'N~ ~N~~NEERs - _ _ _ _ _ _ ~ 124991~est ~alfax Ave.
.
r ~ -
i a
~i 1.
i
' . ~ ~ 3
i ,Y
1 i l
V
S
A _ 5f
\ !:':::1:::::::.. i 1 f
~:2:!:::4:::::~5:::::. F
• Y
i
s .Z
. .::::::::::.`.::C::~:::::::::::::::::::::::::::~::~:::: ~ ::.:::::::::::::::::~h::::' r
Y ::::::::;Y::::::::...:."".:::::::: 3~
:::::::::ti::::
i
u
S S~+ , _ :_.l
t Y~~
'1
~~r f
.a
~~w
t i
_ ~V, w ~ i ~ ;t _ ~ .2 j ~ 1 i f i _ 1 ~ ~ I
~ + i ~ .,~,~tve i i 1 ;1 6e~ i t ~ ~ i i ~ 1 l / ; ~ / ~ ,v~~ ~ ~~i ~ ~
_ ~ ~ l a' c ~l ii ` ~ ,i'` i `y 'i
k' ,,tr~1~' i <s„af+e ~'~~x 't ~ i t w } i ~ ~ ~ i• } t
~ 4 i ~ Mi ~ E x t e ,.~a» i b c
5.Y?" t~ ~i~ a l i \ ~ c , i - ~ ~ _ i _ ~ r t 3~ • ",~4
. . . ~ . e T ` rt ; ~ i i rr, ~ k _ it
~r . ~ Se.~a~ \ ~ r. a \ e z 1 \y,e c ~y t . t XT ~ , c l 1 _ ~ v ~ ~ ~s ~;q 3y 1 _ ~ :P
~...:.c: } ~ 1 _ 'i'`'`ll' ~ 1 ~
/ ~ G _ ~ v,,, _ t t ,
1t, ~ ~l ~ i ~1 } I I 4;~ n>yP.~b
i . i ~ ~ ^c- 3df V✓. _ _..~4::~de d~ ~ y e ~ •i <47 c" i
_ ~ . ice.. F: i
~ `•;y ~ .
y , ` _
. <y-' c.. r i 9 O Z • r s r '
_:::::Yl':::::::~ 1 _ `',z. . is='-' r r v
_ -a:, r . 5 ♦r♦ ♦r t
i +.~a •r
;~lSE~:.., ` ~ ♦ i e iF ~y 'J~Lr'"~ v • ~ r • T ~ J' y
:::::a::::,. k ♦ r / r+ • ♦ ► ~ _ i + ~
_ t r ':n ~~i:: i?~/ :~::::~'~::::::::::~:~:::3:::::ii ~:::~:~::~":~:ii~:::i::
LEGEND STORE SITE LANDSCAPI NTS TOTAL STORE SITE AREA 28.98 AC. ~::.'~::"k .:::::::::::::::::cis: i:: ~
REQUIRED LANDSCAPE 20% OF Deciduous Trees AREA AND SQ. FT.) 252,507 S Y.....,. is i
PROVIDED LANDSCAPE 32% OF + • Evergreen Trees AREA AND SQ. FT.) 402,121 OF STREET TREES 1,684 LF. -
- -
.,j-ems:, - e- 1 _
Streetscape Trees REQUIRED 40TH AV (trees to be counted towards (1150 LF.) 34 TRE street tree requirements) # OF STREET TREES 34 TREE PROVIDED
3 T-
~ ~ ~
r r.
~ ~ # OF TREES/SHRUBS X Shrubs 253 TRE REQUIRED IN LANDSCAPE 1,263 SH ~ Perennials & Grasses AREA (1 TREE AND 5
i
L( F ~\`1LtKY► ~r
SHRUBSI 1,000 SQ. FT.) t I { -
# OF TREES/SHRUBS 253 TRE Irrigated Short Grass PROVIDED IN LANDSCAPE 1.263 SH AREA 2,210 SQ. f i :ter;
+s _ 6
1
r
44,884 S D Irrigated Tall Grass SHRUB BED AREA 11% OF AREA .t
t
663
~
N011-IfT198ted TaII GfBSS NATIVE SEED AREA g0°/ OF E
5UK1-HC;t UC I LN I IUN X34,318 Su. FT. U 5u. FT.
574S( 574 SQ. FT. u~ w
"XX WETLAND SEED AREA 90 OF L/ f1F 1 AN~Sf'.APF 0
Irrigated Wetland Seed h y. Sheet Title
A NOTE:
Q OVERALL o ao' ao' 160'
*AREA REFLECTS ADJUSTE Sl EXISTING CONTOURS SHOWN INDICATE APPROXIMATE FINAL ELEVATIONS EXCEPT IN KNOW LANDSCAPE PLAN
N -Irrigated Wetland Seed W MEOW 2
Z AREAS WHERE PROPOSED COUNTOURS ARE W Sheet Number
3: 1 Z W
~ J SHOWN. a L-2
0 U- NORTH SCALE 1" = 80'
LANDSCAPE PLANT LIST
_
SYM. COMMON NAME BOTANICAL NAME IS :»«:LL~
~ r T~
~o~~~LT'N~ EN~~NEE~s
DECIDUOUS CANOPY TREES 12499 West Colfax Ave. Po Box 151500
AUTUMN BLAZE MAPLE ACER x FREEMANII'JEFFERSRED' f .~u.r s s Lakewood, CO 80215
OX BOX ELDER ACER NEGUNDO'SENSATION' =s . Ph: 303 431 6100 Fax: 303 431-4028
BUR OAK QUERCUS MACROCARPA w
PAW PEACH LEAF WIDOW SALIX AMYGDALOIDES uu~_ Yi s
PLAINS COTTONWOOD POPULUS SARGENTII hl 't it
QUAKING ASPEN POPULUS TREMULOIDES f~ i1
A SHADEMASTER LOCUST G~EDITSIA TRICANTHOS INERMIS' WCA WESTERN CATALPA CATALPA SPECIOSA
I Planning ~ Landscape Architecture
1W µ'L-, 1
EVERGREEN TREES i 1101 Bannock Street
Denver, alorada 80204
CSP COLORADO SPRUCE PICEA PUNGENS
DFR DOUGLAS FIR PSEUDOTSUGA MENZIESII 303.892.1168
BSP BAKERI SPRUCE PICEA PUNGENS'BAKERI' 303.892.1186
+ LIM LIMBER PINE PINUS FLEXILIS Yr L www . n o rris-design . Co m
1
PIN PINION PINE PINUS EDULIS
PON PONDEROSA PINE PINUS PONDEROSA t_ i5' 7P"'"'
PVP WANDERWO~F'S PYRAMID PINE PINUS FLEXILIS'VANDERWOLF PY DECIDUOUS ORNAMENTAL TREES 1 iw~ ~
} CALLISON
1420 FIFTH AVENUE #2400
W SEATTLE, WASHINGTON 9810
GMC AMUR MAPLE ACER GINNALA f PHONE: 206 623 4648
DHA DOUGLAS HAWTHORN CRATAEGUS DOUGLASSII ar -e a lY FAX: 206 623 4625
MAS MOUNTAIN ASH SORBUS SCOPULINA v. }p'
BRM ROCKY MOUNTAIN BIRCH BETULA OCCIDENTALIS
SSK SASKATOON SERVICEBERRY AMELANCHIER ALNIFOLIA f Lr r
TAM TATARIAN MAPLE ACER TATARICUM
TCO THORNLESS COCKSPUR HAWTHORN CRATAEGUS CRUS-GALLI'INERMIS'
DECIDUOUS SHRUBS- 2'-4' SPREAD 1\ a
t r
BMS BLUE MIST SPIREA CARYOPTERIS X CLANDONENSIS'B RDW DWARF BLUE RABBIT BUSH CHRYSOTHAMNUS NAUSEOSUS NA
~oc DEC DWARF EUROPEAN CRANBERRYBUSN VIBURNUM OPULUS'NANUM' ■
DNI DWARF NINEBARK PHYSOCARPUS OPULIFOLIUS'NANI FWS FOUR WING SALTBUSH ATRIPLEX CANASCENS ~F. t~ v
w
GLS GRO-LO SUMAC RHUS AROMATICA'GRO-LOW' ,n
NMO MOUNTAIN NINEBARK PHYSOCARPUS MONOGYNUS i r~
RMS ROCKY MOUNTAIN SUMAC RHOS GLABRA CISMONTANA r
MSN SNOWBELLE MOCKORANGE PHILADELPHYUS'SNOWBELLE' r r~. Q,
DECIDUOUS SHRUBS- 4'-~' ~PR~an i r n
' .~.i ~v
Ww
ALP ALPINE CURRANT RIBES ALPINUM 5 GAL. CONT. pF PRUNE ALL DEAD 5 GAL. CONT. FM DAMAGED WOOD 1 ~ 'W~
APL APACHE PLUME FALLUGIA PARADOXA
DIH ISANTI DOGWOOD CORNUS SERICEA'ISANTI' 5 GAL. CONT. F PRIOR TO PLANTIN 5 GAL. CONT. F SET SHRUB 1" HIG 5 GAL. CONT. FM THAN THE FINISHE 5 GAL. CONT. PF BED GRADE. ® ~
MML LITTLELEAF MOUNTAIN MAHOGANY CERCOCARPUS INTRICATUS '+'■"w',~~ V
C~~~~ RWO NATIVE PINK ROSE ROSA WOCDSII s~ -
YCU GOLDEN CURRANT RIBES AUREtlM y
RAB RABBITBRUSH CHRYSOTHAMNUS NAUSEOSUS AL RSA RUSSIAN SAGE PEROVSKIA ATRIPLICIFOLIA :i is ei Qirni a ie ~ n_n~ ('V1AIT
SNB SNOWBERRY SYMPHORICARPOS ALBUS r
TLS THREE LEAF SUMAC RHUS TRILCSATA i t wnr.
WSC WESTERN SAND CHERRY PRUNUS BESSEYI r. n ~ ~ i.... to
ry
DECIDUOUS SHRUBS- 6' PLUS SPREAD i. r. r
i L
BBE BUFFALOBERRY SHEPHERDIA ARGENTEA
NCH CHOKECHERRY PRUNUS VIRGINIANA
WCY COYOTE WILLOW SAUX EXIGUA
MMA MOUNTAIN MAHOGANY CERCOCARPUS MONTANUS
RTD RED TWIG DOGWOOD CORNUS STOLONIFERA'BAILEYI' t
4
EVERGREEN SHRUBS CV ~
o a G v~a..r/ ~~ii\\ t~~ r.
+ BUF BUFFALO JUNIPER JUNIPERUS SABINA'BUFFALO'
BPO BLUE POINT JUNIPER JUNIPERUS CHINENSIS'BLUE POINT BGH CHINA BOY/GIRL HOLLY JUNIPERUS HORIZONTALIS'HUGHE MMO MOPS MUGO PINE PINUS MUGO'MOPS' ti,. , ~ .
Q
aL i ~ ~.n
RMJ ROCKY MOUNTAIN JUNIPER JUNIPERUS SCOPULORUM I F ~ a/q
MSL SLOWMOUND MUGO PINE PINUS MUGO'SLOWMOUND' `d+r~
f ~ P'~. (i i •~i j+;
~ ~ .
GRASSES
BBS BIG BLUESTEM ANDROPOGON GERARDII
AVG BLUE AVENA GRASS HELICTOTRICHON SEMPERVIRENS .
BFE BLUE FESCUE'ELIJAH BLUE' FESTUCA GLAUCA'ELIJAH BLUE'
~ ~ ~ FRG FEATHER REED GRASS CALAMAGROSTIS ARUNDINACEA'KA x HMS HEAVY METAL SWITCH GRASS PANICUM VIRGATUM 'HEAVY METAL' uS 51
ING INDIAN GRASS SORGHASTRUM AVANACEUM 1
CAG JAPANESE SEDGE CAREX MORROWII
LBG LITTLE BLUESTEM SCHIZACHYRIUM SCOPARIUM
r~~* ' - ~r
PERENNIALS
BES BLACK EYED SUSAN RUDBEKIA FULGIDA'GOLDSTURM' SY w1_ ■
LIA BLAZING STAR LIATRIS SPICATA y
BW BLUE VERVAIN VERBENA HASTATA
PCR CREEPING PHLOX RED PHLOX SUBULATA 3
PCW CREEPING PHLOX WHITE PHLOX SUBULATA 1 r u
DGC DENVER GOLD COLUMBINE AQUILEGIA HYBRIDS'DENVER GOLD'
DWA DWARF ALPINE ASTER ASTER A~PINUS
FRI FRINGED SAGE ARTEMISIA FRIGIDA 1 1 I L. i
GBG GOLDEN BABY GOLDENROD SOLIDAGO'GOLDEN BABY' 1S t i
LUP LUPINE I 1 IPINI IG ARrFtiT~l IC
NBF NATIVE BLANKETFLOWER GA'ILLARDIA ARISTATA UAL. I:UIV I . M 114v 1 L-v.
PCF PRAIRIE CONEFLOWER RATIBIDA COLUMN IFERA'RED' 1 GAL. CONT. M 1. ALL SHRUBS LOCATED WITHIN NATIVE SEED AND AND
SMN SALVIA, MAY NIGHT SALVIA SYLVESTRIS X'MAINACHT' ERDING
DSD SHASTA DWARF DAISY LEUCANTHEMUM X COMPACT'SNOW
ssu SNOW-IN-SUMMER CERASTIUM TOMENTOSUM Sheet Title
VWC VIOLET AND WHITE COLUMBINE AQUILEGIA HYBR IDS 'COLORADO VIO 4
W00 WOOLY THYME THYMUS PRAECOX PSEUDOLANUGIN PLANT LIST
name
Z Q YAY YELLOW YARROW ACHILLEA FILIPENDULP► 2
~ W LLC LANCELEAF COREOPSIS COREOPSIS LANCEOLATA i
u ***ZONE USE KEY:: P=PRAIRIE, F=FOOTHILL, M=MONTANE, S=SUB-ALPINE*** Sheet Number
L-3
y _ . ~Wuu t Tft fY~ .c ..u 'w.Gp~ i x ~ C~~ »J~tpRp «MG' K" ~wG ..G.~~µ~ ~~..J~"k" _ _.i .,~,,,,..,.c _ »G p ~g LY tMC'' ~ _ i~h~ n ykx~B.~ t u' .:t Y~ti.~~.v~et}EPt~ ASC~M,.YG.S.~t'. e.L~ G.. '«>r4 ~I:FUU~ .C' Y•f~r: i EFA itiWi~~. P.~CM~x.F N t
1
CONSULTING ENGINEERS
, . ,~2s~d#~t«~ €~n~,^"t7t€IEEF' ~»»»k,~4.R` ~iFlk~'A~nt ~m"q~4Eh'#e~t4H? ~'A~'k€Y~I#F~'#m, (~M'" "`"kFY;~f= ,t~~. ~~i!EiiY"k~a"E`H ~3569Bi3139{f:i:'si#& 1~i~itBzkp4e~..Ik'MU#hk"'k" 56fiEi:FCt6E~Jtk ~ia»"^~:.~^f" &k~E ur'r~' 'w" ,:H»fia~i :~"Naii'~"" ~FsEP~Gk` N tp~`~Fti#W~ _ _ 12499 vilest Colfax Ave
i
- - f ~
"R.,..,
i
f~_.
E
i
Ie
z ~
I I
. r I
I I ~ I i ~~~R _
~ ~ I 1 ~°n - j
~ ~ I ~s=,.-._
I I I I __u u .gin
I 1 I I ` i- s~~ i
I F.
I .
j ( I I i
I I ~ r J l 1
I I ~ ~ 1 s:.
I I I E
I i ■
I t I '1►
E i I i ~ I
~ ~ i i a i ~ J
i ~ i i ~
i i i
3 i ~ i
i i ~ i ~ /J -n •
~ ~ i 1 tj i
~ i i i Yom,,.
i ~ ! ~ ~ i I
~ j ~ i ~`l ` ~
I ~ I I ~ 1 a i
I I ~ • ~ I j I,I ~ ~ I i
~ I I l ~ I -.-s
i ~ ' ' ~ ~ w
i ~ i . . • • P` r nr~lal r~~~~s e~ s
~ ~ \ m
i ~
_t _ r- w
~ ~ Irrl aced ~or~ r~~s
i ~ ~ ~ i
,
i i R Irri~at~rl T~II ~raec
i a i ~ i u
i i ~ i i ac
i ~ i I i
i j i i ~ ~ .
i
~ ~ ~ i ~ i rr
i i i \
i i i i 1 I
i E i
~ i i i i
i i ?
i ~ i j i i ~ -
i i Y
i i i ~ ~
i i
i ~ ~ i .s a ~
i
~ ~ i e
i i i • }
i i i
i r i
.w i ~ i i
i ~ytu. J
i i 1 L r
i i t
i U? i ~s
~ i i W S~ t f
~ ~ ~ ! 1 QW~F'
i i
i i i
i i i
i i i iu t i
i i i i ~ - + t t.
i i L
i i t.
4 L~ i
t i i1 }t
i i i i
i Sl
i i i i
i 1 i
i
i i
i i i i~ ~ ~
I I III EXISTING CONTO %ftf anow )NTOURS SHOWN INDICATE
1 1 1 ,
I I r, Arm- mr- ROXIMA i cm: FI t « r TE FINAL ELEVATIONS w
I I EXCEPT IN AREAN ,REAS WHERE PROPOSED ~ ~ Sheet Title
»ww«t ^R COUNTOURS ARE ARE SHOWN. ~
I r
nW.
I ^i e MM, Mm= W- I . . ;€E~d~Eq{diiE:d~ F~x«`K~i+: raj~+••>i:;: i„ s P 5~K'na.,:#m,k#r t#Xstilk~ ~5.'•.ar`^..:.'kki".f.'•'•.t'~'' hMk acc5fr35f#Yi5s58~1i r3EiLL6:ifNL:uh'~:eci~_''.:f. 3EiEft(intiff6Etsi6E5E~"+ifti ':ilittti:i'~.u"''cYSEEfifE;k9cEY' "aif¢s~iifieiN596E fJEE'iiyl&EieEifi::ir._i•~_._ tiNrfi?5~.. e._enes_ ...e_..ekiN3Ai~c!~':.~eti.tH.'! _.:wcPttcw,~r5" PEF3»»4Eh+rn:
Z I z
w ~ J
U-
0 1s1 so' so' Z PLAN
w. _ ~~~~;1~1,~W?~"»i~ ~ ~ ~i '~,'»?SI . IF~T~''P4~'k°~i z~~"~+~~.SP~ ~~e~~~~''~. '5.~~~~~~ ~~_c-~e.~ .......;,»w,~~~~r
, x
tii~'.n°
i
5 - - - - -av.-_ - «.r _ _ -
,j
I
I; ! j, l' as~'~~
.,.e.~.`--~--
i
1
. ~ . L
1
1 ~ - ~
t
i r 3
x
f j f~ r i YYT~.~~- . . ~ - _ -
'x / ~ MARTIN !MARTIN CONSULTING ENGINEERS
t i / I 1 i 1 ..-...m.......~_._ ...................._...;..,T.:_. _ _ 12499 West Colfax Ave
-y _ PO Box 151500
i ~ ~ -.~.w:::::::~.:~ : v - ; ; ; ; ; - ; ~ Lakewood, CO 80215 - ..,.-e ii c::S~' ^:°~i':::i-.:::~':i:":S:i:.':i::::~`:'~.":::E::fE:i~:::.":;:::.~`~Fi:[::':"~::::~::::: i::::::: :i:l~: = v- = _ ,:+-~'''"iY's ::;5~`'<: `iii's i:::` f':::: ;i;' ` ii:::' :<:iiii €i€s
i __=r. ~ t;-i: ~ : Ph. 303 431 fi 100 Fax: 303 431-4028 . . ....I......... : . ,.i .~c i~ ~ s...-.,~_...,_....-,~ ,kr;:;:.,u:,. ~::r.i.~~ : ' : . C.S::~::::::.....
i ~ - P..~ ~ ~ M 1
i A I
Y _K~F~vv' -
J
t ~ t .
a.. .1 . _
~ 1 S S
~~''i.
/ i, F
/ i - ,..._z.,,.,...
/ r t"~ tii W ~
i i I a 4: r i i ~ ~ ~ 1'~`"'
r1 E 1
■ ■ i ■ ■ i i 7 1 Perennials rases ~
i / ~i
w
r {
Y4 ~ J .4 ~r~ i
l i _ i j i ~ J 1 » W W
~ i %
~ ` it I, ~ I W i } / s ii
3-HS i ~ ~ 1 ~ 1 ~ _
i IS 1'/
n q ; l t i I l 4 I
/ ~ Ys.., `
/ ` ~ / f ~ ~ I i ~ ~ 1 1 _
~ i _ , ~ ~ ` W
i a ~ , 1 ~ I t 4
~ ~ 1, y ~'E r
~ ~ / ~ r y i t t i _ r s..
Vin: ~'f i ~1 i 1 l _t,.
/ ''1 .x~ < 1 1 ~l . j i 1 z 4"-_
` ~ i s~~. ~ i } ~ i L;' ~ ~ e~ Sl r
I 1 i 'i t 1 t ~ ~ 1 1 i x
~ j ~ ~ ~ l ~ ~ { r 1 j 1~ 7
i ~ t ; ` i'~ L . y,
:~a~ ~ `si7 a Y
-HS ~ i
/ I ~'<o I P
/ Y r i~ i- F tir ! i
/ i z ~
i~ l it t i
t ~ r L~
~r ~ b
I \ . i -ss:.
_ _ _ -
I
v.
f{ fi i`i [ ~ ~"=~'sEiiis ~ is i~i~ii" E 2 iii'!' ' ~`~ii . ..............,::~~::~~~::::_::::::::::::::::::::::::::::::::::::::::r~:_:::: - - - 1
V J _ _ ~ iii'.iii iiiiiii ~ _ i i _
W - ' - i _ \ ~'S- _ _ 1 ' i
\ ~ F
` r~-'9 r ~ 1 ~ ( I b-
1 I rrir~~t~r~ TAI I C~►r~~~ _ _v _
_ y, \
~ ......_.._..........,........................__......................................,._...._............1......................................................... ~
i 3g
_ ~ _ V
_ _ } ,l
`t `'V i.. i a• S
1 - iti~:: ~ ~l ::~c:. : $ , Y
_::i°.'s~~~::::~i::::.~:::::::::::::i:ii:::::: ~::::::::::::<i:::i~::i:::::e ::::i :::::i ~S::e:::::^. ::':~::ii:ii. ' 1 t t ~ ~::::i:::'::::::::::'::::::c:w ?:::::::iii:e:::::::::: ":.'iiiii:iiE:. '~cF.aS~~-:::::::: ~ -;c:;:: ~ :::::::::::::::::::::::::::~:c::.::::;:::~::::=:::::. ~s:: ~;_ce:;:.:i ~:ifi~'i::'::i: ii'::_,.:::: I
rev::.. ::e , `t i _ t: 91 a
'l NOTE:
. . . . . . . . . . . . . . . . Nod i ~ ' WA'S 1 y y y y
. e _ j 1-PON C
ff NiMi_ i :iiii~ii _iiiii€i=iiii-, s
. . . . . . . . . . . . . . . . . . . . •:iii»:::::::::::ii; ~:::::::i:::::::::cE::i::::::rc::::-.::~::» ::::::::::::::::::::::::i::::-:: ~i: '~i:::::::::::::<:~::::»Ii»::E~S.. i
I t
€t:. `I[€~'[[[ i[``~at~~:_:::::::~ :::::::::::::::::::::::::::::::::::::::::._:•'~es:~:s~~e:°s":iii€::. W
7111 5
Sill 4, 4 x -
, Z Hanoi i
I A
LL_ I i i
r .
i..
.4
u.~ _ . d~npp~ft~.5`~t su~EE~c~62vt 55n~~ !r`,.?.~#:~9s3.~!:FI~~ ;uF.e'~epmm'~ `~~~;Iami~m##!:lzz Si~1.5# an` dA3tl4h3t~;ld+.?...C... ..»w'~F~H~ifi~E i1E~`~€~~J~~ ~ ~@~~3!~~###~'t; ~#a~kEik~kikt€ ;.«~E{utt~tE;~~"~ ~.'i~ "^F~..""trb?li:'e;:~# ~tis~ m. ....m c; i4tf&~a;
{ MARTIN !MARTIN
- ..s,.~... . - - ~ C®NSUI..,.TIN1-.-,. ENC7INEERS
x 12499 West Coifax Ave. -
_ - _ i~ PO Box 151500 C/=~ r ~ .
:l: ' : ; ~ ~ . - ~ ~ ~ Ph: 303 431 6100 Fax; 303 431-4028
~ ~ r t
-
- a9s; _ r- I :Y~ -ter' {t~i~~ t t
t( I .a~.._ v ,t.,. d-..: . w . H.. '~-u.~4_ i-...... •::F
/ ~ r X,. W `y . c~.~l Ir - - / ~ .r. .t ..i..... , i...... ..r.. .s~~...::: ~ ..f: :f::~: ....e.....„ . .~.'.......,i .n. ~ ~ ...+r... tt i ~ w. ti. . :S'.C~:: .:.::F'9v:i:i:i'?. •1":'~:;x::-: .f`r ;i 5. :f... ~ ~E~ N : .r .t.. f .t:. yam. ....4... .'.:s'_':..::~.::::::i . is
W W W W ~ , i W W W f 1 i .f .~x.., Plannin Landsca a Architecture _ .t~ ~ • ~ _ ^LiU t....
- _ W W _ W 'il f ,..t....... ~ y. k ............t:Y:::,~ , z.:, . ..1..::.. q~ . ::.:..k ~ f ~ :::~.h 'tYL~..::..:~ .r { x..: s... .~...E
W ~Y W W W 1 W ~C W W W W W W W r ;rat:.: ° . . . 4c -.'k f ik~ ~~~"::i:.:" . 'rig', ,r.
W W W r W W 1 W W W W W W W W W l nom' . 11 1 B nn k r ~ 0 a oc St eet ty t t. JrJ ' ~^i~i- ift,~`7 ' ::::..:iiii..i: rf Pic .a..;:• /[r'~~ ~P i a 8a2o4
W W W W W W W ~ W w y ~ r V n Ve r, V Ore V v'~' ti. -
W W W W W W ~ W W W W W E _ . f P 303.892.1186
W- "yY W W W W .y W W W W W W W r 303.892.1188
i r., t` } i x v~nr~nn~ . n o r r i s- d s~ g n. c o m
W - ~ y W W W W _ W W ~ ~
- - ~ `i _ ' t, -
- 'x ' W W W i -s -
! W~ W ^r. W W W~~ W W i r _ ' I ,3 AL Li 1~1
~ U~. € v~ i W `,W W W r' - .~I 1420 FIFTH AVENUE #2400 . SEATTLE, WASHINGTON 9810
- if ~ ~ W W W W W W ~ _ r Y~l - ~~'cld lrlolrlS Trees PHONEn 206 623 4646
- ' ~ W W W W W _ r -i E W W W ,W W W W i f FAX: 206 623 4625
_ ~ ~ r i f W W W W W ~ i i `'e.,
W W ~ ~ _ ~ W W W ~ ~ j- - --1_ - W W r~;.' 'i W W ~t r 1 ~
~ ~ ~ WW W ~ , t ~ ~ W W l ! ~
a ' , t y ~y ~I - _
t 'i ~ 1 W W l W ~ y Ever reer~ Trees
® ~ y; ' 1 s y 1 i _ ~ ~ 1 ~ _ ~ W W ' ~ W W r i
l j ~ ~ I W ~ W 1 W W W i J
_ W +V W W W W h'. .t ~ ' i~ ; 4-' W W ~ W W W W 1. W W } ~ p..` s r' s ~r
~ t ~ J
~ ~ _ ~ - " W ` / W _ i
/ ~ W W W J Trees
- y ~ W ` i ~ trees to be counted towards
_ _ , W W i _ - _ ~ - ■ ~ _ _ - i ~ _ I street tree requirements
■ Y F - W W W i W W ~ i k
t ~l ~ _ W W ~ i _ l i l ~ w....,.-, ,1 , .l 1
W / W t l i - . ~ 1 ~ i ~ l 1 i . ti
t l i 1 1 'y 1 F ` x - ~ ~ ,i ~ ~••1 W~
~t!' d' i 1 ~ 1 t l ~t w w F,, tl F r ~ ' 1 ~ ~ 1 • Pren~~~ls r~~ ~ yes
1 v ~ j '1 r, r t - w1 ` ~ %F i w V ~ ~ ~
~ 1 v- ~ lf. 11 1 1 j I w W W W W w W a~
!w `,1 ~ _ l~ • S 2 ,i lY ~F 11 w it it _ ~ .1 i .r"~ 1 F. _ ~ W w W W W W G W W W W W W W
~ /F 1 - ~ 1 i i" i W ~V W d' W W W `I y+ W W W W W W
w ~'l ~ ' _ 1 1 .1 ~ ~ l t _ _ l 1 l/ ~ t3 , . W W W W W W W t~
1 } i w w i r, 1 y ~ • 's 4 ~ .vaa:m IXpC~ p
~ % - ` _ ,,,gas t . 1 p~, .F„ c 3 S~ ~ W W \ ~ \ ~ 1 p~ 1
t 1 1 ~ _ 1 y ~ w ~ , 1 } i ` ~ r l -`~~~a,. t _
F i ~ '~l / ~ \ e ~
~1 ~ ~ w ~ \ ~
~ i ,,j ` w ` w i ~,3;'' w 1 1 , 2f ».Sltl I '1
i t ~ ~ ~ 11 F ,t ~ 1 t, L
~ t\ 1 i it ;.rya,, F ~ ~ - I i - i } t 'r I ~.t ~ ~'7
~1 t 1 F } ~ , j F 1 F ''1 Z I 1 S ~ ' I m<<:. E t
~ `1 1 l w W 1 - 'l F ~ t + -i- ~ ,l 1 1 ; - 1 ''fir` iX• ~ 11 \ \ \ \ ~l` \ I E i ~ ~ \ .
~ ~ ~ t ~ } 1 w it F y - i ~ ~1 . ~ ~i ~ / 1 ` \ i ~ ~ ~ E y ~ ~ r :r i ~
:1 ; ~s , w 1 1 ~ 1 a. s , . I' ~
~l 1 y _ l it w 'k _ R ' ; l ~ 1 `t s ~'s i _
~ Il M / • / F 1 7,. 1,1 - ~F
' ~ `i~ E
_ 1 1 a w ; ,`V,,C ~r J
1 .i ~ am~,~'yyc~.G', w } % j r:
F ~ ' ® -I- ,F ~i _ _ Y f•
~ ' / -I- i 1 ~ F 1 ,1 :k~' / ~ t~~
-YT / ly ~l i _ r F 1 1 F F l j F L LJ
i %
~ } ,1 i ~ F '1 a; a , 1 1 ,a,edi 1 N,_
i i ~ ~ + ~
F 1 ~ /y %hS n,, cr --sa - ' 3 _ i v-. 7r 1 4-si
~ • / _ '~i"n „ ~r
x~~< Li ~ w ~ ~i~) ~ „'~t
' ® ~ ,J`, `~a,' . ~i~
~ ~ r 0 '1
~ ;s, i_ - L-
. 'es;iF -F a~~s„ .
LL ',1 + F ~ W + 1 ,1
1 ~ + + ~ ~ a ~ X~B1 / r J F / U;~ 4 _L' L~ 7
I ,`'~c ~ L..
I i~6 ~'~'a i ~ ~ J6:.~ ~ `
! _ l,. F % ~ ~ 7'
i i } \ - 1 ~ ~
` ~ 11
t ~1 ' - ° l I rri~at~?r~ Tall C;ra~~
,1 'F ~ 1 1 \ l t l ~ t' _ s 4 ,1_
i 1 1 i ~\i ' t ys 't h t\
F O 1r tl ~ rJ ~ 41 _ r •i i l
1 ~ I ~ ~;i It XUL i~ + ~ l C.<_ Q '
` t i F t 1 ~ 11 t
l ~ ,1 0 .t t ~'l ~
; 1 ~ j J r j
`I xBI o i`+ p.
~ to
: ~ / , ~ 0 - _ ~ ~ RAC~I -
Q EXISTING CONTO )NTOURS SHOWN INDICATE
48"' BFE LJ"IVIQL 2.GMC
8-BM kr. ,ajjjll 11. APPROXIMATE FI t„x TE FINAL ELEVATIONS w
-Z 12-RSA EXCEPT IN AREAl i REAS WHERE PROPOSED ~ ,~hP.et TAP
1 0-MSL 7 DEC b„ ` r COUNTOURS ARE
• ~ u
16 CRI 16 -P 2-PVP d + •3
11 -DGCI 11 -DSD ' zau:\J~ i 6-MSN t , ge
4 _ ' ON w Z i ~ ~.rti..... » t ! ~""z'~5~~ :f ; u :E,r.E s,..~ Fzfks ..z z ttE ~ ' Ywz.zzxw 7 ME- zz~Etet z» ~ " : ~ eesuuz~• : ''E .s : { : ~..„aiifi~ "3 :nnd " za:»L'::L':::::Rr . « 3.' a~" i14•JJ•~ » « ~ .azE?~E:az.~ ..,x.».' ....•...«..s u':!a"z%..?~a~ :»a» » a . ~ E:! c5" .i~ •un z ...?~._aElh s ; . r 3a»a. . •:i . y H z a J
3: Z
Q~ W J
U-
.s NORTH
i25~22' * ~'C
- s ~ i j ~ ~ ,l ~ 1 w w ':r w w Lls ~l V 1 ~ l `t _3_HS , y y ~ i~ W ~ ~ t ,t t i ~ 1 , .t' e~ u
;~i ~ ~ 1 l ~ 1 1 ~t l ~ ~ i t .i E i ~ 't l 't ~ : " ~~R6 ~ i ~ l ~ l ~ i ~ 1 ~ ~ ~ ~ ~ ~ i Y ~ " x M . ~ " p " ! ~ w;pm ~ l .a:• "s aii ^ii~"ra" .«i 'i"' "»a"n .aiii.» , as afi s;i:zi ^?F' :a ~ ~ i . d". 4 ~,kr~i::»». " r a ~ "s.E~. ....,i ~e a i »,I rips, IfA , ~ ~ l ! i i % ' ' s; i ~ ~ r - ~ ,~........,.m„ nn.,'.n~.».....~.w~~~, n~m:nmm~:::mrnn~kncr :xh::~xdn~c sc.?s~'.. wI s^T^Kt's~Fin»4_=. v.. a"„~i ~:^s~"5»m7P~naac '3!~fi?~9H::EE.xiL~ 7-!zfnssn;nu„~ . A ■ ' ■ 1 ' ■ - ■ ' ■ ~
_ w .I ti~~. ~ '..tt'~Y ~ 4 ~ . K..,.. . i... . w I 2 «fs " t ~fz , t 1 ~ ' y; s ~ ~ " ~ s:ttesaua~" j ..aaa;,~t 3:L `~i41 yu~~4 :a « , G I :EY, x n Ar SL.;UILJ""»~' x» . »~73~ . " ~ .n t ~p : t ~ CONSULTING ENGINEERS
~1 1 ~I ,1 i t~ i ~ ,Y t ty ~l j { S l i~ L 11 i l i i i t ,l '1 . 12499 West Colfax Ave. . PO Box 1 ~ 1500
FGG ~ t~. , r ~ • ti, i l ~ - ~ l l s ~ ~ ~ ~ : `t ~ ~ Yi. .Y.: Y..~ ~ ~ , ~ - Lakewaod, CC} 80215 t. --T:u
1 ~ ~ f 11~11 ~ ~ ~ t . - _ ~i / 't 1 it !s ~ 1, 1 ~ 1 W t \ ~ •ll 1 1 13 ~ ail ~ i _ ~
~ ~::::v~ ~ ~ l 1 ~ ~ j' ~ \ ~,i _ ~ t 1'~ ~ 1
t ~ ~ ~ ~ '7 i \I/ ~.~J W.. _ t. VK ~ V/. ~ l 1 ~S ~1 ~ ~ j ~t ~ l i ` `
` ~ f ~ 1 r :t
_ \ J _ -
~l ::yy~~~~ _ \ 1 i
W - e
~ ~
~:.T:::~:::::::_
- r~
~r...
':~.':::~::::e~:: ec:::: - =aw-°_ a»»» 7
a ~::::c:.:::::... ~:~::::::::::::::i::::::::::::. x i,~ Y
~f~-~- . r
~:~:=5::::::::~i:fc'Si ~:::::i ::iii:::: is i.
x... ''«CR'
: L
~4. .G ..............~.......................................5 ~::::iS:::'::::'.:::
................._............_.::::::............._L..........................._......_............ 1
S » E s »r, '~::i:::i:::::::::~:i :::::i::::::ii::::: ii:::
~R~ -
'~::::::::::5i:::::::::. ..4. i:::3:::::~ ~:;i::::~~::::5:: ~ i ".f»~{. r a
,.»L. 1 1~y.S C f
"p"x ^:::e:::::::: :~::.::-::::::::::::e . rx cp :i:::::':5°::°::::~ ::i:::cf a., i
=:::::~tii::~~' l ~E' - .~t'~4
«p~ t V I y i TR~"~ W '
L_ I
i
r ~~M1ri.t.:-n.r.~r......_.
i#« ~r IL llYY 1 11 41 ll i w~- - rJl I ~
I * _
'i# s.. d~a
pp M
?~'FLJI ~
!u c ,y
.i t~ 1 l I Wil➢YGWfV1' Y ~4 "YY 1 . ~t Ll 1
4 »ced
y'~".tl~CG ~h1 ~S 2F i...5ar~_. __..lkilf{ii~U"'~rYY~lit~~
,yy~~4 i~"'a _ Fr_v.:.,x~.
x 9- ~i i w % ~ i ~
~J~~ y~, ,i, v~ y ;y Perennials rases
0 , r r t - , , ~ .l'i 1 w'°~`W ~ ~ ;,q ~ ~ ' 1 ~ ~
Q o
,__r
A I L_
r
T_~ s
i~
.ii
i rf
s ■ e -
t
v
4
✓~'i
,y L r
1-
F rt
i
• ■ i • ai _
X
'
i
s~
a
k~
4
r .
J
i
1 F
°i G DNTOURS SHOWN INDICATE
t~ r1 k I A I r1 ri,A
t
t
sr.: " . ®r"W"I"mm ; sm «-xxx-aaa ^ a ~ ax~;.~.: s;: ^ a • :»n •::xMar:.s:£~~&r Hs « : t e^_ . n • E~ n„»a_~c^ t«, a^! • « , [ £ " ......:f ~s ,.~:.f~a5 a. : a~x:^~s-x.,, Y• .s .a a. r « » ^ mm. ,W~~Niai . , o,... ! ..fir ,y: s »~e. : x^ 7n",zxn»«. ...E ~ •
am mm mm ow BMW 7i Z
I• k
W J LL
J
Jr
- -
,a n \ ;L~; ~ i . ~ ..r' rr Q ~ r r
i~ t . ~ ~ ' - r • _ ~ r , ~ . _ E..,.... . • .sW'rifiEE~ 7~:u::. ~ rGii ~ ~ '~'i'y.~~r a; ;•.;=EE~~.,.. , ur rya,._»a"".»aa»a „ i~ '^..,4` ' r i ~;E: ry ~a ~ rti ~ m ..aaa ~ c» „~i»»i »i~»»f:i,.. c. ~ i ' '''~i='~ii a ~:"ns rv5~»ir." ^'r^ri " .x~.. 'Y'' »aRa:t 'S' .::{.a»t~ i 1'~ISS iE 'tJ. as R E« . "~i r.: Ev.r« ,..p?;r.., i ...a~~;a .'3x..r.»~x .aa i E. ..r .....roc: ~...~...rn'.. '"'3a,_.. _~,y. rta ,».«,.'......r. .c,;..,.;,.u?.. ~ . n....F'~.n=";c»» 3'~»!?»... . _....~e. a~~'x c#~Er ..:z~ rca• i nl. ~.C >rr.•,, a..W~ ..__~6~ ^ ».SP.rs. ....6.H..a aaaa .".s'»:.,.fx,-..,.. n..... y
t r r ~ ~ i it it ~ (jj MARTIN I MARTIN CONSULTING ENGINEERS
~ , . r r ~ f X - 124991t11est Colfax Ave.
~ + z XB1 t i i ~ ~ ~ s r Bl rs, PO BOX 151500 . ewoo
r ~ i ~ f ~ ~h t ,d i t f`~ ~ _ \ r J'~f \i ` ~ F Y...._ ,~;5~- w _ ~ Ph: 303 431 fi 100 Fax: 303 431-4028 ~....Y-a
t t "tip 1 1 ~ ~ + r ~~:r;.::.:_ . . t........................................... f . ..l '1~,..'~.. X ~ ~
i 1 F ~ t ~ ~ y Ll r 1 t t ,e'`F ti t = r i ' _ ~ ~ •
`t' f ` r i i1 ® + ~A` .r \ ~ ~.s3i ~ r ~ , ~ i t ! ~ iJ fl f
i , - 1 L f JN i~1 :4'c r i r ~ r E.° 1 i
t ; ~ r `i i ti ~ it ~ `,S::V^I ti l ` ~ r ^ f rs ti, ~ = Vb'`~~` ` I,
j 1 ,~~s~~ ~ i c + "s#. . + + +
t 1 + ~ ~ I U ` 'j ~,a~~. .~-a
u~, ~ti X B1 ~ ~
` > ,p r W W t i il ~4 ~ ~ ~Ili~~ flf' I~,~ ~ f A v}~ f x S 3 ~YM'""w~» ~ ' _..1...
sY . • ~ rt y~, + .y~ J• `r 1 S~ 1 % 9 ~v ' r ~ 1 ~t L i l ~ ~i i
W ~ i 3 f1 3l
1, W W ~ ~ A ~ 1,,+» o_._ A., .
r 1°`~ - - r r W W L' ~r Ii .l f. r H _ v t . . I
r 1 W r "t' r 1 ~ ~ i i + J i
~ ~ i i~ + . ~ +
x 4 ~ it ,i = t i i i / -F' _ ~ w ~t -a
f' ~i / i j` E ~jt t \ e W W ~ ~ ~ ~ ~ ~ l 1l ~ 1 t i t i i
k 1 1 1 t T. i r E' d' ~Y W fi' r 1 ~ 1. ~i t 1~ „ ~
~ i i t ~ 'f I ~ ~ i l ~ i i
y i i % t } i { _ ' f 'i i i t ~
W y r r i 1 li t i 5~' ~ / 1 ti ~ li i 1 ~~y r t j __A 1 1
;'~tFT.E~~" i ~f 1 W s ~ ~ ~ t` ~ ~ ~li ~ ~ } it / moo, i t ; j 1 r i
r, ti t , ~ i .y i i t / t ~ t ~ ~ ~ i L i w~r~ 1
f i ~ i ~ j t_~
i ii a t i 1 ~ 1i W~~, ~ i ~ r y t } 7 ` ~ i i 'i E. i ti , i - r
i V'^~.._ i , t ~:x ro ` c=
r F ~ i i W i J i t ! 1L ~ ~ li ~t' 1} i M _ _ i~' 1 1 1 l c h
%i k i _ ,F - s ~ 1 i ii ~t W , ~ ' f~,~ i 1 ~ t r- i t... _~r .
t, i j ~ i i
f ! / E. _ L ~
W ;'i r 11 ~ 1i tl i j 1 _ ~ y y a ~ i t { i e ~ / _ / 1 t i i _ ~C~ HS W
~ i; E i ~ r k , °f l i it 'f W y i i W i i e l
~ { j t _'~w W W W r ! : i i t ! ii i ~ t ~ - , J
;,l ii i 1 i ~ 1 t' i t
} t4 i ` y y t% i t ,v i /1 'i l `j i is 4n
! V/ i j~ 1 i ,,..,d. -
1 S
r ~ t i ` y y y t . ~a 1 'aa'i~, m i i r t ,r .y W .rte
ids . t ~ i ~ / I .a ~r ~ i i y y y ~ ' 1 ~ _ , 'r T I
E 4. ~ y y y i~ ~ ~ \ ~ \ I / ~~vrs~da~ b ors"dd ~ ~ w ~ I 4~{Gaii i t # WWV 'I i~iaiiiliiil ~
3»i ~ i 1 1 r - x~ ' ~ 1 y y ,y y y ~ 1 y y i y I ' ~ ~ k ~ +1 ei(tiiit! "aasici hr ~ ub c~
y; i ~ ~ 1 ~ ' t i~ t i` j ~ ' / ,r s. 1 ~a
y i t / "e ~ t _ :w~;;•µ I l t ";a it t ~^r.•~ aa:ty~y 1 o~
l r° ~ ~ i ~ , 1 ~ ~ y y y _ l i r ~ , ,:r `i ® ~
~ x-- i ~ ~ i ~ ~ I l i ~ ~ ~ y y / rj Per nn~ I ~ e a ~ rases
i ~ ~ r Jr y Vr' y I i , ~ y y ~ n,~ VIII Eta!' _ ut~~ ~
1 ~ 1 't j i \ \ y 'w W xE~:~ta i ~ ~ ~ ~ ~ y w ~ ~ v
t~ s ; ~ .F ii ~ 3+ ~ y ' i . ~ ~ ~ ~ i ~Y ~Y W ~V ~Y ~V ~Y 1 ~V ~ y ~ ~ ~ y
I t ~ ~ ~ w y y y r I ~ ~ ,y, ; y y ~ y ~r y t W w W V~ +Y W W ` k:~:• ~ V u:•. ~ d ~Y y y y y
~ 1, 1. 1 i d~ ~ ~ ~ ~""^v.., y ~ ~ ~ ,t 1 _ ..g;; ,r.,.,,.-, W ~Y 3~ W ~Y ~ V°
1 ~ ,14 y ~ y `"mi'x';, :GCw ~:~1J
1 r u' ^ ,,,mow a, 1. aE;xs;~: i;l~tt;;:.:
~ }
` F~ l u ~~i ~ ; i ~4 ,r
i y y ~ y y s ■ r:
t r i ~ , ; i y y y
~ y d' t it y y y ~ 4~ ! t w.. ,
~ ~ ! y y z t - ' . l ``""..vim i ~ l } ~ r
t ~ 1, y ~ i ~ ~ F, t y ~
1 it t f 3 t ~ t t t k 'd
t l e f K._ Lax:-: ~ ~
1 j 2 ~1 i ~ i n1f ~ ~ t t ~ 4 .l i i! ~ E ~ ~i ,d y ~y
' i ~ ~ , ~ k ;.:yi ~ ~ ~i f` it l ~ ~ t J ~1 l r < ,C ~r , i _i 't ~ ~ E ~ r .
i O _ t ~ ~ - I I
r ~ t i, ii l i
` s ~ t l u' 1 ~ 1 ~ } x M i --ik ~ i~. ~ ' t - 1 ~
~ :i ~ ' - ' ~ 1 iii »;~er~ ~~~'i _ 1
:bi, t ..p~,G~ " ~ i ~_1
1 ~ ~ M ~ ~ r ; i t , q -S _ ~ t 1'
~ ~ ~ 1.
i 1 } ` i s i + ~ ~ ~ ~ ! l ~ ~l ;1 l I ~ i ij } ~ I
l ~ 1 '.:.yin L...,,,,~ i 'i ,t Y ~ j 1 - ! . ~y i t } 1 ~ l 1 ~ ! 1 t~ s
i +~ti .fie ' ~ li _'_i 1 l ~ ° ~ 1 4~"-
~ ~ _ , r t `t t ` _ _
1.
{ j` , d t 'l W W 1 ~ ~ t j 1 ~ i ~t b I
t i d ~ 4r~~
~ ~ 1 _ s f ~ Y
l t ~t ~ i " r' 4 ~."T., } ~ j ~ • try ~
uu i
i
~ ~ } 1 l ~ ~ F ar' ,
~ t i t _ 4~rc
t J' 3 ~ , r i ; ~ ~ f,, J fa ! li ~ ' 1
It t E 1 ~ ~ ,r i. ~ i 1 t p ~ i J
V ~ ~ t ~ 1
l ~ f f ~ ,l l f. t j F'~ ~ a ~ - l _1y.
~ ~ ~ ~ sr- 1_ j
s ~ t f ^ ,d 1! 1 r fr'` ~ r ~ 1 i 1~~
W .f W
G ~ ~ f is ~ ~
g"~` l r; any ~R ~ ; rr 'f r~ °
~r~
' ' n~.~3~a ti law Amm "ITT s.: s.-
4w
Ant
Y, t. e ri; .dee..~~.. ~ t. _ .._..__.....:::::.C::::::::::::::.::'::::::::::C::::::::-C::.:::::;:.:::;.:::::::::::::::::':::::::;:::::::::_, .:CAS,. _.......:V ............................................._.._.........._.........._....::::C:::::::::::::::::::::::::::::C::::::::::::::::::::::::::::::::::::::::::::::::...:....__.............................._......................_.. .m~. NOTE:
arJ J ff w f 'i ii ;It EXI STI N G C 0 NTOI NTOURS SHOWN INDICATE
i Z., i.W .
C' y PPROXI MATE F I I " s 't [ i fi .
R W m~ 3- R AB t E 3'~~ i-8 J', - EXCEPT I N AREA"
z COU NTOURS ARE 1, t
$ L.+ W 1 z-z fY'
s f 4M ' f 4 Sk- sm . . . . . . . . . . . . . . . . . . . . . . ~u.... u~~~-.. x :C.
1 'tM ki
p W
Z J W MATCHLINE:: SEE THIS SHEET
0 LL 7qu t
NORI n i
1 i
ut~r~-~vrrrr-~- - ~~t
- I
G _~i 1 R yr' 2' r , A. Fn, k 4.~ 'w
~ is
i i . s: ~ s is ( I . !
.11' i': ~ i L I: ,p"`,: ~~.u2tn:Yr..: :.aa:rrt: ~ iL s. Ih I..'i4ry, r_
..rr'L ~~~~n w? t 1' I ~ ~ , ~.,>TM - - -
e i ,h,..' t ~ ~ a. a' : i s ~L.,~ ,.,fin it r i _r 1 ~,i
i { ~ i ~m~~,~,,, : € ti I i ~ m: I m. r i' ::m ~ 3 r... 1 i ii # i i 1 m;.~: i - 1 ~i 3 § i i i ~ i i i r c i . m., ~ ii ~ ~ is 3 i : : i:.. . j 1 i i { i. i a ?♦G`y iff 1 i 2 y ~ m., : Y ~ t~: ~ is . ~ t ~ ~ i i m ~ r. a F 3 2 M,. ,J ~ t I
,,~t.m.. ` i t ~ i ~ ~ 1 , ~ ~ , .1. I. t :i i t 't A' ~i , .L, '.E .,..h. . : ~ Y ; :j I ~ I ;1 ° ; r. "S?~~ .:'~r I''. :I i ( t :>ry...
E F ~ { 1, ~ { o .ibrt+l'u. " t i. I j ~ ham.
.~E I l I: 1 ' .r t
,
i t I. : ~ . i:. "r r 1
~ f'. ~ « . i _ ~ b. ' ~ i. '
~ r~:1 .
~,iY I t # 4 1 0
I I E t; J
t t,-~_. - r---~ r i i
r :y
hW r-.._ ~
s.r :ra u r;r: nnr F f ~ . 1
i . C' ~ ~~4 w.
,~f., ,.T k r. 1 C
1 c. r 1 1~ V.. ~::4. 1 l i
t A~ f i
i s
' ~ '!"N '..r
. t., ~i.F..
f i
i I. ~~rr
2 E t t.~ t
I is s . ~
z ~ i f`
= s 1 3 { s '.i i ` i : ~ ~ E ~ i F „Im.3f , s
I $ ~yry } `5= i
t } f 1 it t I: i { r. 3 z E is x,:pX%%~~ e i f I m , ..,...y. ; w.....~ r, : ; I ~ s 3 3 I ~ ~ ~ ~ i is ~ s i J!
s is i 3: i. a: ~ff is :I ~ : i i i~ p 3 is ~ F ~ s is ;s
i i. 33 tx i ~ ~ 3.. ~ 9 is E ~ C .j s E ~ r i i ' x. ~ I I I E II ~i'i ~ .tr f ,
,j... sj 'i. Diu. _ s
a c-. `~;u•', -~.;u:,:, T„, u.....~it'i.F....,r::r{,. y,;.. r.;:.r yw«« :fit .:~i t. ~ ~ i E ! ( is i u' t a ~ I r ~i g_'~ra~. ~
~ ~ E ~ ~ ~ 3: s s ` ~ ~ is ti
p ~I. r.l:..' ..SCHMtM tt'YYY~' .w „n 4i.. ~W.~ »mm.r j# j 1 ~ ~r, a J
err ~ s.::, f ;tr Hw a a 'r ; i . E ~~~a~,, tt t ly .I ~RiP,,, ~...xs~ ~!'~I .~.~aN ~ ..~1:~ r,:.Y(ii~ , i
i 1 I ~i's.E i
i I' 7 -_i =
1
i
?""l t i a
r
; S~~ = -
~`P' r is ~
i ;:'.'r
t i 1
i i„F 7w
. r
, w. ; rs~ 'W.'rx:. J a'~
t 3 ' s { t ? e ~ ! s { ~X l4wA,~r 1 f
t ' ~ ' ~ : 1 ~j , I I ~ .:J~,. .y~w~ : 1 ~i ~ 1'd~ ~11j'a » . Y "rn y . f t
? ~ ~r : ~ { i ~ 1 ~ , ~a ~f ~ f ~ ' ~ir~:. , , ,s' r a t r ..«.w«w.«w,....,.„....,,..,.« ..............»m..««.«w.wwv»«w.«,w.,«..«.w.m«...«,.««,,.wrw.nwr,... ««mr.,w..»....»..»......»w.««» ..»»«,....m»».«.r...«..«. ~ . ...,MM • ~ • E: j .
~ ~ ~ s s s - s a .i I r..t :i o , . - I t i.i' , . , j - t w i,. , .w F ,a a • .,i 3 . , : a ~ . ~
~ I ~ ! r ~ ..,y , . f ; ~ ~ s I 3 i r, ; 1~, , > . . . { , : ( ~ 1 I Iii I: i,~' t ~ t ' , . I'
:...~rn''F .f...: s ~i ir. y x. 1 a w., , . e r. , F z a . . .i.u a .,.....a r._....... . . . : .,.,,.1 I. ~i ! ~L~~ r
4 I' j r.. a ~ , « k .r i;;. • 3 a s. , - , , : ,
is ?.f...: _ . i..... ~ .,.,i 77 ~ 1, is IS^irMrr•..i I..'.' f.: i:.. F i.. a s~ r as •a : .c - 1 .u. . v~. a a : a . . . . .t ...e ....d.. . . « s a ~~~f. ,..a, : s r ' a: , .i' ~ ' , ~ .a N
I. I: 11 a r , _ a: . ; ? s , ~ t. i r. . . ~ :a f ,s 3 i.. . 1 , . ~ ~ « i , a s 3 .,,,E r. ~ , i , . a . . . 3 :a : 3 L. ii .
S ' ~4 a ~ : is a € a t{
s t
r
r-.-r ~ ;.wc. {
' ~ ~ Vii. :i~ 'I: ~~;j , I
F i
~ -
a
t .S .c
VJ
W .rt
1 s~
1; i
: WY--1UV s t ~ypt1 I
i
~m~nn nn~cf!.43s>.ft~. o:uuw, Si$i',P~S!i" ' sgG'SC''"iw'"".{L~ti'l~,fi"' ^~EI"u"u"~ii1~9 a"~1" c: s E~E~~ ~ J
s ~ E ~ ~ i' i I . I r. _I i I - , f i j f I s: ; r ~ i
3 is s :.f i i : i! i s
i'I i t : a ~ , 3 , ..,M.,.. i ~.i ~
i ~ is j 1...., n n.... x ~ , ` . ' i i i S " I t
, ~ is :i z ~ r ' y ~~33i „ i.
-j , ! } ...»..,».»w...«w., .w ..,...,.~.»..»~,.w ~
s E s ~ , ~ - . . ~ , I i > > r> >
i ..a E ~ z r. f ~ i }
, i I ~ a - ` ! : ~ : Q
_ ,.3, ~Ti :I,., , J
i r ' p i ~
::E.:. i F , `w i4' 'i
0
Sheet Title
I LE 4 Q BUILDING
Z ELEVATIONS
W m
Z 4 W Sheet Number
3: i Z W
-9 J 0 LL s : a L-9
tl. _ ~
r1 r _ , ' . w. <_~~~,u .~r ;s; ~ - -
v ! :.i I; 1
I: ~ r ! ~ , 1
_ ~ 1~-' i 1.:
;t n: i ~ r n.
4.. sl ~,r i ~ ~ ~t
~ ',.1 q .s., ~ li'd' ,.L,~: ..::L.. a r 'fir n .
a rte' ill :i.. M : b {I " a• F 1 I. j: ~ r ~ ~ l 11. ~ YJ it 1: ~ y 'Y. 4'~ ~x
: y : .lJ ~ ..L._ :,.,•n,.. 9... : : • ~ `~.r~ r C 1 :1'r "'JI Ile. 1""'°-.n y:4 .1 y- !I: F: ~i+::. .Ir I 41 i ~ ' L " 1 1 A.._
6 r,'x5. 4. .J ~ J.... ff .l:... 1:. ~ 'I I''. ^...r. ! .r• ...w:d .:rr• W. :.l;-i. 1 1 I:,., : m. nuy r 44 ~+L. t{ e f ~r. .1 J ~h~, i y • H.. :r~. ~?4d r~"~ ...q rt. 1.^1!:~ 1ir"...,...w...".!r 'i; ~i4
t a ,pWy, vy~ . ~ i - Ali. ' ' :1" It `L'l4"' '.,,,,.•IImM~.'~. ."h i j 1 :.'II I r I :i' , i " 4 . - is . : ' ~ .:irv .r, ; , i l; i....
r t I.. ,.:Y',,^~""'el^.. `Yr.Y.r 1.p~:':~mnn--:-~la:.,,~ a° r - - ~ ff "»r l 11:... '!r:.. 4 is : k M::r.. ~ ~i.
i ...a• 1 .w. ~ l~~lu.. n.. .~;,.r ~ W"u~"mM'.........,eJly.. s 4 m µ 1 mL'.: 1. 1 F I i. L''„. 1!~ r. ~!ir... ':!x' I L'., Y.,. :1. 3' .1 .:,....-'yimn;.....:. a.. 1;1 r... 1
~ ~r 1 I 1 is 4: { ~
u, ,a: i t Yf:., m.,.. 'il. I.r':'. ~ .....a_,,.. { :f... r. r 4. s' I,. r
: . .I~ 1. ....:c, L ~
: k. y. . r. a;, r i
is • ci. 1 ...y : -!L 1: _ fly I _Y-. q~ y
1 j ,.~L :~:-114 A L,w . ~ ~'',.,T,, 1 y C n 4n 41XIXfH. 46:'NhAH+ IdkY:H)fi:~.:1~, +ArW4, °'.^i:: . ~r'Y...Nflt:: ~tlMh, e...:
' ~ 1.. ' ' ~ n y . : :h ..r'''' . .J .1 s I ~x". y 1 h ti Ir .li ~!~L ~.'JNNliflt^~HIL:1~.IJ~::: 1.'1 Y
I. ~ ~ i'. I . lye, y,,.. tl 'G 4 '1{ . 4 ,r :C : t . ' y, ,b I1. ~t ~~:y k tLy"L 4 .sm.~:_.. 'i: ~ 1 T I
•,;4 •.L ~ :4z, 'L.y'n a .~u.. 1 - is n r '9P ~ ~ '~1 " i ~..1::::" y....,. r' I~:ti..l~'-. rf:."y 'a .nr :ii' ~I g~ "tt 'e' 'L ~i. .L4 ~tS
1 Y~ . 1..' 1.. 1, '.1: I 1 1 1..Y..: `f !h.... rr" . b
i 7~.~ .:~:r ....:.J'a'il 'LL..:, ~'~flt I: is i ~ • z n
'J. .5.. n.:~' ' ~ 1: Y.. i ~ ~ :1 1, Jr`:;.. ~ '4 r. L. ~w4 { yy,~ y,~ ~ ra':. Far.
1 ~ ~ R S - ' '1'I y L y, 1 1 y Yc ..k fL. 'I. f ~:'"^...;..Yw Y n L Try.
.b YL "T : 1 Y" LI l i L J~N : : ru,~ rr 4' ro.:, ""1'h, n m µ ~'~r Jd 1, L:..: y.`..
: is 4 ~ r I..y 4 L r:... ~ , w f:4 • y ~ W. f ~ :
: dY„~`rm t.:: 1 ~_Y`~~.w. ~ k.,~gyt t 1 I,r ~ ~tc ~ Y' I r 11~~ f1 ~1!"Y.~'Y... LIB Y':li. Y~J:J.~~, _ _
Y.I" I ' . v.ri''; . n is =n; k"' _ ~ J ekv
' n Ft ~ 71 y'..
. . 41~ J 1'. t ~,xfi 't. % nl.' X 1..,
:I : 'm ~~u : l: 1,. . >g, '
~ ' ~ e.. ,L ;4} 1
M L .J~ I "k it ry4 ~ 3. y a~ ..r 'l!i 1
! ..lid. ' ~ r i - u`~ i
„ , ri ' 1 _ ~ " _ ,fit, y , ' y,, S
w ; ,I 1.. . ' Fq 'r:. ` -1' f
I. Y 'i'..1. .41'J . y: 1
4,
1 ~
-
I •1 r;, ! "ua«, x :j E 'h-y~ t! I r'.,. b : s I .Tir...~ .ir : I: S p, 3 pr ; . . r; :~Mx: f: ~ i ..^m: r r i .a'.: ~ : r - i 1 _ ~p
k ,.h.;:i'4.. ";j .i "'9n:.... ~ hi a w.. i C i'~'}!i 1 ~ ! " ~ Y . ~ I it i i'- u : '.uu S' a : ' i , , r. I k . i - S ...,......„....,„.v~
r 5. 4. , ,I.; .n r. I'. h. La-: {';:!r`'e ....M .4:•.. . _ " ~ .I. 'I ~1. ~ ~ r , al.• ~ ~ 'v.:...r:.. :.~...'r:,. ( ~ s Yii ..;Ix ' 'h r<r .a 's:.:.. t.~:r.. `4r. •4r. I II. Y.,' y ~-7 I, 4 ~ IS d' ~~"{tL'., y ,4 tl Ri} ' . ~~i bi..: 4 4.. ~ :i, f t :14 II r.:: 'u:.. t ~ IR.. E _ ` i ~t
Y.''' ~ R: ' : ly j f A:e.:i: .,y r::.:... I j i ~;j., : II I F '~..r~ 'I: jp + " - 'u !'I, ~ I I` ~4. Vii. '1. : ji a: I'I'':
p~ ~ sir:. 4. : ~ is ~'..t. ~ .,..,yam,,,,. ~a,r is i . ~ ~ : 4s::, ~ : : ':;i. Via. ~f 'h;;~ : i.. 't".,. :;f:..,., .,.au:,.,.:,:: r :;.,.n >r 7 ~ y ~
R.:nu... I n e W. i 1 ~ 1, . y. : _".a : n, r r, : i ~ j. ?iL.; V I j'.. • ' .Y: ~ .ir ::?Ij.. , . . . x n' "Y~'! k il:. }rj. ~.!~k 4 r !r.n If ~ ..,,u. , '•,::.y m:,::;r, . i n.:..^4. . s4 r.,
u... r , 'i~ I r I~a ' ~.i ~ :n ' S ~'I+ 114 t; r I.. ,,I n: _ r { `a na r t ...::u,r.,..,,-nom:'-.~~'..iuta:w.h,:.. xa.:,,,w: r 1' 'r. ~ i :r.r. Y: ~'ry..-'~~ - :~..:ifl" ~ t I a' i': :,....:'n. I .:f'n~ :i~~ .x ,a+
4 i, Yr. ...,,v ~k I . T ~ ' ; ~ ' 4 ~ Yr.... a Y... i f; y. ~ LL I ' I yt ~ :i: E
,C. r : ,0. f Y:S , . a :.,.4 IS i j ly M',~ . fr i.#a.. r, ; R' ';...,f"u:.,,,,. ~.rw 'th a iy rr.ar) n la.i• ~ ,.r {4. TI :t ~ : I'. it ~ t5 :I ~I Y~.,. ICI. k r~. j4 r ~q~':.,' a, 1 '4:w.•:a ~..,4:.... .r . ~::M' ~ ~ # 'I~ ~ i.. Y "i'~ !i
t ...;p 1: „ {}~G~ ~~}I~ .u t x S 1 j:. .
n. Y.u , w n { 1'rt. ...awes s. ~ a. r. i-.r ,er :cti !n' :i: i Owner.
r r ; ' : ..I r" fu s ~ _ d }d ..r f ~;i s"', f u: y:---.~ ~ ~I
3. r 'r~ gg fir. I !il ~t. I I, u; _ ....xr".'rs x ~ ~ ...I I: ..i ~ r".. ' ' pr y '^n yr J e ~ , ~ ~ ~
' ~ 'F , h. 0...:r, - ..r 5ar. ~ r y i•~.' .i,._ ~1 I :r~ . 5 f' N ~
: :r. . ; • ' ~
ifS' r ~ ' I . I. l 9 1 _ ,0. 1 'f ik ~r ~ G:_~: Iii pi ,i~ 5 '.i: ':I I ' .I ' Y H ' ' :l. ~'1: 'M1:. :31 i. r :1~ f t : .:..::lL ~ .r ~ _........_rzmssrmmm- ~rre i I. . ~ 'i
s ~ t I a r. L. j e~ ',j 'ey ''4:.L 1 '.i^ r sr ~I:. u u'''~ ~ n I' r, y: r { ~:i ,.r ~ r, ' M1:' r' 5r "'I, rr'.:, G rr r u:. Y"Yt....; 11 'i.: } Pa li. j~..: s'~ ~.I W{j Y~~ t ~ ~t`
, . w rW ly I .•rr ar y 6d'. ..ay X { N, : i. : ii ~ r '3. , 1". ~ ~ ~ ~ 1,(7 r O
j { ~ir . • '.k u I rt ~ I'''~ ij j ~ i ~i jl S M1 ~ m , . r. ..r L : ~ ' ~ P' d y, „ 1 :1 ~F ~r _ 117
r P! r 4 ' , I t C'11 I
xt i IIRI rlt, tl:, I_, ~ F t { it Ri ~ ~;;r ~ 0.n ~ " ~ r t iT ~ h:».''' _ ! h t t :..:.Y».. Y. , p 'L 'i. ~ k ~ 'i. S' Vii. ~~g' ~ a { Op . - Cp
~ ~`,',"~'~.r' PI S n YI 1, 1. ~ ~t I t I jl It i i . ; Y . . a if 0.I ly r,, !'45~ i? 9 ? i = !,il, i ~ a~"! ii ' 0.1. ..:ap r e ~ r : I' : S , .=:.,.y;: S'tV .k 'i a i;, aF~h `ku. ~ ~ j
fT~ ~t-
~ o ~ ~r: _ - ..tt.. _ r,,
_ y. Q
. `v,.. ~ 5 ~Y}
1 R W
~ 1 u _ ~ W
~E Tai J LICE N' `s~~ ~ r .:i
i - ~i
- f
~ ~
6 v- ~ _ J i_ ~ W
'Cr Y
_ ~ -
~ ' ~r~. T..._
Y1 I'
- i
J~ b~ - Y
i h
Q.
~ ~.T 1.. . _1..~~.......
T~~
r-~ j
rt
` ~ 1. is 1 l { h 7., F..r aL r H., r r ,I I~ (1 ;1. I fe kkr I !h h ~ I . , ~ r . n r:
, I : 4 .:T Cl)
i I; !h t . • w will
a: . I r I~ s , : t r h. : ~ 'L -,...,:in 'tr rh.~.1 'I .'~i:}I 1 Sit
ri rt r^ I.I. : ~ r . ~ 1 .E L • ~ , s~;l ,~f r: : i~'I r ~ I is ' ;1 . I ' Sheet Titie
r.' SITE PLAN
l t.lr I I~f I 'i,, 'Ia:. l is ? ! . , . „ ; , } , t . ; I I 1 I I ~ , zoi li 7 !I 1 I..i' Ji
M
W I0' I: G~ m t~ , h 4 ti
Z 3 FW, "F. t Sheet Number
wt[ W J
L~ LL C.1
- - - -
f:: ~ I f
1 _ . I ( i i ~ r~mn ;.I < . .E r~. L a
, I '.i i 3f I 1 ' .f u .rc~', r i F f I"". ~ i!nn' m!~ ,y..«'"4 :Im:. n r« ii _ ~
,j{ 6 ~ a ~au"il :ii .r i. I mr. !mpl` ~nr P~ ' me mm - ; C l4. j i ~
3 s i s: ~ ~I ~ n I ~...:h. f '~:;I ,y, _ ~ ~ `r
~ H'!ru I H.. C; ~ 4~, f ~ ~ ~ ~ ~ _ _ Ai~.IN I MARTIN
€ ,ri i H, f. ~ ~ry Y'~ 1 7 .W i i i; ~ _
l; ' .f~ .f.K : III ! i I ; ~ ~ a, . 12499 West Colfax Aveo I PO Box 151500
1 ~ w... G .CM~~_.fr" ~ ~f: W W._ 1 . Iii ~ ~ ~ ~ „Hf'.. i ~ Lakewood, C~ 80215
r:. ' ~ ~ ~ l Ph: 303 431 fi 100 Fax: 303 431-4028 ~
' i;., H + { ii: i ; H f
' ~I. . IX.. JJ..~ ,"'ate= tiL gg~' L l~~~vvvm ~ s.~! ~ is ~ I j', I ~ ` i.;~.
.ep^ ~ . u f .,r~., f ,L I ~ ~ ,,j I
.~r r Y~ fm 1 .I.. '~H YL Lam... Y.'+Wt':.: : ; is is u.. 4 1 ~ ` ~ ~ ~
Y~~,. ~i' .Y L AYLf~ I: ~ M'y ~fi. ~L'i::: Rat:. ~ ~ ~ , . i ~ . i i ua Yi , gi. : ~ ~ ! N'~~~.~ I3ES I ~N
~ry L qty "t ~fH';.r. " ~ ~ _ " " f `4} "'i: ~'1:. R. ,.I, 1. L ; : ; u:. I: I ~ ~ Planning ~ Landscape Architecture
i ` . P. . : ~ uu`... 1, µr ; ~ km= _ cf, i
, .ej_ I ~ ~ b 1 i ~Y r f ~ ~ 'L wf~ '.ry ~N.. 3!'. H:.. 4:. Af ' .....~,W. . { t N 7 . I . . ~ a ~ ~ itIAAIYYII~`~INIIIiIilNlllllllllfllllli~~lllif~ '»V
tt~ '1..:~ Y~ 'L ' ~ - nn k treat 11 a 1 Be c ~ 3 ~ r
L L ~ Y~L.. .,~:m ; I r 1 f a. ~ ''t,. .W _ _ ~ ~ Denver, Colorado 804
'.I; ry. t ~ 1. ..Y_ L.. ' ~ A ~ ti i~7P1]7YYV77YY'i7' ~ ~ P 303.89.1188
~ ~i~ n I f 303.892.1188
~ ~ 4Y-~ fw Vii: :LS~ ~ k::. 4:P. ~4r ~ www.norr~s-desin.com
f .Y V4~ LP ~r
i ~ .W... -I. ~ , . . ~ ~ ~ ~ew~cs N. i
1 p: y i H„.. ' i w' ..Y ' 'Y 'H^"t b. ~i~~Y~
r: 5 w Vii. ~Hr H~,,,~ ~
~iM ' # HE'S. ~ ?L a ,yL ~ '"n
"L W Y 1 1 1 _ .
3 i..: ~'s:. ~ Cpl.: ~ .,r:.; 'H.. r..: z`:: ' ~b - - 1
C ~ x . 11~~f~., -
.y~, y. I : Hrb:. ~ f~L... Y~Iq: M~ ~ ~ YI.. .lly...
~
~ ,L ~.q~ `w
4.. TMi }4~;~ ^f. ~ ~ ~ H , f-
' i. ~ ' i ~ _ I ~t
.5~ , r_ HSHHy:... b ~ y..ry f+l.~~.. Mtl.:::..:: ' .
I p ~ „ ' , . Vii: ~~1:. off .
I ~ f Si. nl: j ~ u 5.~,.
g`~ 'i. 'i;p 'H5 S 7.
~ f~. fit ~'f. 'I:.N y_ f':,I.
r 1:. U yL i ',I
,r .t, .H H
f' H:1: ~ rf.
rT~ ii , .
z ~?k, " Ii! .w. i f. ~ ;
~ r ~ 5 r. ..r ! :..:ir a a "'M:.._,, i ..;,rte .f I i , r ~ . fi :i" "'*w t, F I 1 i. : ~ : : i. ~ry V ,~I (
.a ' 'S.. .r ~'4, ,r'7r m. -r '~i. r,; r .p:. 4 ; , ..r :q .i ,m, r f :i I I. ~I. r i. !3 3 r...... 5; .t. :tF 4n Irr~n, ....i> I} i .m I "r.:«,,,~. ~ t I II i i; y::. r" W. , n ~ 7r.~...,... 5'.'+!.. :ii" "'4, ern... ~s:. s. I t, ~'.i, ! .~:::,...iN:.. « ~I1.~.i r" #i ii :vc..~ ~i a i t t d' 1 .r. '~ar..m 4:, t!r . 51:. ~ `~h ..:.5.. , TS.. A I: I. a 4. f. ~I~. +I I:: "'S ' .r i- : ~ : : . ~ , n'. r A ~ ~ w :r ....;w a7 ti!'.n:. ~ ~ r :r~ a" i, I M:..;~. "
:r. I ' G a.,:..::. I .I r IJ' i~ s. 51ir :n. :;na n 4r w:. ,I j.: r.,, fy i'1~ Fi, ! 4 f r9 '".•1"~ a!' i:. ~ . . 'iI n. 5, n 5y _'~1'. ah :yr I '._„n -^,...~n:. r' ~3 i is ~i ~.I': i " _ yam-
,k; p r 3 ri°ia .Npw: .r. d- u41 e' d wrr d;uc', I 7i; r ~ f; J I. i ~yi. 'I.:. .~,ll!' aril.. I.A 1. 4„'.. !i. 1. ,i .t ~ F ~4 ~i I I, r~ 't. 4. i g n r Ira` , ` i ` F ~,y ; 1
1.._.r . J.wv,,. ~ I ti. 1 'wi... ~ ,y?''u.. ~y, .r I: ~ yr!y, :1, I. 5'. ~ ?ry „ "'t 3: '"w.... r ~n„... L f: I i~.,: ~ ?ii 5:: ~N~, s!' : r: 51. Ac .i' ~ i. y: j: '~;iil:. ~ u.. I:.. ; 4: f..:4. I,, t, i .I 5 r ~ rs .e d F L.. 5s. ~ r4 :i: ~i. :.."..'!p..... I I. r:"l~ ~1 ":.r_ •n~. ~~W~ y, r .
1 .ti hi~;. ~Yl.. ~ C'w_~' ~:i EE R tr a~ t k r , a:. , . ,,r! i. g, ♦ x J ~ . r:...: `.:r"~ .i. ~ ° y . ~'I, I~ 1' I fay 5 _ r M 9 ~ N~ x y ~ l.llJ W
i! Ili. .:..,I~ 4 ~ L,. ~y.. ~I: w.I ..1: ~ ' ' f4 Sf f ".f.. S } S Ii .;'t 9 f..4 rr, " F tE^P...., h'. f 'r ! I ;°"I '~;r... :I; :a" R' r' . :r . S ~ ! k 6 'r. ! is ~ 'Ss~'', FI: r".j ' ' h. 5!i. ' ' S: ~i ~i 7 ! C: Grp r,, ~~».~h v
u ,:c :sac: .r'. rAA" 5 ~h ~r ~w' .,n;...... ..;yc ~ 'I 'j. n... ..,M:...;;. i ~ ~r " t. Y~ ~ r,:
. r.~,; 'r: Ei I i i~. y, ~k ~ ::y " ':y,i~ ~'S ~ I. qk..±F 'f ,.n . S. i ,:li ~ 's~"'~,:.... t i - tl ~r fir, p ( ti is v~. r L t T
' f..~ ° it u:. M... !!F. ~ s. 'if 'I. k. rod... I d. ij `""',I:. if x S 'y i I; I.. n~ ry y!in; ~y. . 5!'.!!F, .,i" 7. ..y, y. :.~,.y. ~ :f t d . ~ I`S: .,5 4. 9~... .S''4..~ : t ~i i~; I ! ....E; -W.._ ~ 1' I: I~ '..S.i ii., ay 'S. F; } I} i:,,:.,.. ~ !i. ur:tl ,,;4 r . 1 `3. f.,! .~{Et, u
~I E: is «-u'? _ ,M r.. r«''. ' 5ij: ~f .s~. 1 :m p!'~......I:., ~'i :Y j~ ! 1- '!f i!ir~, ~ ,r w ' I. :ar ~ Gyi ~ ?y: . r, r y '!ti. !j. ,F. t .4 t. i : r z :4 F 'i: y ` :':::.4 "I: it h~.: .i. ~ t y, ~i:. m::... tl I' lw R1:
i i ~ 1
E L
J4' t
y . ~u.~„
"TSm . , is s ~
~f 9 r
I ~~t. 4~i a
# . , rsR 'fi fi. s i rp h . •
~h ~r+. 'i ' ,d ,Y
4.~4 'Ni. :..i r r
r r I
{ `
f ~4.
" 4 ' i ' ~ . F. i. ,
~h. ~ ] s:f~!
i 9 d ::.~L Il. ti.. 9g 7~ '
1' .t. ~1~. 1 rr~ i~~ _
rl 1. r` 4 i ~ ~ ti z t: ~ a , i i ~ v '
x f. t r~'i. ~5 k y 5 r
Ei. l~
~i~ 's~, I d
Y r bi
. M, r ~ ~ " 'k
t;. . , ,;z ~ ' ' . . it41 F u 1 _ , I
~ . r I
is µ ~ i,,
i l~
''.L. ~...g. . c. 3 4i~, 91.
~r.,hh. { ~H "i ~ ~ h G ~ 1 _ ' L y
' Y~
jjj 1{. ■qa ks
w 4 1: ' '
W . :j ~ ,..y i
_ ~M7::NPlYYYW1WW Wll 1
3
i 3 r~
i.
i 1 "w
u`:;,,. d~ C ~ "rj. tip'"""' d
1 Y
' i t!t: ,u- a::~,'!i is
,~aw~~~19h. ,yam .;m;w ~r. i~
:1~~ ~ ' '4 _
1 ?iii P ~f 'rlw"attn:.~ ~ i~ :i~~~l ; tt% ...y ...,;11.1 .,i'.,. ~ ~r. I . F . ~ 11 'u. iii: .:.U' < a~' ;d Yom- r~ 1 ~ , roll* I~1IVICIVUIVICIV I ff I . ~ ur-u 1 / , zuu t .=x 1
*FINAL, LE 1[.!I ~4L, CABLE AND S.N~ ~~E. 44.E ~#L GAS, ys l ~ , F . : a Vin: h ~ , : ~:t:t I ~6r'! . p ~
1FEE4J l ~fl 5~L.~If'+~Ilbt1 w F~ONAL l1VIE C0R&✓ Ra#1 f"1 i i
F~i,~a~ ~~~i~~~~i.. N: fif ~~ll.`~~IC~T1~IN . y
A ND 21 y} r':.. r
tIl j iL ~ 1 '
~J i LU
.:.L.
Sheet Tide
L 4
f UTILITY PLAN
n
Sheet Number
Z C-2
WMWWWWWWWWWF
S_
t
MARTIN / MARTI N CONSULTING ENGINEERS
12499 West Colfax Ave.
PO Box 151500
Lakewood, CO 80215
Ph: 303 4316100 Fax: 303 431-4028
Vim" N41~,IS DESIGN Planning (Landscape Architecture
r
1101 Bannock Street
Denver, Colorado 80204
P 303.892.1166
F 303.892.1186
www.norris-design.com
~ i i E s . t. , . x . J , .
CALLISON
1420 FIFTH AVENUE #2400
SEATTLE, WASHINGTON 9810 PHONE: 206 623 4646
FAX: 206 623 4625
~ ,.r ;i
a. r , ,
i:,
LLl Q
i ~ f~ O ~
. r .,.,qs,.. iii i Z ~
f r......~ • ~
~ O Q U
. C~
Z ?
_ ° , . . ~ Z
, . ~ O Z
f- ~ 4
,
; W O ~ ~ J O
1 ■ . ~ chi ~
F
~
V
. i
, . ~
_ ~ ;,i a
, ~ r~ _ YM~~.r/ .
~ ~ CC3
p.,.
:I , : , N ~
s. ~ ~r .
pry. ~ i
,.1' ~ ~ t ~ .,i.. ~ ~ 1""'!:
' . ~'ii. 3~, ;
• y; .I j .--r
~ M
n.... 'n+r ~
41. ~
_ ~ ~
. , _ Q ~ r
i rn► ~~~~~ti. ~
~ p;,. W ;~1
~ .a;:. i ~ mM~ ' , W
f~.-~ t' n Vie: ~~a i
i, ~ ~
.-i ~ ~ ~ ,I ~
_.,J
.,n ! ~ ' W
ri = ~ r-' . .~y. m ~
i'. iYi:..
~il~
vJ +
W I
X ~V
-F~ `M1j AY
~~i ~ 0
JUN Q~
1. ~l~
JULY 0
T
_
r
v~~ to
AMENDMENT 1 DES 1?, 2Q07
. dr''C.
t ~
~v
Cl)
w
cl y. Sheet Title
Q PHOTOMETRIC
Z PLAN 2
mui zQ
¢w W Sheet Number
p LL
a ESO-1
,r,..,.~.+~.
MARTIN / MARTI N C❑NSIJLTING ENGINEERS
12499 West Colfax Ave.
PO Box 151500
Lakewood, CO 80215 Ph: 303 431 6100 Fax: 303 431-4028
N4I~,1S DESIGN
Planning ~ Landscape Architecture
1101 Bannock Street
Denver, Colorado 80204
P 303.892.1166
F 303.892.1186
www. norris-desig n.com
, r ~ ~ , R ~ i ~ ! fi.
r :,E t z ~ , , t . ,1 i E" ~ ~ t , . ~ ~ i. ,.t.. i, , .
CALLISON
L 142Q FIFTH AVENUE #2400
w: a SEATTLE, WASHINGTON 9810 PHONE: 206 623 4646
FAX: 206 623 4625
I ~ ~
e~
~LI Q
-1 .It Z
I W
i ~ O Q U
.
;a , Z ?
♦ - i~. ..ice 1, ~ Z
4. O Z
I-- ~ q~,
- i Q W p ~
i ~ r ;.r r ~ p ~
~ ~ i... ~ LLI ° "
'
. ..,.,,,,,v~~
'""~w.~
r ,
-E ~ ~ ~ . r
>
;
} i
, , YY# l1 .
.iix=; C'V
_ r - F'
t;t~
N Ol'a
M u
s r ' Ll..
~ ~h~' ~ ~ ~
4 , ';~"4;; N .-t
L~ ~ aV
~~'~+n,, (r is i i?j: ■ ° ■ `4rL."nr_ ~ ~ r.r~
L..... ~4, ~a: l^'l~a
~~'h. t{' ~ VpVi41Ji/ ~T l'l ~ u':
„T - _ } ~ 'i~. i~... W
~'^iit 1~ f y}
i _ ~
~y:..
W
. W
, .
L1! -
SAY 1
, _ _ _ , ~r► ~1 ~ N ~
J U LY ~ 2
r
v~~r~ aye
AMENDMENT 1 ::DEC 1 2~~?
fiii
cf) w
0
~ Sheet Title
Q PHOTOMETRIC
Z PLAN
m~ Z W Sheet Number
3: z
w J w CL ESO-2
Q t.l_
MARTIN I MARTIN c®NSUL,-'N~ ~N~~NE~Rs
1249 Vvest Colfax Ave.
PO Box 151500
Lakewood, ~ $Q215
Ph; 303 431 fi~ 00 Fax: 303 431-4028
1'~+~I~I S 'S I 1'~I Planning ~ Landscape Architecture
1101 anno+~k trefi
Denver, Colorado 80204
P 303.892.1166
.j
303.892.1186
www. norris-design .com
L# N
, 1420 FIFTH AvEN~E 24oa
sEATTL~, ASH~NT~N ~s1o
PHQNE: 206 623 4846 F : 2Q8 623 4625
. F.
; _ ~ . .
~
C~
. , . E;
;i . y, r
: . ~ :x:
y. :i -
-
' i~. ~ ~i i.. i' i. . ' '..:i. . r. V
.i; ~ . f , i ~ I w~•,.
- s 1
r.
fi:: .
r
war:
r i i r ~ ~
~ I ~ N
ir. OO
i _
~ ' LL
' i "4~~h ~w;;.Y' W i ~
t~t'! .1~~~ ~ ,
r ~t CC1
.r,~ ~ ti`.../ ~ L.. ?fm.. ~Tn:.. - :avp
I ':'i ~ I ' ' _ ~~Y ~ ~ ~
~ 7 -1. ~ t C~ ~ ~ , ~ ~ T
2 ;
r W 4~~~,. i~
y i....... ,N \ w ~ iF s7"`
t ~ :my:i;
~ ~ + i~ .t
i . Y; _ _ gyn. W .~r >
I~ ~r_ ~ ~
W
r iv,~...,,, w _.~...y C3C] ~C
W~= W
. t i.ii :.'ni,.... i-.. Z . C~
_ 1t-.~,s., ~ ~ ti
. ■ e ~
f
,wry v.
~~Y , oar
r t t L
J U N 7, o
c.~ JULY ?
v~s~n ale
AMENDMENT 1 DES 17. ~Q07
0
z
iflin
z
A P&
N
w
U ~ Sheet Title
Q PHOTOMETRIC
Z PLAN
m~ W Sheet Number
z
w ~ J a coo-3,
,~,,,,,,...7, MARTIN / MARTI N
CONSULTING ENGINEERS
12499 West Colf~ Ave. PO Box 151500
Lakewood, CO 80215
Ph: 303 4316100 Fax: 303 431-4028
J
, NOI~1S DESIGN
. ~ „ Planning ~ Landscape Architecture
i . y ~ ~ ~ r , , ~ , 1101 Bannock Street
: i . ; t
, .:5. ~ t, , 1..47 1 Denver, Colorado 80204
~ P 303.892.1166
F 303.892.1186
~ www.norris-design.com
, ~ 1 ~ ~ 1'.
r .r - .:n. j'-
CALLISON
1420 FIFTH AVENUE #2400
k J~ SEATTLE, WASHINGTON 9810
PHONE: 206 623 4646
FAX: 206 623 4625
. ..,:;:i y t~-
+
- l1J Q
~c `
i... 4~.i - i Z ~
?:,i.. i is W ~
Q O
-
. C~
Z ? Z
~ O Z o a
Wo ~
J ~o
, , . k. I
. . <
i f r""~" '\.J
~.s: r,,,,~
. .
r . wry r:
~r#
.r , r J
. _ N.
i _ - i ! r ~ ~
u . t r.._ i:.... 1. M
i:: I
~
~ ~ H ~ ~ ~ ~n
~ ;i
~ ~
I I
_ _ _ _ ' ~
~'F ~ ~ ; ~ ~ ~ ~ ~ ~
A j;
Q ~,r..
~
t_~
_ . l.1.1 E
I.~ ~.~F~I:I~~ l~`~~' 31~~i~il: - - f t 1 . kFy~ ~ ~
I:1 w 7 I , ,
tU~~~. 1~~~i. C~~~i~~~ ~h~'::r~':~ Lid ~ ~~i ~C~ .~,U fA'. ~
~~'rF' ~,~i~ I ~ ,rC I'" i ~~~r`''.°~~.i'5:~-1'A~ u~^~~~4d?. ' ~I~?;r~~ ~ H~! I~ri:•~. 3~:~'~@~~ti~w "~..r'.~"f.4.3~"~r.x.~a '~'I.~ I..~... ...,r~,' '..?:E 1~ a$" C;:.._. ~ ~i
.I~t~~ t~f!~!~J~~ ~'~;;''C ~~Ct'~~ ~.k~!~d' I,~ 3 .d _ ~°+^b~~, ~`f ~f 35d' ~•~~I"iG79f'~'.i*'~~P~, t i'"ipp"~II. ~'4% W
z :t!'«..
'r - ',A i E..~ '...:::5
.
LL M
G
~ &.r~~w"ik t ~4 ~!'ifl ~ ~~'k~L~, fR~Ffi~1~L~' iWiY~ >."7!F 1 ~::~~`i.N4~N li!'Sf1'~ ~".~~.,;,j 4~6Y C: ~ ~ ;ri
~l R~ ~
JUN
JULY fl
. _
R R
~'~E' 1/lSiQt"~
AMENDMENT DEC 17, 2Qa~
~ U.: M":...
.t j'.{::~ is
c~
w
o
~ Sheet Title
Q PHOTOMETRIC
PLAN
m ui Z
~ Z W Sheet Number
~C w ~ J
a ESO=4
~~yajl
Cdy of Wheat ftm9e \ i
Department of Public Works
December 28, 2007
William Willis, P.E.
Martin/Martin
12499 West Colfax
P.O. Box 151500
Lakewood, CO 80215
DEPARTMENT OF PUBLIC WORKS
7500 WEST 29Ta AVENUE WHEAT RIDGE, CO 80033
(303) 235-2861
FAX (303) 235-2857
Re: - First Review Comments of the (foundation only) Building Permit Application civil plans received
November 29, 2007, the Final Drainage Report received November 30, 2007, and the Final Development
Plan received December 18, 2007, for the Cabela's Development located at 4000 Cabela Drive.
Dear Mr. Willis,
I have completed the first review of the above referenced documents, and have the following comments:
DRAINAGE
Cabela's Final Drainage Report (Discussion)
1. For Pages 4-7 under the Runoff section, please include the area and the anticipated Qfoo at the Design
Point in each sub-basin description.
2. Page 5: Describe the criteria used for establishing the runoff coefficient for Sub-basin W9, i.e., 80%
maximum imperviousness (full build-out) as allowed by City Code, etc.
3. Need to double-check that the proposed pond bottom elevation for the northeasterly WQ pond, along with
the orifice opening and invert out elevations, will properly function with the 60" diameter offsite storm
system. It appears when that 60" facility is running full it could flow into the pond, but the pipe profile
with HGL data for the 60" line is needed to analyze further.
4. Discuss the anticipated velocity of storm sewer flows releasing into the northeasterly water quality pond.
Discuss the potential for "flushing" of the pond, what solutions are to be implemented, and if erosion
control at the outlet will be necessary (if so, describe what is proposed).
5. Detention Section on page 8:
a. Please include both the 5-year WSEL as well as the 100-year WSEL.
b. A scenario of "catastrophic failure of the water quality pond" is discussed, but which pond is not
specified. Since there are 2 different ponds, one to the NW and one to the NE, one must assume
this is a reference to the larger, regional WQ pond lying to the northwest. While it is duly noted
that ample and additional freeboard has been provided for the northeasterly WQ pond, the
potential for negative impacts to downstream properties still exists. Please describe the
emergency flow direction in the unlikely event of overflow or catastrophic failure and what
negative impacts, if any, would be anticipated to downstream properties.
c. Provide a description of the proposed outlet structure for the northeasterly pond. Include the
orifice plate openings, box type, well-screen, and top grate (be sure top grate is bolted to box).
d. Please include a brief description of the northeasterly WQ pond itself. Since the City of Wheat
Ridge requires detention facilities to fully drain in 24-40 hours, please discuss how this will be
accomplished, i.e., the pond bottom is to be graded at a minimum of 2% towards a 2' wide
concrete trickle channel, etc. (These are typical design elements of Wheat Ridge detention
ponds).
6. Please discuss in detail the proposed bio-swales and basis for design functionality. While it is stated on
page 5 that the landscape architect will be designing these facilities, as they are integral to the site
drainage and water quality design, some engineering will of course need to be incorporated into the
design (using percolation test data, soils analysis, etc when it becomes available subsequent to the major
SUP fill importation). Also discuss the anticipated runoff depths and drain times for both the minor and
major storm events at each of the three facilities, and include percolation data and other soils info in the
Appendix in support the design.
7. Please provide a P.E. seal and signature on the revised Final Drainage Report.
Cabela's Final Drainage Report (Appendix)
1. Need to include pipe profiles (with HGL) for the 5-year minor storm.
2. Include percolation test data and any pertinent soils analysis in support of the bio-swale design
functionality (when it becomes possible subsequent to the major SUP fill importation in these areas).
Cabela's Final Drainage Plan
1. On Sheet C250:
a. Need to show the parcel boundary; refer to the (amended) plat for bearings and distances.
b. Some additional information is needed for the northeasterly detention facility. Please include an
enlarged detail of the pond showing the following:
i. Show an (emergency) overflow weir location and the anticipated overflow direction
downstream of the pond.
ii. Per the City of Wheat Ridge Site Drainage Requirements the detention facility must fully
drain within 24-40 hours. A typical method used to accomplish this is to grade the pond
bottom at 2% towards a 2' wide V-shaped concrete trickle channel having a minimum
grade of 0.5% towards the outlet structure. The lowermost orifice opening of the outlet
structure located in the trickle channel flowline (as shown on the outlet detail on Sheet
C251) and the length of the trickle channel needs (to be long enough) to allow the deepest
area of the pond to fully drain. Please incorporate these design changes on the Drainage
Plan (and also on the Final Grading Plan in the civil plan set). An enlarged detail of the
NE pond needs to be included with the Drainage Plan to better clarify constructed items
(and also to show the to-scale cross sections required below).
C. Need to double-check that the proposed pond bottom, orifice opening, and invert out elevations
will function properly with the 60" diameter offsite storm system (it appears when that facility is
running full it may flow into the pond).
2. On Sheet C251:
a. Please include a note stating the grate is to be bolted to the outlet structure using stainless steel
bolts.
b. Could use this sheet to include the enlarged NE pond detail with to-scale cross sections.
3. Please provide to-scale cross-sections AA-AA and BB-BB across the northerly and easterly sides
respectively of the NE detention facility (please see attached sheet for requested locations).
4. Please provide a P.E. seal and signature on the revised Drainage Plan.
CONSTRUCTION PLANS
Foundation Permit Civil Plans
General Comments (for all plan views):
1. Clearly identify all spill and catch gutter pans. (This can be easily accomplished by including the linetype
in the Legend).
2. Include transition zones (minimum of 10 feet in length) between the catch and spill curb & gutter.
3. Show the grade percents for all grade arrows.
4. Provide sufficient grade percents for the curb and gutter, concrete drain pans, asphalt parking and drive
Cabelas FoundationPermit FDP&FDRr iewl(12-28-07)lt.doe
areas, etc., to allow for proper construction.
5. All grade breaks, low points, and high points need to be clearly identified, and include dimensions from
known points of reference so these can be located in the field.
Sheet 0000 (Cover Sheet):
1. Need to include a Plan Set Index on this sheet.
Sheet 0001 (Notes):
1. Under the Grading Notes:
a. Remove from Number 1 I the last 4 words "SHOULD CONDITIONS MERIT THEM".
b. Revise the portion of Number 17 from "...ENGINEERING STAFF OR THE CITY'S
REPRESENTATIVE WHEN..." to "...ENGINEERING STAFF AT 303.235.2861 WHEN..."
2. Under the General Notes - Storm:
a. Add a Note 12 to read, "ALL STORM SEWER MANHOLE LIDS SHALL CONFORM TO
CURRENT CITY OF WHEAT RIDGE PHASE lI LID STANDARDS."
3. Under the General Notes - Construction:
a. Note 12 C and D need to be clarified/modified as follows:
i. Regarding Note 12C. - Please clarify what type of emergency and who is at the phone
number provided.
ii. Regarding Note 12D. - Please verify whether Mountain View Fire Protection District
needs to be changed to West Metro Fire Protection District.
b. Note 28 needs to have the following text added:
TWO (2) COPIES OF THE "AS-BUILT" PLANS ARE REQUIRED PRIOR TO ISSUANCE OF THE
C.O.AND ARE TO BE SUBMITTED AS FOLLOWS:
a. 1 COPY IS TO BE ON 24" X 36" BOND PAPER, AND
b. 1 COPY IS TO BE ON ELECTRONIC MEDIA (CD/DVD-ROM) IN AUTOCAD (.DWG)
FORMAT.
Sheet 0002 (Notes):
1. Please include the Traffic Control portion of the City of Wheat Ridge standard General Notes (G-A02
GEN NOTES-CITY FUNDED-TITLE) in the current City construction details. (Please see attached page
identifying the required text).
Sheet 0003 (Notes):
1. Need to replace the currently shown Erosion Control Notes with the City of Wheat Ridge standard
Erosion Control Notes and Legend (E-AO 1_EROS.NOTES-TITLE) and Seeding and Mulching Notes (E-
A03 SEED.NOTES-TITLE). (Please see attached pages)
Sheet C100 (Overall Grading Plan):
1. Please show the Limits of Construction and the property boundary on this sheet.
Sheet C121 (Grading Plan):
Please refer to the attached sheet for the NE WQ Pond for comments 1 through 4 below.
1. Include to-scale cross-sections AA-AA and BB-BB at the locations specified on the attached sheet.
2. Provide outlet protection at all outfalls into the pond.
3. Per City Site Drainage Requirements all detention facilities need to fully drain within 24-40 hours.
Generally the bottoms of ponds are graded at a minimum of 2% towards a 2' wide concrete trickle
channel to achieve this.
4. If a trickle channel is used, please include the grade percent of the channel and the FL elevations at either
end.
5. Show the location of the emergency overflow weir for the WQ pond.
6. Need to identify the underdrain.
7. Delete the FES that has no pipe attached (next to the underdrain at the pond outfall).
Cabelae Fouvdaeo.Nr w FDP & FDR reviml (12-28-07) lt.doc
Sheets C122-129 (Grading Plans):
1. A minimum of four (4) horizontal coordinate points (with northing & easting) will need to be provided
for all traffic/parking islands so they can be properly locate in the field.
2. Along those same lines, provide the northing and casting for any curb & gutter angle point or tangent
lengths over 150' in length. You should also provide random pc's and pt's for the longer stretches of curb
& gutter, i.e., around the perimeter, to allow the surveyor performing the layout (or designing engineer) to
easily and efficiently check the field work performed.
3. Northings and eastings also need to be provided at sidewalk and curb chases.
4. Please use a different linetype for the parking lot striping (darker maybe?) than the proposed contours.
Having both the same makes some areas very difficult to read.
5. Identify the two rectangular structures shown on the westerly side of Sheet C 124.
6. Show the flowline of grate and manhole rim elevations for all structures.
7. Show the curb cut locations/spacing for the islands containing the bio-swales.
8. While it is stated on these sheets that the bio-swales are to be designed by the architect, these facilities are
integral to the drainage system and require some engineering. Engineering concepts of the subsurface
drainage system, i.e., perforated pipe section, including the pipe grade and invert elevations, bedding
material, soil type and placement, and even the inlet placement and percolation test data should be
incorporated into the design. Therefore, engineering details of the bio-swale facilities needs to be included
with the plan set.
Sheets C130-133 (Details):
1. Please show on all plan views where the curb chase, curb cut, commercial drivecut, the various types of
ADA ramps, etc. are to be constructed.
Sheets C150-151 (Erosion Control Plan):
1. Please refer to the attached memo from William C. LaRow, Stormwater Quality Program Manager.
Sheets C152-153 (Erosion Control Details):
1. Please refer to the attached memo from William C. LaRow, Stormwater Quality Program Manager.
Sheets C154-158 (Details):
1. No comments at this time.
Sheet C200 (Overall Storm Plan):
1. No comments at this time.
Sheets C210-214 (Storm Plan & Profile):
1. Please provide an invert in elevation at manhole E4 for the roof drain.
2. For all plan views:
a. Please include a Note with a brief description of the underdrain on each sheet where it is shown.
b. Show outlet protection (rip-rap) at all of the outfalls into the northeast WQ pond.
3. For all profile views:
a. Need to modify the currently shown "rim" elevations to "FL Grate" elevations for all inlets.
b. Provide both the 5-year and 100-year hydraulic grade lines.
c. Need to identify the type of all inlets (this could be done in the plan view if preferred).
4. Need to provide the pipe classification for each pipe run shown on these plans.
5. To ensure proper functionality, double-check that the grade for pipe run E4-E2 and the proposed invert
elevation at E2 is sufficient to prevent back-flow from the flows coming from the upstream system and
flowing into the collecting basin.
6. The following pertains to Sheet C211:
a. To ensure proper functionality, double-check the grade for pipe run NE WQ Outlet-l0-ft MB and
that the invert elevation at the proposed 10-ft MH is sufficient to prevent the 60" from back-
flowing into the WQ pond. It appears from this initial review that the pond bottom may need to
be raised to avoid this from occurring.
Cabelas Fow&ffi oOP rmit_FDP & FDR review) (12-28-07) Itodoc
b. The invert pipe run information is cutoff for MHl-W6 pipe run on the profile view.
c. For W6, please include the invert in elevation for the roof drain.
7. On Sheet 212, rotate the stationing text to be perpendicular to the MH4-MH5 pipe run.
8. On Sheet 213, double-check that the grade for pipe run MH3-W9 and the proposed invert elevation at W9
is sufficient to provide proper functionality of the drainage system (and not cause ponding at W9).
Sheet C214 (Storm Plan & Profile):
1. Please rename this Sheet to "Underdrain Plan & Profile".
2. Since the profile does not lineup with the plan view, include labels for all of the clean-outs (i.e., CL 1,
etc.) on both the plan and profile views to help the reader quickly identify these.
Sheet C215-223 (Storm Details):
1. No comments at this time.
Sheet C300-431 (overall utility & sanitary sewer plans, details, etc.):
1. No comments at this time.
Sheet C500 (Overall Horizontal Control Plan):
1. Need to include a control diagram (similar to the vicinity map) showing the proximity of the control
points to the project site (does not need to be to-scale, just informational).
Sheets C502-509 (Horizontal Control Plan):
1. The two far left islands shown on Sheet 502 call out a "Detail 1 For Monolithic Curb". Please use the
actual title and provide the Sheet number where the detail can be found.
2. A minimum of four (4) horizontal coordinate points (with northing & easting) will need to be provided
for all traffic/parking islands so they can be properly locate in the field.
3. Along those same lines, provide the northing and easting for any curb & gutter angle point or tangent
lengths over 150' in length. Random pc's and pt's for the longer stretches of curb & gutter, i.e., around
the perimeter should also be provided to not only allow the surveyor performing the layout but it will also
allow the designing engineer(s) to easily and efficiently check the field work performed.
4. Besides showing the distance of the drive aisles and the distance from drive aisle to drive aisle, please
include the actual length of the parking stalls as well as the distance between the stripes (please see
attached sheet).
Sheet C10 (Horizontal Control Plan Line and Curve Tables):
1. Need to provide a control diagram showing the surveying control monuments D412 and F411 Reset and
their proximity to the jobsite. This diagram does not need to be to scale; in fact you can use the vicinity
map from the Cover Sheet -just add the control points.
2. Include a Note on this Sheet stating that all radii and curve distances are measured from the gutter
flowline (or whatever they are to).
Sheet C520 (Paving Plant
1. It is doubtful that the contractor will have read (or even have a copy of) the Geotechnical Report in the
filed. Therefore, please provide the following:
a. Typical Pavement Sections for the various asphalt pavement categories shown on the Sheet.
b. Provide concrete pavement specifications and subgrade information.
Cabelm FomdaboaPertnit_FDP & FDR review! (12-28-07) W.doc
FINAL DEVELOPMENT PLAN (AMENDED)
Site and Landscape Plans
General Comments:
1. For all Site Plan sheets, please show the following:
a. All existing and proposed easements.
b. The property boundary line, including the bearings and distances.
c. All storm sewer needs to be shown as lying within a (minimum of) 15' wide Drainage Easements.
2. Need to show all storm inlets and storm sewer lines on all sheets.
3. If the area shown as a "Water Quality Pond" along the westerly end of the site is not to be this, please
modify on all sheets to reflect what is actually proposed for this area.
Cover Sheet:
1. Include a Date of Preparation (and also revision dates) on the Cover Sheet.
Sheet L-1 (Overall Site Plan):
1. This sheet should be renamed to simply "Site Plan". Sheet C-1 (Site Plan) appears to be more of an
"Overall Site Plan".
2. Need to include/show the following on this sheet:
a. Pedestrian lighting pedestal locations along the property frontage.
b. Other streetscape amenities such as trees/plantings, benches, and trash receptacles should be
shown on this sheet as well.
c. Identify the bio-swales
d. All on-site storm sewer and drop inlets.
e. All on-site storm sewer systems need to lie within (minimum of) 15' wide Drainage Easements.
£ Show the location of the outlet structure of the northeasterly water quality pond.
g. Show the storm sewer pipe running from the outlet structure to the proposed 60" storm line.
h. Identify the entry sign.
i. Place handicap (wheelchair) symbols on the proposed handicap parking places.
j. Identify the raised median within Cabela Drive.
3. It appears the raised median within Cabela Drive could be extended another 60 feet further to the east and
also another 20 feet further to the west. If lower-growth plantings are used within the nose areas it
shouldn't impede visibility.
4. Consider using about a 120' or so of raised median for the traffic island southwest of the main entrance.
5. Is the area identified as a water quality pond on the northwesterly portion of the parcel to be used for this?
If not, please modify the text to reflect what is actually proposed for this area.
6. Include the property boundary line and include bearings/distances and curve information.
7. Double-check the property line on the easterly side of the parcel as it is currently shown encroaching into
the frontage road ROW.
8. Double-check the property line on the westerly side of the parcel. There appears to be a strange shaped
area jutting into this parcel.
Sheet L-2 (Overall Landscape Plan):
1. Need to clearly identify plantings and necessary irrigation for the 8' landscape strip. The currently
proposed "non-irrigated" grass does not meet the landscaping criteria set forth in the City of Wheat Ridge
Streetscape Manual.
Sheets L-4 throueh L-8 (Landscape Plan):
1. Need to include the following for all sheets as applicable:
a. Show plantings and locations for landscaping and irrigation lines per City of Wheat Ridge
Streetscape Manual criteria.
b. Identify the parcel boundary line, sidewalk, and landscape strip.
c. Show pedestrian lighting pedestal locations.
Cabelas FomdaeonPermit_FDP & FDR revicwl (12-2"7)1tr.doc
d. Identify the raised median(s), and also the plant materials and irrigation lines to be placed within
these.
e. Show all storm sewer lines and inlet locations.
f. Identify the bio-swales, and show all storm sewer Drainage Easements.
2. For Sheet L-4, double-check the "odd-shaped" tract shown along the westerly side of the sheet.
3. For Sheet L-6, show the pond outlet structure location and the pipe running easterly towards the 60" main
line, the outfalls into the pond area, and if utilized, the 2' wide concrete trickle channel.
Sheet C-9 (Site Plan):
1. Need to change the name of this sheet to "Overall Site Plan", as it reflects a broader, overall, area. -
2. Show the location of the proposed 60" storm main and the pipe connection from the northeasterly pond
outlet structure.
TRAFFIC ENGINEERING
This submittal was forwarded to the Engineering Division Manager, Mr. Steve Nguyen, P.E., 303.235.2862 for
review. Please find his review comments (in the form of a memo) attached to this letter.
ADDITIONAL ENGINEERING
This submittal was forwarded to the Projects Supervisor, Mr. Mark Westberg, P.E., 303.235.2863, for review.
Please find his review comment memo attached to this letter.
STORMWATER QUALITY MANAGEMENT
This submittal was forwarded to the Stormwater Quality Program Manager, Mr. Bill LaRow 303.235.2871 for his
review. Please find his review comment memo attached to this letter.
The Public Works Department requires 4 signed and stamped copies of the revised (foundation only)
Building Permit Application civil plans, Final Drainage Report/Plan, and Final Development Plan
accompanied by a CD-ROM containing the revised documents in PDF. Please provide these with the
next submittal. (NOTE: The PDF File of the Final Drainage Report /Plan may be combined with the
Major Grading SUP Plans for submittal on CD-ROM).
NPDES Permit
The area of the proposed development is greater than I acre and therefore shall comply with NPDES regulations.
The NPDES permit for construction activities is issued by the State through the Colorado Discharge Permit
System (CDPS), and may be obtained by contacting the Colorado Department of Public Health & Environment,
Water Quality Control Division. A copy of the CDPS Permit and Stormwater Management Plan (SWMP) is to be
submitted to the Department of Public Works prior to issuance of any Grading/Fill or Building Permits.
Public Improvements
All Public Improvements shall be completed in accordance with the Annexation and Development Agreement
dated December 20, 2004.
Cabelas Fo daflonPemut FDP&FDR reviewl(12-28-07)Iv.doc
Right-of-Way Construction Permit(s)/Licensing
Prior to the construction of any improvements, utility service connections, etc. within the public Right-of-Way,
the required Right-of-Way Construction Permit(s) and respective licensing shall be submitted to the Department
of Public Works for processing. Right-of-Way Construction Permits are issued only after approval of all required
technical documents, including but not limited to, the Final Drainage Report & Plan, Final Plat, Final
Development Plan, Traffic Impact Study, Storm Sewer Plans, Street Construction Plans, Grading & Erosion
Control Plan, and easement and/or ROW dedications.
2-Year Warranty Period for Public Improvements
The Contractor shall warrant all work performed within the public right-of-way for a period of two (2) years,
commencing upon completion of all constructed public improvements and Final Acceptance by the City
Inspector. Prior to the expiration of said 2-year Warranty Period, if the City Inspector deems that the constructed
public improvements are in such condition as to require repairs or replacement, the Contractor shall complete
such repair work upon request per the City of Wheat Ridge Permit Testing and Inspection Requirements.
The above comments are as of the date reviewed and may not reflect all comments from other departments
or reviewing agencies.
If you have any questions, please contact me at 303.235.2864.
Sincerely,
David F. Brossman, P.L.S.
Development Review Engineer
CC: Steve Nguyen, Engineering Division Manager
Mark Westberg, Projects Supervisor
Travis Crane, Planner
William LaRow, Stormwater Quality Program Manager
File
Cabelas FoundationPermit_FDP & FDR review] (12-28-07) lu.doc
t.
~l.
~4I
d
City of Wheat l4dife
Departrnent of Public Works
MEMORANDUM
TO: Dave Brossman, Development Review Engineer
FROM: Mark Westberg, Projects Supervisor
DATE: Thursday, December 27, 2007
SUBJECT: Cabela Foundation Submittal Comments
I have reviewed the above plans and have the following comments:
Plans
I. Sheet C100 - The potential ponding depths at several inlets appears to be too deep if
the inlets become clogged. Some of the areas tributary to the inlets may not be large
enough to contribute enough runoff to achieve the potential ponding depth; however,
there still would not be an overland flow path to alleviate the ponding. The following
inlets were identified as potentially impacting customers:
a. Either of the two inlets in the RV parking area northwest of the building could
pond to around 12" deep before overflowing to the other inlet. The RV
parking are could pond to almost 24" deep before overflowing to the west if
both inlets became plugged.
b. The inlet just northwest of the building could pond to 18" before overflowing
the landscaped island to the RV parking area.
C. Both inlets on the northeast of the building could pond to between 16" and
18" before overflowing to the northeast.
d. The inlets in the bioswales could pond to between 18" and 24" before
overflowing to the northeast or northwest depending upon the bioswale.
e. The inlets in the main entrance could pond to around 12" before overflowing
to the northwest.
f. The inlet in the truck access near the horse area could pond to around 9"
before overflowing to the northwest.
2. Sheet C 100 - The proposed grading along the north side of the property between
the curb and the property line is not clear.
3. Sheet C121 - A relatively steep area, around 3%, is shown between two of the
islands in the RV parking area.
4. Sheet C 121 - There appears to be an extra FES at the south end of the pond. This
shows on several sheets.
5. Sheet C 122 - A relatively steep area, around 4%, is shown between the end of the
truck ramp and the inlet to the north. This could create clearance issues for the
trucks entering and exiting the truck ramp. In addition, since this is the north side of
the building, icing could be a concern.
Page 1 of 2
6. Sheet C122 -The discharge for the trench drain in the truck dock is not shown.
7. Sheets C122 and C123 -The slopes of the gutter adjacent to the stormwater pond
are not shown and appear to be very flat.
8. Sheet C 123 - The contours at the end of the boat storage area do not appear to be
correct.
9. Sheet C 123 - The slope of the 4' pan is not shown and appears to be very flat.
10. Sheet C 124 - The slopes of several of the catch curbs near the horse area are not
shown and appear to be very flat.
11. Sheet C 124 - The cross slope of the drive between the front of the store and the
truck access appears to be steep. It is also not clear how the runoff in this drive is
directed to the inlet to the east.
12. Sheet C124 - The grade break just west of the spill curb in the truck access drive
does not appear to be correct.
13. Sheet C 124 - The slope in the RV parking area south of the inlet that is shown on
this sheet may be too steep, 4%, for this type of parking.
14. Sheet C125 - The slope of the drive between the bioswale and the corner of the
sidewalk around the building appears to be, around 5%.
15. Sheets C152 and C153 - Some of the details on these sheets are very light and
difficult to read.
16. Sheet C200 - The underdrain should be added to the legend.
17. Sheets C210 and 211 - The FES on the profiles are shown as inlets and not as FES.
18. Sheet C214 - Backwater from the pond will likely surcharge the entire underdrain
pipe.
19. Sheet C410 - A portion of the force main appears to be missing.
20. Sheet C502 - A "Do Not Enter" sign needs to be added at the east end of the east
flowing drive.
21. Sheet C504 - The "Yield" sign at the end of drive between the front of the store and
the truck access should be a "Stop" sign.
22. Sheets C504 and C505 - The signage in the islands along the front of the store is
not consistent.
23. Sheets C505 and C508 - "Do Not Enter" and/or "Keep Right" signs should be used
at the ends of the median of the entrance drive to direct the traffic appropriately.
24. Sheet C506 - A "Do Not Enter" sign needs to be added at the west end of the west
flowing drive on the southeast side of the building.
25. Sheet C506 - The "Stop" sign at the entrance drive does not appear to be placed
correctly.
26. Sheets C507 through C509 - At the corners of the parking lot near Cabela Drive,
the width of the drive that runs parallel to Cabela Drive should be reduced to 18
feet and signed to discourage two-way traffic from entering the area adjacent to the
exit of a one-way drive. The island can either be longer or the curb along the
outside of the parking lot can be inset.
27. Sheets C507 through C509 - The signage in the islands at the end of the parking lot
near Cabela Drive is not consistent.
28. Sheet C520 - The paving for the truck dock is not detailed.
Page 2 of 2
City of
~WheatRdge
20 December 2007
Jeff Ramsey
One Cabela Drive
Sydney, Nebraska 69160
RE: Plan Review 07-0448/4000 Cabela Drive
Dear Mr. Ramsey:
Cab I, D s &
I have completed my initial review of the building permit application for the property located at 4000 Cabela Drive,
and I have the following comments:
1. This permit, as submitted, can be reviewed as a foundation only permit. It is imperative to note that a full
building permit cannot be issued until such time that the required off-site right-of-way for Cabala Drive has
been secured. Pursuant to the conditions of approval of the Outline and Final Development Plans at City
Council, all required right-of-way must be secured before the building permit can be issued.
2. An amended Final Development Plan has been submitted for review. This amended Plan will slightly change
the site layout and architectural treatment on the building exterior from the approved Final Development
Plan. Please be aware that the amended Final Development Plan must be approved prior to the issuance of
a core and shell building permit. The amended Final Development Plan is currently under review.
3. The proposed location of the foundation does comply with the minimum setback standards established on
the Outline Development Plan approved by the Wheat Ridge City Council.
4. Upon the next full submittal, please place the index page (General Information - page A-001) at the front of
the plan set. Additionally, it would be helpful to receive the civil drawings (series "C") as a separate, 24" x 36"
plan set. This will help to expedite the review.
5. Please be aware that all exterior signage will require a separate building permit.
6. Please be aware that upon the next submittal the following should be submitted: four 24" x 36" civil plan sets
(series "C'), seven plan sets containing the "A", "S", "M", "P", "E" and "F" series drawings and an electronic
submittal of the civil drawings (series "C').
If you have any questions regarding my comments, please feel free to contact me. I can be reached at
303.235.2849 or tcrane(@ci.wheatridge.co.US.
S' c I
T ' R. Crane
Planner II
CITY OF WHEAT RIDGE MUNICIPAL BUILDING 7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.234.5900
f. 303.234.5924
www.ci.wheatridge.co.us
4Z1
City of Wheat Ridge
~
Department of Public Works MEMORANDUM
TO: Dave Brossman, Development Review Engineer
FROM: Steve Nguyen, Engineering manager
DATE: Saturday, December 08, 2007
SUBJECT: Cabela Final Drainage Report
I have reviewed the above plan and have the following comments:
1. Bio-swales, soil filtration and perforated pipes are part of drainage collection design in the
parking lot as stated in the report. Please discuss and provide relevant soil classification,
percolations test data and related design either in the report or plans. Page 5.
2. Basin W 10 is intended for housing or facilitating horses. Thus, elaborate design of filtration
containment of contaminated drainage water for this sub basin prior to release into the inlet
(design point 11). Page 5.
The paragraph in page 8 does is not clearly discuss the catastrophic failure to the northeast
water quality pond. Specifically, what is the overflow path adjacent to the Table Mountain
Animal Center? Is the existing and proposed grading will prevent water from entering the
subject property?
4. The report needs to include the storm sewer profile for the FHU line situated in the northeast
corner of the site. Hydraulic grade lines will also need to be provided. All calculation,
parameters and flows for this line must be consistent with the analysis performed by Felsburg
Holt and Ullevig.
5. Any ponding by design in the parking lot shall meet maximum allowable depth set by the
City. This is necessary to avoid flood damage.
6. Invert drop in all manholes and inlets should be at least 0.2' or deeper.
r
4v\vvv v v vv~ v vv`-vvy
(I P,
/ / / Q3\ \ \
OUTLET STRUCTURE \ \ \ \ \ \ \ \
AID
GENERAL NOTES FOR CITY FUNDED PROJECTS
1. ALLNORKSHPJL BE GONE IN ACCORDANCEWTHME STANOARDMD SPECIAL PROVISIONS. THE 34. TIE CONTRACTORSHALL HAVE ONE SIGNED MLLMECOPY OFHE PLANS APPROVED BYTHE GOVERNING
CONSTRUCTION PLANS FOR ME PROJECT. THE CURRENT EDFRON OF ME COOT STANDARD AGENCIES MD ONE COPY OF IRE APPROPRIATE DESIGN AND CONSTRUCTION STANDMDS AND PECIFILVNQN6.
SPECIFICATION FOR ROADMO BRIDGE CONSTRUCTONAND THE COOT STMDAND PLANSAS COOTPERMRHFAPPLJCAHLEI, ANOSYA/,PDOMMEMONTHEJOSSREATALLTMES.
APPUCMLE TO ME VARK
2 TIE CONTRACTOR SHALL PRE PME MD3 UBMIT TO ME CITY A STORMWATER MANAGEMENT PLAN
(SNMP)AT ME TI ME OF ME PR ELONSTRUCTON MEETING. ME CONTRACTOR SHALL ADD RESS
EROSION MITIGATION 8 PROTECTIVE ME96URES TO UMIT EROSION REIATNG TO CONSTRUCTION
.U.S. UNLESS PREVIOUSLY OBTAINED BY THE CRY. TIE CONTRACTOR SHALL OBTAIN A CDPHE
STORMNATER DISCHARGE PERMITAS STATED IN SECTION 20B OF THE PROJECT SPECIAL PROVISIONS
3, ME CONTRACTOR WLL BE REQUIRED TO SUBMIT A CONSTRUCTION SCHEOUIE AT THE PROJECT
PRE{ HISTRUCTON MEETING, THIS SCHEDULE WILL SHOW THE BEGINNING AND ENDING GATES OF
MAJOR COMBACT ITEMS. THIS SCHEDULE WLL BE UPDATED BYTHE CONTRACTOR EVERY HO
W ] RKING DAYS. 0A M REWH UD OY THE CRY.
4. CONSTRUCTION STAKING SHALL BE PROMDEO BY THE CONTRACTOR
5. 6UBSEOUENT ASPHALT UFT6 SHALL NOT BE PLACED ON THE SAME OAYAS THE PREVIOUS OFT,
UNLESS APPROVED BY ME CRY IN THE FIELD,
8. FOR FINALPIM QUMTITES ME FOLLOWING RATES OFAPPLUCATIONNERE USED BITUMINOUS
PAVFMENT AT HE .75 LBSFUOIC FOOT(DOSSIS TONS/ STUN) AGGREGATE BASE COURSE AT 133
LBSICUWC FOOT
7. A SKI TYPE DEVICE AT LEAST WFEET IN IENGM, SHORT SKI OR SHOE MO SON FEET OF CONTROL
UNEMD STAKES SHALL BE FURNISHED WM EACH BITUMINOUS PAVER. ME CONTROL LINE SHALL BE
REQUIRED FOR ALL LAYERS, OR M DIRECTED BY ME CT',
S. A TACK COAT OF EMULSIFIED ASPHALT(SIUM SETRNGI 15 TO BE APPLIED BEMEEN PAVEMENT
COURSE AND ON ALL VERTICAL EDGES TO IMPROVE BOND BETMEN PAVEMENT LAYERS. THE RAZE
OF APPUCATON SHALL BEM DETERMINED BY THE CITY AT THE TI ME OF APPLICATION. TACK GOAT NO
IS INCIDENTAL NORK TO HMA PAY ITEMS.
E UHCLN'SMEG EXCAVATION QUANTITIES FOR SUB GRADE 6TABIUZAN ON N LL BE M EIMUR ED IN THE
FIELD. TYPICAL DEPTH OF CUT FOR SUBGRAOE STABIUZATON WILL BE LESS TIWI 15 INCHES
BELOW DESIGN SUBGRADE ONLE550MERW BE 01RECTED BY ME CITY.
M FU LL DEPTH ASPHALT TO BE R ENOVED HAS BEE N CALCULATED AS REMOVAL OF ASPHALT MAT.
REMOVED ASPHALTIC PAVEM ENT MATERIAL WILL BECOM E THE PROPERTY OF M E CONTRACTOR.
11. ATTACHED SIDEWALK CURB AND GUTTER SHALL BE PLACED MONOLITHICALLY. UNLESS QMUWSE
SPECIFIED OR DIRECTED BY ME CITY.
12 BREAK POINTS ON SLOPES MG IN BOTTOMS OF DITCHES SHALL BE ROUNDED DURING
CONSTRUCTION M DIRECTED BY THE CITY. SEE STANDARDS FOR OETAIL60F CUT SLOPE
TFWMENT, FIMINOMD WIDENING.
13. CLEARING AND GRUBBING MH LINCWDE REMOVAL OFALL SHRUBS WEEDS. SMALLMEES U'
CALIPER OR LEGS). ALLASSOIWED ROOTS AND OTHER VEGETATION WITHIN TARE CONSTRUCTION
LIMITS UNLESS SEPARATE PAYITEM IS PROVIDED.
14. LIMITS OFASPHALT REMOVAL SHALL BE CUTTO AGTMGHTLINE WTHAVERTICALEDGE.THE
VERTICAL EDGE SHALL BE SAWCUF UNLESS OTHER WSEMPROVEO BY CITY.ASPHALT PAVEMENT
SHALL BE REMOVED AMINIMUM OF TING FEET, GRAS DIfl EGTED BYTHE CITY, FROM MY GUTTER
PINUP. ASPHALT PATCMBACK SHALL BE PLACED IN LIFTS NOT E%CEEDING4 INCHES.
15. COMPACTION TESTING FOR THIS PROJECT SHALL BE IN ACCORDANCE MATH SECTION 7200F THE
SPECIAL PROVISIONS.
18, E%CJV OON FOR THE COMPACTION OF THE BASE OF CUTS AND FILLS NIL NOT BE PAID FOR
SEPARATELY BUT SHALL BE INCLUDED IN ME COST OF EXCAVATION 4EMBANKMENT PAY ITEMS.
17. DEPTH OF MOISTURELDENSITY CONTROL FOR THIS PROJECT SHALL BE AS FOLLOWS: FULL
DEPTH OF ALL EMBANKMENTS. BMEE OF CUTS AND FILLS SHALL BE 6 INCHES. COMPACTION OF
BASES OF CUTS MD FILLS SHALL NOT BE PAID FOR SEPARATELY. BIT SHALL BE INCLUDED IN
THE COST OF EXCAVATION B EMBPNINIENT PAY ITEMS. WATER FOR COMPACTION WILL NOT
BE PAID FOR SEPARATELY BUT SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION.
WATER FOR DUST CONTROL SHALL NOT BE PAID FOR SEPARATELY BUT SHALL BE CONSIDERED
INCIDENTAL TO CONSTRUCTION.
18. SWEEPINGSMll. BE DONE BY A PICKUP TYPE ORODM WM DUST CONTROL MDBEYDND INCLUDED
PAY ITEMS, SHALL BE DONE AT NO MOTIONAL COST TO THE PROJECT.
18. SALVAGE ITEMS REMAIMNGAS PROPMTYOF ME CITYOF WHEAT RIME SHALL SEOELNEREO TO
THE CITY MAINTENANCE FACILITY LOCATED AT 11= W 45TH AVE. EQUIPMENT &OPERATOR FOR
UNLOADING W LL BE PROVIDED BY THE CITY IF REQUESTED IN ADVANCE. CONTRACTOR WLL ASSIST
W M UNLOADING. DELIVERY AND UNLOADING SHALL BE CONSIDERED I NCICENTAL TO CONSTRUCTION.
M, REINFORCING STEEL SHALL BE GRADE M CONCRETE SHALL BE CLASS 8 MO 0 REINFORCING
STEEL IS INCIDENTAL TO STRUCTURE PAY ITEMS.
31. CURB CUT LOCATIONS SHOM ON THE PLANS ME APPROXIMATE. ME CONTRACTOR SHALL STAKE
THE APPROXIMATE LIMITS OF GRADING, LOCATION OF CURB CUTS, AND LOCATION OF MARSOX(ES)
IN ME FIELD.
M ORNEWAY RESTORATION SHALL BE AS FOLLOWS:
REGRME S REPIAC E GRAVEL ORJFG A REPARE THE SO USAGE F ROM BACK O F El OEWALK TO
MATLH POINT. PLACE A I - UFT OF CRA668 AGGREGATE BASE COURSE FOLLONED SYA 1' LIFT OF
14' CRUSHED ROCK(MOUNTNN GRANTRUANO COMPACT. BASE MATERW.TOSE PAID AS
AGGREGATE WE COURSE (CLASS 6), ROCK TO BE PAID AS LP CRUSHED ROCK (GRAVEL
DRIVEWAY).
REPIAC E ASPHALT ORNEWAYFREPARE THE SUBOMBE FRO M BACK OF SID EWALK TO MATCH
POINT. PLACE 4' OF HOT MIX ASPHALT, COMPACTED TO ME-%%OF MAXIMUM THEORETICAL
DENSITY. MAI£R W. TO BE PAID AS HMA (41,
REPLACE CONCRETE ORNEWAY-0REPARE THE SUBGRADE FROM BACK OF SIDEWALK TO MATCH
POINT. PLACE A MINIMUM OF C(RFSIDENTPL) MO T(COMMERGAL) OF CONCRETE PAVEMENT.
MATERMLTO BE PAID AS CONCRETE PAVEMENT PON.
23.4L TRENCHES MO PITS SHALL BE ADEQUATELY SUPPORTE O MO ME SAFETY OF M RUSS
PROVIDED FOR M REQUIRED BY ME MOST RECENT OCCUPATIONAL SAFETY MO HEALTH
ADMINISTRATION (OSHA) 'SAFETY AND HEALTH REGVUTONS FOR CONSTRUCTION.-THESE
REGULATIONS M E OESCRI BED IN SUBPART P, PMT I INS OF THE CODE OF FEDERAL REGV IATIONS
6 NEER FIG MG S HOW NO SHALL BE UDLVED WHERE NECESSARY TO PREVENT PNY IXCESSNE
W OENING OR SLOUGHIN G OF ME TRENCH OR PIT W II CH MAY B E DETRIM ENTAIL TO HUMAN SAFETY.
TOME PIPE BEINGPLACEO, TO THUS OR TO ANY FASTING STRUCTURE WHERE EXCAVATIONS ARE
MADE. UNDER SEVERE WATER CONDITIONS. THE CONTRACTOR IMY BE REQUIRED TO VSEM
APPROVED PILING INSTEAD OF SHEETING MO SHORING.
M. REPAR OFAHY DAMAGE TO E96TNG IMPROVEMEMSMOIOR W DSCPPING IG TIE RESPONSIBIUIYOF ME
CONTRACTOR AT HIS PD RENSE
R. ALL DAMAGE CAUSED TO EXISTING CURB. GUTTER AND SIDEWALK WRING CON STRUCTL N SHALL BE
REPAJREO PRIOR TO ACCEPTANCE OF COMPLETED IMP ROVE M ENTS.
OF THE CONTRACTOR SHALL NOTIFY ALL PRO PERTY OVAERS IN NUVNG A MIN IMUM OF 40 HOURS PRIOR TO ANY
UTILITY SHUT OFF OR CLOSURE OF ORNEWAYS. ME NOTICES MUST HAVE CONTRACTORS PHONE NUMBER
AND WE OF CONTACT PERSON, AND EMERGENCY PHONE NUMBER FOR A FUHOURS CALLS,
CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING LOCAL ACCESS TO ALL ORNEWAYS.
ID. CONTRACTOR WLL BE RESPONSIBLE FOR MAINTAINING CLEANLINESS ON ALL LOCAL ROADWAYS AFFECTED By
HIS CONSTRUCTION.
W. MA CONDITION FOR QUALIFYING FOR FINAL PAYMENT THE CONTRACTOR WLL FURNISH UPON COMPLETION OF
ME PROJECT, I SET OF ASCONSTRUCTEO DRAWINGS PER SECTION 1%.030F THE PROJECT SPECIAL
WW_ PREPARATION. MULCHING MO MULCH TACSRIER SHALL BE INCLUDED IN ME PRICE OF SEEDING.
SEEDING SHALL BE IN ACCORDANCE WM ME REQUIREMENTS OF SECTION 212 OF ME SPECII PROVISIONS.
1. THE CONTRACTOR SHALL LIMN CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF
CONSTRUCTION MONK TOES OF SLOPEM SHOWN ON ME PLANE ANY DISTURBANCE BEYOND THESE LIMITS
SHALL BE RESTORED TO ORIGINAL CONDITION W THE CONTRACTOR AT HIS EAPENSE. CONSTRUCTION
ACTIVITIES, IN ADDITION TO NORMAL CONSMVOTION PROCEDURES. SHALL INCLUDE THE PARKING OF
VEHICLES OR EQUIPMENT . DISPOSAL OF LITTER, AND ANY OTHER ACTION MICH =OLD CLEARING AND
GRUBBING, MD LW O6CAPE RESTOPATCH LV MP SVM ITEMS SHALL BE BIQ TO INCLUDE ALLMFAS DISNROEO
DURING CONSTRUCTIOR WHETHER WTHIN OR OUTSIDE THE LIMITS OF CONSTRUCTION.
32 TIE CONTMCTORMALL BE RESPONSIBLE FOR ME ACCEPTMCEMD CONTROLOF ALL SUBSURFACE
DMINAGE AND GROUNDWATER ENTERING THE PROJECT MFA CONTRACTOR IS RESPONSIBLE FOR
PROVIDING DEWATERING, IF NEEOEOATNOAODITIONAL COST TO THE PROJECT. DEWATERING METHODS
SHALL BE APPROVED BY ME CITY.
RU THE CONTRACTOR 6WLLL BE RESPONSE OR FOR PRESERVING ALL LAND MONUNESTE MONUMENTS
DISTURBED DURING CONSTRUCTION MMITY SHALL BE RESET AT NO ADDITIONAL COSTTO THE PROJECT,THE
RESERING OF MONUMENTS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A R EGISTEREO LAND
S VRVEYOR. THE CONTRACTOR SHALL FILE MON MJMT RECORDS WTH THE BOARD OF REGISTRATION OF
PROFESSIONAL ENGINEERS MO LINO SURVEYORS FOR ALL LAND MONUMENTS RESET DURING CONSTRUCTION.
34. THE WYSHALL OBTAIN AMOTPERMITFORANY VARK WTHIN CBOT ROW, THE CONTRACTOR SHALL MEET
ALL TERMS AND CONDITIONS A65TATED IN THE PERMIT FOR ALLNORK WTHIN OR AFFECTING COOT ROW.
TRAFFIC CONTROL
1. ME CONTRACTOR SHALL PREPMEMD PRESENT HISMERMETHOD FOR HANDLINGCONSTRUCTON ZONE
TRAFFIC TO THE CITY FOR APPROVAL AT ME PRELONSTRUCTON MEETING.
2 SUBSEQUENT CHANGES TO THE TRAFFIC CONTROL PLAN ANN SEQUENCE OF NORK REQUESTE D BY ME
CONTRACTOR MH SE SUBMITTED FOR MPROVALTZ HOURS PRIOR TO IMPLEMENTATION OF ME REVISED
PLAN.
3. TRAFFIC CONTROLPLW 6HALLAOORESS SPECIFIC PHASED OF CONSTRUCTION MO BE ORANN.TO GCALEOR
DIMENSIONED, TRAFFIC PLANNING WIA BE DIRECTED TO THE SAFETY OF ME CONSTRUCTION FORCE M NW.
AS THE SAFE AND EXPEDITIOUS MOVEMENT OF TRAFFIC.
4. NOR K WITH IN CITY ROW ROALMNY AS EM CLOSED TO THROUGH TRAFFIC MAY PROCEED UPABEN M E HOURS
OF7 W AM MO SOO PM ON LOCAL MEETS. AND MINGEN ME HOUR60F.30 AM MD GM PM ON
COLLECTOR, ARTERIAL AND HIGH VOLUME LOCAL STRUM AS D ETERMI NED IN N TNNO BY THE CITY,
6, NORK WMI N ROADWAY FEW IS ALSO SUBJECT TO THE TIME RESTRICTION S STATED I 18 PECLAL PROVISION
SECTION iW.04 OF ME PROD MT SPECIFICATIONS.. ALL MEN NTH N COOT ROW S HALL BE AMFIORALLY
R ESTRICTED AS STATEN I N SECTION I M04 M D M R ME APPLICABLE COOT PERMIT ISSUED FOR THE PROJECT.
6. TRAFFIC CONTROL DU RI NO CONSTRUCTION SHALL COMPLY WM THE LATEST EDITION OF THEFlIVM'S
'MANUAL ON UNIFORM TRAFFIC CONTROL DEVCCS ANOOTNER DOCUMENTS DETAILED IN THE
SPECIFICATIONS.
7. MIN IMUM TEMPORARY IAN E WDM 6HKL BE TE N(10)FEET, UNLESS OMERW BE APPROVED IN TURNING BY
THE CITY.
9 PRONSIONS FOR PEDESMM TRAFFIC SHALL BE MADE FOR- ALL PHASES OF CONSTRUCTION.
UTILITIES
1, THE CONTRACTOR IS RESPONSIBILE TO EXCAVATE MO LOCATE ALL EXISTING UTILITIES WHICH MAY
AFFECT UMSTRUBRON. ALL EWLOMTORY EXCAVATIONS SHALL OCCUR FM ENOUGH INADVANCETO
PERMITAM' NECESSARY RELOCATIONTB BE MME WM MINIMAL DELAYS TOTHE PROJECT. UNLESSA
PAY ITEM HAS BEEN INCLUDED FOR EXPLORATORYEXOIVATIONS(POTHOLING). ALLEXPLORATORY
E%CAVATONS6HALLBECON610EREOINCIOENTALTOMEPROJECT, LACKOFMECITYTOINCLUOEA
POTHOLING PAY ITEM SHALL NOT PREGLU DE ME CONTRACTOR FOR PERFORMING ALL NEC BIGAMY
EXPLORATORY EXCAVATIONS. THE CONTRACTOR SHALL N OT BE COMPENSATED FOR MY B DAY DUE TO
UTILITY CONFLICTS.
2 ALL UTUTY RELOCATES WILL BE FIRM R NED BY ME OWH NO UTUTY COMPANY DORI NG ME COURSE
OF ME PROJECT, UN LOS S A SEPARATE PAY ITEM IS PRO VI DEC.
3. UT LITY LOCATIONS SHOWN ON THE PLAN ARE PLOTTED TO ME BEST INFORMATION AT T ME OF
0 ES ON. UTILITY LOCATIONS SHOAT ON THE PLANS ME FOR DESCRIPTIVE PURPOSES ONLY. THE
CONTRACTOR IS REQUIRED TO CONTACT ME PROPER UTILITY COMPANY MNOR UTILITY LOCATE
DOM PARY PRIOR TO CON STRUOTION. LOCATO N OF ALL UTILM U. NHETHER SHOWN ON ME PLATS OR
NOT, IS ME SOLE RESPONSIBILITY OF THE CONTRACTOR MY DAMAGES TO EXISTING UTILITIES
CAUSED BY ME CONTRACTOR, OR MY OF HIS SUBCONTRACTORS. SHALL BE ME SOLE
R ESPONSI HLITY OF ME CONTRACTOR FOR ALL REM RE AT HIS EAPENSE
4, THE CONTRACTOR WALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLD WO AT LEAST 0
HOURS PRIOR TO CONSTRUCTION. CALL 8DOUD i 987
6. PRIOR TO TH E COMMENCE M ENT OF ANY CONSTRU CTION, THE CONTRACTOR SHALL CONTACT ALL
UTIUTIE6 TO COORDINATE SCHEDULES.
S. STORMSENERPIPESR LBEWC6DR ,ORRCPASSPECIFIEDONORAWNGS
7. ELECTRICAL CONDUITWJULBE PVC SCHNMO SHALL BE SUMEDAMINIMUMOF 2 FEET,
9 ALL STORM STRUCNRESTO BECMT IN PILMMUNLES6 DMERWSEAPPROVEO INNRRING BY THE CITY. IETAIL
0 WHEgT CITY OF WHEAT RIDGE G-A02 GEN NOTES-CITY FUNDED CODE
O DEPT. OF PUBLIC WORKS GENERAL NOTES FOR
ENGINEERING DIVISION CITY FUNDED PROJECTS COLORp00 APPROVED BY: SNN XM7
GRADING AND EROSION CONTROL (GEC) PLAN GENERAL NOTES
1. THE APPROVAL GRANTED IN WRITING FOR THIS DOCUMENT INDICATES THE CITY OF WHEAT RIDGE PUBLIC
WORKS DEPARTMENT. ENGINEERING DIVISION. HAS RENEWED THE DOCUMENT AND FOUND IT IN
GENERAL COMPLMNCE WIM THE CITY OF WHEAT NDGE SUBDIVISION REGULATIONS MORE THE URBAN
DRAJNAGE AND FLOOD CONTRO DISTRICT CRITERIA MANUAL THE CITY OF WHEAT RIDGE ENGINEER,
THROUGH ACCEPTANCE OF THIS DOCUMENT, ASSUMES NO RESPoNSIBNTY (OTHER THAN AS STATED
ABOVE] FOR THE COMPLETENESS ANDIOR ACCURACY OF THESE DOCUMENTS,
2. THE ADEQUACY OF THIS GEC PUN UEYMTH THE ENGINEER OF RECORD.
3. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE CITY OF WHEAT RIDGE
FNG IBERING DIVISION. CITY OF MEAT RIDGE RESERVES THE RIGHT TO ACCEPT OR REJECT ANY SUCH
MATERIALS AND WORKMANSHIP THAT DOES NOT CONFORM TO THE GEC PLAN.
4. THE PLACEMENT OF EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES IBMPM SHALL BE
IN ACCORDANCE WITH THE CITY OF WHEAT RIDGE-ACCEPTED GEC PLAN AND THE URBAN DRAINAGE AND
FLOOD CONTROL MANUAL
5. ANY VARIATION IN MATERIAL, TYPE OR LOCATION O F EROSION AND S EX M ENT CONTROL BM Ps FROM THE
CITY OF WHEAT RIDGE-ACCEPTED GEC PLAN WILL REQUIRE APPROVAL FROM AN ACCO TRIABLE
REPRESENTATIVE OF THE CITY OF WHEAT RIDGE ENGINEERING DIVISION.
S. AFTER THE GEC PUN HAS BEEN ACCEPTED, THE CONTRACTOR MAY INSTALL THE INUUMSTAGE EROSION
CONTROL AND SEDIMENT CONTROL BMPS INDICATED ON THE ACCEPTED DEC PLAN.
7. THE FIRST BMP TO BE INSTALLED ON ME SITE SHALL BE CONSTRUCTION FENCE, MARKERS. OR OTHER
APPROVED MEANS OF DEFINING THE LIMITS OF CONSTRUCTION, INCLUDING CONSTRUCTION OMITS
ADJACENT TO STREAM CORRIDORS AND OTHER AREAS TO BE PRESERVED.
S. THE DEC OPERATOR SHALL STRICTLY ADHERE TO THE CITY OF WHEAT RIOGEAPPROVED UNITS OF
CONSTRUCTION AT ALL TIMES. THE CITY OF WHEAT RIDGE ENGINEERING DIVISION MUST APPROVE ANY
CHANGES TO THE UMHS OF CONSTRUCTION AND, AT THE DISCRETION OF THE ENGINEERING DIVISION
ADDITIONAL EROSIO WSEDIMENT CONTROLS MAY BE REQUIRED IN ANY ADDITIONAL AREAS OF
OO NSTRUCTIOTL
9. PRIOR TO ACTUAL CONSTRUCTION, THE PERMITTEE SUALL VERIFY THE LOCATION OF EXISTING UTILITIES,
FOR INFORMATION. CONTACT THE DENVER INTER-J LHY GROUP AT 1-000.922-1987 OR FAX AT
(303)5345700.
10. NATURAL VEGETATON SHALL BE RETAINED AND PROTECTED WHEREVER POSSIBLE. EXPOSURE OF SOIL
TO EROSION BY REMOVAL OR DISTURBANCE OF VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED
FOR IMMEDIATE CONSTRUCTION OPERATIONS.
11. ACOPY OF THE ACCEPTED DEC PLANS SHALL BE ON SITE AT ALL TIMES,
12. ALL CONSTRUCTION TRAFFIC MUST EMEILFXIT THE SUE THROUGH THE CITY OF WHEAT
RIDGEAPP ROVED ACCESS POINT.A VEHICLE TRACKING CONTROL PAD IS REQUIRED AT ALL ACCESS
POINTS ON THE SITE ADDITIONAL STASIUMO CONSTRUCTION ENTRANCES MAY BE ADDED WIN
AUTHORIZATION FROM THE CITY OF WHEAT RIDGE ENGINEERING DIVISION.
13. THE DEC OPERATOR IS RESPONSIBLE FOR CLEANUP OF SEDIMENT OR CONSTRUCTION DEBRIS TRACKED
ONTO ADJACENT PAVED AREAS. PAVED AREAS INCLUDING STREETS ARE TO BE KEPT CLEAN
THROUGHOUT SUILD4UT AND SHALL BE CLEANED, NTHA STREET SWEEPER OR SIMILAR DEVICE. AT
FIRST NOTICE OF ACCIDENTAL TRACKING OR AT THE DISCRETION OF THE CITY OF MEAT RIDGE GEC
INSPECTOR STREET WASHING IS NOT ALLOWED. CITY OF MEAT RIDGE RESERVES THE RIGHT TO
REQUIRE ADDITIONAL MEASURES TO ENSURE AREA STREETS ARE KEPT FREE OF SEDIMENT ANDIOR
CONSTRUCTION DEBRIS
14. APPROVED EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED AND KEPT IN GOOD REPAIR
FOR THE DURATION OF THIS PROJECT. ATA MINIMUM. THE DEC OPERATOR SHALL INSPECT ALL SMPS IN
ACCORDANCE NTH THE ACCEPTED GEL PLAN, ALL NECESSARY MAINTENANCE AND REPAIR ACTIVITIES
SHALL BE COMPLETED WITHIN 48 HOURS FOR LEVEL III VIOLATIONS, AND IMMEDIATELY FOR LEVEL II
VIOLATIONS, DRAB DIRECTED BY THE CITY OF WHEAT RIDGE, ACCUMULATED SEDIMENT AND
CONSTRUCTION DEBRIS SHALL BE REMOVED AND PROPERLY DISPOSED OF ON A DAY TO DAY BASIS,
15. TOPSO1 SHALL BE STRIPPED AND STOCKPILED IN THE LOCATION SHOWN ON THE ACCEPTED GEC PLAN.
15. THE ACCEPTED DEC PUN MAY REQUIRE CHANGES OR ALTERATIONS AFTER APPROVAL TO MEET
CHANGING SITE OR PROJECT CONDITIONS OR TO ADDRESS INEFFICIENCIES IN DESIGN OR INSTALLATION.
THE GEC OPERATOR SHALL OBTAIN PRIOR APPROVAL FROM THE DESIGN ENGINEER AND CITY OF WHEAT
RIDGE ENGINEERING FOR ANY PROPOSED CHANGES.
17, NO PERMANENT EARTH SLOPES GREATER THAN IT SHALL BE ALLOWED.
18. TUNING OF TEMPORARY SWALES AND DITCHES SHALL BE IN ACCORDANCENTH THE URBAN DRANAGE
AND FLOOD CONTROL DISTRICT MANUAL
19. ANY SETTLEMENT OR SOIL ACCUMULATIONS BEYOND THE UNITS OF CONSTRUCTION DUE TO GRADING OR
EROSION SHALL BE REPAIRED IMMEDIATELY BY THE GEC OPERATOR. THE GEE MANAGER SHALL BE HELD
RESPONSIBLE FOR OBTAINING ACCESS RIGHTS TO ADJACENT PROPERTY. IF NEEDED. AND REMEDIATING
ANY ADVERSE IMPACTS TO ADJACENT WATERWAYS, WETUNDS. PROPERTIES, ETC, RECVLTING FROM
WORK DONE AS PART OF THIS PROJECT.
30. A WATER SOURCE SHALL BE AVAILABLE ON SHE DURING EARTHWORK OPERATIONS AND UTILIZED AS
REQUIRED TO MINIMIZE DUST FROM EARTHWORK EOVIPMENT AND WIND,
P. SOILS THAT W"E STOCKPILED FOR MORE THAN THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED
WITHIN FOURTEEN (14) DAYS OF STOOMLE CONSTRUCTION. NO STOCKPILES SHALL BE PLACED WITHIN
ONE HUNDRED (100) FEET OFA DRAINAGE WAY UNLESS APPROVED BY THE CITY OF MEAT RIDGE
ENGINEERING DIVISION.
GILL ALL CHEMICAL OR HA]ARWUS MATERIAL SPILLS MICH MAY ENTER WATERS OF THE STATE OF
COLORADO, WHICH INCLUDE BUT ME NOT UNITED TO, SURFACE WATER. GROUND WATER AND CRY
GUW ES OR STORM SEWER LEADING TO SURFACE WATER. SHALL BE IMMEDIATELY REPORTED TO ME
COPTS PER CRS 258-601, AND CITY OF WHEAT RIDGE RELEASES OF PETROLEUM PRODUCTS AND
CERTANW RDOUS SUBSTANCES LISTED UNDER THE FEDERAL CLEAN WATER ACT (40 OR PART 113)
MUST BE REPORTED TO THE NATIONAL RESPONSE CENTER AS WELL AS THE CDPHE CONTACT
INFORMATION FOR CONTE, CITY OF MEAT RIME AND THE NATIONAL RESPONSE CENTER CAN BE FOUND
IN APPENDIX A. SPILLS THAT POSE AN IMMEDIATE RIS K TO H UMAN LIFE SHALL BE REPORTED TO 911,
FAILURE TO REPORT AND CLEAN UP ANY SPILL SHALL RESULT IN ISSUANCE OF A STOP WORK ORDER.
2S. ALL WORK ON SITE SHALL STAY A M IN IMUM OF ON E FUND RED N HIS FEET AWAY FROM ANY DRAINAGE
WAY, WETAND. ETC. UNLESS OTHERWISE NOTED ON AN ACCEPTED CITY OF MEAT RIDGE GEC PLAN,
N. THE USE OF REBM. STEEL STAKES OR STEEL FENCE POSTS FOR STAKING OR SUPPORT OF ANY EROSION
OR SEDIMENT CONTROL BMP IS PROHIBITED (EXCEPT STEEL TEE-POSTS FOR USE IN SUPPORTING
CONSTRUCTION FENCE).
2S. THE CLEANING OF CONCRETE DELIVERY TRUCK CHUTES IS RESTRICTED TO APPROVED CONCRETE WASH
OUT LOCATIONS ON THE JOB SITE THE DISCHARGE OF WATER CONTAINING WASTE CONCRETE TO THE
STORM SEWER SYSTEM IS PROHIBITED, ALL CONCRETE WASTE SHALL BE PROPERLY CLEANED VP AND
USPOSM AT AN APPROPRIATE LOCATION.
36. ALL DEWATERING ON SITE SHALL BE COORDINATED NTH A CITY OF WHEAT RIDGE GEC INSPECTOR AND
BE FREE OF SEDIMENT IN ACCORDANCE WITH THE GEC MANUAL
27. ALL DISTURBED AREAS SHALL BE DRILL SEEDED AND CRIMP MULCHED IN ACCORDANCE WIN THE GEC
PLAN W,THIN THIRTY DAYS OF INITIAL EXPOSURE OR WITHIN SEVEN DAYS OF SUBSTANTIAL COMPLETION
(AS DEFINED BY CITY OF WHEAT RIDGE) OF AN AREA, WHICHEVER IS LESS. THIS MAY REQUIRE MULTIPLE
MOBILVATIONS FOR SEEDING AND MULCHING.
25. HYDRAULIC SEEDING AND HYDRAULC MULCHING ARE NOT AN ACCEPTABLE METHOD OF SLICING OR
MULCHING IN CITY OF WHEAT RIDGE.
29. REQUIRED DEWATERING EXCAVATIONS SHALL BE CONDUCTED IN A MOTHER THAT AVOIDS POLLUTION
AND EROSION. WATER FROM OEWATERING OPERATIONS SHALL NOT BE DISCHARGED INTO ANY STATE
WATERS INCLUDING WETUNDS, IRRIGATION DITCHES, CHANNELS, OR STORM SEWERS UNLESS WRITTEN
PERMISSION IS OBTAINED FROM THE OWNER OR CONTROLLING AUTHORITY AND A COPY OF THIS
APPROVAL SUBMITTED TO THE ENGINEER,
30. THE STORMUMMER PROGRAM MANAGER MUST BE NOTIFIED AT LEAST W HOURS PRIOR TO ANY
CONSTRUCTION ACTIVITY TO ASSURE ALL NECESSARY BMPS ARE ADEQUATELY INSTALLED PER THE
STORMWATER MANAGEMENT PUN EVOMP).
31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON THE SITE. DISTURBED AREAS NOT
YET READY TO BE SEEDED, LANDSCAPED. PAVED OR OTHERWISE STABILIZED SHALL BE WATERED,
SPRAYED WTHEA TACKIFIER, MULCHED (WITHOUT SEED) OR RIPPED AS NECESSARY TO EXCLUDE
VISIBLE DUST EMISSIONS.
32. ARRAS TO BE RE-VEGETATED SHOULD HAVE SOIL CONDITIONS CAPABLE OF SUPPORTING VEGETATION,
UNDER CERTAIN CONUMONS. SOIL AMENDMENTS AND TREATMENTS MAY BE NECESSARY TO PROVIDE AN
ADEQUATE GROWTH MEDIUM TO SUSTAIN VEGETATION.
®
❑
I
IT O
OW
O
68
DWA
®
®
CXECNMM
COMPSiOUNKEi
MPOATNLTERQERM
CONCRETE W0.5HOYTMFA
CONSTRUCT.. fENCE
C.NS1RUClION MARKERS
I--33~
I~T&O
®
®
UW
®
EW
O
oRW
®
BMPLEGENF1D
GEWAIERING
+L~
ONEPSION DRCX®~p
EROSIONOCUTROLOIANKET ~®C{6
MLETPRDTECTOX Q
REINFORCED CHECK DAM
EINFOOE.ROCKTION
o
O
$G'
O
®
®
®
~HQIAENT IN
ENTCDXTROLIOG
EQ
3EQIMENTIIUP
SEEDING A. HJLCHING
MLTFENCE
STAS.E.STAGINGAAEA
®
O
~
O
®
®
®
O
SURFACE OX. NPG
TENPoPMYSLOPEDRNX
iEMPoRMYSIPFAN CR0901XG
TERPACINO
WCOTETM.N SC0UV0L
NM
N
®
KITS. ULVERTPRORCTON
LCC
MI
PoNSTRVC1pN
GRAPHICAL STANDARDS FOR REFERENCE ONLY - ONLY, SUGGESTED NOT REQUIRED
DEW ~T CITY OF WHEAT RIDGE E-AO1 EROS.NOTES DETAIL
COLE
DEPT. OF PUBLIC WORKS EROSION CONTROL NOTES E
ENGINEERING DIVISION AND LEGEND
OOLORP~ APPROVED BY: SKIN WAIT
t. SANEX OF SEEDING MULCHING.
AND WEE OF S
-ttFE OF SEED MIX (PERMANENT NIENT, TEMPoRPItV, ON LOWGItOWN).
2 ALL BRANDS FURNISHED SHALL BE FREE FROM ALL NOXIOUS SEEDS INCLUDING RUSSIAN OR CANADIAN
THISTLE, COARSEFESCUEEUROPFPNBINONEED,JOMSONGB ,W MEDMOLFAFYSPURGE.
3. ME SEEDER SHALL FURNISH TO ME CONTRACTOR A SIGNED STATEMENT CERTIFYING THAT ME SEED
FURNISHED ISFROMALOTT THPSBEENMSMODYARECOGIMDLABORATORY.SEEDV ICHHAS
BECOMEV ,MOLDY,OROMEAIMSE DAMAGED IN TRANSIT OR IN STORAGE WILL NOT BE
ACCEPTABLE SEED TCHETS SIWLLBE PROVIDED TO ME GTY UPON REQUEST.
4. DRILL SEEDING MIX SHALL CONFORM TO ME TABLE ON ME RIGHT
S. I F ME SEED AVAILABLE ON THE MARKET DOES NOT MEET ME MINIMUM PURITY MD GERMINATION
PERCENTAGES SPECIFIED, ME SUBCONTRACTOR MUST COMPENSATE FORA LESSER PERCENTAGE OF
AUNTY OR GERMINATION BY FURNISHING SUFFICIENT ADDITIONAL SEED TO EOUALTHE SPECIFIED
PRODUCT, ME TAGS FROM ME SEED MIXES MUST BE SUPPLIED TO CONTACTOR AND FORWARDED TO
ME CITY GESC INSPECTOR.
6. ME FORMULA USED FOR DETERMINING ME OUANTTY OF PURE LIVE SEED(FEE) SHALL BE (POUNDS OF
SEED)X (PURIMX (GERMINATION)=POLMOS OF PURE LIVE SEED (PUS),
7. PERMANENT SEED MIX SHALL BE USED UNLESS OMENWISE APPROVED BY ME CITY.
e. ALL AREAS TO BE SEEDED AND MULCHED SHALL HAVE NATIVE TOPSOL OR APPROVED SOIL
AMENDMENTS SPREAD TO A DEPTH OF AT LEAST6 INCHES (LOOSE DEPTH). HAUL RGADS AND OTHER
COMPACTED ARRAS SHALL BE LOOSENED TO A DEPTH OF 6 INCHES PRIOR TO SPREADING TOPSOL
9 SOIL IS TO BE THOROUGHLY LOOSENED TELLS) TO A DEPTH OF AT LEAST 6 INCHES PRIOR TO SEEDING.
ME TOP 6INCHES OF ME SEED BED SHALL BE FREE OF ROOKS GREATER MAN 4 INCHES AND SOIL
CLODS GREATER MAN 2 INCHES, SEEDING OVERPLAY COMPACTED AREAS THAT HAVENT BEEN
THOROUGHLY LOOSENED SHALL BE REJECTED.
M SEED IS TO BE APPLED USING A MECHANICAL ON LL TO A DEPTH OF IA INOL ROW SPACING SHALL BE
NO MORE TAI 6INCHES. MATERIAL USED FOR MULCH SHALL CONSIST OF LONG-STEMMED STRAW AT
LEAST SB PERCENT OF ME MULCK BY WflGET, 5-AU- BE 101HONES OR MORE IN IENGIH MULCH
SHALL BE APPLIED AND MECHANICALLY ANCHOR ED TO A DEPTH OF AT LEAST 2 INCHES MULCH SHALL
BE APPLIED ATA RATE OF 40X LB, OF STRAW PER ACRE
11. IF THE PERMIT TEE DEMONSTRATES TO ME CITY MAT N IS NOT POSSIBLE TO DRILL SEED. SEED 13 TO
BE UNIFORMLY BROADCAST AT TVA TIMES ME DRILLED RATE, TH EN TIGHTLY HARROWED TO FRONDE
A SEED DEPTH OF APPROXIMATELY IH INCH. MEN ROLLED TO COMPACT, THEN MULCHED AS SPEC'NED
ABOVE.
12 SEEDING AND MU -CMG SHALL BE COMPLETED AMIN SO DAYS OF INITAL EXPOSURE OR 7 DAYS
AFTER GRACING IS SUBSTANTIALLY COMPLETE IN A GIVEN AREA (AS OPENED BY ME CIM, MI5 MAY
REQUIRE MLETN B MOMLWTIONS FOR SEEDING AND MULCHING.
13. MULCH SHALL BE AP NI ED PoMIN NAOURS CF SEEDING,
14. TACNFIER SHOULD BE UTIUMD TO HELP WTH STRAWOISPIACEMENi
SEEDING AND MULCHING MAINTENANCE NOTES
I. SEEDED MD MULCHED AREAS SHALL BE INSPECTED FOR REQUIRED COVERAGE MONTHLY FORA
PERIOD OFT AG YEARS FOLLOWNG INITIAL SEEDING. REPAIRS AND RE-SEEGNO AND MULCHING
SHALL BE UNDERTAKEN AFTER ME FIRST GROVANG SEASON FOR ANY AREAS FAILING TO MEET
THEREQUIREO COVERAGE
IF REQUIRED COVERAGE FOR STANDARD, OPEN SPACE AND LOW GROVITH SEED MIXES SHALL BE
DEFINED AS FOLLOVI6:
I. MREE(3) PLANTS PERSQUAREFUGTVAM A MINIMUM HEIGHT OF 3 INCHES ME3PIANTS
PER SQUARE FOOTSHALLBE OF ME VARIETYANDSPEGES FOUND INTHE CITY-APPROVED
MIX
2 NOOMEAREASLARGERTH 460VMEFEET(T FEEFBYT EETOREQUIVAIENT).
3. FREE OF MOULD AREAS,
4. FREE FROM INFESTATION OF NOXIOUS%MEEOS IN ACCORDANCE WTH SECTION 6.4 OF TH E
GESC CRITERIA MANUAL
3. REQUIRED COVERAGE FOR TURF GRASSAREAS SW BE DERNEOAS FOLK-0I
1. ATLFPSTSO-A EC TATVECOVMOFGRA66SPEGESFL 0.
2 NO8 EARE4 GERTHPN4SQUAREFEET(TV.OFEETBYMt} UCREOUIVATEM).
3, FREEOFERMEDAREAS.
0. FREE FROM INFESTATION OF NOXIOUS WEEDS IN ACCORDANCE MIH BECTON 6.4 OF ME
GESCCRITERIAMANUAL
4. RILL AND GULLY EROSION SHALL BE RULED MTH TOPSOIL PRIOR TO RESEEDING. THE
RESEEDING METHOD SHALLBEAPPROVED BY THEGTY.
PERMANENT DRILL SEEDING MIX
BIG BLUESTEM
SAW
P.
10
1.1
SMATCHGRANS
B~CKVAEUL
10
OA
BLUE GRANA
KAMETA
1.
03
"EATGRASS
GREEN NEEDLED.
LOGNOR.
EMU
10
1
MEATGRASS
MEATGRASS
TOTAL
TEMPORARY DRILL SEEDING MIX
LPECIES
VARIETY
NOTES I
'A IN MIX
POUNDSOPOL8
AM RE
INTERMEDIATE
OME
FICS
3.
4.5
MEATGRASS
PUBESCENT
PC$
IS
kA
TOTAL
13.4
LOW-GROWTH DRILL SEEDING MIX
SPECIES
VARIETY
NOTES
XINMIX
POUNDS OF PUS
BUFFALOGRASS
TEXOKA
1.
2U
3.2
MIHEATGRASS
MHEATGRASS
MEATGRASS
TOTAL
(H )SEEDING AND MULCHING
DETAIL
F"~r CITY OF WHEAT RIDGE E-A03 SEED.NOTES CODE
DEPT. OF PUBLIC WORKS SEEDING AND MULCHING NOTES E
ENGINEERING DIVISION
OOLORP~ APPROVED BY SNN 06107
M ~
LO r~
W It
n O
-t N
O M
r 6
CF)
LO C)
J O
00
r
M
3
rl 0)
Z W
,n
0
000
O r, M
`ZZ W
00 r,
LO rn
0 't
o(D
N O
00
M
rv
v
ZZI
Qr~
3a,D
N
OLOO
O 00
J CD to
Q(3;4
3: 00 to
000
0 ~ M
Z Z W
LLI
1Lo M
000
O0
00 -t
In O
00
`v
LLI
ti-"
00 11-
lee M o
r~
/
Z W
"ic
co ,
0) 04
N
W 0 O Oro
M r
Z W
U r
Z W
~aY ZL~
6~-XI
OL
N 00
r 0
dM
? LO O O
00 r
rN1 ZW
Z W
Zb-i
0
0
N
38
„
29 4~9
W
O
O . N
O Q
O
O
...sz.sti,sz
O > N
00pQ
V
Q.
mwol~
ytiZI
Community Development
7500 West 29th Avenue
Wheat Ridge, Colorado 80033
303.235.2846 Fax: 303.235.2857
The City of
Wheat Ridge
Community Development Referral Form
Date: 19 December 2007 Response Due: 11 January 2008
The Wheat Ridge Community Development Department has received a request for approval of
an amendment to a final development plan at the property located at 4000 Cabela Drive (Lot 1
of the Cabe/a's/Coors Subdivision, First Amended Plat). No response from you will constitute
having no objections or concerns regarding this proposal.
Case No.: WZ-07-05/Cabela's
Request: The applicant is requesting some minor changes to the final development plan.
The changes include slight changes to the building elevations, the parking areas and drive
aisles and landscaping.
Please respond to this request in writing regarding your ability to serve the property. Please
specify any new infrastructure needed or improvements to existing infrastructure that will be
required. Include any easements that will be essential to serve the property as a result of this
development. Please detail the requirements for development in respect to your rules and
regulations. If you need further clarification, contact the case manager.
I Case Manager: Travis R. Crane Voice: 303.235.2849 Fax: 303.235.2857 Email: tcrane@ci.wheatridge.co.us
DISTRIBUTION:
Consolidated Mutual Water District
North Table Mountain Sanitation District
West Metro Fire District
Longs Peak Metro District
Jefferson County Planning Department
Xcel Energy
AT&T Broadband
Qwest Communications
Wheat Ridge Parks & Recreation Department
Wheat Ridge Building Division
Wheat Ridge Police Department
Wheat Ridge Public Works
"The Carnation City"
"The Carnation City"
1101 Bannock Stceet
De ..c , Colorado 80204
P 303.892.1166 P 303.892.1186
TRANSMITTAL
Date: December 17th, 2007
NOR,R,IS DESIGN
Planning Landscape Architecture
To: City of Wheat Ridge
7500 W. 29th Avenue
Wheat Ridge CO, 80033
303.235.2849
Attention: Travis Crane
From: Nathan Schrock
Re: Cabela's FDP Amendment 1
We are sending you the following items via Delivery:
Copies Dates Description
18 Full Size,1 December FDP Amendment
11x17 17th, 2007
Remarks:
Travis-
Enclosed please find 18 full size copies of the Cabela's FDP amendment along with 1 11"x17" copy. Also
included are 18 copies of the Cabela Drive Streetscape Design Guidelines,-and two land use forms as
requested by the city. All other required documents will be provided by Cableas.
Please call if you have any questions. Thank you.
-Nathan Schrock
www.norris-design.com
Denver, CO + Chicago, IL + Frisco, CO + Phoenix, AZ +Tucson, AZ
Cabela Drive - Streetscape Design Guidelines
December 2nd, 2007
Purpose
These guidelines are intended to illustrate the application of landscape material along the right-of-way
associated with Cabela Drive. This will insure a consistent theme along the entire length of Cabela Drive
from 44th Avenue on the north to 32nd Avenue on the south. These guidelines are to be followed as closely
as possible, but are to remain flexible to react to any conditions found along the right-of-way.
Theme
Cabela Drive shall have a naturalized theme to integrate the streetscape with the sportsman experience
developed for the Cabela's retail site. The Cabela's retail site is designed to immolate the various
ecosystems experienced by the Colorado sportsman. There are 4 main ecosystems demonstrated, which
include; Prairie, Foothills, Mountain, and Sub-Alpine.
This landscape theme relies heavily on naturalized grasses and the introduction of native and native like
plant material found in each ecosystem. When native plantings for specific ecosystems cannot be used
due to survivability, substitute plantings are used to emulate the desired look.
The introduction of typical urban tree species are used to provide a canopy type experience but are located
in informal groupings to complement the naturalized look.
Streetscape Design
The streetscape is designed to compliment the general theme. For purposes of maintenance, traffic and
retail visibility, the streetscape program will differ from the typical urban streetscape approach. Required
street tree quantities will be honored, but utilized as part of the thematic experience. All landscape should
be well coordinated with street lighting, pedestrian lighting, bus stops, site triangles and sight lines.
Application of the various landscape elements are as follows:
Ground Plane - Naturalized short grasses (Seed Mix A) will be utilized between the curb and detached walk
with naturalized tall grasses (Seed Mix B) behind the walk. The grasses between the curb and walk will be
irrigated with efficient spray irrigation as part of the district irrigation system. The grasses behind the walk
may be irrigated with efficient spray irrigation as part of the retail development.
Street Trees - The required street trees (as measured at 1 tree per 50 If) will be grouped in groves and will
be located behind the walk and within 60' of the back of walk. Trees are to be grouped to form a natural
appearance. Gaps between groups are intended to provide visibility to retail and any important views and
vistas identified by the retail developer.
Irrigation System
The streetscape between the curb and walk is intended to be irrigated by a master system. The landscape
behind the walk will be irrigated by the adjacent land owner/developer. The streetscape irrigation system
shall be a fully automated underground system with pop-up spray heads for the short grasses & drip for bed
areas.
Recommended Plant List
The streetscape design and adjacent developments are intended to follow the basic theme set out in these
guidelines. The following plant list represents recommended plant material that should adapt in the local
climate, while still achieving the thematic intent. Other plant material may be utilized as long at it still meets
the intent of the development theme.
ZONE
COMMON NAME BOTANICAL NAME SIZE & COND. USE
DECIDUOUS CANOPY TREES
AUTUMN BLAZE MAPLE
ACER x FREEMANII'JEFFERSRED'
2 1/2" CAL. S&B
F
BOX ELDER
ACER NEGUNDO'SENSATION'
2 1/2" CAL. B&B
F
BUR OAK
QUERCUS MACROCARPA
2 1/2" CAL. B&B
P
PEACH LEAF WILLOW
SALIX AMYGDALOIDES
2 1/2" CAL. B&B
F
PLAINS COTTONWOOD
POPULUS SARGENTII
2 1/2" CAL. B&B
PF
QUAKING ASPEN
POPULUS TREMULOIDES
21/2"CAL. B&B
S
SHADEMASTER LOCUST
GLEDITSIA TRICANTHOS INERMIS
'SHADEMASTER'
2 1/2" CAL. B&B
P
WESTERN CATALPA
CATALPA SPECIOSA
2 112" CAL. B&B
P
EVERGREEN TREES
COLORADO SPRUCE
PICEA PUNGENS
6' HT. MIN
MS
DOUGLAS FIR
PSEUDOTSUGA MENZIESII
UHT. MIN
M
BAKERI SPRUCE
PICEA PUNGENS'BAKERI'
6' HT. MIN
MS
LIMBER PINE
PINUS FLEXILIS
UHT. MIN
S
PINION PINE
PINUS EDULIS
UHT. MIN
FM
PONDEROSA PINE
PINUS PONDEROSA
6' HT. MIN
FM
WANDERWOLF'S PYRAMID
PINE
PINUS FLEXILIS'VANDERWOLF
PYRAMID'
UHT. MIN
S
DECIDUOUS ORNAMENTAL
TREES
AMUR MAPLE
ACER GINNALA
5 GAL. CONT.
M
DOUGLAS HAWTHORN
CRATAEGUS DOUGLASSII
5 GAL. CONT.
F
MOUNTAIN ASH
SORBUS SCOPULINA
5 GAL. CONT.
M
ROCKY MOUNTAIN BIRCH
BETULA OCCIDENTALIS
5 GAL. CONT.
M
SASKATOON SERVICEBERRY
AMELANCHIER ALNIFOLIA
5 GAL. CONT.
MS
TATARIAN MAPLE
ACER TATARICUM
5 GAL. CONT.
M
THORNLESS COCKSPUR
HAWTHORN
CRATAEGUS CRUS-GALLI
'INERMIS'
5 GAL. CONT.
F
DECIDUOUS SHRUBS 2'- 4'
SPREAD
BLUE MIST SPIREA
CARYOPTERIS X CLANDONENSIS
'BLUE MIST'
5 GAL. CONT.
MS
DWARF BLUE RABBIT BUSH
CHRYSOTHAMNUS NAUSEOSUS
NAUSEOUS'DW. BLUE
5 GAL. CONT.
PF
DWARF EUROPEAN
CRANBERRYBUSH
VIBURNUM OPULUS'NANUM'
5 GAL. CONT.
S
DWARF NINEBARK
PHYSOCARPUS OPULIFOLIUS
'NANUS'
5 GAL. CONT.
P
FOUR WING SALTBUSH
ATRIPLEX CANASCENS
5 GAL. CON T.
F
GRO-LO SUMAC
RHUS AROMATICA'GRO-LOW'
5 GAL. CONT.
MS
MOUNTAIN NINEBARK
PHYSOCARPUS MONOGYNUS
5 GAL. CONT.
M
ROCKY MOUNTAIN SUMAC
RHUS GLABRA CISMONTANA
5 GAL. CONT.
F
SNOWBELLE MOCKORANGE
PHILADELPHYUS'SNOWBELLE'
5 GAL. CONT.
S
DECIDUOUS SHRUBS 4' - 6'
SPREAD
ALPINE CURRANT
RIBES ALPINUM
5 GAL. CONT.
PF
APACHE PLUME
FALLUGIA PARADOXA
5 GAL. CONT.
FM
ISANTI DOGWOOD
CORNUS SERICEA'ISANTI'
5 GAL. CONT.
F
LITTLELEAF MOUNTAIN
MAHOGANY
CERCOCARPUS INTRICATUS
5GAL. CONT.
F
NATIVE PINK ROSE
ROSA WOODSII
5 GAL. CONT.
FM
GOLDEN CURRANT
RIBES AUREUM
5 GAL. CONT.
PF
RABBIT BRUSH
CHRYSOTHAMNUS NAUSEOSUS
ALBICAULIS
5 GAL. CONT.
P
RUSSIAN SAGE
PEROVSKIA ATRIPLICIFOLIA
5 GAL. CONT.
MS
SNOWBERRY
SYMPHORICARPOS ALBUS
5 GAL. CONT.
F
THREE LEAF SUMAC
RHUS TRILOBATA
5 GAL. CONT.
FM
WESTERN SAND CHERRY
PRUNUS BESSEYI
5 GAL. CONT.
PF
DECIDUOUS SHRUBS 6' PLUS
SPREAD
BUFFALOBERRY
SHEPHERDIA ARGENTEA
5 GAL. CONT.
S
CHOKECHERRY
PRUNUS VIRGINIANA
5 GAL. CONT.
F
COYOTE WILLOW
SALIX EXIGUA
5 GAL. CONT.
PF
MOUNTAIN MAHOGANY
CERCOCARPUS MONTANUS
5 GAL. CONT.
FM
RED TWIG DOGWOOD
CORNUS STOLONIFERA'BAILEYI'
5 GAL. CONT.
P
EVERGREEN SHRUBS
BUFFALO JUNIPER
JUNIPERUS SABINA'BUFFALO'
5 GAL. CONT.
FM
BLUE POINT JUNIPER
JUNIPERUS CHINENSIS'BLUE
POINT'
5 GAL. CONT.
S
CHINA BOY/GIRL HOLLY
JUNIPERUS HORIZONTALIS
'HUGHES'
5 GAL. CONT.
S
MOPS MUGO PINE
PINUS MUGO'MOPS'
5 GAL. CONT.
M
ROCKY MOUNTAIN JUNIPER
JUNIPERUS SCOPULORUM
5 GAL. CONT.
FM
SLOWMOUND MUGO PINE
PINUS MUGO'SLOWMOUND'
5 GAL. CONT.
FMS
ORNAMENTAL GRASSES
BIG BLUESTEM
ANDROPOGON GERARDII
1 GAL. CONT.
PF
BLUE AVENA GRASS
HELICTOTRICHON
SEMPERVIRENS
1 GAL. CONT.
PFMS
BLUE FESCUE'ELIJAH BLUE'
FESTUCA GLAUCA'ELIJAH BLUE'
1 GAL. CONT.
PFMS
FEATHER REED GRASS
CALAMAGROSTIS ARUNDINACEA
'KARL FOERSTER'
5 GAL. CONT.
PFMS
HEAVY METAL SWITCH GRASS
PANICUM VIRGATUM'HEAVY
METAL'
5 GAL. CONT.
PFM
INDIAN GRASS
SORGHASTRUM AVANACEUM
5 GAL. CONT.
P
JAPANESE SEDGE
CAREX MORROWII
5 GAL. CONT.
S
LITTLE BLUESTEM
SCHIZACHYRIUM SCOPARIUM
5 GAL. CONT.
PFM
PERENNIALS
BLACK EYED SUSAN
RUDBEKIA FULGIDA
'GOLDSTURM'
1 GAL. CONT.
MS
BLAZING STAR
LIATRIS SPICATA
1 GAL. CONT.
MS
BLUE VERVAIN
VERBENA HASTATA
1 GAL. CONT.
M
CREEPING PHLOX RED
PHLOX SUBULATA
1 GAL. CONT.
S
CREEPING PHLOX WHITE
PHLOX SUBULATA
1 GAL. CONT.
S
DENVER GOLD COLUMBINE
AQUILEGIA HYBRIDS'DENVER
GOLD'
1 GAL. CONT.
S
DWARF ALPINE ASTER
ASTER ALPINUS
1 GAL. CONT.
MS
FRINGED SAGE
ARTEMISIA FRIGIDA
1 GAL. CONT.
S
GOLDEN BABY GOLDENROD
SOLIDAGO'GOLDEN BABY'
1 GAL. CONT.
M
LUPINE
LUPINUS ARGENTEUS
1 GAL. CONT.
M
NATIVE BLANKETFLOWER
GAILLARDIA ARISTATA
1 GAL. CONT.
M
PRAIRIE CONEFLOWER
RATIBIDA COLUMNIFERA'RED'
1 GAL. CONT.
M
SALVIA, MAY NIGHT
SALVIA SYLVESTRIS X
'MAINACHT'
1 GAL. CONT.
MS
SHASTA DWARF DAISY
LEUCANTHEMUM X COMPACT
'SNOW LADY'
1 GAL. CONT.
S
SNOW-IN-SUMMER
CERASTIUM TOMENTOSUM
1 GAL. CONT.
MS
VIOLET AND WHITE
COLUMBINE
AQUILEGIA HYBRIDS'COLORADO
VIOLET AND WHITE'
1 GAL. CONT.
S
WOOLYTHYME
THYMUS PRAECOX
PSEUDOLANUGINOSUS
1GAL. CONT.
S
YELLOW YARROW
ACHILLEA FILIPENDULA
1 GAL! CONT.
MS
Use Zone Key
P - Prairie Zone
F - Foothills Zone
M - Montane Zone
S - Sub-Alpine Zone
Seed Mix A - Short Grass Seed Mix
PLS PER
COMMON NAME SCIENTIFIC NAME ACRE
BLUE GRAMA
BOUTELOUA GRACILIS
4.5 LBS.
BOTTLEBRUSH SQUIRREL
TAIL
ELYMUS ELYMOIDES
1.8 LBS.
BUFFALO GRASS
BUCHLOE DACTYLOIDES
4.5 LBS.
GALLETA
PLEURAPHIS JAMESII
3.6 LBS.
SHEEP FESCUE
FESTUCA OVINE
3.6 LBS.
REGREEN TRITICUM AESTIVUM 5.0 LBS.
23.0 LBS
APPLY AT A RATE OF 23 PLS LBS. PER ACRE
Seed Mix B - Tall Grass Seed Mix
PLS PER
COMMON NAME SCIENTIFIC NAME VARIETY ACRE
WESTERN WHEATGRASS
AGROPYRON SMITH II
ARRIBA
5.0 LBS.
ANDROPOGON
BIG BLUESTEM
GRARDII
KAW
2.0 LBS.
BOUTELOUA
VAUGHN OR EL
SIDE OATS GRAMA
CURTIPENDULA
RENO
2.0 LBS.
CALAMOVILFA
PRAIRIE SANDREED
LONGIFOLIA
GOSHEN
.5 LBS.
SWITCHGRASS
PANICUM VIRGATUM
BLACKWELL
1.0 LBS.
SORGHASTRUM
INDIANGRASS
NUTANS
CHEYENNE
2.0 LBS.
ELYMUS
SLENDER WHEATGRASS
TRACHYCAULUS
2.0 LBS.
SCHIZACHYRIUM
LITTLE BLUESTEM
SCOPARIUS
PASTURA
2.0 LBS.
REGREEN TRITICUM AESTIVIM 5.0 LBS
TOTAL 21.5 LBS
APPLY AT A RATE OF 21.5 PLS LBS. PER ACRE
Landscape Plan Specifications and Procedures (to be included on plans)
1. ALL LANDSCAPED AREAS ARE TO RECEIVE ORGANIC SOIL PREPARATION AT A
MINIMUM OF 3.5cu.yrds/1,000sf.
2. ALL SHRUB BEDS ARE TO BE MULCHED WITH MIN. 3" DEPTH, 11/2" RIVER ROCK OVER
SPECIFIED GEOTEXTILE WEED CONTROL FABRIC. ALL GROUND COVER AND
PERENNIAL FLOWER BEDS SHALL BE MULCHED WITH 2" DEPTH SHREDDED CEDAR
MULCH. NO WEED CONTROL FABRIC IS REQUIRED IN GROUNDCOVER OR PERENNIAL
AREAS.
3. SHRUB BEDS ARE TO BE CONTAINED BY 4" x 14 GAUGE GREEN EDGER, RYERSON OR
EQUAL. EDGER IS NOT REQUIRED WHEN ADJACENT TO CURBS, WALLS, OR WALKS.
4 THE DEVELOPER IS RESPONSIBLE FOR THE COST TO REPAIR UTILITIES, ADJACENT
LANDSCAPE, PUBLIC AND PRIVATE PROPERTY THAT IS DAMAGED BY THE
CONTRACTOR OR THEIR SUBCONTRACTOR'S OPERATIONS DURING INSTALLATION OR
DURING THE SPECIFIED MAINTENANCE PERIOD. CALL FOR UTILITY LOCATIONS PRIOR
TO ANY EXCAVATION.
5. THE DEVELOPER SHALL COORDINATE LANDSCAPE AND IRRIGATION DESIGN WITH
THE METRODISTRICT PRIOR TO SUBMITTAL TO THE CITY. THE METOPOLITAN
DISTRICT SHALL APPROVE THE LANDSCAPE PLANS AND ISSUE AN APPROVAL LETTER
PRIOR TO FIRST SUBMITTAL TO THE CITY.
6. THE DEVELOPER SHALL COORDINATE MAINTENANCE OF THEIR PROPERTY WITH THE
METROPOLITAN DISTRICT. ANY DEVELOPER INSTALLED LANDSCAPE TO BE OWNED
AND MAINTAINED BY THE METROPOLITAN DISTRICT SHALL BE REVIEWED AND
APPROVED BY THE METROPOLITAN DISTRICT PRIOR TO TURN OVER. THE
DEVELOPER SHALL COORDINATE OWNERSHIP AND TURNOVER NEGOTIATIONS PRIOIR
TO SUBMITTAL OF PLANS TO THE METORPLITAN DISTIRCT.
DO NOT CUT LEADER.
PRUNE IMMEDIATELY
PRIOR TO PLANTING.
USE 3 GUY ASSEMBLIES
FOR EVERGREENS AND
TREES OVER 3" CAL.
INSTALL SAUCER IN
NATIVE AREAS.
USE NYLON TREE
STRAPS AT END OF
WIRE (EVERGREEN TREES).
12 GAUGE GALVANIZED
WIRE
4" TREE TAPE (DECIDUOUS
TREES ONLY)
2112" DEPTH CEDAR MULCH
2,V' x 3/4" P.V.C.
MARKERS (TYPICAL)
OVER WIRES.
1/2 SPECIFIED BACKFILL
MIX & 112 PIT SOIL
TREATED WOOD POST W1
GROMMETED NYLON
STRAPS. USE 2 GUY WIRES
REMOVE TOP 2!3 OF WIRE BASKET
AFTER TREE IS IN THE
PIT. REMOVE TWINE, & PULL
BURLAP FROM TREE TRUNK.
NOTE: SET TOP OF ROOT BALL 2" TO 3" ABOVE
SURROUNDING FINISH GRADE.
Tree Planting Detail
PRUNE ALL DEAD OR
DAMAGED WOOD
PRIOR TO PLANTING.
SET SHRUB P' HIGHER
THAN THE FINISHED
BED GRADE.
DIG PLANT PIT TWICE
AS WIDE & HIGH AS
THE CONTAINER
APPLY SPECIFIED
MULCH.
CARE SHOULD BE
TAKEN NOT TO DAMAGE
THE SHRUB OR ROOT-
BALL WHEN REMOVING
IT FROM ITS CONTAINER.
LOOSEN SIDES OF
PLANT PIT & WATER IN
WELL TO ELIMINATE
LARGE AIR POCKETS.
ALL JUNIPER PLANTS
SHOULD BE PLANTED
SO TOP OF ROOT MASS
OCCURS AT FINISH
GRADE OF MULCH
LAYER.
COMPACTED BACKFILL
MIX
FILL PLANT PIT WITH
112 SPECIFIED SOIL MIX
& 112 PIT SOIL
Shrub Planting Detail
NOTE: BROKEN OR
CRUMBLING ROOT- -
BALLS WILL BE
REJECTED.
LAND USE CASE PROCESSING APPLICATION
Community Development Department
7500 West 29th Avenue, Wheat Ridge, CO 80033
Phone (303) 235-2846
(Please print or type all information)
Applicant Cabela's Retail Inc.
City Sidney
Owner Cabela's Retail Inc.
City Sidney
Address One Cabela Drive Phone (3081254.5505
State Nebraska Zip 69160 Fax (308)254.7626
State Nebraska Zip 69160 Fax
Contact Dennis Armstrong Address One Cabela Drive Phone (308)255-2810
City Sidney State Nebraska Zip 69160 Fax (308)254-7626
(The person listed as contact will be contacted to answer questions regarding this application, provide additional information when necessary, post
public hearing signs, will receive a copy of the staff report prior to Public Hearing, and shall be responsible for forwarding all verbal and written
communication to applicant and owner.)
Location of request (address): Southwest of State Highway 58 and 1-70 Interchange (No address assigned)
Type of action requested (check one or more of the actions listed below which pertain to your request):
Application submittal requirements on reverse side
Change of zone or zone conditions - Special Use Permit
- Consolidation Plat - Subdivision: Minor (5 lots or less)
Flood Plain Special Exception - Subdivision: Major (More than 5 lots)
- Lot Line Adjustment - Right of Way Vacation
- Planned Building Group - Temporary Use, Building, Sign
Site Development Plan approval - Variance/Waiver (from Section )
✓Other: FDP Amendment
Detailed description of request: The applicant is requesting an amendment to an existing Final Development Plan for a
Required information:
Assessors Parcel Number: 39.203.01.006 Size of Lot (acres or square footage):-36.42 Acres
Current Zoning: PUD (Jefferson County) Proposed Zoning: PCD
Current Use: Vacant, Abandoned Gravel Pit Proposed Use: Retail/Commercial/Open Space
I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge
and that in filing this application, I am acting with the knowledge and consent of those persons listed above,
without whose consent the requested action cannot lawfully be accomplished. Applicants other than owners
must submit power-of-attorney from owne w 'ch approved of this action on his behalf.
Signature of Applicant
Subscribed and sworn to me this 15th spy of November - „ 20 07
Nofary(Public U
My commission expires ~o7y f/
To be filled out by staff-
Date received
Comp Plan Design.
Related Case No.
Fee $ Receipt No. Case No.
Zoning Quarter Section Map
Pre-App Mtg. Date Case Manager
Submittal Requirements:
Case No.:
App: Last Name:
App: First Name:
Owner: Last Name:
Owner: First Name:
App Address:
City, State Zip:
App:Phone:
Owner Address:
City/State/Zip:
Owner Phone:
Project Address:
Street Name:
City/State, Zip:
Case Disposition:
Z0705
Quarter Section Map No.:
Cabela's Retail, Inc.
Related Cases:
c/o Dennis Armstrong
Case History:
Final Development Plan -
mendment . . .
Cabela's Retail, Inca
One Cabala Dr.
Review Body:
dm.
Sidney, NE 69160
1308-255-2810 ~
- APN:
39.203-01.006
One Cabela Dr.
2nd Review Body:
Sidney, NE 69160
2nd Review Date:
308-254-5505
Decision-making Body:
000
Approval/Denial Date:
Cabela Drive..
Golden, C080401.
Reso/Ordinance No.:
Project Planner: Crane
File Location: ctive
Notes:
Follow-Up:
Conditions of Approval:
District: I
Date Received: 12/1.8/2007
Pre-App Date: I