Loading...
HomeMy WebLinkAbout2705 Lamar Street2765 INSPECTION RECORD INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection INSPECTION REQUEST LINE: (303) 234-5933 Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Occupancy/1 �� k r Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Lath /Wall Tie Do Not Pour Concrete Prior To Annroval of Tho Ahnva Inenar-finne Underground/Slab Inspections Date Inspector Comments Initials Electrical Sewer Service Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To Annroval Of Thp Ahnvp Inanar_finne Rough Inspections Date Inspector Initials Comments Sheathing Mid -Roof Lath /Wall Tie Rough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof 7v� Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. For iow voltage permits — Hease be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather City of Wheat Ridge Residential Roofing PERMIT - 201705918 PERMIT NO: 201705918 ISSUED: 08/11/2017 JOB ADDRESS: 2705 Lamar ST EXPIRES: 08/11/2018 JOB DESCRIPTION: Residential Re -roof to install GAF Timberline asphalt shingles - 40 sq ***revision add sheathing 38sq***** *** CONTACTS *** OWNER (303)472-0617 RUDY RICHARD L SUB (303)763-9114 Scott Riopelle 019938 Interstate Roofing Incorporate *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 12,734.75 FEES Total Valuation 0.00 Use Tax 267.43 Permit Fee 251.85 ** TOTAL ** 519.28 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. City of Wheat Ridge Residential Roofing PERMIT - 201705918 PERMIT NO: 201705918 JOB ADDRESS: 2705 Lamar ST ISSUED: 08/11/2017 EXIES:JOB DESCRIPTION: Residential Re -roof to install GAP Timberline asphalt08shingie1/20is ***revision add sheathing 38sq***** glen - sq I, by my signature, do hereby attest that the work to be performed shall comply with all accom an ink�* applicable building codes, and all applicable municipal codes, policies and procedures, and thapl am thepegal ownerlbio and specifications e been autl ns, by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved a conjunction with this permit. I further attest that I am legally autho ized to include all entities named within this document as parties to the work to be ioi ized perforrr�ed and that all work to b rforrr d 's 'se osed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of C7;'lefBuilding Official Date 11:59PM A REQUESTS MUST BE MADE BY ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of Wheat l, jAc COMMUNITY DEVELOPMENT Building & Inspection Services Division 7500 W. 291h Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits(a)-ci.wheatridge.co.us FOR OFFICE USE ONLY Date: q h f ( Add to Permit # A170TW9 Building Permit Revision/Amendment Application *** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: 'o70 5 1-1 rn G I'/ - Owner Property Owner Email: K` Mailing Address: (if different than property address) Address: City, State, Zip: Submitting Company: Contact Person: Contractor: T Yl Tt r 5 /'°1 � P V A. Phone• Contractors City License #: 6 1 1� 3 X Phone: Contractor E-mail Address: Phone: Please Note: Additional valuation must include all general and subcontracted work to be performed related to the revisions and/or amendments declared in the description of work and which were not included in the original permit valuation. If revisions or amendments increase the original valuation, additional fees will be due at the time of approval. Depending on the scope of work, additional plan review fees may be due upon approval ($60.00 an hour - 2 hour minimum). Description of revised/amended work: Sq. Ft./LF Amps 3 � �J v0�fe- Btu's Gallons Squares 3 /) Other Additional Project Value: (Must include all general and subcontracted work to be performed related to revisions/amendments described above) $ ! 9Uo_UU OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. CIRCLE ONE: (OWNER) (CONTRACTOR) I r (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) PRINT NAME: t Vq h U Q` ite SIGNATURE: 41�&DATE: "// — ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: PROOF OF SUBMISSION FORMS Fire Department ❑ Received ❑ Not Required Water District ❑ Received ❑ Not Required Sanitation District ❑ Received ❑ Not Required DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: Building Division Valuation: $ City of Wheat Ridge Residential Roofing PERMIT - 201705918 PERMIT NO: 201705918 ISSUED: 08/11/2017 JOB ADDRESS: 2705 Lamar ST EXPIRES: 08/11/2018 JOB DESCRIPTION: Residential Re -roof to install GAF Timberline asphalt shingles - 40 sq *** CONTACTS *** OWNER (303)472-0617 RUDY RICHARD L SUB (303)763-9114 Scott Riopelle 019938 Interstate Roofing Incorporate *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 10,280.00 FEES Total Valuation 0.00 Use Tax 215.88 Permit Fee 220.15 ** TOTAL ** 436.03 *** COMMENTS *** v 7�IN C-7 Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. 7—v *** CONDITIONS *** Effective December 1, 2014, asphalt shingle instal _130 inspection, conducted when 25-75 percent of the ro ( r 0 � �ljQ � J al approval. installation of roof sheathing (new or o when spaced or board sheathing with ANY gap exceed -roofs be in — �Y(I tm -I r lb/0= d mid may called at the same time, one h e complete and 25-75 percent of the mid -roof may be d to be fastened to the roof deck with a minimum of eld is required. Eave and rake metal is required. A la ave and secured in place is required to be provided fo on is required to comply with applicable codes and/or s, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. i CITY OF WHEAT RIDGE l Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 07_ Job Address: 7 70 ) C Permit Number: 7 V %v j a' { ❑ No one available for inspection: Time �I/pm Re -Inspection required: Yes �0 When corrections have been made, call for re -inspection at 303-234- Date:- (� r G Inspector: DO NOT REMOVE THIS NOTICE CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTIC Inspection Type: �_r I "Llf 2� Job Address: 7u ``+✓�-` - Permit Number: 10 l :?O J U C, " y (a, tl /, --c, f?"f� ❑ No one available for inspection: Time ' U AM/ Re -Inspection required: Yes When corrections have been made, call for re -inspection at 303-234-5933 rl Date: VW31 , Inspector: DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201705918 PERMIT NO: 201705918 ISSUED: 08/11/2017 JOB ADDRESS: 2705 Lamar ST EXPIRES: 08/11/2018 JOB DESCRIPTION: Residential Re—roof to install GAF Timberline asphalt shingles — 40 sq I, by my signature, do hereby attest applicable building codes, and all al by the legal owner of the roperty a this permit. I further attesFthat I am performed and that all work to be pi work tobe performed shall comply with all accompanying approved plans and specifications, municipal codes, policies and procedures, and that I am the legal owner or have been authorized uthorized to obtain thispermit and perform the work described and approved in conjunction with authorized to include all entities named within this document as parties to the work to be I is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying Flaps and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and maybe subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6, The issuance or grant' of a permit shall of be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or c r reg ion thi jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. 41 City of Wheat Ridge Residential Roofing PERMIT - 201705918 _1�9r PERMIT NO: 201705918 ISSUED: 08/11/2017 JOB ADDRESS: 2705 Lamar ST EXPIRES: 08/11/2018 JOB DESCRIPTION: Residential Re -roof to install GAF Timberline asphalt shingles - 40 sq *** CONTACTS *** OWNER (303)472-0617 RUDY RICHARD L SUB (303)763-9114 Scott Riopelle 019938 Interstate Roofing Incorporate *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 10,280.00 FEES Total Valuation 0.00 .: �� •y � e , Use Tax 215.88 _. Permit Fee 220.15 ** TOTAL ** 436.03 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists.. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. Dan Schultz From: no-reply@ci.wheatridge.co.us Sent: Monday, August 7, 2017 11:08 AM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Dane Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 2705 Lamar St Richard Rudy 3034720617 jwiles@interstateroof.com Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. Attached Copy of contract.pdf Contract CONTRACTOR INFORMATION Contractor Business Interstate Roofing Name Contractor's License 019938 Number (for the City of Wheat Ridge) Contractor Phone 3037639114 Number Contractor Email Address jwiles@interstateroof.com Retype Contractor Email jwiles@interstateroof.com Address DESCRIPTION OF WORK Are you re-decking the No roof? Description of Roofing GAF Timberline Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 40 material selected above? Does any portion of the No property include a flat roof? If yes, how many squares Field not completed. on the flat roof? TOTAL SQUARES 40 (pitched + flat) of all 2 roofing material for this project Provide additional detail house, 5:12 pitch here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract e2otp value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant John Quante Email not displaying correctly? View it in your browser. 3 re�errelistcom TN7TERSTATE t�� IM -- ----- -- aorl ] V G Submitted To Kc, i�V cly ahidi /-i''= OoDate -ZJ Jqc 17 a�' Ktc < c.irl -,03 47Z- o017 Email r C:s�f net Phone ji_s( 454rb•7367 Alt. Phon� Street -f- 5 Li hinjav City'' e v4lel State CO Zip BOZ19 t insurance Company hyrneyY Claims-3oOS5881Policy;r Scope of Work and Materials to be provided. The scope of work and materials identified Mow are the scope of work recommended by Interstate Roofing Inc., however, Interstate Rooting is not obligated to perform any part of the scope of work that is not approved by the Insurance company unless you authorize the work and agree to pay for this additional work. ShindeManufaMurar 1 7Ak Twin t+ \E—) Tear off fiIIF .IJ layers of composition shingles [I Tear off one layer of wood shingles Ile Instal! Decking (7116" OSB) JO �] Install new fell �P2t 4tA Install pre -painted �eave metal to code - Color Brown Charcoal Tan Gray White i+ rat._______. Valley(s) will be closed ❑ Valleys will be ope Ridgets)to be oolor-coordinated Z ❑ Ridge(s) will be 'High Profile Ridge' color -coordinated shingles ' �] Install new pipejacks \1 Replace Vents as needed Re -flash chimneys and all wall abutment as needed and if possible (stucco or siding may be a deterrent) �^�°^...®ft et ones--------Wdge.vEnt �,rptp� Instal3 In. ft. of ice &water shield tv code v� f t] Install �' nails per shingle Lj Clean out gutters t7 5 year workmanship warranty ❑ Interstate Roofing, Inc will provide general liability insurance coverage of S2,00Q000. general aggregate LI Make a magnetic sweep of driveway and yard for removal of any nails b Remove all debris resulting from above work U - CC, r"' e(, 31 . d I Oil L 114. The approximate costs of the services based on damages known at the time this contract :s entered Is $ �U interstate Roofing, Inc., however, will perform the scope of work approved by the insurance company for the amount of the insurance approved proceeds, with noadditionalcists to You except for your deductible. The final scope and price agreed on between the Insurance company and Interstate Rooting, Inc. shall= this final contract price for the insurance approved scope. You will be responsible to pay for any upgrades or additional work authorized by you that the Insurance company determines is not covered within the scope of coverage provided by your insurance policy. Supplemental claims billed by Interstate Roofing, Inc. that are approved by the insurance company for additional work or increases in costs become a part of this contract. + Approximate Dates of Service: �r L`� These dates of service are subject to change due to unusual delays,n transportation of materials, ordinary weather delays, or by any other causes beyond the reasonable control of Contractor Notice: It the property owner plans to use the proceeds of a property and causuatty insurance policy Issued pursuant to part 1 of article 4 of title 10. C.R.S.. to pay for the roofing work, pursuant to section 6-22.105, the roofing contractor cannot pay, waive, rebate, or promise to pay, waive, or rebate all or part of any insurance deductible applicable to the insurance claim for payment for work on the covered residential property, Terms: I (We) hereby authorize & instruct the insurance company & all hen holders to Include the name of interstate Roofing, Inc. as co -payee on any subsequent loss drafts or checks after today's date as indicated above. t (We) also authorize any legal representative and/or agent of Interstate Roofing, Inc. to obtain information necessary to complete any funding process relative to the claim number referenced above. .. I (we) further authorize Interstate Rooting, Inc. to pick up In person any loss drafts or checks on my/our behalf and behalf of Interstate Roofing. Deposit Amount: $ !1 V,J V � io,!' y/ Date: Rep. Initials; Interstate Roofing shall hold in trust any payment from the ptoperty owner until interstate Roofing has di materials at the residential property site or has preformed a majority of the roofing work on the property. I (We) agree, by signing below, to all the contract conditions, both front & back of this agreement Date of Acceptance Z �( (7 Client Signature(s) r r Representative Corp. Headquartwo Colorado Sprfngs Office Fort Collins Office Cheysrrne office Stack Ina Agency I OM W 47th Ave 2161 N Academy Blvd. P, 970.482.7 722 F- 970.682.10,a I01O S G111ay Highway 4600E Arapahoe Rd OM Denver, CO 90211 colorado Springs. CO 60909 Too Free 87' 098 8144 Cheyenne, Wy 80211 c, P 303.7834114 F 303 789 3790 P 719471.9752 F. 719.547444 4www. intarstateroof.eom P. 307.&34.2553 � C-0 80112-37226 (303) 397.7820 www.interstateroof.com info@interstateroof.com