HomeMy WebLinkAbout6710 W. 36th Placei CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office a (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: X01- I=in61fJin`Q0-F
Job Address: 6 7 7_74 A p1,
Permit Number: 7010 02-6766
❑ No one available for inspection: Time
1010 7 (9km
Re -Inspection required: Yes S
When corrections have been made, call for re -inspection at 303-234-5933
Date: /q/l � Inspector: bor-6,- Ldt.-c j�_
DO NOT REMOVE THIS NOTICE
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office - (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: 3 D 4, - M d
Job Address: !o -71 o w 3/, -U P 1
Permit Number: �? O /,a O a o IF g
d- F 0o4
❑ No one available for inspection: Time AKVff
Re -Inspection required: Yes No
When corrections have been made; call for re -inspection at 303 -234 -
Date: 'd -7 1S' Inspector: 'TM
DO NOT REMOVE THIS NOTICE
FM
7
City of Wheat Ridge
Residential Roofing PERMIT - 201802088 Q�u
PERMIT NO: 201802088 ISSUED: 07/25/2018
JOB ADDRESS: 6710 W 36th P1 EXPIRES: 07/25/2019
JOB DESCRIPTION: Reroof remove and install Owens Corning Laminated Dimensional Asphalt
Shingles with 22 squares.
Pitch 4/12. House.
*** CONTACTS ***
OWNER (303)421-6414 DR
ROBERT SIMON
SUB (303)431-8972 Ken
Penny
019489 Penny Enterprises
*** PARCEL INFO ***
ZONE CODE: UA /
Unassigned
USE: UA / Unassigned
SUBDIVISION CODE: 2405
/ BARTHS, COULEHAN GRANGE,
WHEAT BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
ESTIMATED PROJECT VALUATION: 5,834.00
FEES
Total Valuation
0.00
Use Tax
122.51
Permit Fee
140.90
** TOTAL **
263.41
*** COMMENTS ***
*** CONDITIONS ***
Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be
required for both the midroof and final inspections. The 3rd party inspection report AND
THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat
Ridge. The report MUST BE SIGNED by the Homeowner.
REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec.
R806. The installation of ridge venting requires the installation or existence of soffit
venting. For calculation purposes, one hat or turtle vent equal to one-half of one square
foot of opening.
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name) roof
covering" is required to be on site at the time of final inspection.
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved inconjunction with
this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be
performe-and that all work to be performed is disclosed in this document and/or its' agcomp ! ying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official andmay be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6, The issuance or granting of a permi shall not be construed to be a permit for, or an approval of, any violation of any provision of any
applicable code o�«a�ay ordinance 91pulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
City of Wheat Ridge
Residential Roofing PERMIT -
201802088
PERMIT NO:
201802088
ISSUED:
07/25/2018
JOB ADDRESS:
6710 W 36th P1
EXPIRES:
07/25/2019
JOB DESCRIPTION:
Reroof remove and install Owens Corning Laminated
Dimensional Asphalt
Shingles with 22 squares.
Pitch 4/12. House.
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved inconjunction with
this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be
performe-and that all work to be performed is disclosed in this document and/or its' agcomp ! ying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official andmay be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6, The issuance or granting of a permi shall not be construed to be a permit for, or an approval of, any violation of any provision of any
applicable code o�«a�ay ordinance 91pulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
1141
INSPECTION RECORD
INSPECTION REQUEST LINE: (303) 234-5933
Occu.pan°y/Ty
Inspections will not be performed unless this card is posted on the project site.
Call the inspection request line before 11:59 p.m. to receive an inspection the following business day.**
Inspector Must Sign ALL Spaces pertinent to this project
Foundation Inspections
Date
Inspector Comments
Initials
Pier
Mid -Roof
Final Plumbing
Concrete Encased Ground (CEG)
Final Mechanical
Lath / Wall Tie
Foundation / P.E. Letter
Final Window/Doors
Do Not Pour Concrete Prior To Approval Of The Above Insnections
Underground/Slab Inspections Date Inspector
Initials
Comments
Electrical
Comments
Sewer Service
Floodplain Inspection (if applicable)
Plumbing
Final Electrical
Do Not Cover Underground or Below/In-Slab Work Prior To ADDroval Of The Above Insnpctinnc
Rough Inspections
Date
Inspector
Initials
Comments
Wall Sheathing
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Mid -Roof
Final Plumbing
Final Mechanical
Lath / Wall Tie
Roof
Final Window/Doors
Rough Electric
Final Building
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
Rough Plumbing/Gas Line
Rough Mechanical
Rough Framing
Rough Grading
Insulation
Drywall Screw/ Nail
Final Inspections Date Inspector
Initials
Comments
Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Final Plumbing
Final Mechanical
Roof
Final Window/Doors
Final Building
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
For iow voltage permits — riease oe sure that rough inspections are completed from the Fire District and electrical low voltage
by the Building Division.
"For Inspection Time Window — Please email insptimerequest p@ci.Wheatridge.CO.US by 8:00 A.M. the morning of the
inspection with the property address in the subject line of the email. Time window is based on the inspector's route.
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued
Protect This Card From The Weather
City of Wheat Ridge Lov
Residential Roofing PERMIT - 201701386
PERMIT NO: 201701386 ISSUED: 06/01/2017
JOB ADDRESS: 6710 W 36th AVE EXPIRES: 06/01/2018
JOB DESCRIPTION: Tear off roof material to decking and replace with GAF grand sequia; 1
layer; 4/12 pitch - 25 squares
*** CONTACTS ***
OWNER (303)420-3507 LUNDY RAMONA D
SUB (303)296-0361 Randy Brothers/Cody Hayes 130240 Elite Roofing
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 13,397.18
FEES
Total Valuation 0.00
Use Tax 281.34
Permit Fee 267.70
** TOTAL ** 549.04
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding k/2 -inch exists. Asphalt shingles are required to
be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is
required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturera€Tms installation
instructions, whichever is more stringent. In order to pass a final inspection of
elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer's technical representative stating that "the application of the roof at
(project address) has been applied in accordance with the installation instruction for
(roof material brand name) roof covering" is required to be on site at the time of final
inspection.
FOR OFFICE USE ONLY
City of Date:
9
ha �
gc
:1 91�ii NrTy DEVELOPMENT Plan1B r it # '22 -CA
C , . ,
Building $ Inspection Services Division
7500 W. 29'x` Ave., Wheat Ridge, CO 80033 Plan Review
Office: 303-235-2355 * ex: 303-237-8929
Inspection Line: 303-234-5933
Building ermit Application
Property Owner Mil* `.
4
Mailing dress: ("if different than property address)
Address:
Archi tiEng n ` r E-mail: Phone:
Contractor:
Contractor E-mail Address:
Sulo Contractors.*
Electrical: Plumbing: Mechanical:
W.R. City Lice W.R. City License # WR. City License ##
Other City Licensed Sub, Other City Licensed Sub:
City License ## City License i#
Complete t all information on BOTH sides of this form
amount uT materials to be us , etc.)
Sq. FULF ttu's Gallons
Fps Squares Other