Loading...
HomeMy WebLinkAboutStudy Session Agenda Packet 05-16-16STUDY SESSION AGENDA CITY COUNCIL CITY OF WHEAT RIDGE, COLORADO 7500 W. 29th Ave. Wheat Ridge CO May 16. 2016 6:30 p.m. Individuals with disabilities are encouraged to participate in all public meetings sponsored by the City of Wheat Ridge. Call Maureen Harper, Public Information Officer at 303-235-2877at least one week in advance of a meeting if you are interested in participating and need inclusion assistance. Citizen Comment on Agenda Items .L Staff Reports 2. Jeffco Schools Facility Master Plan (FMP) Presentation 3. 381h Avenue Streetscape Discussion 4. Elected Officials' Report(s) ADJOURNMENT -. ~A# ... , " City of • ~Wheat&_dge ~ 0mCE OFTiiE CJ1Y MANAGER Memorandum TO: Mayor and City Council FROM: Patrick Goff, City Manager DATE: May 12111 (for May 16, 2016 Study Session) SUBJECT: Jeffco Schools Facility Master Pl an (FMP) Presentation Representatives from the Jeffco Public Schools District wi ll be attending the May l 61h Study Session to present information on the Facili ty Master Plan (FMP) for Jeffco Schools. Please see the attachments included with this memorandum for additional information. A FMP public presentation is schedul ed for June g•h from 6 to 8 p.m. in the Wheat Ridge High School Auditorium. Please see Attachment I for additional information. If you have questions prior to the presentation, please feel free to let me know. ATTACHMENTS: I. Facility Master Plan Public meeting dates 2. Facility Master Plan PowerPoint Presentation from April 21, 2016 Board of Education Meeting 3. Facility Master Plan Document dated April 21, 2016 Attachment 1 , . . " . . . . . M ' .. ' •, , '< , ' 1 i ' : •" I , ' ' .)• ., . '... . . . . . ' '----' . , ' , • ; . l. •,, , c, , , I J • , '' ; ; ' ', , : • ) • • ' • l. Cll 4 0 0 ~~ u ~J (/) Attachment 2 t:lO c ·~ Q) Q) ~ c 0 This Evening's Desired Outcomes • We will gain an understanding of Jeffco's facilities master plan {FMP) • Why we need a comprehensive plan to address our needs • How the plan was developed • When {and under what conditions) the plan will be implemented • Secure your support for gathering community input on the plan and direction on additional information. • Documents available as support information to this presentation: • 2015-16 Facility Condition Assessment Summary of Findings • 2016 District-Wide Facilities Master Plan ~ ' • 's .I .I I : '' • '' ._' J 'J ", ' ' • t-' ' I("' j 4 ~ \) ' '·. J I • : '1 ; . ' ) ~ . ) . . . IL •• 'J ' ' • ·, . . . '. • . j • I i. N") ,H1; ·li''".11 H! 1l" i'' 'J ·"'U \..--! GJ > .., .... -c .... GJ .c "' • GJ GJ GJ c ra I.. c .c .c :::J :::J GJ .., ~ "' .., GJ ra .., :::J • u. I.. > • 'I c ra -c .., GJ .c "' c 0 c .c 0 ra • GJ .., E I.. GJ I.. -c 0 u "' I.. 'I • -:::J .c -c GJ u 0 I.. c. ... "' ... 0 0 GJ ~ .c I.. In order for students to pursue their life goals, by2020 all Jeffco graduates~ "'3 4) ( will be able to successfully apply the following competencies: JEFFCO 2020 Vision Content Mastery Civic & Global Engagement I Communication Critical Thinking & Creativity I Self-Direction & Personal Responsibility J effco School's Current Reality Our School District is over 60 years old and our Educational Programming Needs have Changed Significantly ... Student Learning & Enrichment School Infrastructure & Design • More pathways (STEM, Career, Technical Education, Problem Based Learning, etc.) • Pre-school and elementary enrichment programs • Academic, Social, and Emotional Interventions and Supports • Enhanced safety and security measures and staffing • Behavioral supports • Federal and State regulations • Changes in student population density and transportation • Technology infrastructure to support learning & operations • Ensuring accommodations for physically disabled community members How did we get here? • Jeffco is a ''neighborhood'' school district. I Denver JI 90,234 JI 199 JI 453 ][ $7,612 I --.. !f I I Jeff co 86,708 154 563 $7,126 I .J .. Ii I [Douglas ][ 66,896 II 89 r 751 II $7,050 I l :1 ·-,, . I I $7,265 I IC. Creek I 54,695 61 I 896 I I I 1· ,I II II l Boulder 31,247 .J 56 557 II $7,234 I - -·-. Littleton 15,780 26 606 $7,040 How did we get here? Comparisons per pupil PPR, MLO and Bond District Denver Jeff co I 1 I Douglas r • C. Creek I 1 Boulder I ' I ' Littleton : II II ii #Students State Per Pupil Funding 15/16 Mill Levy Override per pupil 15/16 Outstanding bonds per pupil 14/15 90,234 11 $7,612 11 $1,608 11 $16,429 86,708 $7,126 ,i $1,307 ' $5,160 (2"d) I (4th) (Sth) (6th) :1 I I. II II 66,896 II $7,050 $504 II $5,839 .. 1· • II 54,695 I! $7,265 :1 $1,547 ,: $9,060 'I I $2,125 JI $18,374 I _ I _ 31,-247 II ~7,234 II ., . 15,780 $7,040 'l $1,825 ~'. $8,336 C"· cu ~ cu ...r:: ~ cu 0.0 cu ~ "d ........ "d ~ 0 ::c: 'j r--'\ Jt l? l <) J 'F) J 0 j )', J cl l lJl; ) J I Al• i L l; l 1 )[' •) ~ l 'n ! 'd ·'--<1 'S!c:~lD'llS ~·10 JDj )t:J1,,,.c),,.'\,J j ~l,;1,Jn',l I \'>at; 00 -0 0 ..c u V) ·led tl;J MJJd 0) ', il'•l) J"Q '----.J 0 0 c en N " '#. ~ " '#. en en M 00 N c "' 0 CIJ CIJ ·-.., -t20 ..c ta N ta "' ·-._ .., -CIJ ._ ·-.., ~ 0 ::::> ~ CIJ "' :J c ·- J effco Schools Facilities Age Building Age by Age Bracket Average Year Built 1978 ... QI QI u.. QI ... Ill :J "' Ill ii ... 0 ~ 5,000,000 4,500,000 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 -I Pre 1928 1928-1947 1948 -1967 1968 -1987 Square Feet I 13,388 195,144 4,311,473 3,974,855 69% of Jeffco's square footage is ... Campus Average Age 1976 1988 -1997 1998 -2007 2008 -2014 1,664,601 1,874,499 25,300 29 to 68 years of age Current Real Estate Portfolio • • • • • • • • • • 12 Million Square Feet of Facilities 3,100 Acres of Land 169 Campuses with 384 Permanent Buildings, 333 Modular Buildings, 12 Cottage Buildings Average Age 40 years; Median Age 44 years 39% of District Buildings Constructed Prior to 1967, 71% before 1988. Replacement Value of Improvements $2.7 Billion Total Value of Deficiencies $520 Million Building Condition Related $ 396.6 Million Educational Adequacy Related $ 123.4 Million Average Facility Condition Index 20 4 I FACILITY CONDITION IN.DEX • Leu than SS I Best I 6~ to 10~ Good • Building Utilization 81% I IX to 20X Averaie 21 X to 30~ BeJow Averaie 31X to SOX Poor SI X to 6SX Very Poor Greater than 65% Replacement undJdue CJ ~ .~ '-'' c () u '+- ..J r:; ~ ~ <./) Vl ~-.._ ::J ::J 0 0 .._ .._ 0 0 4--...__ .__, ~ C,J c c _c c.; G .__, r [ t:: G c r ·-c 0 0 > L .._ 0 > > '--r c_ ~ ~-c Cl!) t:J.IJ -c c V) -r ''-' ., ;, r:; 0 ::; CJ \..'.) ~ f- L --"" :;; 0 CJ ::J cc cc ( 10 J ' r-"\ ,,:1 :() ~··) 1 ); ,,j '"4l, iJ i, ;;\• 11 ll'd~ .. 1·'~· ) ,.,~ i•1·1'r ,,,., 1 • '4 • '!.... ~ ~ \ ~J, ~.,,, 1 •) l ' J lt .•J ll••, j,• \, • 1,, <•.Jt',j I, !(' ~ .1,,. ··~) r\ ,.r: !): ... , 1:· ir) ~·lo '----' ~ I c c I 0 ·-0 -c -·---·-:E C"-· Ln CJ) \0 ~ N CJ) ii). ·-0 : :E -c ·-GI -I -00 ..., ·-:E • ta ~ 1 M ~ en N M GI en z ii). c ii). := ,.c: ~ CJ) 00 -c CJ) GI ~ .... ns ~ ~ GI ·~ c ~ c c 0 0 c ·-·---0 ---c ·-·-·-:E :E GI --..., ·-00 Ln ta :E • • ~ Ln 00 en M ' M GI M ii). i ii). c ii). ,_ I ~ 00 0 en I I en I ~ 00 N en 0 0 t--1 ::c: en t-1 en 0 0 0 t-1 N N N I 19 I ; <(~ ·~ ' \. ~ ,, " • • I " I \. II. " N ' 1: I ' • ~ "'-'\ \.., ' C"-· ' ' ' ' CJ) ' ~ i ' : CJ) ~ ' 1 ' ,..t:: • ! ' l \.., • ~ ~ ' • u ,, I • CJ) i ' i II. ' 00 i « I i ' ! ... ' CJ) .. ' ~ ""\ ' ' "tj ~~ I ~ ........ "tj ' J1 ~ .. i ' f ... ~~ ~ ~ ~ ' J I ~~ ~ 0 1 I ~ ~I 8 ., ~ .. "' ::c I ! l I I s " I .,: ., I ., :; ., 11~11\jrl\()I' _ , ~ H"• 'J t+l.J.JuL.",.;1:l~.~):.•L:c..t'tl L l Lj l ' " I u ' ' I) i' ; c; j ,, l I , • I l I ' •• j • I I ) • ._. ' ' ' CV') 1 t • \, J • ..._, l >.o J, 1 ! I i ',, )'t, t--1 ' 1 ~ t) ~I I 1\ () ' ~: \ j ; \ ')' i _) I ' 1 () "' :::s I.. .... I.. .... :::s • I.. GJ GJ 0 0 -c I.. 'I bO :::s • GJ "' c ..... c E • :::s 0 ~ 'I • u ra c ..... "' 0 E ~ • ..... --0 -- FMP History • Facility Master Plan last done/presented January of 2011. • A comprehensive, long term FMP is essential to the Jeffco tradition of excellence. • Multiple presentations to the Board of Education on December 17, January 14 and January 28 regarding urgent needs and long-term issues. • On January 28 the Board of Education directed COO and Facilities Staff to draft a new Facility Master Plan. FMP Process/Timeline • BOE Establishes Guidelines ./Develop Set of Parameters to Establish Planning Criteria ./Consistent Application of Rules • Staff Defines & Recommends Goals ./Optimal Use of our Existing Facilities ./Balance Articulation Areas ./Right Sizing Square Footage Portfolio ./Equitable Distribution Center Programs ./Financing Approach and Schedule • Internal I External Review ./Cabinet, Capital Asset Advisory Committee, Financial Oversight Committee ~Board of Education, Public Presentations ' • Q) "' ~ c 0 0 ·-... :::s ~ -0 en ~ "' CD ~ ·-... ·-Q) -·-u a cu u.. Q) CD ~ ~ ~ ~ C/l Q) .,..... ~ .,..... I • .,..... u ~ ~ FMP Key Points • The plan will be phased in over time beginning in 2017-18 • The plan does not expect to create a reduction in force • Administrative attrition • Teaching vacancies annually • Learning support professionals shortages • Community Forums for parent voice • We need to hear from our communities and thus have created 12 opportunities in the next 8 weeks to gather this insight • To ensure consistent information and gathering of insight, please do not conduct or host local meetings at this time, instead, strongly encourage your parents to attend the community meetings. • Remember the plan is interdependent & it is vital not to focus on one aspect in isolation. • The plan, if fully implemented, can significantly enhance the efficient use of general fund dollars to significantly improve student learning and teaching conditions. Jeffco Schools Facilities Focus Our Goal is to provide the Best Learning Environment for our Students, and the Best Teaching Environment for our Staff JEFFCO 2020 Vision Cot·l'!n". MUt"')I Ow: & Globa Eoga~ I ~­ Cr;tCaJ Tlri"'O & CteetMty I ~l·tlotec!IO"&~~~:y <;I' l~fcfcS2 Building Bright Futurr.s . . . . . :. ,,. en , '.· , , .. , .. . . , 'r"""'I . . . . ) . . . '. l ' • ~ ' ·, .·,'.';· . . '· ') '---.-) .. ' . . . '. . . . . , . I \ District Wide Facility Master Plan Addresses the Following: 1) Enrollment Trends on Articulation Areas, School Boundaries, & Individual Schools 2) Efficient Utilization of Buildings 3) Facilities Equity Between Schools and Compliance with District Educational Specifications 4) Deferred Maintenance Needs 5) Need for New Buildings, Additions, Renovations, Consolidations, Closures, Ancillary Facilities Key Terms Boundary Changes Closure Consolidation Grade Reconfiguration Program Offeriog Scheduling Changes Refers to changing the identified school to serve the student population in a neighborhood. Closing a school and moving students into a newly identified school to serve the neighborhood students attending the closed school. Relocate students into an adjacent/nearby existing school or consolidate two existing schools into a new single school; will require boundary changes. Changing the grades served in a given school. For example, moving from a 7-8 middle school to a 6-8 middle school. Generic term referring to the grades, courses, pathways, etc. offered in a facility. Adjustments to the school day and school year to increase the volume of students served in a facility. For example, split sessions: half of the student body attends an A.M. session and the other half attends a P.M. session . 1) FMP Recognizes Enrollment Trends (Growth & Decline) • Reasons for Growth/Decline • Long or Short Term • Demographic, Socio-Economic • Program Offerings • Means to Address Population Density Changes • New Buildings • Additions/Renovations/Modulars • Consolidations/Closures • Grade Reconfiguration • Boundary Adjustments • School Scheduling Changes • Growth due to Programs/Athletics/Activities • Career and Tech Ed Programs/Pre-School/Special Needs • School/Community Athletic Resources 2) FMP Maximizes Efficiencies • Educational • Administrative Staff Operational Cost Reductions • Program Change Opportunities • Grade Reconfiguration to Increase Enrollment at Underutilized Facilities • Decrease Enrollment at Over-Enrolled Facilities • Facilities • Maintenance, Operations, Utility Cost Reductions • Reduction in Priority Deferred Maintenance • Energy and Water Savings • Transportation • School Locations Effect upon Transportation Services • Boundary Changes and Community Impact 3) FMP Reviewed Program Equity & Past Promises • Program Equity issues: • Auxiliary Gymnasiums in High Schools • Artificial Turf Fields High Schools • Review Projects Proposed in 2008 • 3 High Schools • 1 Middle School • 1 Elementary School • 2 Option Schools • Develop Facility Master Plans • 3 High Schools • Career & Tech Ed Facility 4) FMP Addresses Deferred Maintenance Needs • Assessment and Evaluation of Priority Needs • High FCI Buildings • End of Life-Cycle; Repair, Replace • Address Higher Priority Deficiencies • Educational Adequacy • Exterior Envelope • Site, Parking, Underground Utilities • Interior Finishes-Carpet & Paint, Lighting, Cabinetry • HVAC, Plumbing and Electrical Upgrades. • Building Technology • Safety and Security Upgrades • Secure Vestibules • Door Hardware • Security System/Video Monitoring 5) FMP Identifies New Square Footage Needs • Recommendations for Additions, Major Renovations & Reconstruction/Replacement • Cost Benefit Analysis • Determine Location, Size, Develop Timeline, Budget Projections • Ancillary & Support Facilities • Stadiums & Fields Renovation/New • Transportation Terminals and Maintenance Shop Locations Our Goal is to provide the Best Learning Environment for our Students, and the Best Teaching Environment for our Staff JEFF CO 2020 Vision eon1en1 Mnte<y I CMa & C1otM11 ~ I eommunic.11on Cnticol Thtnlnt'!Q & Cree1Mty ScfH)l<ection t. Pe-soool ReeponslbolltY ~ !J?Lfcfc~2 Building Brighi Futures The following provides an overview of the recommendations contained within the FMP FACILITIES MASTER PLAN DETAILS Vl ~ OJ > ....... ~ 0 ~ ~ ~ ~ ~ 0 ~ Vl " 0 u t I e t I 4 OJ • ' District Wide Facility Master Plan Addresses the Following: 1) Enrollment Trends on Articulation Areas, School Boundaries, & Individual Schools 2) Efficient Utilization of Buildings 3) Facilities Equity Between Schools and Compliance with District Educational Specifications 4) Deferred Maintenance Needs S) Need for New Buildings, Additions, Renovations, Consolidations, Closures, Ancillary Facilities FMP Timeline District Wide Facility Master Plan Phase I Implementation Time line Task Boundary Changes Matriculation Changes Grade Reconfiguration (K-5, 6-8) Additions Consolidations & Closures Replacements Program Equity Past Promises Deferred Maintenance No Capital Program 2017-18 School I Year Year One Phase I Capital Improvement Program Year I Year I Year Two Three Four Year Five I I I I I -r ~~ J Year Six j Minimal Capital Investment (a) Current Capital Program: • Candelas Site K-8 project (Opening fall of 2017) • Sierra Phase II project (Opening fall of 2017) • Rose Stein Renovation (Opening fall of 2017) • Deferred Maintenance Program District-wide Minimal Capital Investment (b) Minimal Capital Investment-Start Fall of 2017 • Grade Reconfiguration • Conversion of 4 Articulation Areas to K-5 Elementary & 6-8 Middle Schools • 15 Elementary School Boundary Changes • 2 Elementary School Matriculation Changes • Modular Building Disposition • Close and/or Remove 62 Modular Buildings • Benefits • ($280,000) Annual Maintenance & Operations Savings from Modulars • Estimated Costs • $600,000 Estimated Added Administrative Expense due to 6-8 Change • $1,000,000 One-Time Expense Demolition/Closure of Modulars Minimal Capital Investment (b) Recorrimendation Details Reconfigurations by Articulation (K-5, 6-8) •Arvada •Bear Creek • Chatfield • Standley Lake •Alameda •Bear Creek • Chatfield •Columbine • Dakota Ridge Capital Investment Program ( c) Successful Capital Bond • Multiple Year Implementation • Grade Reconfiguration • Conversion of 7 Articulation Areas to K-5 Elementary & 6-8 Middle Schools • Five Additions to 7-8 Middle Schools Converting them to 6-8 and Reconfiguring Fifty K-6 to K-5 Elementary Schools in Five Articulation Areas • Benefits • Build Capacity in Elementary Schools in High Growth Areas • Increased Utilization of Middle Schools • Additions Require Less Capital Investment than New Facilities • Reduce Deferred Maintenance Expen se At Buildings with Additions • Add PreK Capacity at Elementary Schools • Estimated Costs I (Savings) • $45,750,000 Capital Expense for Five Additions • $750,000 Added Administrative Expense due to 6-8 Change. Capital Investment Program ( c) Details Reconfigurations by Articulation • Arvada West •Arvada •Golden • Green Mountain •Lakewood • Ralston Valley • Wheat Ridge Middle School Additions • Bell • Creighton • Dunstan • Drake •Oberon Capital Investment Program ( d) Successful Capital Bond • Multiple Year Implementation • Consolidations & Replacements • Consolidate 10 Under-Utilized High FCI Elementary Schools into Five New Buildings • Conversion of 1 Articulation Areas to K-5 Elementary & 6-8 Middle Schools • Replace Two Elementary with New Buildings • Two Elementary School Closures • Benefits • Creates a Modern Learning Environment, Better Educational Model, Better Facility Utilization • Reduces Maintenance, Operations & Utility Costs • Reduces Deferred Maintenance & Deficiencies • $1,400,000 Annual Savings in Maintenance & Operations Expenses • $3,150,000 Annual Savings in Educational Administrative Expense • $52,580,000 Reduction in Deferred Maintenance • Estimated Costs • $172,800,000 Capital Expense for Seven Elementary Schools Capital Investment Program ( d) Details • Allendale- Campbell I • K-Lakes-11 Patterson :I • Parr-Little •Prospect Valley- Kullerstrand ii • Vivian-Stober • Green Gables • Marshdale I • Jefferson HS ii Reconfigurations by Articulation (K-5, 6-8) ~I •Pomona • Glennon Heights • Pleasant View Capital Investment Program ( e) Successful Capital Bond • Multiple Year Implementation • Elementary & Middle School Additions & Renovations • Additions to 20 Facilities resulting in 118 New Classrooms Deferring the Need for New Buildings. • Benefits • Better Learning Environment, Educational Model and Utilization • Estimated Costs • $108,300,000 Capital Expense for Nineteen Elementary & Middle Schools • $760,000 Increase in Maintenance & Operations Expenses • Program Equity • High School Sites -7 Auxiliary Gym Additions; 10 Artificial Turf Fields • Benefits • Ability to Better Schedule Student Activities; Less "Wear & Tear" on Fields • Estimated Costs • $34,000,000 Capital Expense Capital Investment Program ( e) Details Additions & Renovations •Bell MS •Belmar ES • Candelas K-8 • Creighton MS • Drake MS •Dunstan MS • Eiber ES • Edgewater ES • Evergreen MS • Foster ES • Green Mtn ES ·1 I !1 1: I Additions & Renovations 1 • Kyffin ES • Lumberg ES • Maple Grove ES • Molholm ES • Mount Carbon ES I •Oberon MS • Powderhorn ES I I • Ralston Valley HS •Wilmot ES i I High School Equity Improvements •Arvada • Chatfield •Columbine •Conifer • D'Evelyn • Dakota Ridge •Green Mtn •Jefferson •Pomona • Ralston Valley I • Standley Lake Capital Investment Program (f) Capital Program • Multiple Year Implementation • Ancillary Facilities • New Stadium Complex • Renovate & Expand Existing Stadia Facilities • Benefits • Ability to Better Schedule Student Activities; Less "Wear & Tear" on Fields • Estimated Costs • $30,000,000 Capital Expense Capital Investment Program (g) Capital Program • Multiple Year Implementation • "Past Promises" • Two High Schools Complete Second Phase • One High School Start First Phase • Two Option Schools • One Replacement High School • Two New Schools • Career & Tech Ed Expansion • Benefits • Better Learning Environment, Educational Model and Utilization • Estimated Costs • $195,000,000 Capital Expense Capital Investment Program (g) Details Replacement and First & Second Phase Implementation •Alameda HS • Green Mtn HS • Wheat Ridge HS • Fletcher Miller K-12 • Jeffco Open School • Jefferson HS • Table Rock ES (K-8} • Leyden Rock • South Area Location TBD Charter School Investment (h) Capital Program • The scope of the projects include: • Safety & security • Critical and general maintenance • Roofs • Parking lots • Build out, additions & new builds • Limited FFE • Boilers/HVAC • Drainage • Playgrounds FMP Timeline District Wide Facility Master Plan Phase I Implementation Time line Task Boundary Changes Matriculation Changes Grade Reconfiguration (K-5, 6-8) Additions Consolidations & Closures Replacements Program Equity Past Promises Deferred Maintenance No Capital Program 2017-18 School I Year Year One Phase I Capital Improvement Program Year I Year I Year Two Three Four Year Five I I --I - 1 -I I I Year Six l Our Goal is to provide the Best Learning Environment for our Students, and the Best Teaching Environment for our Staff JEFFCO 2020 Vision C.onl!!nt M&stecy I CMc: & Glob&' Enga~ I COmmunlcanon crn<a1 ThlnklnQ • CtC!!lltMIY I se1r-0,.,.,llion c. ~ ~·blhtY Q!J?fcfcS2 Building Bright Futures The following provides an overview of the funding requirements and impact to our valued Jeffco stakeholders FMP FUNDING REQUIREMENTS EXPENSES District Wide Facility Master Plan Phase I and Phase II Estimated lm.plementation Expenses No capital I Phase I capital I Phase II capital Program Improvement Program Improvement Program Task I 2017-18 I School Year Year 1 to Year 6 I Year 7 to Year 13 Boundary Changes Minimal I Minimal Cost Matriculation Changes Cost ,Additions $137,500,000 $49,500,000 Consolidations $99,800,000 $28,000,000 Replacements/New Buildings $80,000,000 $58,100,000 Program Equity $34,000,000 $2,700,000 Past Promises $29,000,000 $56,000,000 Charters $40,000,000 Total I I $420,300,000 I $194,300,000 I Deferred Maintenance GF Tr~nsfer ] $20,000,QOQ J $120,000,000 -J $120,000,000 FMP Key Points (Again) • The plan will be phased in over time beginning in 2017-18 • The plan does not expect to create a reduction in force • Administrative attrition • Teaching vacancies annually • Learning support professionals shortages • Remember the plan is interdependent & it is vital not to focus on one aspect in isolation. • The plan, if fully implemented, can significantly enhance the efficient use of general fund dollars to significantly improve student learning and teaching conditions. FMP Key Points (Again) • Community Forums for parent voice • We need to hear from our communities and thus have created 12 opportunities in the next 8 weeks to gather this insight • To ensure consistent information and gathering of insight, please do not conduct or host local meetings at this time, instead, strongly encourage your parents to attend the community meetings. Date April 23, Saturday April 27, Wednesday May 4, Wednesday May 4, Wednesday May 31, Tuesday June 1, Wednesday June 4, Saturday June 4, Saturday June 6, Monday June 8, Wednesday June 8, Wednesday June 9, Thursday location Time Dakota Ridge HS-Auiiltorrumlr 9 to 11 a.m. North Arvada MS Auditorium 6 to 8 p.m. 1; Conifer HS Cafeteria If 8 to 10 a.m. -Green Mountain HS 5 to 7 p.m. Auditorium Ralston Valley HS Auditorium II 6 to 8 p.m. Pomona HS library 6 to 8 p.m. " . -_,, Stevens Elementary Ir 8 to 10 a.m. "cafetorlum• Arvada West HS Auditorium . Golden HS Auditorium II 6to 8 p.m. -Bear Creek HS Auditorium Wheat Ridge HS Auditorium II 6to 8 p.m. Stein @ O'Connell Cafeteria 6 to 8 p.m. Our Goal is to provide the Best Learning Environment for our Students, and the Best Teaching Environment for our Staff A Comprehensive plan to support teaching and learning, while maximizing general fund dollars JEFFCO 2020 Vision ~JEFFCO ~ PUBLIC SCHOOLS Cor1en1 Mastf<Y C.W: & C'·ioo.. (tloa~1 , Communcaloon c;.,1oQ>1 Tl*li<lng. CtfflM:y I S• f •Oll't!Cftoft ~ ""'-' ~ny Buildlni Briglu Futures .....I Staff Recommendations: Alameda Articulation Area • Alameda International Jr./Sr. High • Phase II -Addition & Renovation • Deane Elementary • Boundary Change • Emory O'Connell • Boundary Change • New Replacement Facility; • Kendrick Lakes Elementary Consolidate with Patterson • Lasley Elementary • Boundary Change • Patterson Elementary • Close, Move to Kendrick Lakes • Rose Stein Elementary • On-Going Renovation • Demo Temps at Rose Stein • 12 Temps Staff Recommendations: Arvada Articulation Area • Arvada High • Aux. Gym; Artificial Turf Field • North Arvada Middle • Convert to 6-8 • Arvada K-8 • Boundary Change • Fitzmorris Elementary • Deferred Maintenance • Foster Elementary • 4 Classroom Addition; Convert to K-5 • Hackberry Hill Elementary • Deferred Maintenance • Lawrence Elementary • K-6; Boundary Change • Peck Elementary • Deferred Maintenance • Secrest Elementary • Convert to K-5 • Swanson Elementary • Convert to K-5 • Thomson Elementary • Convert to K-5 • Demo Temps at Foster • 6 Temps Staff Recommendations: Arvada West Articulation Area • Arvada West High • Deferred Maintenance • Drake Middle • 16 Classroom Addition; • Table Rock Mesa K-8 • New Facility • New Replacement Facility; • Allendale Elementary Consolidate with Campbell • Campbell Elementary • Close, Move to Allendale • Fairmount Elementary • Deferred Maintenance • Fremont Elementary • Deferred Maintenance • Stott Elementary • Deferred Maintenance • Vanderhoof Elementary • Deferred Maintenance Staff Recommendations: Bear Creek Articulation Area • Bea r Creek High • Deferred Maintenance • Carmody Middle • Convert to 6-8 • Bear Creek K-8 • Deferred Maintenance • Replacement Facility; K-5; Boundary • Green Gables Elementary Change • Kendallvue Elementary • Convert to K-5 • Peiffer Elementary • Convert to K-5 • Red Rocks Elementary • Convert to K-5; Boundary Ch ange • Westgate Element ary • Boundary Change • Demo Temps • 24 Temps Staff Recommendations: Chatfield Articulation Area • Chatfield High • Artificial Turf Field • Deer Creek Middle • Convert to 6-8 • Falcon Bluffs Middle • Convert to 6-8 • Boundary Change to Consolidate • Bradford K-8 Bradford Primary and Intermediate • Coronado Elementary • Convert to K-5 • Mortensen Elementary • Convert to K-5 • Shaffer Elementary • Deferred Maintenance • Stony Creek Elementary • Convert to K-5; Boundary Change • Ute Meadows Elementary • Convert to K-5 • Demo Temps • 20 Temps Staff Recommendations: Columbine Articulation Area • Aux. Gym; Renovation; Artificial Turf • Columbine High Field • Ken Caryl Middle • Deferre d Maintenance • Columbine Hills Elementary • Deferre d Maintenance • Dutch Creek Elementary • Boundary Ch ange • Governor's Ranch Elementary • Matriculation Change • Leawood Elementary • Boundary Change • Normandy Elementary • Boundary Change • Demo Temps • 6 Temps at Normandy Staff Recommendations: Conifer Articulation Area • Conifer High • Aux. Gym; Weight Rm; Renovation • West Jefferson Middle • Artificial Turf Field • Elk Creek Elementary • Deferred Maintenance • Marshdale Elementary • Replacement Facility K-5 • West Jefferson Elementary· • Deferred Maintenance Staff Recommendations: Dakota Ridge Articulation Area • Dakota Ridge High • Deferred Maintenance • Summit Ridge Middle • Deferred Maintenance • Blue Heron Elementary • Matriculat ion Change • Colorow Elementary • Boundary Change • Mount Carbon Elementary • 4 Classroom Addition • Powderhorn Elementary • 8 Classroom Addition • Westridge Elementary • Deferred Maintenance • Demo Temps • 9 Tem ps at Powderhorn Staff Recommendations: Evergreen Articulation Area • Evergreen High • Master Plan; Sports Field Upgrades • Evergreen Middle • Phase II -Addition & Renovation • Bergen Meadow Elementary • Deferred Maintenance • Bergen Valley Elementary • Deferred Maintenance • Parmalee Elementary • Deferred Maintenance • Wilmot Elementary • Phase II Addition -Past Promise • Demo Temps • 2 Temps at Evergreen Middle Staff Recommendations: Golden Articulation Area • Golden High • Deferred Maintenance • Bell Middle • 4 Classroom Addit ion • Addition & Renovation; Convert to K-• Kyffin Elementary 5 • M itchell Elementary • Deferred Maintenance • Pleasant View Elementary • Closed, Boundary Change • Ralston Elementary • Deferred Maintenance • 3 Cla ssroom Addition; Convert to K-5; • Shelton Elementary Boundary Change • Welchester Elementary • Convert to K-5; Bou ndary Cha nge Staff Recommendations: Green Mountain Articulation Area • Green Mountain High • Phase I Master Plan • Dunstan Middle • 8 Classroom Addition; Convert to 6-8 • Devinny Elementary • Convert to K-5; Boundary Change • Foothills Elementary • Convert to K-5 • Green Mountain Elementary • 8 Classroom Addition; Convert to K-5 • Hutchinson Elementary • Convert to K-5 • Rooney Ranch Elementary • Convert to K-5; Boundary Change • Demo Temps • 13 Temps Staff Recommendations: Jefferson Articulation Area • Phase I Master Plan Replacement-• Jefferson Jr./Sr. High Addition & Renovation • Edgewater Elementary • Pre-K Wing • Lumberg Element ary • 8 Classroom Addition • Molholm Elementary • 8 Classroom Addition • Demo Temps • 25 Temps Staff Recommendations: Lakewood Articulation Area • Lakewood High • Deferred Maintenance • Creighton Middle • 8 Classroom Addition; Convert to 6-8 • 6 Classroom Addition; Convert to K-5; • Belmar Elementary Boundary Change • Eiber Elementary • 6 Classroom Addition; Convert to K-5 • Glennon Heights Elementary • Close; Boundary Change • Slater Elementary • Convert to K-5 • South Lakewood Elementary • Convert to K-5 • Demo Temps • 12 Temps Staff Recommendations: Pomona Articulation Area • Pomona High • Aux. Gym; Artificial Turf Field • Moore Middle • Convert to 6-8 • Little Elementary • Close, Move to Parr • New Repl acement Facility Pre-K-5; • Parr Elementary Conso lidate with Little • Warder Elementary • Convert to K-5; Add 2 Temps • Weber Elementary • Convert to K-5 • Demo Temps • 15 Tem ps Staff Recommendations: Ralston Valley Articulation Area • 10 Classroom Addition; Artificial Turf • Ralston Valley High Field • Oberon Middle • 8 Classroom Addition; Convert to 6-8 • 8 Classroom Addition; Boundary • Candelas K-8 Change • Coal Creek K-8 • Deferred Maintenance • Meiklejohn Elementary • Convert to K-5; Boundary Change • Sierra Elementary • Convert to K-5; Boundary Change • Van Arsdale Elementary • Convert to K-5 • West Woods Elementary • Convert to K-5 • Demo Temps • 9 Temps Staff Recommendations: Standley Lake Articulation Area • Aux. Gym ; Renovation; Artificial Turf • Standley Lake High Field • Mandalay Middle • Convert to 6-8 • Wayne Carle Middle • Co nvert to 6-8 • Adams Elementary • Convert to K-5 • Lukas Elementary • Co nvert to K-5 • Ryan Elementary • Co nvert to K-5 • Semper Elementary • Co nvert to K-5 • Sheridan Green Elementary • Con vert to K-5 • Witt Elementary • Co nvert to K-5 Staff Recommendations: Wheat Ridge Articulation Area • Wheat Ridge High • Phase II Master Plan • Everitt Middle • Renovation; Convert to 6-8 • Kullerstrand Elementary • Close; Move to Prospect Valley • Maple Grove Elementary • 4 Classroom Addition; Convert to K-5 • Pennington Elementary • Convert to K-5 • New Replacement Facility K-5; • Prospect Valley Elementary Consolidate with Kullerstrand • Stevens Elementary • Convert to K-5 • Stober Elementary • Close; Move to Vivian • New Replacement Facility K-5; • Vivian Elementary Consolidate with Stober • Wilmore-Davis Elementary • Convert to K-5 • Demo Temps • 13 Temps Staff Recommendations: Options • Brady Exploration • Deferred Maintenance • Connections • Deferred M aintenance • D'Evelyn • Deferred Maintenance • Dennison • Deferred Maintenance • Fletcher Miller Special • Master Pl an -Ad dition & Renovation • Jeffco Open • Phase II • Long View • Close; Relocate to Mclain • Manning • Deferred Maintenance • Mclain Community • Long View Relocation • Sobesky • Deferred Maintenance • Warren O.T.C • • Deferred Maintenance • Warren O.T.C. North Campus • Deferred Maintenance • Warren O.T.C. South Campus • Expand CTE Opportu nities Staff Recommendations: District-Wide • Jeffco Virtual Academy • Deferred Maintenance • Mt. Evans OELS • Master Plan -Phase I • North Transportation & Maintenance • New Facility Shops • South Area Athletic Complex • New Facility • Trailblazer Stadium • Renovation; Replace Buildings on Site • Windy Peak OELS • Master Plan -Phase I Prepared by: Jeffco Schools Facilities Management April 21, 2016 Attachment 3 Bulldmg Bnghi F11111m Acknowledgements Acknowledgement is given to the Board of Education, the Superintendent and Cabinet, Achievement Directors, and the Capital Asset Advisory Committee, all of which provide valuable information and recommendations to Facilities in the development of this Master Plan. Board of Education Ron Mitchell, President (District 5) Ali Lasell, First Vice President (District 3) Susan Harmon, Second Vice President (District 2) Amanda Stevens, Secretary (District 4) Brad Rupert, Treasurer (District 1) Superintendent and Cabinet Dan McMinimee, Superintendent Steve Bell, Chief Operating Officer Kathleen Askelson, Chief Financial Officer Terrance Elliott, Chief School Effectiveness Officer Syna Morgan, Chief Academic Officer Craig Hess, Chief Legal & Employee Relations Officer Brett Miller, Chief Information Technology Officer Amy Weber, Chief Human Resources Officer Diana Wilson, Chief Communications Officer Kevin Carroll, Chief Student Success Officer 3 4 Executive Summary ................................................................................................................ 7 Facility Portfolio ...................................................................................................................... 8 Challenges and Needs ............................................................................................................. 9 Identifying Needs .................................................................................................................. 10 Anticipated Implementation Schedule ................................................................................ 14 Identifying and Prioritizing Needs ......................................................................................... 15 Program and Utilization Recommendations ......................................................................... 16 Articulation Areas ................................................................................................................. 16 Alameda Articulation Area ......................................................................................... 17 Arvada Articulation Area ............................................................................................ 23 Arvada West Articulation Area ................................................................................... 29 Bear Creek Articulation Area ...................................................................................... 35 Chatfield Articulation Area ......................................................................................... 39 Columbine Articulation Area ...................................................................................... 43 Conifer Articulation Area ............................................................................................ 47 Dakota Ridge Articulation Area .................................................................................. 51 Evergreen Articulation Area ....................................................................................... 55 Golden Articulation Area ............................................................................................ 59 Green Mountain Articulation Area ............................................................................. 63 Jefferson Articulation Area ......................................................................................... 67 Lakewood Articulation Area ....................................................................................... 71 Pomona Articulation Area .......................................................................................... 75 Ralston Valley Articulation Area ................................................................................. 81 Standley Lake Articulation Area .................................................................................. 85 Wheat Ridge Articulation Area ................................................................................... 89 Options ...................................................................................................................... 95 District-Wide .............................................................................................................. 99 s 6 Executive Summary Jeffco Schools serves over 86,000 students in both neighborhood schools and charter schools spread over 169 campuses covering 3,100 acres. This Master Plan is focused on Facility Utilization within Jeffco Public Schools and covers Capacity, Program, and Enrollment needs in the district. This plan should be implemented over a 5 to 7 year period. This District-Wide Facilities Master Plan will: • Establish a Short and Long-Term Plan to Meet the District's Future Facilities Needs. • Provide for better utilization of school facilities at all grade levels and provide for better instructional and program support. • Build new capacity in high-growth areas of the district to accommodate growth, alleviate over-crowding, and support the needs of the communities. • Transition SO selected K-6 grade elementary schools into K-5 grade elementary schools to increase capacity at the elementary schools and better align with elementary school educational programs in surrounding districts and nationally. • Transition eleven -7'h and 81h grade middle schools into 6111, 7'", and 81" grade schools to provide for better utilization of the middle school facilities and to be in better alignment with surrounding districts and national middle school models. • Consolidate 10 under-utilized and high FCI schools into S new facilities, which will provide for more modern learning environments as well as support better educational models. • Complete 1 new pre-school facility. • Include classroom additions at 16 facilities for a total of 122 new classroom spaces. • Recommend replacing 2 elementary schools and 1 high school with new facilities. • Propose 15 boundary changes to support facility consolidations, new facilities, and critically stressed areas where enrollment may be affecting education. • Review 'Past Promises' of critical projects and needs. • Recommend closing 3 facilities and relocating students to other facilities. • Close and remove 81 temporary classroom modular throughout the district. • Propose changing the matriculation schools for 2 elementary schools to better align with adjacent boundaries. • Reduce the annual Maintenance and Operation Budget by approximately $2.4 million. • Reduce facility-specific identified deferred maintenance needs by approximately $60 million. Educational Adequacy/Learning Environment The district is committed to supporting the learning environment and to providing the physical environments conducive for multiple opportunities of learning at all grade levels. This Master Plan aims to create learning spaces that are functional, efficient, healthy, and comfortable. 7 Facility Portfolio Overview Jeffco Public Schools is the second largest school district in the State of Colorado in terms of student attendance. The district educates a little under 10% of all students attending public schools in the state. The district has: • 12 Million Square Feet of Facilities • 3,100 Acres of Land • 169 Campuses with 381 Permanent Buildings • 327 Modular Buildings and 12 Cottage Buildings • Average Age 40 years; Median Age 44 years • Average Facility Condition Index 20.4% • Replacement Value is $2. 7 billion • Annual Maintenance & Operation Budget $51M • Annual Capital Investment $21M loistrict Facilities by Type Perm.mrnt Budd•n~' Co!tlfll! Bulldln~ Transportable llulldlngs Count Sq Ft 0 229 lli.690 1 1,008 12 12,824 5 4,800 13 12,934 32 35,166 2 1,920 0 4 3,894 29 25,220 327 323,456 2.7% 8 I Building Age by Age Bracket A~race Yur Built 1971 1f76 s.000.000 4,S00,000 4,000,000 ii 3,S00,000 .. ... II 3.000,000 ~ :l 2,500,000 ! ~ 2,000,000 1,500,000 1.000,000 500.000 Pre 1928 2008. 201A Square Feet 13,388 25,300 Square Feet per Student School Type Type llof Schools II of Students Permanent Sq Ft Pre-K Centers Pre-K 5 482 54,736 Elementary Schools ES 92 37,657 4,428,376 K·S Schools K-8 3 1,875 263,091 Middle Schools MS 17 10,057 1,817,299 7·12 Schools 7-12 2 2,013 386,636 High Schools HS 15 21,573 3,337,648 Dlstrictwlde I Option Dlstrictwlde I Option 17 3,663 956,482 Total 151 77,320 11,244,268 Challenges and Needs Enrollment Challenges and Trends Enrollment varies depending upon location, neighborhood demographics, student/parent choice, intangible and other factors. An Enrollment Projections Report that analyzes future growth and reviews the past, by articulation area, is published annually by the Facilities Department and available to the public. The statistical information utilized in this Master Plan is developed from this annual Enrollment Projections Report. Current trends indicate that the north and northwest areas are seeing significant growth due to residential development. Central area growth is stable-to-increasing. This area is impacted by socio-economic factors, household mobility, multi-generational families, and affordable housing. West central growth is increasing due to residential development. 9 114 118 14{) 181 192 155 261 145 • Challenges and Needs The south area is stable-to-declining, with pockets of growth; the area is very dependent upon residential turnover and affordable housing for younger families. The west area is stable with some growth. Charter schools showed significant growth with the addition of one charter this past school year, one new charter anticipated for the upcoming school year, and overall moderate growth at the others. The goal is to better utilize the district's facilities including providing the best overall opportunities to accommodate the various levels of teaching and support for educational programs. Enrollment by Geographic Area High Growth: North County & Along Highway 93 (Candelas and Leyden Rock), Central Lakewood, and Edgewater Moderate Growth: West Lakewood (Solterra) Stable Growth: West Area Slow or No Growth: Pockets in North and South County Reasons for Current Growth Patterns: Economic and Population Growth Improving Real Estate Market Reasons for Anticipated Future Growth Patterns: 2013 Saw its First Increase in Birthrate since 2006 Increase in Property Sales, Decrease in Foreclosures, Increased Availability of Affordable Housing in Established Neighborhoods Operational Needs Program modifications and more efficient facility utilization can affect operational costs. Identifying Needs Facility Assessment Process and the District-Wide Facility Master Plan This process included establishing guidelines and parameters from which Facilities developed this Master Plan. • Facilities provided information about the conditions of buildings, usage, efficiency, enrollment trends, boundaries, maintenance and operations. • Facilities developed this master plan within the BOE guidelines that will provide direction for future development. 10 • This Master Plan will become a key component in the development of capital programs, including construction bond programs. • This Master Plan will also play an important part in communicating facility needs and future district plans to the community. Educational Adequacy Educational Adequacy Categories To comprehensively assess educational effectiveness, it is necessary to understand the components that affect the instructional or teaching program. These components can generally be formulated into standards or guidelines that bridge the gaps between the architectural programs from which schools are built and the district's educational standards. There may be numerous criteria that contribute to educational adequacy, however, in general they fall into eight major categories: Capacity: The ability of core facilities to meet needs of the student population. It is critical to consider the programs at a particular campus and the impact these programs have on classroom inventory and student teaching stations. It is also important to evaluate the use of permanent versus temporary structures. Support for Programs: The provision of special spaces or classrooms that support specific curriculum offerings such as, among others, music, sports, science, and technology programs. Technology: The presence of infrastructure, data distribution/storage, and equipment within classrooms and laboratory settings. This includes local area network cabling, video distribution systems, electrical power outlet s, and projection or video display screens. Security and Supervision: The extent to which physical configurations help or hinder building operations and includes both passive and physical security. Instructional Support: The presence of necessary equipment within teaching spaces including, among others, teacher storage, student storage, writing and tack surfaces, sinks, demonstration tables, and fixed audio/video equipment. Physical Characteristics: This focuses primarily on the sizes and shapes of individual teaching spaces and their adequacy to support program needs. Learning Environment: The degree to which learning areas are comfortable, well-lit, odor- free, controllable, and quiet. 11 Relationship of Spaces: The proximity of instructional spaces to support areas like, among others, libraries, restrooms, and student dining and recreational areas. These above eight categories establish the criteria for data collection and subsequent data- generated analysis. At any school, there are certain things that can be resolved or upgraded, and there are specific things that cannot realistically be resolved without spending more than the replacement value of a structure. For instance, electrical outlets can be added, flooring materia Is can be changed, and data ports can be installed. However, it is generally cost prohibitive to reconfigure a building's layout, expand a classroom to house five extra students, or move a library. The eight categories are used to identify "deficiencies" that can be repaired or upgraded, and "inadequacies" that simply impact a building's learning environment and should be considered when making decisions that will affect the long-term utilization of a particular facility. Educational Adequacy Assessment Educational adequacy is reviewed and updated annually by staff site visits and assessments, interviews with principals, and an annual building usage survey. The information obtained is then reviewed and any changes or modifications to usage entered into the FACTS database. Capacity and Enrollment Summary by Area West Articulation Areas Conifer -Stable/Growing • West Jefferson ES -Over-Enrolled • Balance of Facilities -Under-Utilized Evergreen -Stable/Growing • Parmalee ES -Over-enrolled • Bergen Valley ES -Significantly Under-Utilized • Balance of Facilities -Under-Utilized South Articulation Areas Bear Creek -Declining • Red Rocks ES, Very High 'Choice In' • Westgate ES, Demographic/Neighborhood Changes • Bear Creek K8, Very High 'Choice In' 12 Chatfield -Stable • Coronado ES, High 'Choice In' • Shaffer ES, Stony Creek ES, Neighborhood, Low 'Choice In' • Deer Creek MS, Very Low Utilization Columbine -Stable/Declining • Dutch Creek ES, High 'Choice Out', Demographics • Normandy ES, High 'Choice In' Dakota Ridge -Stable/Declining • Powderhorn ES, Mt. Carbon ES, Westridge ES - High Utilization • Summit Ridge, Approaching Capacity • Colorow ES, Significantly Under Utilized Central Articulation Areas Alameda -Stable, Better Utilization • Alameda HS 7-12 -Conversion • Stein ES Move to O'Connell reopen 2017, Demographic Changes, High Mobility Arvada -Declining • Arvada HS -High 'Choice Out' • Foster ES, Hackberry Hill ES, Arvada KS -Continued Growth • North Arvada MS -Declining Jefferson -Stable Better Utilization • Jefferson 7-12 -Conversion, Better Utilization/Under Enrolled • Stevens Relocation to WRMS -Better Utilization • Edgewater ES, Molholm ES, Lumberg ES -Continued Growth; Over-enrolled. Green Mountain -Increasing • Devinny ES, Green Mtn. ES, Rooney Ranch ES -Over-enrolled, Solterra, Neighborhood Turnover Lakewood -Stable • Lakewood HS -High 'Choice In' • Eiber ES, Belmar ES -Over-enrolled Golden -Increasing • Kyffin ES -Over-enrolled, High 'Choice In' • Mitchell 2013-14 6th Grade to Bell MS Stable/Growing • Bell MS -Increasing Due to 6th Grade & STEM Wheat Ridge -Stable/Growing • Everitt MS; WRHS -Solid Growth; Most ES -Growth • Stober, Prospect Valley, Kullerstrand ES -Over-Enrolled 13 Processes and Evaluations Facility Condition Index The Facility Condition Index (FCI) is a widely used indicator that provides a relative scale of the overall condition of a given facility or group of facilities within a facility portfolio. The index is derived by dividing the total repair cost, including educational adequacy and site-related repairs, into the total replacement cost for the set of facilities. Based on previous district experience and consultation with district staff, the following scale was implemented: Less than 5% Best 6%to 10% Good 11% to 20% Average 21% to 30% Below Average 31% to 50% Poor 51% to 65% Very Poor Greater than 65% Replacement Candidate The FCI factor can assist in evaluating the adequacy, or inadequacies, of facilities to accommodate the educational programs of which the buildings were designed. Academic, School, and Community Input In the development of this Facilities Master Plan, Facilities received input from multiple sources and resources, including: • The Superintendent and Members of the Superintendent's Cabinet • Achievement Directors • Principal Questionnaires • Enrollment Projections • Summary of Findings Anticipated Implementation Schedule Implementation is based on a 5 to 7 year plan: • Year 1: Deferred Maintenance and Minor Upgrades; Some K-5 transitions • Year 2: Additions and Program Support, Deferred Maintenance, Upgrades • Year 3: Replacement Schools, Major Renovations and Additions, and Program Support • Year 4: New Facilities, Major Renovations and Additions, and Program Support • Year 5 and Beyond: Deferred Maintenance, Upgrades 14 Identifying and Prioritizing Needs Prioritizing Educational Needs and Establishing Guidelines The following were considered in the evaluations: School Consolidations • Relocate Students into Adjacent/Nearby Existing Schools. • Consolidate Two Existing Schools into a Single New School. School Closures • Close Selected Schools based on Multiple Criteria. Closures will Follow Identified and Established Protocol based on Selection Criteria , Community Involvement, and Support. Boundary Changes • Boundary Changes based on Multiple Criteria. Boundary Changes will Follow Identified and Established Protocol based on Program Placements and will include Community Involvement. • This Protocol is Initially a Lengthy Process and may Require phased Implementation to Fully Implement. New Construction • Constructing New Buildings. This is a Lengthy Process and Requires Early Decision Making and Early Commitments of Funding. • Constructing Additions onto Existing Schools and/or Undergoing Significant Renovations. Grade Configurations • Providing Flexibility in the Utilization of Resources. Repurpose Existing Facilities • Function Changes to a School to Support Specific Facility or Community Needs. • School Type and/or Program or Curriculum Changes. • Neighborhood & Charter. • Charter & Option. Shared Facilities • Sharing Facilities Between Neighborhood Schools and Selected Charter Programs. • Sharing Facilities Between Selected Charter Programs and Option Schools. Explore Finance Options • Evaluate the best option for funding project. These options may include Bonds, Certificates of Participation (COPs), Leases, and Cash . 15 • Program and Utilization Recommendations Program and Utilization Recommendations-Articulation Areas Each Articulation Area is presented separately in the following pages. Each Area includes the following information which is presented in two parts: Part 1: Part 2: • Overview: General summary of enrollment and capacity in the Articulation Area. • Current Conditions: Each school listed with FCI, Utilization, Enrollment, Choice In, and Choice Out information. • Five Year Projections: General summary of projected enrollment and trends . • Articulation Area Facilities: Detailed overview of each facility including date constructed, dates of additions, facility size, site acreage, and temporary portable buildings, if present. Targeted Improvements are listed if there are recommended changes or considerations associated with capacity or utilization. • Facility Department Recommendations: One or more recommendations on Operational Efficiencies, Utilization, Educational Models, School and/or Program Consolidations, as well as other Options. Permanent Capacity vs. Title I Capacity Permanent Capacity: In addition to the permanent building capacity, the Permanent Capacity numbers shown include temporary modular building capacities if students currently occupy the modulars. Title I Capacity: Although important and considered in the building utilization of each evat uation, permanent capacity values were not reduced or modified to accommodate potential variations on how each facility is currently utilized because of Title I assignment. This was to ensure consistent evaluations of district-wide utilization needs. The following Articulation Areas are Included: Alameda Articulation Area Arvada Articulation Area Arvada West Articulation Area Bear Creek Articulation Area Chatfield Articulation Area Columbine Articulation Area Conifer Articulation Area Dakota Ridge Articulation Area Evergreen Articulation Area Golden Articulation Area 16 Green Mountain Articulation Area Jefferson Articulation Area Lakewood Articulation Area Pomona Articulation Area Ralston Valley Articulation Area Standley Lake Articulation Area Wheat Ridge Articulation Area Options District-Wide Alameda Articulation Area OVERVIEW: Stable enrollment combined with improved utilization at the HS/MS levels. In 2015, Alameda International HS was converted to a 7-12 school and is slightly under-enrolled. Kendrick Lakes is at capacity. The rest of the elementary schools are at or near ideal enrollment. Rose Stein Elementary School is currently closed for renovation and will reopen for the 2017-18 school year. Stein ES students are housed in the Emory O'Connell ES facility. Alameda 7-12, Deane, Lasley, and Stein are Title I schools. 2015-16 Capacity: 3,031 available seats at the Elementary schools (including O'Connell), current enrollment 2,446 -81% utilization; Middle and High School (7-12 at Alameda lnt'I) available seats 1,610, current enrollment 1,282 -80% utilization. The MS student enrollment at Alameda lnt'I (7-12) is 466. CURRENT CONDITIONS: Deane ES• 21% 81% 483 20% 49% Lasley ES• 21% 78% 472 14% 42% Kendrick Lakes ES 66% 101% 474 49% 52% Patterson ES 47% 77% 369 35% 46% Patterson PK 41% 94% 113 Rose Stein PK 35% 107% 64 Rose Stein ES 41% 0% 0 (Closed) 0% 0% Emory O'Connell• 17% 74% 648 17% 38% Alameda lnt'I • 16% 80% 1,282 13% 53% •ntie I School FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 1. 7% increase in enrollment or about 65 students. Development in the Alameda Area consists of small residential pockets that do not usually produce a large number of school age children. The Green Gables development near Jewell and Wadsworth will bring new students to the area. Stabilization of multi-family rental rates will increase enrollment also. The Rose Stein ES projections starting in 2017-18 include approximately half of those students that will return from the Emory O'Connell ES. 17 Alameda Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Deane ES 475 470 475 450 451 Lasley ES 465 465 458 454 453 Kendrick Lakes ES 476 475 463 465 471 Patterson ES 352 365 351 341 340 Patterson PK 138 127 148 152 156 Rose Stein PK 69 65 76 70 68 Rose Stein ES 0 313 311 305 298 Stein at O'Connell 650 0 0 0 0 Emory O'Connell ES 0 314 312 306 298 Alameda 7-12 1,292 1,310 1,354 1,390 1,435 Total 3,917 3,904 3,948 3,933 3,970 ARTICULATION AREA FACILITIES: Alameda International Jr/Sr High School Originally constructed in 1961, additions were added in 1968, 1974, 1976, 1996, 2001, and 2009. The two story building has 231,176 SF of area with an applied capacity of 1,610 and is Title I. There are two temporary portable classrooms on site. The site is 26.5 acres. Targeted improvements: Modernization with implementation of Master Plan (scope should be reviewed and confirmed). Past Promise for Phase II (finger additions and total site redevelopment). Converted to 7-12 in 2015; turf field, tennis courts. Emory O'Connell Elementary School (Old O'Connell Middle School} Originally constructed in 1994, the two story building has 107, 786 SF of area with an applied capacity of 876 and is Title I. The site is 17.5 acres. Targeted improvements: Relocate Stein Students back into newly renovated Stein in 2017. Consider a boundary Change to increase enrollment at O'Connell and provide relief to surrounding elementary schools. 18 Alameda Articulation Area (continued) Elementary Schools: Deane: Originally constructed in 1954, additions were added in 1963, 1973, and 1995. The one story building has 46,118 SF of area with an applied capacity of 600 and is Title I. There are four temporary portable classrooms on the 9 acre site. Lasley: Originally constructed in 1961, additions were added in 1963, 1973, 1996, and 2000. The building has 66,926 SF of area with an applied capacity of 606 and is Title I. There are three temporary portable classrooms on the 9. 7 acre site. Kendrick Lakes: Originally constructed in 1970 with a small addition in 1994. The one story building has 40,078 SF of area with an applied capacity of 469. There are four temporary portable classrooms on the 9. 75 acre site. Targeted improvements: Replace facility due to high FCI, construct new 768 K-6 on this site; relocate Kendrick Lakes students to Emory O'Connell during co nstruction. Patterson: Originally constructed in 1964, an addition was added in 1968. The one story building has 48,895 SF of area with an applied capacity of 480. There is one temporary portable classroom. The site is 8 acres. Targeted improvements: Close/Consolidate with new Kendrick Lakes. Patterson Pre-K: Originally constructed in 1965, these consist of four separate cottage buildings. The buildings have a total of 13,820 SF of area with an applied capacity of 120. The site is 1.2 acres. Targeted improvements: Replace. Build New Larger Pre-K to accommodate current cottage based Pre-K; option to relocate or open a Pre-K at Emory O'Connell ES. Remove, sell or use cottages for administrative purposes. Stein Pre-K: Originally constructed in 1961, these consist of two separate cottage bu ildings, of which only one is currently being used as a Pre-K. The buildings have a total area of 6,794 SF of area with an applied capacity of 60. The site is 0.5 acres. Targeted improvements: Close cottages, Move the Pre-K program into Stein ES. Hold cottages for Admin/SPED related programs. Rose Stein: Originally constructed in 1954, with additions added in 1963 and 1995. The one story bu ilding has 47,094 SF of area with an applied capacity of 568. There are currently ten temporary portable classrooms. There is a community health clinic on site. The site is 8.75 acres. Targeted improvements: Renovate to Pre K-6 Neighborhood School. Re-open in 2017. 19 Alameda Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: Replace Kendrick Lakes with new larger capacity school and consolidate Patterson into the new Kendrick Lakes. Close Patterson. Currently there are $11 million in deficiencies identified at these two schools. Remove Patterson Cottages and build new Pre-K center. Close Stein Pre- K Cottages and consolidate Stein Pre-K into newly renovated Stein ES. Adjust boundaries for O'Connell, Lasley, Deane, and combine Kendrick Lakes and Patterson. Impact to elementary schools 2018-19 School Year using enrollment projections: Patterson Pre -K (148 projected for 2018-19 school year) removed from projected enrollment at Patterson. ::----_ ~-:'·. ~~-: :~ i--i'-. ··. ' --I • I I i ' -11 - Kendrick Lakes ES 400 Patterson ES 298 New Kendrick Lakes 91% 698 Operational Efficiency of Patterson (Close and Consolidate with Kendrick lakes) • Capital Expense to relocate K-6 to new Kendrick Lakes ................................ $0.00 • Additional Maintenance & Operations Expense at $5/SF/Year ............. ($244,475) • Outstanding Building Deficiencies ........................................................ $5,000,000 Operational Efficiency of closed Kendrick lakes • Capital Expense to close Kendrick Lakes ....................................................... $0.00 • Additional M aintenance & Operations Expense at $5/SF/Year ............. ($200,390) • Outstanding Building Deficiencies ........................................................ $6,000,000 Operational Efficiency of new Kendrick Lakes (768 Capacity --1s,ooo SF) • Capital Expense to build new Kendrick Lakes ...................................... $28,000,000 • Additional Maintenance & Operations Expense at $5/SF/Year ............... $375,000 20 Alameda Articulation Area (continued) Operational Efficiency of Rose Stein • Additional Maintenance & Operations Expense at $5/SF/Year ................ No Change • Renovate to keep existing permanent capacity of 449. • Remove 12 temporary modular classrooms • Move existing Health Clinic into renovated permanent building. ALAMEDA HIGH SCHOOL: Full Modernization: Maintain as a 7-12 Campus . Past Promise for Finger Additions and total site redevelopment; converted to 7-12 In 2015; turf field, tennis courts. Remove two portables. Phasing and partial facility to remain with renovation. At this time, use 230,000 SF total for final build-out, including existing areas. Renovation, Demolition, and Addition(s) will make the facility more efficient in utilization. Reevaluate Alameda Master Plan based upon programmatic changes and grade reconfiguration. Impact to 7-21 campus 2017-18 School Year using enrollment projections: Impact to 7-21 campus 2018-19 School Year using enrollment projections: Operational Efficiency of Alameda: Capital Expense Addition and Renovation ........................................................ $20,000,000 Maintenance & Operations Expense at $5/SF/Year ........................................... ($1,150,000) 21 22 Arvada Articulation Area OVERVIEW: Under-enrollment at Arvada High and North Arvada Middle is very high with only about 50% of each facility being utilized. Elementary school utilization varies with over-enrollment in some areas and significant under-enrollment in others. Hackberry Hill has a large gifted and talented program and Foster serves a very large boundary. 2015-16 Capacity: 3,926 available seats at the Elementary schools, current enrollment 3,305 - 84% utilization; K-8 School 701 available seats, current enrollment 631 -90% utilization; Middle School 861 available seats, current enrollment 443 -51% utilization; High School available seats 2,006, current enrollment 937 -47% utilization. CURRENT CONDITIONS: Fitzmorris Es• 30% 78% 338 33% 52% Foster ES* 38% 99% 541 48% 32% Hackberry Hill ES 13% 101% 501 72% 28% Lawrence es• 30% 69% 353 43% 53% Peck ES 37% 80% 338 42% 48% Secrest ES* 24% 92% 400 36% 49% Swanson ES* 35% 70% 406 23% 56% Thomson es• 38% 86% 428 35% 40% Arvada K-8* 19% 90% 631 21% 50% North Arvada MS 18% 51% 443 33% 32% Arvada HS 30% 47% 937 11% 54% *Title I School FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 2.2% decrease in enrollment or about 115 students across the articulation area. There is very little in the way of residential growth except for multi-family directed towards light-rail. These developments tend not to generate a significant number of students at any grade level. Single family residential turn-over and possible alterations to the types of programs offered at the high school level may increase the student population. 23 Arvada Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Fitzmorris ES 351 340 329 334 331 Foster ES 551 545 545 526 516 Hackberry Hill ES 492 501 507 506 508 Lawrence ES 348 352 362 333 343 Peck ES 332 340 345 355 352 Secrest ES 405 414 385 451 406 Swanson ES 391 381 373 378 378 Thomson ES 408 405 406 403 381 Arvada K-8 629 618 636 637 632 North Arvada MS 443 430 417 411 424 Arvada HS 930 937 932 917 930 Total S,280 S,263 S,237 S,251 S,201 ARTICULATION AREA FACILITIES: Arvada High School Originally constructed in 1971, additions were added in 1983, 1989, 1997, and 2001. The four story building has 236,196 SF of area with an applied capacity of 2,006. The site is 33.3 acres. Targeted improvements: Renovation, auxiliary gymnasium, and artificial turf field. North Arvada Middle School Originally constructed in 1962, additions were added in 1975, 1983, 1984, and 2000. The two story building has 113,554 SF of area with an applied capacity of 861. The site is 20.4 acres. Targeted improvements: Convert to 6-8 and migrate the 6th grade students east of Wadsworth to North Arvada MS and students west of Wadsworth to Arvada K-8. Arvada K-8 Originally constructed in 1952, additions were added in 1953, 1959, 1961, 1965, and 1995. The two story building has 115,363 SF of area with an applied capacity of 701 and is Tltle I. The site is 15.2 acres. 24 Arvada Articulation Area (continued) Elementary Schools: Fitzmorris: Originally constructed in 1960, additions were added in 1962, 1965, 1994, and 2000. The building has 51,259 SF of area with an applied capacity of 435 and is ntle I. The site is 14.2 acres. Foster: Originally constructed in 1953, additions were added in 1959 and 1995. The building has 42,486 SF of area with an applied capacity of 548 and is Title I. There are six modulars on the 10.5 acre site. Targeted improvements: Modular reduction, 4 CR addition. Hackberry Hill: Originally constructed in 1966, additions were added in 1969 and 2007. The building has 52,414 SF of area with an applied capacity of 495. The site is 7.2 acres. Lawrence: Originally constructed in 1996, the two story building has 47,139 SF of area with an applied capacity of 511 and is Title I. There are two modulars on the 4.1 acre site. Peck: Originally constructed in 1966 with an addition in 1993. The building has 42,836 SF of area with an applied capacity of 423; there is one modular on the 7.5 acre site. Secrest: Originally constructed in 1955, additions were added in 1959, 1960, 1961, and 1995. The building has 46,373 SF of area with an applied capacity of 435 and is Title I. The site is 8 acres. Swanson: Originally constructed in 1964, additions were added in 1967, 1986, 1989, 1994, and 2001. The building has 54,462 SF of area with an applied capacity of 579 and is Title I. There are three modulars (one mothballed) on the 7.5 acre site. Thomson: Originally constructed in 1973, additions were added in 1995 and 1999. The building has 48,833 SF of area with an applied capacity of 500 and is Title I. The site is 9.4 acres. 25 Arvada Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: 9-12 Arvada HS; North Arvada 6-8 School, K-5 Elementarys Foster, Secrest, Swanson, Thomson, K-6 Elementarys Hackberry Hill (except GT program), Lawrence, Fitzmorris, Peck; 4 CR Addition to Foster: Arvada HS to remain 9-12 review program options as a means to increase enrollment and utilization. Convert North Arvada MS to a 6-8 and remove 61h grade from those elementary schools east of Wadsworth, except Foster. 4 CR addition remains a necessity at Foster. Impact to schools 2018-19 School Year using enrollment projections: ...,;. ---;; -cc--•>;;-L--.---• . - --~ ··-•·r,,-, ....... -· ·· ~,-· ''··• -1 =-==---!~-~ ____ : --. .1 , : ; I -- ---',_~-Arvada K-8* 84% 586 Lawrence PreK-6* 81% 412 Fitzmorris PreK-6* 76% 329 Peck K-6 82% 345 North Arvada 6-8 81% 697 Foster K-5* 83% 475 Hackberry Hill K-6 92% 457 Secrest PreK-5* 77% 335 Swanson K-5* 323 Thomson K-s• 346 • Indicates ntle f school, applied capacity not discounted. Re-Boundary Arvada K-8 and Lawrence PreK-6, isolating Lawrence site. Lawrence PreK-6 boundary from Ridge Road south to 481h; Wadsworth to Kipling; K-6 Students North of Ridge Road containing former Lawrence Boundary attends Arvada K-8. There is no change to the 7-8 Boundary. ARVADA HS RENOVATlON, AUXILIARY GYM, ARTIFICIAL TURF: Operational Efficiency of Arvada HS Renovation: Capital Expense Renovation, Auxiliary Gym, Turf Field ............................................ $4,000,000 Additional Maintenance & Operations Expense at $5/SF/Year .................................... $50,000 Educational Administrative Expense ....................................................................... No Change Annual Total ................................................................................................................ $50,000 26 • Arvada Articulation Area NORTH ARVADA MS 6-8 CONVERSION: Construct a four classroom addition to Foster ES, remove 6 modulars. Operational Efficiency of North Arvada 6-8 Conversion: Additional Maintenance & Operations Expense at $5/SF/Year ................................ No Change Educational Administrative Expense ........................................................................... $100,000 Annual Total ............................................................................................................... $100,000 FOSTER ELEMENTARY ADDITION: Construct a four classroom addition to Foster ES, remove 6 modulars. Operational Efficiency of Foster Addition: Capital Expense 4 CR Addition ............................................................................... $2,400,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................... $10,000 Educational Administrative Expense ........................................................................ No Change Annual Total ............................................................................................................... $10,000 27 28 Arvada West Articulation Area OVERVIEW: Arvada West shows mixed growth due to development in the western and southern portions of the articulation area, but the eastern areas have stable to declining enrollment. Arvada West HS, Drake MS, Fairmount ES, and Stott ES are at or near optimum enrollment. The remaining elementary schools are under-enrolled. The proposed Table Rock Mesa School will have an impact on this and the Golden Articulation area depending upon the size and grade configuration. 2015-16 Capacity: 2,672 available seats at the Elementary schools, current enrollment 2,299 - 86% utilization; Middle School 736 available seats, current enrollment 685 -93% utilization; High School 1,858 available seats, current enrollment l, 751 -94% utilization. CURRENT CONDITIONS: Allendale ES* 22% 61% 211 25% 59% Campbell ES 39% 88% 322 38% 43% Fairmount ES 22% 95% 630 9% 30% Fremont ES 19% 78% 318 43% 58% Stott ES 23% 94% 358 46% 50% Vanderhoof ES 32% 90% 460 25% 46% Drake MS 16% 93% 685 15% 28% Arvada West HS 5% 94% 1,751 30% 31% *Title I School FIVE YEAR PROJECTIONS: Growth projections over the next five years Indicate approximately a 1.0% increase in enrollment or about 48 students. This area is experiencing significant growth due to new single family residential development in the area north of 1-70 and east of Highway 93. The developments aren't the size of Candelas or Leyden Rock but are such that they will add a significant number of students, combined with neighborhood turnover. The growth will offset declines in the more established eastern neighborhoods. 29 Arvada West Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Allendale ES 210 200 208 205 204 Campbell ES 304 298 304 293 290 Fairmount ES 650 655 665 658 668 Fremont ES 330 337 344 340 353 Stott ES 348 374 362 390 392 Vanderhoof ES 472 479 480 475 466 Drake MS 668 678 688 677 677 Arvada West HS 1,753 1,764 1,750 1,741 1,733 Total 4,735 4,785 4,801 4,779 4,783 ARTICULATION AREA FACILITIES: Arvada West High School Originally constructed in 2003, the two story building has 237,052 SF of area with an applied capacity of 1,858. The site is 32.l acres. Drake Middle School Originally constructed in 1962, additions were added in 1963, 1983, and 2000. The two story building has 98,656 SF of area with an applied capacity of 736. The site is 19.6 acres. Targeted improvements: Option for a 16 classroom addition. Elementary Schools: Allendale: Originally constructed in 1964, additions were added in 1995 and 2001. The building has 40,306 SF of area with an applied capacity of 348 and is Title I; there is one modular on the 9.6 acre site. Targeted improvements: Remove original building and construct 576 student K-5 at this site, combine boundary with Campbell. Campbell: Originally constructed in 1964, additions were added in 1965, 1977, and 2000. The building has 43,487 SF of area with an applied capacity of 364; there is one modular on the 7.8 acre site. Targeted improvements: Close school, consolidate boundary with Allendale, construct 576 student K-5 on the Allendale site. 30 Arvada West Articulation Area (continued) Fairmount: Originally constructed in 1962, additions were added in 1975, 1995, 2000, and 2007. The building has 65,146 SF of area with an applied capacity of 660. The site is 12.3 acres. Fremont: Originally constructed in 1948, additions were added in 1953, 1960, 1971, and 1997. The building has 45,915 SF of area with an applied capacity of 408; there are three modulars on the 8.9 acre site. Stott: Originally constructed in 1972, additions were added in 1986 and 1995. The building has 45,529 SF of area with an applied capacity of 382. The site is 9. 7 acres. Vanderhoof: Originally constructed in 1969 with an addition added in 1986. The bui lding has 44,082 SF of area with an applied capacity of 510. There are three modulars on the 8.6 acre site. FACILITY DEPARTMENT RECOMMENDATIONS: PREFERRED RECOMMENDATION : TABLE ROCK MESA K-8: Construct proposed Table Rock Mesa K-8, transfer enrollment from Fairmount, Mitchell, Vanderhoof, and West Woods boundaries; reconfigure boundaries at the four elementary schools; MS students from Bell and Drake, modify boundaries. Consolidate Allendale and Campbell ES into new K-6 elementary school on the Allendale site. Close Campbell and adjust boundaries combining Allendale and Campbell ES. Elementary schools remain K-6, Drake and Bell MS are 7-8. Impact to elementary schools 2018-19 School Year using enrollment projections:• Drake 7-8 80% 588 Bell 6-8 71% 653 Mitchell K-5 85% 482 Allendale K-6 89% 512 Campbell K-6 0% 0 Fairmount K-6 82% 540 Fremont K-6 84% 344 Stott K-6 95% 362 Table Rock Mesa K-8 74% 625* Vanderhoof K-6 77% 430 Includes projected enrollment from Bell, Drake, Mitchell, Vanderhoof, West Woods as well as Fairmount ES. 31 Arvada West Articulation Area (continued) Operational Efficiency of Table Rock Mesa K-8 850 Student School: Capital Expense 113,500 SF Building ................................................................ $35,000,000 Maintenance & Operations Expense at $5/SF/Vear ............................................... $550,000 Educational Administrative Expense ..................................................................... $450,000 Total ................................................................................................................... $1,000,000 Operational Efficiency of Allendale/Campbell 576 Elementary School: Capital Expense 65,000 SF Building .................................................................. $25,000,000 Maintenance & Operations Expense at $5/SF/Vear ............................................... $325,000 Educational Administrative Expense ..................................................................... $450,000 Total ..................................................................................................................... $775,000 Operational Efficiency of Allendale/Campbell 576 Elementary School: Capital Expense 65,000 SF Building .................................................................. $25,000,000 Maintenance & Operations Expense at $5/SF/Vear (net) ...................................... $325,000 Educational Administrative Expense ..................................................................... $450,000 Total ..................................................................................................................... $775,000 Operational Efficiency of Closing Allendale: Reduction in Maintenance and Operations Expense at $5/SF/Vear ..................... ($207,000) Educational Administrative Expense ................................................................... ($450,000) Outstanding Building Deficiencies ...................................................................... $2,000,000 Operational Efficiency of Closing Campbell: Reduction in Maintenance and Operations Expense at $5/SF/Vear ..................... ($222,000) Educational Administrative Expense ................................................................... ($450,000} Outstanding Building Deficiencies ...................................................................... $3, 700,000 32 Arvada West Articulation Area (continued) SECONDARY RECOMMENDATION K·S ELEMENTARIES & 6-8 MIDDLE SCHOOL: Convert elementary schools to K-5 to reduce enrollment and build capacity into schools. Consolidate Allendale and Campbell ES into new K-5 elementary school on the Allendale site. Close Campbell. Currently, there are $5. 7 million in deficiencies at these two locations. Construct a sixteen classroom addition to Drake and convert to 6-8, increase capacity to 950 students. Adjust boundaries combining Allendale and Campbell ES. Impact to elementary schools 2018-19 School Year using enrollment projections: Drake 6-8 94% 1068 Allendale K-s• 74% 422 Campbell K-S 0% 0 Fairmount K-S 84% SSS Fremont K-S 88% 294 Stott K-S 82% 312 Vanderhoof K-S 82% 400 Operational Efficiency of 16 CR Addition to Drake MS: Capital Expense 25,000 SF Building .................................................................. $10,000,000 Maintenance & Operations Expense at $5/SF/Year .............................................. $125,000 Educational Administrative Expense ................................................................... No Change Total ...................................................................................................................... $125,000 Operational Efficiency of Allendale/Campbell 576 Elementary School: Capital Expense 65,000 SF Building ................................................................... $25,000,000 Maintenance & Operations Expense at $5/SF/Year ............................................... $325,000 Educational Administrative Expense ...................................................................... $450,000 Total ...................................................................................................................... $775,000 33 Arvada West Articulation Area (continued) Operational Efficiency of Table Rock Mesa K-8, 850 Student School: Capital Expense 110,000 SF Building ................................................................ $35,000,000 Maintenance & Operations Expense at $5/SF/Year ............................................... $550,000 Educational Administrative Expense ..................................................................... $700,000 Total .................................................................................................................. $1,250,000 Operational Efficiency of Allendale/Campbell 576 Elementary School: Capital Expense 65,000 SF Building .................................................................. $25,000,000 Maintenance & Operations Expense at $5/SF/Year ............................................... $325,000 Educational Administrative Expense ..................................................................... $450,000 Total ..................................................................................................................... $775,000 34 Bear Creek Articulation Area OVERVIEW: Declining enrollment at all schools except Bear Creek K-8. Significant capacity is available in Carmody MS providing the opportunity to convert to a 6-8 facility and changing the elementary schools to KS. This articulation area has three schools-Green Gables, Peiffer, and Red Rocks-with high FCI. A 'past promise' exists to replace Green Gables with a new elementary at the same site. Projected growth of the Green Gables golf course development (Jewell and Wadsworth) will impact this articulation area as well as Alameda. Discussions to relocate the development into the Bear Creek Articulation area have been held but no recommendations or decisions made. 2015-16 Capacity: 2,510 available seats at the Elementary schools, current enrollment 2,103 - 84% utilization; K-8 1,051 available seats, current enrollment 1,104 -105% utilization; Middle School 998 available seats, current enrollment 569 -57% utilization; High School 2,114 available seats, current enrollment 1,634-77% utilization. CURRENT CONDITIONS: Green Gables ES 52% 80% 300 41% 51% Kendallvue ES 32% 87% 493 31% 43% Peiffer ES 34% 72% 410 29% 55% Red Rocks ES 62% 97% 325 60% 30% Westgate ES 28% 87% 575 28% 49% Bear Creek K-8 2% 105% 1104 53% 33% Carmody MS 16% 57% 569 34% 58% Bear Creek HS 3% 77% 1634 34% 42% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 0.9% decrease in enrollment or about 46 students. The articulation area is mature and enrollment growth will come from turnover in the neighborhoods. The housing is 'affordable' with opportunities for growth from migration west from the Sheridan corridor. There are large tracts of undeveloped property east of Wadsworth and south of the Green Gables development that could impact enrollment, but there are no development plans at this time. 35 Bear Creek Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Bear Creek K-8 1,109 1,113 1,100 1,110 1,126 Green Gables ES 303 309 308 306 303 Kendallvue ES 523 520 551 548 536 Peiffer ES 394 390 383 372 376 Red Rocks ES 320 336 318 317 326 Westgate ES 574 576 589 612 626 Carmody MS 546 532 528 524 521 Bear Creek HS 1,614 1,602 1,598 1,572 1,550 Total 5,383 5,378 5,375 5,361 S,364 ARTICULATION AREA FACILITIES: Bear Creek High School: The building was replaced in 2008 incorporating a 2002 addition to the Bear Creek Elementary School that became Bear Creek K-8 at a different location. The two story building has 255,986 SF of area with an applied capacity of 2,114. The site is 41.4 acres. carmody Middle School: The building was constructed in 1965 with an addition in 2000. The two story building has an area of 99,694 SF and an applied capacity of 998. The site is 21 acres. Bear Creek K-8: The building was constructed in 2008. The two-story building has 122,367 SF and an applied capacity of 1,051. The site is 11 acres. Green Gables Elementary School: Constructed in 1969 the building is 36,920 SF and has an applied capacity of 375. There are two modulars on the 8.7 acre site. Kendallvue Elementary School: Constructed in 1982 the building is 45,418 SF and has an applied capacity of 567. There are six modulars on the 13 acre site. Peiffer Elementary School: Constructed in 1973 with additions in 1986 and 1997, the building has 44,035 SF and an applied capacity of 572. There are six modula rs on the 11 acre sit e. Red Rocks Elementary School: Constructed in 1955 with additions in 1961, 1966 and 1996, the building has 29,177 SF and an app lied capacity of 336. There are six modulars on the 20 acre site. Westgate Elementary School: Constructed in 1972 with an addition in 1995, the building has 51,212 SF and an applied capacity of 660. There are eight modulars on the 8.5 acre (5.7 acres owned by Lakewood) site. 36 Bear Creek Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: K-5 ELEMENTARIES & 6-8 MIDDLE SCHOOL: Convert most elementary schools to K-5 to reduce enrollment, reduce modulars and build capacity into schools. No additional area required at Carmody to accomplish this change. Modular reduction would be from 28 to 4 remaining in service at Red Rocks. Review boundary changes between Westgate and Green Gables; also between Red Rocks and Bradfords though this involves a change in matriculation. Assumes Green Gables replacement would come on line for the 2018-19 school year and would reduce the enrollment at Westgate and decrease utilization at Green Gables. Currently, Green Gables has $4.2 million in building deficiencies. Impact to elementary schools 2017-18 School Year using enrollment projections: Carmody 6-8 84% 842 Green Gables K-5 76% 249 Kendallvue K-5 90% 445 Peiffer K-5 77% 330 Red Rocks K-5 94% 296 Westgate K-5 95% 501 Operational Efficiency of 24 Modular Closure Maintenance & Operations Expense at $5/SF/Year ............................................. ($120,000) NEW 576 STUDENT ELEMENTARY SCHOOL AT GREEN GABLES SITE: Construct replacement Green Gables Elementary for 576 K-5 students. Operational Efficiency of Green Gables Replacement: Capital Expense 65,000 SF Building .................................................................. $25,000,000 Maintenance & Operations Expense at $5/SF/Year ............................................... $325,000 Educational Administrative Expense ................................................................... No Change Total ..................................................................................................................... $325,000 Operational Efficiency of closed Green Gables Capit al Expense to close Green Gables ....................................................................... $0.00 Additional Maintenance & Operations Expense at $5/SF/Year ............................ ($200,000) Outstanding Building Deficiencies ....................................................................... $4,200,000 37 38 Chatfield Articulation Area OVERVIEW: Declining enrollment at most schools except Falcon Bluffs and Deer Creek. Deer Creek's growth can be attributed to the STEM curriculum offered to 61h grade students. Significant capacity is available at Deer Creek MS providing the opportunity to convert to a full 6-8 facility and the possibility of converting t he elementary schools to KS. The two Bradford schools will offer a K-8 program beginning in the 2016 school year. This articulation area has two schools, Coronado and Stony Creek, with relatively high FCI. 2015-16 Capacity: 2,920 available seats at the Elementary schools, current enrollment 2,534 - 87% utilization; 975 available seats at the Bradford K-8, current enrollment 717 -74% utilization; Middle School 1,997 available seats, current enrollment 1,313 -66% utilization; High School 2,360 available seats, current enrollment 1,811-77% utilization. CURRENT CONDITIONS: Bradford Primary 21% 81% 442 32% 14% Bradford Intermediate 11% 64% 275 23% 25% Coronado ES 37% 92% 601 53% 45% Mortensen ES 13% 90% 481 32% 41% Shaffer ES 20% 86% 535 20% 33% Stony Creek ES 31% 74% 476 34% 50% Ute Meadows ES 19% 94% 441 24% 30% Deer Creek MS 20% 59% 678 24% 23% Falcon Bluffs MS 7% 75% 635 22% 27% Chatfield HS 14% 77% 1,811 37% 27% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 1.4% increase in enrollment or about 89 students. The articulation area is mature and enrollment growth will come from turnover in the neighborhoods with limited opportunities for new development. The existing housing is 'affordable'. Growth opportunities for neighborhood schools can come from creating capacity with better utilization of existing facilities. Introducing PreK at Bradford and boundary adjustment with Red Rocks ES may provide additional enrollment in the Ken Caryl area . 39 Chatfield Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Bradford K-8 691 669 678 686 683 Coronado ES 610 609 636 635 619 Mortensen ES 459 469 475 469 464 Shaffer ES 537 535 537 552 543 Stony Creek ES 472 448 431 408 435 Ute Meadows ES 453 431 416 403 411 Deer Creek MS 689 700 704 688 695 Falcon Bluffs MS 653 682 668 680 690 Chatfield HS 1,800 1,808 1,851 1,903 1,924 Total 6,364 6,351 6,396 6,424 6,464 ARTICULATION AREA FACILITIES: Chatfield High School: Originally constructed in 1986 with additions added in 1987 and 2008 and an applied capacity of 2,360. The two-story building has an area of 275,727 SF and is located on a 39 acre site. Targeted Improvement:: Artificial Turf Field. Deer Creek Middle School: Originally constructed in 1980 with an addition constructed in 1992 and has an applied capacity of 1,147. The two-s tory building has an area of 120,366 SF and is located on 20.5 acres. Falcon Bluffs Middle School: Originally constructed in 2003 the building has an applied capacity of 850. The two-story building has an area of 113,571 and is located on 15 acres. Bradford Primary (K-8): Originally constructed in 1990 and has an applied capacity of 543. The building has an area of 48,682 SF on a 10.6 acre site. Bradford Intermediate (K-8): Originally constructed in 1994 and has an applied capacity of 432. The building has an area of 46,070 SF on a 20.4 acre site. Coronado Elementary School: Originally constructed in 1987 with an area of 46,544 SF an applied capacity of 656. There are also four modulars on the 9.6 acre site. Mortensen Elementary School: Originally constructed in 1994 with an area of 52,158 SF an applied capacity of 535. The site is 10.8 acres. 40 Chatfield Articulation Area (continued) Shaffer Elementary School: Originally constructed in 1998 with an area of 53,368 SF an applied capacity of 620. There are also six modulars on the 10 acre site. Stony Creek Elementary School: Originally constructed in 1983 with an area of 45,230 SF an applied capacity of 641. There are also ten modulars on the 13 acre site. Ute Meadows Elementary School: Originally constructed in 1987 with an area of 46,466 SF an applied capacity of 468. The re are also two modulars on the 10.5 acre site. FACILITY DEPARTMENT RECOMMENDATIONS: Convert Deer Creek to a full 6-8 facility; 61h grade students from Coronado, Mortensen, Stony Creek elementary schools to Deer Creek, Ute Mea dows 6th grade to Falcon Bluffs. Elementary schools become K-5 to reduce enrollment, reduce modulars and build capacity into schools. No additional square footage required at any location to accomplish this change. Modular reduction would be from 22 to 2 remaining in service at Coronado. Review boundary changes between Red Rocks and Bradford though this Involves a change in matriculation. Consider a PreK at Bradford Primary. MATRICULATION CHANGES: Colorow Elementary School: Incorporate Stony Creek north 'panhandle' into Colorow boundary. Impact to elementary & middle schools 2017-18 School Year using enrollment projections: Bradford K-8 70% 678 Coronado K-5 96% 556 Mortensen K-5 75% 400 Shaffer K·S 94% 537 Stony Creek K-5 82% 371 Ute Meadows ES 89% 416 Deer Creek MS 80% 919 Falcon Bluffs MS 87% 743 Chatfield HS Artificial Turf: Capital Expense ........................................................................................................ $1,500,000 Operational Efficiency of 20 Modular Closures Maintenance & Operations Expense at $5/SF/Year .................................................. ($100,000) Modular Removal/Demolition ..................................................................................... $500,000 41 42 Columbine Articulation Area OVERVIEW: Articulation area growth is flat with a projected 0.7% decrease over the next five years. Elementary school enrollment is close to capacity except for Dutch Creek, which loses a significant number of students to Normandy and charters due to choice enrollment. There is a lack of development in the area; growth is either from the existing community, neighborhood 'turnover', or choice enrollment. 2015-16 Capacity: 2,630 available seats at the Elementary schools, current enrollment 2,162 - 82% utilization; Middle School 854 available seats, current enrollment 654 -77% utilization; High School 1,919 available seats, current en rollment 1,664 -87% utilization. CURRENT CONDITIONS: Columbine Hills ES 19% 87% 423 41% 44% Dutch Creek ES 24% 65% 313 19% 44% Governor's Ranch 24% 78% 429 36% 21% Leawood ES 17% 96% 432 35% 44% Normandy ES 27% 85% 565 48% 33% Ken Caryl MS 15% 77% 654 28% 21% Columbine HS 21% 87% 1664 39% 20% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 0. 7% decrease in enrollment or about 33 students. Lack of development in the area limits options for growth. Recommendations regarding matriculation of some elementary schools may increase enrollment. Residential turnover that provides 'afford able housing' opportunities are a source of growth, but other south area articulation areas offer homes at similar price points. 43 • Columblne Articulation Area Columbine Articulation Area (continued) School 2016-17 2017-18 2018·19 2019·20 2020-21 Columbine Hills ES 412 400 415 423 424 Dutch Creek ES 311 305 289 278 273 Governor's Ranch 401 0 0 0 0 Blue Heron 0 452 420 414 389 Leawood ES 423 456 472 468 466 Normandy ES 553 545 535 554 562 Ken Caryl MS 646 644 640 643 644 Columbine HS 1,660 1,655 1,685 1,691 1,690 Total 4,406 4,457 4,456 4,471 4,448 ARTICULATION AREA FACILITIES: Columbine High School: Originally constructed in 1973 additions were added in 1976, 1979, 1982, 1987, 1989, 1995 and 2000. The two-story building has an area of 238,149 SF with an applied capacity of 1,919 students. The site is 33.6 acres. Targeted Improvements: Auxiliary Gym, Artificial Turf Field, Interior Renovation . Ken Caryl Middle School: Originally constructed in 1970 with additions added in 1984, 1985 and 1986. The building has an area of 88,021 SF and an applied capacity of 854. There are five modulars at this location. The site is 16 acres. Columbine Hills Elementary School: Originally constructed in 1964 with additions added in 1967 and 1996. The building has an area of 47,268 SF and an applied capacity of 486. The site is 9.2 acres. Dutch Creek Elementary School: Originally constructed in 1973 an addition was added in 1995. The building has an area of 49,780 SF and an applied capacity of 483. The site is 6.3 acres. Governor's Ranch Elementary School: Originally constructed in 1987, the building has an area of 46,908 SF and an applied capacity of 550. There are four modulars in use. The site is 10.3 acres. Leawood Elementary School: Originally constructed in 1972 an addition was added in 1995. The building has an area of 48,383 SF and an applied capacity of 448. The site is 11.8 acres. Normandy Elementary School: Originally constructed in 1970 with additions added in 1998 and 2002. The building has an area of 55,702 SF and an applied capacity of 663. There are eight modulars in use and four mothballed. The site is 9.9 acres. 44 Columbine Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: Matriculation Changes: Blue Heron Elementary School: From Dakota Ridge Articulation to Columbine. Benefits to Transportation Services, compensates for loss of Governor's Ranch enrollment. Governor's Ranch Elementary School: From Columbine Articulation to Dakota Ridge. Maintain enrollment balance between Columbine and Dakota Ridge. Boundary Changes: School 2016-17 2017-18 2018-19 2019-20 2020-21 Columbine Hills ES 412 400 415 423 424 Dutch Creek ES 311 305 289 278 273 Blue Heron ES 489 452 420 414 389 Leawood ES 423 456 472 468 466 Normandy ES 553 545 535 554 562 Ken Caryl MS 646 644 640 643 644 Columbine HS 1,660 1,655 1,685 1,691 1,690 Total 4,494 4,457 4,456 4,471 4,448 Blue Heron, Leawood, and Normandy review boundary and modify to better balance enrollment at the three elementary schools. Dutch Creek and Normandy extend the Dutch Creek boundary south to incorporate portion of Normandy boundary and increase Dutch Creek enrollment while reducing the over- enrollment at Normandy. Columbine HS Renovation, Auxiliary Gym, Artificial Turf: Capital Expense Renovation, Auxiliary Gym, Artificial Turf .................................. $3,600,000 Operational Efficiency of Matriculation Changes Reduction in Transportation Services Expense ...................................................... (TBD) Operational Efficiency of Boundary Changes Capital Expense Demolish 6 Modulars at Normandy ............................................. $150,000 Reduction in Modular Maintenance & Operations Expense at $5/SF/Year ............ ($30,000) 45 46 Conifer Articulation Area OVERVIEW: Flat growth at the HS and increased growth at the MS level; West Jefferson ES has increased in enrollment because of placement of moving the PreK program from the Little White Schoolhouse to the school; West Jefferson ES is a PreK-5 program and West Jefferson MS is a 6-8 program. The elementary schools are currently at or above optimal utilization and modular classrooms are to be added in 2016. The proposed scope at Conifer HS is a 'Past Promise' project from the 2008 Bond that is still valid. Enrollment projections indicate a slight reduction for the Articulation area. 2015-16 Capacity: 1,116 available seats at the Elementary schools, current enrollment 1,005 - 90% utilization; Middle School 751 available seats, current enrollment 552 -74% utilization; High School 1,277 available seats, current enrollment 781-61% utilization. CURRENT CONDITIONS: Elk Creek ES 23% 72% 317 21% 300,.(, Marshdale ES 53% 83% 288 14% 36% West Jefferson ES 12% 121% 400 40% 33% West Jefferson MS 30% 74% 552 6% 18% Conifer HS 13% 61% 781 13% 20% FIVE VEAR PROJECTIONS: Growth projections over the next five years indicate approximately a loss of 4.0% enrollment or about 93 students. Development in the Conifer Articulation area is stable with little growth which will keep the enrollment numbers relatively stable. A number of factors affect the Conifer enrollment. These are availability of housing, topography limiting developable land, land and property values, and demographics. School 2016-17 2017-18 2018-19 2019-20 2020-21 Elk Creek ES 314 323 316 316 314 Marshdale ES 270 253 234 218 203 West Jefferson ES 377 354 344 346 346 West Jefferson MS 551 544 588 587 568 Conifer HS 806 825 800 810 814 Total 2,318 2,299 2,282 2,277 2,245 47 Conifer Articulation Area (continued) ARTICULATION AREA FACILITIES: Conifer High School The building was originally constructed in 1996, with no major additions. The two story building with basement has 166,224 SF of area with an applied capacity of 1,277. The site has four temporary buildings. The site is 103.3 acres. Targeted improvements: Renovate+ Expand. Expand with Aux Gym and Weight Room. West Jefferson Middle School Originally constructed in 1974, additions added in 1987, and 1995. The one story building has 104,165 SF of area with an applied capacity of 751. The site is 38.7 acres. Elementary Schools: Elk Creek ES: Originally constructed in 1989 additions added in 1991, 1995, and 1997. The building has 51,002 SF of area with an applied capacity of 438. The site is 14 acres. Marshdale ES: Originally constructed in 1980 with no additions. The one story building has 44,121 SF of area with an applied capacity of 348. The site has two temporary buildings. The site is 12.1 acres. Target Improvements: Replacement. West Jefferson ES: Originally constructed in 2001, with no additions. The one story building has 48,100 SF of area with an applied capacity of 330. The site is 17 acres. Temporary portable classrooms added for start of the 2016-17 school year should reduce the utilization factor. The temporary portable classrooms will increase the applied capacity to 380. 48 Conifer Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: MAINTAIN K-5 ELEMENTARYS -6-8 MIDDLE SCHOOL, AND 9-12 HIGH SCHOOL: Maintain elementary schools at PreK-5 (West Jefferson ES) and K-5 (Elk Creek and Marshdale) to maintain enrollment. Replace Marshdale ES at the same site; this building has $5.1 million in deficiencies. No impact to near-or mid-term school years. Current enrollment projections for 2016-17 will not change significantly: West Jefferson ES has a PreK recently placed at the school, which has increased the utilization to near 100%. West Jefferson ES is also to receive two portable classroom buildings for the 2016-17 school year to reduce the enrollment pressure on the main facility. The Utilization shown in the table Includes two temporary portable classroom buildings, which increases the applied capacity to 380. Elk Creek ES 72% 314 Marshdale ES 78% 270 West Jefferson ES 99% 377 West Jefferson MS 73% 551 Conifer HS 59% 806 CONIFER HIGH SCHOOL: Renovation and Expand with Aux Gym and Weight Room, Tennis Courts. Operational and Capital Expenses of Conifer H.S.: Capital Expense Renovation and Master Plan ..................................................... $6,250,000 Maintenance & Operations Expense at $5/SF/Year ................................................. $60,000 Educational Administrative Expense ................................................................... No Change Total ................................................................................................................... $6,250,000 MARSHOALE ELEMENTARY SCHOOL: Replace existing facility with a 480 Student K-5 Operational and Capital Expenses of Marshdale ES Replacement Capital Expense Replacement 50,000 SF .......................................................... $20,000,000 Maintenance & Operations Expense at $5/SF/Year (net) ........................................ $20,000 Educational Administrative Expense ................................................................... No Change Outstanding Building Deficiencies ....................................................................... $5,100,000 49 so Dakota Ridge Articulation Area OVERVIEW: Articulation area has steadily declining enrollment projected at approximately a 3.2% decrease over the next five years. Elementary school optimal enrollment exceeds capacity at Mount Carbon, Powderhorn, and Westridge. Colorow is significantly under-enrolled which loses a significant number of students to neighborhood and charter schools via choice enrollment. There is some development in the area but nothing comparable to other areas of the county; growth is either from the existing community, neighborhood 'turnover', or choice enrollment. 2015-16 Capacity: 2,681 available seats at the Elementary schools, current enrollment 2,324 - 87% utilization; Middle School 895 available seats, current enrollment 798 -89% utilization; High School 1,936 available seats, current enrollment 1,509 -78% utilization. CURRENT CONDITIONS: Blue Heron ES 12% 86% 501 47% 37% Colorow ES 39% 59% 215 13% 52% Mount Carbon ES 11% 100% 471 21% 40% Powderhom ES 21% 87% 636 23% 29% Westridge ES 31% 95% 501 46% 29% Summit Ridge MS 14% 89% 798 34% 20% Dakota Ridge HS 9% 78% 1,509 40% 33% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 3.2% decrease in enrollment or about 148 students. Lack of significant development in the area limits options for growth. Recommendations regarding matriculation of some elementary schools may increase enrollment. Residential turnover that provides 'affordable housing' opportunities are a source of growth, but other south area articulation areas offer homes at similar price points. 51 Dakota Ridge Articulation Area (continued) --:l ,':..... . ~·-1 . -,• I ' - School 2016-17 2017-18 2018-19 2019-20 2020-21 Blue Heron ES 489 0 0 0 0 Governor's Ranch 0 404 412 386 388 Colorow ES 220 230 229 219 222 Mount Carbon ES 472 475 489 496 500 Powderhorn ES 631 606 600 585 579 Westridge ES 510 501 522 516 512 Summit Ridge MS 771 801 781 782 818 Dakota Ridge HS 1,500 1,499 1,496 1,511 1,463 Total 4,593 4,516 4,529 4,495 4,482 ARTICULATION AREA FACILITIES: Dakota Ridge High School: Constructed in 1996 with additions added in 2000 and 2008 and an applied capacity of 1,936. The two-story building has an area of 236,407 SF on a 42 acre site. Summit Ridge M iddle School: Constructed in 1994 the two-story building is 122,573 SF with an applied capacity of 895. The site is 20.5 acres. Blue Heron Elementary School: Constructed in 2002 the building is 55,083 SF with an applied capacity of 584. The site is 8.6 acres. Colorow Elementary School: Constructed in 1977 with an addition in 1993 the building is 44,227 SF with an applied capacity of 363. The site is 10 acres. Mount Carbon Elementary School: Constructed in 1996 the building is 51,931 SF with an applied capacity of 471. The site is 9.1 acres. Powderhorn Elementary School: Constructed in 1994 the building is 52,135 SF with an applied capacity of 735. In addition to the building there are nine modulars on the 10 acre site. Westridge Elementary School: Constructed in 1987 the building is 47,105 SF with an applied capacity of 528. In addition to the building there are 6 modulars (2 in service) on the 12.5 acre site. 52 Dakota Ridge Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: MATRICULATION CHANGES: Governor's Ranch Elementary School: From Columbine Articulation to Dakota Ridge. Maintain enrollment balance between Columbine and Dakota Ridge. Blue Heron Elementary School: From Dakota Ridge Articulation to Col umblne; benefits to Transportation Services. Colorow Elementary School: Incorporate Stony Creek north 'panhandle' into Colorow boundary. Operational Efficiency of Matriculation Changes Reduction in Transportation Services Expense ...................................................... (TBD) Colorow ES 80% 290 Governor's Ranch ES 85% 404 Mount Carbon ES 101% 475 Powderhorn ES 85% 606 Westridge ES 104% 501 Summit Ridge MS 89% 801 Dakota Ridge HS 77% 1,499 BOUNDARY CHANGES: Incorporate Stony Creek north 'panhandle' into Colorow boundary. 53 • Dakota Ridge Articulation Area Dakota Ridge Articulation Area (continued) POWDERHORN ELEMENTARY ADDITION OPTION: Construct an eight classroom addition to Powderhorn. Remove nine modular classrooms. Operational Efficiency of Powderhorn Addition: Capital Expense 8 CR Addition ............................................................................ $4,200,000 Increased Maintenance & Operations Expense at $5/SF/Year ................................. $60,000 Eliminate Nine M odular Classrooms ..................................................................... ($45,000) Educational Administrative Expense .................................................................. No Change Total ....................................................................................................................... $15,000 MT. CARBON ELEMENTARY ADDITION OPTION: Construct a four classroom addition to Mt. Carbon. Operational Efficiency of Powderhorn Addition: Capital Expense 4 CR Addition ............................................................................ $2,400,000 Increased Maintenance & Operations Expense at $5/SF/Year ................................. $30,000 Educational Administrative Expense .................................................................. No Change Total ....................................................................................................................... $30,000 54 Evergreen Articulation Area OVERVIEW: There is flat growth at the HS level and slightly ascending growth at the MS level. The ES enrollment has remained relatively flat; low utilization at Bergen Meadow and high utilization at Parmalee. Parmalee is projected to decrease in enrollment over the next five years, which should bring its utilization back to optimal. The other elementary schools are currently at or near optimal utilization. The proposed modernization scope at Evergreen MS is a 'Past Promise' project from the 2008 Bond that is still valid. Enrollment projections indicate a slight reduction for the Articulation area. 2015-16 Capacity: 1,695 available seats at the Elementary schools, current enrollment 1,280 - 76% utilization; Middle School 879 available seats, current enrollment 7U -81% utilization; High School 1,347 available seats, current enrollment 1,058 -79% utilization. CURRENT CONDITIONS: Bergen Meadow ES 22% 57% 326 39% 45% Bergen Valley ES 7% 87% 292 6% 29% Parmalee ES 29% 85% 265 34% 30% Wilmot ES 23% 83% 397 32% 41% Evergreen MS 8% 81% 712 14% 22% Evergreen HS 12% 79% 1,058 14% 12% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a loss of 2. 7% in enrollment or about 83 students. Development in the Evergreen Articulation area is stable with little growth which will keep the numbers relatively stable. A number of factors affect the Evergreen enrollment. These are availability of housing, topography limiting developable land, land and property values, and demographics. SS Evergreen Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Bergen Meadow ES 325 300 304 307 306 Bergen Valley ES 283 319 335 333 307 Parmalee ES 277 265 236 207 173 Wilmot ES 380 370 331 372 327 Evergreen MS 722 668 698 696 763 Evergreen HS 1,084 1.136 1,113 1,115 1,091 Total 3,071 3,058 3,017 3,030 2,967 ARTICULATION AREA FACILITIES: Evergreen High School The building was originally constructed in 1954, additions added in 1963, 1971, 1979, 1986, 1997, and 2001. The three story building has 209,129 SF of area with an applied capacity of 1,34 7. The site is 33.3 acres. Targeted Improvement: Master Plan and Sports Field Upgrades Evergreen Middle School Originally constructed in 1969, additions added in 1982, 1984, and 1986. The two story building has 111,715 SF of area with an applied capacity of 879. There are two temporary classroom buildings on site. The site is 19.7 acres. Full Modernization: Phase II -New Cafeteria and Kitchen with major interior renovation. Elementary Schools: Bergen Meadow: Originally constructed in 1970 an addition was added in 1986. The building has 50,555 SF of area with an applied capacity of 567. The site is 13.3 acres. Bergen Valley: Originally constructed in 1997, the one story building has 42,281 SF of area with an applied capacity of 336. The site is 17.3 acres. Parmalee: Originally constructed in 1963, additions were added in 1996 and 2001. The one story building has 29,376 SF of area with an applied capacity of 312. There are five temporary classroom buildings on site. The site is 12 acres. Wilmot: Originally constructed in 1877, with additions added in 1963 and 2000. The one story building and basement has 52,330 SF of area with an applied capacity of 480. The site is 18.4 acres. Targeted Improvement:: Phase II Addition-Cafeteria, Kitchen & Gym 56 Evergreen Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: MAINTAIN K-5 ELEMENTARY, 6-8 MIDDLE SCHOOL, AND 9-12 HIGH SCHOOL: Maintain elementary schools at K-5 to maintain enrollment. Consider program additions to Bergen Meadow to increase enrollment. No impact to near-or mid-term school years. Current enrollment projections for 2016-17 will not change significantly: Bergen Meadow ES 57% 325 Bergen Valley ES 84% 283 Parmalee ES 115% 277 Wilmot ES 85% 380 Evergreen MS 88% 722 Evergreen HS 80% 1,084 Parmalee is projected to reduce in enrollment over the next 2-3 years which will bring this school back in line with acceptable utilization. EVERGREEN HIGH SCHOOL: Renovation and Master Plan for Priority Repairs of the Facility. Operational and Capital Expenses of Evergreen H.S.: Capital Expense Renovation and Master Plan ..................................................... $2,700,000 Maintenance & Operations Expense at $5/SF/Year ............................................. No Change Educational Administrative Expense ................................................................... No Change Total ................................................................................................................... $2, 700,000 EVERGREEN MIDDLE SCHOOL: Addition, Renovation and Master Plan for Full Modernization to include future portable reduction, past promises; Cafeteria, kitchen addition, classroom renovation. Operational and Capital Expenses of Evergreen M .S.: Capital Expense Renovation and Master Plan ..................................................... $7,500,000 Maintenance & Operations Expense at $5/SF/Year $50,000 Educational Administrative Expense ................................................................... No Change Tota l ................................................................................................................... $7,550,000 57 Evergreen Articulation Area (continued) WILMOT ELEMENTARY SCHOOL: Phase II Construction to include approx. 9,000 SF addition; remove outdated wing, dining, kitchen and gymnasium addition. Operational and Capital Expenses of Wilmot E.S.: Capital Expense Renovation and Addition .......................................................... $3,500,000 Maintenance & Operations Expense at $5/SF/Year ............................................ No Change Educational Administrative Expense .................................................................. No Change Total .................................................................................................................. $3,500,000 58 Golden Articulation Area OVERVIEW: Flat growth at the HS level; the STEM program and moving Mitchell 6~h grade has significantly increased enrollment at Bell MS. Low enrollment at Pleasant View with a fairly high FCI provides an opportunity for consolidation with Shelton and Welchester. The Kyffin addition is a 'Past Promise' project from the 2008 Bond that is still valid. Enrollment projections indicate slight growth. 2015-16 Capacity: 3,122 available seats at the Elementary schools, current enrollment 2,422 - 78% utilization; Middle School 916 available seats, current enrollment 744 -81% utilization; High School 1,425 available seats, current enrollment 1,250 -88% utilization. CURRENT CONDITIONS: Kyffin ES 43% 79% 492 42% 29% Mitchell ES 13% 84% 538 8% 27% Pleasant View ES* 29% 64% 294 46% 51% Ralston ES 18% 77% 3S8 16% 26% Shelton ES 27% 86% 444 16% 41% Welchester ES* 26% 70% 296 26% 48% Bell MS 21% 81% 744 19% 36% Golden HS 4% 88% 1,250 15% 34% *Title I School FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 3.8% growth in enrollment or about 172 students. Development along the Highway 93 corridor north of Mitchell can increase these numbers. A number of factors affect the Golden enrollment. These are availability of housing, topography limiting developable land, Colorado Mines, and demographics. 59 Golden Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Litz PK 79 73 76 77 76 Kyffin ES 500 507 499 500 497 Mitchell ES 535 559 558 554 576 Pleasant View ES 293 297 292 306 304 Ralston ES 360 367 385 384 387 Shelton ES 448 445 450 448 440 Welchester ES 297 283 294 294 287 Bell MS 741 690 753 779 802 Golden HS 1,254 1,276 1,253 1,270 1,295 Total 4,507 4,497 4,560 4,612 4,664 ARTICULATION AREA FACILITIES: Golden High School Originally constructed in 2008, the two story building has 187,259 SF of area with an applied capacity of 1,425. The site is 32 acres. Bell Middle School Originally constructed in 1964, additions added in 1967, 1985, 1996 and 2001. The two story building has 125,740 SF of area with an applied capacity of 916. The site is 20 acres. Targeted Improvement: 4 Classroom addition. Kyffin Elementary School: Originally constructed in 1972, an addition was added in 1994. The building has 49,079 SF of area with an applied capacity of 624 there are five modulars on the 9.3 acre site. Targeted Improvement: Major Renovation and Addition; convert to K-5 Mitchell Elementary School: Originally constructed in 1997, the two story building has 52,697 SF of area with an applied capacity of 639. There are three modulars on the 9 acre site. Pleasant View Elementary School: Originally constructed in 1950, additions were added in 1961, 1964, 1995 and 1999. The building has 49,079 SF of area with an applied capacity of 461 and is Title I. The site is 6. 7 acres. Close school, 6th grade to Bell MS, remaining enrollment split between Shelton ES and Welchester. 60 Golden Articulation Area (continued) Ralston Elementary School: Originally constructed in 1955, with additions added in 1963, 1986, 1997, 2001, and 2009. The building has 51,303 SF of area with an applied capacity of 462. The site is 10 acres. Shelton Elementary School: Originally constructed in 1998. The building has 53,530 SF of area with an applied capacity of 516. The site is 11.5 acres. Targeted Improvement: 3 Classroom addition; Convert to K-5 Welchester Elementary School: Originally constructed in 1961, with additions added in 1965, 1980, 1982, 1995, and 2002. The building has 42,093 SF of area with an applied capacity of 420 and is Title I. The site is 9.7 acres. Targeted Improvement: Convert to K-5 FACILITY DEPARTMENT RECOMMENDATIONS: K-5 ELEMENTARIES & 6-8 MIDDLE SCHOOL: Convert elementary schools to K-5 to reduce enrollment and build capacity into schools. Close Pleasant View. Currently, Pleasant View has $3.1 million in building deficiencies. Modify boundary between Shelton and Welchester to accommodate Pleasant View students; 6th grade students to Bell Middle School. Bell 6-8 92% 933 Kyffin K-5 76% 439 Mitchell K-5 98% 558 Ralston K-6 79% 367 Shelton K-5 87% 535 Welchester K-5 91% 381 Impact to affected schools 2017-18 School Year using enrollment projections: Table Rock Mesa K-8 will have an impact upon the enrollment at Mitchell and possibly Bell depending upon grade configuration. Operational Efficiency of Bell Addition Capital Expense 4 CR Addition ............................................................................ $2,250,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................ $30,000 61 Golden Articulation Area (continued) SHELTON, PLEASANT VIEW, AND WELCHESTER OPTION: Construct a three classroom addition to Shelton ES and split the Pleasant View boundary between Shelton and Welchester; close Pleasant View. Operational Efficiency of Shelton Addition: Capital Expense 3 CR Addition ............................................................................ $1, 700,000 Educational Administrative Expense ................................................................... No Change Maintenance & Operations Expense at $5/SF/Year ................................................. $30,000 Operational Efficiency of Pleasant View Closure: Maintenance & Operations Expense at $5/SF/Year ............................................. ($250,000) Educational Administrative Expense ................................................................... ($450,000) Outstanding Building Deficiencies ...................................................................... $3,100,000 MAJOR RENOVATION & ADDITION TO KYFFIN Replacement of the existing building while preserving the 1994 addition. Capital Expense 50,000 SF Addition, Site Redevelopment ................................ $18,750,000 Educational Administrative Expense .................................................................. No Change Maintenance & Operations Expense at $5/SF /Year ................................................. $80,000 62 Green Mountain Articulation Area OVERVIEW: Stagnant growth combined with under-enrollment at HS and MS level. Under-enrollment at Hutchinson, balance of elementary schools are at or over-enrolled in part due to special programs; Gifted and Talented at Devinny and PreK at Foothills. Development of Rooney Valley continues and will need to be monitored closely. Increasing capacity in the elementary schools will absorb the growth in the near term. 2015-16 Capacity: 2,563 available seats at the Elementary schools, current enrollment 2,174 - 85% utilization; Middle School 897 available seats, current enrollment 626 -70% utilization; High School 1,838 available seats, current enrollment 1,126 -61% utilization. CURRENT CONDITIONS: Oevinny ES 18% 81% 543 42% 28% Foothills ES 22% 76% 326 32% 57% Green Mtn. ES 32% 97% 374 63% 42% Hutchinson ES 34% 71% 392 43% 50% Rooney Ranch ES 18% 103% 539 28% 34% Dunstan MS 3% 70% 626 20% 28% Green Mtn. HS 26% 61% 1,126 26% 39% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 2.3% growth in enrollment or about 92 students. Development in the Rooney Valley can significantly increase these numbers. Green Mountain neighborhood turnover provides 'affordable housing' opportunities, but other south area articulation areas offer homes at similar price points. 63 Green Mountain Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Irwin PK 106 U3 128 134 122 Devinny ES 543 518 516 512 503 Foothills ES 313 317 333 349 347 Green Mountain ES 364 363 360 346 342 Hutchinson ES 351 351 335 328 325 Rooney Ranch ES 562 573 617 652 670 Dunstan MS 616 624 639 643 627 Green Mountain HS 1,148 1,156 1,167 1,178 1,189 Total 4,003 4,025 4,095 4,142 4,125 ARTICULATION AREA FACILITIES: Green Mountain High School Originally constructed in 1972 additions were added in 1981, 1982, 1987, 1989, and 1995 . The two story building has 200,903 SF of area with an applied capacity of 1,838. The site is 39 acres. The proposed first phase of the GMHS renovation involves site redevelopment, relocation of athletic fields, and construction of locker rooms, auxiliary gym, mechanical and electrical services. Dunstan Middle School Originally constructed in 2006, the two story building has 125,644 SF of area with an applied capacity of 897. The site is 17 acres. Targeted Improvement: Addition. Convert to 6-8. Elementary Schools: Devinny: Originally constructed in 1964 additions were added in 1995 and 2000. The building has 52,257 SF of area with an applied capacity of 672; there are seven modulars on the 8.6 acre site. Foothills: Originally constructed in 1970 an addition was added in 1994. The building has 43,600 SF of area with an applied capacity of 430; there is one modular on the 10.S acre site. Green Mountain: Originally constructed in 1962, additions were added in 1967, 1995 and 2001. The building has 40,112 SF of area with an applied capacity of 387; there are three modulars on the 8 acre site. Targeted Improvement: 8 Classroom addition. Convert to K-5 64 Green Mountain Articulation Area (continued) Hutchinson: Originally constructed in 1973, an addition was added in 1995. The building has 46,416 SF of area with an applied capacity of 549; there are two modulars on the 10 acre site. Rooney Ranch: Originally constructed in 1994 with an addition in 2006. The building has 53,564 SF of area with an applied capacity of 525. The site is 9.2 acres. FACILITY DEPARTMENT RECOMMENDATIONS: PREFERRED RECOMMENDATION: K-5 ELEMENTARIES & 6-8 DUNSTAN MIDDLE SCHOOL: Convert elementary schools to K-5 to reduce enrollment and build capacity into schools. Modify boundary at Devinny, Hutchinson, and Rooney Ranch to better utilize Hutchinson. Eight classroom addition to Dunstan and convert to 6-8, increase capacity to 1,100 students. Adjust boundaries between Devinny, Hutchinson, and Rooney Ranch. Impact to elementary schools 2017-18 School Year using enrollment projections: Dunstan 6-8 87% 960 Devinny K-5 86% 431 Foothills K-5 76% 277 Green Mtn. K-5 87% 307 Hutchinson K-5 Rooney Ranch K-5 Reconfigure Hutchinson boundary to increase enrollment there, reducing enrollment at Rooney Ranch and Devinny. Operational Efficiency of Dunstan Addition Capital Expense 8 CR Addition ............................................................................ $4,500,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................ $60,000 GREEN MOUNTAIN ES AND GLENNON HEIGHTS OPTION: Construct an eight classroom addition to Green Mountain ES and split the Glennon Heights boundary between Belmar and Green Mountain; close Glennon Heights. Operational Efficiency of Green Mountain/Glennon Heights Option Capital Expense 8 CR Addition ............................................................................ $4,500,000 Maintenance & Operations Expense at $5/SF/Year ................................................. $60,000 Educational Administrative Expense ................................................................... ($450,000) Involves both boundary and matriculation change. 65 • Green Mountain Articulation Area Green Mountain Articulation Area (continued) SECONDARY RECOMMENDATION: NEW 576 STUDENT ELEMENTARY SCHOOL AT COYOTE GULCH SITE: Construct Coyote Gulch Elementary at 576 students initially; expansion potential of 768 K-5 students. Capacity at Dunstan could accommodate 100 additional 61h grade students at current projections. Construction of this elementary school is likely only with increased development in Rooney Valley. Hutchison could be temporarily closed if this school is built. Operational Efficiency of Coyote Gulch 576 Elementary School: Capital Expense 65,000 SF Building .................................................................. $25,000,000 Maintenance & Operations Expense at SS/SF/Year ............................................... $325,000 Educational Administrative Expense ..................................................................... $450,000 Total ..................................................................................................................... $775,000 Operational Efficiency of Hutchinson Closure: Maintenance & Operations Expense at $5/SF /Year ............................................. ($232,000) Educational Administrative Expense ................................................................... ($450,000) Total ................................................................................................................... {$682,000) Boundary changes do not have a direct impact on maintenance and operation expenses but can better utilize the affected facilities. 66 Jefferson Articulation Area OVERVIEW: In the 2015-16 school year, there was a major reconfiguration in the Jefferson Articulation area that changed the High School to a 7-12 facility. Middle school students in this articulation area can attend the 7-12 or choice into one of the other middle schools. There is insufficient data to make anything other than an 'educated guess' based upon past trends as how successful this change will be. All the elementary schools are over-enrolled with a significant number of modulars providing the additional space necessary to meet the number of students. There are 25 modulars at the three elementary schools. There is a lack of development in the area; growth is either from the existing community, neighborhood 'turnover' and 'gentrification', or choice enrollment. This is a high mobility area also, with enrollment increases or decreases dependent upon rental rates. 2015-16 Capacity: 1,875 available seats at the Elementary schools, current enrollment 1,530 - 82% utilization; Middle & High School (7-12) 997 available seats, current enrollment 731-73% utilization. The MS student enrollment at Jefferson (7-12) is 271. CURRENT CONDITIONS: Edgewater Es• 26% 78% 508 41% 41% Lumberg Es• 52% 79% 496 35% 45% Molholm Es• 45% 88% 526 32% 38% Jefferson 7-12* 18% 73% 731 31% 45% •Title I School FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 4.1% decrease in enrollment or about 92 students. The five-year projections are based upon data from the previous configuration of the articulation area. The high mobility and availability of below market priced housing can cause significant fluctuations in enrollment. Replacement of modular classrooms with permanent square footage could reduce the percentage of families choosing to choice out of the neighborhood boundaries. 67 Jefferson Articulation Area (continued) --------- 11 -~.' .: ' ". '1 .. -- - School 2016-17 2017-18 2018-19 2019-20 2020-21 Edgewater ES 488 454 436 412 400 Lumberg ES 490 491 531 544 557 Molholm ES 528 519 499 497 479 Jefferson 7-12 731 727 719 725 733 Total 2,237 2,191 2,185 2,178 2,169 ARTICULATION AREA FACILITIES: Jefferson Jr/Sr High School : Constructed in 1959 with additions added in 1965, 1969, 1974, 1976, 1980, 1995, 2002 and 2012. The building is 123,773 SF with an applied capacity of 997 and is Title I. The site is 18. 7 acres and has three modulars in addition to the building. Targeted Improvements: Develop Master Plan for Phase I scope. Edgewater Elementary School: Constructed in 1949 with additions added in 1953, 1961, 1986, 1997and 1998. The two-story building is 45,207 SF with an applied capacity of 651 and is Title I. The site is 5.7 acres and there are nine modulars in addition to the building. Targeted Improvement:: PreK wing. lumberg Elementary School: Constructed in 1955 with additions added in 1959, 1965, 1973 and 1995. The building is 49,380 SF with an applied capacity of 628 and is Title I. The site is 8.2 acres and there are seven modulars in addition to the building. Targeted Improvement: 8 Classroom Addition. Molholm Elementary School: Constructed in 1954 with additions added in 1963 and 1995. The building is 46,525 SF with an applied capacity of 596 and is Title I. The site is 9.9 acres and has nine modulars. Targeted Improvement: 8 Classroom Addition. 68 Jefferson Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: JEFFERSON HIGH SCHOOL OPTIONS: Should the academic goals that have been established for Jefferson High School not be achieved, the school can be converted into a specialty high school or closed. From the center of the articulation area, the distances from Jefferson to Lakewood or Wheat Ridge High Schools is less than three miles and from Alameda less than four. Master plan Jefferson High School: This school and site is half the size of a typical high school. To replace the building on this site would be very difficult and cause the elimination of the athletic fields during the period of replacement. Master Plan a phased replacement starting with construction of new academic wings. PREFERRED RECOMMENDATION: PHASE I OF A PHASED REPLACEMENT: Develop Master Plan for Phase I Scope. Operational Efficiency of Phase I Master Plan: Capital Expense ............................................................................................... $20,000,000 Operational Efficiency of Repurposed Jefferson H.S.: Total ................................................................................................................... No Change PRE-K WING AT EDGEWATER ELEMENTARY SCHOOL Construct 11,000 SF Pre-K Wing at Edgewater ES, remove nine modular buildings. Capital Expense 11,000 SF Wing ......................................................................... $3,000,000 Maintenance & Operations Expense at $5/SF/Year ................................................. $55,000 Maintenance & Operations Expense at $5/SF/Year-Modular Credit.. ..................... ($45,000) Educational Administrative Expense ................................................................... No Change Total ....................................................................................................................... $10,000 LUMBERG ELEMENTARY SCHOOL 8 CR ADDITION: Construct an eight classroom addition to Lumberg ES. Operational Efficiency of Lumberg Addition: Capital Expense 8 CR Addition ............................................................................ $4,000,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................ $48,000 Maintenance & Operations Expense at $5/SF/Year-Modular. Credit.. .................... ($35,000) Educational Administrative Expense ................................................................... No Change Capital Expense Remove 7 Modulars ..................................................................... $140,000 Total ....................................................................................................................... $13,000 69 Jefferson Articulation Area (continued) MOLHOLM ELEMENTARY SCHOOL 8 CR ADDITION: Construct an eight classroom addition to Molholm ES. Operational Efficiency of Molholm Addition: Capital Expense 8 CR Addition ............................................................................ $4,000,000 Additional Maintenance & Operations Expense at SS/SF/Year ................................ $48,000 Maintenance & Operations Expense at $5/SF/Year-Modular. Credit.. ................... ($45,000) Educational Administrative Expense .................................................................. No Change Capital Expense Remove 9 Modulars ..................................................................... $180,000 Annual Total ........................................................................................................... $13,000 SECONDARY RECOMMENDATION: NEW 1200 STUDENT 7-12 HIGH SCHOOL AT JEFFERSON SITE: Construct replacement Jefferson Jr./ Sr. H.S. for 1200 students. Operational Efficiency of 1200 Student High Schoof: Capital Expense 175,000 SF Building ................................................................ $55,000,000 Maintenance & Operations Expense at $5/SF/Year (net) ...................................... $360,000 Educational Administrative Expense .................................................................. No Change Total ..................................................................................................................... $360,000 Operational Efficiency of Jefferson H.S. Closure: Maintenance & Operations Expense at $5/SF /Year ............................................. ($620,000) Educational Administrative Expense ................................................................... ($800,000) Building Deficiencies ........................................................................................... $4,800,000 Annual Total .................................................................................................... ($1,420,000) 70 Lakewood Articulation Area OVERVIEW: Enrollment growth in the articulation area is steady to flat. There is a lack of development in the area; growth is either from the existing community, neighborhood 'turnover' and 'gentrification', or choice enrollment. The development that does exist is related to Light Rail and tends to focus on multi-family housing with minimal children. This is a demographically diverse area consisting of single family housing with some aging multifamily as well as that related to Light Rail. 2015-16 Capacity: 2,211 available seats at the Elementary schools, current enrollment 1,798 - 81% utilization; Middle School 958 available seats, current enrollment 705 -74% utilization; High School 1,898 available seats, current enrollment 2,099 -111% utilization. CURRENT CONDITIONS: Belmar ES 26% 83% 316 56% 57% Eiber ES* 32% 83% 400 13% 48% Glennon Heights ES 34% 70% 230 47% 56% Slater ES* 24% 67% 333 34% 47% South Lakewood ES 20% 98% 519 41% 40% Creighton MS 7% 74% 705 39% 29% Lakewood HS 8% 111% 2,099 57% 32% *Title I School FIVE VEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 2.2% increase in enrollment or about 102 students. The articulation area is mature and enrollment growth will come from turnover in the neighborhoods and choice enrollment as a result of the successful academic program. The existing housing is 'affordable' but large scale single family development opportunities are minimal. 71 Lakewood Articulation Area (continued) --.. j '1. I ' " - -- School 2016-17 2017-18 2018-19 2019-20 2020-21 Belmar ES 308 319 318 318 324 Eiber ES 423 454 471 485 517 Glennon Heights ES 226 225 221 220 228 Slater ES 337 330 317 310 312 South Lakewood ES 522 522 503 498 495 Creighton MS 714 712 716 719 720 Lakewood HS 2,101 2,105 2,103 2,104 2,108 Total 4,631 4,667 4,649 4,654 4,704 ARTICULATION AREA FACILITIES: Lakewood High School: Constructed in 1958 with an addition added in 2007. The two-story building is 248,135 SF with an applied capacity of 1,898. The site is 28.3 acres. Creighton Middle School: Originally constructed in 1962, additions in 2000 and 2009 have replaced the original building. The two-story building is 120,847 SF with an applied capacity of 958. The site is 27.8 acres. Targeted Improvements: Eight classroom addition, convert to 6-8 facility. Elementary Schools: Belmar Elementary School: Constructed in 1961 with additions added in 1968 and 2000. The building is 40,829 SF with an applied capacity of 382. The site is 10.6 acres and there are two modulars in addition to the building. Targeted Improvements: Six classroom addition, remove modulars. Eiber Elementary School: Constructed in 1955 with additions added in 1962 and 1996. The building is 52,018 SF with an applied capacity of 480 and is Title I. The site is 8.6 acres and has five modulars. Targeted improvements: Six classroom addition, remove modulars. Glennon Heights Elementary School: Constructed in 1957 with an addition added in 1995. The building is 34,699 SF with an applied capacity of 327. The site is 7.1 acres and has five modulars. Targeted improvements: Close, move students to Belmar, Green Mountain ES, and Creighton. 72 Lakewood Articulation Area (continued) Slater Elementary School: Constructed in 1953 with additions added in 1963 and 1995. The building is 46,085 SF with an applied capacity of 494 and is Title I. The site is 9.3 acres and has four modulars. South Lakewood Elementary School: Constructed in 1995, the two-story building is 51, 797 SF with an applied capacity of 528. The site is 4.7 acres and has one modular. FACILITY DEPARTMENT RECOMMENDATIONS: K-5 ELEMENTARIES & 6-8 MIDDLE SCHOOL: Convert elementary schools to K-5 to reduce enrollment and build capacity into schools. Eight classroom addition to Creighton and convert to 6-8, increase capacity to 1,100 students. Six classroom additions to Belmar and Eiber Elementary schools, close Glennon Heights allow students to attend Belmar or Green Mountain Elementary. Glennon Heights has $2.7 million in building deficiencies. Impact to middle and elementary schools 2017-18 School Year using enrollment projections: Operational Efficiency of Creighton Addition Creighton 6-8 87% 986 Belmar K-5 96% 459 Eiber K-5 76% 411 Slater K-5 87% 267 S. Lakewood K-5 55% 423 Capital Expense 8 CR Addition ............................................................................ $4,000,000 Additional Maintenance & Operations Expense at $5/SF/Year. ............................... $60,000 Educational Administrative Expense ...................................................................... $200,000 Annual Total .......................................................................................................... $260,000 Operational Efficiency of Belmar Addition Capital Expense 6 CR Addition ............................................................................ $3,100,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................ $45,000 Operational Efficiency of Eiber Addition Capital Expense 6 CR Addition ............................................................................ $3,100,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................ $45,000 73 Operational Efficiency of Closing Glennon Heights: Reduction in Maintenance and Operations Expense at $5/SF/Vear ..................... ($175,000) Educational Administrative Expense ................................................................... ($450,000) Outstanding Building Deficiencies ...................................................................... $2, 700,000 Twelve Modular Reduction: Reduction in Maintenance and Operations Expense at $5/SF/Vear ....................... ($60,000) Capital Expense Remove 12 Modulars .................................................................. $240,000 74 Pomona Articulation Area OVERVIEW: Articulation area has growing enrollment projected at approximately a 3.2% increase over the next five years. Elementary school enrollment is nearing capacity at Warder and Weber; other elementary schools are under-enrolled which lose a significant number of students to neighborhood and charter schools via choice enrollment. The neighborhoods are established and there could be some growth due to the development further west. There is minor development in the area. 2015-16 Capacity: 2,007 available seats at the Elementary schools, cu rrent enrollment 1,629 - 81% utilization; Middle School 812 available seats, cu rrent enrollment 421 -52% utilization; High School l,921 available seats, current enrollment 1,499 -78% utilization. CURRENT CONDITIONS: Little ES 18% 79% 364 28% 48% Parr ES 30% 59% 363 63% 50% Warder ES 25% 98% 423 44% 42% Weber ES 17% 96% 479 28% 53% Moore MS 23% 52% 421 27% 35% Pomona HS 26% 78% 1,499 51% 29% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 3.2% increase in enrollment or about 113 students. School 2016-17 2017-18 2018-19 2019-20 2020-21 Little ES 364 357 366 358 354 Parr ES 388 394 397 394 398 Warder ES 427 449 454 494 482 Weber ES 466 475 483 485 481 Moore MS 420 422 427 425 430 Pomona HS 1,509 1,511 1,505 1,513 1,517 Total 3,574 3,608 3,632 3,669 3,662 75 Pomona Articulation Area (continued) ARTICULATION AREA FACILITIES: Pomona High School Originally constructed in 1973, additions were added in 1978, 1979, 1981, 1982, 1983, 1987, 1989, and 1995. The two story building has 203,945 SF of area with an applied capacity of 1,921; there are two modulars on the 28.5 acre site. Targeted improvements: Expand with Aux Gym and Weight Room Addition artificial turf field. Remove modulars. Moore Middle School Originally constructed in 1978, the two story building has 83,756 SF of area with an applied capacity of 812. The site is 16 acres. Elementary Schools: Little: Originally constructed in 1973, additions were added in 1995 and 2001. The building has 40,713 SF of area with an applied capacity of 459; there are two modulars on the 8.6 acre site. Option: Consolidate with Parr on Parr site. Dispose of Property. Parr: Originally constructed in 1969, additions were added in 1996 and 2002 . The building has 33,587 SF of area with an applied capacity of 616; there are eleven modulars on the 13.5 acre site. Targeted Improvements: Remove Pre-K students and reduce modular buildings. Build New PreK to accommodate PreK students. Consolidate Parr and Little at Parr Location with new 768 student school. Warder: Originally constructed in 1973, an addition was added in 1995. The building has 41,934 SF of area with an applied capacity of 431. The site is 9.7 acres. Weber: Originally constructed in 1972, an addition was added in 1994. The building has 51,052 SF of area with an applied capacity of 501; there are two modulars on the 9.3 acre site. Zerger (closed): Originally constructed in 1977, the building has 43,876 SF of area; the site is 8.1 acres. The school was closed in 2011. Targeted improvements: Dispose of Property. 76 Pomona Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: 9-12 HIGH SCHOOL Pomona High School program remains unchanged. Operational Efficiency of Gym and Weight Room 10,000 SF Addition; Turf Field Capital Expense .................................................................................................. $3,200,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................ $50,000 CONVERT MOORE MIDDLE SCHOOL INTO A 6-8; ELEMENTARY SCHOOLS TO PreK-5 or K-5: Convert Moore Middle School to 6-8. New Parr consolidated with Little, Weber, and Warder to K-5. CONSOLIDATE UTILE ANO PARR ES CONSTRUCT NEW 768 STUDENT PreK-5 AT PARR SITE. Build a new 768 student elementary school at the Parr location. Close and dispose of Little ES; this school has $1.6 million in building deficiencies. Remove 11 modular classrooms. Consolidate Little-Parr Boundary. Impact to schools 2020-21 School Year using enrollment projections: Operational Efficiency of New PreK-5 School Capital Expense ............................................................................................... $28,000,000 Maintenance & Operations Expense at $5/SF/Year ............................................... $350,000 Educational Administrative Expense ..................................................................... $450,000 Total ............................................................................................................................ $800,000 Little ES 0% () Parr PreK-5 86% 658 Warder K-5 92% 398 Weber K-5 83% 415 Moore 6-8 83% 674 Operational Efficiency of closed Little ES Capital Expense to close little ES ................................................................................ $0.00 Additional Maintenance & Operations Expense at $5/SF/Year ............................ ($212,000) Educational Administrative Expense ................................................................... ($450,000) Outstanding Building Deficiencies ....................................................................... $1,600,000 77 78 Ralston Valley Articulation Area OVERVIEW: Ralston Valley Articulation area is impacted by the growth of the Candelas and Leyden Rock developments. Whisper Creek and in-fill projects are also contributing to the enrollment increase. Using Certificates of Participation, the district will add 1,250 seats to the area as a temporary solution to the growth. For the interim period, nine modular classrooms are being installed at Meiklejohn ES (4) and West Woods ES (5). 2015-16 Capacity: 2,761 available seats at the Elementary schools, current enrollment 2,580 - 93% utilization; K-8 School 223 seats available, current enrollment 140 -63% utilization; Middle School 770 available seats, current enrollment 582 -76% utilization; High School 1,865 available seats, current enrollment 1,828 -98% utilization. CURRENT CONDITIONS: I -= -' . ' '. '(.. ·-····· . ""' .. .. . . • ( q - I I .l .. ·~ ... ·--'· -- Meiklejohn ES 5% 96% 777 8% 17% Sierra ES 46% 89% 545 19% 35% Van Arsdale ES 39% 98% 518 41% 30% West Woods ES 26% 91% 740 16% 21% Coal Creek K-8 27% 63% 140 37% 22% Oberon MS 29% 76% 582 12% 23% Ralston Valley HS 10% 98% 1,828 24% 15% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 36. 7% increase in enrollment or about 1,882 students. School 2016-17 2017-18 2018-19 2019-20 2020-21 Meiklejohn ES 850 855 854 853 857 Sierra ES 580 706 740 764 773 Van Arsdale ES 544 536 528 540 550 West Woods ES 754 762 780 784 782 Coal Creek K-8 149 154 155 156 155 Candelas PK-8 0 600 800 1,000 1,000 Oberon MS 588 612 640 673 695 Ralston Valley HS 1,850 1,905 2,075 2,200 2,200 Total 5,315 6,130 6,572 6,970 7,012 79 Ralston Valley Articulation Area (continued) ARTICULATION AREA FACILITIES: Ralston Valley High School Originally constructed in 2001, an addition was added 2007. The two story building has 239,199 SF of area with an applied capacity of 1,865. The site is 52.9 acres. Targeted improvements: 10 CR third academic wing, artificial turf field. Oberon Middle School Originally constructed in 1965, additions were added in 1969 and 1982. The building has 90,839 SF of area with an applied capacity of 770. The site is 21.7 acres. Targeted improvements: Implement Phase I of Master Plan, convert to 6-8, 8 CR addition. Coal Creek Canyon K-8 Originally constructed in 1963, additions were added in 1973, 1994, 1997, and 2004. The building has 25,361 SF of area with an applied capacity of 223; there is one modular on the 10.3 acre site. Candelas PK-8: Under construction and scheduled to open in August 2017. The building will be 100,000 SF of area with an applied capacity of 800. The site is 25 acres. Targeted Improvements: 8 CR addition. Elementary Schools: Meiklejohn: Originally constructed in 2006, the building has 69,841 SF of area with an applied capacity of 807; four modulars will be added in Summer 2016 on the 6 acre site. These additional modulars will increase applied capacity to 903. Sierra: Originally constructed in 1970, with an addition added in 1994. Phase II of Sierra is scheduled to be completed in 2017. The building has 60,176 SF of area with an applied capacity of 610; there are six modulars on the 10 acre site. With the Phase II work the applied capacity will increase to 768, modulars and the 1970 building will be removed. Van Arsdale: Originally constructed in 1994, the building has 50,512 SF of area with an applied capacity of 528. There are three modulars on the 19.2 acre site, which ls owned by the City of Arvada. West Woods: Originally constructed in 1996, the building has 53,381 SF of area with an applied capacity of 816; there are ten modulars -five added in 2016 -on the 6.4 acre site. Targeted improvements: Modular reduction. 80 Ralston Valley Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: Provide a ten classroom addition to Ralston Valley HS, provide an eight classroom addition to Oberon MS with the implementation of the Oberon Master Plan and convert to 6-8; convert Meiklejohn, Sierra, and Van Arsdale ES to K-5. Convert West Woods to K-5, sixth grade students to Candelas K-8. Provide a 200 seat addition to Candelas School by 2020. The following is the enrollment and utilization projections for the 2018-19 school year with these changes implemented. Plan for a future 576 student K-5 elementary school on the Leyden Rock site. Meiklejohn K-5 93% 754 Sierra K-5 83% 640 Van Arsdale K-5 82% 453 West Woods K-5 96% 670 Coal Creek K-8 77% 155 Candelas PK-8 91% 910 Oberon MS 94% 915 Ralston Valley HS 111% 2075 Operational Efficiency of Ten CR Addition to Ralston Valley HS: Capital Expense 15,000 SF Addition .................................................................... $5,500,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................ $75,000 Educational Administrative Expense ................................................................... No Change Total ....................................................................................................................... $75,000 Operational Efficiency of 8 CR Addition & Master Plan Recommendations Oberon MS: Capital Expense 28,000 SF Addition & Renovation ........................................... $20,000,000 Additional Maintenance & Operations Expense at $5/SF/Year .............................. $140,000 Educational Administrative Expense ................................................................... No Change Total ..................................................................................................................... $140,000 Operational Efficiency of 8 CR Addition to Candelas K-8: Capital Expense 12,000 SF Addition .................................................................... $4,500,000 Additional Maintenance & Operations Expense at $5 /SF/Year ............................... $60,000 Educational Administrative Expense ................................................................... No Change Total ....................................................................................................................... $60,000 81 Operational Efficiency of Leyden Rock 576 Elementary School: Capital Expense 65,000 SF Building .................................................................. $25,000,000 Maintenance & Operations Expense at $5/SF/Year ............................................... $325,000 Educational Administrative Expense ..................................................................... $450,000 Total ..................................................................................................................... $775,000 82 Standley Lake Articulation Area OVERVIEW: Enrollment In this area is flat. Lukas ES is the only facility at capacity, Sheridan Green is approaching optimum enrollment, and the remaining ES's are under-enrolled as are the two Middle Schools. Development to the west of the Standley Lake Articulation Area and in Broomfield plus the availability of less expensive existing housing should increase enrollment at these schools. There are a significant number of students that choice out of neighborhood schools; the high number of charter schools in the area is a factor. 2015-16 Capacity: 3,143 available seats at the Elementary schools, current enrollment 2, 708 - 86% utilization; Middle School 1,260 available seats, current enrollment 828 -66% utilization; High School 1,833 available seats, current enrollment 1,317 -72% utilization. CURRENT CONDITIONS: Adams ES 31% 84% 477 47% 46% Lukas ES 23% 100% 519 18% 46% Ryan ES 24% 85% 471 37% 25% Semper ES 14% 76% 421 29% 42% Sheridan Green ES 25% 89% 443 54% 47% Witt ES 36% 83% 377 37% 51% Mandalay MS 16% 65% 426 22% 30% Wayne Carle MS 8% 67% 402 18% 34% Standley Lake HS 18% 72% 1,317 21% 33% FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 0.8% decrease in enrollment or about 38 students. 83 Standley Lake Articulation Area (continued) FIVE YEAR PROJECTIONS: -. --'= -r.-. . . ~· .• . ---•• '1. School 2016-17 2017-18 Adams ES 470 474 Lukas ES 503 496 Ryan ES 462 466 Semper ES 417 401 Sheridan Green ES 442 445 Witt ES 367 406 Mandalay MS 425 407 Wayne Carle MS 411 382 Standley Lake HS 1,298 1,311 Total 4,795 4,788 ARTICULATION AREA FACILITIES: Standley Lake High School --.· _II - 2018-19 2019-20 2020-21 477 480 481 485 487 472 451 437 438 421 409 406 446 446 447 401 394 408 400 425 434 376 399 409 1,314 1,318 1,320 4,771 4,795 4,815 Originally constructed in 1988, an addition was added 2000. The three story building has 193, 706 SF of area with an applied capacity of 1,833. The site is 42.4 acres. Targeted improvements: Aux Gym addition and turf field, renovate. Mandalay Middle School Originally constructed in 1983, the t wo story building has 88,977 SF of area with an applied capacity of 658. The site is 25.5 acres. Wayne Carle Middle School Origina lly constructed in 2006, the two story building has 105,483 SF of area with an applied capacity of 602. The site is 25.6 acres. Elementary Schools: Adams: Originally constructed in 1988, the building has 47, 737 SF of area with an applied capacity of 570. There is modular on the 5.3 acre site. Lukas: Originally constructed in 1988, the building has 47, 742 SF of area with an applied capacity of 519. Th e site is 6.1 acres. Ryan: Originally constructed in 1994, the building has 50,545 SF of area with an applied capacity of 552. There are three modulars on the 7 acre site, which is owned by the City of Westminster. 84 Standley Lake Articulation Area (continued) Semper: Originally constructed in 1996, the building has S3,7S6 SF of area with an applied capacity of SSS. The site is 9.S acres. Sheridan Green: Originally constructed in 1987, the building has 46,466 SF of area with an applied capacity of 49S. The site is 6. 7 acres. Witt: Originally constructed In 1980, the building has 44,341 SF of area with an applied capacity of 4S2. The site is 8.2 acres. FACILITY DEPARTMENT RECOMMENDATIONS: 9-12 HIGH SCHOOL Standley Lake High School program remains unchanged. Operational Efficiency of Auxiliary Gym Addition and Turf Field Capital Expense .................................................................................................. $3,600,000 Additional Maintenance & Operations Expense at $S/SF/Year ................................ $40,000 K - S ELEMENTARY SCHOOLS, 6-8 MIDDLE SCHOOLS: Relocate 61h grade students from Adams, Semper and Sheridan Green into Mandalay and 61h graders from Lukas, Ryan and Witt into Wayne Carle. Impact to schools 2017-18 School Year using enrollment projections: Adams K-5 73% 417 Lukas K-5 82% 427 Ryan K-5 73% 393 Semper K-5 61% 336 Sheridan Green K-5 70% 379 Witt K-5 79% 359 Mandalay 6-8 90% 595 Wayne Carle 6-8 95% 571 Standley Lake HS 72% 1,311 Operational Efficiency of 61h Grade Relocations Capital Expense .................................................................................................... $200,000 Addition Maintenance & Operations Expense at $S/SF/Year .............................. No Change 85 • Standley Lake Articulation Area 86 • Wheat Ridge Articulation Area Wheat Ridge Articulation Area OVERVIEW: Articulation area has enrollment growth projected at approximately a 2.6% increase over the next five years. Elementary school enrollment exceeds capacity at Prospect Valley and nearly at Maple Grove; other elementary schools are significantly under-enrolled which lose a sign ificant number of students to neighborhood and charter schools via choice enrollment. The neighborhoods are established with community resistance to development. 2015-16 Capacity: 3,359 available seats at the Elementary schools, current enrollment 2,641 - 79% utilization; Middle School 811 available seats, current enrollment 425 -52% utilization; High School 1, 703 available seats, current enrollment 1,309 -77% utilization. CURRENT CONDITIONS: Anderson Pre-K 6% 102% 122 Kullerstrand ES* 27% 77% 223 35% 63% Maple Grove ES 17% 80% 370 36% 29% Pennington ES* 29% 62% 199 45% 53% Prospect Valley ES 51% 103% 493 61% 41% Stevens ES* 17% 67% 476 35% 52% Stober ES 49% 99% 321 48% 44% Vivian es• 27% 57% 210 58% 63% Wilmore-Davis ES 27% 87% 349 50% 54% Everitt MS* 23% 52% 425 30% 59% Wheat Ridge HS 32% 77% 1,309 38% 38% *Title I School FIVE YEAR PROJECTIONS: Growth projections over the next five years indicate approximately a 2.6% increase in enrollment or about 118 students. 87 Wheat Ridge Articulation Area (continued) School 2016-17 2017-18 2018-19 2019-20 2020-21 Anderson Pre-K 128 130 122 133 130 Kullerstrand ES 225 228 234 228 230 Maple Grove ES 374 384 384 395 398 Pennington ES 205 208 218 216 220 Prospect Valley ES 500 504 495 490 492 Stevens ES 493 494 485 489 501 Stober ES 323 325 341 335 334 Vivian ES 198 228 195 224 208 Wilmore-Davis ES 361 369 373 379 380 Everitt MS 446 420 419 423 429 Wheat Ridge HS 1,308 1,312 1,290 1,286 1,293 Total 4,561 4,602 4,556 4,598 4,615 ARTICULATION AREA FACILITIES: Wheat Ridge High School Originally constructed in 1956, additions were added in 1961, 1971, 1972, 1976, 1980, 1996, 2001, and 2008. The two story building has 211,311 SF of area with an applied capacity of l, 703. The site is 23. 7 acres. Targeted improvements: Phase II of the Master Plan (Past Promise). Everitt Middle School Originally constructed in 1966, additions were added in 1983, 1988, and 1997. The building has 103,698 SF of area with an applied capacity of 811 and is Title I. The site is 18. 7 acres. Targeted improvements: Renovation. Elementary Schools: Kullerstrand: Originally constructed in 1961, additions were added in 1973, 1974, 1997, 2002, and 2004. The building has 35,531 SF of area with an applied capacity of 289 and is Title I. There are four modulars on the 9.8 acre site. Targeted improvements: Close and consolidate to a new school Prospect Valley-Kullerstrand on Prospect Valley site, modular reduction; Boundary Change. 88 Wheat Ridge Articulation Area (continued) Maple Grove: Originally constructed in 1960, additions were added in 1963, 1996, and 1999. The building has 42,410 SF of area with an applied capacity of 462. The site is 12.3 acres. Targeted improvements: 4 classroom addition. Take cottages out of service. Pennington: Originally constructed in 1961, additions were added in 1964 and 2001. The building has 36,877 SF of area with an applied capacity of 319 and is Title I. There are three modulars on the 13.7 acre site. Prospect Valley: Originally constructed in 1967, with additions added in 1996 and 2000. The building has 46,229 SF of area with an applied capacity of 480. There is one modular on the 8.4 acre site. Targeted improvements: Consolidate to new school Prospect Valley-Kullerstrand on Prospect Valley Site with modular reduction; Boundary Change. Stevens: Originally constructed in 1995, the two story building has 112,152 SF of area with an applied capacity of 711 and is Title I. The site is 12.3 acres. This is the origina l Wheat Ridge Middle Schoo l. Stober: Origina lly constructed in 1965 with an addition added in 1993, the building has 31,243 SF of area with an applied capacity of 324. There are four modulars on the 6.3 acre site. Targeted improvements: Consolidate to New School -Stober/Vivian on the Vivian site with a modular reduction; Boundary Change. Vivian: Originally constructed in 1953, additions were added in 1958, 1964, and 1994. The building has 33,139 SF of area with an applied capacity of 371 and is Title I. There are four modulars on the 10.1 acre site. Targeted improvements: Consolidate to New School -Stober/Vivian on the Vivia n site with a modular reduction; Boundary Change. Wilmore-Davis: Originally constructed in 1955, additions were added in 1960, 1966, and 1994. The building has 38,596 SF of area with an applied capacity of 403. There are two modulars on the 7.3 acre site. 89 Wheat Ridge Articulation Area (continued) FACILITY DEPARTMENT RECOMMENDATIONS: K-5 ELEMENTARYS & 6-8 MIDDLE SCHOOL: Consolidate Stober and Vivian into a new 768 student facility on the Vivian site. Modify Boundaries in the Stober/Vivian, and Prospect Valley/Kullerstrand areas. Consolidate Prospect Valley ES and Kullerstrand into Prospect Valley with classroom addition for a 768 school. Move Kullerstrand and Prospect Va lley 6Lh graders into Everitt MS. Consolidating these four schools into two sites will remove $12.8 million in building deficiencies. Add 4-classroom addition to Maple Grove ES to reduce high utilization. Sobesky Academy has relocated into Stevens ES. Sobesky at the former Stevens ES is not included in these studies. Impact to middle and elementary schools 2017-18 School Year using enrollment projections: II" -{·f !.__I --- .,/ ' ·--I - Maple Grove K-5 79% 384 Pennington K-5 67% 208 Prospect Valley K-5 82% 626 (incl. Kullerstrand) Stevens K-5 82% 494 Stober-Vivian K-5 72% 553 Wilmore-Davis K-5 82% 369 Everitt 6-8 76% 526 Operational Efficiency of Maple Grove Addition {5,000 SF): Capital Expense 4 CR Addition ............................................................................ $1,800,000 Additional Maintenance & Operations Expense at $5/SF/Year ................................ $15,000 Operational Efficiency of New Prospect Valley-Kullerstrand ES (72,000 SF): Capital Expense for new 768 ES School ............................................................ $23,400,000 Additional Maintenance & Operations Expense at $5/SF/Year .............................. $360,000 Educational Administrative Expense ..................................................................... $450,000 Operational Efficiency of Closing Kullerstrand: Reduction in Maintenance and Operations Expense at $5/SF/Year ..................... ($177,655} Educational Administrative Expense ................................................................... ($450,000) Outstanding Building Deficiencies ...................................................................... $2,200,000 90 Wheat Ridge Articulation Area (continued) Operational Efficiency of Closing Prospect Valley: Reduction in Maintenance and Operations Expense at $5/SF/Year ..................... ($231,000) Educational Administrative Expense ................................................................... ($450,000) Outstanding Building Deficiencies ....................................................................... $5,200,000 Operational Efficiency of New Stober-Vivian ES (72,000 SF): Capital Expense for new 768 ES School ............................................................ $23,400,000 Additional Maintenance & Operations Expense at $5/SF/Year .............................. $360,000 Educational Administrative Expense ..................................................................... $450,000 Operational Efficiency of Closing Vivian: Reduction in Mai ntenance and Operations Expense at $5/SF/Year ..................... ($165,695) Educational Administrative Expense ................................................................... ($450,000) Out standing Building Deficiencies ....................................................................... $2,000,000 Operational Efficiency of Closing Stober: Reduction in Maintenance and Operations Expense at $5/SF/Year ..................... ($156,215) Educational Administrative Expense ................................................................... ($450,000) Outstanding Building Deficiencies ....................................................................... $3,400,000 9-12 HIGH SCHOOL: Phase II of the Master Plan Operational Efficiency of Phase II of Master Plan: Capital Expense for Phase II of Master Plan ........................................................ $7,500,000 91 92 Options OVERVIEW: There are twelve option schools that serve or provide for different stu dent needs and programs. The schools are located primarily in the central areas; although, there are programs in the north (Warren Tech-North) and south area (D' Evelyn). CURRENT CONDITIONS: Connections Learning Center 0% 31% 38 Brady Exploration School 27% 48% 238 Dennison Elementary School 29% 113% 625 D'Evelyn Jr/Sr High School 5% 82% 1,022 Jeffco Open School 8% 121% 542 Long View High School 44% 61% 58 Manning School 24% 102% 447 Mclain Community High School 8% 61% 486 Miller Special School 43% 30% 94 Warren Tech North 20% 3% 12 Warren Tech Central 19% 4% 39 Sobesky Academy at Stevens ES 19% 14% 62 FIVE YEAR PROJECTIONS: The option schools below have enrollments that tend to be static due to the process of enrolling into the school. Most students in these schools are from neighborhood schools though some may choice-in from out of district. 93 Options (continued) Option Schools 2016-17 2017-18 2018-19 2019-20 2020-21 Brady Exploration School 214 214 214 214 214 Dennison Elementary School 624 624 624 624 624 D'Evelyn Jr/Sr High School 1,020 1,020 1,020 1,020 1,020 Jeffco Open School 549 549 549 549 549 Long View High School 56 56 56 56 56 Manning School 450 450 450 450 450 Mclain Community High School 496 496 496 496 496 Warren Tech North 9 9 9 9 9 Warren Tech Central 38 38 38 38 38 Total 3,456 3,456 3,456 3,456 3,456 FACILITY DEPARTMENT RECOMMENDATIONS: Enrollment figures do not paint an accurate picture of the popularity or success of these option programs. Dennison, D' Evelyn, and Manning offer programs geared towards academic excellence with Dennison and Manning exceeding 100% utilization. These facilities are located in the central and south-central areas. Adding sites in the north and south areas should be considered; although, providing additional sites may dilute the candidate pool and increase enrollment at the expense of neighborhood schools. There is increased interest in career, technical education (CTI). The Warren Tech enrollment doesn't appear to support that, but the students that attend Warren Tech are counted in their home schools. 1,200 students attend Warren Tech Central (WT) and 300 Warren Tech North programs each day. Students are responsible for getting themselves to their classes at either campus. Consideration should be given to the creation of another campus located in south area of the district that could offer programs similar to current locations, new programs, or both. The other option is to reconfigure an under-utilized facility to a CTE oriented school that will provide an additional location. 94 Options (continued) Jeffco Open School originally constructed in 1930 with additions in 1977, 1995, and 1997 underwent a major addition and renovation in 2010 which constituted Phase I of the work. Phase I removed approximately 50,000 SF from the center of the building. Phase I constructed these spaces: administration, commons, kitchen, early childhood and primary grades, art, Special Ed, music, site and playground redevelopment. The Proposed Phase II includes a new gymnasium, mechanical plant, renovation of the existing west classroom wing, and renovation of the existing gymnasium. Miller Special originally constructed in 1963 with additions in 1989 and 2000. This facility is unique in that it serves students with special needs that cannot be accommodated in the neighborhood schools. A phased master plan was developed in 2008 that called for the demolition and replacement of about 75% of the facility and the renovation of the remaining portion. Master Plan and phased improvements are still valid. Long View High School serves a small number of students in a series of modular buildings southwest of McClain High School. Placed in service in 1967 these buildings have some of the highest FCI in the district. Recommendation is to relocate the program to a different location (Brady or Mcl ain) and demolish the ex isting building. Operational Efficiency of new Warren Tech Facility (-2s,ooo SF) Capital Expense to build new Warren Tech Satellite ........................................ $10,000,000 Maintenance & Operations Expense at $5/SF/Year ............................................... $125,000 Operational Efficiency of Jeffco Open Phase II (30,000 SF) Capital Expense to build new Phase II Jeffco Open ............................................. $8,000,000 Additional Maintenance & Operations Expense at $5/SF/Year .............................. $150,000 Operational Efficiency of Miller Special (68,000 SF) Capital Expense to build new Miller Special ..................................................... $22,000,000 Additional Maintenance & Operations Expense at $5/SF/Year .............................. $340,000 95 96 District-Wide OVERVIEW: CURRENT CONDITIONS: Ed Center 11% N/A N/A Support Services Quail 16% N/A N/A North Transportation 108% N/A N/A North Shops 50% N/A N/A South Transportation 28% N/A N/A West Transportation 19% N/ A N/A Jeffco Stadium 43% N/A N/A Trailblazer Field 70% N/A N/A Lakewood Memorial Field 153% N/A N/A Mt Evans OELS 43% N/A N/A Windy Peak OELS 29% N/A N/A FACILITY DEPARTMENT RECOMMENDATIONS: North Transportation & Maintenance Shops Identify and purchase a larger site and construct new North Transportation Terminal, relocate from 641h and Indiana location; sell site. Relocate North and North Central shops from North Arvada Middle School to new North Terminal. Acquire "'10 acre site .......................................................................................... $3,000,000 Capital Expense Terminal & Maintenance Building 18,000 SF ............................. $4,000,000 Maintenance & Operations Cost @ $5/SF ............................................................... $60,000 Trailblazer Field Increase bleacher capacity at Field, remove temporary locker rooms and replace with permanent locker rooms, offices and storage. 1,000 seat bleacher expansion .............................................................................. $300,000 15,000 SF Locker rooms, offices & storage expansion ......................................... $3,700,000 Maintenance & Operations Cost @ $5/SF ............................................................... $75,000 97 District-Wide (continued) South Area Athletic Complex Increasing participation in student athletic programs has placed significant strain on the stadiums that support these programs. Currently, there are two primary stadia for football, Jeffco Stadium and North Area Athletic Complex (NAAC), Lakewood Memorial Field is the primary soccer field and Jeffco Stadium for track and field competition. To alleviate this situation a sports complex similar to NAAC is proposed. The proposed site is property located at Kipling Parkway and Quincy Avenue. This site also has D' Evelyn Jr./Sr. High School and Rocky Mountain Deaf School. The Complex would consist of a football stadium, soccer, practice fields, locker rooms, and parking. South Area Athletic Complex ........................................................................... $26,100,000 Outdoor Lab Schools: Mt. Evans and Windy Peak Outdoor Educational Lab Schools serve approximately 6,000 sixth graders during the school year as well as outside organizations during the summer months. In 2015, a Master Plan was prepared for Mt. Evans and Windy Peak. The purpose of the Plan is to provide both a long range plan for each facility as well as a fund-raising tool for the Outdoor Lab Foundation. In the spring of 2015, a large boulder stopped sliding just short of the Mt. Evans dining hall. The boulder has been secured but brought to the forefront the need to reconsider the location of the hall and plan to replace this facility in a location consistent with the recently prepared Master Plan. Mt. Evans Dining Hall/Kitchen Provide a dining hall, kitchen, storage, and support space at Mt. Evans; removal of existing dining hall and reclamation of the area. Phase I -5,000 SF Facility .................................................................................... $2,000,000 Maintenance & Operations Cost @ $8/SF ............................................................... $25,000 Mt. Evans Master Plan Phase II -Site improvements, service & storage facility, main lodge ................... $7,000,000 Phase Ill -Renovations, administration, new cabins ........................................... $3,000,000 Phase IV -New and renovated dormitories ........................................................ $4,000,000 Windy Peak Master Plan Phase I -Site improvements, water & wastewater system improvements, new cabins, new dormitory, service facility & storage ................................................................... $4,000,000 Phase II -New residences, new & renovated cabins, new main lodge .................... $6,000,000 Phase Ill -New residences, new dormitory, new & renovated CR ....................... $2,500,000 98 99 '~ 4 ~ -.,. City of ~Wheat Ri_dge TO: THROUG H: FROM: DATE: SUBJECT: Introduction Memorandum Mayor and City Council ('\ \ Patrick Gof1~ City Manager ~ Ken Johnstone, Community Development Director Scott Brink, Public Works Director Mark Westberg, Projects Supervisor Lauren Mikulak, Senior Planner May 6, 2016 (for May 16 Study Session) 381h Streetscape Alternatives 7 tern 3 The final public meeting for the Cre8 Your 38 streetscape design process was held on April 271h, with 64 individuals signing in as attending. ln order to allow further comment, an on-line survey was made available for one week. On May 12. an additional meeting will be held, in two sessions, for the businesses and property owners along 381h A venue. This culminates the process in which approximately! ,000 citizens and stakeholders have participated at the meetings or on line to reach a community consensus on what to do with the Main Street portion of 381h Avenue, as defined in the October 201 J adopted 38111 Avenue Corridor Plan. The purpose of this memo is to outline the various alternatives and their implications in moving forward with implementation of the City's Main Street on 38th Avenue. Background A memo was provided to City Council for the April 4th Study Session which included the background and the outcomes of the Cre8 Your 38 process. 111is memo and a copy of the Council presentation have been attached for reference. Implementation Alternatives fo r 381h Avenue There are four alternatives presented below. The first two originate from the public processes associated with the recently completed Cre8 Your 38. Also included for Counci l consideration is a No-Action alternative and the existing Streetscapc Design Manual. • No-Action • 2016 Full Reconstruction • 2016 Retrofit • Streetscape Design Manual 3g•h A venue Streetscape Alternatives May 16, 2016 Page2 If, for whatever reason, it is not possible to implement a streetscape project at this time, an additional alternative is described below related to The Green-the area between Stevens Elementary and 381h A venue at High Court. Adding enhancements to public spaces to create more activity on the Corridor is a recommendation from the 201 I Corridor Plan. Enhancement to The Green could represent a lower cost option for improving the functionality and appearance of the City's downtown. This alternative could also be implemented along with any of the other alternati ves. Attached to this memo are photo simulations to help City Council and the public better visualize the impact of each of the alternatives. The photo simulations were done on the north side of the street between High Cou rt and Reed Street facing east. This location was selected as it is fairly typical of the corridor with the attached sidewalk and a wide dri veway. All of the photo simulations of the proposed alternatives show the driveway being narrowed to a more standard width. Also attached to this memo is an exhibit from Cre8 Your 38 Meeting #3 (March 10) showing the Reconstruction and Retrofit alternatives. After the descriptions, two tables have been includ ed that summarize the elements and implementation requirements of each alternative to allow quick comparisons of the alternatives. No Action This alternative would leave the street. sidewalks, and amenities along the corridor in its current configuration. The current striping has been in place fo r four years and was based on recommendations from the adopted 201 1 Corridor Plan. This stakeholder developed plan proposed this low cost option of simply restriping the street to test the results of the traffic analysis that recommended reducing the street from four and five lanes to three lanes. Data gathered since the restriping shows that the street has performed as predicted by the traffic study. The existing 5-foot wide sidewalks were left intact with minimal enhancements using planters and pop-up cafes. 2016 Full Reconst111ctio11 Thjs alternative would reconstruct the corridor based on the 2016 participant-preferred alternative from the recently completed Cre8 Your 38 process. At Council 's request, this process was designed to be int eractive and inclusive, gathering ideas from as many people in the Wheat Ridge community as possible. Public outreach included over 8,000 mailed meeting invitations, Connections newsletter articles, a presentation at the August 31, 2015 Town Hall meeting, small group meetings, Facebook updates. promotional and summary videos onli ne and on Channel 8, project information banners in City buildings and on 381h A venue, meeting announcements through variable message signs. informational handouts included in "Friday Folders'' at public schools, four public workshops, an online survey. and a final open house. Ultimately, approxim ately 1,000 people chose to participate in the process. As many have observed, this design is very similar to the 2014 Design, with detached sidewaJks and amenity zones. The most significant difference is that the amenity zone width may be as narrow as 4-feet instead of the minimum 6-feet included in the 2014 Design. The similarity of 38'11 Avenue Streetscape Alternatives May 16, 2016 Page3 these two designs can only be attributed to the public processes through which they were designed. The Cre8 Your 38 design process in particular was designed to allow pa1ticipants to explore all possible options. lt was through an iterative public process of voting and subsequent narrowing these design options that the Reconstruction alternative was designed and selected. Each element is the result of participant input. The range of estimated costs for this alternative was between $7.5 and $9.75 million. 2016 Retro.fit This alternative would add amenity islands in front of the existing curb/gutter along the corridor. This design was also developed during the Cre8 Your 38 process, but did not receive the majority of votes during Meeting #3. However. since attendance at that meeting was lower than the prior meetings, this alternative is being presented to Council as one of the alternatives. The street would continue to be three lanes with the remaining pavement being removed to construct the amenity zones. The existing narrower, 5-foot, sidewalks would remain and would be separated from the amenity zones by the existing curb/gutter. Because of the separation from the exjsting sidewalk. the amenity zones could contain the lighting but could be difficult to use for benches, trash cans, or some other amenities. The range of estimated costs for this alternative was between $4.5 and $6. 75 miJlion. Streetscape Design Manual The Streetscape Design Manual (SDM) was adopted in 2011 and establishes streetscape requirements for important corridors throughout the City. The purpose of the manual is to promote high-quality streets that enhance the public realm. Per Sections 26-110 and 26-4 17 of the Municipal Code, new development or subdivision platting can trigger requirements for a developer/property owner to dedicate right-of-way and/or construct enhanced streetscape along the property frontage. If none of the above designs are selected, this manual would be implemented as the default regulatory document. This alternative is similar to the No-Action alternative because the existing street configuration would not change. On 3gth Avenue, the SDM requires an 8-foot sidewalk and 6-foot amenity zone. TI1ese would be added behind the existing curb, and the streetscape would be incrementally improved as redevelopment occurs along the corridor. Jn most cases. this would require a developer to dedicate up to 9-feet of right-of-way behind the back of existing sidewalk. In comparison to the previous alternatives, this has the potential to impact development potential of parcels along the corridor where some parcels have limited depth. The estimated cost to implement this alternative is approximately $700 per lineal foot of property frontage. This estimate includes the engineering, land, and construction costs. The Green The open space between Steven's Elementary (previously Wheat Ridge 5-8) and 3gth A venue is commonly referred to as The Green and has been critical in accommodating community events, particularly since adoption of the Corridor Plan. A June I, 2013 memorandwn of understanding 3gth A venue Streetscape Alternatives May 16, 2016 Page4 between the City and school district has allowed for conu1rnnity use of the school property. This land is the single largest vacant property on the corridor. As part of the 2014 streetscape design process. a conceptual design for The Green was developed. This design is attached and includes re-grading of the lawn, an enhanced landscape buffer along 38111 Avenue, retainjng wall seating at the north end, and an at-grade amphitheater. This relatively low cost project would not require any changes to the street but would continue to build on the community's Main Street vision by enhancing a civic gathering space and better supporting commuruty events. In the past, the school district expressed support for the conceptual design. Cost estimates have not been prepared for these improvements. Street Implementation Requirements Jn addition to having differences in the elements noted in Table 1, the various alternatives will also have different requirements for implementation. The No-Action alternative has the least amount of cost and process to the City, with maintenance costs only and no process. The Streetscape Design Manual alternative still only bas maintenance costs. but adds the complication of requiring property owners to consolidate driveways as properties are redeveloped. This could be difficult where driveways are proposed to be shared between two properties if only one is redeveloping. The 2016 Retrofit alternative involves higher costs, street width designation, driveway consolidation, and restriping the street. The 2016 Reconstruction alternative has the highest cost and requires street width designation and driveway consolidation. Comparison of Street Alternatives Table I provides a comparison of the elements of the various alternatives that impact the street. Table 1 -Alternative Elements Element No-Action 2016 2016 Retrofit Streetscape Reconstruction Design Manual Traffic Lanes 3 3 3 3 Sidewalk 5-foot 8-foot 5-foot 8-foot with redevelopment Disconnected from sidewalk -6-foot with Amenity Zone None 4-foot south side only redevelopment east of Pierce Street On-street South side High Court area West of Pierce South side Parking Street Bike Lanes West of Pierce No No West of Pierce Street Street Right-of Way No No No Up to 9-feet Designation 38lh A venue Streetscape Alternatives May 16 , 2016 Page 5 Table 2 provides a high-level comparison of what would be required to implement the various alternatives. Table 2 -Alternative Implementation Requirements Requirement No-Action 2016 2016 Retrofit Streetscape Reconstruction Design Manual $7.5 -$9.75 $4.5 -$6.75 Owner with Funding Maintenance only million million redevelopment, $700/tt of frontaae Street Width No Yes Yes No Designation Driveway No Yes Yes Yes, with Consolidation redevelopment Restriping Maintenance only No Yes Maintenance only Recommendation and Next Steps Interest in redevelopment along the 381h A venue corridor continues to rise but is impacted by the uncertain future of the street. Staff is not recommending one alternative over another. Once a path forward is identified by Council, a more specific implementation plan would be developed by staff, but the following next steps would typically be required: • Prepare a budget and implementation schedule for the selected alternative, including potential phasing options • Present the budget and schedule to City Cow1cil and finalize the scope of the project • Assist City Council in identifying and obtaining funding • Hire an engineering consulting finn to: o Prepare the construction plans and specifications o Work with property owners on driveway consolidations and temporary construction easements o After 60% plans are completed, change the designated street width, if necessary o Prior to construction, bost public meetings to discuss design and construction impacts with property owners and tenants • Hire a contractor to construct the project Attachments I. April 4, 2016 City Council Study Session Memo 2. April 4, 2016 City Council Study Session Presentation 3. Conceptual Design fo r The Green 4. Meeting #3 Exhibit showing 2016 Reconstruction & 2016 Retrofit Alternatives 5. Alternative Cross-sections and Photo Simulations ... \ '.t .... , ..... City of • _rWheatR.!9ge Memorandum TO: Mayor and City Council THROUGH: Patrick Goff, City Manager Ken Johnstone, Community Development Director Scott Brink, Public Works Director FROM: Mark Westberg, Projects Supervisor Lauren Mikulak, Senior Planner DATE: March 25, 2016 (for April 4 Study Session) SUBJECT: Cre8 Your 38 -Process Update Introduction The Crc8 Your 38 streetscape design process commenced in August 2015 when Britina Design Group was first introduced to the community at the City's Town Hall meeting. Since then hundreds of citizens and stakeholders have participated in the public process to reach a community consensus on what to do with the Main Street portion of38th Avenue, as defined in the October 20 I I adopted 381h A venue Corridor Plan. The purpose of this memo is to update Council on the status of the Cre8 Your 38 streetscape design process. The final open house is scheduled for April 27th to wrap up the public input process. An opportunity for discussion on moving forward with implementation will be available at the May 16 study session. Background On May 18, 2015. City Council discussed implementation and next steps related to the 38th A venue Corridor Plan. At that time, Council reaffirmed their support for the 38th A venue Main Street vision as expressed in a series of planning documents: • 2005 Neighborhood Revitalization Strategy; • 2009 Envision Wheat Ridge; and, • 2011 38th A venue Corridor Plan. Council and staff recognized, however, that the 2014 conceptual streetscape design needed to be readdressed given that a street width designation ballot initiative was unsuccessful in November 2014. Attachment 1 3gth A venue Streetscape Update April 4, 2016 Page 2 At Lhe May 2015 study session, Council directed staff to initiate a comprehensive and inclusive public process for the purpose of seeking community consensus on a streetscape design fo r Main Street. There was acknowledgement that it may not be possible to reach a full consensus from everyone, but Council agreed there was merit in having a new public outreach process that invited the entire community to be involved in reviewing a comprehensive range of alternatives. Specifically, there was Council consensus on the following points: • There is a desire to create a downtown destination on 38th A venue, our Main Street. • A new streetscape design process should: o Focus on pedestrian accessibility; o Look at multiple options for roadway designs; o Look at right-of-way and/or easement acquisition as an option; o Look at innovative designs; o Look at consolidation of curb cuts: o Engage professional design services if necessary; o Look at sidewalk and pedestrian space and ensure that a sense of place is accomplished; and. o Look at ways to improve wayfinding and identification. At a study session on June 15. 2015, staff proposed a multi-phase, comprehensive public process, similar to what was just done for the Wadsworth Boulevard Planning and Environmental Linkage Study. It was determined that consultant services were necessary to facilitate the public process as a neutral party and to provide professionaJ urban design expertise. On August I 0, 2015. Council awarded a contract to Britina Design Group. The contract was funded through a previously appropriated Community Development budget. Cre8 Your 38 Streetscape Design Process The Cre8 Your 38 streetscape design process commenced in August 2015 when Britina Design Group was first introduced to the community at the City·s Town Hall meeting. At that time, the dates for the three public meetings in January, February and March, 2016 were first announced. This Town Hall meeting invited the entire Wheat Ridge Community to take an active role in the development of the street scape design process. After nearly a year since ballot measure 28 was not approved, the consultant team sought to reengage the community in discussing 38th Avenue during the fall and winter of 2015. In addition to collecting extensive background information, Britina engaged in extensive public promotion and one-on-one and small group stakeholder outreach. Notification of the three public meetings were promoted in a variety of ways, including fu ll color postcards mailed to every address in Wheat Ridge, notices placed on the City's website, two variable message boards placed on Wadsworth Boulevard and 381h Avenue prior to the first set of 38111 Avenue Streetscape Update April 4, 2016 Page 3 meetings, various social media sites, an article in the City. s Connections, and media advisories sent to local media. Meeting 1and1.5 Public engagement during the first set of meetings for the project exceeded all expectations with nearly I ,000 participants: • Approximately 250 people attended Meeting I on January 14, • Around 75 people attended Meeting 1.5 on January 21. and • 673 new participants engaged in an online survey after Meeting 1.5. During the January meetings, participants discussed core community values, with safety and economic success ranking the highest. After a presentation on the various streetscape elements, the participants at each table engaged in a small group interactive streetscape design process. Each table then presented their designs to the rest of the participants, and after all the designs were presented. real time electronic polling was used to provide feedback on the design concepts. Online participants voted on the same design concepts after reading through a short version of what was presented at the meetings. Tbe first step of any design process is to engage in visioning, and the purpose of the Cre8 Your 38 process was specifically to put all options on the table. For this reason, meeting participants were given very few parameters or restrictions in developing their table's roadway and streetscape design. A wide range of designs were presented; however, community voting clearly indicated a consensus or preference for a I imited range of alternatives. The results of the meetings and online survey are summarized below: • The top two core values were safety and economic success, and these were shared by in- person and online participants. • Meeting participants created a total of thirty-three (33) designs, and of these: o I or 3% was a 2-lane design, o 14 or 73% were 3-lane designs, and o 8 or 24% were 4-lane designs. • Of the 33 designs, 73% stayed within existing right-of-way. In-person and online participants were asked to answer the following question regarding all designs: "Should this design move forward in the process?'' The percentage of yes/no votes for each design were similar among in-person and online participants. The designs were ranked based on the overall support they received, and the outcomes are summarized below: • The highest ranked option received 59% support. • Twenty-one (21) of the top twenty-two (22) designs were 3-lane designs. • All 4-lane options were among the bottom eleven ( 11) designs. • The highest ranked 4-lane option received 30% support. • The 2-lane option was ranked I 0th out of thirty-three (33) designs with 44% support. 381h A venue Streetscape Update April 4, 2016 Page4 The top 6 designs, all with 3 lanes of traffic, received more than 51 % support and were advanced to meeting 2. Only 3-lane options were carried forward for the following reasons: • Because three-quarters of all designs were 3-lane designs, • Because the top two-thirds of all designs were 2 or 3-lane designs, and • Because only the 3-lane designs exceeded 50% of participant support. A 4-lane option was not carried forward for the following reasons: • Because only one-quarter of the designs were 4-lane designs, • Because none of the 4-lane designs received at least 50% participant support. and • Because the top performing 4-lane design only had 30% participant support. Meeting 2 While public input during first phase provided clear community consensus on a 3-lane roadway design. there was less consensus regarding other streetscape elements and right-of-way needs. The purpose of the February public meeting was to refine preferences for sidewalks, amenity zones, bike lanes, parking, and right-of-way. A life-size roadway model was shown on the wall with initially just the right-of-way and three lanes of traffic. Each streetscape element was discussed and again, participants at each table engaged in small group discussions focused on the tradeoffs associated with each element. Through interactive clicker voting. over I 00 participants chose the widths of each of these elements which were then added to the roadway model on the wall as the meeting progressed. This interactive exercise ranked these four elements against each other and also ranked preferences for each element. Meeting 2 provided clear consensus on the following: • Sidewalks: 66% supported 8-foot wide sidewalks (12% wanted wider) • Amenity zones: 59% supported 4-foot wide amenity zones (31 % wanted wider) • Bike lanes: 64% were not in support of bike lanes • Parking: 68% supported including on-street parking where space is available The second half of meeting 2 discussed implementation of the community's preferred design elements, as chosen above. Two options were included that involved moving the curb: complete reconstruction of the street or retrofitting in amenity zones. Even though the community preference for an 8-foot sidewalk and 4-foot amenity zone with 3 lanes of traffic fit within the existing right-of-way, the option to expand the righl-of-way in order to keep the existing curbs was included. After a brief discussion of the three options for implementing the community's preferred design, participants again used interactive clicker voting with the following results: • 71 % of participants preferred to stay within the existing right-of-way. • Of those, there was mixed and very similar support for complete reconstruction (36%) versus retrofitting amenity zones (35%). 381h A venue Streetscape Update April 4, 2016 Page 5 Meeling 3 Based on the community consensus from the previous meetings, the consultant team prepared two roadway packages to present at meeting 3 to resolve whether to reconstruct or retrofit. Both designs included three lanes of travel, sidewalks, and amenity zones and on-street parking where possible, consistent with community preferences from meetings I and 2. Package A included a complete reconstruction of the street, providing 8-foot sidewalks and 4-foot amenity zones with a potential range of cost between $7.5 million and $9.75 million. Package B would keep the existing narrower sidewalks and retrofit the existing street with wider amenity zones with a potential range of cost between $4.5 million and $6. 75 million. The purpose of meeting 3 was to fully understand "what you get and how you get there" for each package. This included a discussion of the elements, cost, process, and outcomes for each package. Since any capitaJ investment requires public support and willingness to identify a funding source for the improvements, the presentation concluded with an overview of financing tools, case studies, and revenue projections based on various levels of sales tax increase. Also discussed was the impact of driveway consolidations as this is a significant implementation issue. Without consolidation of driveways, the effectiveness of any new streetscape improvements will be reduced. After considering all implications, 65% of participants agreed or strongly agreed that driveway consolidation is important. Among the two streetscape packages, Package A received 70% support. When asked what influenced the selection of A or B, 57% of participants said the design reflected their core values with another I 6% saying they simply liked the design. Next Steps Although participation has lessened as the process continued, the most significant outcome was the early community consensus achieved around the core value of safety and three lanes of traffic that was the outcome of the first meeting and on-line voting. The subsequent meetings resulted in community consensus for wider sidewalks, amenity zones. and working within existing right-of-way. While having the preferred design is important, the main purpose of this project was the process itself: to provide an opportunity for community input to anyone wbo wanted to be involved. The involvement of over 1,000 stakeholders from the community should be considered a success. A final open house is scheduled for Wednesday. April 27 from 6:00 pm to 8:00 pm at the Wheal Ridge Recreation Center to recap the process and results from each public meeting and to present the preferred srreetscape package. The designs will not be further refined and no voting will take place at the open house, but~ comments will be accepted at the meeting and online until May4. 38th A venue Streetscape Update April 4, 2016 Page6 Following the open house, Council will need to provide direction for future imp lementation. At the May 16 study session, Council will be presented with a range of options for moving forward with the Crty's Main Street vision. PPT for 4/2 CC SS IT~ ~w aa• Avenue ReconfllUra on (Wadsworth Blvd. to Sheridan Blvd.) CreB Your 38 Process Update Council Study Session April 4, 2016 Meetings 1 & 1.5 & Online Survey ~~ -NiatftJGffenlrM~~ • Participant Core values -Safety -Economic Success • 33 Participant Generated Designs -73% of all designs had 3-lanes -Top 2/3 of designs had 2 or 3-lanes -Only 3-lane designs > 50% participant support • Participant Preference for 3-lanes Attachment 2 5/6/2016 1 PPT for 4/2 CC SS Meeting 2 • Over 100Mi111Ra~ -ur.stii Medel of street • Participant Preferences for Streetscape Elements -Sidewalks -66% preferred 8-foot wide, 12% wider -Amenity Zones -59% preferred 4-foot wide, 31% wider - Bike Lanes -64% preferred NO bike lanes -Parking -68% preferred parking where possible • Participant Preferences for Implementation -71% preferred staying within the existing ROW -No consensus on reconstruct vs retrofit - Meeting 3 • OVer SJl'.,... ,__... • Reconstrud Pacfca&e -$7.5to$9.7SmiUion -8-foot sidewalks, 4-foot amenity zones • Retrofit Package -$4.5 to $6. 75 million - 5-foot sidewalks, > 4-foot amenity zones • Participant Preferences for Implementation -70% preferred Reconstruct Package - 5/6/2016 2 PPT for 4/2 CC SS 5/6/2016 Next Steps -Collect comments on process, results. & preferred design • Sticky notes & comment box at meeting • Online comments after the meeting • May 16 -Council Study Session - Present options for implementation -Request direction for implementation Questions 3 Storage --- Stage Area (temporary stage structure> Ice Rink Outline ' Relocated Flag Pole --------Existing Middle School Plaza r-+-7"'----------18" Seatwall ----------Public Art {dashed -60 person capacity) ...........,... -Paving Bands ~ A» n :r a CD :s .. w 12" Seating Walls, Typ. Bike Corrals ----~ -+-----•-Walk, Typ. 1 Temporary or Permanent Tent Structure ..C\ Native Plantings , ' '" ........_............... ;;;;;;;> \)> 18" Seatwalls Existing Columns Crusher Fines -Bike Corrals Bike Corrals I' __ 1 .__ .• , . , . Primary Welcome/Entrance/ ,. · . \ ~ ,(·~-~~ _. l Information Area ~ :s / ' .._. .._. J "Z: / Bus Shelter --' Bus Stop - -,f a ·~:···~-== , I -• • ·• :--a -r· ·-BJ 38th Avenue -The 6reen Concept DesiCJn Figure 1 -No-Action Alternative: This cross-section and image show the existing conditions west of Reed Street, looking east. This location is typical of the corridor with a 5-foot attached sidewalk adjacent to the street. This location also shows one of the wide driveways that occur in the corridor. The existing condition includes a bike lane between the curb/gutter ( c+g) and the travel lanes. S·foot 1c+g 1 street sidewalk ' Attachment 5 Figure 2 -2016 Full Reconstruction: In this scenario, the location of the back of sidewalk would not change. The existing sidewalk and curb/gutter would be removed; and an 8-foot sidewalk and amenity zone of at least 4 feet in width would be constructed. Because of grades, the street would also need to be removed and reconstructed . Additional right-of-way would not be required from property owners. The location of the curbs would move inward to accommodate the sidewalk and amenity zone, which requires a change in street width designation. The existing bike lanes would be removed. Also, the driveway has been narrowed to a standard width. ~ existing back of walk . t 8-foot ·sidewalk ~ 4-foot amenity zone c+g street Figure 3 -2016 Retrofit: In this scenario, the existing sidewalk and curbs as well as most of the street would remain in place. At least 7-feet of the existing street would be removed and amenity zones would be added at least 4 feet in width. Because the retrofit does not include a full reconstruction of the street, existing grades and drainage would require the amenity zones to be detached from the existing sidewalk .. Additional right-of-way would not be required from property owners. The addition of the amenity islands effectively moves the location of the curbs inward and would require a change in street width designation. Existing bike lanes would be removed. Again, the driveway has been narrowed to a standard width. ~ ..... _._., existing ! sidewalk, c+g ! 5-foot c+g <::4-foot sidewalk amenity zone :····--·>-- ' existing street · c+g I street Figure 4 -Streetscape Design Manual: In this scenario, the existing curb and street would remain in place. The existing sidewalk and 9-feet of property improvements would be removed and an 8-foot sidewalk and 6-foot amenity zone would be constructed behind the existing curb. This would require right-of-way dedication of up to 9-feet behind the existing sidewalk by each property. Dedication and streetscape installation would occur incrementally and only as properties redevelop. Because of grade changes, low retaining walls may be required in some locations, as shown at the back of the 8-foot sidewalk past the driveway. With the redevelopment, the driveways would also be narrowed to a standard width as shown . 8-foot sidewalk . -· ··-... 1 existing c+g, street 6-foot c+g j street amenity , zone