Loading...
HomeMy WebLinkAboutAPP-10-26 4965 Van Gordon St.1* , , 1.( W, City Of "�eat ie COMMUNITY DEVELOPMENT PRE -APPLICATION MEETING SUMMARY Meeting Date: June 3, 2010 Applicant: John Garner Architect fijis@aol.com 303.321.5651 Michael Haupt American Auto Sales and Leasing 303.446.8484 Attending Staff: Meredith Reckert — Senior Planner Sarah Showalter — Planner II Adam Tietz — Planner Dave Brossman — Development Review Engineer Specific Site Location: 4965 Van Gordon Street Wheat Ridge, CO 80033 Existing Zoning: Light Industrial (1) Existing Comp. Plan: Mixed Use Commercial Applicant/Owner Preliminary Proposal: The applicant is proposing to replace the existing building on site, a warehouse that is approximately 2,200 SF, with a new building. The new structure would be approximately 80 feet by 140 feet, measuring approximately 11,200 SF and would be primarily used for the storage of private vehicles, including recreational vehicles, with a small office/bathroom area. Some of the vehicles on-site will be repossessed vehicles, but all will be licensed and operable. The applicant is proposing that the structure have a metal frame with brick veneer, stucco, and metal panels added to the exterior. The proposed new building would be located along the northern edge of the property, with a paved surface parking area to the south. The current proposal leaves the back 60' of the lot (at the western end of the property) unpaved, with gravel only. The building is oriented so that large recreational vehicles can pull directly into the structure from Van Gordon, without having to make a turn on-site, due to their large turning radius. The proposal includes a relocated access point on Van Gordon, as well as installation of curb, gutter, and sidewalk improvements along the street. Will a neighborhood meeting need to be held prior to application submittal? No, a neighborhood meeting will not be required since the only process needed is to apply for a building permit. Existing Conditions: The property is zoned Light Industrial (I), an industrial district that permits the use of previous Industrial (I) -zoned property for commercial and light industrial uses. The site is located on the west side of Van Gordon Street, with the I-70 Frontage Road North to the south and W 49`" Place to the north. The area is just south of the existing BNSF railroad corridor and the future Ward Road commuter rail station, which will be located approximately at Ward Road and 50`h Ave. The properties to the north, south, east and west are all zoned industrial — either the I district or a Planned Industrial District (PID). The site, which is approximately 43,037 SF, contains an existing 2,200 SF structure. The rest of the lot is unimproved with gravel surface. There is a small strip of landscaping along the Van Gordon Street frontage and the property is accessed off of Van Gordon. Planning comments: The zoning code requires any portion of a commercial or industrial property that is used for the circulation or parking of vehicles be paved. This means that the current property, which has several vehicles parked on gravel, is nonconforming. It also means that any area proposed for vehicle circulation or parking with the new building and site configuration must be paved with asphalt or concrete. There area at the back of the lot (to the west) that is not shown as paved in the current site plan will need to be paved wherever RVs exiting the structure will drive, as well as where any vehicles may be parked for storage. 2 The code also requires that 20% of the site area is landscaped. Please see Section 26-502.D.3 for specific landscape requirements, including required street trees along Van Gordon. The required landscaped elements should be included in a Landscape Plan included with the building permit application. Within any industrial district, the zoning code requires that a warehouse use is at least 25% office. This means that at least 25% of the floor area of the proposed new structures should be office use (the bathrooms may be counted toward this area). There are several issues related to the Architectural and Site Design Manual (ASDM). The site is within the contemporary overlay established in the ASDM, which requires a 0-20' build -to area for 40% of the primary street frontage. This means that at least 40% of the frontage along Van Gordon Street will need to contain a building somewhere between 0' and 20' from the property line. One front of way to meet this build -to might be to add the office/bathroom component to the (east end) the structure. Please note that it would also help fulfill the transparency requirements described below to have an office at the front of the building close to Van Gordon Street. The building must meet the architectural standards in the ASDM for commercial/industrial buildings. These requirements include: • Minimum 60% transparency at the ground floor for the facade facing Van Gordon Street. Transparency is calculated as the percentage of the ground floor elevation as measured from the finished grade at the base of the wall, to the second level finished floor elevation. 2 Please include transparency calculations as part of the building elevations submitted with the building permit application. • Metal panels may only be used as an accent material and may not compose more than 20% of the fagade. Please include the percent calculation of metal exterior for each fagade on the building elevations in the building permit drawing set. Process The proposed use is allowed under the current I zoning and no land -use application is needed. The applicant will need to apply for a building permit. The building permit application will include a site plan, landscape plan, building elevations, and the necessary drainage documents required by Public Works (see more below). Planning staff will review the application for compliance with the ASDM as part of the building permit review. Public Works will review the drainage documents as part of the building permit review. Public Works comments: The new paving on-site will require drainage improvements, including detention and water quality. Please see the requirements from Public Works that were distributed at the meeting, and are also attached. Building comments: Building Department not present at the meeting. Please contact John Schumacher, Chief Building Official, with any questions related to the building code. Streetscape / Architectural Design comments: The Architectural and Site Design Manual does apply to the new structure. Please see the comments above under "Planning comments." Attachments: Pre -Application Transmittal Sheet; Public Works Requirements Phone Numbers Meredith Reckert — Senior Planner 303-235-2848 Adam Tietz — Planner 303-235-2845 Sarah Showalter — Planner I1 303-235-2849 John Schumacher — Chief Building Official 303-235-2853 Dave Brossman — Development Review Engineer 303-235-2864 3 City of Wheat RidgePUBLIC WORKS City of Wheat Ridge Municipal Building 7500 W. 29h Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2861 F: 303.235.2857 June 3, 2010 Pre -Application Meeting Michael Haupt Storage Facility (4965 Van Gordon St.) Public Works Requirements: The site must be brought into compliance with the current City of Wheat Ridge Site Drainage Requirements during the building project. 2 Copies of the following shall be submitted for review and approval with the Building Permit Application: 1. Final Drainage Report: A full Final Drainage Report signed and sealed by a Professional Engineer licensed in the State of Colorado. The Report must describe how full stormwater flood attenuation detention incorporating water quality measures for the entire site will be achieved. (Please see the attached Site Drainage Requirements). 2. Grading & Erosion Control Plan: A Grading & Erosion Control Plan signed and sealed by a Professional Engineer, including specific details for all BMP's to be utilized both during and subsequent to construction 3. Civil Construction Plans: Construction Plans signed and sealed by a Professional Engineer licensed in the State of Colorado, shall be required for all public improvements to be constructed, all drainage -related items such as detention ponds, outlet structures, drainageways or pans, and the monolithic curb, gutter, and sidewalk to be constructed along the frontage of Van Gordon Street. Include all applicable City standard details and a plan and profile with (to -scale) cross-sections to the street crown or centerline for the public improvements along Van Gordon Street (please see Note 1 below). 4. Easement: A Stormwater Detention easement for the area encompassing the required detention pond. The easement shall include bearings and Section ties using bearings on the Current City Datum and must be created by a CO licensed Professional Land Surveyor. 5. Site Plan: A Site Plan to include the following: a. 24" X 36" sheet format. b. A Vicinity Map. c. A scale and north arrow, date of map preparation, and the name and address of the firm who prepared the map. d. Existing and proposed contours at 2-11 intervals. e. Adjacent street name(s), distance(s) from the property boundary to the existing Right-of-Way(s), and existing ROW width(s). f. Location of all existing & proposed easements and rights-of-way, fences, walls, drainageways, ditches, buildings to be developed or retained on site i. Location of all existing & proposed easements and rights-of-way, fences, walls, drainageways, ditches, buildings to be developed or retained on site. www.c i.w heat ridge.co. us Public Works Engineering June 3, 2010 Page 2 NOTES: I . Information pertaining to the Public Works development requirements, the City's Street Construction Standards & Details in AutoCAD® DWG format, ROW maps, and City - base coordinate and land surveying information is available on the City of Wheat Ridge website at: www.ci.wheatridee.co.us 2. Application for Minor Grading/Fill Permit: Prior to the commencement of any onsite grading or construction activities, an application for a Grading/Fill Permit along with the fees due shall be submitted for review and approval. 3. Drainage Certification: A Drainage Certification shall be required prior to issuance of the Certificate of Occupancy. The Certification provides evidence the facility was completed per all approved documents. 4. Operations & Maintenance Manual: An Operations & Maintenance Manual will be required outlining the detention facility standard maintenance and operations procedures shall be required prior to issuance of the Certificate of Occupancy. 5. Submittals will not be considered as being under review until all of the above stated submittal requirements have been received. Incomplete submittals will be returned to the applicant without being reviewed. www.ci.wheatridge.co.us (06-03-10) 4965 Van Gordon (Michael Haupt).doc 4965 Van Gordon Street - Michael Haupt N Ror¢ontal Co«dnate System NAD53M Stare Plane C,,W d Central zone 0502 W =dDatam RAvoea E LEGEND o n w rao Feet -11—GiSc— L.- Road Centerline S CLASS , s s vmm�r �eae. ,M..tee Ng—y ..a tmr.a eu..e Awa us..0-or City of Wheat Ridge, Colorado —oO'netlip ioie "unp, — 7500 West 29th Avenue — twgroonaoeroae.. cey tie«b Waamp°"'°'Dods Wheat Ridge, CO 80033A001 �s—or tA.RTY_CWREM ap.cel Rmd Fea"' 303.234.5900 W heat Iudge DATE: 0!10311010 DISCLAIMER _ NOTICE: a This a pctodal rev.,,.,..,• ..,t geogrephic and demographic.!«mato.RN, -up - the acnrraty. rel,%Wdy and authority of Dns mf«matin is salary requesbu s responfbilily. The City of Wheat Ridge, n Jefferson Co.,". Colorado - • p0b al subd... n of Me Stere of Col«ado, has compel d f« ro use I~ —werxed information. This nf«maton is volatile to..V in idenbfpng general rep of—m only. The conputwlnd .formation provided should only be relied upon v dh conob—bon of the methods. Mumpbons. end results by a quakfied inMpendent source. The user of this of«matin shallermiy �ndens hold free the Coy of Wheat Ridge from any and all iableles. damages, heft end causes of action that oft as is cnsequnce of her roliat,ae on nformetin ronaed here.. City of W heat R4dge Date: June 3, 2010 City of Wheat Ridge Pre -Application Transmittal Sheet Property location: 4695 Van Gordon St Now that the required pre -application meeting has been held, the next steps in the process will be: ❑ Schedule a neighborhood meeting ❑ Submit land use application ® Submit building permit application The following documents are required upon submittal of the Building Permit Application: ® Pre -application transmittal sheet ® Property deed ❑ Land use application ❑ Letter of request ® Building permit application ❑ Property owner consent ❑ Full set of civil drawings ® Drainage report ❑ Outline Development Plan ❑ Traffic impact letter ❑ Final Development Plan ❑ Traffic study ❑ Final Plat ❑ Soils report ® Site Plan ® Grading/erosion control plan ❑ Survey/I.L.C. ❑ Electronic copy of Plat (In AutoCAD format) ® Landscape Plan All of the listed items must be submitted to constitute a complete application. If any of the items are not included in the submittal, the application will be returned without review. City of Wheat Ridge Community Development Department 7500 W. 29`h Avenue Wheat Ridge, CO 80033 Building Division - 303.235.2855 Planning Division - 303.235.2846 Inspection line - 303.234.5933 www. ci. wheatridge. co. us J O' H N G A R N E R Architect Interior Design 234 Columbine Street Suite 201 Denver, Colorado 80206 303 3215664 Fax 3215651 avis budget group Todd T. Heller Avis Budget Group, Inc. rket Territory Performance Manager ABG Locai 4900 S. Coal ge Ave #100 Fort Collins, Colorado 80525 720 635 8403 C AVIS OPPP-19"'dget- todd.heller@avisbudget.com Tkia Card Cm& Wm $200 TPL You! Bring in a friend or relative along with this card and as our THANK YOU we'll give you $200 cash if we sell r* , ,-1 ca.-, /�o feba /,? ; C,,d 303 -7 ��- J O H N G A R N E R Architect Interior Design 234 Columbine Street Suite 201 Denver, Colorado May 20th 2010 80206 3033215664 City of Wheatridge Fax 3215651 7500 West 29th Ave. Wheatridge, CO. 80033-8001 Reference: 4965 Van Gordon Street The owner of the property, Michael Haupt, is requesting to redevelop the site for the construction of a new building to store private vehicles. The existing building will be demolished and a new 80x140 building would be constructed in its place. The facade will be primarily brick veneer and stucco with the west and north sides will being metal panels. We are requesting a front setback along Van Gordon of 50' which would allow vehicles pulling boats to maneuver into the building without impeding traffic along Van Gordon. The site is approximately 148 x 250 feet. The improvements along Van Gordon would be new curb and gutter with a new entry curb cut and sidewalk. We will be paving the east and south sides for parking. The west back lot will remain gravel. New landscaping will be per city requirements. 4) N 0 R T H 148' V A N C O R D O N STREET fi iROF05ED 51TE FLAN 234 COLUMBINE ST. DENVER, CO 60200 SURE 201 321-30/4 /m 321-0031 METAL PANELS W E S T E L E V A T 1 0 N E A S T E L E V A T 1 0 N iTUCCO VENEER BRICK VENEER S 0 U T H METAL PANELS E L E V A T 1 0 N N 0 R T H E L E V A T 1 0 N ;TUCCO VENEER BRICK VENEER 234 coLUMSINE sr. DENVER, co 8 020e SU(1E 201 321-5e64 fm 321—Ml