HomeMy WebLinkAbout3195 Fenton StreetX13 �F s�• INSPECTION RECORD Occupancy/Type
INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection
INSPECTION REQUEST LINE: (303) 234-5933
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
Inspections will not be performed unless this card is posted on the project site.
**Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.**
Inspector Must Sign ALL Spaces pertinent to this project
Foundation Inspections
Date Inspector Comments
Initials
Pier
4aa
Concrete Encased Ground (CEG)
Mid -Roof
Lath / Wall Tie
Foundation / P.E. Letter
�t t�
Do Not Pour Concrete Prior To Approval Of The Above Insnections
Underground/Slab Inspections Date Inspector Comments
Initials
Electrical
Sewer Service
Plumbing
Do Not Cover Underground or Below/In-Slab Work Prior To ADDroval Of The Above Insnectinns
Ro gh Inspections Date
Inspector
Initials
Comments
Sheathing f5mh 7
4aa
ZVR/S
Mid -Roof
Lath / Wall Tie
�t t�
Rough Electric
Rough Plumbing/Gas Line
Rough Mechanical
Rough Framing
Rough Grading
Insulation
Drywall Screw / Nail
Final Inspections
Date
Inspector
Initials
Comments
Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Final Plumbing
Final Mechanical
Roof
Final Window/Doors
Final Building
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
For low voltage permits - i'iease be sure that rough inspections are completed from the Fire District and electrical low voltage
by the Building Division.
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued
Protect This Card From The Weather
�. 10, A 4r City of Wheat Ridge
Residential Roofing PERMIT - 201705608
PERMIT NO:
201705608
ISSUED:
08/07/2017
JOB ADDRESS:
3195 Fenton ST
EXPIRES:
08/07/2018
JOB DESCRIPTION:
Residential Re -roof to install GAF
Timberline HD
asphalt shingles with ROOF
DECKING - 20 sq
*** CONTACTS ***
OWNER (408)608-9491
ROBERTSON DONIELLE D
SUB (303)808-6707
Wayne Price
150253 Price Home Improvement, LLC
*** PARCEL INFO ***
ZONE CODE:
UA / Unassigned
USE:
UA / Unassigned
SUBDIVISION CODE:
2412 / LAKESIDE, STEWART GARDENS,
OLI BLOCK/LOT*:
0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 6,702.50
FEES
Total Valuation 0.00
Use Tax 140.75
Permit Fee 156.75
** TOTAL ** 297.50
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
The City of Wheat Ridge
Third Party Form Check List
Property Address
Permit Number Za1
Permit Issued Date 06 0-7 ( 20t'l
Owner Information
Property Owner Information �01,41eLLC�bi5,
Property Owner Address 3i9s T S -r- aJrr�;Ov� Co goZ+y
Inspector Information
Inspection Company JA�s �._ 0cTP�Z
Inspector Name _ soIV �;��
Inspector Contact info. 7��- jolt{ ,
Inspector Statement and Acknowledgement
* I hearby acknowledge the roof I am inspecting is 6/12 or over all roofs
that are under 6/12 must be inspected by the City of Wheat Ridge Buiding Dept.
* I hearby acknowledge the roofing system for the referenced building has been inspected
and found to be in compliance with the minimum requirements of the 2012 IRC and 2012
IBC as well as all City of Wheat Ridge Policies and Procedure and Manufacturer's
recommendatio an c cations./! /
Inspector: Date: j
/�roperty Owner Statement of Acknowledgement
*1 hearby acknowledge that I am the owner of the building referenced above and I give
my consent for the listed third -party inspection company to perform my roof inspection
in lieu of the City of Wheat Ridge Buil ing Di' fon ' ection.
Propery Owner/ Agent: _ ��, l � Date:
This original document as well as the roofing check list, must be submitted to the Chief
Building Offical within seven days of the final inspection.
Drop off in person Submit via Email
Permit counter 2nd floor Kcook@ci.wheatridge.co.us
7500 W. 29th Ave
Wheat Ridge CO 80033
Drafted Date: 7/26/17
Please add note to reverse side
The City of Wheat Ridge
Inspection Check List notes
Mid -Roof
n N/A
171 Pass EJ 6ii
0 N/A
�( Pass El i, -ail
Structural roof components
El N/A
1W Pass rail
Verify that no more than 2 layers of shingles exist
El N/A
Pass ❑ F, -ail
Flashing for roof and walls
Pass EJ, rail
If new sheathing is installed verify that it is listed in the
permit description (Valuation must be adjusted)
[TN/A
Pass 0,; Fall
Verify sheathing nail pattern (See policy & Proceedures)
KN/A
D pass Q rail
Crickets and saddles where needed
N/A
Pass n�Fail
Verify B vent must have boot same gauge as pipe
❑ N/A
Pass Tail
Verify vent caps
❑ N/A
Pass []flail
Verify no flashings are damaged or rusted
171 N/A
N/A
Pass
❑ Pass
Step flashing shall be min. of 4x4 piece per shingle
UNA
Verify scuppers allow for proper drainage
El N/A
Pass EJ IF z ail
Ice and water shield 2' in heated wall spaces
N/A
Pass EDail
Underlayments Must follow 2012 IRC 12012 IBC
N/A
Paz El fail
Verify roof slope for proper drainage
El N/A
Pass El flail
Dripedge shall have min of 2" overlap
FJJ N/A
Pass D Pil
Dripedge should extend down min 2"past roof deck
N/A
pass El !=ail
Dripedge shall be mechanically fastened 12" OC
N/A
El Pass El aii
90 LB roll roofing shall not be applied to roof slopes
less than 2:12 slope: Exception, detached garages,
patios, carports., open on three sides with min. slope of
1:12
N/A
El Pass
Modified Bitumen, EPDM, TPO min slope 1/412 slope
N/A
L] Pass El rail
Above roof insulation R-25
N/A
❑ Pass ❑ 6il
Below roof residential R-38
N/A
N/A
❑ Pass
D Pass EJ u'a
Below roof commercial R-32
Modified Bitumen, EPDM, TPO min slope 1/412 slope
must be installed in accordance with the manufacturers
specifications- Must have manufactures letter of
warranty with the address on the letter for final inspection
Metal Roof Shy""ngles Re uirarnantz
EJ N/A
171 Pass 171 FA
Metal roof shingles shall not be installed on slope less
3:12
El N/A
❑ pass; El 01�ii
Metal valley flashing shall be the same material as roof
0 N/A
C1 Pass El Flail
Metal valley flashing shall extend a min of 8" from the
centerline with a min. of 3/4 " high splash diverter
rib built-in at the flow line with sections overlapping a
a min. of 4"
❑ WA ❑ Pass El FO Clay and concrete the shall have a min. 2-1/2:12 slope
I
Slopes 4:12 and under require double underlayment
The City of Wheat Ridge
Inspection Check List notes
Mid -Roof
Company Name:
9F =
The City of Wheat Ridge
Inspection Check List notes
Final Roof
Roof InspiLqg2n
❑ N/A
Pass
Fail
❑ N/A
Pass
Fail
Structural roof components
❑ N/A
Pass
Fail
Verify that no more than 2 layers
❑ N/A
Pass
Fail
of shingles exist
Flashing for roof and walls
El Pass
TJ Fail
If new sheathing is installed verify that it is listed in the
N/A
El Pass
El Fail
permit description (Valuation must be adjusted)
Verify sheahing nail pattern ( See & Proceedures)
N/A
0 Pass
❑ Fail
policy
Crickets and saddles where needed
F-1 N/A
Eld Pass
Fail
Verify B vent must have boot same gauge as pipe
N/A
Pass
Fail
Verify vent caps
❑ N/A
Pass
0 Fail
Verify no flashings are damaged or rusted
N/A
N/A
Pass
❑ Pass
�J Fail
Step flashing shall be min. of 4x4 piece per shingle
Fail
Verify scuppers allow for proper drainage
El N/A
Pass
Fail
Ice and water shield 2" in heated wall
(]N/A
Pass
Fail
spaces
Underlayments must follow 2012 IRC / 2012 IBC
F1 N/A
L f Pass
Fail
Verify roof slope for proper drainage
E] N/A
lel Pass
r] Fail
Dripedge shall have min of 2" overlap
F1 N/A
❑ N/A
Pass
Pass
Fail
Dripedge should extend down min 2" past roof deck
Fail
Dripedge shall be mechanicaly fastened 12" OC
N/A
❑ Pass
Fail
90 LB roll roofing shall not be applied to roof slopes
less than 2:12 slope: Exception, detached garages,
patios, carports, open on three sides with min. slope of
N/A
❑ Pass
Fail
1:12
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
N/A
F-1 Pass
Fail
Above roof insulation R-25
N/A
0 Pass
Fail
Below roof residential R-38
N/A
El Pass
(_1 Fail
Below roof commercial R-32
NIA
EJ- Pass
Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
must be installed in accordance with the manufacturers
specifications- Must have manufactures letter of
warranty with the address on the letter for final inspection
Metal - Roof ,$LhiLnAles irements
n N/A
Q Pass
rJ Fail
Metal roof shingles shall not be installed on slope less
3:12
n N/A
Cl Pass
[I Fail
Metal valley flashing shall be the same material as roof
El N/A
El Pass
C3 Fail
Metal valley flashing shall extend a min of 8" from the
centerline with a min. of 3/4 " high splash diverter
rib built-in at the flow line with sections overlapping a
a min. of 4"
Tile Roofs Eggluirements
D N/A
❑ Pass
E] Fail
Clay and concrete the shall have a min. 2-1/2:12 slope
Slopes 4:12 and under require double undertayment
Company Name:
LMMA14-1.&9&T,T Mkmu
The City of Wheat Ridge
Inspection Check List notes
Final Roof
WAM A MPN
YA
A i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type:
Job Address: 3��j I rJCU�J S�
Permit Number: ,2-01-1/2-7 _�
�n tai nit n2
Elf- e) tj L� I,N s-'F(37CM
❑ No one available for inspeLNo
e A PM
Re -Inspection required: Yes*When corrections have been made,ns ction at 303-234-5933
Date: G% 05IR _Inspector:
DO NOT REMOVE THIS NOTICE
�e City of Wheat Ridge
Residential Roofing PERMIT - 201705608
PERMIT NO: 201705608 ISSUED: 08/07/2017
JOB ADDRESS: 3195 Fenton ST EXPIRES: 08/07/2018
JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles with ROOF
DECKING - 20 sq
*** CONTACTS ***
OWNER (408)608-9491 ROBERTSON DONIELLE D
SUB (303)808-6707 Wayne Price 150253 Price Home Improvement, LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 6,702.50
FEES
Total Valuation 0.00
Use Tax 140.75
Permit Fee 156.75 w
** TOTAL ** 297.50
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
A 41 City of Wheat Ridge
Residential Roofing PERMIT - 201705608
PERMIT NO: 201705608 ISSUED: 08/07/2017
JOB ADDRESS: 3195 Fenton ST EXPIRES: 08/07/2018
JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles with ROOF
DECKING - 20 sq
I, by my signature, do hereby at
that the work to be performed shall comply with all accompanyingg approved plans and specifications,
applicable building codes, and all apgiable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property anm authorized to obtainthisthiermrt.Ifurther attestthat I am llyauthorizedtoinclude alperformed and thaw 1 work to be pemed is disclosed in this document and/or its' accompanying approved plans and specifications.
DaM
Signature of OWNtk or CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any
apple ode or any
ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
0AAqcr
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan Schultz 2G2 1,70 t C) b
From:
no-reply@ci.wheatridge.co.us
Sent:
Monday, July 31, 2017 11:15 AM
To:
CommDev Permits
(�
Subject:
Online Form Submittal: Residential Roofing Permit Application
Categories:
Gina
c�
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
(~
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
/
Is this application fora Yes (V
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address 3195 Fenton St. Wheat Ridge, CO 80214
Property Owner Name Donielle Robertson
Property Owner Phone 408-608-9491
Number
Property Owner Email donielle. robertson@healthonecares.com
Address
���50
Do you have a signed
Yes
contract to reroof this
property?
It will need to be
provided at the time of
permit pick-up.
Attached Copy of
Field not completed.
Contract
CONTRACTOR INFORMATION
Contractor Business
Price Home Improvement, LLC
Name
Contractor's License
150253
Number (for the City of
Wheat Ridge)
Contractor Phone
3036676439
Number
Contractor Email Address
wayne@pricehomeimprovement.com
Retype Contractor Email
wayne@pricehomeimprovement.com
Address
DESCRIPTION OF WORK
Are you re -decking the
Yes
roof?
Description of Roofing
GAF Timberline HD - Asphalt shingles
Material
Select Type of Material:
Asphalt
If "Other" is selected
Field not completed.
above, describe here:
How many squares of the
20
material selected above?
Does any portion of the
No
property include a flat
roof?
If yes, how many squares
Field not completed.
on the flat roof?
TOTAL SQUARES
20/
(pitched + flat) of all
2
roofing material for this
project
Provide additional detail
here on the description of
work. (Is this for a house
or garage? What is the
roof pitch? Etc)
Project Value (contract
value or cost of ALL
materials and labor)
ReRoof for home and detached garage. Garage 4.9 SQ at
6/12, home 15.1 SQ 5/12 (of which 3.6 SQ is 10/12)
1$630ZZZ
67n2 o
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
Name of Applicant Wayne Price
Email not displaying correctly? View it in your browser.
3
P
Price Home Improvement, LLC
HI 10700 W. Alamo Place
Littleton, CO 80127
Name / Address
Donielle Robertson
3195 Fenton St.
Wheat Ridge, CO 80214
Estimate
Date Estimate #
7/21/2017 1761
Project
Description j Qty ' Rate Total
Re -roof per insurance claim #U18500
MEMBER
8 Signature
6307.731 6,307.73
Totol $6,307.73