Loading...
HomeMy WebLinkAbout3195 Fenton StreetX13 �F s�• INSPECTION RECORD Occupancy/Type INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection INSPECTION REQUEST LINE: (303) 234-5933 Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier 4aa Concrete Encased Ground (CEG) Mid -Roof Lath / Wall Tie Foundation / P.E. Letter �t t� Do Not Pour Concrete Prior To Approval Of The Above Insnections Underground/Slab Inspections Date Inspector Comments Initials Electrical Sewer Service Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To ADDroval Of The Above Insnectinns Ro gh Inspections Date Inspector Initials Comments Sheathing f5mh 7 4aa ZVR/S Mid -Roof Lath / Wall Tie �t t� Rough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. For low voltage permits - i'iease be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather �. 10, A 4r City of Wheat Ridge Residential Roofing PERMIT - 201705608 PERMIT NO: 201705608 ISSUED: 08/07/2017 JOB ADDRESS: 3195 Fenton ST EXPIRES: 08/07/2018 JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles with ROOF DECKING - 20 sq *** CONTACTS *** OWNER (408)608-9491 ROBERTSON DONIELLE D SUB (303)808-6707 Wayne Price 150253 Price Home Improvement, LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT*: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 6,702.50 FEES Total Valuation 0.00 Use Tax 140.75 Permit Fee 156.75 ** TOTAL ** 297.50 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. The City of Wheat Ridge Third Party Form Check List Property Address Permit Number Za1 Permit Issued Date 06 0-7 ( 20t'l Owner Information Property Owner Information �01,41eLLC�bi5, Property Owner Address 3i9s T S -r- aJrr�;Ov� Co goZ+y Inspector Information Inspection Company JA�s �._ 0cTP�Z Inspector Name _ soIV �;�� Inspector Contact info. 7��- jolt{ , Inspector Statement and Acknowledgement * I hearby acknowledge the roof I am inspecting is 6/12 or over all roofs that are under 6/12 must be inspected by the City of Wheat Ridge Buiding Dept. * I hearby acknowledge the roofing system for the referenced building has been inspected and found to be in compliance with the minimum requirements of the 2012 IRC and 2012 IBC as well as all City of Wheat Ridge Policies and Procedure and Manufacturer's recommendatio an c cations./! / Inspector: Date: j /�roperty Owner Statement of Acknowledgement *1 hearby acknowledge that I am the owner of the building referenced above and I give my consent for the listed third -party inspection company to perform my roof inspection in lieu of the City of Wheat Ridge Buil ing Di' fon ' ection. Propery Owner/ Agent: _ ��, l � Date: This original document as well as the roofing check list, must be submitted to the Chief Building Offical within seven days of the final inspection. Drop off in person Submit via Email Permit counter 2nd floor Kcook@ci.wheatridge.co.us 7500 W. 29th Ave Wheat Ridge CO 80033 Drafted Date: 7/26/17 Please add note to reverse side The City of Wheat Ridge Inspection Check List notes Mid -Roof n N/A 171 Pass EJ 6ii 0 N/A �( Pass El i, -ail Structural roof components El N/A 1W Pass rail Verify that no more than 2 layers of shingles exist El N/A Pass ❑ F, -ail Flashing for roof and walls Pass EJ, rail If new sheathing is installed verify that it is listed in the permit description (Valuation must be adjusted) [TN/A Pass 0,; Fall Verify sheathing nail pattern (See policy & Proceedures) KN/A D pass Q rail Crickets and saddles where needed N/A Pass n�Fail Verify B vent must have boot same gauge as pipe ❑ N/A Pass Tail Verify vent caps ❑ N/A Pass []flail Verify no flashings are damaged or rusted 171 N/A N/A Pass ❑ Pass Step flashing shall be min. of 4x4 piece per shingle UNA Verify scuppers allow for proper drainage El N/A Pass EJ IF z ail Ice and water shield 2' in heated wall spaces N/A Pass EDail Underlayments Must follow 2012 IRC 12012 IBC N/A Paz El fail Verify roof slope for proper drainage El N/A Pass El flail Dripedge shall have min of 2" overlap FJJ N/A Pass D Pil Dripedge should extend down min 2"past roof deck N/A pass El !=ail Dripedge shall be mechanically fastened 12" OC N/A El Pass El aii 90 LB roll roofing shall not be applied to roof slopes less than 2:12 slope: Exception, detached garages, patios, carports., open on three sides with min. slope of 1:12 N/A El Pass Modified Bitumen, EPDM, TPO min slope 1/412 slope N/A L] Pass El rail Above roof insulation R-25 N/A ❑ Pass ❑ 6il Below roof residential R-38 N/A N/A ❑ Pass D Pass EJ u'a Below roof commercial R-32 Modified Bitumen, EPDM, TPO min slope 1/412 slope must be installed in accordance with the manufacturers specifications- Must have manufactures letter of warranty with the address on the letter for final inspection Metal Roof Shy""ngles Re uirarnantz EJ N/A 171 Pass 171 FA Metal roof shingles shall not be installed on slope less 3:12 El N/A ❑ pass; El 01�ii Metal valley flashing shall be the same material as roof 0 N/A C1 Pass El Flail Metal valley flashing shall extend a min of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with sections overlapping a a min. of 4" ❑ WA ❑ Pass El FO Clay and concrete the shall have a min. 2-1/2:12 slope I Slopes 4:12 and under require double underlayment The City of Wheat Ridge Inspection Check List notes Mid -Roof Company Name: 9F = The City of Wheat Ridge Inspection Check List notes Final Roof Roof InspiLqg2n ❑ N/A Pass Fail ❑ N/A Pass Fail Structural roof components ❑ N/A Pass Fail Verify that no more than 2 layers ❑ N/A Pass Fail of shingles exist Flashing for roof and walls El Pass TJ Fail If new sheathing is installed verify that it is listed in the N/A El Pass El Fail permit description (Valuation must be adjusted) Verify sheahing nail pattern ( See & Proceedures) N/A 0 Pass ❑ Fail policy Crickets and saddles where needed F-1 N/A Eld Pass Fail Verify B vent must have boot same gauge as pipe N/A Pass Fail Verify vent caps ❑ N/A Pass 0 Fail Verify no flashings are damaged or rusted N/A N/A Pass ❑ Pass �J Fail Step flashing shall be min. of 4x4 piece per shingle Fail Verify scuppers allow for proper drainage El N/A Pass Fail Ice and water shield 2" in heated wall (]N/A Pass Fail spaces Underlayments must follow 2012 IRC / 2012 IBC F1 N/A L f Pass Fail Verify roof slope for proper drainage E] N/A lel Pass r] Fail Dripedge shall have min of 2" overlap F1 N/A ❑ N/A Pass Pass Fail Dripedge should extend down min 2" past roof deck Fail Dripedge shall be mechanicaly fastened 12" OC N/A ❑ Pass Fail 90 LB roll roofing shall not be applied to roof slopes less than 2:12 slope: Exception, detached garages, patios, carports, open on three sides with min. slope of N/A ❑ Pass Fail 1:12 Modified Bitumen, EPDM, TPO min slope 1/4:12 slope N/A F-1 Pass Fail Above roof insulation R-25 N/A 0 Pass Fail Below roof residential R-38 N/A El Pass (_1 Fail Below roof commercial R-32 NIA EJ- Pass Fail Modified Bitumen, EPDM, TPO min slope 1/4:12 slope must be installed in accordance with the manufacturers specifications- Must have manufactures letter of warranty with the address on the letter for final inspection Metal - Roof ,$LhiLnAles irements n N/A Q Pass rJ Fail Metal roof shingles shall not be installed on slope less 3:12 n N/A Cl Pass [I Fail Metal valley flashing shall be the same material as roof El N/A El Pass C3 Fail Metal valley flashing shall extend a min of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with sections overlapping a a min. of 4" Tile Roofs Eggluirements D N/A ❑ Pass E] Fail Clay and concrete the shall have a min. 2-1/2:12 slope Slopes 4:12 and under require double undertayment Company Name: LMMA14-1.&9&T,T Mkmu The City of Wheat Ridge Inspection Check List notes Final Roof WAM A MPN YA A i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: 3��j I rJCU�J S� Permit Number: ,2-01-1/2-7 _� �n tai nit n2 Elf- e) tj L� I,N s-'F(37CM ❑ No one available for inspeLNo e A PM Re -Inspection required: Yes*When corrections have been made,ns ction at 303-234-5933 Date: G% 05IR _Inspector: DO NOT REMOVE THIS NOTICE �e City of Wheat Ridge Residential Roofing PERMIT - 201705608 PERMIT NO: 201705608 ISSUED: 08/07/2017 JOB ADDRESS: 3195 Fenton ST EXPIRES: 08/07/2018 JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles with ROOF DECKING - 20 sq *** CONTACTS *** OWNER (408)608-9491 ROBERTSON DONIELLE D SUB (303)808-6707 Wayne Price 150253 Price Home Improvement, LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 6,702.50 FEES Total Valuation 0.00 Use Tax 140.75 Permit Fee 156.75 w ** TOTAL ** 297.50 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. A 41 City of Wheat Ridge Residential Roofing PERMIT - 201705608 PERMIT NO: 201705608 ISSUED: 08/07/2017 JOB ADDRESS: 3195 Fenton ST EXPIRES: 08/07/2018 JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles with ROOF DECKING - 20 sq I, by my signature, do hereby at that the work to be performed shall comply with all accompanyingg approved plans and specifications, applicable building codes, and all apgiable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property anm authorized to obtainthisthiermrt.Ifurther attestthat I am llyauthorizedtoinclude alperformed and thaw 1 work to be pemed is disclosed in this document and/or its' accompanying approved plans and specifications. DaM Signature of OWNtk or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any apple ode or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. 0AAqcr Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dan Schultz 2G2 1,70 t C) b From: no-reply@ci.wheatridge.co.us Sent: Monday, July 31, 2017 11:15 AM To: CommDev Permits (� Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Gina c� Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those (~ documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. / Is this application fora Yes (V residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address 3195 Fenton St. Wheat Ridge, CO 80214 Property Owner Name Donielle Robertson Property Owner Phone 408-608-9491 Number Property Owner Email donielle. robertson@healthonecares.com Address ���50 Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. Attached Copy of Field not completed. Contract CONTRACTOR INFORMATION Contractor Business Price Home Improvement, LLC Name Contractor's License 150253 Number (for the City of Wheat Ridge) Contractor Phone 3036676439 Number Contractor Email Address wayne@pricehomeimprovement.com Retype Contractor Email wayne@pricehomeimprovement.com Address DESCRIPTION OF WORK Are you re -decking the Yes roof? Description of Roofing GAF Timberline HD - Asphalt shingles Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 20 material selected above? Does any portion of the No property include a flat roof? If yes, how many squares Field not completed. on the flat roof? TOTAL SQUARES 20/ (pitched + flat) of all 2 roofing material for this project Provide additional detail here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract value or cost of ALL materials and labor) ReRoof for home and detached garage. Garage 4.9 SQ at 6/12, home 15.1 SQ 5/12 (of which 3.6 SQ is 10/12) 1$630ZZZ 67n2 o SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Wayne Price Email not displaying correctly? View it in your browser. 3 P Price Home Improvement, LLC HI 10700 W. Alamo Place Littleton, CO 80127 Name / Address Donielle Robertson 3195 Fenton St. Wheat Ridge, CO 80214 Estimate Date Estimate # 7/21/2017 1761 Project Description j Qty ' Rate Total Re -roof per insurance claim #U18500 MEMBER 8 Signature 6307.731 6,307.73 Totol $6,307.73