Loading...
HomeMy WebLinkAbout6660 W. 45th Place. , ' City of Wheat Ridge Residential Roofing PERMIT - 201706067 PERMIT NO: 201706067 ISSUED: 08/14/2017 JOB ADDRESS: 6660 W 45th PL EXPIRES: 08/14/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles with ROOF DECKING - 22 sq *** CONTACTS *** OWNER (720)333-3135 BENZIE MICHAEL J SUB (303)761-6400 J. Bretz nla„o *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 10,546.11 FEES Total Valuation 0.00 Use Tax 221.47 Permit Fee 220.15 ** TOTAL ** 441.62 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering” is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. 2o)706067 6 14,0 INSPECTION RECORD INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection INSPECTION REQUEST LINE: (303) 234-5933 do -k— ++P,i win the nniinP fnrm hefore 8 a.m. the day of the inspection Occupancy/Tyne Inspections will not be performed unless this card is posted on the project site. "Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day." Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Inspector Comments Date Initials Pier Concrete Encased Ground (CEG) Mid -Roof Foundation / P.E. Letter Do Not Pour Concrete Prior 10 Approval yr I ne Muwc 11�N�����"J Underground/Slab Inspections Date Inspector CommentsInitials Electrical Mid -Roof Sewer Service Lath / Wall ie Plumbing ■AI --I. o..:.... Y- Ar%r%rr%%ffMI [IT 1 nP AnnVP- IFI_NUCGLILJIIJ uo Not .over unuGr 91 Vul Iu ul L"w" .,,,,-......, Rough Inspections Date Inspector Initials Comments - Wall Sheathing Mid -Roof Lath / Wall ie Rough Electric' Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Inspector Date Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW &Drainage !Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. _...I_4_A c.,,... ++,., Ciro nicfriri nnri PlPrtrlf:Al Inw voltaoe "For Iow voltage permits — riease uc DU a lal I Vuyi 1 I o+ ..•, •---- by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather ® A ® City of Wheat Ridge Residential Roofing PERMIT - 201706067 PERMIT NO: 201706067 ISSUED: 08/14/2017 JOB ADDRESS: 6660 W 45th PL EXPIRES: 08/14/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles with ROOF DECKING - 22 sq *** CONTACTS *** OWNER (720)333-3135 BENZIE MICHAEL J SUB (303)761-6400 J. Bretz 018118 Excel Roofing, Inc. *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 10,546.11 FEES Total Valuation 0.00 Use Tax 221.47 Permit Fee 220.15 ** TOTAL ** 441.62 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. City of Wheat Ridge Residential Roofing PERMIT - 201706067 PERMIT NO: 201706067 ISSUED: 08/14/2017 JOB ADDRESS: 6660 W 45th PL EXPIRES: 08/14/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles with ROOF DECKING - 22 sq I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this ermrt. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be per ed and that a -work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) date 1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. .The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any apphca a or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. a Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dan Schultz 70706067 606 From: no-reply@ci.wheatridge.co.us Sent: Thursday, August 10, 2017 1:55 PM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Dane Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address 6660 W 45tthh PI Property Owner Name Michael Benzie Property Owner Phone 720-333-3135 Number (enter WITH dashes, eg 303-123-4567) 81 Q_gZD L -51Q. H Property Owner Email Address Do you have a signed contract to reroof this property? Applications cannot be submitted without an executed contract attached below. Attach Copy of Executed Contract excel@excelroofing.com Yes 21177 Contract.pdf CONTRACTOR INFORMATION Contractor Business Excel Roofing, Inc Name �L Contractor's License 018118 Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone Number (enter WITH dashes, eg 303-123-4567) Contractor Address (Primary address of your business) 3037616400 4510 S FEDERAL BLVD Contractor Email Address excel@excelroofing.com Retype Contractor Email Address DESCRIPTION OF WORK excel@excelroofing.com TOTAL SQUARES of 22 the entire scope of work: Project Value (contract10546.11 value or cost of ALL materials and labor) Are you re -decking the Yes / roof? { 82 Does the scope of the project include a flat roof (less than 2:12 pitch)? Does the scope of the project include a pitched roof (2:12 or greater pitch)? How many squares are part of the pitched roof? Describe the roofing materials for the pitched roof: Type of material for the pitched roof: Provide any additional detail here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) No Yes 22 Owens Corning Duration Storm Asphalt House 15sq, Garage 5sq , shed 2sq SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work may not begin on this property until a permit has been issued and posted on the property. Yes Yes Yes 83 I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Name of Applicant James Bretz Email not displaying correctly? View it in your browser. 84 Excel Roofing Mike Benzie workbook ExceiRoafng.com We're on Top of It EXCEL ROOFING 4510 S FEDERAL BLVD ENGLEWOOD CO 80110 303.761.6400 Proposal/Contract Date: 7125120.17 Proposal submitted to: Michael Senxie Address: 6650 W 45th P/ Wheat Ridge 80033 Phone # : 7203333135 Email: mbenziel@gmaii.com Job Style: hip We hereby propose to furnish materials and labor necessary for the completion of: I. Installation of the; Owens Corning Duration Storm Limited Life - Class 4 Impact rated asphalt roof systern installed per the manufactures recommendation Initial here: Color: Estate Grey A. Provide Workman's Comp and Liability Insurance. (:Acord Ins 303-762-1717) and Pinnacol ins: B. Obtain building permit from city or county. (cost not included) C. Protide Carbon Monoxide Alarm at start of project. D. Remove all layers of existing roofing, currently has: 1 E. Inspect Roof decking, S 55 per sheet to replace if needed. F. Ensure that all caves and gables have metal drip edge. white G. Install New shingle underlayment(s) that meet or exceed code: Synthetic H. Ensure all HVAC tents arc properly flashed & painted. Install & paint new neoprene flashing on all plumbing vent pipes. I. Install asphalt shingles to manufacturer's recommendations with I V4 inch plvanizcd nails, 6 nails per shingle. J. Attic ventilation: Excel Roofing recommends; K. Install matching ridge shingles. I— Final inspection urith Project Manager at completion of project :and call for final permit inspection. H. Workmanship is guaranteed for Five (5) years. Free transfer to new owner. III, Excel Roofing will clean up, use nail tnagnet and haul all debris at completion of project. III. Excel Roofing will wash the roof at completion of project, ➢ Additional items: Code required ice/water shield costs to be added to below listed roof cost. w Roof cost includes dumpster load, tax, overhead, and profit per USAA claim statement. r Redeck of house not included; additional cost $2,284.50 if needed. > Remove shed skylight, repair decking, cut in and install vent. A Apply to USAA supplement for code required felt on garage and shed and add cost to total. Any and all Unforeseen Code Upgrades, Supplemental items and permit fee will be billed to the insurance company, if It is an insurance claim and the policy allows. Excel Project Manager: Bob Joyce Email: bob@exceimofing.com ExcelRooffng.com Mike Benzie workbook Phone #: 3039051100 Excel Roofing We're on Top of It Pages 1 of 2 Excel Roofing Mike Benzie workbook i:xcelRoofing.com We're on Top of It M Home and Roof Options: Cost for removal and replacement of Roof, Including all labor and materials. $ Replace 186 Feet of 5 inch gutter 24 Feet of D/5 Color: white $ Cost to upgrade to a Limited Lifetime Class 4 impact rated shingle Cost for additional attic ventilation if needed; $ Cost to replace flat roof area with: Color: N/A $ Cost to add 0 inches of blown in insulation on top of the existing attic insulation. $ Cost for any additional items noted on the 1st page of the contract. $ Payment Options: *Please initial next to the payment option of choice* A: Payment using Financing: *Payment plan options, WAC* Amount to be financed $ 12,570.65 *Please note that Excel does not make any additional money on these fees & loar Dealer # 11545 ph # 866-393-0033 12 Month 0% Deferred Interest 60 Months 7.99% interest 120 Months 7.99% interest ($1,047.55) ($254.83) ($152.45) 10,546.11 1,312.99 Free Initials inwalx—____ Initials..,..,.,....,.. 8: Payment Using Credit Card: Cost of Project if paid by credit card. This price reflects the 3% convenience fee $ 12,214.87 Initials C: Payment by cash, check or secured funds = $ 121859.10 Initials plus permit fee Terms: 100% Payment due upon completion of each phase of worts Total Cost does not include City/County Permit fee. According to Colorado law if the services provided are paid through an insurance claim it is illegal for a Contractor to pay the homeowner's deductible in whole or part, also any deposit paid by the Homeowner must be held in trust. The homeowner may cancel this contract at any time prior to construction. if the material has been delivered or the permit has been purchased then the homeowner shall be obligated to pay the delivery and permit costs. The homeowner may also cancel this contract if they are notified that their claim is denied in whole or part. All work to be completed per standard industry practices according to specifications submitted. The homeowner agrees that if any additional work is required to complete the above specifications involving extra cost they will pay these additional charges. All agreements are contingent upon strikes, accidents, or delays beyond our control. Owner agrees to carry regular homeowners insurance. Excel Roofing will not be held liable for any structural movement, settling, cracks in drywall, damage to driveway, or any damage to siding due to the roofing or loading process. Finance charges of 1 Y4 percent per month will be added to any unpaid balance. In the event collection action is taken to recover payment under this agreement, Excel Roofing, Inc., should be entitled to reasonable collection and attorney fees and costs incurred in such action. Excel Roofing's liability insurer is Cincinnati Insurance Company, 62005. Gilmore Road, Fairfield, OH 45014-5141. This proposal may be withdrawn by Excel if not accepted within -7jays. The approximate start date shall be within_60 days of acceptance of this proposal. , Bob Joyce Date: 7/25/2017 Cell Phone # 3.04E+09 Project Manager 303-761-6442 Fax Acceptance ofContr&act The above price, specifications and conditions are satisfactory and are hemby accepted. fitcei Roofing, Inc. is hcn•by authorized to do the work: as spetdfied and payment will be made to Excel Roofing, Inc., as outlined above. Printed Signatu ExcelRocifing.com Mike Benzie workbook Excel Roofing We're on Top of It Pages 2 of 2 A = CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: U�- Permit Number: '7 L, 1-70L, ol, 7 ❑ No one available for inspection: Time A,9/PM Re -Inspection required: Yes When corrections have been made, call for re -inspection at 303-234-5933 Date: �� Inspector: t' DO NOT REMOVE TMIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTIONNO `ICE AUE Inspection Type: 0 "' `, Job Address: Permit Number: 1--0 170 (,�Q ❑ No one available for inspection: Time f % AM/PM Re -Inspection required: Yes (No _. 4 When corrections have been made, call for re -inspection at 303-234-5933 Date: () Inspector:-1�.%Jl` f;f�. 10/20/2015 14:41 303-761-6442 EXCEL ROOFING INC PAGE 02/02 XUB 14t25 FAX 303 231 $929 303 ov*t fty nYDEWLoPk&f pailding Dlvfsfon 7500 W. 29"'Avo., Wheat Ridge, Co 80033 Ofte* 303-235-2866 * Fax: 303-237-8929 InsPectiOn303-234-5033 0 *0 MIMI M. IYr 0 a" vokmoom. Credit Cardfile'layment: U", CrOtrit oate listed o 0 a n . -0tw. Print nme: 04 - Signature: