HomeMy WebLinkAbout62 Hillside DriveOccupancy /Type
INSPECTION RE ;R(D)6
INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection
INSPECTION REQUEST LINE: (303) 234-5933
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
Inspections will not be performed unless this card is posted on the project site.
**Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.**
Inspector Must Sign ALL Spaces pertinent to this project
Foundation Inspections Date Inspector Comments
Initials
Pier
Concrete Encased Ground (CEG)
Foundation / P.E. Letter
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground/Slab Inspections Date Inspector Comments
Initials
Electrical
Sewer Service
Plumbing
Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections
Rough Inspections
Date
Inspector
Initials
Comments
Wall Sheathing
Mid -Roof
V
Lath / Wall Tie
Rough Electric "
Rough Plumbing/Gas Line
Rough Mechanical
Rough Framing
Rough Grading
Insulation
Drywall Screw/ Nail
Final Inspections
Date Inspector
Initials
Comments
Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Final Plumbing
Final Mechanical
Roof
Final Window/Doors
A r
7
Final Building
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
"For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage
by the Building Division.
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued
Protect This Card From The Weather
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: qoq
Job Address:
Permit Number: 201 706 7 23
❑ No one available for inspection.—Time AM/PM
Re -Inspection required: Yes i�No
When corrections have been made, call for re -inspection at 303-234-5933
Date: % 7 Inspector: % .T l�
DO NOT REMOVE THIS NOTICE
A i CITYOFWHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: Ll 0 G - 1
Job Address: f-1 !) <, 4 � t --
Permit Number: q 0 l -7 n 1 -7 -7 3
❑ No one available for inspection: Time AM/PM
Re -Inspection required: Yes No
When corrections have been made, call for re -inspection at 303-234-5933
Date: -i a Inspector: -T7--�,
DO NOT REMOVE THIS NOTICE
1�
i CITY OF WHEAT_. RIDGE
_:�9�Building Inspection- Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: 3 C t- [11,d
Job Address: 1. 1) 5 , cic N r
Permit Number: 0 (-7 C. 1, 7 7 3
�1 r7�./ e"� r- k- v d � ) ", _ 1, ) O -�--c c, cr mss
❑ No one available for inspection: TimeM
Re -Inspection required: Yes to
When corrections have been made, call for re -inspection at 303-234-5933
Date: -/;4 / Inspector: TZ�
DO NOT REMOVE THIS NOTICE
r
A City of Wheat Ridge
Residential Roofing PERMIT - 201706773
PERMIT NO:
201706773
ISSUED: 08/31/2017
JOB ADDRESS:
62 Hillside DR
EXPIRES: 08/31/2018
JOB DESCRIPTION:
Residential Re -roof to install certainteed
presidential shake asphalt
shingles with 40sq
pitch 2/12
*** CONTACTS ***
OWNER (303)881-4620
MASCARENAZ JAMES
DANIEL/MELODY
SUB (303)426-7370
Kirk Tiley
021395 Tiley Roofing Inc.
*** PARCEL INFO ***
ZONE CODE:
UA / Unassigned
USE: UA / Unassigned
SUBDIVISION CODE:
2404 / APPLEWOOD
KNOLLS, PARAMOUNT
HE BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
ESTIMATED PROJECT VALUATION: 13,504.00
FEES
Total Valuation
0.00
Use Tax
283.58
Permit Fee
267.70
** TOTAL **
551.28
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Midroof & Final Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be
required, the 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped
off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the
Homeowner.
� t A i City of Wheat Ridge
d�V,
Residential Roofing PERMIT -201706773
PERMIT NO: 201706773 ISSUED: 08/31/2017
JOB ADDRESS: 62 Hillside DR EXPIRES: 08/31/2018
JOB DESCRIPTION: Residential Re -roof to install certainteed presidential shake asphalt
shingles with 40sq
pitch 2/12
I, by my signature, do hereby attest that the work
applicable building codes, and all applicable mun
by the legal owner of the property and am auth&
thispermit. I further attest that I am le ally autho
performed and that ado;to eU� 000njWd is di
performed shall comply with all accompanying approved plans and specifications,
codes, policies and procedures, and that I am the legal owner or have been authorized
> obtain this permit and perform the work described and approved in conjunction with
to include all entities named within this document as parties to the work to be
;d in this document and/or its' accompanying approved plans and specifications.
Signature of 'OWNER or CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in the permit application and accompanying Flans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and maybe subject to a fee equal to one-half of the originalpermitfee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable code or, any ordinance or regulation of this jurisdiction. Approval of work is subject to f any
inspection.
Signature of Chief Building Official °'^F Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan SchultzL���
From: no-reply@ci.wheatridge.co.us
Sent: Monday, August 28, 2017 8:48 AM
To: CommDev Permits
Subject: Online Form Submittal: Residential Roofing Permit Application v
Categories: Danny
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
J
Property Address 62 Hillside Dr. Wheat Ridge, CO 80215
Property Owner Name Melody Mascarenaz
Property Owner Phone 303-881-4620
Number (enter WITH
dashes, eg 303-123-4567)C ` 2
1 Q_J
157
Property Owner Email
Address
Do you have a signed
contract to reroof this
property?
Applications cannot be
submitted without an
executed contract
attached below.
melody2003@comcast.net
Yes
Attach Copy of Executed 20170828084251577.pdf
Contract
CONTRACTOR INFORMATION
Contractor Business Tiley Roofing Inc.
Name
Contractor's License 021395
Number (This is a 5 or 6
digit number for the City
of Wheat Ridge)
Contractor Phone 303-426-7370
Number (enter WITH
dashes, eg 303-123-4567)
Contractor Address 5399 FEDERAL BLVD
(Primary address of your
business)
Contractor Email Address mglenn@tileyroofing.com
Retype Contractor Email mglenn@tileyroofing.com
Address
DESCRIPTION OF WORK
TOTAL SQUARES of 40 ii/
the entire scope of work:
Project Value (contract13504
value or cost of ALL
materials and labor)
Are you re -decking the No y
roof?
158
Does the scope of the No
project include a flat roof
(less than 2:12 pitch)?
Does the scope of the
project include a pitched
roof (2:12 or greater
pitch)?
How many squares are
part of the pitched roof?
Describe the roofing
materials for the pitched
roof:
Type of material for the
pitched roof.
Provide any additional
detail here on the
description of work. (Is
this for a house or
garage? What is the roof
pitch? Etc)
Yes V/
40
Certainteed Presidential Shake
Asphalt
Home, 2/12
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work
may not begin on this
property until a permit
has been issued and
posted on the property.
Yes
Yes
Yes
159
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
Name of Applicant Michael Glenn
Email not displaying correctly? View it in your browser.
160
97 IN,I
A full-service residential and commercial ROOFING and gutter contractor.
303-426-7370 (o) 1303-426-0312 (f) 3 5399 Federal Blvd., Denver, CO 80221 1 email filey konrFit+1G
JOB_INFORMATION
Submitted To:
Melody Moscarenaz
Proposal Date:
01/00/00
Jobsite Address:
62 Hillside Dr, Wheatridge, Co 80215
Client Email:
melody2003@comcast.nef
Client Phone:
303-881-4620
Estimator:
Tony Miller 303-249-8151 Cony@tileyroofing.com
Roof Area (sq. ft.):
4000
Roof Pitch: 2/12
Removal Layers: 1
There are multiple pages to this proposal.
At Tiley Roofing we like to provide our clients with several alternatives to ensure you are getting the roof that best fits your needs. Below is a
choice of a "Better" and "Best' package, several shingle product choices, and add on options to accommodate those needs.
Roof Hyperlink Photos: https://app.companycam.com/galleriesilPiCbVVDGcgE
I SCOPE OF WORK AND MATERIALS I
Existing Roof Condition: Hail damage noted throughout the roof area.
Existing Leaks with Location: None reported.
Demoliffon: Removal and disposal of existing layers (roof covering) specified above and 1 layer roof underlayment. Additional hidden layers
may be difficult to determine until demolition process. Charges for these hidden layers may apply.
Better - Standard Roof Package
Underlayment: 2 layer of synthetic underlayment over entire low slope with 2 rows Ice and water on eaves installed per local building code,
row at crickets, chimneys and skylights (if they exist).
Flashing: 26 gauge factory finish bronze (dark brown) color drip edge, rake edge flashing, headwall, and step flashing. Replacement of all
roofing jacks which will be painted to match shingles. Surface mounted visible flashing may be required at roof to wall intersections.
Venting: Factory finish painted small animal proof roof vents AND Ridge vent as existing.
Nailing: 6 nails per shingle.
Shingles: See choices below.
Hip/Ridge: To match shingles.
Warranty: Five - Year Workmanship through Tiley Roofing.
OR
Best - Upgraded Roof Package
Underlayment: 2 layers of synthetic underlayment with Ice and Water at eaves, valleys, crickets, chimney and skylights (as existing).
Flashing: 26 gauge factory finish color in your choice of white, charcoal gray, bronze, or brown drip edge, rake edge flashing, headwall, and
step flashing. Replacement of all roofing jacks which will be painted to match shingles. Surface mounted visible flashing may be required at
roof to wall intersections.
Venting: Ridge Vent and roof vents.
Nailing: 6 nails per shingle.
Shingles: See choices below
Hip/Ridge: Raised Hip/Ridge to match shingles.
Warranty: Five to Twenty Five -Year Workmanship through the manufacturer. Please call for details.
Specific Job Notes and Details
Existing roof package highlighted in Bold Below.
Please let me know if you need assistance with your insurance claim (if applicable), would like to visit our showroom, have
samples delivered to your home, or have any additional questions or concerns.
Clarifications Prior to Contract
Chimney repairs reusing flashing (previous damage) and Caution with exposed soffits/ceiling.
Colors and options.
Gutters/Downspouts.
Counter and chimney flashing.
Schedule/Access.
Page 1 of 3
Below are hyperlinks to connect you to the particular product you may be interest in, just click and go. There is also a general picture of the
product.
919
PREMIUM DIMENSIONAL LAMINTATES • Highest grade:Dimensional's upgrade 11 thickness and wind warranty.
SHINGLE TYPE BETTER. BEST
GAF Timberline HD ULTRA; $18,637 $20,899
Owens Corning TruDef Duration Desig $18,626 $20,888
Certainteed Landmark Premium: 14,18,626 $20,888
aT3hi �� as w `J�i.,a n[X ffe1
Your baalinveslmanl tar an
a-tl,mansiena� wcetl-shako
look.
DESCRIPTION OF AVAILABLE OPTIONS
Gutters/Downspouts: 26 gauge pre -painted S' K -style gutters and 2"x3" corrugated downspouts. The same gutter configuration will be used
unless otherwise instructed. INCLUDES replacement of 3 downspouts all others to be REUSED (per insurance claim).
Gutter Screen: Metal gutter screen to reduce debris build-up in the gutters. Gutter screen still requires some maintenance and may cause
additional icicle formation.
Leaf Proof: Install solid advanced gutter protection system with solid cover to reduce debris build-up in the gutters. Gutter cover still requires
some maintenance and may cause additional icicle formation. Available in 12 standard colors.
Rain Barrel: Install (1) 50 Gal. Rain Barrel, includes brass spigot (Whiskey barrel style) with black stand and downspout diverter kit. Available in 4
stock colors, excludes hoses or any other accessories not mentioned, also excludes landscaping alterations.
Chimney Cap: Furnish and install sheet metal cap on the chimney in your color of choice (stock standard 26g).
Below are hyperlinks to connect you to the particular product you may be interest in, just click and go. Please note this is for a general
product description. Specific product can vary,in appearance based on manufacturer.
Contract Amount:
Customer Signature:
Shingle Type:
Shingle Color:
Options:
OPTIONS-
COST (add ons)
OPTION COLOR SELECTION
GutiersLDow_nspouts;
$1,347
Color:
GutlecSueen.-
$585
add on
Leaf Proof:
$3,071
add on Color
Rgin..Barrel:
$496
add on per unit Color
ChimneyCa.p:
$675
add on per unit
TBD based upon roof package and options
We must have all these items in order to schedule your project.
_Confirm your selection with your HOA if applicable.
_Please highlight the Roof Package and Options and write in the color selections.
_Please return a signed copy also confirm you have read the terms, conditions, and information page.
We must have color and option selections to accurately schedule your job.
Please confirm all of your insurance claim documentation is complete (if applicable).
s h,
*cam °tea
Page 2 of 3
TERMS. GONDITIONS-AND ADDITIONAL INFORMATION
Price is good for: 30 days
Access: Price is based on direct roof access with a dumpster next to the house (for safety, ease of access) and conveyor truck loading materials.
Payment Terms: We must have a signed copy to schedule work. 50 % payment of the contract amount is due upon material arrival, 90% is due upon substantial completion. 10%
can be withheld until inspection/punch list is complete. Contract becomes binding upon written acceptance or commencement of work. Interest on all overdue amounts shall be
added at the rate of 18% per annum. Owner agrees to pay for costs and fees that maybe incurred by contractor to enforce the terms of this contract. Price is based on cash or
check. Credit card purchases are accepted. If Tiley Roofing Inc. and owner of the above mentioned property need to go into mitigation. homeowner agrees to cover costs
associated with mitigation.
Master Agreement Amendment
Our proposal should be an amendment to any master agreement. The following conditions also apply: Five days will be allotted to dispute any pay application otherwise the pay
application will be considered to be accepted. If 30 days terms are not met late fees may apply as well as stoppage of work with a five day notification.
Additional Information: Please call and ask about possible upgrades, extended warranties, and different types of shingles that are available. Please note bronze counter flashing
maybe used at roof to wall intersection if notable to install under siding. It is common for granules to be dispersed near downspouts after a new installation and rainfall.
Inclusions: Fasteners, sealants, permit (reroof only), sales tax, workers compensation, liability insurance and landscape protection (reroof only). Note for insurance claim projects
we will supplementally bill your insurance proAderfor the permit. Price is based on direct roof access with a dumpster next to the house and conveyor truck loading.
Exclusions: Roof deck replacement. Roof deck replacement is $60.00 per sheet and done only upon notifying the customer. Siding repair from installation of flashing maybe
additional. Driveway damage, correction of structural imperfections, and additional hidden layers of roofing will cost extra upon notifying the customer. Leaks and icicles created
by snow or ice damming. Unwanted animal entry, tree or vegetation damage to the roof covering or acts of God. Satellite Dish adjustment or reinstallation. Electrical most
disconnection or connection. Drywall, texture or painting. Additional work other than specifically mentioned (HVAC. electrical, woodwork, painting) or any other home repairs or
replacement. Leaks caused be re-using existing skylights are excluded due to the process necessary and disturbance that could cause the failing of existing skylights that may not
have previously leaked. If an estimate for a new skylight has not been provided please request one from your estimator. Please call for any additional clarification. Excludes
engineering or correction of structural imperfections. Owens responsible for all color choices. Snow or Ice damage as a result of weather to shingles or gutters is excluded as well as
Engineered snow retention. unless otherwise indicated. Ventilation design or environmental engineering is excluded. please call regarding consulting with structural engineer or net
free ventilation recommendations.
New Construction Information: Snow removal or work in severe conditions is excluded. Trip charges may apply if project is not ready for our scope of work. Please contact TRI prior
to commencement of work as to necessary preparatory measures needing to be complete). Project is based on accessibility with a conveyor loading truck. Temporary
waterproofing for new construction projects. Permit to be provided by Contractor (except Denver) unless specifically mentioned otherwise.
Safety: Tiley Roofing may choose to install permanent anchors on your roof. These anchors should not be used by anyone other than Tiley Roofing Employees.
Colorado Law. All provision of CRS 18.13.13.119.5 "Abuse Of Property Insurance' SB-33 senate bill 38) Concerning measures to protect consumers who engage a roofing contractor
to perform roof services on residential property are included, attached in initial brochure/packet (insurance provider information including workers compensation, automobile and
general liability insurance). incorporated in job information, scope of work or additional information wording and are to be considered part of this contract in compliance with
Colorado Revised Statutes. Additional stipulations are as follows: upon acceptance of contract initial job cost, terms and conditions, property owner has the right to rescind
contract within 72 hours, cancel all conditions and receive refund of any deposit (if applicable). Typical time frame for job completion upon acceptance, material availability, work
load, pending weather (acts of God) delays and work commencement are as follows. Tile roof installations 2-4 weeks, shingle roof Installations 1-2 weeks, small repairs 1-3 days.
large repairs 4-10 days. Contractor cannot pay or waive all or part of a property owners insurance deductible, provide any rebating directly or indirectly to compensate, eliminate
or offset owners obligations to pay deductible. Please call or email for clarifications, explanations or any additional information regarding Consumer Protection 5838 Compliance.
Lead: For houses built prior to 1978 there is a high probability lead may have been used to paint the exterior. We are required to use certain techniques to ensure the lead is
correctly removed when the amount disturbed exceeds twenty square feet. Typically the amount of paint disturbed is negligible if just the roof is being replaced but almost always
the case if gutters or siding are being removed. Tiley Roofing is a lead certified renovation firm allowing us to perform this procedure. Prior to contracting please let us know if your
house was built prior to 1978. If the house Is pre-1978 we will perform a lead test. If the testis positive for lead we will assess a fee in addition to the above costs. Generally this fee
ranges from $500 to $1000.
Insurance Claims: Owner is responsible to verify insurance settlement payment is sufficient to cover contract amount.
Owner is responsible for any difference. Owner is responsible for any Non Recoverable Depreciation. Owner is responsible for deductible payment. Pursuant Colorado Statutes all
insurance claim payments must be in the form of check only,
Owner is responsible for any code compliance or ordinance of law payment difference with Actual Cash Value Policies, please call for more details. If any additional damage or
costs are identified, for which you believe your insurer is responsible for, they must be approved by a representative of your insurance provider prior to having the additional work
done. If you have any questions please contact your Tiley Roofing estimator.
Page 3 of 3
r
A City of Wheat Ridge
Residential Roofing PERMIT - 201706773
PERMIT NO:
201706773
ISSUED: 08/31/2017
JOB ADDRESS:
62 Hillside DR
EXPIRES: 08/31/2018
JOB DESCRIPTION:
Residential Re -roof to install certainteed
presidential shake asphalt
shingles with 40sq
pitch 2/12
*** CONTACTS ***
OWNER (303)881-4620
MASCARENAZ JAMES
DANIEL/MELODY
SUB (303)426-7370
Kirk Tiley
021395 Tiley Roofing Inc.
*** PARCEL INFO ***
ZONE CODE:
UA / Unassigned
USE: UA / Unassigned
SUBDIVISION CODE:
2404 / APPLEWOOD
KNOLLS, PARAMOUNT
HE BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
ESTIMATED PROJECT VALUATION: 13,504.00
FEES
Total Valuation
0.00
Use Tax
283.58
Permit Fee
267.70
** TOTAL **
551.28
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Midroof & Final Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be
required, the 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped
off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the
Homeowner.
� t A i City of Wheat Ridge
d�V,
Residential Roofing PERMIT -201706773
PERMIT NO: 201706773 ISSUED: 08/31/2017
JOB ADDRESS: 62 Hillside DR EXPIRES: 08/31/2018
JOB DESCRIPTION: Residential Re -roof to install certainteed presidential shake asphalt
shingles with 40sq
pitch 2/12
I, by my signature, do hereby attest that the work
applicable building codes, and all applicable mun
by the legal owner of the property and am auth&
thispermit. I further attest that I am le ally autho
performed and that ado;to eU� 000njWd is di
performed shall comply with all accompanying approved plans and specifications,
codes, policies and procedures, and that I am the legal owner or have been authorized
> obtain this permit and perform the work described and approved in conjunction with
to include all entities named within this document as parties to the work to be
;d in this document and/or its' accompanying approved plans and specifications.
Signature of 'OWNER or CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in the permit application and accompanying Flans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and maybe subject to a fee equal to one-half of the originalpermitfee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable code or, any ordinance or regulation of this jurisdiction. Approval of work is subject to f any
inspection.
Signature of Chief Building Official °'^F Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan SchultzL���
From: no-reply@ci.wheatridge.co.us
Sent: Monday, August 28, 2017 8:48 AM
To: CommDev Permits
Subject: Online Form Submittal: Residential Roofing Permit Application v
Categories: Danny
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
J
Property Address 62 Hillside Dr. Wheat Ridge, CO 80215
Property Owner Name Melody Mascarenaz
Property Owner Phone 303-881-4620
Number (enter WITH
dashes, eg 303-123-4567)C ` 2
1 Q_J
157
Property Owner Email
Address
Do you have a signed
contract to reroof this
property?
Applications cannot be
submitted without an
executed contract
attached below.
melody2003@comcast.net
Yes
Attach Copy of Executed 20170828084251577.pdf
Contract
CONTRACTOR INFORMATION
Contractor Business Tiley Roofing Inc.
Name
Contractor's License 021395
Number (This is a 5 or 6
digit number for the City
of Wheat Ridge)
Contractor Phone 303-426-7370
Number (enter WITH
dashes, eg 303-123-4567)
Contractor Address 5399 FEDERAL BLVD
(Primary address of your
business)
Contractor Email Address mglenn@tileyroofing.com
Retype Contractor Email mglenn@tileyroofing.com
Address
DESCRIPTION OF WORK
TOTAL SQUARES of 40 ii/
the entire scope of work:
Project Value (contract13504
value or cost of ALL
materials and labor)
Are you re -decking the No y
roof?
158
Does the scope of the No
project include a flat roof
(less than 2:12 pitch)?
Does the scope of the
project include a pitched
roof (2:12 or greater
pitch)?
How many squares are
part of the pitched roof?
Describe the roofing
materials for the pitched
roof:
Type of material for the
pitched roof.
Provide any additional
detail here on the
description of work. (Is
this for a house or
garage? What is the roof
pitch? Etc)
Yes V/
40
Certainteed Presidential Shake
Asphalt
Home, 2/12
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work
may not begin on this
property until a permit
has been issued and
posted on the property.
Yes
Yes
Yes
159
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
Name of Applicant Michael Glenn
Email not displaying correctly? View it in your browser.
160
97 IN,I
A full-service residential and commercial ROOFING and gutter contractor.
303-426-7370 (o) 1303-426-0312 (f) 3 5399 Federal Blvd., Denver, CO 80221 1 email filey konrFit+1G
JOB_INFORMATION
Submitted To:
Melody Moscarenaz
Proposal Date:
01/00/00
Jobsite Address:
62 Hillside Dr, Wheatridge, Co 80215
Client Email:
melody2003@comcast.nef
Client Phone:
303-881-4620
Estimator:
Tony Miller 303-249-8151 Cony@tileyroofing.com
Roof Area (sq. ft.):
4000
Roof Pitch: 2/12
Removal Layers: 1
There are multiple pages to this proposal.
At Tiley Roofing we like to provide our clients with several alternatives to ensure you are getting the roof that best fits your needs. Below is a
choice of a "Better" and "Best' package, several shingle product choices, and add on options to accommodate those needs.
Roof Hyperlink Photos: https://app.companycam.com/galleriesilPiCbVVDGcgE
I SCOPE OF WORK AND MATERIALS I
Existing Roof Condition: Hail damage noted throughout the roof area.
Existing Leaks with Location: None reported.
Demoliffon: Removal and disposal of existing layers (roof covering) specified above and 1 layer roof underlayment. Additional hidden layers
may be difficult to determine until demolition process. Charges for these hidden layers may apply.
Better - Standard Roof Package
Underlayment: 2 layer of synthetic underlayment over entire low slope with 2 rows Ice and water on eaves installed per local building code,
row at crickets, chimneys and skylights (if they exist).
Flashing: 26 gauge factory finish bronze (dark brown) color drip edge, rake edge flashing, headwall, and step flashing. Replacement of all
roofing jacks which will be painted to match shingles. Surface mounted visible flashing may be required at roof to wall intersections.
Venting: Factory finish painted small animal proof roof vents AND Ridge vent as existing.
Nailing: 6 nails per shingle.
Shingles: See choices below.
Hip/Ridge: To match shingles.
Warranty: Five - Year Workmanship through Tiley Roofing.
OR
Best - Upgraded Roof Package
Underlayment: 2 layers of synthetic underlayment with Ice and Water at eaves, valleys, crickets, chimney and skylights (as existing).
Flashing: 26 gauge factory finish color in your choice of white, charcoal gray, bronze, or brown drip edge, rake edge flashing, headwall, and
step flashing. Replacement of all roofing jacks which will be painted to match shingles. Surface mounted visible flashing may be required at
roof to wall intersections.
Venting: Ridge Vent and roof vents.
Nailing: 6 nails per shingle.
Shingles: See choices below
Hip/Ridge: Raised Hip/Ridge to match shingles.
Warranty: Five to Twenty Five -Year Workmanship through the manufacturer. Please call for details.
Specific Job Notes and Details
Existing roof package highlighted in Bold Below.
Please let me know if you need assistance with your insurance claim (if applicable), would like to visit our showroom, have
samples delivered to your home, or have any additional questions or concerns.
Clarifications Prior to Contract
Chimney repairs reusing flashing (previous damage) and Caution with exposed soffits/ceiling.
Colors and options.
Gutters/Downspouts.
Counter and chimney flashing.
Schedule/Access.
Page 1 of 3
Below are hyperlinks to connect you to the particular product you may be interest in, just click and go. There is also a general picture of the
product.
919
PREMIUM DIMENSIONAL LAMINTATES • Highest grade:Dimensional's upgrade 11 thickness and wind warranty.
SHINGLE TYPE BETTER. BEST
GAF Timberline HD ULTRA; $18,637 $20,899
Owens Corning TruDef Duration Desig $18,626 $20,888
Certainteed Landmark Premium: 14,18,626 $20,888
aT3hi �� as w `J�i.,a n[X ffe1
Your baalinveslmanl tar an
a-tl,mansiena� wcetl-shako
look.
DESCRIPTION OF AVAILABLE OPTIONS
Gutters/Downspouts: 26 gauge pre -painted S' K -style gutters and 2"x3" corrugated downspouts. The same gutter configuration will be used
unless otherwise instructed. INCLUDES replacement of 3 downspouts all others to be REUSED (per insurance claim).
Gutter Screen: Metal gutter screen to reduce debris build-up in the gutters. Gutter screen still requires some maintenance and may cause
additional icicle formation.
Leaf Proof: Install solid advanced gutter protection system with solid cover to reduce debris build-up in the gutters. Gutter cover still requires
some maintenance and may cause additional icicle formation. Available in 12 standard colors.
Rain Barrel: Install (1) 50 Gal. Rain Barrel, includes brass spigot (Whiskey barrel style) with black stand and downspout diverter kit. Available in 4
stock colors, excludes hoses or any other accessories not mentioned, also excludes landscaping alterations.
Chimney Cap: Furnish and install sheet metal cap on the chimney in your color of choice (stock standard 26g).
Below are hyperlinks to connect you to the particular product you may be interest in, just click and go. Please note this is for a general
product description. Specific product can vary,in appearance based on manufacturer.
Contract Amount:
Customer Signature:
Shingle Type:
Shingle Color:
Options:
OPTIONS-
COST (add ons)
OPTION COLOR SELECTION
GutiersLDow_nspouts;
$1,347
Color:
GutlecSueen.-
$585
add on
Leaf Proof:
$3,071
add on Color
Rgin..Barrel:
$496
add on per unit Color
ChimneyCa.p:
$675
add on per unit
TBD based upon roof package and options
We must have all these items in order to schedule your project.
_Confirm your selection with your HOA if applicable.
_Please highlight the Roof Package and Options and write in the color selections.
_Please return a signed copy also confirm you have read the terms, conditions, and information page.
We must have color and option selections to accurately schedule your job.
Please confirm all of your insurance claim documentation is complete (if applicable).
s h,
*cam °tea
Page 2 of 3
TERMS. GONDITIONS-AND ADDITIONAL INFORMATION
Price is good for: 30 days
Access: Price is based on direct roof access with a dumpster next to the house (for safety, ease of access) and conveyor truck loading materials.
Payment Terms: We must have a signed copy to schedule work. 50 % payment of the contract amount is due upon material arrival, 90% is due upon substantial completion. 10%
can be withheld until inspection/punch list is complete. Contract becomes binding upon written acceptance or commencement of work. Interest on all overdue amounts shall be
added at the rate of 18% per annum. Owner agrees to pay for costs and fees that maybe incurred by contractor to enforce the terms of this contract. Price is based on cash or
check. Credit card purchases are accepted. If Tiley Roofing Inc. and owner of the above mentioned property need to go into mitigation. homeowner agrees to cover costs
associated with mitigation.
Master Agreement Amendment
Our proposal should be an amendment to any master agreement. The following conditions also apply: Five days will be allotted to dispute any pay application otherwise the pay
application will be considered to be accepted. If 30 days terms are not met late fees may apply as well as stoppage of work with a five day notification.
Additional Information: Please call and ask about possible upgrades, extended warranties, and different types of shingles that are available. Please note bronze counter flashing
maybe used at roof to wall intersection if notable to install under siding. It is common for granules to be dispersed near downspouts after a new installation and rainfall.
Inclusions: Fasteners, sealants, permit (reroof only), sales tax, workers compensation, liability insurance and landscape protection (reroof only). Note for insurance claim projects
we will supplementally bill your insurance proAderfor the permit. Price is based on direct roof access with a dumpster next to the house and conveyor truck loading.
Exclusions: Roof deck replacement. Roof deck replacement is $60.00 per sheet and done only upon notifying the customer. Siding repair from installation of flashing maybe
additional. Driveway damage, correction of structural imperfections, and additional hidden layers of roofing will cost extra upon notifying the customer. Leaks and icicles created
by snow or ice damming. Unwanted animal entry, tree or vegetation damage to the roof covering or acts of God. Satellite Dish adjustment or reinstallation. Electrical most
disconnection or connection. Drywall, texture or painting. Additional work other than specifically mentioned (HVAC. electrical, woodwork, painting) or any other home repairs or
replacement. Leaks caused be re-using existing skylights are excluded due to the process necessary and disturbance that could cause the failing of existing skylights that may not
have previously leaked. If an estimate for a new skylight has not been provided please request one from your estimator. Please call for any additional clarification. Excludes
engineering or correction of structural imperfections. Owens responsible for all color choices. Snow or Ice damage as a result of weather to shingles or gutters is excluded as well as
Engineered snow retention. unless otherwise indicated. Ventilation design or environmental engineering is excluded. please call regarding consulting with structural engineer or net
free ventilation recommendations.
New Construction Information: Snow removal or work in severe conditions is excluded. Trip charges may apply if project is not ready for our scope of work. Please contact TRI prior
to commencement of work as to necessary preparatory measures needing to be complete). Project is based on accessibility with a conveyor loading truck. Temporary
waterproofing for new construction projects. Permit to be provided by Contractor (except Denver) unless specifically mentioned otherwise.
Safety: Tiley Roofing may choose to install permanent anchors on your roof. These anchors should not be used by anyone other than Tiley Roofing Employees.
Colorado Law. All provision of CRS 18.13.13.119.5 "Abuse Of Property Insurance' SB-33 senate bill 38) Concerning measures to protect consumers who engage a roofing contractor
to perform roof services on residential property are included, attached in initial brochure/packet (insurance provider information including workers compensation, automobile and
general liability insurance). incorporated in job information, scope of work or additional information wording and are to be considered part of this contract in compliance with
Colorado Revised Statutes. Additional stipulations are as follows: upon acceptance of contract initial job cost, terms and conditions, property owner has the right to rescind
contract within 72 hours, cancel all conditions and receive refund of any deposit (if applicable). Typical time frame for job completion upon acceptance, material availability, work
load, pending weather (acts of God) delays and work commencement are as follows. Tile roof installations 2-4 weeks, shingle roof Installations 1-2 weeks, small repairs 1-3 days.
large repairs 4-10 days. Contractor cannot pay or waive all or part of a property owners insurance deductible, provide any rebating directly or indirectly to compensate, eliminate
or offset owners obligations to pay deductible. Please call or email for clarifications, explanations or any additional information regarding Consumer Protection 5838 Compliance.
Lead: For houses built prior to 1978 there is a high probability lead may have been used to paint the exterior. We are required to use certain techniques to ensure the lead is
correctly removed when the amount disturbed exceeds twenty square feet. Typically the amount of paint disturbed is negligible if just the roof is being replaced but almost always
the case if gutters or siding are being removed. Tiley Roofing is a lead certified renovation firm allowing us to perform this procedure. Prior to contracting please let us know if your
house was built prior to 1978. If the house Is pre-1978 we will perform a lead test. If the testis positive for lead we will assess a fee in addition to the above costs. Generally this fee
ranges from $500 to $1000.
Insurance Claims: Owner is responsible to verify insurance settlement payment is sufficient to cover contract amount.
Owner is responsible for any difference. Owner is responsible for any Non Recoverable Depreciation. Owner is responsible for deductible payment. Pursuant Colorado Statutes all
insurance claim payments must be in the form of check only,
Owner is responsible for any code compliance or ordinance of law payment difference with Actual Cash Value Policies, please call for more details. If any additional damage or
costs are identified, for which you believe your insurer is responsible for, they must be approved by a representative of your insurance provider prior to having the additional work
done. If you have any questions please contact your Tiley Roofing estimator.
Page 3 of 3