HomeMy WebLinkAboutStudy Session Agenda Packet 05-16-16STUDY SESSION AGENDA
CITY COUNCIL
CITY OF WHEAT RIDGE, COLORADO
7500 W. 29th Ave.
Wheat Ridge CO
May 16. 2016
6:30 p.m.
Individuals with disabilities are encouraged to participate in all public meetings
sponsored by the City of Wheat Ridge. Call Maureen Harper, Public Information
Officer at 303-235-2877at least one week in advance of a meeting if you are
interested in participating and need inclusion assistance.
Citizen Comment on Agenda Items
.L Staff Reports
2. Jeffco Schools Facility Master Plan (FMP) Presentation
3. 381h Avenue Streetscape Discussion
4. Elected Officials' Report(s)
ADJOURNMENT
-. ~A#
... , " City of • ~Wheat&_dge ~ 0mCE OFTiiE CJ1Y MANAGER
Memorandum
TO: Mayor and City Council
FROM: Patrick Goff, City Manager
DATE: May 12111 (for May 16, 2016 Study Session)
SUBJECT: Jeffco Schools Facility Master Pl an (FMP) Presentation
Representatives from the Jeffco Public Schools District wi ll be attending the May l 61h Study
Session to present information on the Facili ty Master Plan (FMP) for Jeffco Schools. Please see
the attachments included with this memorandum for additional information.
A FMP public presentation is schedul ed for June g•h from 6 to 8 p.m. in the Wheat Ridge High
School Auditorium. Please see Attachment I for additional information.
If you have questions prior to the presentation, please feel free to let me know.
ATTACHMENTS:
I. Facility Master Plan Public meeting dates
2. Facility Master Plan PowerPoint Presentation from April 21, 2016 Board of Education
Meeting
3. Facility Master Plan Document dated April 21, 2016
Attachment 1
, . . " . . . . . M ' .. ' •, , '< , ' 1 i ' : •" I , ' '
.)• ., . '... . . . . . ' '----'
. , ' , • ; . l. •,, , c, , , I J • , '' ; ; ' ', , : • ) • •
' • l.
Cll
4
0
0 ~~ u ~J (/)
Attachment 2
t:lO c
·~
Q)
Q)
~
c
0
This Evening's Desired Outcomes
• We will gain an understanding of Jeffco's facilities master plan
{FMP)
• Why we need a comprehensive plan to address our needs
• How the plan was developed
• When {and under what conditions) the plan will be implemented
• Secure your support for gathering community input on the plan and
direction on additional information.
• Documents available as support information to this presentation:
• 2015-16 Facility Condition Assessment Summary of Findings
• 2016 District-Wide Facilities Master Plan
~ ' • 's .I .I I : '' • '' ._' J 'J ", ' ' • t-' ' I("'
j 4 ~ \) ' '·. J I • : '1 ; . ' ) ~ . ) . . . IL •• 'J ' ' • ·, . . . '. • . j • I i. N")
,H1; ·li''".11 H! 1l" i'' 'J ·"'U \..--!
GJ > .., .... -c .... GJ .c "' •
GJ GJ GJ c ra I.. c .c .c :::J :::J GJ .., ~ "' ..,
GJ ra .., :::J • u.
I.. > • 'I c ra -c .., GJ .c
"' c 0 c .c 0 ra • GJ ..,
E I.. GJ I.. -c 0 u "' I.. 'I • -:::J .c -c GJ u 0 I.. c. ... "' ... 0 0 GJ ~ .c I..
In order for
students to pursue
their life goals,
by2020
all Jeffco graduates~
"'3 4) (
will be able to
successfully
apply
the following
competencies:
JEFFCO
2020 Vision
Content Mastery Civic & Global Engagement I Communication
Critical Thinking & Creativity I Self-Direction & Personal Responsibility
J effco School's Current Reality
Our School District is over 60 years old and our Educational
Programming Needs have Changed Significantly ...
Student
Learning &
Enrichment
School
Infrastructure &
Design
• More pathways (STEM, Career, Technical Education,
Problem Based Learning, etc.)
• Pre-school and elementary enrichment programs
• Academic, Social, and Emotional Interventions and
Supports
• Enhanced safety and security measures and staffing
• Behavioral supports
• Federal and State regulations
• Changes in student population density and transportation
• Technology infrastructure to support learning & operations
• Ensuring accommodations for physically disabled
community members
How did we get here?
• Jeffco is a ''neighborhood'' school district.
I Denver JI 90,234
JI
199
JI
453 ][ $7,612
I --..
!f I I
Jeff co 86,708 154 563 $7,126
I .J .. Ii I
[Douglas ][
66,896
II
89 r 751
II
$7,050
I
l :1 ·-,, . I I $7,265 I IC. Creek I 54,695 61 I 896 I
I I 1· ,I
II II
l Boulder 31,247 .J 56 557
II
$7,234
I - -·-.
Littleton 15,780 26 606 $7,040
How did we get here?
Comparisons per pupil PPR, MLO and Bond
District
Denver
Jeff co
I 1
I Douglas
r •
C. Creek
I
1 Boulder
I
'
I
'
Littleton
:
II
II
ii
#Students State Per
Pupil Funding
15/16
Mill Levy
Override per
pupil 15/16
Outstanding
bonds per
pupil 14/15
90,234 11 $7,612 11 $1,608 11 $16,429
86,708 $7,126 ,i $1,307 ' $5,160
(2"d) I (4th) (Sth) (6th) :1
I I.
II
II
66,896
II
$7,050 $504
II
$5,839
.. 1· • II
54,695 I! $7,265 :1 $1,547 ,: $9,060
'I
I
$2,125 JI $18,374 I _ I _ 31,-247 II ~7,234 II
., .
15,780 $7,040 'l $1,825 ~'. $8,336
C"· cu ~ cu ...r::
~ cu
0.0
cu
~
"d ........
"d
~
0 ::c:
'j r--'\ Jt l? l <) J 'F) J 0 j )', J cl l lJl; ) J I Al• i L l; l 1 )[' •) ~ l 'n ! 'd
·'--<1 'S!c:~lD'llS ~·10 JDj )t:J1,,,.c),,.'\,J j ~l,;1,Jn',l I \'>at; 00
-0
0 ..c u
V)
·led tl;J MJJd 0) ', il'•l) J"Q '----.J
0
0 c en N "
'#.
~
"
'#. en en M
00 N
c "' 0 CIJ CIJ ·-.., -t20 ..c ta N ta "' ·-._ .., -CIJ ._ ·-.., ~ 0 ::::> ~
CIJ
"' :J
c ·-
J effco Schools Facilities Age
Building Age by Age Bracket Average Year Built 1978
...
QI
QI u..
QI ...
Ill :J "' Ill
ii ... 0 ~
5,000,000
4,500,000
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
-I Pre 1928 1928-1947 1948 -1967 1968 -1987
Square Feet I 13,388 195,144 4,311,473 3,974,855
69% of Jeffco's
square footage is ...
Campus Average Age 1976
1988 -1997 1998 -2007 2008 -2014
1,664,601 1,874,499 25,300
29 to 68
years of age
Current Real Estate Portfolio
•
•
•
•
•
•
•
•
•
•
12 Million Square Feet of Facilities
3,100 Acres of Land
169 Campuses with 384 Permanent Buildings, 333 Modular
Buildings, 12 Cottage Buildings
Average Age 40 years; Median Age 44 years
39% of District Buildings Constructed Prior to 1967, 71% before 1988.
Replacement Value of Improvements $2.7 Billion
Total Value of Deficiencies $520 Million
Building Condition Related $ 396.6 Million
Educational Adequacy Related $ 123.4 Million
Average Facility Condition Index 20 4 I FACILITY CONDITION IN.DEX • Leu than SS I Best I
6~ to 10~ Good
• Building Utilization 81% I IX to 20X Averaie
21 X to 30~ BeJow Averaie
31X to SOX Poor
SI X to 6SX Very Poor
Greater than 65% Replacement undJdue
CJ
~
.~
'-''
c
() u '+-
..J r:;
~ ~
<./) Vl
~-.._
::J ::J
0 0 .._ .._
0 0
4--...__
.__, ~
C,J c c
_c c.; G .__, r [ t:: G c r ·-c 0 0
> L .._
0 > > '--r
c_ ~ ~-c Cl!) t:J.IJ -c c
V) -r
''-' ., ;, r:;
0 ::; CJ
\..'.) ~ f-
L --"" :;;
0 CJ ::J cc cc
( 10 J
' r-"\ ,,:1 :() ~··) 1 ); ,,j '"4l, iJ i, ;;\• 11 ll'd~ .. 1·'~·
) ,.,~ i•1·1'r ,,,., 1 • '4 • '!.... ~ ~ \ ~J, ~.,,, 1 •) l ' J lt .•J ll••, j,• \, • 1,, <•.Jt',j I, !(' ~
.1,,. ··~) r\ ,.r: !): ... , 1:· ir) ~·lo '----'
~
I c
c I 0 ·-0 -c -·---·-:E
C"-· Ln
CJ) \0
~ N
CJ) ii).
·-0 : :E -c ·-GI -I -00 ..., ·-:E • ta
~ 1 M ~ en N
M GI en z ii). c ii).
:= ,.c:
~
CJ)
00 -c
CJ) GI
~ .... ns
~ ~ GI
·~ c ~
c c
0 0 c ·-·---0 ---c ·-·-·-:E :E GI --..., ·-00 Ln ta :E • • ~ Ln 00 en
M ' M
GI M
ii). i ii). c ii).
,_
I
~ 00 0 en
I
I
en I ~ 00 N en 0 0 t--1 ::c: en
t-1
en 0 0 0
t-1 N N N
I
19 I ; <(~
·~
' \.
~ ,,
" • • I
" I \.
II.
" N
'
1:
I
' • ~
"'-'\
\..,
' C"-· ' ' ' '
CJ)
'
~ i
'
: CJ) ~
'
1
'
,..t:: • !
'
l
\..,
• ~ ~
'
• u
,, I •
CJ)
i '
i
II.
'
00 i « I i ' ! ...
'
CJ) ..
' ~ ""\
' '
"tj
~~
I ~
........
"tj
' J1 ~ .. i
' f ... ~~ ~ ~
~ ' J I ~~
~
0 1 I ~ ~I 8 .,
~ .. "' ::c I ! l I I s
" I .,: ., I ., :; .,
11~11\jrl\()I' _ , ~ H"• 'J t+l.J.JuL.",.;1:l~.~):.•L:c..t'tl
L l Lj l ' " I u ' ' I) i' ; c; j ,, l I , • I l I ' •• j • I I ) • ._. ' ' ' CV')
1 t • \, J • ..._, l >.o J, 1 ! I i ',, )'t, t--1
' 1 ~ t) ~I I 1\ () ' ~: \ j ; \ ')' i _) I ' 1 ()
"' :::s I.. ....
I.. .... :::s • I.. GJ GJ 0 0 -c I..
'I bO :::s •
GJ "' c ..... c E • :::s
0 ~ 'I
• u ra c .....
"' 0 E ~ • ..... --0 --
FMP History
• Facility Master Plan last done/presented January of 2011.
• A comprehensive, long term FMP is essential to the Jeffco
tradition of excellence.
• Multiple presentations to the Board of Education on
December 17, January 14 and January 28 regarding urgent
needs and long-term issues.
• On January 28 the Board of Education directed COO and
Facilities Staff to draft a new Facility Master Plan.
FMP Process/Timeline
• BOE Establishes Guidelines
./Develop Set of Parameters to Establish Planning Criteria
./Consistent Application of Rules
• Staff Defines & Recommends Goals
./Optimal Use of our Existing Facilities
./Balance Articulation Areas
./Right Sizing Square Footage Portfolio
./Equitable Distribution Center Programs
./Financing Approach and Schedule
• Internal I External Review
./Cabinet, Capital Asset Advisory Committee, Financial Oversight
Committee
~Board of Education, Public Presentations
' • Q)
"' ~ c
0 0 ·-... :::s ~ -0 en ~ "' CD ~ ·-... ·-Q) -·-u a cu u.. Q)
CD
~ ~
~
~
C/l
Q) .,.....
~ .,.....
I • .,..... u
~ ~
FMP Key Points
• The plan will be phased in over time beginning in 2017-18
• The plan does not expect to create a reduction in force
• Administrative attrition
• Teaching vacancies annually
• Learning support professionals shortages
• Community Forums for parent voice
• We need to hear from our communities and thus have created 12
opportunities in the next 8 weeks to gather this insight
• To ensure consistent information and gathering of insight, please do not
conduct or host local meetings at this time, instead, strongly encourage your
parents to attend the community meetings.
• Remember the plan is interdependent & it is vital not to focus on one
aspect in isolation.
• The plan, if fully implemented, can significantly enhance the efficient
use of general fund dollars to significantly improve student learning and
teaching conditions.
Jeffco Schools Facilities Focus
Our Goal is to provide the
Best Learning Environment for our Students, and
the Best Teaching Environment for our Staff
JEFFCO
2020 Vision
Cot·l'!n". MUt"')I Ow: & Globa Eoga~ I ~
Cr;tCaJ Tlri"'O & CteetMty I ~l·tlotec!IO"&~~~:y
<;I' l~fcfcS2
Building Bright Futurr.s
. . . . . :. ,,. en , '.· , , .. , .. . . , 'r"""'I . . . . ) . . . '.
l ' • ~ ' ·, .·,'.';· . . '· ') '---.-) .. ' . . . '. . . . . , .
I \
District Wide Facility Master Plan
Addresses the Following:
1) Enrollment Trends on Articulation Areas, School
Boundaries, & Individual Schools
2) Efficient Utilization of Buildings
3) Facilities Equity Between Schools and Compliance
with District Educational Specifications
4) Deferred Maintenance Needs
5) Need for New Buildings, Additions, Renovations,
Consolidations, Closures, Ancillary Facilities
Key Terms
Boundary
Changes
Closure
Consolidation
Grade
Reconfiguration
Program
Offeriog
Scheduling
Changes
Refers to changing the identified school to serve the student
population in a neighborhood.
Closing a school and moving students into a newly identified
school to serve the neighborhood students attending the
closed school.
Relocate students into an adjacent/nearby existing school or
consolidate two existing schools into a new single school; will
require boundary changes.
Changing the grades served in a given school. For example,
moving from a 7-8 middle school to a 6-8 middle school.
Generic term referring to the grades, courses, pathways, etc.
offered in a facility.
Adjustments to the school day and school year to increase the
volume of students served in a facility. For example, split
sessions: half of the student body attends an A.M. session and
the other half attends a P.M. session .
1) FMP Recognizes Enrollment
Trends (Growth & Decline)
• Reasons for Growth/Decline
• Long or Short Term
• Demographic, Socio-Economic
• Program Offerings
• Means to Address Population Density Changes
• New Buildings
• Additions/Renovations/Modulars
• Consolidations/Closures
• Grade Reconfiguration
• Boundary Adjustments
• School Scheduling Changes
• Growth due to Programs/Athletics/Activities
• Career and Tech Ed Programs/Pre-School/Special Needs
• School/Community Athletic Resources
2) FMP Maximizes Efficiencies
• Educational
• Administrative Staff Operational Cost Reductions
• Program Change Opportunities
• Grade Reconfiguration to Increase Enrollment at Underutilized Facilities
• Decrease Enrollment at Over-Enrolled Facilities
• Facilities
• Maintenance, Operations, Utility Cost Reductions
• Reduction in Priority Deferred Maintenance
• Energy and Water Savings
• Transportation
• School Locations Effect upon Transportation Services
• Boundary Changes and Community Impact
3) FMP Reviewed Program
Equity & Past Promises
• Program Equity issues:
• Auxiliary Gymnasiums in High Schools
• Artificial Turf Fields High Schools
• Review Projects Proposed in 2008
• 3 High Schools
• 1 Middle School
• 1 Elementary School
• 2 Option Schools
• Develop Facility Master Plans
• 3 High Schools
• Career & Tech Ed Facility
4) FMP Addresses Deferred
Maintenance Needs
• Assessment and Evaluation of Priority Needs
• High FCI Buildings
• End of Life-Cycle; Repair, Replace
• Address Higher Priority Deficiencies
• Educational Adequacy
• Exterior Envelope
• Site, Parking, Underground Utilities
• Interior Finishes-Carpet & Paint, Lighting, Cabinetry
• HVAC, Plumbing and Electrical Upgrades.
• Building Technology
• Safety and Security Upgrades
• Secure Vestibules
• Door Hardware
• Security System/Video Monitoring
5) FMP Identifies New Square
Footage Needs
• Recommendations for Additions, Major Renovations &
Reconstruction/Replacement
• Cost Benefit Analysis
• Determine Location, Size, Develop Timeline, Budget
Projections
• Ancillary & Support Facilities
• Stadiums & Fields Renovation/New
• Transportation Terminals and Maintenance Shop
Locations
Our Goal is to provide the Best Learning Environment for our Students,
and the Best Teaching Environment for our Staff
JEFF CO
2020 Vision
eon1en1 Mnte<y I CMa & C1otM11 ~ I eommunic.11on
Cnticol Thtnlnt'!Q & Cree1Mty ScfH)l<ection t. Pe-soool ReeponslbolltY
~ !J?Lfcfc~2
Building Brighi Futures
The following provides an overview of the
recommendations contained within the FMP
FACILITIES MASTER PLAN DETAILS
Vl
~
OJ > .......
~
0
~
~
~
~
~
0 ~
Vl
" 0 u t I e
t I 4
OJ
• '
District Wide Facility Master Plan
Addresses the Following:
1) Enrollment Trends on Articulation Areas, School
Boundaries, & Individual Schools
2) Efficient Utilization of Buildings
3) Facilities Equity Between Schools and Compliance
with District Educational Specifications
4) Deferred Maintenance Needs
S) Need for New Buildings, Additions, Renovations,
Consolidations, Closures, Ancillary Facilities
FMP Timeline
District Wide Facility Master Plan Phase I Implementation
Time line
Task
Boundary Changes
Matriculation Changes
Grade Reconfiguration (K-5, 6-8)
Additions
Consolidations & Closures
Replacements
Program Equity
Past Promises
Deferred Maintenance
No Capital
Program
2017-18 School I Year
Year One
Phase I Capital Improvement Program
Year I Year I Year
Two Three Four
Year
Five
I I I I I -r ~~ J
Year
Six
j
Minimal Capital Investment (a)
Current Capital Program:
• Candelas Site K-8 project (Opening fall of 2017)
• Sierra Phase II project (Opening fall of 2017)
• Rose Stein Renovation (Opening fall of 2017)
• Deferred Maintenance Program District-wide
Minimal Capital Investment (b)
Minimal Capital Investment-Start Fall of 2017
• Grade Reconfiguration
• Conversion of 4 Articulation Areas to K-5 Elementary & 6-8 Middle
Schools
• 15 Elementary School Boundary Changes
• 2 Elementary School Matriculation Changes
• Modular Building Disposition
• Close and/or Remove 62 Modular Buildings
• Benefits
• ($280,000) Annual Maintenance & Operations Savings from Modulars
• Estimated Costs
• $600,000 Estimated Added Administrative Expense due to 6-8 Change
• $1,000,000 One-Time Expense Demolition/Closure of Modulars
Minimal Capital Investment (b)
Recorrimendation Details
Reconfigurations by
Articulation
(K-5, 6-8)
•Arvada
•Bear Creek
• Chatfield
• Standley Lake
•Alameda
•Bear Creek
• Chatfield
•Columbine
• Dakota Ridge
Capital Investment Program ( c)
Successful Capital Bond
• Multiple Year Implementation
• Grade Reconfiguration
• Conversion of 7 Articulation Areas to K-5 Elementary & 6-8 Middle
Schools
• Five Additions to 7-8 Middle Schools Converting them to 6-8 and
Reconfiguring Fifty K-6 to K-5 Elementary Schools in Five Articulation
Areas
• Benefits
• Build Capacity in Elementary Schools in High Growth Areas
• Increased Utilization of Middle Schools
• Additions Require Less Capital Investment than New Facilities
• Reduce Deferred Maintenance Expen se At Buildings with Additions
• Add PreK Capacity at Elementary Schools
• Estimated Costs I (Savings)
• $45,750,000 Capital Expense for Five Additions
• $750,000 Added Administrative Expense due to 6-8 Change.
Capital Investment Program ( c)
Details
Reconfigurations by
Articulation
• Arvada West
•Arvada
•Golden
• Green Mountain
•Lakewood
• Ralston Valley
• Wheat Ridge
Middle School
Additions
• Bell
• Creighton
• Dunstan
• Drake
•Oberon
Capital Investment Program ( d)
Successful Capital Bond
• Multiple Year Implementation
• Consolidations & Replacements
• Consolidate 10 Under-Utilized High FCI Elementary Schools into Five New
Buildings
• Conversion of 1 Articulation Areas to K-5 Elementary & 6-8 Middle
Schools
• Replace Two Elementary with New Buildings
• Two Elementary School Closures
• Benefits
• Creates a Modern Learning Environment, Better Educational Model,
Better Facility Utilization
• Reduces Maintenance, Operations & Utility Costs
• Reduces Deferred Maintenance & Deficiencies
• $1,400,000 Annual Savings in Maintenance & Operations Expenses
• $3,150,000 Annual Savings in Educational Administrative Expense
• $52,580,000 Reduction in Deferred Maintenance
• Estimated Costs
• $172,800,000 Capital Expense for Seven Elementary Schools
Capital Investment Program ( d)
Details
• Allendale-
Campbell I
• K-Lakes-11
Patterson :I
• Parr-Little
•Prospect
Valley-
Kullerstrand ii
• Vivian-Stober
• Green Gables
• Marshdale
I • Jefferson HS
ii
Reconfigurations
by Articulation
(K-5, 6-8)
~I •Pomona
• Glennon
Heights
• Pleasant
View
Capital Investment Program ( e)
Successful Capital Bond
• Multiple Year Implementation
• Elementary & Middle School Additions & Renovations
• Additions to 20 Facilities resulting in 118 New Classrooms Deferring the
Need for New Buildings.
• Benefits
• Better Learning Environment, Educational Model and Utilization
• Estimated Costs
• $108,300,000 Capital Expense for Nineteen Elementary & Middle Schools
• $760,000 Increase in Maintenance & Operations Expenses
• Program Equity
• High School Sites -7 Auxiliary Gym Additions; 10 Artificial Turf Fields
• Benefits
• Ability to Better Schedule Student Activities; Less "Wear & Tear" on Fields
• Estimated Costs
• $34,000,000 Capital Expense
Capital Investment Program ( e)
Details
Additions &
Renovations
•Bell MS
•Belmar ES
• Candelas K-8
• Creighton MS
• Drake MS
•Dunstan MS
• Eiber ES
• Edgewater ES
• Evergreen MS
• Foster ES
• Green Mtn ES
·1
I
!1
1:
I
Additions &
Renovations
1
• Kyffin ES
• Lumberg ES
• Maple Grove ES
• Molholm ES
• Mount Carbon ES
I •Oberon MS
• Powderhorn ES
I
I • Ralston Valley HS
•Wilmot ES
i I
High School Equity
Improvements
•Arvada
• Chatfield
•Columbine
•Conifer
• D'Evelyn
• Dakota Ridge
•Green Mtn
•Jefferson
•Pomona
• Ralston Valley
I • Standley Lake
Capital Investment Program (f)
Capital Program
• Multiple Year Implementation
• Ancillary Facilities
• New Stadium Complex
• Renovate & Expand Existing Stadia Facilities
• Benefits
• Ability to Better Schedule Student Activities; Less "Wear &
Tear" on Fields
• Estimated Costs
• $30,000,000 Capital Expense
Capital Investment Program (g)
Capital Program
• Multiple Year Implementation
• "Past Promises"
• Two High Schools Complete Second Phase
• One High School Start First Phase
• Two Option Schools
• One Replacement High School
• Two New Schools
• Career & Tech Ed Expansion
• Benefits
• Better Learning Environment, Educational Model and
Utilization
• Estimated Costs
• $195,000,000 Capital Expense
Capital Investment Program (g)
Details
Replacement and
First & Second Phase
Implementation
•Alameda HS
• Green Mtn HS
• Wheat Ridge HS
• Fletcher Miller K-12
• Jeffco Open School
• Jefferson HS
• Table Rock ES (K-8}
• Leyden Rock
• South Area Location
TBD
Charter School Investment (h)
Capital Program
• The scope of the projects include:
• Safety & security
• Critical and general maintenance
• Roofs
• Parking lots
• Build out, additions & new builds
• Limited FFE
• Boilers/HVAC
• Drainage
• Playgrounds
FMP Timeline
District Wide Facility Master Plan Phase I Implementation
Time line
Task
Boundary Changes
Matriculation Changes
Grade Reconfiguration (K-5, 6-8)
Additions
Consolidations & Closures
Replacements
Program Equity
Past Promises
Deferred Maintenance
No Capital
Program
2017-18 School I Year
Year One
Phase I Capital Improvement Program
Year I Year I Year
Two Three Four
Year
Five
I I --I - 1 -I I I
Year
Six
l
Our Goal is to provide the Best Learning Environment for our Students,
and the Best Teaching Environment for our Staff
JEFFCO
2020 Vision
C.onl!!nt M&stecy I CMc: & Glob&' Enga~ I COmmunlcanon
crn<a1 ThlnklnQ • CtC!!lltMIY I se1r-0,.,.,llion c. ~ ~·blhtY
Q!J?fcfcS2
Building Bright Futures
The following provides an overview of the funding
requirements and impact to our valued Jeffco stakeholders
FMP FUNDING REQUIREMENTS
EXPENSES
District Wide Facility Master Plan Phase I and Phase II
Estimated lm.plementation Expenses
No capital I Phase I capital I Phase II capital
Program Improvement Program Improvement Program
Task I 2017-18 I
School Year Year 1 to Year 6 I Year 7 to Year 13
Boundary Changes Minimal I Minimal Cost
Matriculation Changes Cost
,Additions $137,500,000 $49,500,000
Consolidations $99,800,000 $28,000,000
Replacements/New Buildings $80,000,000 $58,100,000
Program Equity $34,000,000 $2,700,000
Past Promises $29,000,000 $56,000,000
Charters $40,000,000
Total I I $420,300,000 I $194,300,000
I Deferred Maintenance GF Tr~nsfer ] $20,000,QOQ J $120,000,000 -J $120,000,000
FMP Key Points (Again)
• The plan will be phased in over time beginning in 2017-18
• The plan does not expect to create a reduction in force
• Administrative attrition
• Teaching vacancies annually
• Learning support professionals shortages
• Remember the plan is interdependent & it is vital not to focus on
one aspect in isolation.
• The plan, if fully implemented, can significantly enhance the
efficient use of general fund dollars to significantly improve
student learning and teaching conditions.
FMP Key Points (Again)
• Community Forums for
parent voice
• We need to hear from our
communities and thus have
created 12 opportunities in
the next 8 weeks to gather
this insight
• To ensure consistent
information and gathering
of insight, please do not
conduct or host local
meetings at this time,
instead, strongly
encourage your parents to
attend the community
meetings.
Date
April 23, Saturday
April 27, Wednesday
May 4, Wednesday
May 4, Wednesday
May 31, Tuesday
June 1, Wednesday
June 4, Saturday
June 4, Saturday
June 6, Monday
June 8, Wednesday
June 8, Wednesday
June 9, Thursday
location Time
Dakota Ridge HS-Auiiltorrumlr 9 to 11 a.m.
North Arvada MS Auditorium 6 to 8 p.m.
1;
Conifer HS Cafeteria If 8 to 10 a.m.
-Green Mountain HS 5 to 7 p.m.
Auditorium
Ralston Valley HS Auditorium II 6 to 8 p.m.
Pomona HS library 6 to 8 p.m.
" . -_,,
Stevens Elementary Ir 8 to 10 a.m.
"cafetorlum•
Arvada West HS Auditorium
.
Golden HS Auditorium II 6to 8 p.m.
-Bear Creek HS Auditorium
Wheat Ridge HS Auditorium II 6to 8 p.m.
Stein @ O'Connell Cafeteria 6 to 8 p.m.
Our Goal is to provide the Best Learning
Environment for our Students, and the Best
Teaching Environment for our Staff
A Comprehensive plan to support
teaching and learning, while maximizing
general fund dollars
JEFFCO
2020 Vision
~JEFFCO ~ PUBLIC SCHOOLS Cor1en1 Mastf<Y C.W: & C'·ioo.. (tloa~1 , Communcaloon
c;.,1oQ>1 Tl*li<lng. CtfflM:y I S• f •Oll't!Cftoft ~ ""'-' ~ny Buildlni Briglu Futures .....I
Staff Recommendations:
Alameda Articulation Area
• Alameda International Jr./Sr. High • Phase II -Addition & Renovation
• Deane Elementary • Boundary Change
• Emory O'Connell • Boundary Change
• New Replacement Facility; • Kendrick Lakes Elementary Consolidate with Patterson
• Lasley Elementary • Boundary Change
• Patterson Elementary • Close, Move to Kendrick Lakes
• Rose Stein Elementary • On-Going Renovation
• Demo Temps at Rose Stein • 12 Temps
Staff Recommendations:
Arvada Articulation Area
• Arvada High • Aux. Gym; Artificial Turf Field
• North Arvada Middle • Convert to 6-8
• Arvada K-8 • Boundary Change
• Fitzmorris Elementary • Deferred Maintenance
• Foster Elementary • 4 Classroom Addition; Convert to K-5
• Hackberry Hill Elementary • Deferred Maintenance
• Lawrence Elementary • K-6; Boundary Change
• Peck Elementary • Deferred Maintenance
• Secrest Elementary • Convert to K-5
• Swanson Elementary • Convert to K-5
• Thomson Elementary • Convert to K-5
• Demo Temps at Foster • 6 Temps
Staff Recommendations:
Arvada West Articulation Area
• Arvada West High • Deferred Maintenance
• Drake Middle • 16 Classroom Addition;
• Table Rock Mesa K-8 • New Facility
• New Replacement Facility; • Allendale Elementary Consolidate with Campbell
• Campbell Elementary • Close, Move to Allendale
• Fairmount Elementary • Deferred Maintenance
• Fremont Elementary • Deferred Maintenance
• Stott Elementary • Deferred Maintenance
• Vanderhoof Elementary • Deferred Maintenance
Staff Recommendations:
Bear Creek Articulation Area
• Bea r Creek High • Deferred Maintenance
• Carmody Middle • Convert to 6-8
• Bear Creek K-8 • Deferred Maintenance
• Replacement Facility; K-5; Boundary • Green Gables Elementary Change
• Kendallvue Elementary • Convert to K-5
• Peiffer Elementary • Convert to K-5
• Red Rocks Elementary • Convert to K-5; Boundary Ch ange
• Westgate Element ary • Boundary Change
• Demo Temps • 24 Temps
Staff Recommendations:
Chatfield Articulation Area
• Chatfield High • Artificial Turf Field
• Deer Creek Middle • Convert to 6-8
• Falcon Bluffs Middle • Convert to 6-8
• Boundary Change to Consolidate • Bradford K-8 Bradford Primary and Intermediate
• Coronado Elementary • Convert to K-5
• Mortensen Elementary • Convert to K-5
• Shaffer Elementary • Deferred Maintenance
• Stony Creek Elementary • Convert to K-5; Boundary Change
• Ute Meadows Elementary • Convert to K-5
• Demo Temps • 20 Temps
Staff Recommendations:
Columbine Articulation Area
• Aux. Gym; Renovation; Artificial Turf • Columbine High Field
• Ken Caryl Middle • Deferre d Maintenance
• Columbine Hills Elementary • Deferre d Maintenance
• Dutch Creek Elementary • Boundary Ch ange
• Governor's Ranch Elementary • Matriculation Change
• Leawood Elementary • Boundary Change
• Normandy Elementary • Boundary Change
• Demo Temps • 6 Temps at Normandy
Staff Recommendations:
Conifer Articulation Area
• Conifer High • Aux. Gym; Weight Rm; Renovation
• West Jefferson Middle • Artificial Turf Field
• Elk Creek Elementary • Deferred Maintenance
• Marshdale Elementary • Replacement Facility K-5
• West Jefferson Elementary· • Deferred Maintenance
Staff Recommendations:
Dakota Ridge Articulation Area
• Dakota Ridge High • Deferred Maintenance
• Summit Ridge Middle • Deferred Maintenance
• Blue Heron Elementary • Matriculat ion Change
• Colorow Elementary • Boundary Change
• Mount Carbon Elementary • 4 Classroom Addition
• Powderhorn Elementary • 8 Classroom Addition
• Westridge Elementary • Deferred Maintenance
• Demo Temps • 9 Tem ps at Powderhorn
Staff Recommendations:
Evergreen Articulation Area
• Evergreen High • Master Plan; Sports Field Upgrades
• Evergreen Middle • Phase II -Addition & Renovation
• Bergen Meadow Elementary • Deferred Maintenance
• Bergen Valley Elementary • Deferred Maintenance
• Parmalee Elementary • Deferred Maintenance
• Wilmot Elementary • Phase II Addition -Past Promise
• Demo Temps • 2 Temps at Evergreen Middle
Staff Recommendations:
Golden Articulation Area
• Golden High • Deferred Maintenance
• Bell Middle • 4 Classroom Addit ion
• Addition & Renovation; Convert to K-• Kyffin Elementary 5
• M itchell Elementary • Deferred Maintenance
• Pleasant View Elementary • Closed, Boundary Change
• Ralston Elementary • Deferred Maintenance
• 3 Cla ssroom Addition; Convert to K-5; • Shelton Elementary Boundary Change
• Welchester Elementary • Convert to K-5; Bou ndary Cha nge
Staff Recommendations:
Green Mountain Articulation
Area
• Green Mountain High • Phase I Master Plan
• Dunstan Middle • 8 Classroom Addition; Convert to 6-8
• Devinny Elementary • Convert to K-5; Boundary Change
• Foothills Elementary • Convert to K-5
• Green Mountain Elementary • 8 Classroom Addition; Convert to K-5
• Hutchinson Elementary • Convert to K-5
• Rooney Ranch Elementary • Convert to K-5; Boundary Change
• Demo Temps • 13 Temps
Staff Recommendations:
Jefferson Articulation Area
• Phase I Master Plan Replacement-• Jefferson Jr./Sr. High Addition & Renovation
• Edgewater Elementary • Pre-K Wing
• Lumberg Element ary • 8 Classroom Addition
• Molholm Elementary • 8 Classroom Addition
• Demo Temps • 25 Temps
Staff Recommendations:
Lakewood Articulation Area
• Lakewood High • Deferred Maintenance
• Creighton Middle • 8 Classroom Addition; Convert to 6-8
• 6 Classroom Addition; Convert to K-5; • Belmar Elementary Boundary Change
• Eiber Elementary • 6 Classroom Addition; Convert to K-5
• Glennon Heights Elementary • Close; Boundary Change
• Slater Elementary • Convert to K-5
• South Lakewood Elementary • Convert to K-5
• Demo Temps • 12 Temps
Staff Recommendations:
Pomona Articulation Area
• Pomona High • Aux. Gym; Artificial Turf Field
• Moore Middle • Convert to 6-8
• Little Elementary • Close, Move to Parr
• New Repl acement Facility Pre-K-5; • Parr Elementary Conso lidate with Little
• Warder Elementary • Convert to K-5; Add 2 Temps
• Weber Elementary • Convert to K-5
• Demo Temps • 15 Tem ps
Staff Recommendations:
Ralston Valley Articulation
Area
• 10 Classroom Addition; Artificial Turf • Ralston Valley High Field
• Oberon Middle • 8 Classroom Addition; Convert to 6-8
• 8 Classroom Addition; Boundary • Candelas K-8 Change
• Coal Creek K-8 • Deferred Maintenance
• Meiklejohn Elementary • Convert to K-5; Boundary Change
• Sierra Elementary • Convert to K-5; Boundary Change
• Van Arsdale Elementary • Convert to K-5
• West Woods Elementary • Convert to K-5
• Demo Temps • 9 Temps
Staff Recommendations:
Standley Lake Articulation
Area
• Aux. Gym ; Renovation; Artificial Turf • Standley Lake High Field
• Mandalay Middle • Convert to 6-8
• Wayne Carle Middle • Co nvert to 6-8
• Adams Elementary • Convert to K-5
• Lukas Elementary • Co nvert to K-5
• Ryan Elementary • Co nvert to K-5
• Semper Elementary • Co nvert to K-5
• Sheridan Green Elementary • Con vert to K-5
• Witt Elementary • Co nvert to K-5
Staff Recommendations:
Wheat Ridge Articulation Area
• Wheat Ridge High • Phase II Master Plan
• Everitt Middle • Renovation; Convert to 6-8
• Kullerstrand Elementary • Close; Move to Prospect Valley
• Maple Grove Elementary • 4 Classroom Addition; Convert to K-5
• Pennington Elementary • Convert to K-5
• New Replacement Facility K-5; • Prospect Valley Elementary Consolidate with Kullerstrand
• Stevens Elementary • Convert to K-5
• Stober Elementary • Close; Move to Vivian
• New Replacement Facility K-5; • Vivian Elementary Consolidate with Stober
• Wilmore-Davis Elementary • Convert to K-5
• Demo Temps • 13 Temps
Staff Recommendations:
Options
• Brady Exploration • Deferred Maintenance
• Connections • Deferred M aintenance
• D'Evelyn • Deferred Maintenance
• Dennison • Deferred Maintenance
• Fletcher Miller Special • Master Pl an -Ad dition & Renovation
• Jeffco Open • Phase II
• Long View • Close; Relocate to Mclain
• Manning • Deferred Maintenance
• Mclain Community • Long View Relocation
• Sobesky • Deferred Maintenance
• Warren O.T.C • • Deferred Maintenance
• Warren O.T.C. North Campus • Deferred Maintenance
• Warren O.T.C. South Campus • Expand CTE Opportu nities
Staff Recommendations:
District-Wide
• Jeffco Virtual Academy • Deferred Maintenance
• Mt. Evans OELS • Master Plan -Phase I
• North Transportation & Maintenance • New Facility Shops
• South Area Athletic Complex • New Facility
• Trailblazer Stadium • Renovation; Replace Buildings on Site
• Windy Peak OELS • Master Plan -Phase I
Prepared by: Jeffco Schools Facilities Management
April 21, 2016
Attachment 3
Bulldmg Bnghi F11111m
Acknowledgements
Acknowledgement is given to the Board of Education, the Superintendent and Cabinet,
Achievement Directors, and the Capital Asset Advisory Committee, all of which provide
valuable information and recommendations to Facilities in the development of this Master
Plan.
Board of Education
Ron Mitchell, President (District 5)
Ali Lasell, First Vice President (District 3)
Susan Harmon, Second Vice President (District 2)
Amanda Stevens, Secretary (District 4)
Brad Rupert, Treasurer (District 1)
Superintendent and Cabinet
Dan McMinimee, Superintendent
Steve Bell, Chief Operating Officer
Kathleen Askelson, Chief Financial Officer
Terrance Elliott, Chief School Effectiveness Officer
Syna Morgan, Chief Academic Officer
Craig Hess, Chief Legal & Employee Relations Officer
Brett Miller, Chief Information Technology Officer
Amy Weber, Chief Human Resources Officer
Diana Wilson, Chief Communications Officer
Kevin Carroll, Chief Student Success Officer
3
4
Executive Summary ................................................................................................................ 7
Facility Portfolio ...................................................................................................................... 8
Challenges and Needs ............................................................................................................. 9
Identifying Needs .................................................................................................................. 10
Anticipated Implementation Schedule ................................................................................ 14
Identifying and Prioritizing Needs ......................................................................................... 15
Program and Utilization Recommendations ......................................................................... 16
Articulation Areas ................................................................................................................. 16
Alameda Articulation Area ......................................................................................... 17
Arvada Articulation Area ............................................................................................ 23
Arvada West Articulation Area ................................................................................... 29
Bear Creek Articulation Area ...................................................................................... 35
Chatfield Articulation Area ......................................................................................... 39
Columbine Articulation Area ...................................................................................... 43
Conifer Articulation Area ............................................................................................ 47
Dakota Ridge Articulation Area .................................................................................. 51
Evergreen Articulation Area ....................................................................................... 55
Golden Articulation Area ............................................................................................ 59
Green Mountain Articulation Area ............................................................................. 63
Jefferson Articulation Area ......................................................................................... 67
Lakewood Articulation Area ....................................................................................... 71
Pomona Articulation Area .......................................................................................... 75
Ralston Valley Articulation Area ................................................................................. 81
Standley Lake Articulation Area .................................................................................. 85
Wheat Ridge Articulation Area ................................................................................... 89
Options ...................................................................................................................... 95
District-Wide .............................................................................................................. 99
s
6
Executive Summary
Jeffco Schools serves over 86,000 students in both neighborhood schools and charter schools
spread over 169 campuses covering 3,100 acres. This Master Plan is focused on Facility
Utilization within Jeffco Public Schools and covers Capacity, Program, and Enrollment needs in
the district. This plan should be implemented over a 5 to 7 year period.
This District-Wide Facilities Master Plan will:
• Establish a Short and Long-Term Plan to Meet the District's Future Facilities Needs.
• Provide for better utilization of school facilities at all grade levels and provide for better
instructional and program support.
• Build new capacity in high-growth areas of the district to accommodate growth, alleviate
over-crowding, and support the needs of the communities.
• Transition SO selected K-6 grade elementary schools into K-5 grade elementary schools to
increase capacity at the elementary schools and better align with elementary school
educational programs in surrounding districts and nationally.
• Transition eleven -7'h and 81h grade middle schools into 6111, 7'", and 81" grade schools to
provide for better utilization of the middle school facilities and to be in better alignment
with surrounding districts and national middle school models.
• Consolidate 10 under-utilized and high FCI schools into S new facilities, which will provide
for more modern learning environments as well as support better educational models.
• Complete 1 new pre-school facility.
• Include classroom additions at 16 facilities for a total of 122 new classroom spaces.
• Recommend replacing 2 elementary schools and 1 high school with new facilities.
• Propose 15 boundary changes to support facility consolidations, new facilities, and
critically stressed areas where enrollment may be affecting education.
• Review 'Past Promises' of critical projects and needs.
• Recommend closing 3 facilities and relocating students to other facilities.
• Close and remove 81 temporary classroom modular throughout the district.
• Propose changing the matriculation schools for 2 elementary schools to better align with
adjacent boundaries.
• Reduce the annual Maintenance and Operation Budget by approximately $2.4 million.
• Reduce facility-specific identified deferred maintenance needs by approximately $60
million.
Educational Adequacy/Learning Environment
The district is committed to supporting the learning environment and to providing the physical
environments conducive for multiple opportunities of learning at all grade levels. This Master
Plan aims to create learning spaces that are functional, efficient, healthy, and comfortable.
7
Facility Portfolio
Overview
Jeffco Public Schools is the second largest school district in the State of Colorado in terms of
student attendance. The district educates a little under 10% of all students attending public
schools in the state. The district has:
• 12 Million Square Feet of Facilities
• 3,100 Acres of Land
• 169 Campuses with 381 Permanent Buildings
• 327 Modular Buildings and 12 Cottage Buildings
• Average Age 40 years; Median Age 44 years
• Average Facility Condition Index 20.4%
• Replacement Value is $2. 7 billion
• Annual Maintenance & Operation Budget $51M
• Annual Capital Investment $21M
loistrict Facilities by Type
Perm.mrnt Budd•n~' Co!tlfll! Bulldln~ Transportable llulldlngs
Count Sq Ft
0
229 lli.690
1 1,008
12 12,824
5 4,800
13 12,934
32 35,166
2 1,920
0
4 3,894
29 25,220
327 323,456
2.7%
8
I Building Age by Age Bracket A~race Yur Built 1971 1f76
s.000.000
4,S00,000
4,000,000
ii 3,S00,000 .. ...
II 3.000,000 ~ :l 2,500,000
! ~ 2,000,000
1,500,000
1.000,000
500.000
Pre 1928 2008. 201A
Square Feet 13,388 25,300
Square Feet per Student
School Type Type llof Schools II of Students Permanent Sq Ft
Pre-K Centers Pre-K 5 482 54,736
Elementary Schools ES 92 37,657 4,428,376
K·S Schools K-8 3 1,875 263,091
Middle Schools MS 17 10,057 1,817,299
7·12 Schools 7-12 2 2,013 386,636
High Schools HS 15 21,573 3,337,648
Dlstrictwlde I Option Dlstrictwlde I Option 17 3,663 956,482
Total 151 77,320 11,244,268
Challenges and Needs
Enrollment Challenges and Trends
Enrollment varies depending upon location, neighborhood demographics, student/parent
choice, intangible and other factors. An Enrollment Projections Report that analyzes future
growth and reviews the past, by articulation area, is published annually by the Facilities
Department and available to the public. The statistical information utilized in this Master Plan
is developed from this annual Enrollment Projections Report.
Current trends indicate that the north and northwest areas are seeing significant growth due
to residential development. Central area growth is stable-to-increasing. This area is impacted
by socio-economic factors, household mobility, multi-generational families, and
affordable housing. West central growth is increasing due to residential development.
9
114
118
14{)
181
192
155
261
145
• Challenges and Needs
The south area is stable-to-declining, with pockets of growth; the area is very dependent upon
residential turnover and affordable housing for younger families. The west area is stable with
some growth.
Charter schools showed significant growth with the addition of one charter this past school
year, one new charter anticipated for the upcoming school year, and overall moderate growth
at the others.
The goal is to better utilize the district's facilities including providing the best overall
opportunities to accommodate the various levels of teaching and support for educational
programs.
Enrollment by Geographic Area
High Growth: North County & Along Highway 93 (Candelas and
Leyden Rock), Central Lakewood, and Edgewater
Moderate Growth: West Lakewood (Solterra)
Stable Growth: West Area
Slow or No Growth: Pockets in North and South County
Reasons for Current Growth Patterns:
Economic and Population Growth
Improving Real Estate Market
Reasons for Anticipated Future Growth Patterns:
2013 Saw its First Increase in Birthrate since 2006
Increase in Property Sales, Decrease in Foreclosures, Increased
Availability of Affordable Housing in Established Neighborhoods
Operational Needs
Program modifications and more efficient facility utilization can affect operational costs.
Identifying Needs
Facility Assessment Process and the District-Wide Facility Master Plan
This process included establishing guidelines and parameters from which Facilities developed
this Master Plan.
• Facilities provided information about the conditions of buildings, usage, efficiency,
enrollment trends, boundaries, maintenance and operations.
• Facilities developed this master plan within the BOE guidelines that will provide
direction for future development.
10
• This Master Plan will become a key component in the development of capital
programs, including construction bond programs.
• This Master Plan will also play an important part in communicating facility needs
and future district plans to the community.
Educational Adequacy
Educational Adequacy Categories
To comprehensively assess educational effectiveness, it is necessary to understand the
components that affect the instructional or teaching program. These components can
generally be formulated into standards or guidelines that bridge the gaps between the
architectural programs from which schools are built and the district's educational standards.
There may be numerous criteria that contribute to educational adequacy, however, in general
they fall into eight major categories:
Capacity: The ability of core facilities to meet needs of the student population. It is critical to
consider the programs at a particular campus and the impact these programs have on
classroom inventory and student teaching stations. It is also important to evaluate the use of
permanent versus temporary structures.
Support for Programs: The provision of special spaces or classrooms that support specific
curriculum offerings such as, among others, music, sports, science, and technology programs.
Technology: The presence of infrastructure, data distribution/storage, and equipment within
classrooms and laboratory settings. This includes local area network cabling, video
distribution systems, electrical power outlet s, and projection or video display screens.
Security and Supervision: The extent to which physical configurations help or hinder
building operations and includes both passive and physical security.
Instructional Support: The presence of necessary equipment within teaching spaces
including, among others, teacher storage, student storage, writing and tack surfaces, sinks,
demonstration tables, and fixed audio/video equipment.
Physical Characteristics: This focuses primarily on the sizes and shapes of individual teaching
spaces and their adequacy to support program needs.
Learning Environment: The degree to which learning areas are comfortable, well-lit, odor-
free, controllable, and quiet.
11
Relationship of Spaces: The proximity of instructional spaces to support areas like, among
others, libraries, restrooms, and student dining and recreational areas.
These above eight categories establish the criteria for data collection and subsequent data-
generated analysis.
At any school, there are certain things that can be resolved or upgraded, and there are specific
things that cannot realistically be resolved without spending more than the replacement
value of a structure. For instance, electrical outlets can be added, flooring materia Is can be
changed, and data ports can be installed. However, it is generally cost prohibitive to
reconfigure a building's layout, expand a classroom to house five extra students, or move a
library. The eight categories are used to identify "deficiencies" that can be repaired or
upgraded, and "inadequacies" that simply impact a building's learning environment and should
be considered when making decisions that will affect the long-term utilization of a particular
facility.
Educational Adequacy Assessment
Educational adequacy is reviewed and updated annually by staff site visits and assessments,
interviews with principals, and an annual building usage survey. The information obtained is
then reviewed and any changes or modifications to usage entered into the FACTS database.
Capacity and Enrollment Summary by Area
West Articulation Areas
Conifer -Stable/Growing
• West Jefferson ES -Over-Enrolled
• Balance of Facilities -Under-Utilized
Evergreen -Stable/Growing
• Parmalee ES -Over-enrolled
• Bergen Valley ES -Significantly Under-Utilized
• Balance of Facilities -Under-Utilized
South Articulation Areas
Bear Creek -Declining
• Red Rocks ES, Very High 'Choice In'
• Westgate ES, Demographic/Neighborhood Changes
• Bear Creek K8, Very High 'Choice In'
12
Chatfield -Stable
• Coronado ES, High 'Choice In'
• Shaffer ES, Stony Creek ES, Neighborhood, Low 'Choice In'
• Deer Creek MS, Very Low Utilization
Columbine -Stable/Declining
• Dutch Creek ES, High 'Choice Out', Demographics
• Normandy ES, High 'Choice In'
Dakota Ridge -Stable/Declining
• Powderhorn ES, Mt. Carbon ES, Westridge ES - High Utilization
• Summit Ridge, Approaching Capacity
• Colorow ES, Significantly Under Utilized
Central Articulation Areas
Alameda -Stable, Better Utilization
• Alameda HS 7-12 -Conversion
• Stein ES Move to O'Connell reopen 2017, Demographic Changes, High Mobility
Arvada -Declining
• Arvada HS -High 'Choice Out'
• Foster ES, Hackberry Hill ES, Arvada KS -Continued Growth
• North Arvada MS -Declining
Jefferson -Stable Better Utilization
• Jefferson 7-12 -Conversion, Better Utilization/Under Enrolled
• Stevens Relocation to WRMS -Better Utilization
• Edgewater ES, Molholm ES, Lumberg ES -Continued Growth; Over-enrolled.
Green Mountain -Increasing
• Devinny ES, Green Mtn. ES, Rooney Ranch ES -Over-enrolled, Solterra, Neighborhood
Turnover
Lakewood -Stable
• Lakewood HS -High 'Choice In'
• Eiber ES, Belmar ES -Over-enrolled
Golden -Increasing
• Kyffin ES -Over-enrolled, High 'Choice In'
• Mitchell 2013-14 6th Grade to Bell MS Stable/Growing
• Bell MS -Increasing Due to 6th Grade & STEM
Wheat Ridge -Stable/Growing
• Everitt MS; WRHS -Solid Growth; Most ES -Growth
• Stober, Prospect Valley, Kullerstrand ES -Over-Enrolled
13
Processes and Evaluations
Facility Condition Index
The Facility Condition Index (FCI) is a widely used indicator that provides a relative scale of the
overall condition of a given facility or group of facilities within a facility portfolio. The index is
derived by dividing the total repair cost, including educational adequacy and site-related
repairs, into the total replacement cost for the set of facilities. Based on previous district
experience and consultation with district staff, the following scale was implemented:
Less than 5% Best
6%to 10% Good
11% to 20% Average
21% to 30% Below Average
31% to 50% Poor
51% to 65% Very Poor
Greater than 65% Replacement Candidate
The FCI factor can assist in evaluating the adequacy, or inadequacies, of facilities to
accommodate the educational programs of which the buildings were designed.
Academic, School, and Community Input
In the development of this Facilities Master Plan, Facilities received input from multiple sources
and resources, including:
• The Superintendent and Members of the Superintendent's Cabinet
• Achievement Directors
• Principal Questionnaires
• Enrollment Projections
• Summary of Findings
Anticipated Implementation Schedule
Implementation is based on a 5 to 7 year plan:
• Year 1: Deferred Maintenance and Minor Upgrades; Some K-5 transitions
• Year 2: Additions and Program Support, Deferred Maintenance, Upgrades
• Year 3: Replacement Schools, Major Renovations and Additions, and Program Support
• Year 4: New Facilities, Major Renovations and Additions, and Program Support
• Year 5 and Beyond: Deferred Maintenance, Upgrades
14
Identifying and Prioritizing Needs
Prioritizing Educational Needs and Establishing Guidelines
The following were considered in the evaluations:
School Consolidations
• Relocate Students into Adjacent/Nearby Existing Schools.
• Consolidate Two Existing Schools into a Single New School.
School Closures
• Close Selected Schools based on Multiple Criteria. Closures will Follow Identified
and Established Protocol based on Selection Criteria , Community Involvement, and
Support.
Boundary Changes
• Boundary Changes based on Multiple Criteria. Boundary Changes will Follow
Identified and Established Protocol based on Program Placements and will include
Community Involvement.
• This Protocol is Initially a Lengthy Process and may Require phased Implementation
to Fully Implement.
New Construction
• Constructing New Buildings. This is a Lengthy Process and Requires Early Decision
Making and Early Commitments of Funding.
• Constructing Additions onto Existing Schools and/or Undergoing Significant
Renovations.
Grade Configurations
• Providing Flexibility in the Utilization of Resources.
Repurpose Existing Facilities
• Function Changes to a School to Support Specific Facility or Community Needs.
• School Type and/or Program or Curriculum Changes.
• Neighborhood & Charter.
• Charter & Option.
Shared Facilities
• Sharing Facilities Between Neighborhood Schools and Selected Charter Programs.
• Sharing Facilities Between Selected Charter Programs and Option Schools.
Explore Finance Options
• Evaluate the best option for funding project. These options may include Bonds,
Certificates of Participation (COPs), Leases, and Cash .
15
• Program and Utilization Recommendations
Program and Utilization Recommendations-Articulation Areas
Each Articulation Area is presented separately in the following pages. Each Area includes the
following information which is presented in two parts:
Part 1:
Part 2:
• Overview: General summary of enrollment and capacity in the Articulation Area.
• Current Conditions: Each school listed with FCI, Utilization, Enrollment, Choice In,
and Choice Out information.
• Five Year Projections: General summary of projected enrollment and trends .
• Articulation Area Facilities: Detailed overview of each facility including date
constructed, dates of additions, facility size, site acreage, and temporary portable
buildings, if present. Targeted Improvements are listed if there are recommended
changes or considerations associated with capacity or utilization.
• Facility Department Recommendations: One or more recommendations on
Operational Efficiencies, Utilization, Educational Models, School and/or Program
Consolidations, as well as other Options.
Permanent Capacity vs. Title I Capacity
Permanent Capacity: In addition to the permanent building capacity, the Permanent Capacity
numbers shown include temporary modular building capacities if students currently occupy
the modulars.
Title I Capacity: Although important and considered in the building utilization of each
evat uation, permanent capacity values were not reduced or modified to accommodate
potential variations on how each facility is currently utilized because of Title I assignment. This
was to ensure consistent evaluations of district-wide utilization needs.
The following Articulation Areas are Included:
Alameda Articulation Area
Arvada Articulation Area
Arvada West Articulation Area
Bear Creek Articulation Area
Chatfield Articulation Area
Columbine Articulation Area
Conifer Articulation Area
Dakota Ridge Articulation Area
Evergreen Articulation Area
Golden Articulation Area
16
Green Mountain Articulation Area
Jefferson Articulation Area
Lakewood Articulation Area
Pomona Articulation Area
Ralston Valley Articulation Area
Standley Lake Articulation Area
Wheat Ridge Articulation Area
Options
District-Wide
Alameda Articulation Area
OVERVIEW:
Stable enrollment combined with improved utilization at the HS/MS levels. In 2015, Alameda
International HS was converted to a 7-12 school and is slightly under-enrolled. Kendrick Lakes
is at capacity. The rest of the elementary schools are at or near ideal enrollment. Rose Stein
Elementary School is currently closed for renovation and will reopen for the 2017-18 school
year. Stein ES students are housed in the Emory O'Connell ES facility. Alameda 7-12, Deane,
Lasley, and Stein are Title I schools.
2015-16 Capacity: 3,031 available seats at the Elementary schools (including O'Connell),
current enrollment 2,446 -81% utilization; Middle and High School (7-12 at Alameda lnt'I)
available seats 1,610, current enrollment 1,282 -80% utilization. The MS student enrollment
at Alameda lnt'I (7-12) is 466.
CURRENT CONDITIONS:
Deane ES• 21% 81% 483 20% 49%
Lasley ES• 21% 78% 472 14% 42%
Kendrick Lakes ES 66% 101% 474 49% 52%
Patterson ES 47% 77% 369 35% 46%
Patterson PK 41% 94% 113
Rose Stein PK 35% 107% 64
Rose Stein ES 41% 0% 0 (Closed) 0% 0%
Emory O'Connell• 17% 74% 648 17% 38%
Alameda lnt'I • 16% 80% 1,282 13% 53%
•ntie I School
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 1. 7% increase in
enrollment or about 65 students. Development in the Alameda Area consists of small
residential pockets that do not usually produce a large number of school age children. The
Green Gables development near Jewell and Wadsworth will bring new students to the area.
Stabilization of multi-family rental rates will increase enrollment also. The Rose Stein ES
projections starting in 2017-18 include approximately half of those students that will return
from the Emory O'Connell ES.
17
Alameda Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Deane ES 475 470 475 450 451
Lasley ES 465 465 458 454 453
Kendrick Lakes ES 476 475 463 465 471
Patterson ES 352 365 351 341 340
Patterson PK 138 127 148 152 156
Rose Stein PK 69 65 76 70 68
Rose Stein ES 0 313 311 305 298
Stein at O'Connell 650 0 0 0 0
Emory O'Connell ES 0 314 312 306 298
Alameda 7-12 1,292 1,310 1,354 1,390 1,435
Total 3,917 3,904 3,948 3,933 3,970
ARTICULATION AREA FACILITIES:
Alameda International Jr/Sr High School
Originally constructed in 1961, additions were added in 1968, 1974, 1976, 1996, 2001, and
2009. The two story building has 231,176 SF of area with an applied capacity of 1,610 and is
Title I. There are two temporary portable classrooms on site. The site is 26.5 acres.
Targeted improvements: Modernization with implementation of Master Plan (scope should be
reviewed and confirmed). Past Promise for Phase II (finger additions and total site
redevelopment). Converted to 7-12 in 2015; turf field, tennis courts.
Emory O'Connell Elementary School (Old O'Connell Middle School}
Originally constructed in 1994, the two story building has 107, 786 SF of area with an applied
capacity of 876 and is Title I. The site is 17.5 acres.
Targeted improvements: Relocate Stein Students back into newly renovated Stein in 2017.
Consider a boundary Change to increase enrollment at O'Connell and provide relief to
surrounding elementary schools.
18
Alameda Articulation Area (continued)
Elementary Schools:
Deane: Originally constructed in 1954, additions were added in 1963, 1973, and 1995. The
one story building has 46,118 SF of area with an applied capacity of 600 and is Title I. There
are four temporary portable classrooms on the 9 acre site.
Lasley: Originally constructed in 1961, additions were added in 1963, 1973, 1996, and 2000.
The building has 66,926 SF of area with an applied capacity of 606 and is Title I. There are
three temporary portable classrooms on the 9. 7 acre site.
Kendrick Lakes: Originally constructed in 1970 with a small addition in 1994. The one story
building has 40,078 SF of area with an applied capacity of 469. There are four temporary
portable classrooms on the 9. 75 acre site.
Targeted improvements: Replace facility due to high FCI, construct new 768 K-6 on this site;
relocate Kendrick Lakes students to Emory O'Connell during co nstruction.
Patterson: Originally constructed in 1964, an addition was added in 1968. The one story
building has 48,895 SF of area with an applied capacity of 480. There is one temporary
portable classroom. The site is 8 acres.
Targeted improvements: Close/Consolidate with new Kendrick Lakes.
Patterson Pre-K: Originally constructed in 1965, these consist of four separate cottage
buildings. The buildings have a total of 13,820 SF of area with an applied capacity of 120. The
site is 1.2 acres.
Targeted improvements: Replace. Build New Larger Pre-K to accommodate current cottage
based Pre-K; option to relocate or open a Pre-K at Emory O'Connell ES. Remove, sell or use
cottages for administrative purposes.
Stein Pre-K: Originally constructed in 1961, these consist of two separate cottage bu ildings, of
which only one is currently being used as a Pre-K. The buildings have a total area of 6,794 SF of
area with an applied capacity of 60. The site is 0.5 acres.
Targeted improvements: Close cottages, Move the Pre-K program into Stein ES. Hold cottages
for Admin/SPED related programs.
Rose Stein: Originally constructed in 1954, with additions added in 1963 and 1995. The one
story bu ilding has 47,094 SF of area with an applied capacity of 568. There are currently ten
temporary portable classrooms. There is a community health clinic on site. The site is 8.75
acres.
Targeted improvements: Renovate to Pre K-6 Neighborhood School. Re-open in 2017.
19
Alameda Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
Replace Kendrick Lakes with new larger capacity school and consolidate Patterson into the
new Kendrick Lakes. Close Patterson. Currently there are $11 million in deficiencies identified
at these two schools. Remove Patterson Cottages and build new Pre-K center. Close Stein Pre-
K Cottages and consolidate Stein Pre-K into newly renovated Stein ES. Adjust boundaries for
O'Connell, Lasley, Deane, and combine Kendrick Lakes and Patterson.
Impact to elementary schools 2018-19 School Year using enrollment projections:
Patterson Pre -K (148 projected for 2018-19 school year) removed from projected enrollment
at Patterson.
::----_ ~-:'·. ~~-: :~ i--i'-. ··. ' --I
• I I i ' -11 -
Kendrick Lakes ES 400
Patterson ES 298
New Kendrick Lakes 91% 698
Operational Efficiency of Patterson (Close and Consolidate with Kendrick lakes)
• Capital Expense to relocate K-6 to new Kendrick Lakes ................................ $0.00
• Additional Maintenance & Operations Expense at $5/SF/Year ............. ($244,475)
• Outstanding Building Deficiencies ........................................................ $5,000,000
Operational Efficiency of closed Kendrick lakes
• Capital Expense to close Kendrick Lakes ....................................................... $0.00
• Additional M aintenance & Operations Expense at $5/SF/Year ............. ($200,390)
• Outstanding Building Deficiencies ........................................................ $6,000,000
Operational Efficiency of new Kendrick Lakes (768 Capacity --1s,ooo SF)
• Capital Expense to build new Kendrick Lakes ...................................... $28,000,000
• Additional Maintenance & Operations Expense at $5/SF/Year ............... $375,000
20
Alameda Articulation Area (continued)
Operational Efficiency of Rose Stein
• Additional Maintenance & Operations Expense at $5/SF/Year ................ No Change
• Renovate to keep existing permanent capacity of 449.
• Remove 12 temporary modular classrooms
• Move existing Health Clinic into renovated permanent building.
ALAMEDA HIGH SCHOOL:
Full Modernization: Maintain as a 7-12 Campus . Past Promise for Finger Additions and total
site redevelopment; converted to 7-12 In 2015; turf field, tennis courts. Remove two
portables. Phasing and partial facility to remain with renovation. At this time, use 230,000 SF
total for final build-out, including existing areas. Renovation, Demolition, and Addition(s) will
make the facility more efficient in utilization. Reevaluate Alameda Master Plan based upon
programmatic changes and grade reconfiguration.
Impact to 7-21 campus 2017-18 School Year using enrollment projections:
Impact to 7-21 campus 2018-19 School Year using enrollment projections:
Operational Efficiency of Alameda:
Capital Expense Addition and Renovation ........................................................ $20,000,000
Maintenance & Operations Expense at $5/SF/Year ........................................... ($1,150,000)
21
22
Arvada Articulation Area
OVERVIEW:
Under-enrollment at Arvada High and North Arvada Middle is very high with only about 50%
of each facility being utilized. Elementary school utilization varies with over-enrollment in
some areas and significant under-enrollment in others. Hackberry Hill has a large gifted and
talented program and Foster serves a very large boundary.
2015-16 Capacity: 3,926 available seats at the Elementary schools, current enrollment 3,305 -
84% utilization; K-8 School 701 available seats, current enrollment 631 -90% utilization;
Middle School 861 available seats, current enrollment 443 -51% utilization; High School
available seats 2,006, current enrollment 937 -47% utilization.
CURRENT CONDITIONS:
Fitzmorris Es• 30% 78% 338 33% 52%
Foster ES* 38% 99% 541 48% 32%
Hackberry Hill ES 13% 101% 501 72% 28%
Lawrence es• 30% 69% 353 43% 53%
Peck ES 37% 80% 338 42% 48%
Secrest ES* 24% 92% 400 36% 49%
Swanson ES* 35% 70% 406 23% 56%
Thomson es• 38% 86% 428 35% 40%
Arvada K-8* 19% 90% 631 21% 50%
North Arvada MS 18% 51% 443 33% 32%
Arvada HS 30% 47% 937 11% 54%
*Title I School
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 2.2% decrease in
enrollment or about 115 students across the articulation area. There is very little in the way of
residential growth except for multi-family directed towards light-rail. These developments
tend not to generate a significant number of students at any grade level. Single family
residential turn-over and possible alterations to the types of programs offered at the high
school level may increase the student population.
23
Arvada Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Fitzmorris ES 351 340 329 334 331
Foster ES 551 545 545 526 516
Hackberry Hill ES 492 501 507 506 508
Lawrence ES 348 352 362 333 343
Peck ES 332 340 345 355 352
Secrest ES 405 414 385 451 406
Swanson ES 391 381 373 378 378
Thomson ES 408 405 406 403 381
Arvada K-8 629 618 636 637 632
North Arvada MS 443 430 417 411 424
Arvada HS 930 937 932 917 930
Total S,280 S,263 S,237 S,251 S,201
ARTICULATION AREA FACILITIES:
Arvada High School
Originally constructed in 1971, additions were added in 1983, 1989, 1997, and 2001. The four
story building has 236,196 SF of area with an applied capacity of 2,006. The site is 33.3 acres.
Targeted improvements: Renovation, auxiliary gymnasium, and artificial turf field.
North Arvada Middle School
Originally constructed in 1962, additions were added in 1975, 1983, 1984, and 2000. The two
story building has 113,554 SF of area with an applied capacity of 861. The site is 20.4 acres.
Targeted improvements: Convert to 6-8 and migrate the 6th grade students east of
Wadsworth to North Arvada MS and students west of Wadsworth to Arvada K-8.
Arvada K-8
Originally constructed in 1952, additions were added in 1953, 1959, 1961, 1965, and 1995. The
two story building has 115,363 SF of area with an applied capacity of 701 and is Tltle I. The
site is 15.2 acres.
24
Arvada Articulation Area (continued)
Elementary Schools:
Fitzmorris: Originally constructed in 1960, additions were added in 1962, 1965, 1994, and
2000. The building has 51,259 SF of area with an applied capacity of 435 and is ntle I. The site
is 14.2 acres.
Foster: Originally constructed in 1953, additions were added in 1959 and 1995. The building
has 42,486 SF of area with an applied capacity of 548 and is Title I. There are six modulars on
the 10.5 acre site.
Targeted improvements: Modular reduction, 4 CR addition.
Hackberry Hill: Originally constructed in 1966, additions were added in 1969 and 2007. The
building has 52,414 SF of area with an applied capacity of 495. The site is 7.2 acres.
Lawrence: Originally constructed in 1996, the two story building has 47,139 SF of area with an
applied capacity of 511 and is Title I. There are two modulars on the 4.1 acre site.
Peck: Originally constructed in 1966 with an addition in 1993. The building has 42,836 SF of
area with an applied capacity of 423; there is one modular on the 7.5 acre site.
Secrest: Originally constructed in 1955, additions were added in 1959, 1960, 1961, and 1995.
The building has 46,373 SF of area with an applied capacity of 435 and is Title I. The site is 8
acres.
Swanson: Originally constructed in 1964, additions were added in 1967, 1986, 1989, 1994, and
2001. The building has 54,462 SF of area with an applied capacity of 579 and is Title I. There
are three modulars (one mothballed) on the 7.5 acre site.
Thomson: Originally constructed in 1973, additions were added in 1995 and 1999. The
building has 48,833 SF of area with an applied capacity of 500 and is Title I. The site is 9.4
acres.
25
Arvada Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
9-12 Arvada HS; North Arvada 6-8 School, K-5 Elementarys Foster, Secrest, Swanson, Thomson,
K-6 Elementarys Hackberry Hill (except GT program), Lawrence, Fitzmorris, Peck; 4 CR Addition
to Foster:
Arvada HS to remain 9-12 review program options as a means to increase enrollment and
utilization. Convert North Arvada MS to a 6-8 and remove 61h grade from those elementary
schools east of Wadsworth, except Foster. 4 CR addition remains a necessity at Foster.
Impact to schools 2018-19 School Year using enrollment projections:
...,;. ---;; -cc--•>;;-L--.---• . - --~ ··-•·r,,-, ....... -· ·· ~,-· ''··• -1 =-==---!~-~ ____ : --. .1 , : ; I
-- ---',_~-Arvada K-8* 84% 586
Lawrence PreK-6* 81% 412
Fitzmorris PreK-6* 76% 329
Peck K-6 82% 345
North Arvada 6-8 81% 697
Foster K-5* 83% 475
Hackberry Hill K-6 92% 457
Secrest PreK-5* 77% 335
Swanson K-5* 323
Thomson K-s• 346
• Indicates ntle f school, applied capacity not discounted.
Re-Boundary Arvada K-8 and Lawrence PreK-6, isolating Lawrence site. Lawrence PreK-6
boundary from Ridge Road south to 481h; Wadsworth to Kipling; K-6 Students North of Ridge
Road containing former Lawrence Boundary attends Arvada K-8. There is no change to the 7-8
Boundary.
ARVADA HS RENOVATlON, AUXILIARY GYM, ARTIFICIAL TURF:
Operational Efficiency of Arvada HS Renovation:
Capital Expense Renovation, Auxiliary Gym, Turf Field ............................................ $4,000,000
Additional Maintenance & Operations Expense at $5/SF/Year .................................... $50,000
Educational Administrative Expense ....................................................................... No Change
Annual Total ................................................................................................................ $50,000
26
• Arvada Articulation Area
NORTH ARVADA MS 6-8 CONVERSION:
Construct a four classroom addition to Foster ES, remove 6 modulars.
Operational Efficiency of North Arvada 6-8 Conversion:
Additional Maintenance & Operations Expense at $5/SF/Year ................................ No Change
Educational Administrative Expense ........................................................................... $100,000
Annual Total ............................................................................................................... $100,000
FOSTER ELEMENTARY ADDITION:
Construct a four classroom addition to Foster ES, remove 6 modulars.
Operational Efficiency of Foster Addition:
Capital Expense 4 CR Addition ............................................................................... $2,400,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................... $10,000
Educational Administrative Expense ........................................................................ No Change
Annual Total ............................................................................................................... $10,000
27
28
Arvada West Articulation Area
OVERVIEW:
Arvada West shows mixed growth due to development in the western and southern portions
of the articulation area, but the eastern areas have stable to declining enrollment. Arvada
West HS, Drake MS, Fairmount ES, and Stott ES are at or near optimum enrollment. The
remaining elementary schools are under-enrolled. The proposed Table Rock Mesa School will
have an impact on this and the Golden Articulation area depending upon the size and grade
configuration.
2015-16 Capacity: 2,672 available seats at the Elementary schools, current enrollment 2,299 -
86% utilization; Middle School 736 available seats, current enrollment 685 -93% utilization;
High School 1,858 available seats, current enrollment l, 751 -94% utilization.
CURRENT CONDITIONS:
Allendale ES* 22% 61% 211 25% 59%
Campbell ES 39% 88% 322 38% 43%
Fairmount ES 22% 95% 630 9% 30%
Fremont ES 19% 78% 318 43% 58%
Stott ES 23% 94% 358 46% 50%
Vanderhoof ES 32% 90% 460 25% 46%
Drake MS 16% 93% 685 15% 28%
Arvada West HS 5% 94% 1,751 30% 31%
*Title I School
FIVE YEAR PROJECTIONS:
Growth projections over the next five years Indicate approximately a 1.0% increase in
enrollment or about 48 students. This area is experiencing significant growth due to new
single family residential development in the area north of 1-70 and east of Highway 93. The
developments aren't the size of Candelas or Leyden Rock but are such that they will add a
significant number of students, combined with neighborhood turnover. The growth will offset
declines in the more established eastern neighborhoods.
29
Arvada West Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Allendale ES 210 200 208 205 204
Campbell ES 304 298 304 293 290
Fairmount ES 650 655 665 658 668
Fremont ES 330 337 344 340 353
Stott ES 348 374 362 390 392
Vanderhoof ES 472 479 480 475 466
Drake MS 668 678 688 677 677
Arvada West HS 1,753 1,764 1,750 1,741 1,733
Total 4,735 4,785 4,801 4,779 4,783
ARTICULATION AREA FACILITIES:
Arvada West High School
Originally constructed in 2003, the two story building has 237,052 SF of area with an applied
capacity of 1,858. The site is 32.l acres.
Drake Middle School
Originally constructed in 1962, additions were added in 1963, 1983, and 2000. The two story
building has 98,656 SF of area with an applied capacity of 736. The site is 19.6 acres.
Targeted improvements: Option for a 16 classroom addition.
Elementary Schools:
Allendale: Originally constructed in 1964, additions were added in 1995 and 2001. The
building has 40,306 SF of area with an applied capacity of 348 and is Title I; there is one
modular on the 9.6 acre site.
Targeted improvements: Remove original building and construct 576 student K-5 at this site,
combine boundary with Campbell.
Campbell: Originally constructed in 1964, additions were added in 1965, 1977, and 2000. The
building has 43,487 SF of area with an applied capacity of 364; there is one modular on the 7.8
acre site.
Targeted improvements: Close school, consolidate boundary with Allendale, construct 576
student K-5 on the Allendale site.
30
Arvada West Articulation Area (continued)
Fairmount: Originally constructed in 1962, additions were added in 1975, 1995, 2000, and
2007. The building has 65,146 SF of area with an applied capacity of 660. The site is 12.3
acres.
Fremont: Originally constructed in 1948, additions were added in 1953, 1960, 1971, and 1997.
The building has 45,915 SF of area with an applied capacity of 408; there are three modulars
on the 8.9 acre site.
Stott: Originally constructed in 1972, additions were added in 1986 and 1995. The building
has 45,529 SF of area with an applied capacity of 382. The site is 9. 7 acres.
Vanderhoof: Originally constructed in 1969 with an addition added in 1986. The bui lding has
44,082 SF of area with an applied capacity of 510. There are three modulars on the 8.6 acre
site.
FACILITY DEPARTMENT RECOMMENDATIONS:
PREFERRED RECOMMENDATION : TABLE ROCK MESA K-8:
Construct proposed Table Rock Mesa K-8, transfer enrollment from Fairmount, Mitchell,
Vanderhoof, and West Woods boundaries; reconfigure boundaries at the four elementary
schools; MS students from Bell and Drake, modify boundaries. Consolidate Allendale and
Campbell ES into new K-6 elementary school on the Allendale site. Close Campbell and adjust
boundaries combining Allendale and Campbell ES. Elementary schools remain K-6, Drake and
Bell MS are 7-8.
Impact to elementary schools 2018-19 School Year using enrollment projections:•
Drake 7-8 80% 588
Bell 6-8 71% 653
Mitchell K-5 85% 482
Allendale K-6 89% 512
Campbell K-6 0% 0
Fairmount K-6 82% 540
Fremont K-6 84% 344
Stott K-6 95% 362
Table Rock Mesa K-8 74% 625*
Vanderhoof K-6 77% 430
Includes projected enrollment from Bell, Drake, Mitchell, Vanderhoof, West Woods as well
as Fairmount ES.
31
Arvada West Articulation Area (continued)
Operational Efficiency of Table Rock Mesa K-8 850 Student School:
Capital Expense 113,500 SF Building ................................................................ $35,000,000
Maintenance & Operations Expense at $5/SF/Vear ............................................... $550,000
Educational Administrative Expense ..................................................................... $450,000
Total ................................................................................................................... $1,000,000
Operational Efficiency of Allendale/Campbell 576 Elementary School:
Capital Expense 65,000 SF Building .................................................................. $25,000,000
Maintenance & Operations Expense at $5/SF/Vear ............................................... $325,000
Educational Administrative Expense ..................................................................... $450,000
Total ..................................................................................................................... $775,000
Operational Efficiency of Allendale/Campbell 576 Elementary School:
Capital Expense 65,000 SF Building .................................................................. $25,000,000
Maintenance & Operations Expense at $5/SF/Vear (net) ...................................... $325,000
Educational Administrative Expense ..................................................................... $450,000
Total ..................................................................................................................... $775,000
Operational Efficiency of Closing Allendale:
Reduction in Maintenance and Operations Expense at $5/SF/Vear ..................... ($207,000)
Educational Administrative Expense ................................................................... ($450,000)
Outstanding Building Deficiencies ...................................................................... $2,000,000
Operational Efficiency of Closing Campbell:
Reduction in Maintenance and Operations Expense at $5/SF/Vear ..................... ($222,000)
Educational Administrative Expense ................................................................... ($450,000}
Outstanding Building Deficiencies ...................................................................... $3, 700,000
32
Arvada West Articulation Area (continued)
SECONDARY RECOMMENDATION K·S ELEMENTARIES & 6-8 MIDDLE SCHOOL:
Convert elementary schools to K-5 to reduce enrollment and build capacity into schools.
Consolidate Allendale and Campbell ES into new K-5 elementary school on the Allendale site.
Close Campbell. Currently, there are $5. 7 million in deficiencies at these two locations.
Construct a sixteen classroom addition to Drake and convert to 6-8, increase capacity to 950
students. Adjust boundaries combining Allendale and Campbell ES.
Impact to elementary schools 2018-19 School Year using enrollment projections:
Drake 6-8 94% 1068
Allendale K-s• 74% 422
Campbell K-S 0% 0
Fairmount K-S 84% SSS
Fremont K-S 88% 294
Stott K-S 82% 312
Vanderhoof K-S 82% 400
Operational Efficiency of 16 CR Addition to Drake MS:
Capital Expense 25,000 SF Building .................................................................. $10,000,000
Maintenance & Operations Expense at $5/SF/Year .............................................. $125,000
Educational Administrative Expense ................................................................... No Change
Total ...................................................................................................................... $125,000
Operational Efficiency of Allendale/Campbell 576 Elementary School:
Capital Expense 65,000 SF Building ................................................................... $25,000,000
Maintenance & Operations Expense at $5/SF/Year ............................................... $325,000
Educational Administrative Expense ...................................................................... $450,000
Total ...................................................................................................................... $775,000
33
Arvada West Articulation Area (continued)
Operational Efficiency of Table Rock Mesa K-8, 850 Student School:
Capital Expense 110,000 SF Building ................................................................ $35,000,000
Maintenance & Operations Expense at $5/SF/Year ............................................... $550,000
Educational Administrative Expense ..................................................................... $700,000
Total .................................................................................................................. $1,250,000
Operational Efficiency of Allendale/Campbell 576 Elementary School:
Capital Expense 65,000 SF Building .................................................................. $25,000,000
Maintenance & Operations Expense at $5/SF/Year ............................................... $325,000
Educational Administrative Expense ..................................................................... $450,000
Total ..................................................................................................................... $775,000
34
Bear Creek Articulation Area
OVERVIEW:
Declining enrollment at all schools except Bear Creek K-8. Significant capacity is available in
Carmody MS providing the opportunity to convert to a 6-8 facility and changing the
elementary schools to KS. This articulation area has three schools-Green Gables, Peiffer, and
Red Rocks-with high FCI. A 'past promise' exists to replace Green Gables with a new
elementary at the same site.
Projected growth of the Green Gables golf course development (Jewell and Wadsworth) will
impact this articulation area as well as Alameda. Discussions to relocate the development into
the Bear Creek Articulation area have been held but no recommendations or decisions made.
2015-16 Capacity: 2,510 available seats at the Elementary schools, current enrollment 2,103 -
84% utilization; K-8 1,051 available seats, current enrollment 1,104 -105% utilization; Middle
School 998 available seats, current enrollment 569 -57% utilization; High School 2,114
available seats, current enrollment 1,634-77% utilization.
CURRENT CONDITIONS:
Green Gables ES 52% 80% 300 41% 51%
Kendallvue ES 32% 87% 493 31% 43%
Peiffer ES 34% 72% 410 29% 55%
Red Rocks ES 62% 97% 325 60% 30%
Westgate ES 28% 87% 575 28% 49%
Bear Creek K-8 2% 105% 1104 53% 33%
Carmody MS 16% 57% 569 34% 58%
Bear Creek HS 3% 77% 1634 34% 42%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 0.9% decrease in
enrollment or about 46 students. The articulation area is mature and enrollment growth will
come from turnover in the neighborhoods. The housing is 'affordable' with opportunities for
growth from migration west from the Sheridan corridor. There are large tracts of
undeveloped property east of Wadsworth and south of the Green Gables development that
could impact enrollment, but there are no development plans at this time.
35
Bear Creek Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Bear Creek K-8 1,109 1,113 1,100 1,110 1,126
Green Gables ES 303 309 308 306 303
Kendallvue ES 523 520 551 548 536
Peiffer ES 394 390 383 372 376
Red Rocks ES 320 336 318 317 326
Westgate ES 574 576 589 612 626
Carmody MS 546 532 528 524 521
Bear Creek HS 1,614 1,602 1,598 1,572 1,550
Total 5,383 5,378 5,375 5,361 S,364
ARTICULATION AREA FACILITIES:
Bear Creek High School: The building was replaced in 2008 incorporating a 2002 addition to
the Bear Creek Elementary School that became Bear Creek K-8 at a different location. The two
story building has 255,986 SF of area with an applied capacity of 2,114. The site is 41.4 acres.
carmody Middle School: The building was constructed in 1965 with an addition in 2000. The
two story building has an area of 99,694 SF and an applied capacity of 998. The site is 21
acres.
Bear Creek K-8: The building was constructed in 2008. The two-story building has 122,367 SF
and an applied capacity of 1,051. The site is 11 acres.
Green Gables Elementary School: Constructed in 1969 the building is 36,920 SF and has an
applied capacity of 375. There are two modulars on the 8.7 acre site.
Kendallvue Elementary School: Constructed in 1982 the building is 45,418 SF and has an
applied capacity of 567. There are six modulars on the 13 acre site.
Peiffer Elementary School: Constructed in 1973 with additions in 1986 and 1997, the building
has 44,035 SF and an applied capacity of 572. There are six modula rs on the 11 acre sit e.
Red Rocks Elementary School: Constructed in 1955 with additions in 1961, 1966 and 1996,
the building has 29,177 SF and an app lied capacity of 336. There are six modulars on the 20
acre site.
Westgate Elementary School: Constructed in 1972 with an addition in 1995, the building has
51,212 SF and an applied capacity of 660. There are eight modulars on the 8.5 acre (5.7 acres
owned by Lakewood) site.
36
Bear Creek Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
K-5 ELEMENTARIES & 6-8 MIDDLE SCHOOL:
Convert most elementary schools to K-5 to reduce enrollment, reduce modulars and build
capacity into schools. No additional area required at Carmody to accomplish this change.
Modular reduction would be from 28 to 4 remaining in service at Red Rocks. Review boundary
changes between Westgate and Green Gables; also between Red Rocks and Bradfords though
this involves a change in matriculation. Assumes Green Gables replacement would come on
line for the 2018-19 school year and would reduce the enrollment at Westgate and decrease
utilization at Green Gables. Currently, Green Gables has $4.2 million in building deficiencies.
Impact to elementary schools 2017-18 School Year using enrollment projections:
Carmody 6-8 84% 842
Green Gables K-5 76% 249
Kendallvue K-5 90% 445
Peiffer K-5 77% 330
Red Rocks K-5 94% 296
Westgate K-5 95% 501
Operational Efficiency of 24 Modular Closure
Maintenance & Operations Expense at $5/SF/Year ............................................. ($120,000)
NEW 576 STUDENT ELEMENTARY SCHOOL AT GREEN GABLES SITE:
Construct replacement Green Gables Elementary for 576 K-5 students.
Operational Efficiency of Green Gables Replacement:
Capital Expense 65,000 SF Building .................................................................. $25,000,000
Maintenance & Operations Expense at $5/SF/Year ............................................... $325,000
Educational Administrative Expense ................................................................... No Change
Total ..................................................................................................................... $325,000
Operational Efficiency of closed Green Gables
Capit al Expense to close Green Gables ....................................................................... $0.00
Additional Maintenance & Operations Expense at $5/SF/Year ............................ ($200,000)
Outstanding Building Deficiencies ....................................................................... $4,200,000
37
38
Chatfield Articulation Area
OVERVIEW:
Declining enrollment at most schools except Falcon Bluffs and Deer Creek. Deer Creek's
growth can be attributed to the STEM curriculum offered to 61h grade students. Significant
capacity is available at Deer Creek MS providing the opportunity to convert to a full 6-8 facility
and the possibility of converting t he elementary schools to KS. The two Bradford schools will
offer a K-8 program beginning in the 2016 school year. This articulation area has two schools,
Coronado and Stony Creek, with relatively high FCI.
2015-16 Capacity: 2,920 available seats at the Elementary schools, current enrollment 2,534 -
87% utilization; 975 available seats at the Bradford K-8, current enrollment 717 -74%
utilization; Middle School 1,997 available seats, current enrollment 1,313 -66% utilization;
High School 2,360 available seats, current enrollment 1,811-77% utilization.
CURRENT CONDITIONS:
Bradford Primary 21% 81% 442 32% 14%
Bradford Intermediate 11% 64% 275 23% 25%
Coronado ES 37% 92% 601 53% 45%
Mortensen ES 13% 90% 481 32% 41%
Shaffer ES 20% 86% 535 20% 33%
Stony Creek ES 31% 74% 476 34% 50%
Ute Meadows ES 19% 94% 441 24% 30%
Deer Creek MS 20% 59% 678 24% 23%
Falcon Bluffs MS 7% 75% 635 22% 27%
Chatfield HS 14% 77% 1,811 37% 27%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 1.4% increase in
enrollment or about 89 students. The articulation area is mature and enrollment growth will
come from turnover in the neighborhoods with limited opportunities for new development.
The existing housing is 'affordable'. Growth opportunities for neighborhood schools can come
from creating capacity with better utilization of existing facilities. Introducing PreK at Bradford
and boundary adjustment with Red Rocks ES may provide additional enrollment in the Ken
Caryl area .
39
Chatfield Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Bradford K-8 691 669 678 686 683
Coronado ES 610 609 636 635 619
Mortensen ES 459 469 475 469 464
Shaffer ES 537 535 537 552 543
Stony Creek ES 472 448 431 408 435
Ute Meadows ES 453 431 416 403 411
Deer Creek MS 689 700 704 688 695
Falcon Bluffs MS 653 682 668 680 690
Chatfield HS 1,800 1,808 1,851 1,903 1,924
Total 6,364 6,351 6,396 6,424 6,464
ARTICULATION AREA FACILITIES:
Chatfield High School: Originally constructed in 1986 with additions added in 1987 and 2008
and an applied capacity of 2,360. The two-story building has an area of 275,727 SF and is
located on a 39 acre site.
Targeted Improvement:: Artificial Turf Field.
Deer Creek Middle School: Originally constructed in 1980 with an addition constructed in
1992 and has an applied capacity of 1,147. The two-s tory building has an area of 120,366 SF
and is located on 20.5 acres.
Falcon Bluffs Middle School: Originally constructed in 2003 the building has an applied
capacity of 850. The two-story building has an area of 113,571 and is located on 15 acres.
Bradford Primary (K-8): Originally constructed in 1990 and has an applied capacity of 543.
The building has an area of 48,682 SF on a 10.6 acre site.
Bradford Intermediate (K-8): Originally constructed in 1994 and has an applied capacity of
432. The building has an area of 46,070 SF on a 20.4 acre site.
Coronado Elementary School: Originally constructed in 1987 with an area of 46,544 SF an
applied capacity of 656. There are also four modulars on the 9.6 acre site.
Mortensen Elementary School: Originally constructed in 1994 with an area of 52,158 SF an
applied capacity of 535. The site is 10.8 acres.
40
Chatfield Articulation Area (continued)
Shaffer Elementary School: Originally constructed in 1998 with an area of 53,368 SF an
applied capacity of 620. There are also six modulars on the 10 acre site.
Stony Creek Elementary School: Originally constructed in 1983 with an area of 45,230 SF an
applied capacity of 641. There are also ten modulars on the 13 acre site.
Ute Meadows Elementary School: Originally constructed in 1987 with an area of 46,466 SF an
applied capacity of 468. The re are also two modulars on the 10.5 acre site.
FACILITY DEPARTMENT RECOMMENDATIONS:
Convert Deer Creek to a full 6-8 facility; 61h grade students from Coronado, Mortensen, Stony
Creek elementary schools to Deer Creek, Ute Mea dows 6th grade to Falcon Bluffs. Elementary
schools become K-5 to reduce enrollment, reduce modulars and build capacity into schools.
No additional square footage required at any location to accomplish this change. Modular
reduction would be from 22 to 2 remaining in service at Coronado. Review boundary changes
between Red Rocks and Bradford though this Involves a change in matriculation. Consider a
PreK at Bradford Primary.
MATRICULATION CHANGES:
Colorow Elementary School: Incorporate Stony Creek north 'panhandle' into Colorow
boundary.
Impact to elementary & middle schools 2017-18 School Year using enrollment projections:
Bradford K-8 70% 678
Coronado K-5 96% 556
Mortensen K-5 75% 400
Shaffer K·S 94% 537
Stony Creek K-5 82% 371
Ute Meadows ES 89% 416
Deer Creek MS 80% 919
Falcon Bluffs MS 87% 743
Chatfield HS Artificial Turf:
Capital Expense ........................................................................................................ $1,500,000
Operational Efficiency of 20 Modular Closures
Maintenance & Operations Expense at $5/SF/Year .................................................. ($100,000)
Modular Removal/Demolition ..................................................................................... $500,000
41
42
Columbine Articulation Area
OVERVIEW:
Articulation area growth is flat with a projected 0.7% decrease over the next five years.
Elementary school enrollment is close to capacity except for Dutch Creek, which loses a
significant number of students to Normandy and charters due to choice enrollment. There is a
lack of development in the area; growth is either from the existing community, neighborhood
'turnover', or choice enrollment.
2015-16 Capacity: 2,630 available seats at the Elementary schools, current enrollment 2,162 -
82% utilization; Middle School 854 available seats, current enrollment 654 -77% utilization;
High School 1,919 available seats, current en rollment 1,664 -87% utilization.
CURRENT CONDITIONS:
Columbine Hills ES 19% 87% 423 41% 44%
Dutch Creek ES 24% 65% 313 19% 44%
Governor's Ranch 24% 78% 429 36% 21%
Leawood ES 17% 96% 432 35% 44%
Normandy ES 27% 85% 565 48% 33%
Ken Caryl MS 15% 77% 654 28% 21%
Columbine HS 21% 87% 1664 39% 20%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 0. 7% decrease in
enrollment or about 33 students. Lack of development in the area limits options for growth.
Recommendations regarding matriculation of some elementary schools may increase
enrollment. Residential turnover that provides 'afford able housing' opportunities are a source
of growth, but other south area articulation areas offer homes at similar price points.
43
• Columblne Articulation Area
Columbine Articulation Area (continued)
School 2016-17 2017-18 2018·19 2019·20 2020-21
Columbine Hills ES 412 400 415 423 424
Dutch Creek ES 311 305 289 278 273
Governor's Ranch 401 0 0 0 0
Blue Heron 0 452 420 414 389
Leawood ES 423 456 472 468 466
Normandy ES 553 545 535 554 562
Ken Caryl MS 646 644 640 643 644
Columbine HS 1,660 1,655 1,685 1,691 1,690
Total 4,406 4,457 4,456 4,471 4,448
ARTICULATION AREA FACILITIES:
Columbine High School: Originally constructed in 1973 additions were added in 1976, 1979,
1982, 1987, 1989, 1995 and 2000. The two-story building has an area of 238,149 SF with an
applied capacity of 1,919 students. The site is 33.6 acres.
Targeted Improvements: Auxiliary Gym, Artificial Turf Field, Interior Renovation .
Ken Caryl Middle School: Originally constructed in 1970 with additions added in 1984, 1985
and 1986. The building has an area of 88,021 SF and an applied capacity of 854. There are five
modulars at this location. The site is 16 acres.
Columbine Hills Elementary School: Originally constructed in 1964 with additions added in
1967 and 1996. The building has an area of 47,268 SF and an applied capacity of 486. The site
is 9.2 acres.
Dutch Creek Elementary School: Originally constructed in 1973 an addition was added in
1995. The building has an area of 49,780 SF and an applied capacity of 483. The site is 6.3
acres.
Governor's Ranch Elementary School: Originally constructed in 1987, the building has an area
of 46,908 SF and an applied capacity of 550. There are four modulars in use. The site is 10.3
acres.
Leawood Elementary School: Originally constructed in 1972 an addition was added in 1995.
The building has an area of 48,383 SF and an applied capacity of 448. The site is 11.8 acres.
Normandy Elementary School: Originally constructed in 1970 with additions added in 1998
and 2002. The building has an area of 55,702 SF and an applied capacity of 663. There are
eight modulars in use and four mothballed. The site is 9.9 acres.
44
Columbine Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
Matriculation Changes:
Blue Heron Elementary School: From Dakota Ridge Articulation to Columbine. Benefits to
Transportation Services, compensates for loss of Governor's Ranch enrollment.
Governor's Ranch Elementary School: From Columbine Articulation to Dakota Ridge.
Maintain enrollment balance between Columbine and Dakota Ridge.
Boundary Changes:
School 2016-17 2017-18 2018-19 2019-20 2020-21
Columbine Hills ES 412 400 415 423 424
Dutch Creek ES 311 305 289 278 273
Blue Heron ES 489 452 420 414 389
Leawood ES 423 456 472 468 466
Normandy ES 553 545 535 554 562
Ken Caryl MS 646 644 640 643 644
Columbine HS 1,660 1,655 1,685 1,691 1,690
Total 4,494 4,457 4,456 4,471 4,448
Blue Heron, Leawood, and Normandy review boundary and modify to better balance
enrollment at the three elementary schools.
Dutch Creek and Normandy extend the Dutch Creek boundary south to incorporate portion
of Normandy boundary and increase Dutch Creek enrollment while reducing the over-
enrollment at Normandy.
Columbine HS Renovation, Auxiliary Gym, Artificial Turf:
Capital Expense Renovation, Auxiliary Gym, Artificial Turf .................................. $3,600,000
Operational Efficiency of Matriculation Changes
Reduction in Transportation Services Expense ...................................................... (TBD)
Operational Efficiency of Boundary Changes
Capital Expense Demolish 6 Modulars at Normandy ............................................. $150,000
Reduction in Modular Maintenance & Operations Expense at $5/SF/Year ............ ($30,000)
45
46
Conifer Articulation Area
OVERVIEW:
Flat growth at the HS and increased growth at the MS level; West Jefferson ES has increased in
enrollment because of placement of moving the PreK program from the Little White
Schoolhouse to the school; West Jefferson ES is a PreK-5 program and West Jefferson MS is a
6-8 program. The elementary schools are currently at or above optimal utilization and modular
classrooms are to be added in 2016. The proposed scope at Conifer HS is a 'Past Promise'
project from the 2008 Bond that is still valid. Enrollment projections indicate a slight
reduction for the Articulation area.
2015-16 Capacity: 1,116 available seats at the Elementary schools, current enrollment 1,005 -
90% utilization; Middle School 751 available seats, current enrollment 552 -74% utilization;
High School 1,277 available seats, current enrollment 781-61% utilization.
CURRENT CONDITIONS:
Elk Creek ES 23% 72% 317 21% 300,.(,
Marshdale ES 53% 83% 288 14% 36%
West Jefferson ES 12% 121% 400 40% 33%
West Jefferson MS 30% 74% 552 6% 18%
Conifer HS 13% 61% 781 13% 20%
FIVE VEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a loss of 4.0% enrollment
or about 93 students. Development in the Conifer Articulation area is stable with little growth
which will keep the enrollment numbers relatively stable. A number of factors affect the
Conifer enrollment. These are availability of housing, topography limiting developable land,
land and property values, and demographics.
School 2016-17 2017-18 2018-19 2019-20 2020-21
Elk Creek ES 314 323 316 316 314
Marshdale ES 270 253 234 218 203
West Jefferson ES 377 354 344 346 346
West Jefferson MS 551 544 588 587 568
Conifer HS 806 825 800 810 814
Total 2,318 2,299 2,282 2,277 2,245
47
Conifer Articulation Area (continued)
ARTICULATION AREA FACILITIES:
Conifer High School
The building was originally constructed in 1996, with no major additions. The two story
building with basement has 166,224 SF of area with an applied capacity of 1,277. The site has
four temporary buildings. The site is 103.3 acres.
Targeted improvements: Renovate+ Expand. Expand with Aux Gym and Weight Room.
West Jefferson Middle School
Originally constructed in 1974, additions added in 1987, and 1995. The one story building has
104,165 SF of area with an applied capacity of 751. The site is 38.7 acres.
Elementary Schools:
Elk Creek ES: Originally constructed in 1989 additions added in 1991, 1995, and 1997. The
building has 51,002 SF of area with an applied capacity of 438. The site is 14 acres.
Marshdale ES: Originally constructed in 1980 with no additions. The one story building has
44,121 SF of area with an applied capacity of 348. The site has two temporary buildings. The
site is 12.1 acres.
Target Improvements: Replacement.
West Jefferson ES: Originally constructed in 2001, with no additions. The one story building
has 48,100 SF of area with an applied capacity of 330. The site is 17 acres.
Temporary portable classrooms added for start of the 2016-17 school year should reduce the
utilization factor. The temporary portable classrooms will increase the applied capacity to 380.
48
Conifer Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
MAINTAIN K-5 ELEMENTARYS -6-8 MIDDLE SCHOOL, AND 9-12 HIGH SCHOOL:
Maintain elementary schools at PreK-5 (West Jefferson ES) and K-5 (Elk Creek and Marshdale)
to maintain enrollment. Replace Marshdale ES at the same site; this building has $5.1 million
in deficiencies.
No impact to near-or mid-term school years. Current enrollment projections for 2016-17 will
not change significantly:
West Jefferson ES has a PreK recently placed at the school, which has increased the utilization
to near 100%. West Jefferson ES is also to receive two portable classroom buildings for the
2016-17 school year to reduce the enrollment pressure on the main facility. The Utilization
shown in the table Includes two temporary portable classroom buildings, which increases the
applied capacity to 380.
Elk Creek ES 72% 314
Marshdale ES 78% 270
West Jefferson ES 99% 377
West Jefferson MS 73% 551
Conifer HS 59% 806
CONIFER HIGH SCHOOL:
Renovation and Expand with Aux Gym and Weight Room, Tennis Courts.
Operational and Capital Expenses of Conifer H.S.:
Capital Expense Renovation and Master Plan ..................................................... $6,250,000
Maintenance & Operations Expense at $5/SF/Year ................................................. $60,000
Educational Administrative Expense ................................................................... No Change
Total ................................................................................................................... $6,250,000
MARSHOALE ELEMENTARY SCHOOL:
Replace existing facility with a 480 Student K-5
Operational and Capital Expenses of Marshdale ES Replacement
Capital Expense Replacement 50,000 SF .......................................................... $20,000,000
Maintenance & Operations Expense at $5/SF/Year (net) ........................................ $20,000
Educational Administrative Expense ................................................................... No Change
Outstanding Building Deficiencies ....................................................................... $5,100,000
49
so
Dakota Ridge Articulation Area
OVERVIEW:
Articulation area has steadily declining enrollment projected at approximately a 3.2% decrease
over the next five years. Elementary school optimal enrollment exceeds capacity at Mount
Carbon, Powderhorn, and Westridge. Colorow is significantly under-enrolled which loses a
significant number of students to neighborhood and charter schools via choice enrollment.
There is some development in the area but nothing comparable to other areas of the county;
growth is either from the existing community, neighborhood 'turnover', or choice enrollment.
2015-16 Capacity: 2,681 available seats at the Elementary schools, current enrollment 2,324 -
87% utilization; Middle School 895 available seats, current enrollment 798 -89% utilization;
High School 1,936 available seats, current enrollment 1,509 -78% utilization.
CURRENT CONDITIONS:
Blue Heron ES 12% 86% 501 47% 37%
Colorow ES 39% 59% 215 13% 52%
Mount Carbon ES 11% 100% 471 21% 40%
Powderhom ES 21% 87% 636 23% 29%
Westridge ES 31% 95% 501 46% 29%
Summit Ridge MS 14% 89% 798 34% 20%
Dakota Ridge HS 9% 78% 1,509 40% 33%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 3.2% decrease in
enrollment or about 148 students. Lack of significant development in the area limits options
for growth. Recommendations regarding matriculation of some elementary schools may
increase enrollment. Residential turnover that provides 'affordable housing' opportunities are
a source of growth, but other south area articulation areas offer homes at similar price points.
51
Dakota Ridge Articulation Area (continued)
--:l ,':..... . ~·-1 . -,• I ' -
School 2016-17 2017-18 2018-19 2019-20 2020-21
Blue Heron ES 489 0 0 0 0
Governor's Ranch 0 404 412 386 388
Colorow ES 220 230 229 219 222
Mount Carbon ES 472 475 489 496 500
Powderhorn ES 631 606 600 585 579
Westridge ES 510 501 522 516 512
Summit Ridge MS 771 801 781 782 818
Dakota Ridge HS 1,500 1,499 1,496 1,511 1,463
Total 4,593 4,516 4,529 4,495 4,482
ARTICULATION AREA FACILITIES:
Dakota Ridge High School: Constructed in 1996 with additions added in 2000 and 2008 and
an applied capacity of 1,936. The two-story building has an area of 236,407 SF on a 42 acre
site.
Summit Ridge M iddle School: Constructed in 1994 the two-story building is 122,573 SF with
an applied capacity of 895. The site is 20.5 acres.
Blue Heron Elementary School: Constructed in 2002 the building is 55,083 SF with an applied
capacity of 584. The site is 8.6 acres.
Colorow Elementary School: Constructed in 1977 with an addition in 1993 the building is
44,227 SF with an applied capacity of 363. The site is 10 acres.
Mount Carbon Elementary School: Constructed in 1996 the building is 51,931 SF with an
applied capacity of 471. The site is 9.1 acres.
Powderhorn Elementary School: Constructed in 1994 the building is 52,135 SF with an
applied capacity of 735. In addition to the building there are nine modulars on the 10 acre
site.
Westridge Elementary School: Constructed in 1987 the building is 47,105 SF with an applied
capacity of 528. In addition to the building there are 6 modulars (2 in service) on the 12.5 acre
site.
52
Dakota Ridge Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
MATRICULATION CHANGES:
Governor's Ranch Elementary School: From Columbine Articulation to Dakota Ridge.
Maintain enrollment balance between Columbine and Dakota Ridge.
Blue Heron Elementary School: From Dakota Ridge Articulation to Col umblne; benefits to
Transportation Services.
Colorow Elementary School: Incorporate Stony Creek north 'panhandle' into Colorow
boundary.
Operational Efficiency of Matriculation Changes
Reduction in Transportation Services Expense ...................................................... (TBD)
Colorow ES 80% 290
Governor's Ranch ES 85% 404
Mount Carbon ES 101% 475
Powderhorn ES 85% 606
Westridge ES 104% 501
Summit Ridge MS 89% 801
Dakota Ridge HS 77% 1,499
BOUNDARY CHANGES:
Incorporate Stony Creek north 'panhandle' into Colorow boundary.
53
• Dakota Ridge Articulation Area
Dakota Ridge Articulation Area (continued)
POWDERHORN ELEMENTARY ADDITION OPTION:
Construct an eight classroom addition to Powderhorn. Remove nine modular classrooms.
Operational Efficiency of Powderhorn Addition:
Capital Expense 8 CR Addition ............................................................................ $4,200,000
Increased Maintenance & Operations Expense at $5/SF/Year ................................. $60,000
Eliminate Nine M odular Classrooms ..................................................................... ($45,000)
Educational Administrative Expense .................................................................. No Change
Total ....................................................................................................................... $15,000
MT. CARBON ELEMENTARY ADDITION OPTION:
Construct a four classroom addition to Mt. Carbon.
Operational Efficiency of Powderhorn Addition:
Capital Expense 4 CR Addition ............................................................................ $2,400,000
Increased Maintenance & Operations Expense at $5/SF/Year ................................. $30,000
Educational Administrative Expense .................................................................. No Change
Total ....................................................................................................................... $30,000
54
Evergreen Articulation Area
OVERVIEW:
There is flat growth at the HS level and slightly ascending growth at the MS level. The ES
enrollment has remained relatively flat; low utilization at Bergen Meadow and high utilization
at Parmalee. Parmalee is projected to decrease in enrollment over the next five years, which
should bring its utilization back to optimal. The other elementary schools are currently at or
near optimal utilization. The proposed modernization scope at Evergreen MS is a 'Past
Promise' project from the 2008 Bond that is still valid. Enrollment projections indicate a slight
reduction for the Articulation area.
2015-16 Capacity: 1,695 available seats at the Elementary schools, current enrollment 1,280 -
76% utilization; Middle School 879 available seats, current enrollment 7U -81% utilization;
High School 1,347 available seats, current enrollment 1,058 -79% utilization.
CURRENT CONDITIONS:
Bergen Meadow ES 22% 57% 326 39% 45%
Bergen Valley ES 7% 87% 292 6% 29%
Parmalee ES 29% 85% 265 34% 30%
Wilmot ES 23% 83% 397 32% 41%
Evergreen MS 8% 81% 712 14% 22%
Evergreen HS 12% 79% 1,058 14% 12%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a loss of 2. 7% in
enrollment or about 83 students. Development in the Evergreen Articulation area is stable
with little growth which will keep the numbers relatively stable. A number of factors affect the
Evergreen enrollment. These are availability of housing, topography limiting developable land,
land and property values, and demographics.
SS
Evergreen Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Bergen Meadow ES 325 300 304 307 306
Bergen Valley ES 283 319 335 333 307
Parmalee ES 277 265 236 207 173
Wilmot ES 380 370 331 372 327
Evergreen MS 722 668 698 696 763
Evergreen HS 1,084 1.136 1,113 1,115 1,091
Total 3,071 3,058 3,017 3,030 2,967
ARTICULATION AREA FACILITIES:
Evergreen High School
The building was originally constructed in 1954, additions added in 1963, 1971, 1979, 1986,
1997, and 2001. The three story building has 209,129 SF of area with an applied capacity of
1,34 7. The site is 33.3 acres.
Targeted Improvement: Master Plan and Sports Field Upgrades
Evergreen Middle School
Originally constructed in 1969, additions added in 1982, 1984, and 1986. The two story
building has 111,715 SF of area with an applied capacity of 879. There are two temporary
classroom buildings on site. The site is 19.7 acres.
Full Modernization: Phase II -New Cafeteria and Kitchen with major interior renovation.
Elementary Schools:
Bergen Meadow: Originally constructed in 1970 an addition was added in 1986. The building
has 50,555 SF of area with an applied capacity of 567. The site is 13.3 acres.
Bergen Valley: Originally constructed in 1997, the one story building has 42,281 SF of area
with an applied capacity of 336. The site is 17.3 acres.
Parmalee: Originally constructed in 1963, additions were added in 1996 and 2001. The one
story building has 29,376 SF of area with an applied capacity of 312. There are five temporary
classroom buildings on site. The site is 12 acres.
Wilmot: Originally constructed in 1877, with additions added in 1963 and 2000. The one
story building and basement has 52,330 SF of area with an applied capacity of 480. The site is
18.4 acres.
Targeted Improvement:: Phase II Addition-Cafeteria, Kitchen & Gym
56
Evergreen Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
MAINTAIN K-5 ELEMENTARY, 6-8 MIDDLE SCHOOL, AND 9-12 HIGH SCHOOL:
Maintain elementary schools at K-5 to maintain enrollment. Consider program additions to
Bergen Meadow to increase enrollment.
No impact to near-or mid-term school years. Current enrollment projections for 2016-17 will
not change significantly:
Bergen Meadow ES 57% 325
Bergen Valley ES 84% 283
Parmalee ES 115% 277
Wilmot ES 85% 380
Evergreen MS 88% 722
Evergreen HS 80% 1,084
Parmalee is projected to reduce in enrollment over the next 2-3 years which will bring this
school back in line with acceptable utilization.
EVERGREEN HIGH SCHOOL:
Renovation and Master Plan for Priority Repairs of the Facility.
Operational and Capital Expenses of Evergreen H.S.:
Capital Expense Renovation and Master Plan ..................................................... $2,700,000
Maintenance & Operations Expense at $5/SF/Year ............................................. No Change
Educational Administrative Expense ................................................................... No Change
Total ................................................................................................................... $2, 700,000
EVERGREEN MIDDLE SCHOOL:
Addition, Renovation and Master Plan for Full Modernization to include future portable
reduction, past promises; Cafeteria, kitchen addition, classroom renovation.
Operational and Capital Expenses of Evergreen M .S.:
Capital Expense Renovation and Master Plan ..................................................... $7,500,000
Maintenance & Operations Expense at $5/SF/Year $50,000
Educational Administrative Expense ................................................................... No Change
Tota l ................................................................................................................... $7,550,000
57
Evergreen Articulation Area (continued)
WILMOT ELEMENTARY SCHOOL:
Phase II Construction to include approx. 9,000 SF addition; remove outdated wing, dining,
kitchen and gymnasium addition.
Operational and Capital Expenses of Wilmot E.S.:
Capital Expense Renovation and Addition .......................................................... $3,500,000
Maintenance & Operations Expense at $5/SF/Year ............................................ No Change
Educational Administrative Expense .................................................................. No Change
Total .................................................................................................................. $3,500,000
58
Golden Articulation Area
OVERVIEW:
Flat growth at the HS level; the STEM program and moving Mitchell 6~h grade has significantly
increased enrollment at Bell MS. Low enrollment at Pleasant View with a fairly high FCI
provides an opportunity for consolidation with Shelton and Welchester. The Kyffin addition is
a 'Past Promise' project from the 2008 Bond that is still valid. Enrollment projections indicate
slight growth.
2015-16 Capacity: 3,122 available seats at the Elementary schools, current enrollment 2,422 -
78% utilization; Middle School 916 available seats, current enrollment 744 -81% utilization;
High School 1,425 available seats, current enrollment 1,250 -88% utilization.
CURRENT CONDITIONS:
Kyffin ES 43% 79% 492 42% 29%
Mitchell ES 13% 84% 538 8% 27%
Pleasant View ES* 29% 64% 294 46% 51%
Ralston ES 18% 77% 3S8 16% 26%
Shelton ES 27% 86% 444 16% 41%
Welchester ES* 26% 70% 296 26% 48%
Bell MS 21% 81% 744 19% 36%
Golden HS 4% 88% 1,250 15% 34%
*Title I School
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 3.8% growth in
enrollment or about 172 students. Development along the Highway 93 corridor north of
Mitchell can increase these numbers. A number of factors affect the Golden enrollment.
These are availability of housing, topography limiting developable land, Colorado Mines, and
demographics.
59
Golden Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Litz PK 79 73 76 77 76
Kyffin ES 500 507 499 500 497
Mitchell ES 535 559 558 554 576
Pleasant View ES 293 297 292 306 304
Ralston ES 360 367 385 384 387
Shelton ES 448 445 450 448 440
Welchester ES 297 283 294 294 287
Bell MS 741 690 753 779 802
Golden HS 1,254 1,276 1,253 1,270 1,295
Total 4,507 4,497 4,560 4,612 4,664
ARTICULATION AREA FACILITIES:
Golden High School
Originally constructed in 2008, the two story building has 187,259 SF of area with an applied
capacity of 1,425. The site is 32 acres.
Bell Middle School
Originally constructed in 1964, additions added in 1967, 1985, 1996 and 2001. The two story
building has 125,740 SF of area with an applied capacity of 916. The site is 20 acres.
Targeted Improvement: 4 Classroom addition.
Kyffin Elementary School: Originally constructed in 1972, an addition was added in 1994. The
building has 49,079 SF of area with an applied capacity of 624 there are five modulars on the
9.3 acre site.
Targeted Improvement: Major Renovation and Addition; convert to K-5
Mitchell Elementary School: Originally constructed in 1997, the two story building has 52,697
SF of area with an applied capacity of 639. There are three modulars on the 9 acre site.
Pleasant View Elementary School: Originally constructed in 1950, additions were added in
1961, 1964, 1995 and 1999. The building has 49,079 SF of area with an applied capacity of 461
and is Title I. The site is 6. 7 acres.
Close school, 6th grade to Bell MS, remaining enrollment split between Shelton ES and
Welchester.
60
Golden Articulation Area (continued)
Ralston Elementary School: Originally constructed in 1955, with additions added in 1963,
1986, 1997, 2001, and 2009. The building has 51,303 SF of area with an applied capacity of
462. The site is 10 acres.
Shelton Elementary School: Originally constructed in 1998. The building has 53,530 SF of area
with an applied capacity of 516. The site is 11.5 acres.
Targeted Improvement: 3 Classroom addition; Convert to K-5
Welchester Elementary School: Originally constructed in 1961, with additions added in 1965,
1980, 1982, 1995, and 2002. The building has 42,093 SF of area with an applied capacity of
420 and is Title I. The site is 9.7 acres.
Targeted Improvement: Convert to K-5
FACILITY DEPARTMENT RECOMMENDATIONS:
K-5 ELEMENTARIES & 6-8 MIDDLE SCHOOL:
Convert elementary schools to K-5 to reduce enrollment and build capacity into schools. Close
Pleasant View. Currently, Pleasant View has $3.1 million in building deficiencies. Modify
boundary between Shelton and Welchester to accommodate Pleasant View students; 6th
grade students to Bell Middle School.
Bell 6-8 92% 933
Kyffin K-5 76% 439
Mitchell K-5 98% 558
Ralston K-6 79% 367
Shelton K-5 87% 535
Welchester K-5 91% 381
Impact to affected schools 2017-18 School Year using enrollment projections:
Table Rock Mesa K-8 will have an impact upon the enrollment at Mitchell and possibly Bell
depending upon grade configuration.
Operational Efficiency of Bell Addition
Capital Expense 4 CR Addition ............................................................................ $2,250,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................ $30,000
61
Golden Articulation Area (continued)
SHELTON, PLEASANT VIEW, AND WELCHESTER OPTION:
Construct a three classroom addition to Shelton ES and split the Pleasant View boundary
between Shelton and Welchester; close Pleasant View.
Operational Efficiency of Shelton Addition:
Capital Expense 3 CR Addition ............................................................................ $1, 700,000
Educational Administrative Expense ................................................................... No Change
Maintenance & Operations Expense at $5/SF/Year ................................................. $30,000
Operational Efficiency of Pleasant View Closure:
Maintenance & Operations Expense at $5/SF/Year ............................................. ($250,000)
Educational Administrative Expense ................................................................... ($450,000)
Outstanding Building Deficiencies ...................................................................... $3,100,000
MAJOR RENOVATION & ADDITION TO KYFFIN
Replacement of the existing building while preserving the 1994 addition.
Capital Expense 50,000 SF Addition, Site Redevelopment ................................ $18,750,000
Educational Administrative Expense .................................................................. No Change
Maintenance & Operations Expense at $5/SF /Year ................................................. $80,000
62
Green Mountain Articulation Area
OVERVIEW:
Stagnant growth combined with under-enrollment at HS and MS level. Under-enrollment at
Hutchinson, balance of elementary schools are at or over-enrolled in part due to special
programs; Gifted and Talented at Devinny and PreK at Foothills. Development of Rooney
Valley continues and will need to be monitored closely. Increasing capacity in the elementary
schools will absorb the growth in the near term.
2015-16 Capacity: 2,563 available seats at the Elementary schools, current enrollment 2,174 -
85% utilization; Middle School 897 available seats, current enrollment 626 -70% utilization;
High School 1,838 available seats, current enrollment 1,126 -61% utilization.
CURRENT CONDITIONS:
Oevinny ES 18% 81% 543 42% 28%
Foothills ES 22% 76% 326 32% 57%
Green Mtn. ES 32% 97% 374 63% 42%
Hutchinson ES 34% 71% 392 43% 50%
Rooney Ranch ES 18% 103% 539 28% 34%
Dunstan MS 3% 70% 626 20% 28%
Green Mtn. HS 26% 61% 1,126 26% 39%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 2.3% growth in
enrollment or about 92 students. Development in the Rooney Valley can significantly increase
these numbers. Green Mountain neighborhood turnover provides 'affordable housing'
opportunities, but other south area articulation areas offer homes at similar price points.
63
Green Mountain Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Irwin PK 106 U3 128 134 122
Devinny ES 543 518 516 512 503
Foothills ES 313 317 333 349 347
Green Mountain ES 364 363 360 346 342
Hutchinson ES 351 351 335 328 325
Rooney Ranch ES 562 573 617 652 670
Dunstan MS 616 624 639 643 627
Green Mountain HS 1,148 1,156 1,167 1,178 1,189
Total 4,003 4,025 4,095 4,142 4,125
ARTICULATION AREA FACILITIES:
Green Mountain High School
Originally constructed in 1972 additions were added in 1981, 1982, 1987, 1989, and 1995 . The
two story building has 200,903 SF of area with an applied capacity of 1,838. The site is 39
acres.
The proposed first phase of the GMHS renovation involves site redevelopment, relocation of
athletic fields, and construction of locker rooms, auxiliary gym, mechanical and electrical
services.
Dunstan Middle School
Originally constructed in 2006, the two story building has 125,644 SF of area with an applied
capacity of 897. The site is 17 acres.
Targeted Improvement: Addition. Convert to 6-8.
Elementary Schools:
Devinny: Originally constructed in 1964 additions were added in 1995 and 2000. The building
has 52,257 SF of area with an applied capacity of 672; there are seven modulars on the 8.6
acre site.
Foothills: Originally constructed in 1970 an addition was added in 1994. The building has
43,600 SF of area with an applied capacity of 430; there is one modular on the 10.S acre site.
Green Mountain: Originally constructed in 1962, additions were added in 1967, 1995 and
2001. The building has 40,112 SF of area with an applied capacity of 387; there are three
modulars on the 8 acre site.
Targeted Improvement: 8 Classroom addition. Convert to K-5
64
Green Mountain Articulation Area (continued)
Hutchinson: Originally constructed in 1973, an addition was added in 1995. The building has
46,416 SF of area with an applied capacity of 549; there are two modulars on the 10 acre site.
Rooney Ranch: Originally constructed in 1994 with an addition in 2006. The building has
53,564 SF of area with an applied capacity of 525. The site is 9.2 acres.
FACILITY DEPARTMENT RECOMMENDATIONS:
PREFERRED RECOMMENDATION: K-5 ELEMENTARIES & 6-8 DUNSTAN MIDDLE SCHOOL:
Convert elementary schools to K-5 to reduce enrollment and build capacity into schools.
Modify boundary at Devinny, Hutchinson, and Rooney Ranch to better utilize Hutchinson.
Eight classroom addition to Dunstan and convert to 6-8, increase capacity to 1,100 students.
Adjust boundaries between Devinny, Hutchinson, and Rooney Ranch.
Impact to elementary schools 2017-18 School Year using enrollment projections:
Dunstan 6-8 87% 960
Devinny K-5 86% 431
Foothills K-5 76% 277
Green Mtn. K-5 87% 307
Hutchinson K-5
Rooney Ranch K-5
Reconfigure Hutchinson boundary to increase enrollment there, reducing enrollment at
Rooney Ranch and Devinny.
Operational Efficiency of Dunstan Addition
Capital Expense 8 CR Addition ............................................................................ $4,500,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................ $60,000
GREEN MOUNTAIN ES AND GLENNON HEIGHTS OPTION:
Construct an eight classroom addition to Green Mountain ES and split the Glennon Heights
boundary between Belmar and Green Mountain; close Glennon Heights.
Operational Efficiency of Green Mountain/Glennon Heights Option
Capital Expense 8 CR Addition ............................................................................ $4,500,000
Maintenance & Operations Expense at $5/SF/Year ................................................. $60,000
Educational Administrative Expense ................................................................... ($450,000)
Involves both boundary and matriculation change.
65
• Green Mountain Articulation Area
Green Mountain Articulation Area (continued)
SECONDARY RECOMMENDATION: NEW 576 STUDENT ELEMENTARY SCHOOL AT COYOTE
GULCH SITE:
Construct Coyote Gulch Elementary at 576 students initially; expansion potential of 768 K-5
students. Capacity at Dunstan could accommodate 100 additional 61h grade students at
current projections. Construction of this elementary school is likely only with increased
development in Rooney Valley. Hutchison could be temporarily closed if this school is built.
Operational Efficiency of Coyote Gulch 576 Elementary School:
Capital Expense 65,000 SF Building .................................................................. $25,000,000
Maintenance & Operations Expense at SS/SF/Year ............................................... $325,000
Educational Administrative Expense ..................................................................... $450,000
Total ..................................................................................................................... $775,000
Operational Efficiency of Hutchinson Closure:
Maintenance & Operations Expense at $5/SF /Year ............................................. ($232,000)
Educational Administrative Expense ................................................................... ($450,000)
Total ................................................................................................................... {$682,000)
Boundary changes do not have a direct impact on maintenance and operation expenses but
can better utilize the affected facilities.
66
Jefferson Articulation Area
OVERVIEW:
In the 2015-16 school year, there was a major reconfiguration in the Jefferson Articulation
area that changed the High School to a 7-12 facility. Middle school students in this articulation
area can attend the 7-12 or choice into one of the other middle schools. There is insufficient
data to make anything other than an 'educated guess' based upon past trends as how
successful this change will be. All the elementary schools are over-enrolled with a significant
number of modulars providing the additional space necessary to meet the number of
students. There are 25 modulars at the three elementary schools.
There is a lack of development in the area; growth is either from the existing community,
neighborhood 'turnover' and 'gentrification', or choice enrollment. This is a high mobility area
also, with enrollment increases or decreases dependent upon rental rates.
2015-16 Capacity: 1,875 available seats at the Elementary schools, current enrollment 1,530 -
82% utilization; Middle & High School (7-12) 997 available seats, current enrollment 731-73%
utilization. The MS student enrollment at Jefferson (7-12) is 271.
CURRENT CONDITIONS:
Edgewater Es• 26% 78% 508 41% 41%
Lumberg Es• 52% 79% 496 35% 45%
Molholm Es• 45% 88% 526 32% 38%
Jefferson 7-12* 18% 73% 731 31% 45%
•Title I School
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 4.1% decrease in
enrollment or about 92 students. The five-year projections are based upon data from the
previous configuration of the articulation area. The high mobility and availability of below
market priced housing can cause significant fluctuations in enrollment. Replacement of
modular classrooms with permanent square footage could reduce the percentage of families
choosing to choice out of the neighborhood boundaries.
67
Jefferson Articulation Area (continued)
---------
11
-~.' .: ' ". '1
.. -- -
School 2016-17 2017-18 2018-19 2019-20 2020-21
Edgewater ES 488 454 436 412 400
Lumberg ES 490 491 531 544 557
Molholm ES 528 519 499 497 479
Jefferson 7-12 731 727 719 725 733
Total 2,237 2,191 2,185 2,178 2,169
ARTICULATION AREA FACILITIES:
Jefferson Jr/Sr High School : Constructed in 1959 with additions added in 1965, 1969, 1974,
1976, 1980, 1995, 2002 and 2012. The building is 123,773 SF with an applied capacity of 997
and is Title I. The site is 18. 7 acres and has three modulars in addition to the building.
Targeted Improvements: Develop Master Plan for Phase I scope.
Edgewater Elementary School: Constructed in 1949 with additions added in 1953, 1961,
1986, 1997and 1998. The two-story building is 45,207 SF with an applied capacity of 651 and
is Title I. The site is 5.7 acres and there are nine modulars in addition to the building.
Targeted Improvement:: PreK wing.
lumberg Elementary School: Constructed in 1955 with additions added in 1959, 1965, 1973
and 1995. The building is 49,380 SF with an applied capacity of 628 and is Title I. The site is
8.2 acres and there are seven modulars in addition to the building.
Targeted Improvement: 8 Classroom Addition.
Molholm Elementary School: Constructed in 1954 with additions added in 1963 and 1995.
The building is 46,525 SF with an applied capacity of 596 and is Title I. The site is 9.9 acres and
has nine modulars.
Targeted Improvement: 8 Classroom Addition.
68
Jefferson Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
JEFFERSON HIGH SCHOOL OPTIONS:
Should the academic goals that have been established for Jefferson High School not be
achieved, the school can be converted into a specialty high school or closed. From the
center of the articulation area, the distances from Jefferson to Lakewood or Wheat Ridge
High Schools is less than three miles and from Alameda less than four.
Master plan Jefferson High School: This school and site is half the size of a typical high
school. To replace the building on this site would be very difficult and cause the
elimination of the athletic fields during the period of replacement. Master Plan a phased
replacement starting with construction of new academic wings.
PREFERRED RECOMMENDATION: PHASE I OF A PHASED REPLACEMENT:
Develop Master Plan for Phase I Scope.
Operational Efficiency of Phase I Master Plan:
Capital Expense ............................................................................................... $20,000,000
Operational Efficiency of Repurposed Jefferson H.S.:
Total ................................................................................................................... No Change
PRE-K WING AT EDGEWATER ELEMENTARY SCHOOL
Construct 11,000 SF Pre-K Wing at Edgewater ES, remove nine modular buildings.
Capital Expense 11,000 SF Wing ......................................................................... $3,000,000
Maintenance & Operations Expense at $5/SF/Year ................................................. $55,000
Maintenance & Operations Expense at $5/SF/Year-Modular Credit.. ..................... ($45,000)
Educational Administrative Expense ................................................................... No Change
Total ....................................................................................................................... $10,000
LUMBERG ELEMENTARY SCHOOL 8 CR ADDITION:
Construct an eight classroom addition to Lumberg ES.
Operational Efficiency of Lumberg Addition:
Capital Expense 8 CR Addition ............................................................................ $4,000,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................ $48,000
Maintenance & Operations Expense at $5/SF/Year-Modular. Credit.. .................... ($35,000)
Educational Administrative Expense ................................................................... No Change
Capital Expense Remove 7 Modulars ..................................................................... $140,000
Total ....................................................................................................................... $13,000
69
Jefferson Articulation Area (continued)
MOLHOLM ELEMENTARY SCHOOL 8 CR ADDITION:
Construct an eight classroom addition to Molholm ES.
Operational Efficiency of Molholm Addition:
Capital Expense 8 CR Addition ............................................................................ $4,000,000
Additional Maintenance & Operations Expense at SS/SF/Year ................................ $48,000
Maintenance & Operations Expense at $5/SF/Year-Modular. Credit.. ................... ($45,000)
Educational Administrative Expense .................................................................. No Change
Capital Expense Remove 9 Modulars ..................................................................... $180,000
Annual Total ........................................................................................................... $13,000
SECONDARY RECOMMENDATION: NEW 1200 STUDENT 7-12 HIGH SCHOOL AT JEFFERSON
SITE:
Construct replacement Jefferson Jr./ Sr. H.S. for 1200 students.
Operational Efficiency of 1200 Student High Schoof:
Capital Expense 175,000 SF Building ................................................................ $55,000,000
Maintenance & Operations Expense at $5/SF/Year (net) ...................................... $360,000
Educational Administrative Expense .................................................................. No Change
Total ..................................................................................................................... $360,000
Operational Efficiency of Jefferson H.S. Closure:
Maintenance & Operations Expense at $5/SF /Year ............................................. ($620,000)
Educational Administrative Expense ................................................................... ($800,000)
Building Deficiencies ........................................................................................... $4,800,000
Annual Total .................................................................................................... ($1,420,000)
70
Lakewood Articulation Area
OVERVIEW:
Enrollment growth in the articulation area is steady to flat. There is a lack of development in
the area; growth is either from the existing community, neighborhood 'turnover' and
'gentrification', or choice enrollment. The development that does exist is related to Light Rail
and tends to focus on multi-family housing with minimal children. This is a demographically
diverse area consisting of single family housing with some aging multifamily as well as that
related to Light Rail.
2015-16 Capacity: 2,211 available seats at the Elementary schools, current enrollment 1,798 -
81% utilization; Middle School 958 available seats, current enrollment 705 -74% utilization;
High School 1,898 available seats, current enrollment 2,099 -111% utilization.
CURRENT CONDITIONS:
Belmar ES 26% 83% 316 56% 57%
Eiber ES* 32% 83% 400 13% 48%
Glennon Heights ES 34% 70% 230 47% 56%
Slater ES* 24% 67% 333 34% 47%
South Lakewood ES 20% 98% 519 41% 40%
Creighton MS 7% 74% 705 39% 29%
Lakewood HS 8% 111% 2,099 57% 32%
*Title I School
FIVE VEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 2.2% increase in
enrollment or about 102 students. The articulation area is mature and enrollment growth will
come from turnover in the neighborhoods and choice enrollment as a result of the successful
academic program. The existing housing is 'affordable' but large scale single family
development opportunities are minimal.
71
Lakewood Articulation Area (continued)
--.. j '1. I ' " - --
School 2016-17 2017-18 2018-19 2019-20 2020-21
Belmar ES 308 319 318 318 324
Eiber ES 423 454 471 485 517
Glennon Heights ES 226 225 221 220 228
Slater ES 337 330 317 310 312
South Lakewood ES 522 522 503 498 495
Creighton MS 714 712 716 719 720
Lakewood HS 2,101 2,105 2,103 2,104 2,108
Total 4,631 4,667 4,649 4,654 4,704
ARTICULATION AREA FACILITIES:
Lakewood High School: Constructed in 1958 with an addition added in 2007. The two-story
building is 248,135 SF with an applied capacity of 1,898. The site is 28.3 acres.
Creighton Middle School: Originally constructed in 1962, additions in 2000 and 2009 have
replaced the original building. The two-story building is 120,847 SF with an applied capacity of
958. The site is 27.8 acres.
Targeted Improvements: Eight classroom addition, convert to 6-8 facility.
Elementary Schools:
Belmar Elementary School: Constructed in 1961 with additions added in 1968 and 2000. The
building is 40,829 SF with an applied capacity of 382. The site is 10.6 acres and there are two
modulars in addition to the building.
Targeted Improvements: Six classroom addition, remove modulars.
Eiber Elementary School: Constructed in 1955 with additions added in 1962 and 1996. The
building is 52,018 SF with an applied capacity of 480 and is Title I. The site is 8.6 acres and has
five modulars.
Targeted improvements: Six classroom addition, remove modulars.
Glennon Heights Elementary School: Constructed in 1957 with an addition added in 1995.
The building is 34,699 SF with an applied capacity of 327. The site is 7.1 acres and has five
modulars.
Targeted improvements: Close, move students to Belmar, Green Mountain ES, and Creighton.
72
Lakewood Articulation Area (continued)
Slater Elementary School: Constructed in 1953 with additions added in 1963 and 1995. The
building is 46,085 SF with an applied capacity of 494 and is Title I. The site is 9.3 acres and has
four modulars.
South Lakewood Elementary School: Constructed in 1995, the two-story building is 51, 797 SF
with an applied capacity of 528. The site is 4.7 acres and has one modular.
FACILITY DEPARTMENT RECOMMENDATIONS:
K-5 ELEMENTARIES & 6-8 MIDDLE SCHOOL:
Convert elementary schools to K-5 to reduce enrollment and build capacity into schools.
Eight classroom addition to Creighton and convert to 6-8, increase capacity to 1,100 students.
Six classroom additions to Belmar and Eiber Elementary schools, close Glennon Heights allow
students to attend Belmar or Green Mountain Elementary. Glennon Heights has $2.7 million
in building deficiencies.
Impact to middle and elementary schools 2017-18 School Year using enrollment projections:
Operational Efficiency of Creighton Addition
Creighton 6-8 87% 986
Belmar K-5 96% 459
Eiber K-5 76% 411
Slater K-5 87% 267
S. Lakewood K-5 55% 423
Capital Expense 8 CR Addition ............................................................................ $4,000,000
Additional Maintenance & Operations Expense at $5/SF/Year. ............................... $60,000
Educational Administrative Expense ...................................................................... $200,000
Annual Total .......................................................................................................... $260,000
Operational Efficiency of Belmar Addition
Capital Expense 6 CR Addition ............................................................................ $3,100,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................ $45,000
Operational Efficiency of Eiber Addition
Capital Expense 6 CR Addition ............................................................................ $3,100,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................ $45,000
73
Operational Efficiency of Closing Glennon Heights:
Reduction in Maintenance and Operations Expense at $5/SF/Vear ..................... ($175,000)
Educational Administrative Expense ................................................................... ($450,000)
Outstanding Building Deficiencies ...................................................................... $2, 700,000
Twelve Modular Reduction:
Reduction in Maintenance and Operations Expense at $5/SF/Vear ....................... ($60,000)
Capital Expense Remove 12 Modulars .................................................................. $240,000
74
Pomona Articulation Area
OVERVIEW:
Articulation area has growing enrollment projected at approximately a 3.2% increase over the
next five years. Elementary school enrollment is nearing capacity at Warder and Weber; other
elementary schools are under-enrolled which lose a significant number of students to
neighborhood and charter schools via choice enrollment. The neighborhoods are established
and there could be some growth due to the development further west. There is minor
development in the area.
2015-16 Capacity: 2,007 available seats at the Elementary schools, cu rrent enrollment 1,629 -
81% utilization; Middle School 812 available seats, cu rrent enrollment 421 -52% utilization;
High School l,921 available seats, current enrollment 1,499 -78% utilization.
CURRENT CONDITIONS:
Little ES 18% 79% 364 28% 48%
Parr ES 30% 59% 363 63% 50%
Warder ES 25% 98% 423 44% 42%
Weber ES 17% 96% 479 28% 53%
Moore MS 23% 52% 421 27% 35%
Pomona HS 26% 78% 1,499 51% 29%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 3.2% increase in
enrollment or about 113 students.
School 2016-17 2017-18 2018-19 2019-20 2020-21
Little ES 364 357 366 358 354
Parr ES 388 394 397 394 398
Warder ES 427 449 454 494 482
Weber ES 466 475 483 485 481
Moore MS 420 422 427 425 430
Pomona HS 1,509 1,511 1,505 1,513 1,517
Total 3,574 3,608 3,632 3,669 3,662
75
Pomona Articulation Area (continued)
ARTICULATION AREA FACILITIES:
Pomona High School
Originally constructed in 1973, additions were added in 1978, 1979, 1981, 1982, 1983, 1987,
1989, and 1995. The two story building has 203,945 SF of area with an applied capacity of
1,921; there are two modulars on the 28.5 acre site.
Targeted improvements: Expand with Aux Gym and Weight Room Addition artificial turf field.
Remove modulars.
Moore Middle School
Originally constructed in 1978, the two story building has 83,756 SF of area with an applied
capacity of 812. The site is 16 acres.
Elementary Schools:
Little: Originally constructed in 1973, additions were added in 1995 and 2001. The building
has 40,713 SF of area with an applied capacity of 459; there are two modulars on the 8.6 acre
site.
Option: Consolidate with Parr on Parr site. Dispose of Property.
Parr: Originally constructed in 1969, additions were added in 1996 and 2002 . The building has
33,587 SF of area with an applied capacity of 616; there are eleven modulars on the 13.5 acre
site.
Targeted Improvements: Remove Pre-K students and reduce modular buildings. Build New
PreK to accommodate PreK students. Consolidate Parr and Little at Parr Location with new
768 student school.
Warder: Originally constructed in 1973, an addition was added in 1995. The building has
41,934 SF of area with an applied capacity of 431. The site is 9.7 acres.
Weber: Originally constructed in 1972, an addition was added in 1994. The building has
51,052 SF of area with an applied capacity of 501; there are two modulars on the 9.3 acre site.
Zerger (closed): Originally constructed in 1977, the building has 43,876 SF of area; the site is
8.1 acres. The school was closed in 2011.
Targeted improvements: Dispose of Property.
76
Pomona Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
9-12 HIGH SCHOOL
Pomona High School program remains unchanged.
Operational Efficiency of Gym and Weight Room 10,000 SF Addition; Turf Field
Capital Expense .................................................................................................. $3,200,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................ $50,000
CONVERT MOORE MIDDLE SCHOOL INTO A 6-8; ELEMENTARY SCHOOLS TO PreK-5 or K-5:
Convert Moore Middle School to 6-8. New Parr consolidated with Little, Weber, and Warder
to K-5.
CONSOLIDATE UTILE ANO PARR ES CONSTRUCT NEW 768 STUDENT PreK-5 AT PARR SITE.
Build a new 768 student elementary school at the Parr location. Close and dispose of Little ES;
this school has $1.6 million in building deficiencies. Remove 11 modular classrooms.
Consolidate Little-Parr Boundary.
Impact to schools 2020-21 School Year using enrollment projections:
Operational Efficiency of New PreK-5 School
Capital Expense ............................................................................................... $28,000,000
Maintenance & Operations Expense at $5/SF/Year ............................................... $350,000
Educational Administrative Expense ..................................................................... $450,000
Total ............................................................................................................................ $800,000
Little ES 0% ()
Parr PreK-5 86% 658
Warder K-5 92% 398
Weber K-5 83% 415
Moore 6-8 83% 674
Operational Efficiency of closed Little ES
Capital Expense to close little ES ................................................................................ $0.00
Additional Maintenance & Operations Expense at $5/SF/Year ............................ ($212,000)
Educational Administrative Expense ................................................................... ($450,000)
Outstanding Building Deficiencies ....................................................................... $1,600,000
77
78
Ralston Valley Articulation Area
OVERVIEW:
Ralston Valley Articulation area is impacted by the growth of the Candelas and Leyden Rock
developments. Whisper Creek and in-fill projects are also contributing to the enrollment
increase. Using Certificates of Participation, the district will add 1,250 seats to the area as a
temporary solution to the growth. For the interim period, nine modular classrooms are being
installed at Meiklejohn ES (4) and West Woods ES (5).
2015-16 Capacity: 2,761 available seats at the Elementary schools, current enrollment 2,580 -
93% utilization; K-8 School 223 seats available, current enrollment 140 -63% utilization;
Middle School 770 available seats, current enrollment 582 -76% utilization; High School 1,865
available seats, current enrollment 1,828 -98% utilization.
CURRENT CONDITIONS:
I -= -' . ' '. '(.. ·-····· . ""' .. .. . . • ( q -
I I .l .. ·~ ... ·--'· --
Meiklejohn ES 5% 96% 777 8% 17%
Sierra ES 46% 89% 545 19% 35%
Van Arsdale ES 39% 98% 518 41% 30%
West Woods ES 26% 91% 740 16% 21%
Coal Creek K-8 27% 63% 140 37% 22%
Oberon MS 29% 76% 582 12% 23%
Ralston Valley HS 10% 98% 1,828 24% 15%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 36. 7% increase in
enrollment or about 1,882 students.
School 2016-17 2017-18 2018-19 2019-20 2020-21
Meiklejohn ES 850 855 854 853 857
Sierra ES 580 706 740 764 773
Van Arsdale ES 544 536 528 540 550
West Woods ES 754 762 780 784 782
Coal Creek K-8 149 154 155 156 155
Candelas PK-8 0 600 800 1,000 1,000
Oberon MS 588 612 640 673 695
Ralston Valley HS 1,850 1,905 2,075 2,200 2,200
Total 5,315 6,130 6,572 6,970 7,012
79
Ralston Valley Articulation Area (continued)
ARTICULATION AREA FACILITIES:
Ralston Valley High School
Originally constructed in 2001, an addition was added 2007. The two story building has
239,199 SF of area with an applied capacity of 1,865. The site is 52.9 acres.
Targeted improvements: 10 CR third academic wing, artificial turf field.
Oberon Middle School
Originally constructed in 1965, additions were added in 1969 and 1982. The building has
90,839 SF of area with an applied capacity of 770. The site is 21.7 acres.
Targeted improvements: Implement Phase I of Master Plan, convert to 6-8, 8 CR addition.
Coal Creek Canyon K-8
Originally constructed in 1963, additions were added in 1973, 1994, 1997, and 2004. The
building has 25,361 SF of area with an applied capacity of 223; there is one modular on the
10.3 acre site.
Candelas PK-8: Under construction and scheduled to open in August 2017. The building will
be 100,000 SF of area with an applied capacity of 800. The site is 25 acres.
Targeted Improvements: 8 CR addition.
Elementary Schools:
Meiklejohn: Originally constructed in 2006, the building has 69,841 SF of area with an applied
capacity of 807; four modulars will be added in Summer 2016 on the 6 acre site. These
additional modulars will increase applied capacity to 903.
Sierra: Originally constructed in 1970, with an addition added in 1994. Phase II of Sierra is
scheduled to be completed in 2017. The building has 60,176 SF of area with an applied
capacity of 610; there are six modulars on the 10 acre site. With the Phase II work the applied
capacity will increase to 768, modulars and the 1970 building will be removed.
Van Arsdale: Originally constructed in 1994, the building has 50,512 SF of area with an
applied capacity of 528. There are three modulars on the 19.2 acre site, which ls owned by the
City of Arvada.
West Woods: Originally constructed in 1996, the building has 53,381 SF of area with an
applied capacity of 816; there are ten modulars -five added in 2016 -on the 6.4 acre site.
Targeted improvements: Modular reduction.
80
Ralston Valley Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
Provide a ten classroom addition to Ralston Valley HS, provide an eight classroom addition to
Oberon MS with the implementation of the Oberon Master Plan and convert to 6-8; convert
Meiklejohn, Sierra, and Van Arsdale ES to K-5.
Convert West Woods to K-5, sixth grade students to Candelas K-8. Provide a 200 seat addition
to Candelas School by 2020. The following is the enrollment and utilization projections for the
2018-19 school year with these changes implemented.
Plan for a future 576 student K-5 elementary school on the Leyden Rock site.
Meiklejohn K-5 93% 754
Sierra K-5 83% 640
Van Arsdale K-5 82% 453
West Woods K-5 96% 670
Coal Creek K-8 77% 155
Candelas PK-8 91% 910
Oberon MS 94% 915
Ralston Valley HS 111% 2075
Operational Efficiency of Ten CR Addition to Ralston Valley HS:
Capital Expense 15,000 SF Addition .................................................................... $5,500,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................ $75,000
Educational Administrative Expense ................................................................... No Change
Total ....................................................................................................................... $75,000
Operational Efficiency of 8 CR Addition & Master Plan Recommendations Oberon MS:
Capital Expense 28,000 SF Addition & Renovation ........................................... $20,000,000
Additional Maintenance & Operations Expense at $5/SF/Year .............................. $140,000
Educational Administrative Expense ................................................................... No Change
Total ..................................................................................................................... $140,000
Operational Efficiency of 8 CR Addition to Candelas K-8:
Capital Expense 12,000 SF Addition .................................................................... $4,500,000
Additional Maintenance & Operations Expense at $5 /SF/Year ............................... $60,000
Educational Administrative Expense ................................................................... No Change
Total ....................................................................................................................... $60,000
81
Operational Efficiency of Leyden Rock 576 Elementary School:
Capital Expense 65,000 SF Building .................................................................. $25,000,000
Maintenance & Operations Expense at $5/SF/Year ............................................... $325,000
Educational Administrative Expense ..................................................................... $450,000
Total ..................................................................................................................... $775,000
82
Standley Lake Articulation Area
OVERVIEW:
Enrollment In this area is flat. Lukas ES is the only facility at capacity, Sheridan Green is
approaching optimum enrollment, and the remaining ES's are under-enrolled as are the two
Middle Schools. Development to the west of the Standley Lake Articulation Area and in
Broomfield plus the availability of less expensive existing housing should increase enrollment
at these schools. There are a significant number of students that choice out of neighborhood
schools; the high number of charter schools in the area is a factor.
2015-16 Capacity: 3,143 available seats at the Elementary schools, current enrollment 2, 708 -
86% utilization; Middle School 1,260 available seats, current enrollment 828 -66% utilization;
High School 1,833 available seats, current enrollment 1,317 -72% utilization.
CURRENT CONDITIONS:
Adams ES 31% 84% 477 47% 46%
Lukas ES 23% 100% 519 18% 46%
Ryan ES 24% 85% 471 37% 25%
Semper ES 14% 76% 421 29% 42%
Sheridan Green ES 25% 89% 443 54% 47%
Witt ES 36% 83% 377 37% 51%
Mandalay MS 16% 65% 426 22% 30%
Wayne Carle MS 8% 67% 402 18% 34%
Standley Lake HS 18% 72% 1,317 21% 33%
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 0.8% decrease in
enrollment or about 38 students.
83
Standley Lake Articulation Area (continued)
FIVE YEAR PROJECTIONS:
-. --'= -r.-. . . ~· .• . ---•• '1.
School 2016-17 2017-18
Adams ES 470 474
Lukas ES 503 496
Ryan ES 462 466
Semper ES 417 401
Sheridan Green ES 442 445
Witt ES 367 406
Mandalay MS 425 407
Wayne Carle MS 411 382
Standley Lake HS 1,298 1,311
Total 4,795 4,788
ARTICULATION AREA FACILITIES:
Standley Lake High School
--.· _II -
2018-19 2019-20 2020-21
477 480 481
485 487 472
451 437 438
421 409 406
446 446 447
401 394 408
400 425 434
376 399 409
1,314 1,318 1,320
4,771 4,795 4,815
Originally constructed in 1988, an addition was added 2000. The three story building has
193, 706 SF of area with an applied capacity of 1,833. The site is 42.4 acres.
Targeted improvements: Aux Gym addition and turf field, renovate.
Mandalay Middle School
Originally constructed in 1983, the t wo story building has 88,977 SF of area with an applied
capacity of 658. The site is 25.5 acres.
Wayne Carle Middle School
Origina lly constructed in 2006, the two story building has 105,483 SF of area with an applied
capacity of 602. The site is 25.6 acres.
Elementary Schools:
Adams: Originally constructed in 1988, the building has 47, 737 SF of area with an applied
capacity of 570. There is modular on the 5.3 acre site.
Lukas: Originally constructed in 1988, the building has 47, 742 SF of area with an applied
capacity of 519. Th e site is 6.1 acres.
Ryan: Originally constructed in 1994, the building has 50,545 SF of area with an applied
capacity of 552. There are three modulars on the 7 acre site, which is owned by the City of
Westminster.
84
Standley Lake Articulation Area (continued)
Semper: Originally constructed in 1996, the building has S3,7S6 SF of area with an applied
capacity of SSS. The site is 9.S acres.
Sheridan Green: Originally constructed in 1987, the building has 46,466 SF of area with an
applied capacity of 49S. The site is 6. 7 acres.
Witt: Originally constructed In 1980, the building has 44,341 SF of area with an applied
capacity of 4S2. The site is 8.2 acres.
FACILITY DEPARTMENT RECOMMENDATIONS:
9-12 HIGH SCHOOL
Standley Lake High School program remains unchanged.
Operational Efficiency of Auxiliary Gym Addition and Turf Field
Capital Expense .................................................................................................. $3,600,000
Additional Maintenance & Operations Expense at $S/SF/Year ................................ $40,000
K - S ELEMENTARY SCHOOLS, 6-8 MIDDLE SCHOOLS:
Relocate 61h grade students from Adams, Semper and Sheridan Green into Mandalay and 61h
graders from Lukas, Ryan and Witt into Wayne Carle.
Impact to schools 2017-18 School Year using enrollment projections:
Adams K-5 73% 417
Lukas K-5 82% 427
Ryan K-5 73% 393
Semper K-5 61% 336
Sheridan Green K-5 70% 379
Witt K-5 79% 359
Mandalay 6-8 90% 595
Wayne Carle 6-8 95% 571
Standley Lake HS 72% 1,311
Operational Efficiency of 61h Grade Relocations
Capital Expense .................................................................................................... $200,000
Addition Maintenance & Operations Expense at $S/SF/Year .............................. No Change
85
• Standley Lake Articulation Area
86
• Wheat Ridge Articulation Area
Wheat Ridge Articulation Area
OVERVIEW:
Articulation area has enrollment growth projected at approximately a 2.6% increase over the
next five years. Elementary school enrollment exceeds capacity at Prospect Valley and nearly
at Maple Grove; other elementary schools are significantly under-enrolled which lose a
sign ificant number of students to neighborhood and charter schools via choice enrollment.
The neighborhoods are established with community resistance to development.
2015-16 Capacity: 3,359 available seats at the Elementary schools, current enrollment 2,641 -
79% utilization; Middle School 811 available seats, current enrollment 425 -52% utilization;
High School 1, 703 available seats, current enrollment 1,309 -77% utilization.
CURRENT CONDITIONS:
Anderson Pre-K 6% 102% 122
Kullerstrand ES* 27% 77% 223 35% 63%
Maple Grove ES 17% 80% 370 36% 29%
Pennington ES* 29% 62% 199 45% 53%
Prospect Valley ES 51% 103% 493 61% 41%
Stevens ES* 17% 67% 476 35% 52%
Stober ES 49% 99% 321 48% 44%
Vivian es• 27% 57% 210 58% 63%
Wilmore-Davis ES 27% 87% 349 50% 54%
Everitt MS* 23% 52% 425 30% 59%
Wheat Ridge HS 32% 77% 1,309 38% 38%
*Title I School
FIVE YEAR PROJECTIONS:
Growth projections over the next five years indicate approximately a 2.6% increase in
enrollment or about 118 students.
87
Wheat Ridge Articulation Area (continued)
School 2016-17 2017-18 2018-19 2019-20 2020-21
Anderson Pre-K 128 130 122 133 130
Kullerstrand ES 225 228 234 228 230
Maple Grove ES 374 384 384 395 398
Pennington ES 205 208 218 216 220
Prospect Valley ES 500 504 495 490 492
Stevens ES 493 494 485 489 501
Stober ES 323 325 341 335 334
Vivian ES 198 228 195 224 208
Wilmore-Davis ES 361 369 373 379 380
Everitt MS 446 420 419 423 429
Wheat Ridge HS 1,308 1,312 1,290 1,286 1,293
Total 4,561 4,602 4,556 4,598 4,615
ARTICULATION AREA FACILITIES:
Wheat Ridge High School
Originally constructed in 1956, additions were added in 1961, 1971, 1972, 1976, 1980, 1996,
2001, and 2008. The two story building has 211,311 SF of area with an applied capacity of
l, 703. The site is 23. 7 acres.
Targeted improvements: Phase II of the Master Plan (Past Promise).
Everitt Middle School
Originally constructed in 1966, additions were added in 1983, 1988, and 1997. The building
has 103,698 SF of area with an applied capacity of 811 and is Title I. The site is 18. 7 acres.
Targeted improvements: Renovation.
Elementary Schools:
Kullerstrand: Originally constructed in 1961, additions were added in 1973, 1974, 1997, 2002,
and 2004. The building has 35,531 SF of area with an applied capacity of 289 and is Title I.
There are four modulars on the 9.8 acre site.
Targeted improvements: Close and consolidate to a new school Prospect Valley-Kullerstrand
on Prospect Valley site, modular reduction; Boundary Change.
88
Wheat Ridge Articulation Area (continued)
Maple Grove: Originally constructed in 1960, additions were added in 1963, 1996, and 1999.
The building has 42,410 SF of area with an applied capacity of 462. The site is 12.3 acres.
Targeted improvements: 4 classroom addition. Take cottages out of service.
Pennington: Originally constructed in 1961, additions were added in 1964 and 2001. The
building has 36,877 SF of area with an applied capacity of 319 and is Title I. There are three
modulars on the 13.7 acre site.
Prospect Valley: Originally constructed in 1967, with additions added in 1996 and 2000. The
building has 46,229 SF of area with an applied capacity of 480. There is one modular on the 8.4
acre site.
Targeted improvements: Consolidate to new school Prospect Valley-Kullerstrand on Prospect
Valley Site with modular reduction; Boundary Change.
Stevens: Originally constructed in 1995, the two story building has 112,152 SF of area with an
applied capacity of 711 and is Title I. The site is 12.3 acres. This is the origina l Wheat Ridge
Middle Schoo l.
Stober: Origina lly constructed in 1965 with an addition added in 1993, the building has 31,243
SF of area with an applied capacity of 324. There are four modulars on the 6.3 acre site.
Targeted improvements: Consolidate to New School -Stober/Vivian on the Vivian site with a
modular reduction; Boundary Change.
Vivian: Originally constructed in 1953, additions were added in 1958, 1964, and 1994. The
building has 33,139 SF of area with an applied capacity of 371 and is Title I. There are four
modulars on the 10.1 acre site.
Targeted improvements: Consolidate to New School -Stober/Vivian on the Vivia n site with a
modular reduction; Boundary Change.
Wilmore-Davis: Originally constructed in 1955, additions were added in 1960, 1966, and
1994. The building has 38,596 SF of area with an applied capacity of 403. There are two
modulars on the 7.3 acre site.
89
Wheat Ridge Articulation Area (continued)
FACILITY DEPARTMENT RECOMMENDATIONS:
K-5 ELEMENTARYS & 6-8 MIDDLE SCHOOL:
Consolidate Stober and Vivian into a new 768 student facility on the Vivian site. Modify
Boundaries in the Stober/Vivian, and Prospect Valley/Kullerstrand areas. Consolidate Prospect
Valley ES and Kullerstrand into Prospect Valley with classroom addition for a 768 school. Move
Kullerstrand and Prospect Va lley 6Lh graders into Everitt MS. Consolidating these four schools
into two sites will remove $12.8 million in building deficiencies. Add 4-classroom addition to
Maple Grove ES to reduce high utilization. Sobesky Academy has relocated into Stevens ES.
Sobesky at the former Stevens ES is not included in these studies.
Impact to middle and elementary schools 2017-18 School Year using enrollment projections:
II" -{·f !.__I ---
.,/ ' ·--I -
Maple Grove K-5 79% 384
Pennington K-5 67% 208
Prospect Valley K-5 82% 626 (incl. Kullerstrand)
Stevens K-5 82% 494
Stober-Vivian K-5 72% 553
Wilmore-Davis K-5 82% 369
Everitt 6-8 76% 526
Operational Efficiency of Maple Grove Addition {5,000 SF):
Capital Expense 4 CR Addition ............................................................................ $1,800,000
Additional Maintenance & Operations Expense at $5/SF/Year ................................ $15,000
Operational Efficiency of New Prospect Valley-Kullerstrand ES (72,000 SF):
Capital Expense for new 768 ES School ............................................................ $23,400,000
Additional Maintenance & Operations Expense at $5/SF/Year .............................. $360,000
Educational Administrative Expense ..................................................................... $450,000
Operational Efficiency of Closing Kullerstrand:
Reduction in Maintenance and Operations Expense at $5/SF/Year ..................... ($177,655}
Educational Administrative Expense ................................................................... ($450,000)
Outstanding Building Deficiencies ...................................................................... $2,200,000
90
Wheat Ridge Articulation Area (continued)
Operational Efficiency of Closing Prospect Valley:
Reduction in Maintenance and Operations Expense at $5/SF/Year ..................... ($231,000)
Educational Administrative Expense ................................................................... ($450,000)
Outstanding Building Deficiencies ....................................................................... $5,200,000
Operational Efficiency of New Stober-Vivian ES (72,000 SF):
Capital Expense for new 768 ES School ............................................................ $23,400,000
Additional Maintenance & Operations Expense at $5/SF/Year .............................. $360,000
Educational Administrative Expense ..................................................................... $450,000
Operational Efficiency of Closing Vivian:
Reduction in Mai ntenance and Operations Expense at $5/SF/Year ..................... ($165,695)
Educational Administrative Expense ................................................................... ($450,000)
Out standing Building Deficiencies ....................................................................... $2,000,000
Operational Efficiency of Closing Stober:
Reduction in Maintenance and Operations Expense at $5/SF/Year ..................... ($156,215)
Educational Administrative Expense ................................................................... ($450,000)
Outstanding Building Deficiencies ....................................................................... $3,400,000
9-12 HIGH SCHOOL:
Phase II of the Master Plan
Operational Efficiency of Phase II of Master Plan:
Capital Expense for Phase II of Master Plan ........................................................ $7,500,000
91
92
Options
OVERVIEW:
There are twelve option schools that serve or provide for different stu dent needs and
programs. The schools are located primarily in the central areas; although, there are programs
in the north (Warren Tech-North) and south area (D' Evelyn).
CURRENT CONDITIONS:
Connections Learning Center 0% 31% 38
Brady Exploration School 27% 48% 238
Dennison Elementary School 29% 113% 625
D'Evelyn Jr/Sr High School 5% 82% 1,022
Jeffco Open School 8% 121% 542
Long View High School 44% 61% 58
Manning School 24% 102% 447
Mclain Community High School 8% 61% 486
Miller Special School 43% 30% 94
Warren Tech North 20% 3% 12
Warren Tech Central 19% 4% 39
Sobesky Academy at Stevens ES 19% 14% 62
FIVE YEAR PROJECTIONS:
The option schools below have enrollments that tend to be static due to the process of
enrolling into the school. Most students in these schools are from neighborhood schools
though some may choice-in from out of district.
93
Options (continued)
Option Schools 2016-17 2017-18 2018-19 2019-20 2020-21
Brady Exploration School 214 214 214 214 214
Dennison Elementary School 624 624 624 624 624
D'Evelyn Jr/Sr High School 1,020 1,020 1,020 1,020 1,020
Jeffco Open School 549 549 549 549 549
Long View High School 56 56 56 56 56
Manning School 450 450 450 450 450
Mclain Community High School 496 496 496 496 496
Warren Tech North 9 9 9 9 9
Warren Tech Central 38 38 38 38 38
Total 3,456 3,456 3,456 3,456 3,456
FACILITY DEPARTMENT RECOMMENDATIONS:
Enrollment figures do not paint an accurate picture of the popularity or success of these
option programs.
Dennison, D' Evelyn, and Manning offer programs geared towards academic excellence with
Dennison and Manning exceeding 100% utilization. These facilities are located in the central
and south-central areas. Adding sites in the north and south areas should be considered;
although, providing additional sites may dilute the candidate pool and increase enrollment at
the expense of neighborhood schools.
There is increased interest in career, technical education (CTI). The Warren Tech enrollment
doesn't appear to support that, but the students that attend Warren Tech are counted in their
home schools. 1,200 students attend Warren Tech Central (WT) and 300 Warren Tech North
programs each day. Students are responsible for getting themselves to their classes at either
campus. Consideration should be given to the creation of another campus located in south
area of the district that could offer programs similar to current locations, new programs, or
both. The other option is to reconfigure an under-utilized facility to a CTE oriented school that
will provide an additional location.
94
Options (continued)
Jeffco Open School originally constructed in 1930 with additions in 1977, 1995, and 1997
underwent a major addition and renovation in 2010 which constituted Phase I of the work.
Phase I removed approximately 50,000 SF from the center of the building. Phase I constructed
these spaces: administration, commons, kitchen, early childhood and primary grades, art,
Special Ed, music, site and playground redevelopment. The Proposed Phase II includes a new
gymnasium, mechanical plant, renovation of the existing west classroom wing, and renovation
of the existing gymnasium.
Miller Special originally constructed in 1963 with additions in 1989 and 2000. This facility is
unique in that it serves students with special needs that cannot be accommodated in the
neighborhood schools. A phased master plan was developed in 2008 that called for the
demolition and replacement of about 75% of the facility and the renovation of the remaining
portion. Master Plan and phased improvements are still valid.
Long View High School serves a small number of students in a series of modular buildings
southwest of McClain High School. Placed in service in 1967 these buildings have some of the
highest FCI in the district. Recommendation is to relocate the program to a different location
(Brady or Mcl ain) and demolish the ex isting building.
Operational Efficiency of new Warren Tech Facility (-2s,ooo SF)
Capital Expense to build new Warren Tech Satellite ........................................ $10,000,000
Maintenance & Operations Expense at $5/SF/Year ............................................... $125,000
Operational Efficiency of Jeffco Open Phase II (30,000 SF)
Capital Expense to build new Phase II Jeffco Open ............................................. $8,000,000
Additional Maintenance & Operations Expense at $5/SF/Year .............................. $150,000
Operational Efficiency of Miller Special (68,000 SF)
Capital Expense to build new Miller Special ..................................................... $22,000,000
Additional Maintenance & Operations Expense at $5/SF/Year .............................. $340,000
95
96
District-Wide
OVERVIEW:
CURRENT CONDITIONS:
Ed Center 11% N/A N/A
Support Services Quail 16% N/A N/A
North Transportation 108% N/A N/A
North Shops 50% N/A N/A
South Transportation 28% N/A N/A
West Transportation 19% N/ A N/A
Jeffco Stadium 43% N/A N/A
Trailblazer Field 70% N/A N/A
Lakewood Memorial Field 153% N/A N/A
Mt Evans OELS 43% N/A N/A
Windy Peak OELS 29% N/A N/A
FACILITY DEPARTMENT RECOMMENDATIONS:
North Transportation & Maintenance Shops
Identify and purchase a larger site and construct new North Transportation Terminal, relocate
from 641h and Indiana location; sell site. Relocate North and North Central shops from North
Arvada Middle School to new North Terminal.
Acquire "'10 acre site .......................................................................................... $3,000,000
Capital Expense Terminal & Maintenance Building 18,000 SF ............................. $4,000,000
Maintenance & Operations Cost @ $5/SF ............................................................... $60,000
Trailblazer Field
Increase bleacher capacity at Field, remove temporary locker rooms and replace with
permanent locker rooms, offices and storage.
1,000 seat bleacher expansion .............................................................................. $300,000
15,000 SF Locker rooms, offices & storage expansion ......................................... $3,700,000
Maintenance & Operations Cost @ $5/SF ............................................................... $75,000
97
District-Wide (continued)
South Area Athletic Complex
Increasing participation in student athletic programs has placed significant strain on the
stadiums that support these programs. Currently, there are two primary stadia for football,
Jeffco Stadium and North Area Athletic Complex (NAAC), Lakewood Memorial Field is the
primary soccer field and Jeffco Stadium for track and field competition. To alleviate this
situation a sports complex similar to NAAC is proposed. The proposed site is property located
at Kipling Parkway and Quincy Avenue. This site also has D' Evelyn Jr./Sr. High School and
Rocky Mountain Deaf School. The Complex would consist of a football stadium, soccer,
practice fields, locker rooms, and parking.
South Area Athletic Complex ........................................................................... $26,100,000
Outdoor Lab Schools:
Mt. Evans and Windy Peak Outdoor Educational Lab Schools serve approximately 6,000 sixth
graders during the school year as well as outside organizations during the summer months. In
2015, a Master Plan was prepared for Mt. Evans and Windy Peak. The purpose of the Plan is
to provide both a long range plan for each facility as well as a fund-raising tool for the Outdoor
Lab Foundation.
In the spring of 2015, a large boulder stopped sliding just short of the Mt. Evans dining hall.
The boulder has been secured but brought to the forefront the need to reconsider the location
of the hall and plan to replace this facility in a location consistent with the recently prepared
Master Plan.
Mt. Evans Dining Hall/Kitchen
Provide a dining hall, kitchen, storage, and support space at Mt. Evans; removal of existing
dining hall and reclamation of the area.
Phase I -5,000 SF Facility .................................................................................... $2,000,000
Maintenance & Operations Cost @ $8/SF ............................................................... $25,000
Mt. Evans Master Plan
Phase II -Site improvements, service & storage facility, main lodge ................... $7,000,000
Phase Ill -Renovations, administration, new cabins ........................................... $3,000,000
Phase IV -New and renovated dormitories ........................................................ $4,000,000
Windy Peak Master Plan
Phase I -Site improvements, water & wastewater system improvements, new cabins, new
dormitory, service facility & storage ................................................................... $4,000,000
Phase II -New residences, new & renovated cabins, new main lodge .................... $6,000,000
Phase Ill -New residences, new dormitory, new & renovated CR ....................... $2,500,000
98
99
'~ 4 ~ -.,. City of ~Wheat Ri_dge
TO:
THROUG H:
FROM:
DATE:
SUBJECT:
Introduction
Memorandum
Mayor and City Council ('\ \
Patrick Gof1~ City Manager ~
Ken Johnstone, Community Development Director
Scott Brink, Public Works Director
Mark Westberg, Projects Supervisor
Lauren Mikulak, Senior Planner
May 6, 2016 (for May 16 Study Session)
381h Streetscape Alternatives
7 tern 3
The final public meeting for the Cre8 Your 38 streetscape design process was held on April 271h,
with 64 individuals signing in as attending. ln order to allow further comment, an on-line survey
was made available for one week. On May 12. an additional meeting will be held, in two
sessions, for the businesses and property owners along 381h A venue. This culminates the process
in which approximately! ,000 citizens and stakeholders have participated at the meetings or
on line to reach a community consensus on what to do with the Main Street portion of 381h
Avenue, as defined in the October 201 J adopted 38111 Avenue Corridor Plan.
The purpose of this memo is to outline the various alternatives and their implications in moving
forward with implementation of the City's Main Street on 38th Avenue.
Background
A memo was provided to City Council for the April 4th Study Session which included the
background and the outcomes of the Cre8 Your 38 process. 111is memo and a copy of the
Council presentation have been attached for reference.
Implementation Alternatives fo r 381h Avenue
There are four alternatives presented below. The first two originate from the public processes
associated with the recently completed Cre8 Your 38. Also included for Counci l consideration is
a No-Action alternative and the existing Streetscapc Design Manual.
• No-Action
• 2016 Full Reconstruction
• 2016 Retrofit
• Streetscape Design Manual
3g•h A venue Streetscape Alternatives
May 16, 2016
Page2
If, for whatever reason, it is not possible to implement a streetscape project at this time, an
additional alternative is described below related to The Green-the area between Stevens
Elementary and 381h A venue at High Court. Adding enhancements to public spaces to create
more activity on the Corridor is a recommendation from the 201 I Corridor Plan. Enhancement to
The Green could represent a lower cost option for improving the functionality and appearance of
the City's downtown. This alternative could also be implemented along with any of the other
alternati ves.
Attached to this memo are photo simulations to help City Council and the public better visualize
the impact of each of the alternatives. The photo simulations were done on the north side of the
street between High Cou rt and Reed Street facing east. This location was selected as it is fairly
typical of the corridor with the attached sidewalk and a wide dri veway. All of the photo
simulations of the proposed alternatives show the driveway being narrowed to a more standard
width.
Also attached to this memo is an exhibit from Cre8 Your 38 Meeting #3 (March 10) showing the
Reconstruction and Retrofit alternatives. After the descriptions, two tables have been includ ed
that summarize the elements and implementation requirements of each alternative to allow quick
comparisons of the alternatives.
No Action
This alternative would leave the street. sidewalks, and amenities along the corridor in its current
configuration. The current striping has been in place fo r four years and was based on
recommendations from the adopted 201 1 Corridor Plan. This stakeholder developed plan
proposed this low cost option of simply restriping the street to test the results of the traffic
analysis that recommended reducing the street from four and five lanes to three lanes. Data
gathered since the restriping shows that the street has performed as predicted by the traffic study.
The existing 5-foot wide sidewalks were left intact with minimal enhancements using planters
and pop-up cafes.
2016 Full Reconst111ctio11
Thjs alternative would reconstruct the corridor based on the 2016 participant-preferred
alternative from the recently completed Cre8 Your 38 process. At Council 's request, this process
was designed to be int eractive and inclusive, gathering ideas from as many people in the Wheat
Ridge community as possible. Public outreach included over 8,000 mailed meeting invitations,
Connections newsletter articles, a presentation at the August 31, 2015 Town Hall meeting, small
group meetings, Facebook updates. promotional and summary videos onli ne and on Channel 8,
project information banners in City buildings and on 381h A venue, meeting announcements
through variable message signs. informational handouts included in "Friday Folders'' at public
schools, four public workshops, an online survey. and a final open house. Ultimately,
approxim ately 1,000 people chose to participate in the process.
As many have observed, this design is very similar to the 2014 Design, with detached sidewaJks
and amenity zones. The most significant difference is that the amenity zone width may be as
narrow as 4-feet instead of the minimum 6-feet included in the 2014 Design. The similarity of
38'11 Avenue Streetscape Alternatives
May 16, 2016
Page3
these two designs can only be attributed to the public processes through which they were
designed. The Cre8 Your 38 design process in particular was designed to allow pa1ticipants to
explore all possible options. lt was through an iterative public process of voting and subsequent
narrowing these design options that the Reconstruction alternative was designed and selected.
Each element is the result of participant input.
The range of estimated costs for this alternative was between $7.5 and $9.75 million.
2016 Retro.fit
This alternative would add amenity islands in front of the existing curb/gutter along the corridor.
This design was also developed during the Cre8 Your 38 process, but did not receive the
majority of votes during Meeting #3. However. since attendance at that meeting was lower than
the prior meetings, this alternative is being presented to Council as one of the alternatives. The
street would continue to be three lanes with the remaining pavement being removed to construct
the amenity zones. The existing narrower, 5-foot, sidewalks would remain and would be
separated from the amenity zones by the existing curb/gutter. Because of the separation from the
exjsting sidewalk. the amenity zones could contain the lighting but could be difficult to use for
benches, trash cans, or some other amenities.
The range of estimated costs for this alternative was between $4.5 and $6. 75 miJlion.
Streetscape Design Manual
The Streetscape Design Manual (SDM) was adopted in 2011 and establishes streetscape
requirements for important corridors throughout the City. The purpose of the manual is to
promote high-quality streets that enhance the public realm. Per Sections 26-110 and 26-4 17 of
the Municipal Code, new development or subdivision platting can trigger requirements for a
developer/property owner to dedicate right-of-way and/or construct enhanced streetscape along
the property frontage. If none of the above designs are selected, this manual would be
implemented as the default regulatory document.
This alternative is similar to the No-Action alternative because the existing street configuration
would not change. On 3gth Avenue, the SDM requires an 8-foot sidewalk and 6-foot amenity
zone. TI1ese would be added behind the existing curb, and the streetscape would be incrementally
improved as redevelopment occurs along the corridor. Jn most cases. this would require a
developer to dedicate up to 9-feet of right-of-way behind the back of existing sidewalk. In
comparison to the previous alternatives, this has the potential to impact development potential of
parcels along the corridor where some parcels have limited depth.
The estimated cost to implement this alternative is approximately $700 per lineal foot of property
frontage. This estimate includes the engineering, land, and construction costs.
The Green
The open space between Steven's Elementary (previously Wheat Ridge 5-8) and 3gth A venue is
commonly referred to as The Green and has been critical in accommodating community events,
particularly since adoption of the Corridor Plan. A June I, 2013 memorandwn of understanding
3gth A venue Streetscape Alternatives
May 16, 2016
Page4
between the City and school district has allowed for conu1rnnity use of the school property. This
land is the single largest vacant property on the corridor.
As part of the 2014 streetscape design process. a conceptual design for The Green was
developed. This design is attached and includes re-grading of the lawn, an enhanced landscape
buffer along 38111 Avenue, retainjng wall seating at the north end, and an at-grade amphitheater.
This relatively low cost project would not require any changes to the street but would continue
to build on the community's Main Street vision by enhancing a civic gathering space and better
supporting commuruty events. In the past, the school district expressed support for the
conceptual design. Cost estimates have not been prepared for these improvements.
Street Implementation Requirements
Jn addition to having differences in the elements noted in Table 1, the various alternatives will
also have different requirements for implementation. The No-Action alternative has the least
amount of cost and process to the City, with maintenance costs only and no process. The
Streetscape Design Manual alternative still only bas maintenance costs. but adds the
complication of requiring property owners to consolidate driveways as properties are
redeveloped. This could be difficult where driveways are proposed to be shared between two
properties if only one is redeveloping. The 2016 Retrofit alternative involves higher costs, street
width designation, driveway consolidation, and restriping the street. The 2016 Reconstruction
alternative has the highest cost and requires street width designation and driveway consolidation.
Comparison of Street Alternatives
Table I provides a comparison of the elements of the various alternatives that impact the street.
Table 1 -Alternative Elements
Element No-Action 2016 2016 Retrofit Streetscape
Reconstruction Design Manual
Traffic Lanes 3 3 3 3
Sidewalk 5-foot 8-foot 5-foot 8-foot with
redevelopment
Disconnected
from sidewalk -6-foot with Amenity Zone None 4-foot south side only redevelopment east of Pierce
Street
On-street South side High Court area West of Pierce South side Parking Street
Bike Lanes West of Pierce No No West of Pierce
Street Street
Right-of Way No No No Up to 9-feet Designation
38lh A venue Streetscape Alternatives
May 16 , 2016
Page 5
Table 2 provides a high-level comparison of what would be required to implement the various
alternatives.
Table 2 -Alternative Implementation Requirements
Requirement No-Action 2016 2016 Retrofit Streetscape
Reconstruction Design Manual
$7.5 -$9.75 $4.5 -$6.75 Owner with
Funding Maintenance only million million redevelopment,
$700/tt of frontaae
Street Width No Yes Yes No Designation
Driveway No Yes Yes Yes, with
Consolidation redevelopment
Restriping Maintenance only No Yes Maintenance only
Recommendation and Next Steps
Interest in redevelopment along the 381h A venue corridor continues to rise but is impacted by the
uncertain future of the street. Staff is not recommending one alternative over another. Once a
path forward is identified by Council, a more specific implementation plan would be developed
by staff, but the following next steps would typically be required:
• Prepare a budget and implementation schedule for the selected alternative, including
potential phasing options
• Present the budget and schedule to City Cow1cil and finalize the scope of the project
• Assist City Council in identifying and obtaining funding
• Hire an engineering consulting finn to:
o Prepare the construction plans and specifications
o Work with property owners on driveway consolidations and temporary
construction easements
o After 60% plans are completed, change the designated street width, if necessary
o Prior to construction, bost public meetings to discuss design and construction
impacts with property owners and tenants
• Hire a contractor to construct the project
Attachments
I. April 4, 2016 City Council Study Session Memo
2. April 4, 2016 City Council Study Session Presentation
3. Conceptual Design fo r The Green
4. Meeting #3 Exhibit showing 2016 Reconstruction & 2016 Retrofit Alternatives
5. Alternative Cross-sections and Photo Simulations
... \ '.t .... , ..... City of • _rWheatR.!9ge
Memorandum
TO: Mayor and City Council
THROUGH: Patrick Goff, City Manager
Ken Johnstone, Community Development Director
Scott Brink, Public Works Director
FROM: Mark Westberg, Projects Supervisor
Lauren Mikulak, Senior Planner
DATE: March 25, 2016 (for April 4 Study Session)
SUBJECT: Cre8 Your 38 -Process Update
Introduction
The Crc8 Your 38 streetscape design process commenced in August 2015 when Britina Design
Group was first introduced to the community at the City's Town Hall meeting. Since then
hundreds of citizens and stakeholders have participated in the public process to reach a
community consensus on what to do with the Main Street portion of38th Avenue, as defined in
the October 20 I I adopted 381h A venue Corridor Plan.
The purpose of this memo is to update Council on the status of the Cre8 Your 38 streetscape
design process. The final open house is scheduled for April 27th to wrap up the public input
process. An opportunity for discussion on moving forward with implementation will be
available at the May 16 study session.
Background
On May 18, 2015. City Council discussed implementation and next steps related to the 38th
A venue Corridor Plan. At that time, Council reaffirmed their support for the 38th A venue Main
Street vision as expressed in a series of planning documents:
• 2005 Neighborhood Revitalization Strategy;
• 2009 Envision Wheat Ridge; and,
• 2011 38th A venue Corridor Plan.
Council and staff recognized, however, that the 2014 conceptual streetscape design needed to be
readdressed given that a street width designation ballot initiative was unsuccessful in November
2014.
Attachment 1
3gth A venue Streetscape Update
April 4, 2016
Page 2
At Lhe May 2015 study session, Council directed staff to initiate a comprehensive and inclusive
public process for the purpose of seeking community consensus on a streetscape design fo r Main
Street. There was acknowledgement that it may not be possible to reach a full consensus from
everyone, but Council agreed there was merit in having a new public outreach process that
invited the entire community to be involved in reviewing a comprehensive range of alternatives.
Specifically, there was Council consensus on the following points:
• There is a desire to create a downtown destination on 38th A venue, our Main Street.
• A new streetscape design process should:
o Focus on pedestrian accessibility;
o Look at multiple options for roadway designs;
o Look at right-of-way and/or easement acquisition as an option;
o Look at innovative designs;
o Look at consolidation of curb cuts:
o Engage professional design services if necessary;
o Look at sidewalk and pedestrian space and ensure that a sense of place is
accomplished; and.
o Look at ways to improve wayfinding and identification.
At a study session on June 15. 2015, staff proposed a multi-phase, comprehensive public process,
similar to what was just done for the Wadsworth Boulevard Planning and Environmental
Linkage Study. It was determined that consultant services were necessary to facilitate the public
process as a neutral party and to provide professionaJ urban design expertise. On August I 0,
2015. Council awarded a contract to Britina Design Group. The contract was funded through a
previously appropriated Community Development budget.
Cre8 Your 38 Streetscape Design Process
The Cre8 Your 38 streetscape design process commenced in August 2015 when Britina Design
Group was first introduced to the community at the City·s Town Hall meeting. At that time, the
dates for the three public meetings in January, February and March, 2016 were first announced.
This Town Hall meeting invited the entire Wheat Ridge Community to take an active role in the
development of the street scape design process.
After nearly a year since ballot measure 28 was not approved, the consultant team sought to
reengage the community in discussing 38th Avenue during the fall and winter of 2015. In
addition to collecting extensive background information, Britina engaged in extensive public
promotion and one-on-one and small group stakeholder outreach.
Notification of the three public meetings were promoted in a variety of ways, including fu ll color
postcards mailed to every address in Wheat Ridge, notices placed on the City's website, two
variable message boards placed on Wadsworth Boulevard and 381h Avenue prior to the first set of
38111 Avenue Streetscape Update
April 4, 2016
Page 3
meetings, various social media sites, an article in the City. s Connections, and media advisories
sent to local media.
Meeting 1and1.5
Public engagement during the first set of meetings for the project exceeded all expectations with
nearly I ,000 participants:
• Approximately 250 people attended Meeting I on January 14,
• Around 75 people attended Meeting 1.5 on January 21. and
• 673 new participants engaged in an online survey after Meeting 1.5.
During the January meetings, participants discussed core community values, with safety and
economic success ranking the highest. After a presentation on the various streetscape elements,
the participants at each table engaged in a small group interactive streetscape design process.
Each table then presented their designs to the rest of the participants, and after all the designs
were presented. real time electronic polling was used to provide feedback on the design concepts.
Online participants voted on the same design concepts after reading through a short version of
what was presented at the meetings.
Tbe first step of any design process is to engage in visioning, and the purpose of the Cre8 Your
38 process was specifically to put all options on the table. For this reason, meeting participants
were given very few parameters or restrictions in developing their table's roadway and
streetscape design. A wide range of designs were presented; however, community voting clearly
indicated a consensus or preference for a I imited range of alternatives. The results of the
meetings and online survey are summarized below:
• The top two core values were safety and economic success, and these were shared by in-
person and online participants.
• Meeting participants created a total of thirty-three (33) designs, and of these:
o I or 3% was a 2-lane design,
o 14 or 73% were 3-lane designs, and
o 8 or 24% were 4-lane designs.
• Of the 33 designs, 73% stayed within existing right-of-way.
In-person and online participants were asked to answer the following question regarding all
designs: "Should this design move forward in the process?'' The percentage of yes/no votes for
each design were similar among in-person and online participants. The designs were ranked
based on the overall support they received, and the outcomes are summarized below:
• The highest ranked option received 59% support.
• Twenty-one (21) of the top twenty-two (22) designs were 3-lane designs.
• All 4-lane options were among the bottom eleven ( 11) designs.
• The highest ranked 4-lane option received 30% support.
• The 2-lane option was ranked I 0th out of thirty-three (33) designs with 44% support.
381h A venue Streetscape Update
April 4, 2016
Page4
The top 6 designs, all with 3 lanes of traffic, received more than 51 % support and were advanced
to meeting 2. Only 3-lane options were carried forward for the following reasons:
• Because three-quarters of all designs were 3-lane designs,
• Because the top two-thirds of all designs were 2 or 3-lane designs, and
• Because only the 3-lane designs exceeded 50% of participant support.
A 4-lane option was not carried forward for the following reasons:
• Because only one-quarter of the designs were 4-lane designs,
• Because none of the 4-lane designs received at least 50% participant support. and
• Because the top performing 4-lane design only had 30% participant support.
Meeting 2
While public input during first phase provided clear community consensus on a 3-lane roadway
design. there was less consensus regarding other streetscape elements and right-of-way needs.
The purpose of the February public meeting was to refine preferences for sidewalks, amenity
zones, bike lanes, parking, and right-of-way.
A life-size roadway model was shown on the wall with initially just the right-of-way and three
lanes of traffic. Each streetscape element was discussed and again, participants at each table
engaged in small group discussions focused on the tradeoffs associated with each element.
Through interactive clicker voting. over I 00 participants chose the widths of each of these
elements which were then added to the roadway model on the wall as the meeting progressed.
This interactive exercise ranked these four elements against each other and also ranked
preferences for each element. Meeting 2 provided clear consensus on the following:
• Sidewalks: 66% supported 8-foot wide sidewalks (12% wanted wider)
• Amenity zones: 59% supported 4-foot wide amenity zones (31 % wanted wider)
• Bike lanes: 64% were not in support of bike lanes
• Parking: 68% supported including on-street parking where space is available
The second half of meeting 2 discussed implementation of the community's preferred design
elements, as chosen above. Two options were included that involved moving the curb: complete
reconstruction of the street or retrofitting in amenity zones. Even though the community
preference for an 8-foot sidewalk and 4-foot amenity zone with 3 lanes of traffic fit within the
existing right-of-way, the option to expand the righl-of-way in order to keep the existing curbs
was included. After a brief discussion of the three options for implementing the community's
preferred design, participants again used interactive clicker voting with the following results:
• 71 % of participants preferred to stay within the existing right-of-way.
• Of those, there was mixed and very similar support for complete reconstruction (36%)
versus retrofitting amenity zones (35%).
381h A venue Streetscape Update
April 4, 2016
Page 5
Meeling 3
Based on the community consensus from the previous meetings, the consultant team prepared
two roadway packages to present at meeting 3 to resolve whether to reconstruct or retrofit. Both
designs included three lanes of travel, sidewalks, and amenity zones and on-street parking where
possible, consistent with community preferences from meetings I and 2. Package A included a
complete reconstruction of the street, providing 8-foot sidewalks and 4-foot amenity zones with a
potential range of cost between $7.5 million and $9.75 million. Package B would keep the
existing narrower sidewalks and retrofit the existing street with wider amenity zones with a
potential range of cost between $4.5 million and $6. 75 million.
The purpose of meeting 3 was to fully understand "what you get and how you get there" for each
package. This included a discussion of the elements, cost, process, and outcomes for each
package. Since any capitaJ investment requires public support and willingness to identify a
funding source for the improvements, the presentation concluded with an overview of financing
tools, case studies, and revenue projections based on various levels of sales tax increase.
Also discussed was the impact of driveway consolidations as this is a significant implementation
issue. Without consolidation of driveways, the effectiveness of any new streetscape
improvements will be reduced.
After considering all implications, 65% of participants agreed or strongly agreed that driveway
consolidation is important. Among the two streetscape packages, Package A received 70%
support. When asked what influenced the selection of A or B, 57% of participants said the
design reflected their core values with another I 6% saying they simply liked the design.
Next Steps
Although participation has lessened as the process continued, the most significant outcome was
the early community consensus achieved around the core value of safety and three lanes of
traffic that was the outcome of the first meeting and on-line voting. The subsequent meetings
resulted in community consensus for wider sidewalks, amenity zones. and working within
existing right-of-way.
While having the preferred design is important, the main purpose of this project was the process
itself: to provide an opportunity for community input to anyone wbo wanted to be involved. The
involvement of over 1,000 stakeholders from the community should be considered a success. A
final open house is scheduled for Wednesday. April 27 from 6:00 pm to 8:00 pm at the Wheal
Ridge Recreation Center to recap the process and results from each public meeting and to present
the preferred srreetscape package. The designs will not be further refined and no voting will take
place at the open house, but~ comments will be accepted at the meeting and online until
May4.
38th A venue Streetscape Update
April 4, 2016
Page6
Following the open house, Council will need to provide direction for future imp lementation. At
the May 16 study session, Council will be presented with a range of options for moving forward
with the Crty's Main Street vision.
PPT for 4/2 CC SS
IT~ ~w
aa• Avenue ReconfllUra on
(Wadsworth Blvd. to Sheridan Blvd.)
CreB Your 38 Process Update
Council Study Session
April 4, 2016
Meetings 1 & 1.5 & Online Survey
~~
-NiatftJGffenlrM~~
• Participant Core values
-Safety
-Economic Success
• 33 Participant Generated Designs
-73% of all designs had 3-lanes
-Top 2/3 of designs had 2 or 3-lanes
-Only 3-lane designs > 50% participant support
• Participant Preference for 3-lanes
Attachment 2
5/6/2016
1
PPT for 4/2 CC SS
Meeting 2
• Over 100Mi111Ra~
-ur.stii Medel of street
• Participant Preferences for Streetscape Elements
-Sidewalks -66% preferred 8-foot wide, 12% wider
-Amenity Zones -59% preferred 4-foot wide, 31% wider
- Bike Lanes -64% preferred NO bike lanes
-Parking -68% preferred parking where possible
• Participant Preferences for Implementation
-71% preferred staying within the existing ROW
-No consensus on reconstruct vs retrofit
-
Meeting 3
• OVer SJl'.,... ,__...
• Reconstrud Pacfca&e
-$7.5to$9.7SmiUion
-8-foot sidewalks, 4-foot amenity zones
• Retrofit Package
-$4.5 to $6. 75 million
- 5-foot sidewalks, > 4-foot amenity zones
• Participant Preferences for Implementation
-70% preferred Reconstruct Package
-
5/6/2016
2
PPT for 4/2 CC SS 5/6/2016
Next Steps
-Collect comments on process, results. & preferred design
• Sticky notes & comment box at meeting
• Online comments after the meeting
• May 16 -Council Study Session
- Present options for implementation
-Request direction for implementation
Questions
3
Storage ---
Stage Area
(temporary stage structure>
Ice Rink Outline
' Relocated Flag Pole
--------Existing Middle School Plaza
r-+-7"'----------18" Seatwall
----------Public Art
{dashed -60 person capacity) ...........,... -Paving Bands
~ A» n :r a
CD :s ..
w
12" Seating Walls, Typ.
Bike Corrals ----~ -+-----•-Walk, Typ.
1
Temporary or Permanent Tent Structure
..C\ Native Plantings , ' '" ........_............... ;;;;;;;> \)>
18" Seatwalls Existing Columns
Crusher Fines
-Bike Corrals
Bike Corrals I' __ 1 .__ .• , . , . Primary Welcome/Entrance/
,. · . \ ~ ,(·~-~~ _. l Information Area ~ :s / '
.._. .._. J "Z: / Bus Shelter
--' Bus Stop
- -,f a ·~:···~-== , I
-• • ·• :--a
-r· ·-BJ 38th Avenue -The 6reen Concept DesiCJn
Figure 1 -No-Action Alternative: This cross-section and image show the existing
conditions west of Reed Street, looking east. This location is typical of the corridor with
a 5-foot attached sidewalk adjacent to the street. This location also shows one of the
wide driveways that occur in the corridor. The existing condition includes a bike lane
between the curb/gutter ( c+g) and the travel lanes.
S·foot 1c+g 1 street
sidewalk '
Attachment 5
Figure 2 -2016 Full Reconstruction: In this scenario, the location of the back of
sidewalk would not change. The existing sidewalk and curb/gutter would be removed;
and an 8-foot sidewalk and amenity zone of at least 4 feet in width would be
constructed. Because of grades, the street would also need to be removed and
reconstructed . Additional right-of-way would not be required from property owners. The
location of the curbs would move inward to accommodate the sidewalk and amenity
zone, which requires a change in street width designation. The existing bike lanes
would be removed. Also, the driveway has been narrowed to a standard width.
~
existing
back of walk .
t 8-foot
·sidewalk
~ 4-foot
amenity
zone
c+g street
Figure 3 -2016 Retrofit: In this scenario, the existing sidewalk and curbs as well as
most of the street would remain in place. At least 7-feet of the existing street would be
removed and amenity zones would be added at least 4 feet in width. Because the
retrofit does not include a full reconstruction of the street, existing grades and drainage
would require the amenity zones to be detached from the existing sidewalk .. Additional
right-of-way would not be required from property owners. The addition of the amenity
islands effectively moves the location of the curbs inward and would require a change in
street width designation. Existing bike lanes would be removed. Again, the driveway has
been narrowed to a standard width.
~ ..... _._.,
existing !
sidewalk, c+g !
5-foot c+g <::4-foot
sidewalk amenity
zone
:····--·>--
' existing street
· c+g I street
Figure 4 -Streetscape Design Manual: In this scenario, the existing curb and street
would remain in place. The existing sidewalk and 9-feet of property improvements
would be removed and an 8-foot sidewalk and 6-foot amenity zone would be
constructed behind the existing curb. This would require right-of-way dedication of up to
9-feet behind the existing sidewalk by each property. Dedication and streetscape
installation would occur incrementally and only as properties redevelop. Because of
grade changes, low retaining walls may be required in some locations, as shown at the
back of the 8-foot sidewalk past the driveway. With the redevelopment, the driveways
would also be narrowed to a standard width as shown .
8-foot
sidewalk
. -· ··-...
1 existing c+g, street
6-foot c+g j street
amenity
, zone