HomeMy WebLinkAbout2950 Ingalls Streeti CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type:
Job Address:
Permit Number:
❑ No one available for inspection: Time
Re -Inspection required: Yes C_� M)
When corrections have been made, call for re -inspection at 303-234-5933
Date: �� `� Inspector
t
DO NOT REMOVE THIS NOTICE
f '
f r
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: / 4E to /-s H z�—
Job Address: 2. ' �_O vZAIG 19 C t S
Permit Number: 2.0/`> > 2
❑ No one available for inspection:. Time f'. :' AM/PM
Re -Inspection required: Yes No
When corrections have been made, call for re -inspection at 303-234-5933
Date: Inspector:
DO NOT REMOVE THIS NOTICE
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type:
Job Address:
Permit Number:
❑ No one available for inspection: Time
Re -Inspection required: Yes C_� M)
When corrections have been made, call for re -inspection at 303-234-5933
Date: �� `� Inspector
t
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
Residential Roofing PERMIT - 201703327
PERMIT NO: 201703327 ISSUED: 07/05/2017
JOB ADDRESS: 2950 Ingalls ST EXPIRES: 07/05/2018
JOB DESCRIPTION: Residential Re -roof to install asphalt shingles with ROOF DECKING - 15 sq.
*** CONTACTS ***
OWNER (720)273-9652 MARTINEZ LEROY L
SUB (720)554-8080 Peter S Mallouk
270260 Remodel Assistance, LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 5,026.88
FEES
Total Valuation 0.00
Use Tax 105.56
Permit Fee 140.90
** TOTAL ** 246.46 -- ---- -
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval.. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are
required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and
water shield is required. Eave and rake metal is required. A ladder extending 3 feet above
the roof eave and secured in place is required to be provided for all roof inspections.
Roof ventilation is required to comply with applicable codes and/or manufacturer
installation instructions, whichever is more stringent. In order to pass a final inspection
of elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer technical representative stating that "the application of the roof at (project
address) has been applied in accordance with the installation instruction for (roof
material brand name) roof covering" is required to be on site at the time of final
inspection.
City of Wheat Ridge
Residential Roofing PERMIT - 201703327
PERMIT NO: 201703327 ISSUED: 07/05/2017
JOB ADDRESS: 2950 Ingalls ST EXPIRES: 07/05/2018
JOB DESCRIPTION: Residential Re -roof to install asphalt shingles with ROOF DECKING - 15 sq.
I, by m signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable �uilding codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be
performed; and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po icies and procedures.
2. This pennit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180.days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4, No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anyy violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to held inspection.
Signature of Chief BuildirW f:. — ate
REQUESTS MUST BE MADE BI�`'Y :99PM ANY BUSINESS DAY R INSPECTION THE FOLLOWING BUSINESS DAY.
Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us
between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line.
Dan Schultz
� c�o33a�
From: no-reply@ci.wheatridge.co.us
Sent: Thursday, June 22, 2017 7:16 PM
To: Permits CommDev
Subject: Online Form Submittal: Residential Roofing Permit Application
Follow Up Flag: Flag for follow up
Flag Status: Flagged
Categories: Add Decking to this permit/revise valuation
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT
IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME
WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your
contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit. Permits are currently being
processed within 5 business days, subject to change based on volume.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof? W wat l p j _
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address 2950 Ingalls Street
Property Owner Name Leroy Martinez
M
S'
Ir
Property Owner.Phone
720-273-9652
Number
Property Owner Email
Field not completed.
Address
Do you have a signed
Yes
contract to reroof this
property?
It will need to be
provided at the time of
permit pick-up.
CONTRACTOR INFORMATION
Contractor Name
Remodel Assistance, LLC
Contractor's License
270260
Number (for the City of
Wheat Ridge)
Contractor Phone
303-880-4664
Number
Contractor Email Address
sam@supertract-colorado.com
Retype Contractor Email
sam@supertract-colorado.com
Address
DESCRIPTION OF WORK
Are you re -decking the
/
Yes ✓
roof?
Description of Roofing
shingles
Material
Select Type of Material:
Asphalt
If "Other" is selected
Field not completed.
above, describe here:
How many squares of the
15
material selected above?
Does any portion of the Yes
property include a flat
roof?
If yes, how many squares none - is not part of work scope
on the flat roof?
z
TOTAL SQUARES of all 15 L'Ilz
roofing material for this
project
Provide additional detail house
here on the description of
work. (Is this for a house
or garage? What is the
roof pitch? Etc)
Project Value (contract -yg@t�,
value or cost of ALL �vZ�• 4
materials and labor)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
Name of Applicant Sam Mallouk
Email not displaying correctly? View it in your browser.
3
7zc -2_� �,- �6s z
SHORT FORM PRIME CONTRACT BETWEEN OWNER & CONTRACTOR
This Agreement ("Contract") is made this 21" day of June , 2017 , between
Remodel Assistance, LLC ("Contractor") and
Leroy Martinez ("Owner") at 2950 Ingalls Street, Wheat Ridge, CO 80214
The work described in Section t below shall be performed in accordance with all plans, specifications and other
Contract documents for the project known as: 2950 Ingalls Street, Wheat Ridge, CO 80214
The name and address of the construction lender (if applicable) is: n/a
Section 1. Scope. The Contractor agrees to furnish all labor, materials, equipment and other facilities
required to complete the following work: all roofing work including demo, haul -off, and providing a new
shingle roof on shingled portion of the home. Shingles are Owens Corning Duration shingles. Hip and Ridge
Shingles are "High Profile" type hip and ridges. �G (1t-.
The color is %S -'/4C
Owner to Please Initial Here
Exclusions include flat roofing work, and removing and replacing the gas fireplace double- wall chimney flue
cap.
Section 2. Price and Payment. The Owner agrees to pay the Contractor for the strict performance of the
S i
work, the sum f $ 6,145.81 — �(; to
($) subject to adjustments for changes in the work as may be agreed to by
the Owner and the Contractor, or as may be required under this Contract.
The Owner- agrees to pay the- C-entraeter. in menthly progress payments fer a4l wark e9mpleted. Payments will he.
due aPA payable 464in thiny days of invaiee. Final payment to the Gentfaetef shall be made within " five
days af4ef substantial completion of the Contract and submission of the final inveiee to 0,A%er-.
First Payment u Pon material delivery on roof of'fi coAr�f amount, which is $3,072.90.
iii �I i�i}1��1�% t 2-v
Final Payment with n 7 days of completion of work, receipt of Building Permit Final, and satisfaction of the homeowner.
That amount is $3,072.91
M10
Section 3. Entire Agreement. This agreement represents the entire agreement between the Contractor and
the Owner regarding the work described in Section 1, and supersedes any prior written or oral agreements or
representations as to that work.
Section 4. Time. Time is of the essence of this agreement. The Contractor shall provide the Owner with a
progress and completion schedule and shall conform to that schedule, including any changes to that schedule
agreed to between the Owner and the Contractor or required by circumstances beyond Contractor's control.
Section 5. Differing Site Conditions. Contractor shall promptly, and before the following conditions are
disturbed, notify the Owner in writing of any:
(1) Hazardous Material that, because of its quantity, concentration or physical or chemical characteristics, is
deemed by any federal, state or local governmental authority to pose a present or potential hazard to human
health or safety or to the environment, or that the handling of which may subject Contractor to legal
liability.
(2) Subsurface or latent physical conditions at the site materially different from those indicated in the Contract
Documents; or
(3) Unknown physical or other conditions at the site of an unusual nature, materially different from
those ordinarily encountered and generally recognized as inherent to work of the character provided for in
the Contract.
The Owner shall promptly investigate such conditions. If the Owner finds that the worksite conditions do
materially differ, or involve Hazardous Material, the Owner shall make an equitable adjustment in the Contract Price
and the Contract Time for such work by issuing a change order under Article 15.
Section 6. Changes in Work. The work shall be subject to changes by additions, deletions or revisions
by the Owner. The Owner shall notify Contractor of such changes by delivery of additional and/or revised
drawings, specifications, exhibits or written orders.
Whenever an adjustment in the Contract price or Contract time is required because of Owner's change request,
differing site conditions, errors in the plans and specifications, or other circumstances beyond the control of
Contractor (including acts of any governmental authority, acts of a public enemy, fire, flood, unusual delay in
transportation, abnormal weather conditions, labor disputes, strikes, lack of worksite access, acts of God, natural
disasters, or acts of third parties), the Contractor shall submit to the Owner, within a reasonable time, a
detailed estimate with supporting calculations and pricing, together with any adjustments to the Contract price
and the Contract time. Pricing of the adjustment shall be in general accordance with the pricing structure of this
Contract. However, to the extent that such pricing is inapplicable, cost of the change or the amount of the
adjustment shall be determined based on the cost to the Contractor plus reasonable amounts for overhead and
profit.
The Contractor shall not be obligated to perform changes in the work or additional work until the Owner has
approved, in writing, the changes to the Contract price and the Contract time.
Section 7. Suspension of Work. The Contractor, at its option, may suspend work under the Contract as
a result of the following: (1) Owner's failure to timely pay sums due to the Contractor, until such payment
is made; (2) a dispute over payment for extra work, differing site conditions, changes by Owner or other
circumstances beyond Contractor's control if such circumstance will cause the Contractor to suffer substantial
financial hardship if Contractor is required to continue the work; or (3) Owner's failure to providc Owner's
ability to pay Contractor for the work remaining to be performed by Contractor.
Any suspension of work under this Contract will also suspend the progress and completion dates set forth in
Section 4.
Section 8. Inspection of the Work. The Contractor shall make the work accessible at all reasonable times for
inspection by the Owner. The Contractor shall inspect all material and equipment delivered to the job site by
others to be used or incorporated in the Contractor's work.
Section 9. Site Access and Rights of Way. The Owner shall provide, no later than the date when needed
by the Contractor, all necessary access to the site or sites upon which the Work is to be performed, including
convenient access to the site or sites and any other site or sites designated in the Contract Documents for use by the
Contractor. Owner shall continue to provide such access until completion of the Contract. Any delay in
providing such access shall entitle the Contractor to an equitable adjustment in the Contract price and the
Contract time.
Section 10. Surveys and Reports. The Owner shall furnish to Contractor for the Work, prior to the start of the
Work, all necessary surveys and reports describing the physical characteristics, soil, geological and subsurface
conditions, legal limitations, utility locations and legal descriptions that might assist the Contractor in properly
evaluating the extent and character of the work required. The Owner shall provide all site surveys and baselines
necessary for the Contractor to locate the principal parts of the Work and perform the Work.
Section 11. Permits, Licenses and Regulations. Unless otherwise provided in the Contract Documents, the
Contractor shall obtain and pay for all permits and licenses of a temporary nature necessary for the prosecution
of the Work. The Owner and Contractor shall assist the other in obtaining such permits and licenses. Unless
otherwise provided, the Owner shall secure and pay for all permits, licenses and easements for permanent structures
or permanent changes in existing facilities.
The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the
performance of the Work. If the Contractor observes that drawings, specifications or other Contract documents
are at variance with such laws, ordinances, Hiles and regulations, the C o n t r a c t o r s h a 11 promptly notify
Owner of such variance. If any such variances result in any necessary changes in the Work, then Contractor shall be
entitled to an equitable adjustment to the Contract price or Contract time.
Section 12. Termination. The Owner reserves the right to terminate the work for its convenience upon
notice in writing to the Contractor. In such an event, the Contractor shall be paid its actual costs for the portion of
the work performed to the date of termination, and for all of Contractor's incurred costs of termination, including
demobilization and any termination charges by vendors and subcontractors, plus 20% of all of Contractor's actual
and incurred costs for overhead and profit.
Should the Owner become insolvent or commit a material breach or default under the Contract, including, but not
limited to, failure to pay timely undisputed sums due to the Contractor, then the Contractor may terminate this
Contract.
Section 13. Insurance
13.1. The Contractor shall, at its expense, procure and maintain insurance of its operations under this
Contract consisting of the following coverages:
a. Workers' Compensation and Employers' Liability Insurance;
b. Commercial General Liability Insurance covering Contractor's operations; and,
c. Automobile Liability Insurance, including coverage for Contractor's owned, hired and non -
owned automobiles.
13.2. The Owner shall, at its expense, procure and maintain insurance under this Contract consisting
of the following coverages:
Builder's Risk Insurance. "All risk" Builder's Risk insurance (excluding the hazards of
earthquake and flood) such insurance provides property insurance coverage for both Contractor
and subcontractors including loss or damage to Contractor's work. Such insurance shall also
apply to any of Owner's property in the care, custody or control of Contractor. Owner waives all
rights of recovery against the Contractor for loss of use of the Owner's property, including
consequential losses due to fire or other hazards, however caused.
13.3. Waiver of Subrogation. Owner and Contractor waive all rights against each other and against all
other subcontractors and Owner for loss or damage to the extent reimbursed by any property or
equipment insurance applicable to the work, except such rights as they may have to the proceeds of
such insurance. If any applicable policies of insurance require an endorsement or consent of the
insurance company to provide for continued coverage where there is a waiver of subrogation, the
owners of such policies will cause them to be so endorsed or obtain such consent.
Section 14. Arbitration. Any controversy or claim arising out of or relating to this Contract or its alleged
breach, which cannot be resolved by mutual agreement, shall be settled by arbitration in accordance with
Construction Industry Rules of the American Arbitration Association in effect on the date of the Contract, and
judgment upon the award rendered by the arbitrator(s) may be entered in any court having jurisdiction. Owner
and Contractor agree that, should Contractor be potentially or actually a party to a lawsuit or arbitration arising out
of or connected to this Contract, Owner shall appear in, and be bound by the decision in, that lawsuit or
arbitration. The prevailing party in any action or proceeding to enforce this Contract shall recover its reasonable
attorneys' fees and costs (including expert witnesses) in that action or proceeding.
Section 15. Warranty. The Contractor warrants to the Owner that all materials and equipment furnished
under this Contract shall be new unless otherwise specified and that all work under this agreement will be
performed in a good and workmanlike manner, shall be of good quality, free from faults and defects, and in
conformance with Contract documents.
Section 16. Special Provisions (including unit pricing, if applicable):
Dated:
Owner:
By: --�4
(Name)
(.Add—)
Dated: /
Contractor: Remodel Assistance, LLC
By:
(Name)
&"/,—
Principal
2965 Ingalls Street
Wheat Ridge, CO 80214
303-880-4664
(Contractor's License Number
Wheat Ridge — 270260