PERMIT: CAV - 31- ADDRESS: ��`� � _ f - JOB CODE:
Foundation Inspections
Date
Inspector
Initials
Comments
102 Caissons / Piers
103 Footing / P.E. Letter
104 Foundation Setback Cert.
105 Stem Walls
106 Foundation wall Insulation
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground / Slab Inspections
Date
Inspector
Initials
Comments
201 Electrical / Cable/ Conduit
202 Sewer Underground Int.
203 Sewer Underground Ext.
204 Plumbing Underground Int.
205 Plumbing Underground Ext.
206 Water Underground
Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections
Rough Inspection
Date
Inspector
Initials
Comments
301 Rough Framing
302 Wall Sheathing
303 Roof Sheathing
304 Sheer Inspection
305 Insulation
306 Mid -Roof
307 Metal / Lath / Stucco
308 Rough Electrical Residential
309 Rough Electrical Commercial
310 Electrical Meter Residential
311 Electrical Meter Commercial
312 Temp. Const. Meter
313 Rough Plumbing Residential
314 Rough Plumbing Commercial
315 Shower Pan
SEE OVER FOR ADDITIONAL INSPECTIONS
PERMIT:,26 j:� 9 / ADDRESS q,2 . JOB CODE:
Rough Inspection (continued)
Date
Inspector
Initials
Comments
316 Rough Mechanical Residential
403 Final Electrical Residential
317 Rough Mechanical Commercial
404 Final Electrical Commercial
318 Boiler / Furnace
406 Final Mechanical Commercial
319 Hot water tank
407 Final Plumbing Residential
320 Drywall screw and Nail
408 Final Plumbing Commercial
321 Moisture board / shower walls
% a
410 Final Window/Door
322 Rough Grading
411 Landscape/Park/Planning*
323 Miscellaneous
412 Row/Drainage/Public Works**
413 Flood plain Inspection**
Final Inspections
Date Inspector
Initials
Comments
402 Gas Meter Release
403 Final Electrical Residential
404 Final Electrical Commercial
405 Final Mechanical Residential
406 Final Mechanical Commercial
407 Final Plumbing Residential
408 Final Plumbing Commercial
409 Final Roof
% a
410 Final Window/Door
411 Landscape/Park/Planning*
Inspections from these entities shall be requested
one week in advance.
*For landscaping and parking inspections please
call 303-235-2846
**For ROW and drainage inspections please call
303-235-2861
***For fire inspections please contact the Fire
Protection District for your project.
412 Row/Drainage/Public Works**
413 Flood plain Inspection**
414 Fire Insp. / Fire Protection***
415 Public Works Final**
416 Storm Water Mgmt.**
417 Zoning Final Inspection*
418 Building Final Inspection
Note: All items must be completed and approved by Planning, Public Works, Fire and Building
before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not
constitute authorization of occupancy.
For Low Voltage permits please be sure that rough inspections are completed by the Fire District and
Electrical low voltage by the Building Division.