HomeMy WebLinkAbout5260 W. 29th AvenueD DENVER WATER
December 13,2021
City of Wheat Ridge
Community Development Department
Planning Division
7500 W. 291 Ave., Wheat Ridge, Co 80033
303-234-5931
RE: STRUCTURAL DESIGN CALCULATIONS FOR PERMIT APPLICATIONII:202102361
To whom it may concern:
16DDw.12 hA,e.
Denser, 00 8020-M12
303.628£000
den,emater.org
Denver Water is seeking a general building permit for a small in-house capital improvement project to replace existing
HVAC equipment at it's Ashland Decentralization Station. The existing units will be replaced in kind but in a new safer to
access location.
Structural Engineering designs pertaining to the alteration of the existing roof forthe new RTU's are provided on
Drawing M-4 of the submitted plan set in terms of plan notes and layout of the supplemental framing and Drawing M-5
in terms of the detailing for the installation of the supplemental framing. I, a Structural Engineer licensed in the State of
Colorado, have signed and sealed Drawing M-5.
Per Note 2 on Drawing M$ I have performed structural analysis for the existing steel joists that will receive new
concentrated live loads for the rooftop HVAC units that are in addition to the existing roof dead, superimposed dead,
and live/ snow loads. Analysis has shown that the existing roof joists are sufficiently sized to safely support the HVAC
units within acceptable strength and serviceability limits per Cade and best practice. The calculations for this analysis
and design drawings are attached for your reference.
The design area loads for the Joists are:
Dead t Supplemental Hanging Loads = 25 psf
Live/ Snow: 35 psf (unreducible)
The Live loads for the existing monorail and the RTU's are noted on the attached Drawing M4.
Per the attached calculations, the new loads do not exceed the allowable loads or stresses for the strength or deflection
limits for the steel joists as provide by the attached load tables from the applicable 1994 Steel Joist Manual.
I appreciate your concerns and will gladly discuss this matter with you further as necessary.
Sincerely,
Sean C. Hansz
Denver Water
Infrastructure Engineering
OFIWTm BAY
— [pS, OI
—EXIST ACS LANK , NOW
TENLCOM EXT TO Q►
WHY NET IWKETP
► HOrzD`ra1
TOO* � I
b y Ira) I I
I' in III
MI
S I I
i
w Rnl I
B
I
nn'OTTO� MONI" I_
I•
1Y -Or Imm)
n l I C9WO I
L
� EXISTING W1AX22 Rnz I
NOW rSTEMBEAM _el
/A.
I
n IKOWw�sv
I
FITAINIW
ING — —
MON —
O
MON OF io, It
IRE % Hmw
�q RIDS
— _ DDENVERWATER
12M Aw
- �► 006 0kIII M-6 M-6 CONOTTYANT
_
�OW
W
NOW 1 (TWO rg
OTT
y m l
111.0'
&M LlSig
A
I
F111111 DECENTRALIZATION
_ STATION
CURBu A EIGHT-1211NIT WEIGHT. 5L&S HVAC REPLACEMENT
CURSWEIOM=121LWTOTALWEIGHT•SPT183
hPOINT LOAD ATa COgNERS=2623
-.+=rl
�w%� ri . TI ST YP Of
axon. FL" acws,.ornox
DOT
WANT
RN289 UNIT WEIGHT=BSI LBS
CURB WEIGHT• 91 LITS
TGWLWEIGHT• BBB LBS
POINT LOAD ATO CORNERS =172183
0
��
VIAIA' SG1LR
NNAX 1Wi)
t SUL ROOT SHORT cTn-7 Y-2 W-11 ii/�::# 1 PRINT) PlAft VITT
I
INDICATES SPAN OIREGRCN µY MAUI
ATI
OF EXISTING 1 1/2 INCH Atw
PLAN WE B GALVANIZED STEEL
SCAIF J/8' I'-0' NOW DECKING UAIIXWF
1, PRONOE AODITONAL STEEL FRAMING FOR ROOT DECK AND HMC UNIT SUPPORT AND DUCTWORK PENETRATIONS PER ®. 8. REPAIR Of THE ROOF GONER SEALED PENETRATIONS AND AROUND NEW HVAC UNITS TO BE PERFORMED BY A PROFESSORIAL
RUCH EQUIPMENT CURB EDGE MM CENTER OF EXISTING STEEL JOIST BELOW. ROOFING COMPANY IN ACCORDANCE MM ME DENVER WATER CAPITAL PROJECTS CONSTRUCTION STANDARDS SPECIRCATON
SECTION 07 51 13 i0 NOT MET THE EXISTING ROOFING WARRANTY. "AWLT IF
2, EXISTING STEEL JOISTS APE DESCNAMD 1YHW PER WE STEEL DOST INSTITUTE (SUN AND WERE DETERMINED i0 8E
ADEQUATE TO SUPPORT THE HVAC UNIT WEIGHTS BY ANALYSIS T. DUCT DMENSONS SHOWN ARE CLEAR INTERNAL DIMENSIONS NOT INCLUDING INSULATION LINER. DUCTS SHALL BE FABRICATED
IN ACCORDANCE MTI THE LATEST SMACNA DUCT CONSTRUCTION STANDARD,
1 EXISTING CONCRETE MASONRY UND PARAPET WALL HEIGHT RELATIVE N ROOF SURFACE VARIES MICALLY LESS MAN IB
INCHES 1ERIEY IN FIELD,
PARTIAL ROOF PLAN
4 APPROXIMATE PAIN OF EXISTING MONORAIL FRAMING BELOW MONORAIL OPERATING UFi CgpgCltt 15 TONS.
5 00 NOT CUT WROUGHT ANY EXISTING STEEL FRAMES BELOW ROOF MIEN MAKING PENETRATIONS Si OETWI-S [�
AND FOR REPAIR OF RCODNG AT HVAC UNITS AND AT CONDUIT PENETRATIONS M-4
` 5M'nZ!
NI )
NOTES
I. NL GUARDRAIL COMPONENTS i0 BE FABRICATED
OR STRUCTURAL ALUMINUM.
S COAT PLATE SURFACES IN CONTACT NTH WALL
MM 2 COATS OF BITUMINOUS PAINT.
GUARORA/L
SLOE: B�J
mvs AND
HVAC
STANDARDS Do PETRA
��
MUCH MIT
�1gu
ED, RM NOTE A,
a
a� ,w.
(ME TUBE)
EAST4-my
P. SUCCEED
SUR
I 4 -PLY SUP OVER
HIS UP
STREET FOR BINARY -
I�O
°
LAPPEDY
PRL
GPNL MUST
�CAM)
H10 _
c1 (TM) Ire
a RPE LTM)
----
------- -----_—_
PACT CUT
LWs rn.w
AEAST
EASE NOTE1)~�
Ire
.a-
wi1(2,
8
� )11
SroUM
r
Ire. xo1E UD
PI ft CUBA
T b
B
PEI PLAN AT
Typ A USE UP PRESS [�ffi]
AZ
RUNS OU
SEATS 1)
may)
a PAST GAS
m(rn
POP AME XXXX
PRESS AN SPEAK PLUS
NE (reHAENDSr
ANSI
T
I, POG} DECK AND ROOFING NOT SHONN SEA CLARITY, MEPON ROWING REQUIREMENTS
n
f�
ROOD COAT AND G ATEL NOT $HI MJ FOR CLARITY.
2. TOLD SCARY LOCATIONS RHODE EXISTING STEEL ANGLE OR LOST IS USED TO SUPPORT NEN
SEECONCMTP^�
1V4 CAR
.a
EOWMENI. CB1NN APPROVAL FROM ENGINEER i0 REUSE EXISTING STEEL TIMING,
NOTE. CAT BOTH
CONDITION.
}, LOCATE STEEL FRAMING EACH SDE OF MRS IN ACCMDANCE MM MECHANICAL UWi MANUFACTURER.
DETAIL APPLIES FX CONCENTRATED LOADS GREATER
ME
DETAILS
THAN 100 LBS TO A MAXIMUM OF ME I8G MAXIMUM
xo suLE
A COAT STEEL FRAMING TO MATCH EXISTING STEEL BOARDS IN ACCORDANCE MTH SPECIFICATION
OR 2 LOADS PER ART UNLESS NOTED OMERMSE,
SECTION 09 90 W. SKTEM NUMBER 102,
JOIST REINFORCEMENT
AS
FRAMING AT MECHANICAL ROOF—TOP UNIT =
SCALL: r - 1'-0'
FOR NEW CONCENTRATED
No SCATS
mvs AND
HVAC
STANDARDS Do PETRA
��
o ESTEPA
SEED ALAN PER
5 HO -ED
EAST4-my
SUR
I 4 -PLY SUP OVER
PSOHING CEMENT
STREET FOR BINARY -
I�O
°
LAPPEDY
INSULL TO
MERTCH
C9iT MN. MCT US CEMENT
H10 _
30 MILTZ HART
I ST NT
muR moHxD Em
4* CANT
AD MINAS
IGMP-M
NN UPSIDE
AEAST
EASE NOTE1)~�
EAST 4 PLY BUR
MENERANE POP
"40"CA"T"
8
AMC STAR,
PI ft CUBA
T b
B
AW
SEATS 1)
m(rn
POP AME XXXX
PRESS AN SPEAK PLUS
ANSI
S,�MDUCT
HVAC wve
NOT
El
ROOD COAT AND G ATEL NOT $HI MJ FOR CLARITY.
GRAVEL OVER ROOFING 10 MATCH EXSTNG
RESTORE GUYEL OAER ROARING TO MATCH EXISTING
7
L
CONDITION.
PENETRATION=
ME
DETAILS
xo scA-I,
xo suLE
MET STL
M-5
AS
Z
PUT [ea
a'.I/4' m
xvec
eu0
KETPACT
KIT PACT
aHL
P. Yd{'
(nT EA [w)
mI A
OSE
IeGo THUMP
OPN6 (NExUr
Y
2)
I PVi DESK Do OA TATE: B)
�'WvST
MG OR END
R 1 EE
�Trn�,N
MET STL
OUTPUT TOW/
02EASEMS ra � a
FAEK
T
RM O
5 x/ 00 BE, ttRK 01Y MAX
SPA W MN PER SIDE. 5¢ NOS[ 2)
NOTE5.
1. FASTEN EMSPNG POC} SEEM AT DUCT OPENING TO STEEL ANDES MM 012
lM SAEWS AT 10 -INCH SPACING (MINIMUM OR 2 SREMS PFR SAE)
Y
1. INSSALL INSULATION IN ACCORDANCE MW SPECIFICATION SECTION 0] TER CO
2 MELD SUPPORT ANGLES TB CODING STEEL LOSING AND i0 EACH OTHER
Y
SIMILAR i0 DETAIL®.
E2,
AT NINGS LEAS THAN4 14 INCHES IN WAR LENGTH I EXISTING
3 BOX INSULATION AND ROOFING NOT SHOWN FOR CLARITY, SEE ®FDA
EL FRAMING, CASEMATE XEUN NOW DECK TO EXISTING PEEIROAMINIMUM Cf
FLASHING AND ROOF REPAIR RELATIONSHIPS.
I INCHES EACH END AMD YW RE TO EXISTING DECK AT M RUES AS NOTED.
ROOF OPENING MULL I= ROOF
DECK SUPPORT AT DUCT PENEMON2�
No SCALE
NO SCALE
mvs AND
HVAC
STANDARDS Do PETRA
��
o ESTEPA
xov xuxx
5 HO -ED
TA LET PAT �
USA RUNS FACE MM
PSOHING CEMENT
UDaR<
o�PR�.
C9iT MN. MCT US CEMENT
H10 _
30 MILTZ HART
I ST NT
REVISIONS
4* CANT
AD MINAS
POLICIES NIELSEN LATE PLAMEN
MEMPAREDom"
YIALA'NA1LR
EAST 4 PLY BUR
MENERANE POP
"40"CA"T"
AMC STAR,
PI ft CUBA
I uv PAM
AW
m(rn
POP AME XXXX
PRESS AN SPEAK PLUS
ANSI
S,�MDUCT
HVAC wve
NOT
IAT AND GRAVEL NOT SMOMI fFERE CLARITY.
ROOD COAT AND G ATEL NOT $HI MJ FOR CLARITY.
GRAVEL OVER ROOFING 10 MATCH EXSTNG
RESTORE GUYEL OAER ROARING TO MATCH EXISTING
L
CONDITION.
PENETRATION=
CONDUIT FASHINI
DETAILS
xo scA-I,
xo suLE
M-5
(A) (a1 (c
E) F
J )(J.9) ( K) (K.7)( L ) ( M
Or"
AS NOTED ON DRAWING M-4, THE
MONORAIL CAPACITY SHALL BE
POSTED AS 1.5 TONS (3 KIPS)
Roof Framing Plan m-,
-B
NOhI:
R. METAL SEEK:
1. METAL ROOF DUE IB BE NLCMFT 1-19 1" 111 B. N NUDE W.
APPROVED EQUIVALENT.
i. MINI" DIA%IMGM SMEAR CAPACITY SMALL BE 350 PCF. MINI" ORK
U ML 4S MHUM;
a. ATTACK MCA 10 SOPPORTIN CAMBERS MIN 5-5/B INCH 01U ER
WHOLE WELDS PER N INH BIDE JIM MEET.
b. ATTACH WL DEQ TO ENE MOLES MD fl N BRMLLM N
LIMIM its INCH DIAMETER IWYLE VENDS Al IY INCHES
D.C.
L. DIRECTiw ON DICK WAN
CAED OMEN PLANN0NUS SCAT 12 INCHES IONONES O.C.
L.�,� 44 Ew u m
B. ME DEAD MME'
1. IN ADDITION 10 ALL OWLS OMD LM . THE ME STRUCTURE WU BEEN
DESIGNED FDA M=W RAMING OF IS PSF. MY SUBSTIMIDMS OF
ROOFING SHALL BE MINED BY THE STMCTUML OBSERVER.
C. STEEL RUBS:
1. ELEVATION RDF S
M WMURkL ME LB SGMN GN NICNIIFCN0.9t DRAMINS
UNLESS IpiN M STNCNML DRAl THUS: (R MX' -X,)
I. PROVIDE 1/4' M6N PITTED WEB STIFFENERS ON MCN SNE Cf BUM WEBS
IF BMH 15 CONTINUOUS OYER MM.
CAA
1
2
3
4
n, STEM JOISTS
1. UNLESS WO ELSEMIERE ILL 'M' M •N' SERIES JOISTS MSF 2-1/2'
NEP SWIM SEATS: LK' SERIES JOISTS MBE S' MR BFARIM SEATS.
P. JOIST REMAIN FINATIDA GIRO UI PMRITFCNML ORMINS.
3. JOISTS DESIGMTED'EA' IW6RES A BE INN DEEP K SERIES OEM WEB
!RM JOIST,
S. JOISTS (DESIGNATED RBKSP' INDICATES A BB ENOL BEA JOIST Vim
SSPECIAL PECIAL 10 1% ANNOEfPSAUCOF LION MlQJO°FMfNB. RE: NOTES RN
S. JOISTS AN JOIST BRIDGING MALL BE DESIGMN NR THE FOLLOWING NET
UPLIFT LM(DS WF TO WINO:
LE APPLIED WEB THE ENTIRE ME MEA.
b. SS PSE APPLIED AT NOF MEAMNS.
66-0
Ill -O
Ib -d
14$
I4 -d"
15=♦
Is -4
IS' -6
BB2-4
TI -6
dA
w -d.
4L4
6-4
bu
l,-8
ll -b bn
r
lei
Ol st
54 SUITSAR'
I-1Jt
1�
SO
4 ry
ll Myl: .bl W]/dM1
N:4 eiWvp^n
4:/- e:Wti it
NIba31 WRb'0.
WI/..ai rV.tln
NK
Ml�e'fIWWM1
3IvU
S
IMMi M1
a
9
°
4gSt
48
E
i
_-
-
`�
6@
w
f9
(p }.
3
i
NiMc
nEA'a
N
6
r(Mn) Y
_
2
y
0
_
_
s R
o
aiotWt -6)
It
O
i sa
54 Sd
B.nN
Ip Fp if 1 a
-
'i
I
Clp
wk
M
s'-ql
(•Jl
IL
^
Il-16LX 06
d -Nell
a
&
R
N M
I
u
v
„
P
'
.W
4
4
R44 Find
' t I
I
s,
u TYI
-
IRA win BAII
Sa¢.5 Mist rail b.lw N
.wnrtaa r:en 14M Joist pane
wlnn°Jd'°rr. �ON
."°nw.new°i: i..a
In aaewme t. ells 55 p4r EASE le
N follow:
L MgeMlwlart° rail: t k10
81 tlmwn
B. hnl lel to rail: k tips at
old."" or at support
RUa d
ferenarchitectural Brar
atlEltl nal EBtalli w0 requirements
LOS u,
01
a
4 844.N' s
1
sb
=
Ty
- ?
^
a -T
.d €
ss mm
Maelb
5`
T
a
b
V
LI 8
9I S i
4
54
of $
t s
_
J
9I
Rj[
Or"
AS NOTED ON DRAWING M-4, THE
MONORAIL CAPACITY SHALL BE
POSTED AS 1.5 TONS (3 KIPS)
Roof Framing Plan m-,
-B
NOhI:
R. METAL SEEK:
1. METAL ROOF DUE IB BE NLCMFT 1-19 1" 111 B. N NUDE W.
APPROVED EQUIVALENT.
i. MINI" DIA%IMGM SMEAR CAPACITY SMALL BE 350 PCF. MINI" ORK
U ML 4S MHUM;
a. ATTACK MCA 10 SOPPORTIN CAMBERS MIN 5-5/B INCH 01U ER
WHOLE WELDS PER N INH BIDE JIM MEET.
b. ATTACH WL DEQ TO ENE MOLES MD fl N BRMLLM N
LIMIM its INCH DIAMETER IWYLE VENDS Al IY INCHES
D.C.
L. DIRECTiw ON DICK WAN
CAED OMEN PLANN0NUS SCAT 12 INCHES IONONES O.C.
L.�,� 44 Ew u m
B. ME DEAD MME'
1. IN ADDITION 10 ALL OWLS OMD LM . THE ME STRUCTURE WU BEEN
DESIGNED FDA M=W RAMING OF IS PSF. MY SUBSTIMIDMS OF
ROOFING SHALL BE MINED BY THE STMCTUML OBSERVER.
C. STEEL RUBS:
1. ELEVATION RDF S
M WMURkL ME LB SGMN GN NICNIIFCN0.9t DRAMINS
UNLESS IpiN M STNCNML DRAl THUS: (R MX' -X,)
I. PROVIDE 1/4' M6N PITTED WEB STIFFENERS ON MCN SNE Cf BUM WEBS
IF BMH 15 CONTINUOUS OYER MM.
CAA
1
2
3
4
n, STEM JOISTS
1. UNLESS WO ELSEMIERE ILL 'M' M •N' SERIES JOISTS MSF 2-1/2'
NEP SWIM SEATS: LK' SERIES JOISTS MBE S' MR BFARIM SEATS.
P. JOIST REMAIN FINATIDA GIRO UI PMRITFCNML ORMINS.
3. JOISTS DESIGMTED'EA' IW6RES A BE INN DEEP K SERIES OEM WEB
!RM JOIST,
S. JOISTS (DESIGNATED RBKSP' INDICATES A BB ENOL BEA JOIST Vim
SSPECIAL PECIAL 10 1% ANNOEfPSAUCOF LION MlQJO°FMfNB. RE: NOTES RN
S. JOISTS AN JOIST BRIDGING MALL BE DESIGMN NR THE FOLLOWING NET
UPLIFT LM(DS WF TO WINO:
LE APPLIED WEB THE ENTIRE ME MEA.
b. SS PSE APPLIED AT NOF MEAMNS.
SWw. b
CAA
LT -91 eQ,%g m:Of
REFERENCE:
1994 VULCRAFT JOIST CATALOG
red
number=
safe
live load for
STANDARD LOAD TABLE/LONGSPAN
STEELJOISTS,
LH -SERIES
deflection:
L /360
Based on a
Manmum
Albwable Tensile
Stress of
30 ksi
black number
= total safe load
for joist maximum
moment
calculation
Jail[
WMI.Al,
o h
9AFELOAo
Daip^nin'
^ 36 w
A able
OLSM
SPAN
IN FEET
new Ft.
Ircin nm
TB -33
9
]4 I
36 I
116
Or I
3a
I SO
I 40 1
41
43 1
43
Y
Y
4)
Y
MLHW
11
24
Haus
342
aid
1
235
229
24LHN
12
24
14103
419
379 1:MO
3d3
3 )
bLXY
13
24
15100
a
4Y
297
4211
WHY
16
24
20000
904
ON
555
530
504
0
411
382
350
331
308
284
283
245
220
211
1197
184
1Y
bLX%
17
24
22330
fifi5
&i0
813
598
555
E41
518
491
Y0
4Y
5
40]
303
3]3
35]
343
452
421
393
38]
343
320
297
2]8
257
239
223
308
195
182
1)1
161
NLXY
10
24
MEN
)0]
6)]
649
622
50)
572
545
520
497
475
455
435
4O
b3
389
359 '
4N
447
41A
IN
362
330
314
292
272
254
230
222
200
180
184
113
94LHY
21
20
283[0
337 1
313 1
292
272
254
T39
29
209
199
24LX19
23
24ne
596
559
520
500
4]4
439
d09
378
351
326
304
385
206
T48
234
230
NLXll
5
24
31200
927
WO
875
851'829
007
787
768
)34']01
671
942
BI9
590
5%
500
524
688
555
5251
400
472
HB
418
3118 1361
331
315
291
27p
259
243
33-4w)
47
43
Y
M
Y
Y
IV IY
Y
90
51
62
89
94
6i
69
MLXY
13
20
t40]p
33!
219
31LH31
16
9
new
dWRI
]70
263
2358
We
223
21
17
9
21"
ON
404
404
"5
Y7
410
3N
Me
306
3b2
338
32)
1
326
WE
285
267
251
230
222
203
10]
108
t7p
lop
1611
Ill
IB
9
22503
SY
517
490
475
459
430
420
403
'9)
3)1
E]
300
331
340
325
WE
206
268
252
25
221
RN
180
185
175
106
=LHO
21
28
27703
66]
939
612
596
553
540
519
4%
451
453
Mfi
433
415
4m
387
3l4
420
400
375
351
329
300
291
274
258
243
220
216
204
193
199
1]9
29LHlo
9
28
SOON
729
7"
879
651
W5
Wa
576
554
No
513
485
477
431
4"
429
15
YB
439
414
388
984
342
322
309
286
209
255
241
22B
216
201
183
2911411
25
20
3100
7e3
]02
)36
)11
No
ON
62)
000
582
581
540
521
5%
485
NO
d53
490
475
448
423
387
373
51
331
312
284
279
263
249
236
22
31E
MLH12
27
28
357W
857
837
$18
030
M
IN
737
7%
682
656
632
6%
67
566
SY
52]
545
520
496
470
454
45
408
383
361
340
321
53
25
270
266
243
ULH13
5
28
37200
0%
874
654
835
816
7%
762
76G
51
22
N4
NO
643
820
%S
5)]
569
543
518
496
472
452
433
415
396
373
352
332
314
297
281
266
l]JB
1%W
49
50
51
1 52
0
64
b
57
57
95
2Y
59
2q2
Y
234
BI
Y2]
320
99
2110
33LHp8
10
32
46
138
131
12
119
114
108
1N
BB
23LH%
16
32
ll
80
25
2)9
271
52
251
247
240
293
19)Np
114420
1g3�3
127
121
110
1911
321X2
17
32
30000
15a1g5}d
.44`)7
34
te�d]5
2622
]63919
21%1
1333161256
]31X09
31
32
2231
31995543
ppp9
t�tl9b257�0x
489
32565
2039
349]0384
13898
3fi3550134357
81250
zl
3z
z%CO
35z
35322
351psp
19]
z0T
ze]
742'"4
40
i2B
zi]
p1p9�910013]762156441y69)1%9u1H10
206
190
1899
12]9
109
tez3311411
20
32
1000 31000
MI
U2
8
473
NO
443
8
378
385
383
343
3R6
59
92
25551
238
227
208
106
19]
1]9
%1Ht2
37
32
NNW
ORB
11285281
28]
52108
233
31
22MLH13
[SND
40000
384
954
345
3552243
30
32
4(4000
75
7!I
742
715
e
643
921
600
581
5%
531
5P
511
5117
480
gal
461
4Y
420
3%
54
336
319
300
208
275
252
249
238
]311414
33
32
1%0 41910
04000
7%
738
713
55
643
02
I 0
4 6
ON
547
515
495
470
458
4177
74
35
33O
37
321
304
200
51
3211416
36
32
43200
691
4]3
N
791
1776
170
83
725
701
678
83T
635
616
279
532
511
45
422
40]
3
3)4
355
998
92
56
282
Yd6 47 Y
57
W
68
00
61
%
W
N
65
M
1 %
Y
69
70
71
72
36LH%
16
38
iseds 1620
2%
:
200'
2%
23
251
2"
237
230
224
210
212
207
271
195
191
In
169
IN
153
1Y
tY
100
128
122
Ill
112
107
100
99
95
91
WLHY
18
36
161 1500
321
311
52
293
A9
25
283
M
253
2Y
ME
233
97
221
215
US
1N
185
176
160
IN
163
1Y
1"
134
128
123
118
113
100
1N
IN
XLHa0
21
36
350 23700
374
53
52
3Y
333
323
314
'W
M7
2%
42
05
57
140926
214
200
195
106
179
171
163
167
150
1"
IN
133
127
ELH10
21
36
61M 261%
413
401
NO
Us
5]
357
347
90
ME
39
311
301
IDS
273
260
248
236
225
216
200
197
108
180
173
165
159
152
1"
M
31114111
23
5
28W 281
495
d5
1N
461
UB
45
412
401
WE
370
330
50
3Y
35
No
US
297
283
269
257
246
234
94
214
205
196
180
IN
173
160
159
153
3111412
25
36
41M 34100
N3
575
557
NO
523
506
43
478
400
No
437
424
412
41
36
35
3"
330
322
307
292
270
267
255
243
232
222
213
200
185
187
178
ULH13
30
36
Was "IN
697
675
654
600
815
585
%9
582
5Y
UI
516
502
43
476
46
YI
415
395
376
359
342
327
312
288
285
273
262
251
240
231
222
213
MLH14
36
36
dlNa 4"UO
58
755
7SE
706
0&9
31
"1
621
002
584
007
%I
65
No
500
482
466
434
412
382
373
356
58
323
300
296
283
270
258
247
237
220
WLH16
36
5
48!3 46%0
900
795
781
709
7"
721
6%
677
659
697
610
500
583
317
61
536
480
400
MB
14M
413
300
375
388
N2
327
312
299
286
274
263
252
SWw. b
CAA
LT -91 eQ,%g m:Of
Ashland Decentralization Station - HVAC Improvements
Capacity of Existing Roof Joists for Area and Point Loads
Location: Supports portions of RTU -1 and 1.5 Ton Monorail beam load
Joist of this size with the least roof tributary width I.l(`E.
Steel Joist Size 24LH09 ✓ Tom''
Joist Clear span 38.17 feet
joist spacing 3.8334 feet on center 44133
Joist wt 21 plf tvpa2o2t�
roofing weight 25 psf 32.61817
deckweight 2.14 psf1�
roof live or snow load 35 psf
Total Dead Load 125.1 plf
Total Live Load 134.169 plf
Total Load 259.3 plf 98% lbs 47218 M, ft -lbs
Safe Live Load 363 lbs/ft 13856 lbs WI 1994 Table)
Moment of Inertia 576 inA4
Safe Total Load 663 b 25307 Its (SJl 1994 Table) 120745 M, ft -lbs
Live Load Deflection 0.383 L/ 1195
Taal Deflection 0.741 L/618
RTU -1 concentrated load (new)
a= 12 feet from end b= 26.17 feet from span end
Point Load = 231 1Its <--- Load from the HVAC Unit
equivalent uniform load 10.4 plf
max moment 1901 ft -lbs
midspan moment 1386 ft -lbs
Rl concentrated load (new)
a= 16 feet from end b= 22.17 feet from span end
Point Load= 231 lbs <--Load from the HVAC Unit
equivalent uniform load 11.8 PH
max moment 2147 ft -lbs
midspan moment 1848 ft -lbs
1.5 Ton Monorail Point Load (Existing)
a=
19.167 feet from end
b= 19.003 feet from span end
Point Load=
3000 lbs
<-- Load from the monorail
equivalent uniform load
157.2 plf
max moment
28627 ft -lbs
midspan moment
28505 ft -lbs
RESULTS
Taal Live Load
313.6 plf
OK
86% Deflection Check
Total Dead Load
125.1 plf
Total Load
438.7 plf
OK
66% Strength/ Deflection Check
Safe load
663 plf
End Shear Applied
9372 Ins
OK
66% Strength Check
Max Allowable Shear
12653 Its
Total applied moment
78956 ft -lbs
OK
65% Strength Check
Ashland Decentralization Station - HVAC Improvements
Capacity of Existing Roof Joists for Area and Point Loads
Location: Supports portions of RTU -1 and 1.5 Ton Monorail beam load D�LfCf
Joist of this size with the most roof tributary width r•
Steel Joist Size 24LH09
Joist Clear span 38.17 feet m 44733
joist spacing 4.5 feet on center
Joist wt 21 plf121XV2021.
10
roofing weight 25 psf 31.80667 ii/ �\
deckweight 2.14 psf
roof live or snow load 35 psf
Total Dead Load 143.2 plf
Taal Live Load 157.5 plf
Total Load 300.7 plf 11478 lbs 54763 M, ft -lbs
Safe Live Load 363 lbs/ft 13856 lbs WI 1994 Table)
Moment of Inertia 576 inA4
Safe Total Load 663 b 25307 Its (SJl 1994 Table) 120745 M, ft -lbs
Live Load Deflection 0.450 L/ 1018
Taal Deflection 0.859 U533
RTU -1 concentrated load (new)
a= 12 feet from end b= 26.17 feet from span end
Point Load = 130 1Its <--- Load from the HVAC Unit
equivalent uniform load 5.9 plf
max moment 1070 ft -lbs
midspan moment 780 ft -lbs
Rl concentrated load (new)
a= 16 feet from end b= 22.17 feet from span end
Point Load= 130 lbs <--Load from the HVAC Unit
equivalent uniform load 6.6 plf
max moment 1208 ft -lbs
midspan moment 1040 ft -lbs
1.5 Ton Monorail Point Load (Existing)
a=
19.167 feet from end
b= 19.003 feet from span end
Point Load=
3000 lbs
<-- Load from the monorail
equivalent uniform load
157.2 plf
max moment
28627 ft -lbs
midspan moment
28505 ft -lbs
RESULTS
Taal Live Load
327.2 plf
OK
90% Deflection Check
Total Dead Load
143.2 plf
Total Load
470.4 plf
OK
71% Strength/ Deflection Check
Safe load
663 plf
End Shear Applied
$977 Ins
OK
71% Strength Check
Max Allowable Shear
12653 Its
Total applied moment
85088 ft -lbs
OK
70% Strength Check
Ashland Decentralization Station - HVAC Improvements
Capacity of Existing Roof Joists for Area and Point Loads
12 feet
Location: Supports portions of Fill or RTU -3
26.17 feet from span end
Joist of this size with the most roof tributary width
272 Ills
Steel Joist Size 24LH05
Joist Clear span 38.17 feet
C4433
joist spacing 5.17 feet O.C. Joist wt 13 plf
roofing weight 25 psf
1415 ft -lbs
deckweight 2.14 psf
roof live or snow load 35 psf
1032 ft -lbs
Total Dead Load 153.4 plf
Live Load 210 Ibs/ft 8016 Ids WI 1994 Table(
lent of Inertia 333 inA4
Total Load 363 1bs/ft 13856 Its (SJI 1994 Table( 66109 M, ft -lbs
Load Deflection 0.894 L/512
Deflection 1.651 U277
a=
12 feet
b=
26.17 feet from span end
Point Load=
272 Ills
equivalent uniform load
7.8 PH
max moment
1415 ft -lbs
midspan moment
1032 ft -lbs
RTU -2 or 3 concentrated load (new)
a=
16 feet
b=
22.17 feet from span end
Point Load=
172 Ids
equivalent uniform load
8.8 PH
max moment
1598 ft -lbs
midspan moment
1376 ft -lbs
Other Point Load - Not Applicable
a=
0feet
b=
38.17 feet from span end
Point Load=
Olds
equivalent uniform load
0.0 Ph
max moment
0 ft -lbs
midspan moment
0 ft -lbs
RESULTS
Taal Live Load
197.5 plf
OK
94% Deflection Check
Total Dead Load
153.4 PH
Total Load
350.9 pct
OK
97% Strength/ Deflection Check
Safe load
363 plf
End Shear Applied
6697 Ids
OK
97% Strength Check
Max Allowable Shear
6928 Its
Total applied moment
63299 ft -lbs
OK
96% Strength Check
From: no-reolv(alci.wheatridae.m. us
To: CommDev Pets
Subject: Online Form Submittal: General Permit Application
Date: Friday, October 22, 20217:44:13 AM
General Permit Application
This application is exclusively for Scopes of Work that do not already have a
specific form.
YOU MUST ATTACH AN ELECTRONIC PAYMENT FORM IN ORDER FOR THE
PERMIT TO BE PROCESSED.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
WORK UNTIL PERMIT HAS BEEN ISSUED.
PROPERTY INFORMATION
Is the property Commercial
Residential or
Commercial?
Property Address 5260 West 29th Avenue, Wheat Ridge, Colorado, 80214
Property Owner Name Denver Water
Property Owner Phone 303 628 6394
Number (enter WITH
dashes, eg 303-123-
4567)
Property Owner Email
Address
Attach City of Wheat
Ridge Electronic
Payment Form - "DO
NOT ATTACH A
PICTURE OF A
CREDIT CARD"
CONTACT INFORMATION
matt. mcgavin@denverwater.org
Wheat R dae - Flectron c Payment Form - Rey sed 5-1-20
Fillable 202005011620013849 202006081141368198 Dale
Submitting General Denver Water
Contractor or Architect
Contractor's License
Number (This is a 5 or
6 digit number for the
City of Wheat Ridge)
018585
Contract Phone
Number (enter WITH
dashes, eg 303-123-
4567)
Contact Email Address
Retype Contact Email
Address
303-628-6394
maft.mcgavin@denverwater.org
maft.mcgavin@denverwater.org
Check the appropriate Mechanical , Electrical, Plumbing
boxes if the following
work is involved in the
project.
Mechanical Contractor
Name
Mechanical Contractor
License Number (This
is a 5 or 6 digit number
for the City of Wheat
Ridge)
Electrical Contractor
Name
Electrical Contractor
License Number (This
is a 5 or 6 digit number
for the City of Wheat
Ridge)
Denver Water
1111.161.11
Denver Water
018585
Plumbing Contractor Denver water
Name
Plumbing Contractor 018585
License Number (This
is a 5 or 6 digit number
for the City of Wheat
Ridge)
Are there any No
ADDITIONAL Sub
Contractors associated
with this project?
DESCRIPTION OF WORK
Detailed Scope of Replacing existing HVAC units in kind but in new safer to access
Work - Provide a location.
detailed description of
work including
mechanical, electrical,
plumbing work
occurring,
adding/removing walls,
etc.
Square footage of
1810
scope of work
Location of work
Garage/Roof
(backyard, on roof, etc)
Project Value (contract
$145,000
value or cost of ALL
Valuation okay KM 12/15/21
materials and labor)
Upload Engineer letter
Field not completed.
Upload Asbestos
Field not completed.
Report if triggler level is
met per CDPHE
regulation.
Upload Drawings
21116 HVAC ASHLAND FFC SIGNFD Ddf
Upload Additional
Field not completed.
Drawings
Upload Additional
Field not completed.
Drawings
Upload Additional
Field not completed.
Drawings
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full
Yes
responsibility for
compliance with
applicable City of
Wheat Ridge codes
and ordinances for
work under any permit
issued based on this
application.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have Yes
been authorized by the
legal owner of the
property to submit this
application and to
perform the work
described above.
I attest that everything Yes
stated in this
application is true and
correct and that
falsifying information in
this application is an
act of fraud and may
be punishable by fine,
imprisonment, or both.
Person Applying for Matthew McGavin
Permit
Email not displaying correctly? View it in your browser.
� ► 44" City of Wheat Ridge
'/� Commercial Roofing PERMIT - 202002588
PERMIT NO: 202002588 ISSUED: 12/14/2020
JOB ADDRESS: 5260 W 29th Ave EXPIRES: 12/14/2021
JOB DESCRIPTION: Remove the existing roofing membrane, install l" wood fiber insulation and
new EPDM roofing membrane; 1/4 in./12 pitch, 63 squares total
*** CONTACTS ***
OWNER (720)238-5862 DENVER BOARD OF WATER COMMISSI
SUB (303)295-7769 TIMOTHY HUBKA 017911 ALPINE ROOFING LTD
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 420 / Storage Warehouse; 0 BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 105,946.00
FEES
Total Valuation 0.00
Use Tax 21224.87
Permit Fee 11170.75
** TOTAL ** 31395.62
*** COMMENTS ***
*** CONDITIONS ***
COMMERCIAL FLAT ROOFS: In order to pass a final inspection on commercial elastomeric or
similar type roofing, a WARRANTY LETTER from the manufacturer technical representative
stating that "the application of the roof at (project address) has been applied in
accordance with the installation instruction for (roof material brand name) roof covering"
is required to be on site at the time of final inspection.
LADDER MUST BE SET FOR ALL ROOF INSPECTIONS: A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections.
ALL PITCHED ROOFS REQUIRE A MIDROOF INSPECTION REGARDLESS OF PITCH.
MIDROOF & SHEATHING: Effective December 1, 2014, asphalt shingle installations require an
approved midroof inspection, conducted when 25-75 percent of the roof covering is
installed, prior to final approval. Installation of roof sheathing (new or overlay) is
required on the entire roof when spaced or board sheathing with ANY gap exceeding one half
inch exists. Sheathing and Mid -roof inspections may be called in at the same time, 100
percent of the sheathing must be complete and 25-75 percent of the midroof may be complete.
Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per
shingle. A ladder extending 3 feet above the roof eave and secured in place is required to
be provided for all roof inspections.
REGARDING ROOF VENTILATION: Roof ventilation shall comply with Building Division Policy
BD -18-001 for Balanced Ventilation Systems, or manufacturer installation instructions,
whichever is more stringent.
FOR ROOF PITCH 6/12 AND OVER: Midroof & Final Roof inspections for ROOFS with 6/12 PITCH &
OVER: 3rd party inspection will be required for both the midroof and final inspections. The
3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the
Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner.
1* � 4 41'
City of Wheat Ridge
Commercial Roofing PERMIT - 202002588
PERMIT NO: 202002588
JOB ADDRESS: 5260 W 29th Ave
JOB DESCRIPTION: Remove the existing roofing membrane,
new E PDM roofing membrane; 1/4 in./12
ISSUED: 12/14/2020
EXPIRES: 12/14/2021
install l" wood fiber insulation and
pitch, 63 squares total
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this�permrt. I further attest that I am leg ally authorized to include all entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180, days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and��procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all requ�ired
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
From: no-reolv(alci.wheatridae.m. us
To: CommDev Perm is
Subject: Online Form Submittal: Roofing Permit Application
Date: Monday, December 14, 2020 2:56:12 PM
Roofing Permit Application
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this property Commercial
Commercial or
Residential?
PROPERTY INFORMATION
Property Address 5260 W 29th Ave
Property Owner Name Denver Board of Water Commissionrs
Property Owner Phone 720-238-5862
Number (enter WITH
dashes, eg 303-123-
4567)
Property Owner Email jeff.slamlard@denverwater.org
Address
Do you have a signed Yes
contract to reroof this
property?
CONTRACTOR INFORMATION
Contractor Business Alpine Roofing LTD
Name
Contractor's License 017911
Number
Contractor Phone 303-295-7769
Number (enter WITH
dashes, eg 303-123-
4567)
Contractor Email pconway@ al pineroofingco.com
Address
Retype Contractor pconway@ al pineroofing. com
Email Address
Attach City of Wheat
Ridge Electronic
Payment Form - "DO
NOT ATTACH A
PICTURE OF A
CREDIT CARD"
DESCRIPTION OF WORK
TOTAL SQUARES of
63
the entire scope of
wo rk:
Project Value (contract
$105,946.00
value or cost of ALL
materials and labor)
Are you re -decking the
No
roof?
Is the permit for a flat
Flat roof (less than 2:12 pitch)
roof, pitched roof, or
both? (check all that
apply)
What is the pitch of the
1/4"/12
FLAT roof?
How many squares are
63
part of the FLAT roof?
Describe the roofing
Remove the existing roofing membrane, install 1" wood fiber
material for the FLAT
insulation and new EPDM roofing membrane
roof:
Type of material for the
TPO/EPDM
FLAT roof:
Provide any additional
detail here on the
description of work. (Is
this for a house or
garage? Etc)
This is A Denver Water Station
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of
Wheat Ridge codes
and ordinances for
work under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I
will be contacted by the
City to pay for and pick
up the permit for this
property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have Yes
been authorized by the
legal owner of the
property to submit this
application and to
perform the work
described above.
I attest that everything Yes
stated in this
application is true and
correct and that
falsifying information in
this application is an
act of fraud and may
be punishable by fine,
imprisonment, or both.
Person Applying for Pauline J. Conway
Permit
Email not displaying correctly? View it in your browser.
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: aQ9 VUU & H
Job Address: c;9_"W .
Permit Number: '201-701,5171
❑ No one available for inspection: Time AM/PM
Re -Inspection required Yes No
When corrections have been made, call for r =inspection at 303-234-59
J
Date: 9)d 7/1-?- Inspector -
DO NOT REMO I ' THIS NOTICE
.aaq;eaM aql uaoa=l paeO sigl Ioa;aad
penssl sl Aouednoop jo ejeogniao y mun pa;Iiu JGd ION sl Aouednoop
�uo!s!n!Q 6wppn8 aye �(q
06ellon enol leo!aioala pue jouis!Q aalj aqj woad pajaldwoo aae suo!joadsw y6na fey; ains aq aseali — slimiad 96BIJOA nnoi Boa_
-Aouedn000 jo uo/;ezuoq;ne a;n;/;suoo;ou scop uo/;oedsu/ 6u/p//ng leu/=1 eq; jo /enoaddy •penss/ s/ Ifouedn000 jo
a;eo/p;aao e aaojaq 6u►p;!n8 pue aai_4 `sVaoM oi;gnd `Buiuue;d Xq panoadde pue pa;a/duroo aq;sncu scua;/ 11y.310N
bu!gwnld
eovuas Jamas
saooa/nnopulM 1eu13
leoujoal3
1oo�{
gelS�punoa6�apun
leolueyoaw leu13
bu!gwnld 1eu!3
leouloa13 leu13
-;oefo.rd jnoA joj;ou}sla uo!IoaIoad aa1=1 ay} 10eluoo
suo! oadsul aa! ao a
3 -6982-5£Z-£0£ II o suo!loadsu!
96eu!eip pue Mo2j poi -gtgz-9£Z-£0£ Ileo suo!joadsu!
6u!� jed pue buideospuel ao3 •aouenpe ul )Jaann Guo
polsonbei aq pjnogs salplue Gsay; moil suoi;oodsulV
'3s14 uogoa�ad ani / uo!�oadsu! aa!3
(algeo!Idde;!) uogoadsul u!eldpoo13
}daQ s�laoM o!lgnd / a6ewejQ 8 MO�1
(�1 1, \\
-Ida(]6u!uueld / 6UNed V 6u!deospue-j
s;uawwoo
s�eMul
ao;oadsul Wo
suoi;oadsul jeui=1
I1eN / nnaJoS Ileo
uollelnsul
6u!peaE) y6noH
6u!wea j gbno�j
leopepe" y6no-d
---- -----
au!l se0/6u!gwnld gbnoH
.oujoal3 y6no�!
911 IIeM / ylel
1oob-My
6wyleays IIeM
s;uawwoo
siei;iulao;oadsul
a;ed
suoipoodsul y6noN
suoi}oadsul anogy eql 10 IeAoad V of aOPd 3i,aoM gelS-ul/nnolaa ao puma iepun ,aanof) loN oa
suoi;oadsuyanogy aql JOJenoaddy oj,JO—Ud a;a.aot}o: anod ION oa
��/a• /'e �%�"`',�,nr7. �/ Ja}}a1'Td /uo!lepunoj
(030) punoa0 paseou3 ejejouoo
aa!d
s;uawwoo sleMul oleo suoi;oadsul uoi}epunod
ao;oodsul
pefo.id siy; o;;uoucipad sooedS -1-1d UBIS;snW jo;oadsul
ssouisnq.durenoiioj auj uoiloodsui us aAMMI 01 (lq!1taptui) •tu•d 6S:II ojojaq uoljoadsui ue jsonbag**
•341s pafo.id aqj uo palsod si pea sigj ssalun patwopad aq jou 11!m suotpadsul
I
2�n`r�,u�no�0
uo!joadsui ayj jo Aep aqj -w-e g ajolaq woo; au!luo ayj e!n pappcins aq is n o!;ellaoueo
£C69-t£Z x£00 :3NII 163n0321 N0003dSNl M�`'9M YV*
uoiloodsui/sn•oo'ebplaleayM•lo•MMnn//:dlly :WH0d 3NI-N0 N011O3SNY
xU033H NOLLOWSN1 QV,�
bu!gwnld
eovuas Jamas
leoujoal3
s;uawwoo s1eMul04B(3suol;oadsul
ao;oodsul
gelS�punoa6�apun
suoi;oadsuyanogy aql JOJenoaddy oj,JO—Ud a;a.aot}o: anod ION oa
��/a• /'e �%�"`',�,nr7. �/ Ja}}a1'Td /uo!lepunoj
(030) punoa0 paseou3 ejejouoo
aa!d
s;uawwoo sleMul oleo suoi;oadsul uoi}epunod
ao;oodsul
pefo.id siy; o;;uoucipad sooedS -1-1d UBIS;snW jo;oadsul
ssouisnq.durenoiioj auj uoiloodsui us aAMMI 01 (lq!1taptui) •tu•d 6S:II ojojaq uoljoadsui ue jsonbag**
•341s pafo.id aqj uo palsod si pea sigj ssalun patwopad aq jou 11!m suotpadsul
I
2�n`r�,u�no�0
uo!joadsui ayj jo Aep aqj -w-e g ajolaq woo; au!luo ayj e!n pappcins aq is n o!;ellaoueo
£C69-t£Z x£00 :3NII 163n0321 N0003dSNl M�`'9M YV*
uoiloodsui/sn•oo'ebplaleayM•lo•MMnn//:dlly :WH0d 3NI-N0 N011O3SNY
xU033H NOLLOWSN1 QV,�
City of Wheat Ridge
Comm. Accessory Stru PERMIT - 201705676
PERMIT NO: 201705676 ISSUED: 08/31/2017
JOB ADDRESS: 5260 W 29th AVE EXPIRES: 08/31/2018
JOB DESCRIPTION: Commercial Retaining wall for Denver Water project; segmental block
retaining wall; 120 LF
*** CONTACTS ***
OWNER (303)628-6000 CITY & COUNTY OF DENVER
SUB (303)221-5383 Randall Wambsganss 170390 Glacier Construction Co., Inc.
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 420 / Storage Warehouse; 0 BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 26,980.00
FEES
Total Valuation 0.00
Plan Review Fee 302.28
Use Tax 566.58
Permit Fee 465.05
Engin. Review Fee 700.00
** TOTAL ** 2,033.91
*** COMMENTS ***
*** CONDITIONS ***
All roughs to be done at Framing Inspection.
Approved per plans and red -line notes on plans. Must comply with 2012 IBC, 2014 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
**Prior to final inspection approval - As-builts are required before approval of the
Building Final Inspection and Certificate of Occupancy can be issued.
PERMIT NO:
JOB ADDRESS:
JOB DESCRIPTION
City of Wheat Ridge
Comm. Accessory Stru PERMIT - 201705676
201705676
5260 W 29th AVE
ISSUED:
EXPIRES
Commercial Retaining wall for Denver Water project;
retaining wall; 120 LF
08/31/2017
08/31/2018
segmental block
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this ermrt. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER, or ,-CONTRACTOR (Circle one) Date
1. This permit was issued bad d.on the infori ation provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This.permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new pen -nit shall be subject to the standard
requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired pen -nits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change, of the natural flow of water without prior and specific approval.
5. The pennit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work withoutitten approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a pen -nit for, or an approval of, an violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
City of
/Wheat�gc�
MUMTY DEVLLOI'MLN I
Building & Inspection Services Division
7500 W. 29th Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Ins ection Line: 303-234-5933
FOR OFFICE USE ONLY
Date: �11--6— 1 I
Plan/Permit #
7w,
Plan Review Fee:
P
Email: perm its(c�ci.wheatridge.co.us
1�
Building Permit Application��
*** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed.
Property Address: 5260 West 29th Ave., Wheat Ridge, CO., 80214
Property Owner (please print): Denver Water Phone: (303) 628-6000
Property Owner Email
tim.lapan@denverwater.org
Mailing Address: (if different than property address)
Address: 1600 West 12th Ave., Denver, CO., 80204
City, State Zip: Denver, CO., 80204
Architect/Engineer: Denver Water
Architect/Engineer E-mail:-tim.lapan@denverwater.org Phone:
Contractor: Glacier Construction Company
Contractors City License #-
170390
Contractor E-mail Address: slemley@gcci.com
Sub Contractors:
Electrical:
W.R. City License #
Plumbing:
W.R. City License #
(303)628-6329
Phone: (303)221-5383
�V,
I n
Mechanical:
W.R. City License #
Other City Licensed Sub: Other City Licensed Sub:
City License # City License #
1 S`'
Complete all information on BOTH sides of this form
J. COMMERCIAL ❑ RESIDENTIAL
Description of work: (Check all that apply)
❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE
❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING
❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING
❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT
❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT
❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
F1 OTHER (Describe)
(For ALL projects, please provide a detailed description of work to be performed, including current use of areas,
proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and
amount of materials to be used, etc.)
The scope of work includes:. Furnish and install segmental block retaining wall.
Sq. FULF
Amps
Btu's
Squares
Gallons
Other
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
$_ 26,980.00
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information provided on the application.
CIRCLE ONE: (OWNER) CONTRACTOR r (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR)
Electronic Signature (first and last name): Schuyler Lemley DALE: 7/11/17
DEPARTMENT USE ONLY
ZONING COMMMENTS: OCCUPANCY CLASSIFICATION:
Reviewer. , t^ CIO VS(5�� \
BUILDING DEPARTMENT COMMENTS: Q(��
Reviewer:
pugx,iG WoWS s 5i-�g QrYAC-A-W exWP17ftW!5 CF Apfp9vaL.
MW av- .
e/25f/7
Building Division Valuation: $ 2 ( ) 6T Fc—) 1)C
City of COMMERCIAL/MULTI-FAMILY
I W heat Midge BUILDING PERMIT APPLICATION REVIEW
PUBLIC WORKS
Date: A [I% . ,2,s,_2017
Location: 52(00 W. 264—h AVE.
ATTENTION: BUILDING DEPARTMENT
I have reviewed the submitted application documents to construct a 997'AZIJZAJC� WAL L_
located at the above referenced address. Please note the comments checked below.
3.
4.
Site Survey: _ OK Not OK; refer to stipulations.
Drainage:
a. Final Drainage Report and Plan required V/ Yes No
b. Drainage Letter and Plan required Yes No
C. Site drainage/grading have been reviewed and are: OK Not OK; see stipulations
CDPS Permit & SWMP Approved: Yes No N/A
Public Improvements to be completed:
a. street paving/patching:
Yes
No
b. curb & gutter/drivecut:
Yes
No
C. sidewalk:
Yes
No
d. standard street lights:
Yes
No
e. pedestrian lights:
Yes
No
f. storm sewer:
Yes
vl No
g. Letter of Credit (LOC) required:
Yes
No
h. Funds in lieu of construction:
Yes
No
If an LOC or funds in lieu of are required, for
what improvements?
_
Amount of the LOC or funds: $
5. SIA/PIA required: Yes No
6. Traffic impact analysis required & approved: Yes No
7. Street Access Permit required: Yes No
/ If yes, was it approved by the Director of Public Works? Yes No
8. ✓ Does all existing roadway/alley R.O.W. meet the standards of the City: _ Yes No
If not, what is required:
If R.O.W. is required, has the deed been received? Yes No (See Note below)
NOTE: All deeds must be reviewed and approved prior to issuance of the Certificate of Occupancy.
9. APPROVED: The Public Works Department has reviewed the submitted material and hereby approves this
Permit Application, subject tothe stated or attached stipulations.
KAUA Lce d.\iar"/Vr, AU &. 25.20/7-
/. Sig �ao'iv� R ^ "'eci:,-5� Date
10. NOT APPROVED: The Public Works Department has reviewed the submitted material and does not
approve this Permit Application for the following reason(s):
Signature David F. Brossman, P.L.S. Date
11.1— Stipulations: SSE AITACMa2 tp&z0 j c95 ag ppQaVAL .
12. NOTE: Any damage to the existing Public Improvements resulting from this construction shall be repaired to
City standards prior to the issuance of the Certificate of Occupancy (C.O.). A Drainage Certification
Letter with by As -Built plans shall be required prior to the issuance of the Certificate of Occupancy.
Rev 062013
City of
WheatRidge
PUBLIC WORKS
CONDITIONS OF APPROVAL
Address: 5260 W. 29th Ave.
Permit Number: 201705676
Approval of this building permit is subject to the following conditions and notes:
A Grading and Drainage Letter of Certification shall be required to ensure site has been
properly graded.
A Retaining Wall Certification signed and sealed by the structural engineer shall be
required to attest that the wall(s) have been constructed in accordance with the
approved plans and specifications.
Signed and sealed copies of the Construction Documents are to be included with the
Building Permit sets and made one by their inclusion therein.
Page 1 of 1
7�City of
.I bat e
PUBLIC WORKS
City of Wheat Ridge Municipal Building 7500 W. 291h Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2861 F: 303.235.2857
PUBLIC WORKS DEVELOPMENT REVIEW FEES
Date: 1A& , 2 ,�,,?o/ ?
Location of Construction: X200 W, 21 L1 Ve
Purpose of Construction: !ZETA//WWA f
Single Family Commercial t✓ Multi -Family
Development Review Processing Fee: ................................................ $100.00
(Required of all projects for document processing)
Single Family Residence/Duplex Review Fee: ..........................
Commercial/Multi-Familv Review Fees:
• Review of existing or minimal technical documents:.....
• Initial review' of technical civil engineering documents
(Fee includes reviews of the 15' and 2nd submittals):.......
• Traffic Impact Study Review Fee:
(Fee includes reviews of the I' and 2nd submittals):.......
..$50.00
$200.00
............ I...... $600.00
....... $500.00
• Trip Generation Study Review Fee: .................................................. $200.00
® O & M Manual Review & SMA Recording Fee ................................ $100.00
' Each Application will be reviewed by staff once and returned for changes. If after review of the second submittal changes have
not been made to the civil documents or the Traffic Study as requested by staff, further reviews of the Application will be subject
to the following Resubmittal Fees:
e Resubmittal Fees:
3rd submittal ('/z initial review fee) :.................................................... $300.00
4'h submittal (full initial review fee): ................................................. $600.00
All subsequent submittals: ................................................................. $600.00
(Full initial review fee)
TOTAL REVIEW FEES (due at time of Building Permit issuance)
$
PLEASE NOTE THAT IN ADDITION TO THE ABOVE FEES, THERE WILL BE ADDITIONAL LICENSING
AND PERMITTING FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS WITHIN PUBLIC
RIGHT-OF-WAY.
www.cim hentridge.co.us
Rev 12/12
Synteen
SF 20
SOIL REINFORCEMENT GEOGRID
www.synteen.com
SF 20 is composed of high molecular weight, high tenacity multifilament polyester yarns that are
woven into a stable network placed under tension. The high strength polyester yarns are coated with a
PVC material. SF Geogrids are inert to biological degradation and are resistant to naturally encountered
chemicals, alkalis and acids. SF Geogrids are typically used for soil reinforcement applications such as
retaining walls, steepened slopes, embankments, sub -grade stabilization, embankments over soft soils
and waste containment applications.
TENSILE PROPERTIES
TEST METHOD
MARV VALUES
(LBS/FT)
Ultimate Strength Machine Direction and Cross Machine
ASTM D 6637
2,025 MD & CD
Creep Limited Strength Machine Direction and Cross Machine
ASTM D 5262
1,282 MD & CD
Taj = Long Term Design Strength Machine Direction and Cross
Machine
NCMA 97
1,059 MD & CD
Aperture Size (ins.)
Measured
0.80 x 1.00
RF Creep - 1.58 RF Durability - 1.10 RF Installation Damage (Soil Type 3) - 1.10
SYNTEEN Technical Fabrics, Inc Warranty Synteen Technical Fabrics warrants our products to be free from
defects in material and workmanship when delivered to our customers and that our products meet our
published specifications. If a product is found to be defective, and our customer gives notice to Synteen
Technical Fabrics before installing the product, Synteen Technical Fabrics will replace the product without
charge to our customer or refund the purchase price at Synteen Technical Fabrics election. Replacing the
product or obtaining a refund are the buyer's sole remedy for a breach and Synteen Technical Fabrics will not
be liable for any consequential damage attributed to a defective product. This warranty is given in lieu of all
other warranties, express or implied, including the implied warranty of merchantability or fitness for a
particular purpose. There are no warranties, which extend beyond the description provided herein.
i
DLYDE IN
HE USASynteen V
Z 0 1 -1 c) -S (.0 --1 (,c
SK Wall Design
2800 South Logan Street
Englewood, CO 80113
303-900-8714
I ;-WWF}
V -011140 -ft,
W„«
RETAINING WALL ENGINEERING REVIEW CALCULATIONS
Keystone Compac III (8 degree batter - rear pin configuration) Units
DATE: 8/2/2017
PROJECT NAME: Ashland
PROJECT NUMBER: 17067
PROJECT LOCATION: Wheat Ridge, CO
Critical Cross Section Calculations
The calculations on the following pages were created using the NCMA
design methodology from the NCMA Design Manual, 3rd Edition.
The project will be constructed using Keystone Compac III (8 degree batter
- rear pin configuration) units, and Synteen SF20 geogrid.
Thank you, and please feel free to contact this office with any questions.
Sincerely,
'/
5A' )g --
Steve Kelley, P.E.
SK Wall Design
VO�, 'rQ,!aE9tl
' F F'
�J.
co 8-2-17
46681
Z o N -1 C)
Project: 17067 - Ashland
Site: Wheat Ridge, CO
Date: 8/2/2017
Wall: wall01
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Hu
0.67 ft
Facing Width
Lu
Wall: wall01
Project Design Inputs
Wu
1.00 ft
Facing Weight
Xu
120lb/ft3
Design Standard National Concrete
Masonry Association 3rd Edition
0.50 ft
Setback
u
Minimum Factors of Safety
Batter
GP
7.97'
Cap Height
Hcu
Conventional
Initial Shear Capacity
au
1393.45lb/ft
Apparent Shear Angle
u
External Value
Internal
Vu(max)
Value
Facing
Value
FSsl Base Sliding 1.50
FSsl
Internal Sliding
1.50
140.02
0.70
FSbc Bearing Capacity 2.00
FSsc
Shear Capacity
1.50
FSot Overturning 1.50
No Fines
External Value
Internal
Value
Facing
Value
FSsl Base Sliding 1.50
FSbc Bearing Capacity 2.00
FSot Overturning 1.50
Reinforced
External Value
Internal
Value
Facing
Value
FSsl Base Sliding 1.50
FSsl
Internal Sliding
1.50
FScs
Connection Strength 1.50
FSbc Bearing Capacity 2.00
FSpo
Pullout
1.50
FSsc
Facing Shear 1.50
FSct Crest Toppling 1.50
FSto
Tensile Overstress
1.50
FSot Overturning 2.00
Design Factors
Minimum
Maximum
Term Description
(as appl.)
(as appl.)
RC Reinforced coverage ratio
1.00
0.00
Selected Facing Unit
Compac III Licensor: Keystone
Facing Height
Hu
0.67 ft
Facing Width
Lu
1.50 ft
Facing Depth
Wu
1.00 ft
Facing Weight
Xu
120lb/ft3
Center of Gravity
Gu
0.50 ft
Setback
u
0.09 ft
Batter
GP
7.97'
Cap Height
Hcu
0.33ft
Initial Shear Capacity
au
1393.45lb/ft
Apparent Shear Angle
u
34.00°
Maximum Shear Capacity
Vu(max)
3246.03lb/ft
Selected Reinforcement Types
Reinforcements
SF20MD - Synteen Geogrid SF21Supplier: Synteen Technical Fabrics, Inc., Fill Type: Clays and Silts
Tuft 2,290.73 RFcr 1.54 RFd 1.10 LTDS 1,229.33
RFid 1.10 Cds 0.80 Ci 0.80
Connection Properties
cs1 1,045.33 IP -1
au 900.29 u
Selected Soil Types
1,800.57 cs2 1,527.80 IP -2 6,001.90 cs max 1,527.80
34.00 Vu(max) 2,762.88
Powered by Vespa Page 2 Printed 8/2/2017
k Version: 2.3.10.6234
In Situ
Friction
Density y
Friction Cohesion
Cf
Soil Zone
Soil Type
Angle T
[Ib/ft']
Factor p
[Ib/ft']
Infill (i)
GP
34°
125.00
n/a
n/a
Retained (r)
CL
26°
135.00
n/a
n/a
Foundation (f)
CL
26°
135.00
0.55
0.00
Base (b)
39°
140.02
0.70
n/a
Powered by Vespa Page 2 Printed 8/2/2017
k Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 11 Wheat Ridge, CO
In Situ
Friction Density Friction Cohesion Cf
Soil Zone Soil Type Angle V [Ib/ft'] Factor p [lb/ft']
Drainage (d) GP 38° 125.02 0.70 n/a
Soil Glossary
CH: Inorganic clays, high plasticity
CL: Inorganic clays, low to medium plasticity, gravelly, sandy, silty, lean clays
GC: Clayey gravels, poorly graded gravel -sand -clay mixtures
GM: Silty gravels, poorly graded gravel -sand -silt mixtures
GP: Poorly -graded gravels, gravel -sand. Little or no fines.
GW: Well -graded gravels, gravel -sand. Little or no fines.
MH: Inorganic clayey silts, elastic silts
ML: Inorganic silts, very fine sands, silty or clayey, slight plasticty
SC: Clayey sands, poorly graded sand -clay mixtures
SM: Silty sands, poorly graded sand -silt mixtures
SP: Poorly -graded sands, gravelly sands. Little or no fines.
SW: Well -graded sands, gravelly sands. Little or no fines.
Wall: wall01
Powered by Vespa Page 3 Printed 8/2/2017
�4 Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Section 7 Details
Section 7 Cross-section
E
V:::. — -{Synteen Geogrid SF20MD} 5.50 ft
— — -{Synteen Geogrid SF20MD} 5.50 ft
— — -{Synteen Geogrid SF20MD} 5.50 ft
Section 7 Static ICS Cross-section
Section 7 Cross-section Details
Upper Slope Angle
Crest Offset
Live Load
ql
Live Offset
qlofs
Dead Load
qd
Dead Offset
qdofs
Top of Section
Bottom Grade
Base of Section
Design Height
H
Embedment Depth
Hemb
�-,Gogrid SF20MD} 5.50 ft
tree-"Geogrid SF20MD} 5.50 ft
ynteen Geogrid SF20MD} 5.50 ft
0.00 °
0.00 ft
250 Ib/ft2
6.30 ft
0 Ib/ft2
0.00 ft
92.72 ft
86.56 ft
85.72 ft
7.00 ft
0.83 ft
Wall: wall01
Powered by Vespa Page 4 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1 ] Wheat Ridge, CO
Empirical Checks
Elevation
FSsl
FSpo
FSto
Check
Description
Min. Requirement
Result
Status
Hemb
Minimum Embedment %
10.0000
13.5212
Pass
L
Min. Reinforcement Length
4.0000
5.5000
Pass
UH Ratio
Min. UH Ratio
0.7000
0.7861
Pass
La
Min. Anchorage Length
1.0000
1.5557
Pass
MinHemb
Minimum Embedment
6.0000
10.0050
Pass
Rs
Max. Reinforcement Separation
0.0000
2.0000
Pass
RsBottom
Max. multiple of Hu at bottom
0.00
2.00
Pass
RsTop
Max. multiple of Hu at top
0.00
2.50
Pass
External Checks
Eq. 7-11
Earth pressure from soil weight
Ps
945.26 lb/ft
Static
Force of uniform surcharge
Pq
500.36 lb/ft
Eq. 7-13
Check
Description
Min. Requirement
Result
Status
FSbc
Bearing Capacity
2.00
5.43
Pass
FSct
Crest Toppling
1.50
6.08
Pass
FSot
Overturning
2.00
4.08
Pass
FSsl
Base Sliding
1.50
1.71
Pass
Internal and Local Checks
Static
Static Calculations
General Equations
Elevation
FSsl
FSpo
FSto
FScs FSsc
Layer
(ft)
>=1.50
>=1.50
-1.50
>=1.50 >=1.50
3
91.06
3.20
6.44
2.75
3.69
2
89.06
4.71
4.75
4.44
6.50
1
87.06
9.46
1.61
5.67
12.68
Static Calculations
General Equations
External failure plane
a
49.29'
Eq. 5-5
External active earth pressure
Kaext
0.29
Eq. 7-1
External interface friction angle
a
26.00°
Eq. 7-2
Width of reinforced zone
L'
4.59 ft
Eq. 7-3
Increase in width of reinforced zone due to R
L"
0.00 ft
Eq. 7-4
Increase in height due to backslope
h
0.00 ft
Eq. 7-5
Increase in height due to backslope at L(3
hmax
0.00 ft
Eq. 7-6
Increase in height due to backslope
hs
0.00 ft
Eq. 7-7
Width of rein. layer for internal sliding
Ls"
0.00ft
Eq. 7-8
Equivalent slope at back of rein. zone
ext
0.00 °
Eq. 7-9
Height of back of wall for ext. stability
Hext
7.00 ft
Eq. 7-10
Horizontal width of rein. zone at backslope
L
4.59 ft
Eq. 7-11
Earth pressure from soil weight
Ps
945.26 lb/ft
Eq. 7-12
Force of uniform surcharge
Pq
500.36 lb/ft
Eq. 7-13
Horz. component of Ps
PsH
898.84lb/ft
Eq. 7-14
Horz. force of dead load surcharge
PgdH
0.00lb/ft
Eq. 7-15
Horz. force of live load surcharge
PglH
475.79lb/ft
Eq. 7-16
Horz. component of active earth force
PaH
1374.63lb/ft
Eq. 7-17
Resisting moment arm for PsH
Ys
2.33 ft
Eq. 7-18
Resisting moment arm for PqH
Yq
3.50 ft
Eq. 7-19
Vert. component of Ps
PsV
292.57 Ib/ft
Eq. 7-20
Vert. force of dead load surcharge
PgdV
0.00 lb/ft
Eq. 7-21
Vert. force of live load surcharge
PgIV
154.871b/ft
Eq. 7-22
Vert. component of active earth force
PaV
447.44 Ib/ft
Eq. 7-23
Resisting moment arm for PsV
Xs
5.83 ft
Eq. 7-24
Resisting moment arm for PqV
Xq
5.99ft
Eq. 7-25
Height above rein. area at int. failure plane
hint
0.00 ft
Eq. 7-26
Horz. influence distance
dint
3.86 ft
Eq. 7-27
Distance dead load applied for broken back
L q
4.59 ft
Eq. 7-29
Internal active earth pressure
Kaint
0.20
Eq. 7-43
Internal interface friction angle
i
22.67°
Eq. 7-44
Maximum height of slope influence
hmaxint
0.00 ft
Eq. 7-45
Slope for internal analysis
int
0.00 °
Eq. 7-46
Internal failure plane
i
55.31 °
Eq. 7-50
Elevation of influence of live load
Eqlinfl
0.00 ft
Eq. 7-93
Wall: wall01
Powered by Vespa Page 5 Printed 8/2/2017
k Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Elevation of influence of dead load
Eqdinfl
7.00 ft
Eq. 7-94
Base Sliding
Xri
Layer/
3.19 ft
Weight of reinforced mass
Wri
4810.31 Ib/ft
Eq. 7-30
Weight of soil above wall
Wr 1
0.00lb/ft
Eq. 7-31A1
Weight of soil above wall
Wr 2
0.00lb/ft
Eq. 7-31A2
Weight of soil above wall
Wr 3
0.00 lb/ft
Eq. 7-31A3
Weight of soil above wall
Wr
0.001b/ft
Eq. 7-31
Base sliding resistance
Rs
2346.14 lb/ft
Eq. 7-32
Base sliding
FSsl
1.71
Eq. 7-33
Overturning
Resisting moment
Mr
15359.95 lb -ft
Eq. 7-34
Resisting moment arm for rein. zone
Xri
Layer/
3.19 ft
Eq. 7-35
Resisting moment arm in top slope
Xr 1
(Ib/ft)
1.98 ft
Eq. 7-36A1
Resisting moment arm in top slope
Xr 2
[7-69]
4.28 ft
Eq. 7-36A2
Resisting moment arm in top slope
Xr 3
0.00
6.57 ft
Eq. 7-36A3
Resisting moment arm for surcharge
Xq
246.42
4.18ft
Eq. 7-37
Driving moment
Mo
3760.85 lb -ft
Eq. 7-38
Overturning
FSot
16.54
4.08
Eq. 7-39
Bearing Capacity
PgIV
PaH
PaV
Layer/
Equivalent bearing area
B
(Ib/ft)
4.82 ft
Eq. 7-40
Eccentricity of bearing force
a
[7-71]
0.34 ft
Eq. 7-41
Applied bearing pressure
Qa
87.06
997.461b/ft2
Eq. 7-42
Ultimate bearing pressure
Qult
5416.01 lb/ft2
Eq. 12-10
Bearing capacity
FSbc
495.54
5.43
Eq. 12-11
Tensile Overstress
36.82
0.00
163.92
53.36
LTDS
Acn
Dn
W'ri
Fgn
Layer/ Elevation (Ib/ft)
(ft)
(ft)
(Ib/ft)
(Ib/ft)
Course (ft) [2-3]
[7-54..57]
[7-58..60]
(ft)
[7-61]
2 87.06 1229.33
2.33
5.83
2
446.25
5 89.06 1229.33
2.00
3.66
3.20
276.66
8 91.06 1229.33
2.66
1.33
1196.56
216.75
Pullout
91.06
515.39
955.11
1034.82
ACn
La
do
Layer/ Elevation (Ib/ft)
(ft)
(ft)
FSpo
Course (ft) [7-63]
[7-64]
[7-65]
[7-66]
2 87.06 2875.69
3.76
5.66
6.44
5 89.06 1314.51
2.66
3.66
4.75
8 91.06 349.11
1.56
1.66
1.61
Intenal Sliding
Wall: wall01
Powered by Vespa Page 6 Printed 8/2/2017
Version: 2.3.10.6234
PsH
PgdH
PgIH
PsV
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
(Ib/ft)
Course
(ft)
[7-67]
[7-68]
[7-69]
[7-70]
2
87.06
588.91
0.00
385.12
191.69
5
89.06
246.42
0.00
249.12
80.21
8
91.06
50.81
0.00
113.12
16.54
PgdV
PgIV
PaH
PaV
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
(Ib/ft)
Course
(ft)
[7-71]
[7-72]
[7-73]
[7-74]
2
87.06
125.36
0.00
974.03
317.05
5
89.06
81.09
0.00
495.54
161.30
8
91.06
36.82
0.00
163.92
53.36
R's
W'ri
V u
Layer/
Elevation
(Ib/ft)
(Iblft)
(Ib/ft)
FSsl
Course
(ft)
[7-75]
[7-76]
[7-77]
[7-78]
2
87.06
1754.68
3251.78
1358.31
3.20
5
89.06
1135.04
2103.45
1196.56
4.71
8
91.06
515.39
955.11
1034.82
9.46
Wall: wall01
Powered by Vespa Page 6 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Connection Strength
Fgn
Tconn
hinflmax
Layer/ Elevation (Iblft)
(Ib/ft)
FScs
(ft)
Course (ft) [7-61X]
[7-79]
[7-80]
[7-92]
2 87.06 332.27
1227.28
3.69
0.00
5 89.06 178.96
1163.03
6.50
0.00
8 91.06 86.64
1098.77
12.68
0.00
Crest Toppling
Active earth pressure from soil weight
Ps
34.94lb/ft
Eq. 7-81
Uniform surcharges
Pq
0.00lb/ft
Eq. 7-82
Horz. component of Ps
PsH
33.791b/ft
Eq. 7-83
Uniform surcharge
PqH
0.001b/ft
Eq. 7-84
Vert. component of Ps
PsV
8.86 Ib/ft
Eq. 7-85
Vert. force from dead load surcharge
PgdV
0.00lb/ft
Eq. 7-86
Vert. force from live load surcharge
PgIV
0.00lb/ft
Eq. 7-87
Crest toppling
FSct
6.08
Eq. 7-88
Resisting moment
Mr
113.90 lb -ft
Eq. 7-89
Resisting moment arm
X
0.57 ft
Eq. 7-9C
Height from top layer to grade
z
1.66 ft
Eq.
Overturning moment
Mo
18.74 lb -ft
Eq. 7-91
Wall: wall01
Powered by Vespa Page 7 Printed 8/2/2017
i' Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1) Wheat Ridge, CO
Section 10 Details
Section 10 Cross-section
1
-{Synteen Geogrid SF20MD} 4.50 ft
{Synteen Geogrid SF20MD} 4.50 ft
— — -{Synteen Geogrid SF20MD} 4.50 ft
Section 10 Static ICS Cross-section
1
Section 10 Cross-section Details
Upper Slope Angle
Crest Offset
Live Load
ql
Live Offset
qlofs
Dead Load
qd
Dead Offset
qdofs
Top of Section
Bottom Grade
Base of Section
Design Height
H
Embedment Depth
Hemb
>�en/Geogrid SF20MD} 4.50 ft
yntn Geogrid SF20MD} 4.50 ft
ynteen Geogrid SF20MD} 4.50 ft
0.00 °
0.00 ft
250 Ib/ftz
4.00 ft
0 Ib/ftz
0.00 ft
92.06 ft
86.91 ft
86.39 ft
5.66 ft
0.52 ft
Wall: wall01
Powered by Vespa Page 8 Printed 8/2/2017
`�,? Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Empirical Checks
Elevation
FSsl
FSpo
FSto
Check
Description
Min. Requirement
Result
Status
Hemb
Minimum Embedment %
10.0000
10.0217
Pass
L
Min. Reinforcement Length
4.0000
4.5000
Pass
UH Ratio
Min. UH Ratio
0.7000
0.7951
Pass
La
Min. Anchorage Length
1.0000
1.2918
Pass
MinHemb
Minimum Embedment
6.0000
6.1940
Pass
Rs
Max. Reinforcement Separation
0.0000
2.0000
Pass
RsBottom
Max. multiple of Hu at bottom
0.00
1.00
Pass
RsTop
Max. multiple of Hu at top
0.00
2.50
Pass
External Checks
Eq. 7-11
Earth pressure from soil weight
Ps
618.53 Ib/ft
Static
Force of uniform surcharge
Pq
404.75 Ib/ft
Eq. 7-13
Check
Description
Min. Requirement
Result
Status
FSbc
Bearing Capacity
2.00
4.87
Pass
FSct
Crest Toppling
1.50
6.12
Pass
FSot
Overturning
2.00
3.76
Pass
FSsl
Base Sliding
1.50
1.60
Pass
Internal and Local Checks
Static
Static Calculations
General Equations
Elevation
FSsl
FSpo
FSto
FScs FSsc
Layer
(ft)
-1.50
>=1.50
>=1.50
>=1.50 >=1.50
3
90.39
3.15
7.59
4.42
6.14
2
89.06
3.20
6.44
2.75
3.69
1
87.06
5.08
3.90
5.85
8.87
Static Calculations
General Equations
External failure plane
a
49.29°
Eq. 5-5
External active earth pressure
Kaext
0.29
Eq. 7-1
External interface friction angle
a
26.00 °
Eq. 7-2
Width of reinforced zone
L'
3.59ft
Eq. 7-3
Increase in width of reinforced zone due to li
U
0.00 ft
Eq. 7-4
Increase in height due to backslope
h
0.00 ft
Eq. 7-5
Increase in height due to backslope at L(3
hmax
0.00 ft
Eq. 7-6
Increase in height due to backslope
hs
0.00 ft
Eq. 7-7
Width of rein. layer for internal sliding
Ls"
0.00 ft
Eq. 7-8
Equivalent slope at back of rein. zone
ext
0.00 °
Eq. 7-9
Height of back of wall for ext. stability
Hext
5.66 ft
Eq. 7-10
Horizontal width of rein. zone at backslope
L
3.59 ft
Eq. 7-11
Earth pressure from soil weight
Ps
618.53 Ib/ft
Eq. 7-12
Force of uniform surcharge
Pq
404.75 Ib/ft
Eq. 7-13
Horz. component of Ps
PsH
588.16 Ib/ft
Eq. 7-14
Horz. force of dead load surcharge
PgdH
0.00lb/ft
Eq. 7-15
Horz. force of live load surcharge
PglH
384.88 Ib/ft
Eq. 7-16
Horz. component of active earth force
PaH
973.04 lb/ft
Eq. 7-17
Resisting moment arm for PsH
Ys
1.89 ft
Eq. 7-18
Resisting moment arm for PqH
Yq
2.83 ft
Eq. 7-19
Vert. component of Ps
PsV
191.45 lb/ft
Eq. 7-20
Vert. force of dead load surcharge
PgdV
0.00 lb/ft
Eq. 7-21
Vert. force of live load surcharge
PgIV
125.28lb/ft
Eq. 7-22
Vert. component of active earth force
PaV
316.72 Ib/ft
Eq. 7-23
Resisting moment arm for PsV
Xs
4.76 ft
Eq. 7-24
Resisting moment arm for PqV
Xq
4.90 ft
Eq. 7-25
Height above rein. area at int. failure plane
hint
0.00ft
Eq. 7-26
Horz. influence distance
dint
3.12 ft
Eq. 7-27
Distance dead load applied for broken back
L q
3.59ft
Eq. 7-29
Internal active earth pressure
Kaint
0.20
Eq. 7-43
Internal interface friction angle
i
22.67°
Eq. 7-44
Maximum height of slope influence
hmaxint
0.00 ft
Eq. 7-45
Slope for internal analysis
int
0.00 °
Eq. 7-46
Internal failure plane
i
55.31 °
Eq. 7-50
Elevation of influence of live load
Eqlinfl
0.00 ft
Eq. 7-93
Wall: wall01
Powered by Vespa Page 9 Printed 8/2/2017
k" Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Elevation of influence of dead load
Eqdinfl
5.66 ft
Eq. 7-94
Base Sliding
Xri
Layer/
2.60 ft
Weight of reinforced mass
Wri
3183.681b/ft
Eq. 7-30
Weight of soil above wall
Wr 1
0.001b/ft
Eq. 7-31A1
Weight of soil above wall
Wr 2
0.00lb/ft
Eq. 7-31A2
Weight of soil above wall
Wr 3
0.00lb/ft
Eq. 7-31A3
Weight of soil above wall
Wr
0.00lb/ft
Eq. 7-31
Base sliding resistance
Rs
1552.78 lb/ft
Eq. 7-32
Base sliding
FSsl
1.60
Eq. 7-33
Overturning
Resisting moment
Mr
8276.10 lb -ft
Eq. 7-34
Resisting moment arm for rein. zone
Xri
Layer/
2.60 ft
Eq. 7-35
Resisting moment arm in top slope
Xr 1
(Ib/ft)
1.79ft
Eq. 7-36A1
Resisting moment arm in top slope
Xr 2
[7-69]
3.59 ft
Eq. 7-36A2
Resisting moment arm in top slope
Xr 3
0.00
5.39 ft
Eq. 7-36A3
Resisting moment arm for surcharge
Xq
164.50
3.50 ft
Eq. 7-37
Driving moment
Mo
2198.81 Ib -ft
Eq. 7-38
Overturning
FSot
16.47
3.76
Eq. 7-39
Bearing Capacity
PgIV
PaH
PaV
Layer/
Equivalent bearing area
B
(Ib/ft)
3.82 ft
Eq. 7-40
Eccentricity of bearing force
a
[7-71]
0.34 ft
Eq. 7-41
Applied bearing pressure
Qa
87.06
833.91 lb/ftz
Eq. 7-42
Ultimate bearing pressure
Qult
4057.31 Ib/ft2
Eq. 12-10
Bearing capacity
FSbc
368.04
4.87
Eq. 12-11
Tensile Overstress
36.74
0.00
163.46
53.21
LTDS
Acn
Dn
W'ri
Fgn
Layer/ Elevation (Ib/ft)
(ft)
(ft)
(Ib/ft)
(Ib/ft)
Course (ft) [2-3]
[7-54..57]
[7-58..60]
(ft)
[7-61]
1 87.06 1229.33
1.67
4.83
1
277.90
4 89.06 1229.33
1.67
3.16
3.15
210.05
6 90.39 1229.33
2.33
1.16
1142.36
179.75
Pullout
90.39
402.31
745.56
1034.53
ACn
La
do
Layer/ Elevation (Ib/ft)
(ft)
(ft)
FSpo
Course (ft) [7-63]
[7-64]
[7-65]
[7-66]
1 87.06 2109.66
3.13
4.99
7.59
4 89.06 818.82
2.03
2.99
3.90
6 90.39 289.25
1.29
1.66
1.61
Intenal Sliding
Wall: wall01
Powered by Vespa Page 10 Printed 8/2/2017
Version: 2.3.10.6234
PsH
PgdH
PglH
PsV
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
(Ib/ft)
Course
(ft)
[7-67]
[7-68]
[7-69]
[7-70]
1
87.06
457.76
0.00
339.54
149.00
4
89.06
164.50
0.00
203.54
53.54
6
90.39
50.59
0.00
112.87
16.47
PgdV
PgIV
PaH
PaV
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
(Ib/ft)
Course
(ft)
[7-71]
[7-72]
[7-73]
[7-74]
1
87.06
110.52
0.00
797.31
259.52
4
89.06
66.25
0.00
368.04
119.80
6
90.39
36.74
0.00
163.46
53.21
R's
W'ri
Vu
Layer/
Elevation
(Ib/ft)
(lb/ft)
(Ib/ft)
FSsl
Course
(ft)
[7-75]
[7-76]
[7-77]
[7-78]
1
87.06
1210.22
2242.78
1304.10
3.15
4
89.06
725.47
1344.45
1142.36
5.08
6
90.39
402.31
745.56
1034.53
8.79
Wall: wall01
Powered by Vespa Page 10 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Connection Strength
Fgn
Tconn
hinflmax
Layer/ Elevation (Ib/ft)
(Ib/ft)
FScs
(ft)
Course (ft) [7-61X]
[7-79]
[7-80]
[7-92]
1 87.06 196.48
1205.75
6.14
0.00
4 89.06 128.63
1141.49
8.87
0.00
6 90.39 66.10
1098.66
16.62
0.00
Crest Toppling
Active earth pressure from soil weight
Ps
34.79lb/ft
Eq. 7-81
Uniform surcharges
Pq
0.00 lb/ft
Eq. 7-82
Horz. component of Ps
PsH
33.65lb/ft
Eq. 7-83
Uniform surcharge
PqH
0.00lb/ft
Eq. 7-84
Vert. component of Ps
PsV
8.83 lb/ft
Eq. 7-85
Vert. force from dead load surcharge
PgdV
0.001b/ft
Eq. 7-86
Vert. force from live load surcharge
PgIV
0.00 lb/ft
Eq. 7-87
Crest toppling
FSct
6.12
Eq. 7-88
Resisting moment
Mr
113.90 lb -ft
Eq. 7-89
Resisting moment arm
X
0.57 ft
Eq. 7-90
Height from top layer to grade
z
1.66 ft
Eq.
Overturning moment
Mo
18.62 lb -ft
Eq. 7-91
Wall: wall01
Powered by Vespa Page 11 Printed 8/2/2017
k:>- Version: 2.3.10.6234
SK Wall Design
2800 South Logan Street
Englewood, CO 80113
303-900-8714
RETAINING WALL ENGINEERING REVIEW CALCULATIONS
Keystone Compac III (8 degree batter - rear pin configuration) Units
DATE: 8/2/2017
PROJECT NAME: Ashland
PROJECT NUMBER: 17067
PROJECT LOCATION: Wheat Ridge, CO
Critical Cross Section Calculations
The calculations on the following pages were created using the NCMA
design methodology from the NCMA Design Manual, 3rd Edition.
The project will be constructed using Keystone Compac III (8 degree batter
- rear pin configuration) units, and Synteen SF20 geogrid.
Thank you, and please feel free to contact this office with any questions.
Sincerely.
Steve Kelley, P.E.
SK Wall Design
U 8-2-17
46681
�� CV
zo�ICS(-rl�
Project: 17067 - Ashland [Rev. 1 ] Wheat Ridge, CO
Project Design Inputs
Design Standard National Concrete Masonry Association 3rd Edition
Wall: wa1101
Minimum Factors of Safety
Hu
0.67ft
Facing Width
Lu
1.50ft
Facing Depth
Conventional
1.00 ft
Facing Weight
Xu
120lb/ft3
Center of Gravity
Gu
External
Value
Internal
0.09 ft
Value
Facing
Value
FSsl Base Sliding
1.50
FSsl
Internal Sliding
1.50
1393.45lb/ft
Apparent Shear Angle
FSbc Bearing Capacity
2.00
FSsc
Shear Capacity
1.50
135.00
0.55
FSot Overturning
1.50
39°
140.02
0.70
n/a
No Fines
External
Value
Internal
Value
Facing
Value
FSsl Base Sliding
1.50
FSbc Bearing Capacity
2.00
FSot Overturning
1.50
Reinforced
External
Value
Internal
Value
Facing
Value
FSsl Base Sliding
1.50
FSsl
Internal Sliding
1.50
FScs
Connection Strength 1.50
FSbc Bearing Capacity
2.00
FSpo
Pullout
1.50
FSsc
Facing Shear 1.50
FSct Crest Toppling
1.50
FSto
Tensile Overstress
1.50
FSot Overturning
2.00
Design Factors
Minimum Maximum
Term Description (as appl.) (as appl.)
RC Reinforced coverage ratio 1.00 0.00
Selected Facing Unit
Compac III Licensor: Keystone
Facing Height
Hu
0.67ft
Facing Width
Lu
1.50ft
Facing Depth
Wu
1.00 ft
Facing Weight
Xu
120lb/ft3
Center of Gravity
Gu
0.50 ft
Setback
u
0.09 ft
Batter
GP
7.97'
Cap Height
Hcu
0.33ft
Initial Shear Capacity
au
1393.45lb/ft
Apparent Shear Angle
u
34.00 °
Maximum Shear Capacity
Vu(max)
3246.03lb/ft
Selected Reinforcement Types
Reinforcements
SF20MD - Synteen Geogrid SF21Supplier: Synteen Technical Fabrics, Inc., Fill Type: Clays and Silts
Tult 2,290.73 RFcr 1.54 RFd 1.10 LTDS 1,229.33
RFid 1.10 Cds 0.80 a 0.80
Connection Properties
cs1 1,045.33 IP -1
au 900.29 u
Selected Soil Types
1,800.57 cs2 1,527.80 IP -2 6,001.90 cs max 1,527.80
34.00 Vu(max) 2,762.88
Powered by Vespa Page 2 Printed 8/2/2017
Version: 2.3.10.6234
In Situ
Friction
Density y
Friction Cohesion
Cf
Soil Zone
Soil Type
Angle tp
[Ib/ft']
Factor p
[Ib/ft']
Infill (i)
GP
34'
125.00
n/a
n/a
Retained (r)
CL
26°
135.00
n/a
n/a
Foundation (f)
CL
26°
135.00
0.55
0.00
Base (b)
39°
140.02
0.70
n/a
Powered by Vespa Page 2 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1 ] Wheat Ridge, CO
In Situ
Friction Density y Friction Cohesion Cf
Soil Zone Soil Type Angle tp [Ib/ft-] Factor p [Ib/ft-j
Drainage (d) GP 38° 125.02 0.70 n/a
Soil Glossary
CH: Inorganic clays, high plasticity
CL: Inorganic clays, low to medium plasticity, gravelly, sandy, silty, lean clays
PC: Clayey gravels, poorly graded gravel-sand-Rlily mixtures
qM: Silty gravels, poorly graded gravel -sand -silt mixtures
l': Pogrly-graded gravels, gavel -sand. Little or no fi0es.
,IV: Well -graded gravels, gravel -sand. Little or no ppea.
JAN: Inorganic clayey silts, ela&tic silts
ML: Inorganic silts, very fine sands, silty or clayey, slight plasticty
PC: Clayey sands, poorly greded sand -clay mj�,14rps
M: Silt Bands, poorly graded sand -silt mixturga
jf: Poorly -graded sands, gravelly sands. Lit�'� qFp Pes.
�W: Well -graded sands, gravelly sands. Littld pr n fnq>b.
Wall: wal101
Powered by Vespa Page 3 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1 ] Wheat Ridge, CO
Section 7 Details
Section 7 Cross-section
t,
�—-{Synteen Geogrid SF20MD} 5.50 ft
— —-{Synteen Geogrid SF20MD} 5.50 ft
`J
-{Synteen Geogrid SF20MD} 5.50 ft
Section 7 Static ICS Cross-section
Section 7 Cross-section Details
Upper Slope Angle
Crest Offset
Live Load
ql
Live Offset
qlofs
Dead Load
qd
Dead Offset
gdofs
Top of Section
Bottom Grade
Base of Section
Design Height
H
Embedment Depth
Hemb
Powered by Vespa
r " Gigrid SF20MD} 5.50 ft
tritoe-ri'Geogrid SF20MD} 5.50 ft
ter`
nteen Geogrid SF20MD} 5.50 ft
0.00o
0.00 ft
250 Ib/ft2
6.30 ft
0 Ib/ft2
0.00 ft
92.72 ft
86.56 ft
85.72 ft
7.00 ft
0.83 ft
Wall: wall01
Page 4 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1 j Wheat Ridge, CO
Empirical Checks
Check Description
Min. Requirement
Result
Status
Hemb Minimum Embedment %
10.0000
13.5212
Pass
L Min. Reinforcement Length
4.0000
5.5000
Pass
UH Ratio Min. LM Ratio
0.7000
0.7861
Pass
La Min. Anchorage Length
1.0000
1.5557
Pass
MinHemb Minimum Embedment
6.0000
10.0050
Pass
Rs Max. Reinforcement Separation
0.0000
2.0000
Pass
RsBottom Max. multiple of Hu at bottom
0.00
2.00
Pass
RsTop Max. multiple of Hu at top
0.00
2.50
Pass
External Checks
Static
Check Description
Min. Requirement
Result
Status
FSbc Bearing Capacity
2.00
5.43
Pass
FSct Crest Toppling
1.50
6.08
Pass
FSot Overturning
2.00
4.08
Pass
FSsI Base Sliding
1.50
1.71
Pass
Internal and Local Checks
Static
Elevation FSsi FSpo
FSto FScs
FSsc
Layer (ft) >=1.50 >=1.50
>=1.50 >=1.50
>=1.50
3 91.06 3.20 6.44
2.75 3.69
2 89.06 4.71 4.75
4.44 6.50
1 87.06 9.46 1.61
5.67 12.68
Static Calculations
General Equations
External failure plane
a
49.29'
Eq. 5-5
External active earth pressure
Kaext
0.29
Eq. 7-1
External interface friction angle
a
26.00'
Eq. 7-2
Width of reinforced zone
L'
4.59 ft
Eq. 7-3
Increase in width of reinforced zone due to R
L"
0.00 ft
Eq. 7-4
Increase in height due to backslope
h
0.00 ft
Eq. 7-5
Increase in height due to backslope at LP
hmax
0.00 ft
Eq. 7-6
Increase in height due to backslope
hs
0.00ft
Eq. 7-7
Width of rein. layer for internal sliding
Ls"
0.00 ft
Eq. 7-8
Equivalent slope at back of rein. zone
ext
0.00 °
Eq. 7-9
Height of back of wall for ext. stability
Hext
7.00ft
Eq. 7-10
Horizontal width of rein. zone at backslope
L
4.59 ft
Eq. 7-11
Earth pressure from soil weight
Ps
945.26lb/ft
Eq. 7-12
Force of uniform surcharge
FYI
500.36lb/ft
Eq. 7-13
Horz. component of Ps
PsH
898.84lb/ft
Eq. 7-14
Horz. force of dead load surcharge
PgdH
0.00lb/ft
Eq. 7-15
Horz. force of live load surcharge
PgIH
475.79lb/ft
Eq. 7-16
Horz. component of active earth force
PaH
1374.63lb/ft
Eq. 7-17
Resisting moment arm for PsH
Ys
2.33ft
Eq. 7-18
Resisting moment arm for PqH
Yq
3.50 ft
Eq. 7-19
Vert. component of Ps
PsV
292.571b/ft
Eq. 7-20
Vert. force of dead load surcharge
PgdV
0.00lb/ft
Eq. 7-21
Vert. force of live load surcharge
PgIV
154.87lb/ft
Eq. 7-22
Vert. component of active earth force
PaV
447.44lb/ft
Eq. 7-23
Resisting moment arm for PsV
Xs
5.83ft
Eq. 7-24
Resisting moment arm for PqV
Xq
5.99 ft
Eq. 7-25
Height above rein. area at int. failure plane
hint
0.00ft
Eq. 7-26
Horz. influence distance
dint
3.86 ft
Eq. 7-27
Distance dead load applied for broken back
L q
4.59 ft
Eq. 7-29
Internal active earth pressure
Kaint
0.20
Eq. 7-43
Internal interface friction angle
i
22.67 °
Eq. 7-44
Maximum height of slope influence
hmaxint
0.00 ft
Eq. 7-45
Slope for internal analysis
int
0.00 °
Eq. 7-46
Internal failure plane
i
55.31 °
Eq. 7-50
Elevation of influence of live load
Eqlinfl
0.00 ft
Eq. 7-93
Wall: wall01
Powered by Vespa Page 5 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1 ] Wheat Ridge, CO
Elevation of influence of dead load
Eqdinfl
7.00ft
Eq. 7-94
Base Sliding
Xri
Layer/
3.19 ft
Weight of reinforced mass
Wri
4810.31 Ib/ft
Eq. 7-30
Weight of soil above wall
Wr 1
0.001b/ft
Eq. 7-31A1
Weight of soil above wall
Wr 2
0.00lb/ft
Eq. 7-31A2
Weight of soil above wall
Wr 3
0.00lb/ft
Eq. 7-31A3
Weight of soil above wall
Wr
0.00 lb/ft
Eq. 7-31
Base sliding resistance
Rs
2346.14lb/ft
Eq. 7-32
Base sliding
FSsl
1.71
Eq. 7-33
Overturning
Resisting moment
Mr
15359.95 lb -ft
Eq. 7-34
Resisting moment arm for rein. zone
Xri
Layer/
3.19 ft
Eq. 7-35
Resisting moment arm in top slope
Xr 1
(Ib/ft)
1.98ft
Eq. 7-36A1
Resisting moment arm in top slope
Xr 2
[7-69)
4.28ft
Eq. 7-36A2
Resisting moment arm in top slope
Xr 3
0.00
6.57ft
Eq. 7-36A3
Resisting moment arm for surcharge
Xq
246.42
4.18ft
Eq. 7-37
Driving moment
Mo
3760.851b -ft
Eq. 7-38
Overturning
FSot
16.54
4.08
Eq. 7-39
Bearing Capacity
PgIV
PaH
PaV
Layer/
Equivalent bearing area
B
(Ib/ft)
4.82 ft
Eq. 7-40
Eccentricity of bearing force
e
[7-71]
0.34 ft
Eq. 7-41
Applied bearing pressure
Qa
87.06
997.46 lb/ft2
Eq. 7-42
Ultimate bearing pressure
Qult
5416.01 Ib/ftz
Eq. 12-10
Bearing capacity
FSbc
495.54
5.43
Eq. 12-11
Tensile Overstress
36.82
0.00
163.92
53.36
LTDS
Acn
Dn
W'ri
Fgn
Layer/ Elevation (lbift)
(ft)
(ft)
(Ib/ft)
(Ib/ft)
Course (ft) [2-3]
[7-54..57]
[7-58..60]
(ft)
[7-61]
2 87.06 1229.33
2.33
5.83
2
446.25
5 89.06 1229.33
2.00
3.66
3.20
276.66
8 91.06 1229.33
2.66
1.33
1196.56
216.75
Pullout
91.06
515.39
955.11
1034.82
ACn
La
do
Layer/ Elevation (Ib/ft)
(ft)
(ft)
Page 6
FSpo
Course (ft) [7-63]
[7-64]
[7-65]
[7-66]
2 87.06 2875.69
3.76
5.66
6.44
5 89.06 1314.51
2.66
3.66
4.75
8 91.06 349.11
1.56
1.66
1.61
Intenal Sliding
Wall: wa1101
PsH
PgdH
PgIH
PsV
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
(Ib/ft)
Course
(ft)
[7-67]
[7-68]
[7-69)
[7-70]
2
87.06
588.91
0.00
385.12
191.69
5
89.06
246.42
0.00
249.12
80.21
8
91.06
50.81
0.00
113.12
16.54
PgdV
PgIV
PaH
PaV
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
(Ib/ft)
Course
(ft)
[7-71]
[7-72]
[7-73]
[7-74]
2
87.06
125.36
0.00
974.03
317.05
5
89.06
81.09
0.00
495.54
161.30
8
91.06
36.82
0.00
163.92
53.36
R's
W'ri
Vu
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
FSsI
Course
(ft)
[7-75]
[7-76]
[7-77]
[7-78]
2
87.06
1754.68
3251.78
1358.31
3.20
5
89.06
1135.04
2103.45
1196.56
4.71
8
91.06
515.39
955.11
1034.82
9.46
Powered by Vespa
Page 6
Printed 8/2/2017
,'
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. I] Wheat Ridge, CO
Connection Strength
Fgn
Tconn
hinflmax
Layer/ Elevation (Ib/ft)
(Ib/ft)
FScs
(ft)
Course (ft) [7-61X]
[7-79]
[7-80]
[7-92]
2 87.06 332.27
1227.28
3.69
0.00
5 89.06 178.96
1163.03
6.50
0.00
8 91.06 86.64
1098.77
12.68
0.00
Crest Toppling
Active earth pressure from soil weight
Ps
34.94lb/ft
Eq. 7-81
Uniform surcharges
Pq
0.00lb/ft
Eq. 7-82
Horz. component of Ps
PsH
33.79lb/ft
Eq. 7-83
Uniform surcharge
PqH
0.00lb/ft
Eq. 7-84
Vert. component of Ps
PsV
8.861b/ft
Eq. 7-85
Vert. force from dead load surcharge
PgdV
0.00lb/ft
Eq. 7-86
Vert. force from live load surcharge
PgIV
0.00lb/ft
Eq. 7-87
Crest toppling
FSct
6.08
Eq. 7-88
Resisting moment
Mr
113.90lb-ft
Eq. 7-89
Resisting moment arm
Xw
0.57ft
Eq. 7-90
Height from top layer to grade
z
1.66 ft
Eq.
Overturning moment
Mo
18.74 lb -ft
Eq. 7-91
Wall: wall01
Powered by Vespa Page 7 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Section 10 Details
Section 10 Cross-section
-1- _ _{Synteen GeogridSF20MD) 4.50 ft
- — -{Synteen Geogrid SF20MD} 4.50 ft
— —-{Synteen Geogrid SF20MD} 4.50 ft
Section 10 Static ICS Cross-section
eogrid SF20MDI 4.50 ft
ynteneogrid SF20MD} 4.50 ft
--{Synteen Geogrid SF20MD} 4.50 ft
. „; .-�
Section 10 Cross-section
Details
Upper Slope Angle
0.00 °
Crest Offset
0.00 ft
Live Load
ql
250lb/ft2
Live Offset
qlofs
4.00ft
Dead Load
qd
0lb/ft2
Dead Offset
qdofs
OMft
Top of Section
92.06 ft
Bottom Grade
86.91 ft
Base of Section
86.39 ft
Design Height
H
5.66 ft
Embedment Depth
Hemb
0.52ft
Wall: wall01
Powered by Vespa Page 8 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 11 Wheat Ridge, CO
Empirical Checks
Check
Description
Min. Requirement
Result
Status
Hemb
Minimum Embedment %
10.0000
10.0217
Pass
L
Min. Reinforcement Length
4.0000
4.5000
Pass
UH Ratio
Min. UH Ratio
0.7000
0.7951
Pass
La
Min. Anchorage Length
1.0000
1.2918
Pass
MinHemb
Minimum Embedment
6.0000
6.1940
Pass
Rs
Max. Reinforcement Separation
0.0000
2.0000
Pass
RsBottom
Max. multiple of Hu at bottom
0.00
1.00
Pass
RsTop
Max. multiple of Hu at top
0.00
2.50
Pass
External Checks
5.66 ft
Eq. 7-10
Horizontal width of rein. zone at backslope
L
Static
Eq. 7-11
Earth pressure from soil weight
Ps
618.53lb/ft
Check
Description
Min. Requirement
Result
Status
FSbc
Bearing Capacity
2.00
4.87
Pass
FSct
Crest Toppling
1.50
6.12
Pass
FSot
Overturning
2.00
3.76
Pass
FSsl
Base Sliding
1.50
1.60
Pass
Internal and Local Checks
Static
Static Calculations
General Equations
Elevation
FSsl
FSpo
FSto
FScs FSsc
Layer
(ft)
>=1.50
>=1.50
>=1.50
>=1.50 >=1.50
3
90.39
3.15
7.59
4.42
6.14
2
89.06
3.20
6.44
2.75
3.69
1
87.06
5.08
3.90
5.85
8.87
Static Calculations
General Equations
External failure plane
a
49.29°
Eq. 5-5
External active earth pressure
Kaext
0.29
Eq. 7-1
External interface friction angle
a
26.00°
Eq. 7-2
Width of reinforced zone
L'
3.59 ft
Eq. 7-3
Increase in width of reinforced zone due to P
L"
0.00ft
Eq. 7-4
Increase in height due to backslope
h
0.00 ft
Eq. 7-5
Increase in height due to backslope at LP
hmax
0.00ft
Eq. 7-6
Increase in height due to backslope
hs
0.00 ft
Eq. 7-7
Width of rein. layer for internal sliding
Ls"
0.00ft
Eq. 7-8
Equivalent slope at back of rein. zone
ext
0.00°
Eq. 7-9
Height of back of wall for ext. stability
Hext
5.66 ft
Eq. 7-10
Horizontal width of rein. zone at backslope
L
3.59 ft
Eq. 7-11
Earth pressure from soil weight
Ps
618.53lb/ft
Eq. 7-12
Force of uniform surcharge
Pq
404.75lb/ft
Eq. 7-13
Horz. component of Ps
PsH
588.16lb/ft
Eq. 7-14
Horz. force of dead load surcharge
PgdH
O.00lb/ft
Eq. 7-15
Horz. force of live load surcharge
PgIH
384.88lb/ft
Eq. 7-16
Horz. component of active earth force
PaH
973.04lb/ft
Eq. 7-17
Resisting moment arm for PsH
Ys
1.89ft
Eq. 7-18
Resisting moment arm for PqH
Yq
2.83ft
Eq. 7-19
Vert. component of Ps
PsV
191.45lb/ft
Eq. 7-20
Vert. force of dead load surcharge
PgdV
0.00lb/ft
Eq. 7-21
Vert. force of live load surcharge
PgIV
125.28lb/ft
Eq. 7-22
Vert. component of active earth force
PaV
316.72lb/ft
Eq. 7-23
Resisting moment arm for PsV
Xs
4.76 ft
Eq. 7-24
Resisting moment arm for PqV
Xq
4.90 ft
Eq. 7-25
Height above rein. area at int. failure plane
hint
0.00ft
Eq. 7-26
Horz. influence distance
dint
3.12 ft
Eq. 7-27
Distance dead load applied for broken back
L q
3.59 ft
Eq. 7-29
Internal active earth pressure
Kaint
0.20
Eq. 7-43
Internal interface friction angle
i
22.67°
Eq. 7-44
Maximum height of slope influence
hmaxint
0.00 ft
Eq. 7-45
Slope for internal analysis
int
0.00 °
Eq. 7-46
Internal failure plane
i
55.31 °
Eq. 7-50
Elevation of influence of live load
Eqlinfl
0.00 ft
Eq. 7-93
Wall: wa]101
Powered by Vespa Page 9 Printed 8/2/2017
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 1] Wheat Ridge, CO
Elevation of influence of dead load
Eqdinfl
5.66 ft
Eq. 7-94
Base Sliding
Xri
Layer/
2.60 ft
Weight of reinforced mass
Wri
3183.68lb/ft
Eq. 7-30
Weight of soil above wall
Wr 1
0.001b/ft
Eq. 7-31A1
Weight of soil above wall
Wr 2
0.00lb/ft
Eq. 7-31A2
Weight of soil above wall
Wr 3
0.00lb/ft
Eq. 7-31A3
Weight of soil above wall
Wr
0.00lb/ft
Eq. 7-31
Base sliding resistance
Rs
1552.78lb/ft
Eq. 7-32
Base sliding
FSsl
1.60
Eq. 7-33
Overturning
Resisting moment
Mr
8276.10lb-ft
Eq. 7-34
Resisting moment arm for rein. zone
Xri
Layer/
2.60 ft
Eq. 7-35
Resisting moment arm in top slope
Xr 1
(Ib/ft)
1.79ft
Eq. 7-36A1
Resisting moment arm in top slope
Xr 2
[7-69]
3.59ft
Eq. 7-36A2
Resisting moment arm in top slope
Xr 3
0.00
5.39 ft
Eq. 7-36A3
Resisting moment arm for surcharge
Xq
164.50
3.50ft
Eq. 7-37
Driving moment
Mo
2198.81 lb -ft
Eq. 7-38
Overturning
FSot
16.47
3.76
Eq. 7-39
Bearing Capacity
PgIV
PaH
PaV
Layer/
Equivalent bearing area
B
(Ib/ft)
3.82 ft
Eq. 7-40
Eccentricity of bearing force
a
[7-71]
0.34ft
Eq. 7-41
Applied bearing pressure
Qa
87.06
833.91 Ib/ft2
Eq. 7-42
Ultimate bearing pressure
Quit
4057.31
Ib/ft2
Eq. 12-10
Bearing capacity
FSbc
119.80
4.87
Eq. 12-11
Tensile Overstress
0.00
163.46
53.21
LTDS
Acn
Dn
Vu
Fgn
Layer/ Elevation (Ib/ft)
(ft)
(ft)
(Ib/ft)
(Ib/ft)
Course (ft) [2-3]
[7-54..57]
[7-58..60]
[7-75]
[7-61]
1 87.06 1229.33
1.67
4.83
87.06
277.90
4 89.06 1229.33
1.67
3.16
4
210.05
6 90.39 1229.33
2.33
1.16
5.08
179.75
Pullout
402.31
745.56
1034.53
8.79
ACn
La
do
Layer/ Elevation (Ib/ft)
(ft)
(ft)
FSpo
Course (ft) [7-63]
[7-64]
[7-65]
[7-66]
1 87.06 2109.66
3.13
4.99
7.59
4 89.06 818.82
2.03
2.99
3.90
6 90.39 289.25
1.29
1.66
1.61
Intenal Sliding
Wall: wall01
PsH
PgdH
PglH
PsV
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
(Ib/ft)
Course
(ft)
[7-67]
[7-68]
[7-69]
[7-70]
1
87.06
457.76
0.00
339.54
149.00
4
89.06
164.50
0.00
203.54
53.54
6
90.39
50.59
0.00
112.87
16.47
PgdV
PgIV
PaH
PaV
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
(Ib/ft)
Course
(ft)
[7-71]
[7-72]
[7-73]
[7-74]
1
87.06
110.52
0.00
797.31
259.52
4
89.06
66.25
0.00
368.04
119.80
6
90.39
36.74
0.00
163.46
53.21
R's
W'ri
Vu
Layer/
Elevation
(Ib/ft)
(Ib/ft)
(Ib/ft)
FSsl
Course
(ft)
[7-75]
[7-76]
[7-77]
[7-78]
1
87.06
1210.22
2242.78
1304.10
3.15
4
89.06
725.47
1344.45
1142.36
5.08
6
90.39
402.31
745.56
1034.53
8.79
Powered by Vespa
Page 10
Printed 8/2/2017
.' '
Version: 2.3.10.6234
Project: 17067 - Ashland [Rev. 11 Wheat Ridge, CO
Connection Strength
Active earth pressure from soil weight
Ps
Fgn
Tconn
Uniform surcharges
hinflmax
Layer/ Elevation
(Ib/ft)
(Ib/ft)
FScs
(ft)
Course (ft)
[7-61X]
[7-79]
[7-80]
[7-92]
1 87.06
196.48
1205.75
6.14
0.00
4 89.06
128.63
1141.49
8.87
0.00
6 90.39
66.10
1098.66
16.62
0.00
Crest Toppling
Active earth pressure from soil weight
Ps
34.791b/ft
Eq. 7-81
Uniform surcharges
Pq
0.00lb/ft
Eq. 7-82
Horz. component of Ps
PsH
33.65 lb/ft
Eq. 7-83
Uniform surcharge
PqH
0.001b/ft
Eq. 7-84
Vert. component of Ps
PsV
8.831b/ft
Eq. 7-85
Vert. force from dead load surcharge
PgdV
0.00lb/ft
Eq. 7-86
Vert. force from live load surcharge
PgIV
0.00lb/ft
Eq. 7-87
Crest toppling
FSct
6.12
Eq. 7-88
Resisting moment
Mr
113.90 lb -ft
Eq. 7-89
Resisting moment arm
Xw
0.57ft
Eq. 7-90
Height from top layer to grade
z
1.66 ft
Eq.
Overturning moment
Mo
18.62 lb -ft
Eq. 7-91
Wall: wall0l
Powered by Vespa Page 11 Printed 8/2/2017
Version: 2.3.10.6234
Synteen
SF 20
SOIL REINFORCEMENT GEOGRID
www.synteen.com
SF 20 is composed of high molecular weight, high tenacity multifilament polyester yarns that are
woven into a stable network placed under tension. The high strength polyester yarns are coated with a
PVC material. SF Geogrids are inert to biological degradation and are resistant to naturally encountered
chemicals, alkalis and acids. SF Geogrids are typically used for soil reinforcement applications such as
retaining walls, steepened slopes, embankments, sub -grade stabilization, embankments over soft soils
and waste containment applications.
TENSILE PROPERTIES
TEST METHOD
MARV VALUES
(LBS/FT)
Ultimate Strength Machine Direction and Cross Machine
ASTM D 6637
2,025 MD & CD
Creep Limited Strength Machine Direction and Cross Machine
ASTM D 5262
1,282 MD & CD
T., = Long Term Design Strength Machine Direction and Cross
Machine
NCMA 97
1,059 MD & CD
Aperture Size ins.
Measured
0.80 x 1.00
RF Creep - 1.58 RF Durability - 1.10 RF Installation Damage (Soil Type 3) - 1.10
SYNTEEN Technical Fabrics, Inc Warranty Synteen Technical Fabrics warrants our products to be free from
defects in material and workmanship when delivered to our customers and that our products meet our
published specifications. If a product is found to be defective, and our customer gives notice to Synteen
Technical Fabrics before installing the product, Synteen Technical Fabrics will replace the product without
charge to our customer or refund the purchase price at Synteen Technical Fabrics election. Replacing the
product or obtaining a refund are the buyer's sole remedy for a breach and Synteen Technical Fabrics will not
be liable for any consequential damage attributed to a defective product. This warranty is given in lieu of all
other warranties, express or implied, including the implied warranty of merchantability or fitness for a
particular purpose. There are no warranties, which extend beyond the description provided herein.
MADE IN
D {E USA'
M• S1'J7iNNJ1
. f
�4qi S'-tC'�• -
. Sneeth Ciiroli>>a
K& A
Kumar & Associates, Inc.
Geotechnical & Environmental Engineers
GEOTECHNICAL ENGINEERING STUDY
ASHLAND DECENTRALIZATION FACILITY
SHERIDAN BOULEVARD AND
WEST 29TH AVENUE
DENVER, COLORADO
Prepared for:
MARTIN/MARTIN
4251 KIPLING STREET
WHEAT RIDGE, COLORADO 80033
Attention: Mr. Gary Thomas, P.E.
Project No. 93-108
925 West Kenyon Ave., Unit 1
Englewood, CO 80110
(303) 761-2337
Fax (303) 761-2651
Branch Office - Colorado Springs, CO
February 1, 1993
*-Z- 0 1 -� G -S �'7�o
TABLE OF CONTENTS
CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . .
PURPOSE AND SCOPE OF STUDY . . . . . . . . . . . . . . . . .
PROPOSED CONSTRUCTION . . . . . . . . . . . . . . . . . . . .
SITE CONDITIONS . . . . . . . . . . . . . . . . . . . . . . .
SUBSURFACE CONDITIONS . . . . . . . . . . . . . . . . . . . .
Laboratory Testing . . . . . . . . . . . . . . . . . . .
FOUNDATION RECOMMENDATIONS . . . . . . . . . . . . . . . . .
FLOOR SLAB . . . . . . . . . . . . . . . . . . . . . . .
RETAINING WALLS . . . . . . . . . . . . . . . . . . . . . .
WATER SOLUBLE SULFATE . . . . . . . . . . . . . . . . . . .
PAVEMENT DESIGN AND CONSTRUCTION . . . . . . . . . . . . .
Subgrade Materials . . . . . . . . . . . . . . . . . .
Traffic Loading Conditions . . . . . . . . . . . . . .
Pavement Design . . . . . . . . . . .
Subgrade, Subbase and Aggregate Base Course Layer
Preparation. . . . . . . . . . . . . . . . . . .
Drainage. . . . . . . . . . . . . . . . . . . . . . .
SURFACE DRAINAGE . . . . . . . . . . . . . . . . . . . . .
LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . .
FIG. 1 - LOCATION OF EXPLORATORY BORINGS
FIG. 2 - LOGS OF EXPLORATORY BORINGS
FIGS. 3 AND 4 - SWELL -CONSOLIDATION TEST RESULTS
TABLE I - SUMMARY OF LABORATORY TEST RESULTS
Kumar & Associates, Inc.
1
3
3
5
6
6
7
10
12
13
13
13
14
14
15
16
16
17
CONCLUSIONS
(1) The subsurface conditions encountered in the borings drilled
for this study consist of 14 to 16 feet of sandy clay over
claystone bedrock. Pavement consisting of asphalt and base
course was encountered at some of the borings. Localized fill
associated with the existing construction was also encountered
in one boring. Ground water was detected in two of the
borings at depths of 11 and 14.5 feet at the time of drilling.
When checked six days following drilling, ground -water depths
ranged from 11 to 15 feet.
(2) The natural sandy clay possesses a slight swell potential. We
recommend portions of the building which are outside of the
limits of the existing building be founded with spread
footings placed on the natural undisturbed soils or properly
compacted fill. These footings should be designed for an
allowable soil bearing pressure of 2,500 psf and a minimum
dead load pressure of 500 psf. We recommend an allowable
bearing pressure of 3,000 psf be used for evaluation of
proposed loads on the existing building foundation which will
remain in place to support the other portions of the proposed
building.
(3) A slab -on -grade floor may be used for the new construction.
The floor may be supported on undisturbed natural soils or
properly compacted fill in accordance with the recommendations
Kumar & Associates, Inc.
�4=
given in this report. Special treatment of underslab fill
will be required in the area of the existing building
basement, which will remain partially in place.
(4) We recommend the new pavement for the facility consist of 4
inches of asphalt and 8 inches of aggregate base course,
6.5 inches of full -depth asphalt or 6 inches of portland
cement concrete placed on properly prepared natural soil
subgrade or properly compacted fill. If a more select
granular type of fill material is imported for use at the site
and comprises at least the upper 1 foot of fill directly
beneath the pavement, the pavement sections in these areas can
be reduced in accordance with guidelines presented in the
report.
Kumar & Associates, Inc.
- 3 -
PURPOSE AND SCOPE OF STUDY
This report presents the results of a geotechnical engineering
study for the proposed Ashland Decentralization Facility at
Sheridan Boulevard and West 29th Avenue, Denver, Colorado. The
site is shown on Fig. 1. The study was conducted to develop
information on the general subsurface conditions and provide
recommendations for the building foundation, suitability of
incorporating the existing building foundation into part of the new
structure, slab -on -grade floor recommendations and pavement
recommendations. The study was conducted in accordance with the
scope of work in our proposal to Martin/Martin, Consulting
Engineers, dated December 9, 1992, revised January 18, 1993.
This report has been prepared to summarize the data obtained
during this study and to present our conclusions and
recommendations based on the proposed construction and the
subsurface conditions encountered. Design parameters and a
discussion of geotechnical engineering considerations related to
construction of the proposed facility are included in the report.
PROPOSED CONSTRUCTION
We understand the proposed building will be one story with
various floor levels stepping up to the higher level of the north
end of the property. The north end of the building will house
dispatch offices, a lunchroom, restrooms, lockers and storage
areas. This portion of the proposed building will occupy an area
presently occupied by the existing pump station building, as shown
Kumar & Associates, Inc.
- 4
on Fig. 1. The floor level at the north end of the building will
be 5227.33 feet. The south end of the building will be garages.
The finish floor levels of the garage floors will range from
5221.33 to 5224 feet.
The proposed floor level on the south end of the building will
be approximately 4 to 6 feet above the elevation of the existing
paved parking lot in that area. Additional fill will be imported
to the site. A paved surface parking lot will be constructed on
the south and west sides of the garage building.
The existing building superstructure will be demolished for
new construction. Due to the existing massive foundations and
concrete walls for piping and pump support which occur in the
existing building, consideration is being given to not removing the
floor, foundation elements and some of the concrete walls. These
will be used for supporting part of the new building and its floor
slab.
We understand the new building wall and column loads will be
relatively light. The new construction in the area of the existing
building will probably result in a reduction of loads to the
existing foundation.
If the proposed construction varies significantly from that
described above or depicted in this report, we should be notified
to reevaluate the recommendations provided.
Kumar & associates, Inc.
- 5 -
SITE CONDITIONS
The site is an existing pump station which has been out of
service for a number of years. It is currently being used as a
maintenance decentralization facility. The existing building, as
shown on Fig. 1, was built several decades ago, probably in the
1920 to 1940 era. The existing building is one story above a
walkout basement and is a masonry structure. A labyrinth of
relatively thick concrete walls and pump foundation bases with
remains of cast-iron conduits and valves occur in the basement of
the existing pump station. The upper level housed the large pumps,
many of which have been removed.
There are several buried cast-iron conduits entering the
building on the north, east and west sides. A one-story masonry
block garage building also occurs on the south end of the property,
as shown on Fig. 1.
The site slopes down from the north to the south, creating a
maximum elevation difference of approximately 15 feet. A concrete
retaining wall occurs along a portion of the east side of the paved
parking lot area. Lawns occur on the east side and on the
northwest corner of the property. The remaining area which is not
covered by buildings is asphalt paved.
The existing asphalt pavement is in relatively poor condition.
The existing drainage of the parking lot is relatively poor. A
depression which ponds water and accumulates ice in the winter
occurs in front (north) of the garage building.
Kumar & associates, Inc.
:WIM
SUBSURFACE CONDITIONS
The general subsurface conditions at the site were explored by
drilling six borings at the locations shown on Fig. 1. Graphic
logs of these borings are presented on Fig. 2. The subsurface
conditions encountered at the borings consist of an asphalt
pavement section or sod underlain by approximately 14 to 16 feet of
sandy to very sandy clay overlying claystone bedrock to the maximum
explored depths of 15 to 25 feet.
Sandy clay fill was encountered in Boring 6, between existing
underground piping. The exact vertical and lateral extent of
existing fill at the site was not determined by this study. It is
mainly anticipated to be associated with basement wall backfill and
underground pipe zones.
Sampler penetration resistance values (blow counts) indicate
the sandy clay is stiff to very stiff. The underlying claystone is
medium hard to hard.
Ground water was detected in Borings 2 and 5 at depths of 11
and 14.5 feet, respectively, at the time of drilling. When checked
six days following drilling, ground water was measured at depths of
11 to 15 feet in the borings, except Boring 3, which remained dry.
These water levels range in elevation from 5202 to 5213 feet.
Based on this gradient, ground -water flow is generally occurring
from northwest to southeast, subparallel to the ground slope.
Laboratory Testing: Selected samples of the soils obtained from
the borings were tested in the laboratory to determine
classification properties, natural moisture and density and swell
Kumar & Associates, Inc.
- 7 -
and/or consolidation potential. These data are presented on the
graphic logs (Fig. 2) and summarized in Table I. Results of swell -
consolidation tests are presented on Figs. 3 and 4. The results of
these tests indicate the sandy clay possesses a slight swell
potential at their natural moisture and density condition. Results
of water soluble sulfate analyses are discussed in a later section
of this report.
FOUNDATION RECOMMENDATIONS
Based on the subsurface conditions encountered in the
exploratory borings, the relatively light building loads, the
proposed floor levels, condition of the existing structure and our
experience with the general soil conditions in the area, we
recommend the proposed building be founded with spread footings
placed on undisturbed natural soils or properly compacted fill.
The following design and construction details should be observed
for the spread footing foundation system.
(1) New footings placed on undisturbed sandy clay should be
designed for an allowable soil bearing pressure of 2,500 psf
and a minimum dead load pressure of 500 psf. In order to
maintain the minimum dead load pressure requirement, footings
should be designed as narrow as possible without exceeding the
allowable bearing pressure. A wall -on -grade is also an
acceptable alternative to the spread footing if necessary to
achieve the minimum dead load pressure requirement.
Intermittent void spaces may also be used for this purpose.
Kumar & Associates, Inc.
- 8 -
(2) We understand the proposed construction in the area of the
existing building will generally possess lower structural
loads than that of the existing. If the structural engineer
needs to evaluate loads on the existing foundation which will
remain in place, an allowable soil bearing pressure of
3,000 psf should be used for this purpose. The higher
pressure for the existing versus the new footings is based on
the incremental loading conditions. New footings will impose
2,500 psf loading to virgin soils; whereas, existing footings
having imposed a historic load to their bearing soils, will
subject those soils to a lower incremental increase. If the
proposed structural loads will not exceed the historic loads,
additional settlement of the foundation is not anticipated.
(3) The new footing elements are anticipated to settle as much as
1 inch. As a result, there could be some differential
settlement between portions of the structure supported on the
new footings and portions of the structure constructed on the
existing foundation. The settlement of the clay soils will
occur relatively quickly as the load is applied, since the
clay soils are not saturated.
(4) Continuous foundation walls should be adequately reinforced to
span an unsupported distance of at least 10 feet.
(5) Areas of existing fill beneath the proposed building and
pavement areas should be subexcavated to remove items such as
storm drain piping, inlets, existing abandoned water conduits
and backfill associated with trenches, basement walls and the
Kumar & :associates, Inc.
Cs=
existing garage foundation. The existing garage foundation
and retaining wall footings should also be removed. These
areas should be replaced with properly compacted nonexpansive
granular fill. The fill should be placed in loose lifts not
exceeding 8 inches and compacted to 100% standard Proctor
maximum dry density within 2% of optimum moisture content
beneath new footing areas and to at least 95% maximum dry
density within 2% of optimum moisture content beneath floor
slab areas.
(6) Some of the existing building substructure, including
foundation, floor slab and relatively massive concrete walls
supporting piping and pump bases may remain in place below the
proposed new building level. All exposed piping should be
removed and remaining pipe sections extending through walls
should be filled with grout or flowable type cementitious
backfill (flow fill) material. Areas between the remaining
walls should be filled with flowable backfill or larger areas
can be filled with compacted nonexpansive fill to the above
recommended degrees.
(7) All footing bearing surfaces should be observed by a
representative of the geotechnical engineer prior to placing
concrete.
The owner should be aware that construction of new foundations
over existing underground features involves some potential for
possible settlement if there are undetected voids or poor
foundation conditions beneath the existing structure. The
Kumar &- Associates, Inc.
- 10 -
potential risks involved with these conditions is dependent upon
archive drawings of the existing substructure and underground
pipes. If the archival information is relatively undependable,
consideration could be given to probing below proposed structurally
loaded areas of the new building, particularly at concentrated
column loading areas. This probing should be done at the time of
construction after the superstructure has been razed. The probing
can be done by various types of drilling methods such as air
percussion, which the contractor may propose, if approved by the
engineer. The owner should also be aware that the presence of
these structures may create obstacles for future subsurface
construction, such as installation of utilities, etc.
FLOOR SLAB
Floor slabs present a problem where expansive materials are
present near floor slab elevation because sufficient dead load
cannot be imposed on them to resist the uplift pressure generated
when the materials are wetted and expand. Based on the slight
moisture -volume change characteristics of the materials
encountered, we believe slab -on -ground construction may be used,
provided the risk of distress resulting from slab movement is
accepted by the owner. The following measures should be taken to
reduce damage which could result from movement should the underslab
materials be subjected to moisture changes.
Kumar & Associates. Inc.
(1) Floor slabs should be separated from all bearing walls and
columns with expansion joints which allow unrestrai.nea
vertical movement.
(2) Interior non-bearing partitions resting on floor slabs should
be provided with slip joints so that, if the slabs move, the
movement cannot be transmitted to the upper structure. This
detail is also important for wallboards, stairways and door
frames. slip joints which will allow at least 1 inch of
vertical movement are recommended.
(3) Floor slab control joints should be used to reduce damage due
to shrinkage cracking. Joint spacing is a function of slab
thickness, aggregate diameter, slump and other factors. The
requirements for joint spacing and slab reinforcement should
be established by the designer based on experience,
recommended ACI or PCA guidelines and the intended slab use.
(4) A minimum 4 -inch layer of free -draining gravel should be
placed beneath the slabs. This material should consist of
minus 1 1/2 -inch aggregate with less than 30% passing the No.
4 sieve and less than 5% passing the No. 200 sieve. The
granular layer will prevent capillary water rise and reduce
slab curling due to differential cure.
(5) Fill placed beneath floor slabs should be a nonexpansive soil.
The fill supporting floor slabs should be compacted to at
least 95% of the maximum standard Proctor density within 2% of
optimum moisture content. As previously described, existing
fill and subterranean features such as the existing storm
Kumar & associates, Inc.
- 12 -
drains underlying the proposed garage area should be removed
and replaced with properly compacted fill. Portions of the
existing foundation walls and floor slab area which are to
remain in place beneath the proposed north end of the building
should be backfilled with flowable type cementitious backfill
or compacted fill as previously recommended in the Foundation
Recommendations section of this report.
RETAINING WALLS
Cantilevered retaining structures which can be expected to
deflect sufficiently to mobilize the full active earth pressure
condition should be designed for a lateral earth pressure computed
on the basis of an equivalent fluid unit weight of 45 pcf
(Ka = 0.35) for backfill consisting of the on-site sandy clay.
Restrained walls should be designed for a lateral earth pressure
computed on the basis of an equivalent fluid unit weight of 55 pcf.
(K = 0.45). An allowable coefficient of friction of 0.25 should be
used for analysis of sliding resistance for the footings on the
bearing soils. Allowable passive resistance should be based on an
equivalent fluid unit weight of 150 pcf.
The pressures recommended above assume drained conditions
behind the walls and a horizontal backfill surface. The buildup of
water behind a wall or an upward sloping backfill surface will
increase lateral pressure imposed on the retaining wall. Retaining
walls should also be designed for appropriate surcharge pressures
such as traffic, where applicable.
Kumar & Associates, Inc.
- 14 -
Traffic Loading Conditions: Based on a 20 -year design period, an
equivalent 18 -kip daily load application (EDLA) of 25 was assumed
for the traffic loading factor. This value is based on assumed
traffic on the order of 20 to 40 truck trips per day. The traffic
was assumed to consist of a mix of single and combination units,
some loaded and some empty, with occasional miscellaneous rubber -
tired backhoes and front-end loaders.
Areas which will not be subject to regular truck traffic and
are restricted to cars and pickups will have an EDLA of
approximately 2. However, such areas may be very localized and
reduction of pavement thickness in these areas may not be
justified.
Pavement Design: The following table presents recommended pavement
sections based on the sandy clay subgrade and the above described
traffic loading conditions. Portland cement concrete pavement is
recommended to resist concentrated loads associated with wheel
turning and to resist localized rutting due to heavy wheel loads,
particularly where loaders may be used extensively.
The pavement design analysis used in this study is based on
relationship with 18 -kip axle load equivalency factors. Other
pavement design procedures may be more appropriate for extremely
heavy wheel loads of heavy equipment.
We understand little, if any, existing pavement will remain in
areas where finished grades will require pavement. However, if it
is desired to overlay existing pavement in localized areas, such
Kumar & Associates, Inc.
- 15 -
areas should be further evaluated to develop appropriate overlay
thickness.
ALTERNATIVE PAVEMENT SECTIONS
PAVEMENT TYPE
EDLA = 25
EDLA = 2
(Thickness)
(Thickness)
1. Portland Cement
6 inches
5 inches
Concrete (PCC)
2. Full -Depth As halt
6.5 inches
4 inches
3. Composite Section:
Asphalt
inches
2.5 inches
Aggregate Base CourseF.'8
inches
6 inches
If a 1 -foot thick granular subbase is provided above the sandy
clay beneath the pavement, the above flexible pavement sections for
the EDLA = 25 can be reduced to 4 inches of full -depth asphalt or
3 inches of asphalt and 6 inches of base course.
The PCC thickness should not be reduced below the minimum
thicknesses given above, even if a select granular subbase is used.
This is due to the thinner sections of rigid concrete being more
sensitive to. localized nonuniform subgrade support than the
flexible pavement. In general, however, placement of the thicker
concrete section should result in a longer pavement service life.
Subgrade, Subbase and Aggregate Base Course Laver Preparation:
Prior to placing the pavement section, the entire subgrade area
should be compacted to at least 950 of maximum standard Proctor
density within 2% of optimum moisture content. The pavement
subgrade should be proofrolled with a heavily loaded pneumatic
Kumar &r. Associates, Inc.
- 16 -
tired vehicle. Pavement design procedures assume a stable
subgrade. Areas which deform excessively under heavy wheel loads
are not stable and should be removed and replaced to achieve a
stable subgrade prior to paving.
The granular subbase, if used, and the aggregate base course
layer should be compacted to at least 95% modified Proctor density.
Drainage: The collection and diversion of surface drainage away
from paved areas is extremely important to the satisfactory
performance of pavement. Drainage design should provide for
removal of water from paved areas and prevent wetting of the
subgrade soils.
SURFACE DRAINAGE
The following drainage precautions should be observed during
construction and maintained at all times after the facility has
been completed.
(1) Excessive wetting or drying of the foundation excavations and
underslab areas should be avoided during construction.
(2) Exterior backfill should be adjusted to near optimum moisture
and compacted to at least 95% of the maximum standard Proctor
density in pavement areas and to at least 90% of the maximum
standard Proctor density in landscape areas.
(3) The ground surface surrounding the exterior of the building
should be sloped to drain away from the foundation in all
directions. We recommend a minimum slope of 6 inches in the
Kumar & Associates, Inc.
- 17 -
first 10 feet in unpaved areas and a minimum slope of 3 inches
in the first 10 feet in paved areas.
(4) Roof downspouts and drains should discharge well beyond the
limits of all backfill.
LIMITATIONS
This study has been conducted in accordance with generally
accepted geotechnical engineering practices in this area for use by
the client for design purposes. The conclusions and
recommendations submitted in this report are based upon the data
obtained from the exploratory borings drilled at the locations
indicated on Fig. 1, and the proposed type of construction. The
nature and extent of subsurface variations across the site may not
become evident until excavation is performed. If during
construction, fill, soil, rock or water conditions appear to be
different from those described herein, this office should be
advised at once so reevaluation of the recommendations may be made.
we recommend on-site observation of excavations and foundation
bearing strata by a representative of the geotechnical engineer.
KUMAR & ASSOCIATES, INC.
uS JOHN
�G15TEq . 9
F C/
*; 1 5 5 5 9 Marcgs J. Pardi, P.E.
:90�
J'TgT� �ONAI �a;
...•
E OF COReviewed By
Narender Kumar,,,!E.
MJP/bn
Pouw & Associates, Inc. (2 copies)
Attention: Mr. Paul Jeselnick
Kumar & Associates, Inc.
W
`y
N
a
M
z0
1-
4 K
v
In
V)
w Q
3
n'.
w
- c�
U
w1
U w O
v) S w
Y = z a 3 w aw a~
w
J
m
? Z (
3}
m
m
z
W �Q
o f
>
0
>
a
o 3
ati O a
z
v }
r-3
z �" w�
vi
z
I
~
0
a <
�' 2
a
a
a
O
co, " T U
W 7,s. J Q 1- O
�
m
z
p
Z
3
Qc' d z
w o
= �
3 0
w
Ix
m OH=O Q}
p mwa a
m
}
w
m
)^a o
m
o'No ?�
o
o
m a
m
1 -vim a'
OJ
C�
-�
wO
wQ
C7
a) w
Ws O a
N WO
} w
Z
a
z o> -a �J
�o a~f w
x
c�S
ow
�'
a~ �� a
!d wg
0
>j `'Qm1: 5 3Q
,.
~
N
J
wU
P a
C�
Z
7
)"� W p
J
'�' O a o
Q W
Z W'1
W
wp =WUJI C7w w
OJ'- �
V)
o
UUyZz"
�i
U
VD)
p2'
4
t-
NZy
O
3
z �� a
¢
fn
Oa
6
OZ
z3
2
(X
Up m
a w
v)W
z~
l2
ow 3yj~ xZ 00 v
zx 03 N
O)-
}
W
p
(nm
}m
7i
U
S a Z
FO >
W KN
p0 mSW
6
m
oz -6
=W ON V)
Um mo ZQ Z N
cy.5
a
>
z
a Jm
o6
OJ
f'
V)
O
op
V)
IVn
z:J-
0O
I-
Y
U
U
>
U� >
3 ~
�1
33 )-
NO Kz
a
qp
Za H O �4- j��-'i:N 6
mz Qj� J In f -`d
2
Qw
Q
(C
Q
pprp
Kx
N
-y
E5
Ei! za 0=
OQ
x�
m�WS --M< 7W KWvW�W.
IW
O
O
oZ
N
m
J
I�s
JZ W
m(� XN
�'W WF JU WOf-tCQ-7 3117
OpQQ
M
~
O
Z
a
Y
Z
m
W
O
d
a0 a �i
QM O
W
of s
1�4
WD 1-U VIZT
lg2 mXz �'W Wp V�JVW
a
o
va)
�3
i
a
"'
w
wz
W a
oro z
a=
ViQ
oa
a�
�~ cn� �z oa}a�t~na
�- 1 '-
[]
ZI Q
w
Q
V)
O
J
r
�z
}
g
J =
�a p
o
O1Z- ��
a'�t`'
>
a0 0 W _oa3
W}W �~ �p3po-�a II
0
m
F-
4.
U a
U
[]
p l�
V)I
W
Z V
x0 0�
JZ
p pp II O II II N
2Z'J S2Z �O QUq N J_0
W
N
wI'I
O
Z
WV J4.
WO
F -O F -H= UU J�SO I Jai'
N
- N
1333 - N011`dA313
N
OIn
N
c"I O)
_7
N
NY M
IlfO'�
^ 3�I J6 N
ID INl7
V N
I
Z N
.N
tY
W
W
N
N N
M
O
O
V7 ).:
I
U N
N
N
11
N
V w I
co
CO {j�, �iom {fin
N
N
OI
J
zto
RIX
II
w0
W-,
mW 1_� I � o will
a F N
_ j( N_
V) i W�_�gn ,pp,JJ,,
In X W M�vi
M^
>1-w
I
UN
J a
aaaln
Qm
ZN
Oil
"p
p
W
ti
I
N N
N
W
zD
0
Iwn U'
Q
<1U
M
O
N
O i -i
1[1
2 N
N
O W
W
C
Oil
ILA
@i
mW
0111
N
Q1
at
Z N
[Y
Oil
mWLr)
?
D �i
1n OtnS
In
N
to
Na
In
N
In
I
N N
In In
I I I I I I I
I
In
I I I I
I I
N w
In jn
I I I I I 1 l
133j - N011VA313
i
rn
3nN3Ad H16Z 1S3M
--------------------- - - - - -- — --
---------------------------
I
----
E
Z
i
J
I
CLJ
I
�
if
L
Lj
co
/
zrE I;
i
-------------------
I'
q
/
I
I
\
"
Y:
I
I
I�:
z I
3
j
�-- --'
I
----
J
J
03
0
m
\
�2
)
g
f
/
f
u
°
�
\
§/
g
G
%
2
§2
\
f
to
§
\
\
\
[
&
§
/
%
\
R
2
2e
/ § /
S
%
$
/
wG
`- § \
§
2
G
@
@
))�
4
LO -4-4
\
j
j
\
§ n—
S
g
Q
5
2
\
q
§
§ 2
G
2
§
B
2 /
CN
n
v
\
§
q—
2�
�
�
To
From
CC:
Re
MARTIN/MARTIN
U4• U 1 q;. 1 n4 iR 11 a+.
Mark Westberg & Dave Brossman Date
PW/Engineering Division
7500 W. 29th Avenue
Wheat Ridge, CO 80033
P. Horn/G. Proulx Project No.
Tim LaPan Project
Title:
May 11, 20171
17.0106
CITY OF WHEAT RIDGE
PUBLIC WORKS, ENGINEERING
APPROVED FOR:
Jai DRAINAGE O SIDEWALK
O CURB & GUTTER O STREET
O MISCELLANEOUS O PLAT
COMMENT Site Drainage and Water Quality
0 511 312 0 1 7
CIVIL ENGINEER DATE
SUBJECT TO FIELD INSPECTIONS
Ashland Decentralization Station —
Parking Lot Extension Drainage
Letter & Plan
Ashland Decentralization Station — Parking Lot Extension Drainage Letter & Plan
The project site is located at 5260 W. 29th Avenue, Wheat Ridge, Colorado 80214. The proposed project
extends the parking lot to the south and adds approximately 4,500 square feet of additional imperviousness
to the site. There is also a desire to alleviate some of the existing runoff storage of the site. Currently, the
western half of the site drains to the south and utilizes surface detention in the parking lot, which was
constructed with the original building in 1994. This project also looks to store the western surface runoff in
an underground water quality and detention system. This letter summarizes a concept storm conveyance,
treatment, and detention design based on the site constraints and the following City criteria.
DESIGN CRITERIA: The City of Wheat Ridge considers the proposed parking lot expansion a Moderate
Redevelopment of a Multi-Family/Commercial site, due to increasing the impervious area of the site by
more than 3,000, but less than 10,000 square feet. According to the Wheat Ridge Criteria Section 111.2.b
(Reference 1), this requires addressing 100% of the Water Quality Capture Volume (WQCV) for only the
additional impervious area.
A meeting between Martin/Martin, Denver Water, and the City of Wheat Ridge was held on March 8, 2017.
This meeting outlined the City of Wheat Ridge's requirements regarding underground storage, water quality,
as well as runoff and release rate calculations for the proposed expansion underground storage. With
regards to moving the surface detention underground, it was determined that the historic drainage report
for the site could be used to estimate the detention requirement. The overall drainage for the Ashland
Decentralization Station was discussed in a drainage report that was reviewed and approved by the City of
Wheat Ridge in February, 1994. The 1994 report indicates that 1,954 cubic feet of detention storage is
needed for the western runoff of the site (Reference 2).
The City of Wheat Ridge identified that the outlet structure should be designed to release at a rate that is
based on the tributary runoff reaching the detention facility. This value was determined by assuming 1 cfs
per acre, for type C & D soils, for the tributary basins on the western side of the site. The Drainage Map D1
(EXHIBIT 7) illustrates the concept layout of underground detention vault, water quality vault, inlets, and
drainage basins for the site. The tributary area of Basins Al and A2 is 0.60 acres, so assuming the soil type
and release rate as described above, the outlet should be designed to release at 0.60 cfs.
MARTIN/MARTIN, INC.
124" WIS7 cOt(AX AYI N,U;,
LAKtWOOD. iOWMA00 81371'
MAA 3113 431.61CO
MA.RTINIAARTIN CUA!
CITY OF WHEAT RIDGE
PUBLIC WORKS
DATE 05/11/2017'
RECEIVED 05/11/2017
2nd Submittal
May 11, 2017
ASSUMPTIONS:
1. Additional Imperviousness: 4,500 square feet (Asphalt/Concrete of Basin A2 EXHIBIT 1 & 7)
WQCV: 131 cubic feet (EXHIBIT 5)
2. Existing Drainage Volume Storage 1,954 cubic feet (Reference 2)
3. Total Storage Required: 2,100 cubic feet
4. Type C&D soils (EXHIBIT 10)
5. 1 cfs per acre release rate (Reference 1- page 5)
CONCEPT SUMMARY: Based on the above-mentioned assumptions, criteria, and City input, an underground
detention and water quality vault system is recommended to be used to store approximately 2,100 cubic
feet of storm runoff.
The 100 -year runoff for the tributary Basins Al & A2 would be captured by a bilateral configuration of
Oldcastle Perkfilter Steel Catchbasins. The 100 -year flow from Basins Al & A2, of 3.75 cfs, was used to size a
similar grate type inlet in a sump condition, as shown in the inlet capacity calculations (EXHIBIT 6).
The runoff would then be routed, through the filter system within the catch basins which were sized to treat
the WQCV of 0.15cfs.This flow was determined by using the runoff calculated from a one-hour precipitation
depth of 0.60 inches as shown in the WQCV design storm SF -3 Form (EXHIBIT 2). According to Urban
Drainage Flood Control District — Volume 3 — Chapter 3 — Page 3-24 (Reference 3), the one-hour
precipitation depth for WQCV is typically set at 0.60 inches.
The Oldcastle Perk Filter underground water quality vault (EXHIBIT 8), or approved equal, will be used to
treat the 0.15 cfs of runoff. Calculations provided by Oldcastle show that a single Perkfilter Steel Catchbasin,
with three (3) 12"+12" stacked filter cartridges, can treat 0.09 lcfs according to the Washington General Use
Level Designation. A bilateral configuration, two catch basins running parallel with each other, would be able
to treat 0.182 cfs, which exceeds the calculated requirement of 0.15 cfs. The water quality vault will have a
maintenance lid that will provide easy access to inspect and replace the filter cartridges. According to the
Perk Filter Operation & Maintenance Manual (Reference 4), the cartridges should be replaced every 1-3
years depending on site runoff and varying pollutant loading.
The 100 -year detention volume of 2,100 cubic feet would be stored by utilizing an underground vault
system, like the Oldcastle Stormcapture detention system (EXHIBIT 9 & Reference 5), or an approved equal.
The detention vault would be connected to the water quality vault by two 12" PVC pipes. The outlet of the
detention vault would convey water through a concrete pan east into the gutter flowline of Sheridan. The
outlet release rate was calculated as previously described and a restrictor plate over the outlet pipe will be
used to achieve the desired release rate. The detention vault will have two access points for maintenance
through manholes located at opposite sides of the detention vault.
Emergency overflow for the site will be located near the proposed catchbasins. The flow will be conveyed
using a block out in the retaining wall, and a possible swale that directs the flow east towards the Sheridan
flowline.
Page 213
May 11, 2017
CONCLUSION: The historical release rate for the Ashland Site according to the 1994 report was 0.557 cfs.
The proposed parking lot extension is designed to not increase flow to the existing public storm system by
having a designed release rate of 0.60 cfs as described in the previous assumptions and calculations shown
in the appendix of this letter. The historical drainage of this site also did not have a water quality
component. The proposed design will improve the water quality runoff aspect of the site because it will add
a water quality treatment and detention vault, which the existing detention facility did not provide.
REFERENCES:
1. City of Wheat Ridge, Colorado, Site Drainage Requirements, November 2016.
2. Ashland Decentralization Project Drainage Report, Martin/Martin Inc. February 1994.
3. Urban Drainage and Flood Control District (UDFCD) Drainage Criteria Manual, Volumes
1, 2, and 3, November 2010.
4. Perk Filter - Product Specifications - Stormwater Management Products - Oldcastle
Stormwater, 31 Aug. 2015. Web. 28 Mar. 2017.
http://www. kristar. com/index. php/media-filtration/flogard-perk-filter/38-products/media-
filtration/flogard-perk-filter/118-flogard-perk-filter-product-spec#manuals.
5. StormCapture® - Product Specifications - Stormwater Management Products - Oldcastle
Stormwater, 12 Dec. 2015. Web. 28 Mar. 2017.
http://www. kristar. com/index. php/stormwater-retention-stormwater-
detention/stormcapture/151-products/stormwater-retention-stormwater-
detention/storm-capture/175-storm-capture-product-specifications.
ATTACHED EXHIBITS:
1.) Composite Runoff Coefficients
2.) Time of Concentration (SF -3) for WQCV
3.) Time of Concentration (SF -3) for 100 -yr Event
4.) Runoff Summary
5.) WQCV Calculation
6.) UDFCD Inlet Capacity Calculation
7.) Drainage Map — D1
8.) Perkfilter Information
9.) StormCapture Information
10.)Web Soil Survey Report
11.)100 -year Restrictor Plate Calculation
G:\HORN\17.0106-Ash1and Decentralization Station -Parking Lot Extension\ENG\DRAINAGE\Drainage Design Memo 2017.05.11.Docx
Page 313
PROJECT INFORMATION
PROJECT NAME:
Ashland Denver Water
PROJECT NO:
17.0106
DESIGN BY:
DML
REVIEWED BY:
PFH
JURISDICTION:
Wheat Ridge
REPORT TYPE:
Underground Vault
DATE:
05/11/17
EXHIBIT 1
N ARTIN/MARTIN
CON.SUtTt RG ErJG IN EERS
...'110000000"
URISDICTIONAL STANDARD
C2
C5
C10
C100
% IMPERV
ANDSCAPE
0.02
0.07
0.22
0.52
2%
;OOF
0.80
0.83
0.87
0.91
90°%
ASPHALT/CONCRETE
0.89
0.92
0.94
0.96
100%
,RIVES AND WALKS
0.80
0.83
0.87
0.91
90°%
TOTAL SITE COMPOSITE 1 0.60 1 0.75 0.78 0.82 0.88 83.7%
SUB -BASIN SURFACE CHARACTERISTICS
AREA COMPOSITE RUNOFF COEFFICIENTS
PERCENT
IMPERVIOUSNESS
(ACRES) C2 CS C10 C100
COMPOSITE RUNOFF COEFFICIENTS
C5 C10
C100
PERCENT
IMPERVIOUSNESS
A*
ASPHALT/CONCRETE
0.40
0.89
0.92 0.94
0.96
100%
SUB -BASIN COMPOSITE 0.00 0.00 0.05 0.20 1 0.51
0.0%
SUB -BASIN
SURFACE CHARACTERISTICS
AREA
(ACRES)
C2
COMPOSITE RUNOFF COEFFICIENTS
C5 C10
C100
PERCENT
IMPERVIOUSNESS
ASPHALT/CONCRETE
0.40
0.89
0.92 0.94
0.96
100%
AZ
LANDSCAPE
0.05
0.02
0.07 0.22
0.52
2%
Al
SUB -BASIN COMPOSITE 1
0.15
0.60
0.64 0.70
0.81
SUB' BASIN COMPOSITE
0.45
0.79
0.83 0.86
0.91
89.1%
SUB -BASIN
SURFACE CHARACTERISTICS
AREA
(ACRES)
C2
COMPOSITE RUNOFF COEFFICIENTS
C5 C10
C100
PERCENT
IMPERVIOUSNESS
ASPHALT/CONCRETE
0.10
0.89
0.92 0.94
0.96
100%
AZ
LANDSCAPE
0.05
0.02
0.07 0.22
0.52
2%
SUB -BASIN COMPOSITE 1
0.15
0.60
0.64 0.70
0.81
1 67.3%
TOTAL SITE COMPOSITE 1 0.60 1 0.75 1 0.78 1 0.82 1 0.88 183.7%
COMPOSITE_C-VALUES
5/11/2017 9:39 AM G:\HORN\17.0106-Ashland Decentralization Station - Parking Lot Extension\ENG\DRAINAGBAshland Rational (UDFCD 2016) 2017.05.11.xlsm
O
r`
0
z
m
O
n
HN
_m
2
X
W
z
U W
Vl ,w
W 0
r� 0
0
W
Lu o
0) a.
a.
Oti o
IUD
O
QW
p ? 2
o Q
N z
g O
U)
wa
i
N CD
LLI Z
N
Q L7
V �
Z�
h:"
Ib
Qi
.Z
iQ
Y
LU
W
CJ LL
N
U
LL _ S
LL Z
O
z
tr
I-
O
~ U Q
O LL
a0
U
o
c
N
N
— t
ro
Z
�o
o�
LL U Q
o
c
O
Z
F-
U
w
U-LLLL
LL
O w
r
m
Z O
U
O
O
w
N
Of UQ
M
0
Q
0
H
Z_
O
IL
Z
N
0
(n
W
Z
U)
Q
a
¢
a
[O
g
wa
i
N CD
LLI Z
N
Q L7
V �
Z�
h:"
Ib
Qi
.Z
iQ
U
7L
C
2
(
0M
�_
co
2
X
W
k /
9 � S
LL � o
� � E
° , on
§ ( §
2 $
F- B §
12
§ k
�
LU
� §
-i§ § Lu
k 3 in
V)
IX
2
co
§
°
p:(
)
;
-
-
-
i \
/ j
LU
/
0
» $
\
2
f�
k
0
J 2
§
.
2 §
2
d
�
$
§
�
°/
/
_{z
\2
s
z
J
/
ƒ<
\
&-
={E
oLL
£
§§
.
-z
E
\
CS
ci
§
�
}
LL
§j
«
Z)
(\
+
a§
&
§
§
§
)
y
k
k
a
_
IX
2
co
§
°
/
2:-
°
p:(
)
;
-
-
-
i \
/ j
LU
/
0
» $
\
2
f�
£ f
4
CL 'D
/ j
0
» $
| Q
0 to
f�
k
0
J 2
§
.
2 §
2
d
�
$
PROJECT:
JOB NO:
DATE:
Ashland Denver Water
01/17/00
05/11/17
EXHIBIT 4
MART.. ._�.�....�I. RTI N
CONSULTING ENGINEERS
RUNOFF—SUMMARY
5/11/2017 9:39 AM
G:\HORN\17.0106-Ashland Decentralization Station - Parking Lot Extension\ENG\DRAINAG E\Ash land Rational (UDFCD 2016)
2017.05.11.xlsm
RUNOFF SUMMARY
BASIN DESIGN
POINT
AREA
(ACRES)
% WQCV
IMP.
C100
Q-WQCV
(CFS)
Q100
(CFS)
A"
Al
0.45
0.15
2.89
89.1% 0.79 0.91 0.58
A2
67.3% 0.60 0.81 0.15
0.86
SITE COMPOSITE
0.60
83.7% 0.78
0.88
RUNOFF—SUMMARY
5/11/2017 9:39 AM
G:\HORN\17.0106-Ashland Decentralization Station - Parking Lot Extension\ENG\DRAINAG E\Ash land Rational (UDFCD 2016)
2017.05.11.xlsm
EXHIBIT 5
PROJECT INFORMATION
PROJECT NAME: Ashland Denver Water
PROJECT #: 17.0106
MARTIN/MARTIN
POND NAME: Underground Detention
DATE: 05/11/17
Required Water Quality Volume:
Detention Sizing Method: WQCV
NRCS Hydrologic Soil Group: C & D
'Figure 3-1, UDFCD (V. 3), Chapter 3, Page 3-5
�r>7-vcr• �
1.,]:,F]3 Vv(Zf'V = ({1-;)x� __.0-'-- F_URI ,. , = 1.20i"'
z.
'Equations 12-1, 12-2, 12-3, UDFCD (V 2), Chapter 12, Page 12-4
Where:
WQCV = Water Quality Capture Volume (Watershed Inches)
a = Constant Dependent on Drain Time (Typically a=1.0 40 -Hr Drain Time)
i = Percent Imperviousness
i =F 67.3%
WQCV = 0.263 (watershed inches)
Required Storage
12
'Equation 3-3, UDFCD (V. 3), Chapter 3, Page 3-6
Where:
Required Storage - F. l 12 [ r2 x (AREA
WQCV = Water Quality Capture Volume (Watershed Inches)
Area = Contributing Watershed Area (Acres)
Area = 0.15 (acres)
Required Storage = 0.0033 (ac -ft) 143 (cu -ft)
WQCV
5/11/2017 9:10 AM G:\HORN\17.0106-Ashland Decentralization Station - Parking Lot Extension\ENG\DRAINAGE\WQCV_EURV.xlsx
Project:
Inlet ID:
EXHIBIT 6
Version 4.05 Released March 2017
11 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) N
.. %M YAW.i
Vam
fr
num Allowable Width for Spread Behind Curb
Slope Behind Curb (leave blank for no conveyance credit behind curb)
iing's Roughness Behind Curb (typically between 0.012 and 0.020)
of Curb at Gutter Flow Line
ce from Curb Face to Street Crown
Width
Transverse Slope
Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)
Longitudinal Slope - Enter 0 for sump condition
ig's Roughness for Street Section (typically between 0.012 and 0.020)
Allowable Spread for Minor & Major Storm
Allowable Depth at Gutter Flowline for Minor & Major Storm
k boxes are not applicable in SUMP conditions
STORM Allowable Capacity is based on Depth Criterion
STORM Allowable Capacity is based on Depth Criterion
TancK =
0.0
it
Sencx =
0.000
ft/ft
mm =
0.012
H -as =
8.00
inches
Tcaowa =
50.0
ft
W =
2.00
ft
Sx =
0.010
ftflt
S. =
0.083
Wit
So =
0.000
fvft
ns,=
0.012
Minor Storm Major Storm
T_= 20.0 35.0 ft
d_x= 6.0 6.0 inches
r r
Minor Storm Major Storm
SUMP SUMP ds
UD-Inlet_v4.05.x1sm, Inlet 1 5/2/2017, 7:14 PM
EXHIBIT 6
INLET IN A SUMP OR SAG LOCATION
Version 4.05 Released March 2017
,I` --Lo (C),r
H -Curb H -Vert
Wp
Wo
W
Lo (G)
_ _ ...
of Inlet ... Denver No. 16 Valley Grate
I Depression (additional to continuous gutter depression'a' from above)
ober of Unit Inlets (Grate or Curb Opening)
er Depth at Flowline (outside of local depression)
e In/ormation
nth of a Unit Grate
h of a Unit Grate
Opening Ratio for a Grate (typical values 0.15-0.90)
ging Factor for a Single Grate (typical value 0.50 - 0.70)
e Weir Coefficient (typical value 2.15 - 3.60)
a Orifice Coefficient (typical value 0.60 - 0.80)
r Opening Information
ith of a Unit Curb Opening
ht of Vertical Curb Opening in Inches
ht of Curb Orifice Throat in Inches
e of Throat (see USDCM Figure ST -5)
Width for Depression Pan (typically the gutter width of 2 feet)
ging Factor for a Single Curb Opening (typical value 0.10)
Opening Weir Coefficient (typical value 2.3-3.7)
Opening Orifice Coefficient (typical value 0.60 - 0.70)
t for Grate Midwidth
t for Curb Opening Weir Equation
Dination Inlet Performance Reduction Factor for Long Inlets
Opening Performance Reduction Factor for Long Inlets
:d Inlet Performance Reduction Factor for Long Inlets
Total Inlet Interception Capacity (assumes clogged condition)
Capacity IS GOOD for Minor and Major Storms(>O PEAK)
H—
H.—
Theta
—H.—Theta
Wp
Cf (C)
C. (C)
C. (C)
dcme=
dc-=
RF—a — =
RFa
RFo„„ _
IM
N/A
N/A -
N/A
N/A
N/A N/A
N/A
N/A
MINOR MAJOR
0.369 0.519
MINOR MAJOR
N/A
Type =
Denver No. 16 Valley Grate
N/A
a, =
2.00
inches
No=
2
Ponding Depth =
4.2 6.0
inches
MINOR MAJOR
f- Override Depths
Lo (G) =
3.00
feet
Wo=
1.73
feet
A— =
0.31
Cr (G) =
0.50 0.50
C. (G) =
3.60
Co (G) =
0.60
MINOR MAJOR
L. (C) =
N/A
feet
H—
H.—
Theta
—H.—Theta
Wp
Cf (C)
C. (C)
C. (C)
dcme=
dc-=
RF—a — =
RFa
RFo„„ _
IM
N/A
N/A -
N/A
N/A
N/A N/A
N/A
N/A
MINOR MAJOR
0.369 0.519
N/A
N/A
N/A
N/A
N/A
N/A
0.49
0.70
cfs
UD -Inlet v4.05.xlsm. Inlet 1 5/2/2017. 7.14 PM
I
I
I
I
I
I
I
�I
3 I
3
T
�i
CH
i'.
12"
I '
I
I
I I
I
I
I
I Q
F-
0)
I
I IA
I \
li
20 10 0 20 40
SCALE: 1"=20'
ALL DIMENSIONS SHOWN ARE U.S. SURVEY FEET
LEGEND
I
I
CONTOURS (EXISTING) - 5750 - -
BASIN BOUNDARY m m m m m
I
BASINp C5
25 0.8
AREA IN C100
ACRES
I
0
�6HE
Z --D :DZ z°e �w
0_ off.
O O x Of O
O = 0_ 0_ Z:
n
m m o+
E c c s -
z;boa„
z
Sheet Number
D1
Z
O
F
Q
H
LLI
Q
(n
p
N
O_
�
—�
W
W
>
Z
W
Z
Z
C
W
W
o
0
z
Z
a
2
a
I
0
�6HE
Z --D :DZ z°e �w
0_ off.
O O x Of O
O = 0_ 0_ Z:
n
m m o+
E c c s -
z;boa„
z
Sheet Number
D1
Cartridge filtration proven to remove and retain the toughest pollutants from stormwater runoff
Flexible Configurations
Available in vaults, manholes
and catch basins with variable
inlet/outlet locations.
Superior Flow Rates
High efficiency treatment in a
compact footprint.
Vault Style Configuration
Integral Pretreatment Modular Cartridge Construction
Pretreatment chamber Simple design provides for efficient media
prolongs media lifespan by replacement and cartridge handling,
removing gross pollutants.
Field & Laboratory Tested
High TSS and phosphorus
removal rates.
Internal High Flow Bypass
Integrated bypass system reduces
construction costs by eliminating the
need for a separate bypass structure.
Impervious surfaces and other urban and suburban
landscapes generate a variety of contaminants that
can enter stormwater, polluting downstream receiving
waters. The PerkFilter is a comprehensive filtration BMP
that allows use with a wide variety of media chosen to
address site-specific pollutants of concern.
10 Oldcastle
Stormwater Solutions
EXHIBIT 8
PerkFilter Media Filtration System
Captures sediment, metals, nutrients, and petroleum hydrocarbons, as well as gross solids and trash, to
significantly reduce the total pollutant discharge load in stormwater runoff.
Additional Configuration Options
Steel Catch Basin
Precast Concrete Manhole
Applications
Typical installation locations include:
• In-line storm drain
• New drop inlets or vaults in commercial or
residential developments
• Industrial applications
• Pre- or post-treatment for retention/detention
systems
• Large custom vaults for regional treatment systems
Performance
Field tested removal efficiencies of:
• Total Suspended Solids > 80%
• Total Phosphorus > 60%
Precast Concrete Catch Basin
Standard Cartridge Capacities
Cartridge Height Treatment Capacity
(inches) (gpm) at Media Surface
Loading Rate of:
1.5 gpm/ft2 2.5 gpm/ft2
12 6.8 12
18 10.2 18
24* 13.6 24
30* 17.0 30
* Standard cartridge heights are 12 & 18 inches.
24" & 30" cartridges use modular stacks.
t,
PerkFilter Cartridge
Precast concrete vault configuration
Custom PerkFilter vault in Redmond, WA
�J
ar;•r
OldC1stw (800) 579-8819 oldcastlestormwater.com 9i28/2015_v3
Stormwater Solutions stormcapture.com 9)2015 C dcastle Precast, Inc.
r
Ln E ?� M d CLL
° O
Oy
00 .2 s o c �e C
p N =„ 'y v to
CL X WWW ^ 9 mN W c
O dam r d c ��z
M W S ire a V Cf C C
I= UN m�
Cl LUW� �u U V W S� m a CSL' y N z
1--o Z W Wye g K dU ` w
S m w . O �, DO
N.� �U Q W s O m rn V dog
am z
+ v pp
�" � d C
�N WAN �mm o y LLN I
1L W [��' I O
�Q \W �N IL
OZS �'2 - E'E m Q
OF �W o x y� Zymo
i Dw0 d � NGrL �Q°o
K I a: <
�•, I W _ w W W
O ¢ O m F
w. F- a
,. W W W w� cn w o
O mZ Z a 2
W N W Om F- w Z
1-- W 0'LLJ N 0 0 W 0 a
�! CL OC)I �, - X
U 11 Q - 00 N �O i O mcg z
a 3
ri 1 r -W N N N N u~i� o
W W X Q~ 0 a >
✓;. r— --- M U w
o6I-- LU
W
°M° �H
Q Q LO Lo
u Lij 6i LU
U w u.� F–
Z Z
W O F– w
Q
N O � ZD
C) W N D �O p
Lq O N O
00 r NO
O u M
M X
Q U
c Q
I c m H
(� 04 -® ♦n O M - N Q W
O M O� W p Q W S
.O Hoo �– O 0c LU Z O
NLS w M Z 0_ Q !-
J 'ci W Q_ m
I I
= W W Imil m W
® O N - r - Q F Z
L N CL
—
Z J_ �_i'
.O O' Lq ____T r__-_ (y O O Z C
_...11... r P W w Z
BOOOOOOODODOOOOB -" o0 o `+---i'J; oo O Q I W
0 DOOOOOOOD00000 0 °
0 00000000000000 � Q Z o
W W BDODOOOOOOOOOOOB "*- TT T
LL.
Q
~ ----11---- S Z H H
W
Q Z - I ~ ~ -i
® N O Q 3
N H G
Z w Z
Q -j O
Z d I--
LU
w
O 00 LU LU N W N O Z O
04 ~O F.-
.10 m U
C'4 C,4 Z N M 0
t
U
C Q
N W
mM
��
�
vU
�O
DN
X
U�
OC
N
ri \
O O
C�
L
�U
v�
LC CV
�
CV
00
W
Ln
OP
O
CL
c
N
L
O
f�
V -U�
c U�
OW L
O
a�LL.V
.4)Wdi
Q � n-'
W N
> U .1..
Q O
Q
O W
W
Z � �
o J
0
Z
• � o.v
0
�� CL
CL
P
N Q
o °a
W
WI. -
all
e��r,y W H U
Q ° a 'L m O
P W
0
W F W
W a vo p o a I-- U W
OiOC�II!UO�O��LOC a ° o 0
xC14 ° �[OCJO.i�C�QQ[�� ILW
C� o
LL. 90
` � v
9°
° c
C) >-
C)
C)
4
d
W
J
0
U
Z
Ix
CL
W
I --
LU W
Ix
Z
U
0
W
� N
W
SL
0
J
W >-
M no
O
LO
N N
O tll II.
0Ai
41 11
Il dl
II:
u
16
W Z
C)
— Q
Whe
O tll II.
0Ai
41 11
II:
u
Io-
.i°i
W Z
C)
— Q
Whe
0
c6
m
_
w
W V
J Q
W V
W
1--
cn
N
0
N
Q
z
z
z
a
Storm Capture provides cost-effective solutions for site applications where stormwater
needs to be detained and allowed to discharge at a controlled rate. Storm Capture allows
maximization of developable land by allowing detention to be placed efficiently and easily
under parking lots and roadways with very little cover, as well as in non -traffic areas.
Maintenance Module
Maintainable
• Designed for maintenance, not replacement
• Optional direct module access
• Open Interior
Structurally Superior
• Vehicular traffic loading design with as little as 6"
of earth cover
• No concrete footing required
• Designed for HS -20-44 for full truck load plus impact
Efficient
• Large storage capacity
• Not reliant on stone backfill for storage
• Unique Link SlabT" design reduces concrete
Economical
• Competitive installed and lifetime cost
• Typically backfilled with existing site materials
• Large capacity yields smaller footprint
• Rapid and simple installation
STORM®
www.stormcapture.com
G o CAPTURE
OldcastlePrecast'
888-965-3227 Total Stormwater
Management System
REVISIONS
DESCRIPTION OF RE
DESIGN LOADINGS:
A. AASHTO HS -20-44 W/ IMPACT.
B. DEPTH OF COVER = 6" - 5-0" (120 PCF ASSUMED),
C. ASSUMED WATER TABLE = BELOW BOTTOM OF PRECAST.
D. DRY LATERAL EARTH PRESSURE (EFP) = 45 PCF.
E. LATERAL LIVE LOAD SURCHARGE = 80 PSF (APPLIED TO 8' BELOW GRADE).
F. NO LATERAL SURCHARGE FROM ADJACENT BUILDINGS, WALL PIERS, OR FOU
CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE 6,000 PSI,
STEEL REINFORCEMENT: REBAR, ASTM A-615 OR A-706, GRADE 60.
CEMENT: ASTM C-150 SPECIFICATION.
STORMCAPTURE MODULE TYPE = DETENTION.
REQUIRED NATIVE ALLOWABLE SOIL BEARING PRESSURE = 3,000 PSF.
REFERENCE STANDARDS:
A. ASTM C 890
B. ASTM C 891
C. ASTM C 913
CONSTRUCTION EQUIPMENT EXCEEDING DESIGN LOADING SHALL NOT BE ALLOWEErmwate r
STRUCTURE. ANY DESIGN CONSTRAINT DIFFERENT FROM ABOVE REQUIRES CUST)
STRUCTURAL DESIGN AND MAY REQUIRE THICKER SUBGRADE AND REVISED PRICI
BILL OF MATERIALS
TYPE
QUANTITY
HEIGHT
B
4
3'
C
1
3'
Fl
1
3'
Gi
1
3'
TOTALS
T BASE
7
TOP SLAB
7
030"MANWAYACCESS
2
LADDER
1
3 FOOT
VOLUME
2,249
CUBIC FEET
GEOTEXTILE FABRIC
1
ROLLS
BUTYL ROPE
28
ROLLS
JOINT WRAP
1
ROLLS
016" OPENING FOR 012" PVC,
OUTLET INVERT: 5388.0'.
Sib' OPENING FOR 012" PVC,
T INVERT: 5388.2'.
- PRELIMINARY -
NOT FOR CONSTRUCTION
GEOTEXTILE FABRIC
TO EXTEND 1' MINIMUM
UP SIDES OF SYSTEM.
COMPACTED FILL SEE INSTALLATION GUIDE,
BY OTHERS.
GEOTEXTILE FABRIC,
SEE INSTALLATION GUIDE.
CONTRACTOR
WITH DRILLED IN STEPS/LADDER
TD TO GRADE.
TRIM: 5396.61'MAXIMUM
Ij 5392.11' MINIMUM
5' MAX COVER
6" MIN COVER
�EL: 5391.61'
7Y"
-SEL: 5391.00'
EL: 5388.00'
EL: 5387.42'
NOTE:
TERMADUCT INSERTS TO BE KNOCKED OUT AT
SPECIFIED LOCATIONS ONLY (BY OTHERS).
)rmwater
- PRELIMINARY -
NOT FOR CONSTRUCTION
39° 45 31" N
39° 45 26" N
EXHIBIT 10
Hydrologic Soil Group—Denver County Area, Colorado; and Golden Area, Colorado, Parts of Denver, Douglas, ... o
0 0
495360 495370 495380 495390 495400 495410 495420 4954.90
3
fn
Map Scale: 1:763 if printed on A patait (8.5' x 11") sheet
o Mete
N rs
N 0 10 20 40 80
■ \ 0 35 70 140 210
Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: LITM Zane 13N WG584
uSDA Natural Resources Web Soil Survey
Conservation Service National Cooperative Soil Survey
496440 4954M 4954W 495470
3
0
M
0
2/17/2017
Page 1 of 5
39° 45'31"N
39° 45 26"N
O
H
m
2
x
LLl
G
Z
W
W
J
CL
CL
E
U
m
L
U T 0'0
C U N y
Co
c U m m
a-0 w mm
N E m c
N — rn m 0
+L O C N
N m fl O CDC
com L a)
E N a
> ' C >
.0 C �6 OL
O O a) 'D O
C NCL 3
T a L Co 0
m N. Ey
CL m m E o H "
01
O C C O
N N
p7 N N U y
C 'O f0
` f6 j O N N
>m cN4)cm
W E U N
O-
m
E
O
m
d
L
N
O_
m
E
L
U
m
m
O
N
co
N
m`
a
a)
L
e2
O N
>. E
N N
m m
N N
a E
a
m
O L
m
f0
m
o
0
c
`6
-0
N
m
c
-0
rn
o
m
a
x
�
N
E
d
m
h
N
�
y
- d
U 0 Z
°' U)
o x
�_
7
D D
LL
CL
'O
m
r
N
C
o
aa) C7
O O
'O N
mof
O N
(j CL
c
(n
3
dU�
Q � C
va o
7E5
C �
C9 m
id 0E
m
Q .t--
T a) ("D
a) �
r' vi Q
3 m T
5 Z
i
n0U)
O
T. m co
C
Z
0-5 a)
y d a m
EE 5,
H N "- N T
w .m
C N
oQmo.a
c m m E
E -o E o
U
C m C
N (D 0
E-0c vii o
N a) E N -O
t C N w
T y EN a
C E 3 N 0 3
N c L 0
O m m~ m a
Q m — m
`mc::°0.
N N N T
C N m NC 7
O N L > m N
m a) O
N L C N
O U t.'k- O co
imN'oa
O1
3
Q
N
O
f6 C
CL
U
m m
CL O
N Q
a
N
N N
d 3
m m
d rn
m
m E
.N, m .
<6
C
3 O a)
a m I-
ca
O
E = p N N
o LP
Ci- ON
d
a
O
C
O
� N
a
�a C
0 0 o a IL o 0
a m m U U 0 Z 0 Q a m m
t z 0 0 ■
O
(A
n LO
CD O
N N
.n ()
N d
o
3 m
N -'
— m
o `m
u� a
N 00
2�U
m
c
0
O L
m
d
a
0
a)
U.ca co
a) r m d
m
a
U
U O
N
CD
a 3
ami N Ev
E
�_
N
CC'i_
O
0
a> a 2 a) 3
m 3 m
0
U
'O
m
ca
a N
o
aa) C7
0 N Z d
� -o
Z
0-
N to
C d
a> m
N -O N 7 m
Q
(0 N
U W
m m O
p
a)
a
N m
=
Q 04
a) O
d O
w
:p
0
7 U
>.NY U
00
7
•-
N N
a) O y
E Z
0
a
(D
3 N U O jp
U) d "O
O -O
-0a)
O
>
(6
Z U
Q)
C a)
3J
N(na"CO
m-
N�
ma
ZEE
0) Q o c
mc-cdm°
m y
ICD:
id
� S
Q
N
d N N
Um m 5
N U
.0
N m
�
.LO-. 3 C N
O
>,
In :>
E C m 3 U
D O N N a>
3`
O
y
U
w 'V C L N
a>
3 T
3a 0
N
m O N a U
y.L..
00) 3:
2 n�Q m
H o
U)U)
O O
'O N
mof
O N
(j CL
c
(n
3
dU�
Q � C
va o
7E5
C �
C9 m
id 0E
m
Q .t--
T a) ("D
a) �
r' vi Q
3 m T
5 Z
i
n0U)
O
T. m co
C
Z
0-5 a)
y d a m
EE 5,
H N "- N T
w .m
C N
oQmo.a
c m m E
E -o E o
U
C m C
N (D 0
E-0c vii o
N a) E N -O
t C N w
T y EN a
C E 3 N 0 3
N c L 0
O m m~ m a
Q m — m
`mc::°0.
N N N T
C N m NC 7
O N L > m N
m a) O
N L C N
O U t.'k- O co
imN'oa
O1
3
Q
N
O
f6 C
CL
U
m m
CL O
N Q
a
N
N N
d 3
m m
d rn
m
m E
.N, m .
<6
C
3 O a)
a m I-
ca
O
E = p N N
o LP
Ci- ON
d
a
O
C
O
� N
a
�a C
0 0 o a IL o 0
a m m U U 0 Z 0 Q a m m
t z 0 0 ■
O
(A
n LO
CD O
N N
.n ()
N d
o
3 m
N -'
— m
o `m
u� a
N 00
2�U
m
c
0
d
a
0
N
N
O
C
O
W
C
O
=C
0
rn
d
Q
N
p
Z.
QI
q d
m¢
a°
o
a
0
'm
0
6
C
m
m a
m
U L)
0 Z
rn a
❑
❑
❑ ❑
❑ ❑
❑ ❑
I I
y0 fp
� S
Q
N
O O
'O N
mof
O N
(j CL
c
(n
3
dU�
Q � C
va o
7E5
C �
C9 m
id 0E
m
Q .t--
T a) ("D
a) �
r' vi Q
3 m T
5 Z
i
n0U)
O
T. m co
C
Z
0-5 a)
y d a m
EE 5,
H N "- N T
w .m
C N
oQmo.a
c m m E
E -o E o
U
C m C
N (D 0
E-0c vii o
N a) E N -O
t C N w
T y EN a
C E 3 N 0 3
N c L 0
O m m~ m a
Q m — m
`mc::°0.
N N N T
C N m NC 7
O N L > m N
m a) O
N L C N
O U t.'k- O co
imN'oa
O1
3
Q
N
O
f6 C
CL
U
m m
CL O
N Q
a
N
N N
d 3
m m
d rn
m
m E
.N, m .
<6
C
3 O a)
a m I-
ca
O
E = p N N
o LP
Ci- ON
d
a
O
C
O
� N
a
�a C
0 0 o a IL o 0
a m m U U 0 Z 0 Q a m m
t z 0 0 ■
O
(A
n LO
CD O
N N
.n ()
N d
o
3 m
N -'
— m
o `m
u� a
N 00
2�U
m
c
0
3�0
CD o E
m
— Y N
O NE
O -0 O
y
- N
c
U �:9L O >
3 y @ y
O O Q
T
O. � l0
E 2' m n
0-0 E d
a y o
a�
O N O
O p7 C
7
4>),
O U DOL
O
L c N E
O_ N
w
O p. O C
O E N '.�_
H U - N
n Ln
co
z
8LI
EXHIBIT 10
Hydrologic Soil Group—Denver County Area, Colorado; and Golden Area, Colorado, Parts of
Denver, Douglas, Jefferson, and Park Counties
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Denver County Area, Colorado (CO031)
Map unit symbol
Map unit name
Rating
Acres in AOI
Percent of AOI
NOTCOM
No Digital Data
Available
23.4%
1.1
1.1
35.4%
35.4%
Subtotals for Soil Survey Area
Totals for Area of Interest
3.0
100.0%
Hydrologic Soil Group— Summary by Map Unit — Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park
Counties (C0641)
Map unit symbol
Map unit name Rating
Acres in AOI
Percent of AOI
105 Nunn -Urban land C
0.7
23.4%
complex, 0 to 2
percent slopes
1.2
41.1%
106
Nunn -Urban land
C
complex, 2 to 5
percent slopes
Subtotals for Soil Survey Area
2.0
64.6%
Totals for Area of Interest
3.0
100.0%
L,m),i Natural Resources Web Soil Survey 2/17/2017
Conservation Service National Cooperative Soil Survey Page 4 of 5
EXHIBIT 10
Hydrologic Soil Group—Denver County Area, Colorado; and Golden Area, Colorado, Parts of
Denver, Douglas, Jefferson, and Park Counties
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long -duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink -swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff. None Specified
Tie-break Rule: Higher
uSDA Natural Resources Web Soil Survey 2/17/2017
;iF� Conservation Service National Cooperative Soil Survey Page 5 of 5
Utley,,
PROJECT NAME: Ashland Denver Watel
PROJECT #: 17.0106
POND NAME: Underground Vault
DATE: 5/8/2017
5/8/2017 12:04 PM
EXHIBIT 11
100 -YEAR RESTRICTOR PLATE
.00"
MARTIN/MARTIN
C O N S U t 1 1 N G ENGI N E E R S
Max 100 -Year Release Rate = 0.6 (cfs)
Outlet Pipe Invert Elevation = 87.55 (ft)
Water Quality WSEL = 87.76 (ft)
100 -Year WSEL = 90.50 (ft)
Orifice Equation:
'Equation SO -15, UDFCD (V2), Chapter 10, Page SO -20
Q = Flow Rate Through Orifice (cfs)
C = Discharge Coefficient (0.40-0.65)
A = Area Of Orifice (ft2)
H = Effective Head On Orifice Opening
(ft)
g = Gravitational Acceleration
(32.2 ft/sec2)
Minimum Opening Area = 0.07
(ft2)
H = 2.86
(ft)
g = 32.2
(ft/sec2)-
T
C
(0.40-0.65)
Outlet Pipe Diameter = 12
(in)
1.00
(ft)
R = 0.50
(ft)
8 = 0.79
(rad)
A, : R20 - sin B cos e)
Invert To Plate = 0.15
(ft)
N = 2Re
= 1.8In
( )
A� _ — sin 0 cos 6
Rh = R
A = 0.07
(ft2)
Y 2d
(a) Circular channel (0 in tad)
Centroid Elevation = 87.64
(ft)
Velocity = 8.14
(ft/s)
100 -Yr Restrictor Plate
G:\HORN\17.0106-Ashland Decentralization Station - Parking Lot Extension\ENG\DRAINAGE\100-Year Release.xlsm
ASHLAND
WHEAT RIDGE, CO
KEYSTONE COMPAC III (REAR -PIN CONFIGURATION, 8 DEGREE SETBACK)
RETAINING WALL DESIGN
Cily c,t
W heat P,icic
COMMUNITY DEVELOPMENT
APPROVED
Reviewed for Code Compliance
Plans Examiner Date
VaMity of permit The nsuanre ofo pemut or opproval of p1on, %prof ronnns
ondeomputotiorrs,hull not be opernw Jar, ur an approval of, anv to
any of the provisions of Me building code or of any Cty ord,nonres. Permits
owseming to give outhority to violate of cancel the provisions of the Budding
codes or other ordmonces of the City shall not be valid.
City of
Wheat Ridge
�. - F
�o,�yEN J.
8-2-17 ��;� o
46681
S�CN L -E
SK Wall Desion NO. I DATE REVISION TITLE: TITLE SHEET DATE: 8/2/2017 SHEET NO.
12800 South Logan Street s
Englewood, 80113 Fee
M JOB NAME: PREPARED FOR: PROJECT NO: 17067
SARGON CONSTRUCTION
3woodCOO 8
ASHLAND DESIGNED BY: SJK
www.skwalidesign.com wA" Know whars below. WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
Steve@skwalldesign.com DrsG^ Call before you dig. LITTLETON, CO 80120 SCALE: NTS
_z'_ Cy --7 C S �-,-.71,(.--
SHEETINDEX
No.
Title
RW -1
TITLE PAGE
RW -2
GENERAL NOTES
RW -3
SPECIFICATIONS (1 OF 2)
RW4
SPECIFICATIONS (2 OF 2)
RW -5
CONSTRUCTION DETAILS
RW -6
CONSTRUCTION DETAILS
RW -7
CONSTRUCTION DETAILS
RW -8
CONSTRUCTION DETAILS
RW -9
CONSTRUCTION DETAILS
RW -10
CONSTRUCTION DETAILS
RW -11
CONSTRUCTION DETAILS
RWA2
WALL IDENTIFICATION
RW -13
ELEVATION PROFILE - WALL A
RW -14
ELEVATION PROFILE - WALL B
RW -15
ELEVATION PROFILE - WALL C
RWA6
ELEVATION PROFILE - WALL D
Cily c,t
W heat P,icic
COMMUNITY DEVELOPMENT
APPROVED
Reviewed for Code Compliance
Plans Examiner Date
VaMity of permit The nsuanre ofo pemut or opproval of p1on, %prof ronnns
ondeomputotiorrs,hull not be opernw Jar, ur an approval of, anv to
any of the provisions of Me building code or of any Cty ord,nonres. Permits
owseming to give outhority to violate of cancel the provisions of the Budding
codes or other ordmonces of the City shall not be valid.
City of
Wheat Ridge
�. - F
�o,�yEN J.
8-2-17 ��;� o
46681
S�CN L -E
SK Wall Desion NO. I DATE REVISION TITLE: TITLE SHEET DATE: 8/2/2017 SHEET NO.
12800 South Logan Street s
Englewood, 80113 Fee
M JOB NAME: PREPARED FOR: PROJECT NO: 17067
SARGON CONSTRUCTION
3woodCOO 8
ASHLAND DESIGNED BY: SJK
www.skwalidesign.com wA" Know whars below. WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
Steve@skwalldesign.com DrsG^ Call before you dig. LITTLETON, CO 80120 SCALE: NTS
_z'_ Cy --7 C S �-,-.71,(.--
General Notes:
1) Contractor shall contact all utility companies prior to construction for location of all
underground utilities (i.e. water, sewer, electric, gas, telephone, & cable TV).
2) The subgrade at the base of the proposed retaining walls shall be native, undisturbed
material or well compacted, controlled fill material (95% of Maximum Standard Proctor
ASTM D698, and ±2.0% of optimum moisture content). Consult with site geotechnical
engineer as necessary.
3) All segmental retaining wall units shall be Keystone Compac III (8 degree batter -
rear pin configuration). The manufacturer's specifications for each product shall be used
during construction. Should a conflict occur between the manufacturer's specifications
and the normal construction methods used by the contractor, the contractor shall
contact the engineer to resolve said conflicts prior to construction.
4) Drainage fill shall be installed a minimum of 12" behind all block facing.
5) This Retaining Wall Design is based on a Detailed Grading Plan prepared by Denver
Water, Job No. 18827, dated 6/2/2017. SK Wall Design assumes no responsibility for
grading, finished wall heights or lengths, easement or property line encroachments, or
landscape irrigation removals & improvements.
6) The soil assumptions in this design are based on a geotechnical report prepared by
Kumar & Associates, Job No. 93-108, dated 2/1/1993. The soil design parameters are
assumed to be as follows:
Area
0
Unit Weight
Soil Description
Reinforced Soil
340
125 pcf
Well -Compacted CDOT
Class 1
Retained Soil
260
135 pcf
Onsite Soil
Foundation Soil
260
135 pcf
Onsite Soil
7) The retaining wall design assumes zero hydrostatic pressure. Water should be
managed so that no water build-up occurs behind wall.
8) Retaining wall design calculations are in accordance with NCMA.
9) The retaining wall contractor shall notify the SK Wall Design prior to construction to
coordinate site observations and associated fees, should conformance by SK Wall
Design be required.
10) The engineer shall not be held responsible for the retaining wall design when
subjected to concentrated drainage due to direct runoff, or broken water, irrigation, or
sewer lines. Trees shall never be installed over the reinforced backfill or within 5 feet of
the face of wall.
11) The engineer shall not be responsible for providing adequate surface drainage,
grading, and erosion control during and upon completion of retaining wall construction.
Proper drainage must be maintained to avoid damage to retaining walls.
12) This mechanically stabilized earth retaining wall design is based on an "active
condition"; i.e. wall movement between 0.5% and 1.0% of the wall height can be
expected.
13) All soil backfill shall be tested by others for moisture, density and compaction
periodically (every 2' vertically, 100'-200' c/c) meeting minimum requirements.
14) The owner or owner's representative is responsible for reviewing and verifying that
the actual site conditions are as described in General Note #6 prior to and during
construction. If imported fill is used, contractor shall supply test data to show that
material meets parameters in note #6. The owner or owner's representative shall be on-
site to assure the provisions of the construction notes are followed.
15) If any rock formations and/or ground water are encountered during construction,
immediately contact SK Wall Design and the owner's representative.
0" ®1
�Nreac R�d9z
�?,ND 0
8-2-17
46681
S7pN �'ti •
SK Wall Desian NO. I DATE REVISION TITLE: GENERAL NOTES DATE: 8/2/2017 SHEET NO.
1 2800 South Logan Street S
Englewood, CO 80113 � JOB NAME: PREPARED FOR: PROJECT NO: 17067
K SARGON CONSTRUCTION
303-900-8714 ASHLAND DESIGNED BY: SJK RW -2
WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
wwwskwalldesign.com i - - Know what's below.
Steve@skwalldesign.com G Call before you dig. LITTLETON, CO 80120 SCALE: NTS
Retaining Wall Specifications:
SECTION 1
PART 1: GENERAL
1.1 Scope
Work includes furnishing and installing modular concrete block retaining
wall units to the lines and grades designated on the construction
drawings and as specified herein.
1.2 Applicable Sections of Related Work
Geogrid Wall Reinforcement (see section 2)
1.3 Reference Standards
A. ASTM C-1372 Specification for Segmental Retaining Wall Units
B. ASTM D-422 Particle Size Analysis
C. ASTM D-698 Laboratory Compaction Characteristics of Soil Standard
Effort
D. ASTM D-4318 Liquid Limit, Plastic Limit and Plasticity Index of Soils
1.4 Delivery Storage and Handling
A. Contractor shall check the materials upon delivery to assure proper
material has been received.
B. Contractor shall prevent excessive mud, wet cement, and like
materials from coming in contact with the materials.
C. Contractor shall protect the materials from damage. Damaged
material shall not be incorporated in the project.
PART 2: MATERIALS
2.1 Modular Wall Units
A. Wall units shall be Keystone Compac III (8 degree batter - rear pin
configuration) units as produced by Colorado Best Block.
B. Wall units shall have minimum 28 day compressive strength of 3000
psi in accordance with ASTM C1372-97.
C. Exterior dimensions shall be uniform and consistent. Maximum
dimensional deviations shall be 1/8 inch, not including textured face.
D. Exterior face shall be textured. Color shall be a standard color as
manufactured by Colorado Best Block, and selected by owner. Block
color shall be approved by the local jurisdiction.
2.2 Wall Rock
A. Unit Fill and drain rock shall consist of crushed recycled concrete or
similar crushed stone meeting the following gradation tested in
accordance with ASTM D-422:
Sieve Size
Percent Passing
1 "
90-100
3/4"
75-100
No. 4
0-10
No. 50
0-5
No. 200
0-3
SK Wall Design
1 2800 South Logan Street
Englewood, CO 80113
303-900-8714
www.skwalldesign.com
steve@skwalldesign.com
NO. I DATE
S
X
WAIL
DESIGn
PART 3: WALL CONSTRUCTION
3.1 Excavation
A. Contractor shall excavate to the lines and grades shown on the
construction drawings. Contractor shall use caution not to over -excavate
beyond the lines shown, or to disturb the base elevations beyond those
shown.
3.2 Foundation Soil Preparation
A. Foundation soil shall be native, undisturbed soil, or fill material
compacted to 95% minimum Standard Proctor density per ASTM D-698.
B. Foundation soil shall be examined by the Site Geotechnical Engineer
to insure that the actual foundation soil strength meets or exceeds
assumed design strength. Soil not meeting the required strength shall be
removed and replaced with acceptable material.
3.3 Base
A. Base material shall be placed as shown on construction drawing. Top
of base shall be located to allow bottom wall units to be buried to proper
depths as per wall heights and specifications.
B. Base material shall be installed on undisturbed native soils or suitable
replacement fills compacted at 95% Standard Proctor density.
C. Base shall provide a level surface on which to place the first course of
blocks. The base shall be constructed to insure proper wall embedment
and the final elevation shown on the plans.
D. Base material shall be a 6 inch minimum depth for all walls.
3.4 Unit Installation
A. The first course of wall units shall be placed on the prepared base
with the front edges tight together. The units shall be checked for level
and alignment as they are placed.
B. Insure that units are in full contact with base. Proper care shall be
taken to develop straight lines and smooth curves on base course as per
wall layout.
C. All cavities in and around the base row shall be filled with base
materials. Backfill front and back of entire base row to firmly lock in
place. Check again for level and alignment. All excess material shall be
swept from top of units.
D. Install next course of wall units on top of base row. Check each block
for proper alignment and level. Fill all cavities in and around wall units
and to a 12 inch depth behind block with drainage material. Spread
backfill in uniform lifts not exceeding 8 inches in thickness and compact
to 95% of Standard Proctor density per ASTM D-698. Employ methods
using lightweight compaction equipment that will not disrupt the stability
or batter of the wall. Only hand -operated, plate compaction equipment
shall be used within 3 feet of wall face.
E. Install each subsequent course in like manner. Repeat procedure to
the extent of wall height.
F. Allowable construction tolerance at the wall face is 1 inch in 10 feet
vertically and 1 inch in 10 feet horizontally.
REVISION
•
•
Know what's below.
Call before you dig.
SECTION 2: GEOGRID REINFORCED WALLS
PART 1: GENERAL
1.1 Scope
Work includes furnishings and installing geogrid reinforcement, wall fill,
and backfill to the lines and grades designated on the construction
drawings and as specified herein.
1.2 Applicable Section of Related Work
Section 1: Keystone Compac III (8 degree batter - rear pin configuration)
Retaining Wall Systems.
1.3 Reference Standards
A. ASTM D-4595 - Tensile Properties of Geotextiles, Wide Width Strip
B. ASTM D-5262 - Unconfined Tension Creep Behavior of Geosynthetics
C. GRI-GG4 - Determination of Long Tern Design Strength of Geogrids
D. GRI-GGS - Determination of Geogrid (soil) Pullout
E. NCMA SRWU-1 - Test Method for Determining Connection Strength
of SRW
F. NCMA SRWU-2 - Test Method for Determining Shear Strength of
SRW
1.4 Delivery Storage and Handling
A. Contractor shall check the geogrid upon delivery to assure that the
proper material has been received.
B. Geosynthetic labeling, shipment, and storage shall follow ASTM D-
4873. Product labels shall clearly show the manufacturer or supplier
name, style name, and roll number.
C. Each geosynthetic roll shall be wrapped with a material that will
protect the geosynthetic from damage due to shipment, water, sunlight,
and contaminants.
D. During storage, geosynthetic rolls shall be elevated off the ground and
adequately covered to protect them from the following: site construction
damage, precipitation, extended ultraviolet radiation including sunlight,
chemicals that ore strong acids or strong bases, flames including welding
sparks, excess temperatures, and any other environmental conditions
that may damage the physical property values of the geosynthetic.
4pD0 t/�F
�.�
8-2-17 ��;�, o
46681
city of �4
Wheat Ridge L E
DIVISO
TITLE: SPECIFICATIONS (1 of 2)
JOB NAME: PREPARED FOR:
ASHLAND SARGON CONSTRUCTION
WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
LITTLETON, CO 80120
DATE: 8/2/2017 SHEET NO.
PROJECT NO: 17067
DESIGNED BY: SJK R V V`/�,
—3
SCALE: NTS
Retaining Wall Specifications, cont'd
PART 2: GRID MATERIALS
2.1 Definitions
A. Concrete retaining wall units are as detailed on the drawings and shall
be Keystone Compac III (8 degree batter - rear pin configuration) Units.
B. Drainage material is free draining material as defined in section:
Modular Concrete Retaining Wall systems as "Drainage Material."
C. Backfill is defined as the soil used as fill for the reinforced soil mass.
D. Foundation soil is the in-situ soil.
2.2 Products
A. Geogrid shall be Synteen SF20 minimum or pre -approved equivalent
structural geogrid reinforcement as shown on the construction drawings.
PART 3: WALL CONSTRUCTION
3.1 Foundation Soil Preparation
A. Foundation soil shall be excavated to the lines and grades as shown
on the construction drawings, or as directed by the Engineer.
B. Foundation soil shall be examined by the Site Geotechnical Engineer
to assure that the actual foundation soil strength meets or exceeds
assumed design strength.
C. Over -excavated areas shall be filled with approved compacted backfill
material.
3.2 Wall Construction
A. Wall construction shall be as specified under Section 1, Part 3, Wall
Construction.
3.3 Geogrid Installation
A. Install block wall to designated height of first geogrid layer, backfill
and compact behind wall to depth equal to designed grid length.
B. Cut geogrid to designed embedment length and place on top of block.
Extend horizontally on compacted backfill.
C. Place next course of block on top of grid and fill block cores with
drainage fill to lock in place. Remove slack in grid and stoke as
necessary to maintain tension.
D. Lay geogrid at the proper elevation and orientations shown on the
construction drawings or as directed by the Engineer.
E. Correct orientation (strength direction) of the geogrid shall be verified
by the contractor.
F. Follow manufacturer's guidelines for overlap requirements.
3.4 Fill Placement and Backfill Placement
A. Backfill material shall be placed in 8" maximum lifts and compacted to
95% of the maximum Standard Proctor Density per ASTM D-698.
B. Backfill shall be placed, spread and compacted in such a manner that
minimizes the development of wrinkles in and/or movement of the
geogrid.
C. Only hand -operated equipment shall be allowed within 3 feet, of the
wall face.
D. Tracked construction equipment shall not be operated directly on the
geogrid. A minimum backfill thickness of 8 inches is required prior to
operation of tracked vehicles over the geogrid. Turning of tracked
vehicles should be kept to a minimum to prevent tracks from displacing
the fill and damaging the geogrid.
E. Rubber -tired equipment may pass over the geogrid reinforcement at
slow speeds, less than 10 MPH. Sudden braking and sharp turning shall
be avoided.
F. The backfill shall be placed in 8" maximum lifts. The Engineer may
direct the contractor to remove, correct or amend any soil found not in
compliance with these specifications.
SECTION 3
PART 1: QUALTY CONTROL
1.1 Quality Assurance
A. The Owner's geotechnical engineer will provide compaction testing
based upon general note number 13 on Sheet RW -2.
1.2 Field Quality Control
A. Owner's geotechnical engineer will provide compaction testing based
upon general note number 13 on Sheet RW -2.
B. Quality control inspection and testing shall include soil and backfill
testing to verify soil types and compaction, and verification that the
retaining walls are being constructed in accordance with the design plans
and project specifications.
city of
Wheat Ridge
O\�ptq
N
SEJ. �: •2J'
8-2-17
46681
SK Wall Desian NO. I DATE REVISION TITLE: SPECIFICATIONS (2 of 2) DATE: 8/2/2017 SHEET NO.
12800 South Logan Street JOB NAME: PREPARED FOR: PROJECT NO: 17067
Englewood, CO 80113 SARGON CONSTRUCTION ASHLAND RW -4
303-900-8714 � DESIGNED BY: SJK
WDLL
www.skwalldesign.com Know. what's below. WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
Steve@skwalldesign.com D4^ Call before you dig. LITTLETON, CO 80120 SCALE: NTS
APPROXIMATE
LIMITS OF
EXCAVATION
RETAINED SOIL
8" MIN LOW
PERMEABLE SOIL
GEOGRID 24„
REINF. TYP--\
REINFORCED SOIL
GRID DEPTH
KEYSTONE CAP UNIT
KEYSTONE
UNIT
UNIT DRAINAGE FILL
FREE DRAINING =
CRUSHED STONE OR 9
RECYCLED CONCRETE =
1" - 1 1/4" z
(D
U)
8" w
0
FINISHED GRADE
FOUNDATION SOIL UNREINFORCED
CONCRETE OR CRUSHED
STONE LEVELING PAD OR RECYCLED CONCRETE
6" MIN, HEIGHT
4" PERFORATED DRAIN TILE,
VENTED TO DAYLIGHT ON
50 -FEET CENTERS
TYPICAL REINFORCED WALL SECTION
City of
Wheat Ridge
D
,?,pDO
�O N J.
8-2-17
46681
SK Wall Desian NO. DATE REVISION TITLE: CONSTRUCTION DETAILS DATE: 8/2/2017 SHEET NO.
12800 South Logan Street
Englewood, CO 80113 - is
JOB NAME: PREPARED FOR: PROJECT NO: 17067
303-900-8714 =' SARGON CONSTRUCTION DESIGNED BY: SJK
ASHLAND RW -5
wwwsWALL kwaildesign.com Know what's below. WHEAT RIDGE, CO 5984 SOUTH PRINCE
steve@skwa[Idesign.com oF ,'. Call before you dig. I LITTLETON, CO 80120 SCALE: NTS
CD
w
8" MIN LOW
KEYSTONE CAP UNIT
PERMEABLE SOIL
KEYSTONE
W
UNIT
o
RETAINED SOIL
1" - 1 1/4"
81,
24" FINISHED GRADE
FREE DRAINING
CRUSHED STONE OR
RECYCLED CONCRETE
APPROXIMATE LIMITS
OF EXCAVATION
UNREINFORCED
FOUNDATION SOIL CONCRETE OR CRUSHED
4" PERFORATED
STONE LEVELING PAD
DRAIN TILE, VENTED
OR RECYCLED CONCRETE
TO DAYLIGHT ON
50 -FEET CENTERS
TYPICAL
GRAVITY WALL SECTION
City of
Wheat Ridge
D
,?,pDO
�O N J.
8-2-17
46681
SK Wall Desian NO. DATE REVISION TITLE: CONSTRUCTION DETAILS DATE: 8/2/2017 SHEET NO.
12800 South Logan Street
Englewood, CO 80113 - is
JOB NAME: PREPARED FOR: PROJECT NO: 17067
303-900-8714 =' SARGON CONSTRUCTION DESIGNED BY: SJK
ASHLAND RW -5
wwwsWALL kwaildesign.com Know what's below. WHEAT RIDGE, CO 5984 SOUTH PRINCE
steve@skwa[Idesign.com oF ,'. Call before you dig. I LITTLETON, CO 80120 SCALE: NTS
(2) 4" CAP UNITS OR
ONE CAP UNIT
-ONE UNIT
NOTE:
SECURE ALL CAP UNITS
WITH KEYSTONE KAPSEAL
OR EQUAL
TOP OF WALL STEPS
\ �8" OR 16" WALL STEP
LEVELING PAD EXCAVATION LIMITS
NOTE:
THE LEVELING PAD IS TO BE CONSTRUCTED
OF CRUSHED STONE OR 2000 PSI ±
UNREINFORCED CONCRETE
rl r\/A TI/lAI
W
6" 1/2" x 5 1/4"
FIBERGLASS PINS
6" LEVELING PAD -,,--FRONT FACE
1
EXCAVATION W + 12"
LIMITS
SECTION
LEVELING PAD DETAIL
r1r1hADAr' III
ELEVATION
GEOGRID IS TO BE PLACED ON LEVEL BACKFILL
AND EXTENDED OVER THE FIBERGLASS PINS.
PLACE NEXT UNIT. PULL GRID TAUGHT AND
BACKFILL. STAKE AS REQUIRED.
GRID & PIN CONNECTION
18" / 12"
CAP UNIT ELEVATION
12"
N ,
0
18"
CAP UNIT PLAN
UNIVERSAL
CAP UNIT OPTION
DIMENSIONS & AVAILABILITY
WILL CARY BY REGION
COMPAC III PLAN
COMPAC III UNIT
DIMENSIONS & AVAILABILITY
WILL CARY BY REGION
v
18"
CAP UNIT ELEVATION
18"
CAP UNIT PLAN
STRAIGHT SPLIT
CAP UNIT OPTION
DIMENSIONS & AVAILABILITY
WILL CARY BY REGION
C►iv °s
Wheat Ridge
,Ainn Owkson
N J.
8-2-17
46681
SK Wall Design NO. DATE REVISION TITLE: CONSTRUCTION DETAILS DATE: 8/2/2017 SHEET NO.
12800 South Logan Street
JOB NAME: PREPARED FOR: PROJECT NO: 17067
Englewood, CO 80113
303-900-8714 ASHLAND SARGON CONSTRUCTION DESIGNED BY: SJK RW -6
www.skwaildesign.com Know what's below. WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
steve@skwalidesign.com _ Call before you dig. ILITTLETON, CO 80120 SCALE: NTS
3" OF SOIL FILL IS REQUIRED BETWEEN
OVERLAPPING GEOGRID FOR PROPER H / 4 ADDITIONAL GEOGRID OVERLAP
ANCHORAGE, TYPICAL -N--- /- EXTEND WALL HEIGHT/ 4
ADDITIONAL DRAINAGE FILL,
EXTEND WALL HEIGHT / 2 -7
H/2
Et° J
8-2-17
46681
DRAINAGE FILL
NOTE:
-CHECK WITH MANUFACTURER SPECIFICATIONS
ON CORRECT DIRECTION OF ORIENTATION FOR
GEOGRID TO OBTAIN PROPER STRENGTH
-CORNER UNITS RECOMMENDED FOR OUTSIDE
CORNERS. AVAILABILITY MAY VARY
c+tY °f
What Ridge
SK Wall Desian NO. I DATE REVISION TITLE: CONSTRUCTION DETAILS DATE: 8/2/2017 SHEET NO.
12800 South Logan Street S
Englewood, CO 80113 � JOB NAME: PREPARED FOR: PROJECT NO: 17067
303-900-8714 ASHLAND SARGON CONSTRUCTION DESIGNED BY: SJK RW -7
c=1
MINE&Nall
www.skwalldesign.com Knowallbeoreyou WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
steve@skwalldesign.com nG, C81lbeforeyoudig. LITTLETON, CO 80120 SCALE: NTS
A[
E}
I
PLACE ADDITIONAL PIECES
SK Wall Design
NO. I DATE REVISION
TITLE: CONSTRUCTION DETAILS
DATE: 8/2/2017
SHEET NO.
12800 South Logan Street
15
JOB NAME:
PREPARED FOR:
PROJECT NO: 17067
Englewood, CO 80113
303-900-8714
ASHLAND
SARGON CONSTRUCTION
DESIGNED BY: SJK
RW -8
www.skwalidesign.com a"
Know what's below.
WHEAT RIDGE, CO
5984 SOUTH PRINCE ST #103
steve@skwa0design.com = 4,
Call before you dig. I
LITTLETON, CO 80120
SCALE: NTS
KEYSTONE BLOCK
CUT NOTCH IN UNIT
BLOCK TO ALLOW FOR
DRAIN PIPE. RODENT
SCREEN AS REQUIRED.
FINISHED GRADE TO
SLOPE AWAY FROM
THE WALL FACE WITH
IMPERVIOUS SOIL
OR SURFACE
LOW PERMEABILITY
GRANULAR MATERIAL
PLACED IN CORES OF THE
MESA BLOCK AS WELL AS
IN THE INFILL SOIL
4 in (100 mm) TOE DRAIN PIPE
VENTED THROUGH THE FACE OF
THE WALL AT THE LOWEST
POSSIBLE ELEVATION ON 50 ft
( 15 m) CENTERS MAXIMUM
LEVEL GRADE BELOW WALL
Alternate Drain
KEYSTONE BLOCK
UNIT
SLOPED GRADE BELOW
etails
— 4 in ( 100 mm) TOE DRAIN
PIPE VENTED TO DAYLIGHT
in ( 300 mm)
SK Wall Desian NO. I DATE REVISION TITLE: CONSTRUCTION DETAILS DATE: 8/2/2017 SHEET NO.
12800 South Logan Street 4,
Englewood, CO 80113 JOB NAME: PREPARED FOR: PROJECT NO: 17067
303-900-8714 Wi ~ 10 ASHLAND SARGON CONSTRUCTION DESIGNED BY: SJK RW -9
www.skwalidesign.com "p" WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
9 Know what's below.
steve@skwalldesign.com �'nG, Call before you dig. LITTLETON, CO 80120 SCALE: NTS
r
Fence Plan
Detail
Backfill or Concrete
Post in Place
Steel Fence or Railing
Backfill or Concrete
.]r R A.—
Geogrid
Fence Section Detail
TYPICAL RAILING DETAIL - BY OTHERS
�p,DD CCF
8-2-17
46681 `
Keystone 4"
Cap Unit
Keystone
Compac
Unit
FENCE
POST*
SET POSITION OF
SLEEVE IMMEDIATELY
BEHIND TOPMOST SRW
UNIT.
�L11�LI��
X
SRW UNIT
SLEEVE -IT TM 1224R
12" OX24" DEEP
CUT THE GEOGRID
FILL SLEEVE WITH AROUND THE
CONCRETE, SET SLEEVE -ITT"' SYSTEM
FENCE POST AS NECESSARY
COMPACT TO 95% MDD
/PER ASTM D698.
REINFORCED
BACKFILL ZONE
GEOGRID
*FENCING SYSTEMS APPROVED FOR USE WITH SLEEVE -IT TM 1224R
ARE LIMITED TO THE FOLLOWING HEIGHTS: CHAIN LINK - UP TO 8 -FT,
PRIVACY - UP TO 6 -FT (WOODEN, PVC, METAL). POST SIZE 4"X4" MAX.
DETAIL OF FENCE POST INSTALLATION USING SLEEVE -IT TM 1224R
N.T.S.
FOR PEDESTRIAN RAILINGS DIRECTLY BEHIND BLOCKS
BY OTHERS
U
SK Wall Desian NO. DATE REVISION TITLE: CONSTRUCTION DETAILS DATE: 8/2/2017 SHEET NO.
12800 South Logan Street S
JOB NAME: PREPARED FOR: PROJECT NO: 17067
Englewood, CO 80113
303-900-8714 ASHLAND SARGON CONSTRUCTION DESIGNED BY: SJK RW -10
www.skwalldesign.com "-p-" WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
9 - - Know what's below.
steve@skwalldesign.com nEv'« Call before you dig. LITTLETON, CO 80120 SCALE: NTS
Concrete Collar Saw Cut Units to Fit
(if applicable) Within 1/2" of Pipe
Control Joints
as required
Scour Protection as Required
Use Rip Rap or Concrete Slab
in Outlet Area
Typical Pipe Outlet Detail
8" Min. Low Permeable Soil
0
o^ ^o
Control Joint Cut
Geogrid
Storm Drain
Pipe
Note:
For pipes larger than 24", a concrete
collar may be cast around pipe for
ease of construction and appearance.
1' Min. Thickness
Concrete Collar
if Applicable
Keystone Cap Unit
Keystone Standard
Unit
Concrete Collar
if Applicable
Scour Protection
as Required
Unreinforced Concrete
or Crushed Stone
Leveling Pad
Typical Pipe Outlet Section
,N00 t c Standard Unit - Near Vertical Setback
0
c 8-2-17 4�;• o
46681
City of
Wheat Ridge
SK Wall Desian NO. I DATE REVISION TITLE: CONSTRUCTION DETAILS DATE: 8/2/2017 SHEET NO.
12800 South Logan Street S JOB NAME: PREPARED FOR: PROJECT NO: 17067
Englewood, CO 80113 KSARGON CONSTRUCTION
303-900-8714 ASHLAND DESIGNED BY: SJK RW -11
www.skwalidesign.com wp Know what's below.WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
steve@skwalldesign.com p4^' Call before you dig. I LITTLETON, CO 80120 SCALE: NTS
NOTE: THIS SHEET IS FOR WALL IDENTIFICATION ONLY. ACTUAL WALL LAYOUT SHOULD BE BASED ON THE CONTRACT SITE PLANS
i
N 101107.1044
E 125599.0379
x
1
OF EXIST SEGMENTAL
I / RETAINING WALL, BEGIN EXT OF
SEGMENTAL RETAINING WALL
�
00
N 101157.0061
XX E 125598.7517
r�
ASPHALT PVM T
STATION 231.81
I ;
I I
,
�I
x
— 6" CONC SLAB
' I 6' VINYL WOOD CHAIN
1 x LINK FENCE SEE C-9
1
I
1
B SEGMENTAL RETAINING WALL
� � x C-12
I
,
I 5392
1 `90• p
I't OAi, 0 Sig 0�
I
I
o
, x �
�— x x --- --D W F— x x x x xn x x __ x— i x-
101107.7124
1011
125;
F,..
I I
1�5388"—~
C,ty of
Wheat &Idge
Building Diviso
h n
x o�RDo C/C
.�p�.•VN J.
VI ��
c, 8-2-17
46681
SK Wall Desian NO. DATE REVISION TITLE: WALL IDENTIFICATION DATE: 8/2/2017 SHEET NO.
12800 South Logan Street S JOB NAME: PREPARED FOR: PROJECT NO: 17067
Englewood, CO 80113 S SARGON CONSTRUCTION
303-900-8714 ASHLAND DESIGNED BY: SJK RW -12
WALL65984 SOUTH PRINCE ST #103
www.skwalldesign.com Know what's below. WHEAT RIDGE, CO
steve@skwalldesign.com D4,, Call before you dig. LITTLETON, CO 80120 SCALE: NTS
94
93-
92-
91.
39291.
90.
89-
88-
87-
86-
85-
WALL
988-
8786-
85
NOTES:
-SEE AREA GRADING, EROSION AND SEDIMENT CONTROL PLANS
FOR ALL GEOMETRY, DRAINAGE, EROSION CONTROL, UTILITY
AND SURVEY
-STEP LOCATIONS SHOWN ON RETAINING WALL PROFILE ARE
BASED ON INFORMATION BY OTHERS, AND ARE APPROXIMATE.
INSTALL RETAINING WALL AS NECESSARY TO MEET THE INTENT
OF THE SITE GRADING ENGINEER.
- GEOGRID TYPE IS SYNTEEN SF 20 OR GREATER
WALL ELEVATION -A
SCALE: 1" = 5'
SCALE
o. s' 10, 15'
City of
Wheat
Ridge
V4 N J.
8-2-17
46681
SK Wall Desian NO. DATE REVISION TITLE: ELEVATION PROFILE WALL A DATE: 8/2/2017 SHEET NO.
12800 South Logan Street
Englewood, CO 80113 JOB NAME: PREPARED FOR: PROJECT NO: 17067
303-900-8714 ° =� ASHLAND SARGON CONSTRUCTION DESIGNED BY: SJK RW— 3
. 'NAL L
www.skwalldesign.com Know what's below. WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103 —
steve skwalldesi n.com LITTLETON, CO 80120 SCALE: 1 — 5
@ 9 �_' _'_ Call before you dig.
94
93
92
91
90
89
88
87
86
85
NOTES:
-SEE AREA GRADING, EROSION AND SEDIMENT CONTROL PLANS
FOR ALL GEOMETRY, DRAINAGE, EROSION CONTROL, UTILITY
AND SURVEY
-STEP LOCATIONS SHOWN ON RETAINING WALL PROFILE ARE
BASED ON INFORMATION BY OTHERS, AND ARE APPROXIMATE.
INSTALL RETAINING WALL AS NECESSARY TO MEET THE INTENT
OF THE SITE GRADING ENGINEER.
- GEOGRID TYPE IS SYNTEEN SF 20 OR GREATER
WALL ELEVATION -B
SCALE: 1" = 5'
SCALE
01 s' 10' 15'
City of
Wheat
Ridge
CPDD CCF
�N d
8-2-17 �m o
46681
SK Wall DesianNO. DATE REVISION TITLE: ELEVATION PROFILE WALL B DATE: 8/2/2017 SHEET NO.
1 2800 South Logan Street*WA
JOB NAME: PREPARED FOR: PROJECT NO: 17067
Englewood, CO 80113 ASHLAND RW -1 4
303-900-871415 SARGON CONSTRUCTION DESIGNED BY: SJK
WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
www.skwalldesign.com Know what'sbelow.
Steve@skwalldesign.com C811 before you dig. LITTLETON, CO 80120 SCALE: 1" = 5'
94
93
92
91
90.
89•
88-
87-
86-
85-
WALL
8878685-
NOTES:
-SEE AREA GRADING, EROSION AND SEDIMENT CONTROL PLANS
FOR ALL GEOMETRY, DRAINAGE, EROSION CONTROL, UTILITY
AND SURVEY
-STEP LOCATIONS SHOWN ON RETAINING WALL PROFILE ARE
BASED ON INFORMATION BY OTHERS, AND ARE APPROXIMATE.
INSTALL RETAINING WALL AS NECESSARY TO MEET THE INTENT
OF THE SITE GRADING ENGINEER.
- GEOGRID TYPE IS SYNTEEN SF 20 OR GREATER
WALL ELEVATION -C
SCALE: 1" = 5'
SCALE
o. s' 10, 15'
city of
.
Wheat Ridge
8-2-17
46681 `
s7�lU L ti
SK Wall Desion -` NO. DATE REVISION TITLE: ELEVATION PROFILE WALL C DATE: 8/2/2017 SHEET NO.
12800 South Logan Street JOB NAME: PREPARED FOR: PROJECT NO: 17067
Englewood, CO 80113 SARGON CONSTRUCTION
303-900-8714 ASHLAND DESIGNED BY: SJK RW -15
www.skwalldesign.com NA" Know what's below. 155984 SOUTH PRINCE ST #103 —
WHEAT RIDGE, CO
steve@skwalldesign.com �oFSGr, Call before you dig. LITTLETON, CO 80120 SCALE: 1 — 5
NMIc
W w
W
94 U)
TW 92.72
93 TW 92.06
92 0 o S�NTF�N �F201�I D - x.50
91 - 91.72
E SF M - ft - —BW 91.06
90 - _ __------ ------------------------ BW 90.39
EN SF2 M ft .- iBW 89.72
89 - BW 89.06
88 YN EE SF ft _ [BW88.39
87 ------ BW 87.72
� BW 87.06
86 3W 86.39 BW 86.39
85
Lu
z
i FINISH GRADE @ B.O.W. TYP. RE:CIVIL
U
H
Q
LEVELING PAD @ BOT. OF WALL NOT SHOWN, RE:
CONSTRUCTION DETAILS SHEET RW -5
cn c� (n c/) U) cn cl) U) 07 cn
D D D D D D D D D D D
N N N N N N N N
t t t t t t t t t t t
00 CO C0 O O N N W W
cn O Q1 O cn O CJ1 O cn O N
v
WALL ELEVATION -D
SCALE: 1" = 5'
RDO LlC
F
NOTES: SCALE V ,.�► J.
-SEE AREA GRADING, EROSION AND SEDIMENT CONTROL PLANS 01 s' 10, is' 8-2-17
FOR ALL GEOMETRY, DRAINAGE, EROSION CONTROL, UTILITY vt 46681 {;
AND SURVEY City
BASED ON FRETAININGTIONS SHOWN ON
ORMAT ON BYY OTHERS AN ARE APPROXIMATE. INhE�t fWd9t?
INSTALL RETAINING WALL AS THE SITE GRADING ENGINEER. NECESSARY TO MEET THE INTENT Buitd;�B �QN L E
- GEOGRID TYPE IS SYNTEEN SF 20 OR GREATER
SK Wall Desian NO. DATE REVISION TITLE: ELEVATION PROFILE WALL D DATE: 8/2/2017 SHEET NO.
12800 South Logan Street
Englewood, 80113 JOB NAME: PREPARED FOR: PROJECT NO: 17067
303-90
woodCOO 8 K ASHLAND SARGON CONSTRUCTION DESIGNED BY: SJK RW -1 6
WALL a
www.skwalldesign.com WHEAT RIDGE, CO 5984 SOUTH PRINCE ST #103
steve@skwalldesign.com n.com Know what'sb@IOW. LITTLETON, CO 80120 SCALE: 1" = 5'
@ g n'G^ Call before you dig.
City of Wheat Ridge
] ICommercial Electric PERMIT - 201705171
PERMIT NO: 201705171 ISSUED: 08/31/2017
JOB ADDRESS: 5260 W 29th AVE EXPIRES: 08/31/2018
JOB DESCRIPTION: Permit to install light fixtures and controls; Electrical outlets and
buried feeder conduit; Install a fused disconnect switch
*** CONTACTS ***
OWNER (303)628-6000 CITY & COUNTY OF DENVER
SUB (303)221-5383 Randall Wambsganss 170390 Glacier Construction Co., Inc.
SUB (303)286-8000 Evla Diana Lynch 018567 Sturgeon Electric Co.
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 420 / Storage Warehouse; 0 BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 20,000.00
FEES
Total Valuation 0.00
Plan Review Fee 235.82
Use Tax 420.00
Permit Fee 362.80
** TOTAL ** 1,018.62 Ak. AA
*** COMMENTS ***
*** CONDITIONS *** qq
Approved per plans and red -line notes on plans. Must comply with 2012 IBC, 2014 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
**Prior to final inspection approval - As-builts are required before approval of the
Building Final Inspection and Certificate of Occupancy can be issued.
City of Wheat Ridge
Commercial Electric PERMIT - 201705171
PERMIT NO: 201705171 ISSUED: 08/31/2017
JOB ADDRESS: 5260 W 29th AVE EXPIRES: 08/31/2018
JOB DESCRIPTION: Permit to install light fixtures and controls; Electrical outlets and
buried feeder conduit; Install a fused disconnect switch
1, by my signature, do her
attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable wilding codes, and all applicable municipal codes, policies and procedures, and that [ am tie legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this ermtt. I further attest that I am legally authorized to include all entities named within this document as panes to the work to be
performed and that a work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
i I7r-
Signature of OWNERC—ONTRACTOR (Circle one) I Date
I . This permit was issued bas-edhen-the-information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po plans
and procedures.
2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees andprocedures for approval of any new pen -nit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
CPV1,..
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
City of
WheatN,
z.
COMMUNiTy DEVELOPMLN"i
Building & Inspection Services Division
7500 W. 291h Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
31�s A*—Z
FOR OFFICE USE ONLY
Date: s
1
Plan/Permit #
Plan Review Fee:
Email: permits cDci.wheatridge.co.us t
Building Permit Application
*** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. I
Property Address: 5260 West 29th Ave., Wheat Ridge, CO., 80214
Property Owner (please print): Denver Water Phone: (303) 628-6000
Property Owner Email: tim.lapan@denverwater.org
Mailing Address: (if different than property address)
Address: 1600 West 12th Ave., Denver, CO., 80204
City, State, Zip: Denver, CO., 80204
Architect/Engineer: Denver Water
Architect/Engineer E-mail:-tim.lapan@denverwater.org Phone: (303)628-6329
Contractor: Glacier Construction Company
Contractors City License M.
170390
Contractor E-mail Address: slemley@gcci.com
Sub Contractors:
Electrical: Sturgeon Electric Plumbing:
W.R. City License # 018567 W.R. City License #
Other City Licensed Sub:
City License #
Phone: (303)221-5383
Mechanical:
W.R. City License #
Other City Licensed Sub:
City License #
Complete all information on BOTH sides of this form
c4— S/6- V_ ) c-' �` ' 43 0_3 — 7 ci / c�-;v
X COMMERCIAL ❑ RESIDENTIAL
Description of work: (Check all that apply)
❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE
❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING
❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING
❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT
,ri-COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT
❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ OTHER (Describe)
(For ALL projects, please provide a detailed description of work to be performed, including current use of areas,
proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and
amount of materials to be used, etc.)
Furnish and install lighting fixtures and controls, electrical outlets, and buried feeder conduit. Furnish and install a fused
disconnect switch.
Sq. Ft./LF
Amps
Btu's
Squares
Gallons
Other
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information provided on the application.
CIRCLE ONE: (OWNER) CONTRACTOR r (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR)
Electronic Signature (first and last name): Schuyler Lemley
ZONING COMMMENTS:
Reviewer:
BUILDING DEPARTMENT COMMENTS:
Reviewer:
DEPARTMENT USE ONLY
DATE: 7/11/17
5lST-)' VI.%) JWP0,0JO OCCUPANCY CLASSIFICATION:
(-Cv l o r,—tTfZ-k C— ( n —ca -
Building Division Valuation: $