HomeMy WebLinkAbout2800 Quay StreetCITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line �9r(303) 235-2855 Office - (303) 237-8929 Fax
INSPECTION NOTICE '
Inspection Type: ///z /--) r/- � //-ff
Job Address: Z�O(D 0l 14 1 S7
Permit Number:
El No one available for inspection: Time/ f AM/PM
Re -Inspection required: Yes No
When corrections have been made, call for re -inspection at 303-234-5933
Date: Inspector: G-`
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
Residential Roofing PERMIT - 201701702
PERMIT NO: 201701702 ISSUED: 06/07/2017
JOB ADDRESS: 2800 Quay ST EXPIRES: 06/07/2018
JOB DESCRIPTION: Complete reroof; remove all existing composite underlayment and flashing;
install all new flashing and composite underlayment; replace with GAF
Timberline 10.4 squares plus flat
*** CONTACTS ***
OWNER (303)239-0611 MATTHEWS WILLIAM RORY
SUB (303)732-6625 Dennis Benoit
100219 Allegiant Roofing & Restoratio
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 8,135.53
FEES
Total Valuation 0.00
Use Tax 170.85
Permit Fee 188.45
** TOTAL ** 359.30
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding k/2 -inch exists. Asphalt shingles are required to
be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is
required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturera€ms installation
instructions, whichever is more stringent. In order to pass a final inspection of
elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer's technical representative stating that "the application of the roof at
(project address) has been applied in accordance with the installation instruction for
(roof material brand name) roof covering" is required to be on site at the time of final
inspection.
PERMIT NO:
JOB ADDRESS:
JOB DESCRIPTION
City of Wheat Ridge
Residential Roofing PERMIT - 201701702
201701702
2800 Quay ST
ISSUED: 06/07/2017
EXPIRES: 06/07/2018
Complete reroof; remove all existing composite underlayment and flashing;
install all new flashing and composite underlayment; replace with GAF
Timberline 10.4 squares plus flat
1, by my signature, do hereby attest that the work to be performed shall comply with all accompanyin approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am t�e legal owner or have been authorized
by the legal owner r the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I further attest that I am le ally authorized to include all entities named within this document as parties to the work to be
per
and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
2-017
a
Signature of OWNER or ONTRACTOR (Circle one) Date
I . This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees andprocedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5, The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division,
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us
between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line.
A
City of
Wh6a-t Date:
com
'gle Permit 00
COMMUNiTy DEVELOPMENT
Buildina Division
7500 M 29th Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Facsimile Building Permit Application
Property Address: 2 g 00
Property Owner (please print): -i Phone:
Mailing Address: {if different than pro arty address
Add'rem 7,900
City,
State,
ity, State, Zip: OL+ k
Contractor: A
Contractor License #: 10 ZI Phone:
Sub Contractors:
Company Name: License #: Exr)iration Date: TradelProfession: ApkEoval,
Use of space (description):
Description of wot*,
tub P.� -e-QLW-Cr-C alk'n "A 0
Plan Review (divie at t;ime of submittal):
L4 F -�JOL C,��u �rLK,1_AA__V
V,
h'i lit UM ttLv " rVUlA+, '15111f I 0A UIAJ/- Coe(
a sit
qq. Ft./L.Pt added: squares S _ Gallons ArnDs
OWNERICONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances,
rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record, that all measurements shown, and
allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full
responsibility for compliance with the Wheat Ridge Building Code (I.B C) and ali other applicable Wheat Ridge Ordinances, for work
under this permit. Plans subject to field ins cion.
field
_T
CIRLCE ONE:: {OWNER� �(CONTRACTOR) PERSONAL REPRESENTATIVE of (OWNER) (CONTRATOR)
PRINT NAME: eJ-O SIGNATURE: a e: 7C
DEPARTMENT USE ONLY
ZONING COMMENT&
Zoning:
Reviewer
PUBLIC WORKS COMMENTS -
Reviewer
BUILDING DEPARTMENT COMMENTS OCCUPANCY -
Reviewer.
FIRE DEPARTMENT:: 0 approved w/ comments 0 disapproved 0 no review required [-Bldg Valuation:
Credit Card Payment: Use credit card listed on file. Date:
Print name: Signature-
N
n C'lhy-% I. 1 i. n . �) n I `) n l -1 n i
/_ZVU WLVA Jq INSPECTION RECORD
INSPECTION REQUEST LINE: (303) 234-5933
Occupancy/Type
Inspector Comments
Initials
Inspections will not be performed unless this card is posted on the project site.
Call the inspection request line before 11:59 p.m. to receive an inspection the following business day.**
Inspector Must Sign ALL Spaces pertinent to this project
Foundation Inspections Date
Inspector Comments
Initials
Pier
Concrete Encased Ground (CEG)
Foundation / P.E. Letter
Rough Electric
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground/Slab Inspections Date Inspector Comments
Initials
Electrical
Sewer Service
Plumbing
Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections
Rough Inspections
Date
Inspector Comments
Initials
Wall Sheathing
Mid -Roof
Lath / Wall Tie
Rough Electric
Rough Plumbing/Gas Line
Rough Mechanical
Rough Framing
Rough Grading
Insulation
Drywall Screw/ Nail
Final Inspections
Date Inspector
Initials
Comments
Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Final Plumbing
Final Mechanical
Roof
Final Window/Doors
Final Building
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
"For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage
by the Building Division.
"For Inspection Time Window — Please email insptimerequest@ci.Wheatridge.Co.US by 8:00 A.M. the morning of the
inspection with the property address in the subject line of the email. Time window is based on the inspector's route.
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued
Protect This Card From The Weather
City of Wheat Ridge
Residential Roofing PERMIT - 201701702
PERMIT NO: 201701702 ISSUED: 06/07/2017
JOB ADDRESS: 2800 Quay ST EXPIRES: 06/07/2018
JOB DESCRIPTION: Complete reroof; remove all existing composite underlayment and flashing;
install all new flashing and composite underlayment; replace with GAF
Timberline 10.4 squares plus flat
*** CONTACTS ***
OWNER (303)239-0611 MATTHEWS WILLIAM RORY
SUB (303)732-6625 Dennis Benoit
100219 Allegiant Roofing & Restoratio
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 8,135.53
FEES
Total Valuation 0.00
Use Tax 170.85
Permit Fee 188.45
** TOTAL ** 359.30
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding k/2 -inch exists. Asphalt shingles are required to
be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is
required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer&ems installation
instructions, whichever is more stringent. In order to pass a final inspection of
elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer's technical representative stating that "the application of the roof at
(project address) has been applied in accordance with the installation instruction for
(roof material brand name) roof covering" is required to be on site at the time of final
inspection.