PRE -APPLICATION MEETING SUMMARY
Meeting Date: June 3, 2010
Applicant: John Garner
Architect
fijis@aol.com
303.321.5651
Michael Haupt
American Auto Sales and Leasing
303.446.8484
Attending Staff: Meredith Reckert — Senior Planner
Sarah Showalter — Planner II
Adam Tietz — Planner
Dave Brossman — Development Review Engineer
Specific Site Location: 4965 Van Gordon Street
Wheat Ridge, CO 80033
Existing Zoning: Light Industrial (1)
Existing Comp. Plan: Mixed Use Commercial
Applicant/Owner Preliminary Proposal:
The applicant is proposing to replace the existing building on site, a warehouse that is
approximately 2,200 SF, with a new building. The new structure would be approximately 80 feet
by 140 feet, measuring approximately 11,200 SF and would be primarily used for the storage of
private vehicles, including recreational vehicles, with a small office/bathroom area. Some of the
vehicles on-site will be repossessed vehicles, but all will be licensed and operable. The applicant is
proposing that the structure have a metal frame with brick veneer, stucco, and metal panels added
to the exterior.
The proposed new building would be located along the northern edge of the property, with a paved
surface parking area to the south. The current proposal leaves the back 60' of the lot (at the
western end of the property) unpaved, with gravel only. The building is oriented so that large
recreational vehicles can pull directly into the structure from Van Gordon, without having to make
a turn on-site, due to their large turning radius. The proposal includes a relocated access point on
Van Gordon, as well as installation of curb, gutter, and sidewalk improvements along the street.
Will a neighborhood meeting need to be held prior to application submittal?
No, a neighborhood meeting will not be required since the only process needed is to apply for a
building permit.
Existing Conditions:
The property is zoned Light Industrial (I), an industrial district that permits the use of previous
Industrial (I) -zoned property for commercial and light industrial uses. The site is located on the
west side of Van Gordon Street, with the I-70 Frontage Road North to the south and W 49`" Place
to the north. The area is just south of the existing BNSF railroad corridor and the future Ward
Road commuter rail station, which will be located approximately at Ward Road and 50`h Ave. The
properties to the north, south, east and west are all zoned industrial — either the I district or a
Planned Industrial District (PID).
The site, which is approximately 43,037 SF, contains an existing 2,200 SF structure. The rest of
the lot is unimproved with gravel surface. There is a small strip of landscaping along the Van
Gordon Street frontage and the property is accessed off of Van Gordon.
Planning comments:
The zoning code requires any portion of a commercial or industrial property that is used for the
circulation or parking of vehicles be paved. This means that the current property, which has several
vehicles parked on gravel, is nonconforming. It also means that any area proposed for vehicle
circulation or parking with the new building and site configuration must be paved with asphalt or
concrete. There area at the back of the lot (to the west) that is not shown as paved in the current
site plan will need to be paved wherever RVs exiting the structure will drive, as well as where any
vehicles may be parked for storage.
2
The code also requires that 20% of the site area is landscaped. Please see Section 26-502.D.3 for
specific landscape requirements, including required street trees along Van Gordon. The required
landscaped elements should be included in a Landscape Plan included with the building permit
application.
Within any industrial district, the zoning code requires that a warehouse use is at least 25% office.
This means that at least 25% of the floor area of the proposed new structures should be office use
(the bathrooms may be counted toward this area).
There are several issues related to the Architectural and Site Design Manual (ASDM). The site is
within the contemporary overlay established in the ASDM, which requires a 0-20' build -to area for
40% of the primary street frontage. This means that at least 40% of the frontage along Van Gordon
Street will need to contain a building somewhere between 0' and 20' from the property line. One
front of
way to meet this build -to might be to add the office/bathroom component to the (east end)
the structure. Please note that it would also help fulfill the transparency requirements described
below to have an office at the front of the building close to Van Gordon Street.
The building must meet the architectural standards in the ASDM for commercial/industrial
buildings. These requirements include:
• Minimum 60% transparency at the ground floor for the facade facing Van Gordon Street.
Transparency is calculated as the percentage of the ground floor elevation as measured
from the finished grade at the base of the wall, to the second level finished floor elevation.
2
Please include transparency calculations as part of the building elevations submitted with
the building permit application.
• Metal panels may only be used as an accent material and may not compose more than 20%
of the fagade. Please include the percent calculation of metal exterior for each fagade on the
building elevations in the building permit drawing set.
Process
The proposed use is allowed under the current I zoning and no land -use application is needed. The
applicant will need to apply for a building permit. The building permit application will include a
site plan, landscape plan, building elevations, and the necessary drainage documents required by
Public Works (see more below). Planning staff will review the application for compliance with the
ASDM as part of the building permit review. Public Works will review the drainage documents as
part of the building permit review.
Public Works comments:
The new paving on-site will require drainage improvements, including detention and water quality.
Please see the requirements from Public Works that were distributed at the meeting, and are also
attached.
Building comments:
Building Department not present at the meeting. Please contact John Schumacher, Chief Building
Official, with any questions related to the building code.
Streetscape / Architectural Design comments:
The Architectural and Site Design Manual does apply to the new structure. Please see the
comments above under "Planning comments."
Attachments: Pre -Application Transmittal Sheet; Public Works Requirements
Phone Numbers
Meredith Reckert — Senior Planner 303-235-2848
Adam Tietz — Planner 303-235-2845
Sarah Showalter — Planner I1 303-235-2849
John Schumacher — Chief Building Official 303-235-2853
Dave Brossman — Development Review Engineer 303-235-2864
3
City of
Wheat RidgePUBLIC WORKS
City of Wheat Ridge Municipal Building 7500 W. 29h Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2861 F: 303.235.2857
June 3, 2010
Pre -Application Meeting
Michael Haupt Storage Facility (4965 Van Gordon St.)
Public Works Requirements:
The site must be brought into compliance with the current City of Wheat Ridge Site Drainage
Requirements during the building project.
2 Copies of the following shall be submitted for review and approval with the Building Permit
Application:
1. Final Drainage Report: A full Final Drainage Report signed and sealed by a
Professional Engineer licensed in the State of Colorado. The Report must describe how
full stormwater flood attenuation detention incorporating water quality measures for the
entire site will be achieved. (Please see the attached Site Drainage Requirements).
2. Grading & Erosion Control Plan: A Grading & Erosion Control Plan signed and sealed
by a Professional Engineer, including specific details for all BMP's to be utilized both
during and subsequent to construction
3. Civil Construction Plans: Construction Plans signed and sealed by a Professional
Engineer licensed in the State of Colorado, shall be required for all public improvements
to be constructed, all drainage -related items such as detention ponds, outlet structures,
drainageways or pans, and the monolithic curb, gutter, and sidewalk to be constructed
along the frontage of Van Gordon Street. Include all applicable City standard details and
a plan and profile with (to -scale) cross-sections to the street crown or centerline for the
public improvements along Van Gordon Street (please see Note 1 below).
4. Easement: A Stormwater Detention easement for the area encompassing the required
detention pond. The easement shall include bearings and Section ties using bearings on
the Current City Datum and must be created by a CO licensed Professional Land
Surveyor.
5. Site Plan: A Site Plan to include the following:
a. 24" X 36" sheet format.
b. A Vicinity Map.
c. A scale and north arrow, date of map preparation, and the name and address of the
firm who prepared the map.
d. Existing and proposed contours at 2-11 intervals.
e. Adjacent street name(s), distance(s) from the property boundary to the existing
Right-of-Way(s), and existing ROW width(s).
f. Location of all existing & proposed easements and rights-of-way, fences, walls,
drainageways, ditches, buildings to be developed or retained on site
i. Location of all existing & proposed easements and rights-of-way, fences,
walls, drainageways, ditches, buildings to be developed or retained on site.
www.c i.w heat ridge.co. us
Public Works Engineering
June 3, 2010
Page 2
NOTES:
I . Information pertaining to the Public Works development requirements, the City's Street
Construction Standards & Details in AutoCAD® DWG format, ROW maps, and City -
base coordinate and land surveying information is available on the City of Wheat Ridge
website at:
www.ci.wheatridee.co.us
2. Application for Minor Grading/Fill Permit: Prior to the commencement of any onsite grading
or construction activities, an application for a Grading/Fill Permit along with the fees due shall
be submitted for review and approval.
3. Drainage Certification: A Drainage Certification shall be required prior to issuance of the
Certificate of Occupancy. The Certification provides evidence the facility was completed per all
approved documents.
4. Operations & Maintenance Manual: An Operations & Maintenance Manual will be required
outlining the detention facility standard maintenance and operations procedures shall be required
prior to issuance of the Certificate of Occupancy.
5. Submittals will not be considered as being under review until all of the above stated submittal
requirements have been received. Incomplete submittals will be returned to the applicant
without being reviewed.
www.ci.wheatridge.co.us
(06-03-10) 4965 Van Gordon (Michael Haupt).doc
4965 Van Gordon Street - Michael Haupt
N
Ror¢ontal Co«dnate System
NAD53M Stare Plane C,,W d Central zone 0502
W
=dDatam RAvoea
E
LEGEND
o n w rao
Feet
-11—GiSc— L.-
Road Centerline
S
CLASS
, s s
vmm�r �eae. ,M..tee Ng—y ..a tmr.a eu..e Awa
us..0-or
City of Wheat Ridge, Colorado
—oO'netlip ioie "unp, —
7500 West 29th Avenue
— twgroonaoeroae.. cey tie«b Waamp°"'°'Dods
Wheat Ridge, CO 80033A001
�s—or tA.RTY_CWREM
ap.cel Rmd Fea"'
303.234.5900
W heat Iudge
DATE: 0!10311010
DISCLAIMER _ NOTICE:
a
This a pctodal rev.,,.,..,• ..,t geogrephic and
demographic.!«mato.RN, -up -
the acnrraty.
rel,%Wdy and authority of Dns mf«matin is salary
requesbu s responfbilily. The City of Wheat Ridge, n
Jefferson Co.,". Colorado - • p0b al subd... n of
Me Stere of Col«ado, has compel d f« ro use I~
—werxed information. This nf«maton is volatile
to..V in idenbfpng general rep of—m only.
The conputwlnd .formation provided should only be
relied upon v dh conob—bon of the methods.
Mumpbons. end results by a quakfied inMpendent
source. The user of this of«matin shallermiy �ndens
hold free the Coy of Wheat Ridge from any and all
iableles. damages, heft end causes of action that
oft as is cnsequnce of her roliat,ae on nformetin
ronaed here..
City of
W heat R4dge
Date: June 3, 2010
City of Wheat Ridge
Pre -Application Transmittal Sheet
Property location: 4695 Van Gordon St
Now that the required pre -application meeting has been held, the next steps in the process
will be:
❑ Schedule a neighborhood meeting
❑ Submit land use application
® Submit building permit application
The following documents are required upon submittal of the Building Permit Application:
®
Pre -application transmittal sheet
® Property deed
❑
Land use application
❑ Letter of request
®
Building permit application
❑ Property owner consent
❑
Full set of civil drawings
® Drainage report
❑
Outline Development Plan
❑ Traffic impact letter
❑
Final Development Plan
❑ Traffic study
❑
Final Plat
❑ Soils report
®
Site Plan
® Grading/erosion control plan
❑
Survey/I.L.C.
❑ Electronic copy of Plat
(In AutoCAD format)
®
Landscape Plan
All of
the listed items must be submitted to constitute a complete application. If any of the
items
are not included in the submittal, the application will be returned without review.
City of Wheat Ridge Community Development Department
7500 W. 29`h Avenue
Wheat Ridge, CO 80033
Building Division - 303.235.2855
Planning Division - 303.235.2846
Inspection line - 303.234.5933
www. ci. wheatridge. co. us
J O' H N G A R N E R
Architect
Interior Design
234 Columbine Street
Suite 201
Denver, Colorado
80206
303 3215664
Fax 3215651
avis budget group
Todd T. Heller Avis Budget Group, Inc.
rket
Territory Performance Manager ABG Locai 4900 S. Coal ge Ave #100
Fort Collins, Colorado 80525
720 635 8403 C
AVIS OPPP-19"'dget- todd.heller@avisbudget.com
Tkia Card Cm& Wm
$200 TPL You!
Bring in a friend or relative along with
this card and as our THANK YOU
we'll give you
$200 cash if we sell
r* , ,-1 ca.-,
/�o feba /,? ; C,,d
303 -7 ��-
J O H N G A R N E R
Architect
Interior Design
234 Columbine Street
Suite 201
Denver, Colorado May 20th 2010
80206
3033215664 City of Wheatridge
Fax 3215651 7500 West 29th Ave.
Wheatridge, CO. 80033-8001
Reference: 4965 Van Gordon Street
The owner of the property, Michael Haupt, is requesting to redevelop
the site for the construction of a new building to store private vehicles.
The existing building will be demolished and a new 80x140 building
would be constructed in its place. The facade will be primarily brick
veneer and stucco with the west and north sides will being metal panels.
We are requesting a front setback along Van Gordon of 50' which
would allow vehicles pulling boats to maneuver into the building
without impeding traffic along Van Gordon.
The site is approximately 148 x 250 feet. The improvements along
Van Gordon would be new curb and gutter with a new entry curb
cut and sidewalk. We will be paving the east and south sides for
parking. The west back lot will remain gravel. New landscaping
will be per city requirements.
4)
N 0 R T H
148'
V A N C O R D O N STREET
fi iROF05ED 51TE FLAN
234 COLUMBINE ST.
DENVER, CO 60200
SURE 201
321-30/4 /m 321-0031
METAL PANELS
W E S T E L E V A T 1 0 N
E A S T E L E V A T 1 0 N
iTUCCO VENEER
BRICK VENEER
S 0 U T H
METAL PANELS
E L E V A T 1 0 N
N 0 R T H E L E V A T 1 0 N
;TUCCO VENEER
BRICK VENEER
234 coLUMSINE sr.
DENVER, co 8
020e
SU(1E 201
321-5e64 fm 321—Ml