Loading...
HomeMy WebLinkAbout2950 Ingalls Streeti CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: Permit Number: ❑ No one available for inspection: Time Re -Inspection required: Yes C_� M) When corrections have been made, call for re -inspection at 303-234-5933 Date: �� `� Inspector t DO NOT REMOVE THIS NOTICE f ' f r i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: / 4E to /-s H z�— Job Address: 2. ' �_O vZAIG 19 C t S Permit Number: 2.0/`> > 2 ❑ No one available for inspection:. Time f'. :' AM/PM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: Inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: Permit Number: ❑ No one available for inspection: Time Re -Inspection required: Yes C_� M) When corrections have been made, call for re -inspection at 303-234-5933 Date: �� `� Inspector t DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201703327 PERMIT NO: 201703327 ISSUED: 07/05/2017 JOB ADDRESS: 2950 Ingalls ST EXPIRES: 07/05/2018 JOB DESCRIPTION: Residential Re -roof to install asphalt shingles with ROOF DECKING - 15 sq. *** CONTACTS *** OWNER (720)273-9652 MARTINEZ LEROY L SUB (720)554-8080 Peter S Mallouk 270260 Remodel Assistance, LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 5,026.88 FEES Total Valuation 0.00 Use Tax 105.56 Permit Fee 140.90 ** TOTAL ** 246.46 -- ---- - *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval.. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201703327 PERMIT NO: 201703327 ISSUED: 07/05/2017 JOB ADDRESS: 2950 Ingalls ST EXPIRES: 07/05/2018 JOB DESCRIPTION: Residential Re -roof to install asphalt shingles with ROOF DECKING - 15 sq. I, by m signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable �uilding codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed; and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po icies and procedures. 2. This pennit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180.days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anyy violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to held inspection. Signature of Chief BuildirW f:. — ate REQUESTS MUST BE MADE BI�`'Y :99PM ANY BUSINESS DAY R INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Dan Schultz � c�o33a� From: no-reply@ci.wheatridge.co.us Sent: Thursday, June 22, 2017 7:16 PM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Follow Up Flag: Flag for follow up Flag Status: Flagged Categories: Add Decking to this permit/revise valuation Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 5 business days, subject to change based on volume. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? W wat l p j _ How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address 2950 Ingalls Street Property Owner Name Leroy Martinez M S' Ir Property Owner.Phone 720-273-9652 Number Property Owner Email Field not completed. Address Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. CONTRACTOR INFORMATION Contractor Name Remodel Assistance, LLC Contractor's License 270260 Number (for the City of Wheat Ridge) Contractor Phone 303-880-4664 Number Contractor Email Address sam@supertract-colorado.com Retype Contractor Email sam@supertract-colorado.com Address DESCRIPTION OF WORK Are you re -decking the / Yes ✓ roof? Description of Roofing shingles Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 15 material selected above? Does any portion of the Yes property include a flat roof? If yes, how many squares none - is not part of work scope on the flat roof? z TOTAL SQUARES of all 15 L'Ilz roofing material for this project Provide additional detail house here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract -yg@t�, value or cost of ALL �vZ�• 4 materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Sam Mallouk Email not displaying correctly? View it in your browser. 3 7zc -2_� �,- �6s z SHORT FORM PRIME CONTRACT BETWEEN OWNER & CONTRACTOR This Agreement ("Contract") is made this 21" day of June , 2017 , between Remodel Assistance, LLC ("Contractor") and Leroy Martinez ("Owner") at 2950 Ingalls Street, Wheat Ridge, CO 80214 The work described in Section t below shall be performed in accordance with all plans, specifications and other Contract documents for the project known as: 2950 Ingalls Street, Wheat Ridge, CO 80214 The name and address of the construction lender (if applicable) is: n/a Section 1. Scope. The Contractor agrees to furnish all labor, materials, equipment and other facilities required to complete the following work: all roofing work including demo, haul -off, and providing a new shingle roof on shingled portion of the home. Shingles are Owens Corning Duration shingles. Hip and Ridge Shingles are "High Profile" type hip and ridges. �G (1t-. The color is %S -'/4C Owner to Please Initial Here Exclusions include flat roofing work, and removing and replacing the gas fireplace double- wall chimney flue cap. Section 2. Price and Payment. The Owner agrees to pay the Contractor for the strict performance of the S i work, the sum f $ 6,145.81 — �(; to ($) subject to adjustments for changes in the work as may be agreed to by the Owner and the Contractor, or as may be required under this Contract. The Owner- agrees to pay the- C-entraeter. in menthly progress payments fer a4l wark e9mpleted. Payments will he. due aPA payable 464in thiny days of invaiee. Final payment to the Gentfaetef shall be made within " five days af4ef substantial completion of the Contract and submission of the final inveiee to 0,A%er-. First Payment u Pon material delivery on roof of'fi coAr�f amount, which is $3,072.90. iii �I i�i}1��1�% t 2-v Final Payment with n 7 days of completion of work, receipt of Building Permit Final, and satisfaction of the homeowner. That amount is $3,072.91 M10 Section 3. Entire Agreement. This agreement represents the entire agreement between the Contractor and the Owner regarding the work described in Section 1, and supersedes any prior written or oral agreements or representations as to that work. Section 4. Time. Time is of the essence of this agreement. The Contractor shall provide the Owner with a progress and completion schedule and shall conform to that schedule, including any changes to that schedule agreed to between the Owner and the Contractor or required by circumstances beyond Contractor's control. Section 5. Differing Site Conditions. Contractor shall promptly, and before the following conditions are disturbed, notify the Owner in writing of any: (1) Hazardous Material that, because of its quantity, concentration or physical or chemical characteristics, is deemed by any federal, state or local governmental authority to pose a present or potential hazard to human health or safety or to the environment, or that the handling of which may subject Contractor to legal liability. (2) Subsurface or latent physical conditions at the site materially different from those indicated in the Contract Documents; or (3) Unknown physical or other conditions at the site of an unusual nature, materially different from those ordinarily encountered and generally recognized as inherent to work of the character provided for in the Contract. The Owner shall promptly investigate such conditions. If the Owner finds that the worksite conditions do materially differ, or involve Hazardous Material, the Owner shall make an equitable adjustment in the Contract Price and the Contract Time for such work by issuing a change order under Article 15. Section 6. Changes in Work. The work shall be subject to changes by additions, deletions or revisions by the Owner. The Owner shall notify Contractor of such changes by delivery of additional and/or revised drawings, specifications, exhibits or written orders. Whenever an adjustment in the Contract price or Contract time is required because of Owner's change request, differing site conditions, errors in the plans and specifications, or other circumstances beyond the control of Contractor (including acts of any governmental authority, acts of a public enemy, fire, flood, unusual delay in transportation, abnormal weather conditions, labor disputes, strikes, lack of worksite access, acts of God, natural disasters, or acts of third parties), the Contractor shall submit to the Owner, within a reasonable time, a detailed estimate with supporting calculations and pricing, together with any adjustments to the Contract price and the Contract time. Pricing of the adjustment shall be in general accordance with the pricing structure of this Contract. However, to the extent that such pricing is inapplicable, cost of the change or the amount of the adjustment shall be determined based on the cost to the Contractor plus reasonable amounts for overhead and profit. The Contractor shall not be obligated to perform changes in the work or additional work until the Owner has approved, in writing, the changes to the Contract price and the Contract time. Section 7. Suspension of Work. The Contractor, at its option, may suspend work under the Contract as a result of the following: (1) Owner's failure to timely pay sums due to the Contractor, until such payment is made; (2) a dispute over payment for extra work, differing site conditions, changes by Owner or other circumstances beyond Contractor's control if such circumstance will cause the Contractor to suffer substantial financial hardship if Contractor is required to continue the work; or (3) Owner's failure to providc Owner's ability to pay Contractor for the work remaining to be performed by Contractor. Any suspension of work under this Contract will also suspend the progress and completion dates set forth in Section 4. Section 8. Inspection of the Work. The Contractor shall make the work accessible at all reasonable times for inspection by the Owner. The Contractor shall inspect all material and equipment delivered to the job site by others to be used or incorporated in the Contractor's work. Section 9. Site Access and Rights of Way. The Owner shall provide, no later than the date when needed by the Contractor, all necessary access to the site or sites upon which the Work is to be performed, including convenient access to the site or sites and any other site or sites designated in the Contract Documents for use by the Contractor. Owner shall continue to provide such access until completion of the Contract. Any delay in providing such access shall entitle the Contractor to an equitable adjustment in the Contract price and the Contract time. Section 10. Surveys and Reports. The Owner shall furnish to Contractor for the Work, prior to the start of the Work, all necessary surveys and reports describing the physical characteristics, soil, geological and subsurface conditions, legal limitations, utility locations and legal descriptions that might assist the Contractor in properly evaluating the extent and character of the work required. The Owner shall provide all site surveys and baselines necessary for the Contractor to locate the principal parts of the Work and perform the Work. Section 11. Permits, Licenses and Regulations. Unless otherwise provided in the Contract Documents, the Contractor shall obtain and pay for all permits and licenses of a temporary nature necessary for the prosecution of the Work. The Owner and Contractor shall assist the other in obtaining such permits and licenses. Unless otherwise provided, the Owner shall secure and pay for all permits, licenses and easements for permanent structures or permanent changes in existing facilities. The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the performance of the Work. If the Contractor observes that drawings, specifications or other Contract documents are at variance with such laws, ordinances, Hiles and regulations, the C o n t r a c t o r s h a 11 promptly notify Owner of such variance. If any such variances result in any necessary changes in the Work, then Contractor shall be entitled to an equitable adjustment to the Contract price or Contract time. Section 12. Termination. The Owner reserves the right to terminate the work for its convenience upon notice in writing to the Contractor. In such an event, the Contractor shall be paid its actual costs for the portion of the work performed to the date of termination, and for all of Contractor's incurred costs of termination, including demobilization and any termination charges by vendors and subcontractors, plus 20% of all of Contractor's actual and incurred costs for overhead and profit. Should the Owner become insolvent or commit a material breach or default under the Contract, including, but not limited to, failure to pay timely undisputed sums due to the Contractor, then the Contractor may terminate this Contract. Section 13. Insurance 13.1. The Contractor shall, at its expense, procure and maintain insurance of its operations under this Contract consisting of the following coverages: a. Workers' Compensation and Employers' Liability Insurance; b. Commercial General Liability Insurance covering Contractor's operations; and, c. Automobile Liability Insurance, including coverage for Contractor's owned, hired and non - owned automobiles. 13.2. The Owner shall, at its expense, procure and maintain insurance under this Contract consisting of the following coverages: Builder's Risk Insurance. "All risk" Builder's Risk insurance (excluding the hazards of earthquake and flood) such insurance provides property insurance coverage for both Contractor and subcontractors including loss or damage to Contractor's work. Such insurance shall also apply to any of Owner's property in the care, custody or control of Contractor. Owner waives all rights of recovery against the Contractor for loss of use of the Owner's property, including consequential losses due to fire or other hazards, however caused. 13.3. Waiver of Subrogation. Owner and Contractor waive all rights against each other and against all other subcontractors and Owner for loss or damage to the extent reimbursed by any property or equipment insurance applicable to the work, except such rights as they may have to the proceeds of such insurance. If any applicable policies of insurance require an endorsement or consent of the insurance company to provide for continued coverage where there is a waiver of subrogation, the owners of such policies will cause them to be so endorsed or obtain such consent. Section 14. Arbitration. Any controversy or claim arising out of or relating to this Contract or its alleged breach, which cannot be resolved by mutual agreement, shall be settled by arbitration in accordance with Construction Industry Rules of the American Arbitration Association in effect on the date of the Contract, and judgment upon the award rendered by the arbitrator(s) may be entered in any court having jurisdiction. Owner and Contractor agree that, should Contractor be potentially or actually a party to a lawsuit or arbitration arising out of or connected to this Contract, Owner shall appear in, and be bound by the decision in, that lawsuit or arbitration. The prevailing party in any action or proceeding to enforce this Contract shall recover its reasonable attorneys' fees and costs (including expert witnesses) in that action or proceeding. Section 15. Warranty. The Contractor warrants to the Owner that all materials and equipment furnished under this Contract shall be new unless otherwise specified and that all work under this agreement will be performed in a good and workmanlike manner, shall be of good quality, free from faults and defects, and in conformance with Contract documents. Section 16. Special Provisions (including unit pricing, if applicable): Dated: Owner: By: --�4 (Name) (.Add—) Dated: / Contractor: Remodel Assistance, LLC By: (Name) &"/,— Principal 2965 Ingalls Street Wheat Ridge, CO 80214 303-880-4664 (Contractor's License Number Wheat Ridge — 270260