Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3885 Harlan Street
A i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office _1�9� INSPECTION NOTICE Inspection Type: Job Address: 7 Permit Number: ❑ No one available for inspect on: Time E :`"' AM/Pf� Re -Inspection require Yes /,No When corrections have been made, schedule for re -inspection online at: http.lAvww.ci.wheatridge.co.uslinspection Date: .� I Inspector: ��---- DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Mechanical PERMIT - 201902514 PERMIT NO: 201902514 ISSUED: 12/04/2019 JOB ADDRESS: 3885 Harlan St EXPIRES: 12/03/2020 JOB DESCRIPTION: Replace 60K BTUs, 95% efficiency horizontal gas furnace *** CONTACTS *** OWNER (720)366-7282 HAVEY MICHAEL T SUB (720)236-1344 HOWARD BROOKS 140153 ENERGY RESOURCE CENTER *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 2,000.00 FEES Furnace Replacement 40.00 Total Valuation 0.00 Use Tax 42.00 ** TOTAL ** 82.00 *** COMMENTS *** *** CONDITIONS *** Work shall comply with 2012 IRC & 2017 NEC. Per IRC Sec. R314, smoke detectors are required to be installed in every sleeping room, in hallways outside of sleeping rooms, and on every level of the structure. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and Pal all work to be performed is discl ed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or C f CTOR(6rcle one) Date I . This permit was issued base-&om ormation provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and maybe subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a pe it shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable codep�ny ordinanceloy regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. " City of OMMUNiTy Wheat�idge DEVELOPMENT Building & Inspection Services 7500 W. 291h Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits ,ci.wheatridge.co.t:5 I FOR OFFICE USE ONLY Date: Plan/Permit # 1111 i Plan Review Fee: Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address Proaerty Owner B8 1 a_r arJs� 0 a' Property Owner Email: Tenant Name (Commercial Projects Only) Property Owner Mailing Address: (if different than property address) Address:-, 0, B ox. 1 ll City, State, Zip: �,(' �t1Gtx�" f -A-it. , l 0 3 J Arch itect/Enoineer: Architect/Engineer E-mail: Contractor Name: &tI-c Phone: Phone: 7RO-3 66 - 7,0d City of Wheat Ridge License #: 140 %,�_3 Phone: '20- 2.36 - 13 q l Contractor E-mail Address: WCC_ I h f` Yi (RZ 0- r C dip. ora For Plan Review Questions & Comments (please print): CONTACT NAME (please print): CONTACT EMAIL(please print): Phone: Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # ❑COMMERCIALRESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. Po Cvo f G 1-�r;n-10ti ha I) t i ','(L �4' r I , ); e. Sq. Ft./LF BTUs f'q Inoo Gallons Amps Squares For Solar: KW # of Panels Requires Structural For Commercial Projects Only: Occupancy Type: Construction Type: Occupancy Load: Square Footage: Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that i assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that i am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 1, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLEONE: (OWNER) (CONTRACTOR) or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) r ,n Signature (first and last name): lA I aw"Z� - 1 DATE: � c'' Printed Name: ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: OCCUPANCY CLASSIFICATION: CONSTRUCTION TYPE: Building Division Valuation: Owner: Owner Address: Owner Phone: Description of Building Use: Building Address: CT Product(s) Used: Roof Completion Date: Applicator: Applicator's Address: Applicator's Phone: # of Squares: Expiration Date: COVERAGE For the Warranty Period defined in the Warranty Chart within this document, CertainTeed (CT) warrants to the original building owner (Owner) that the Product described above, used on the roof as a repair material, will not leak due to a manufacturing defect. In the event there is a leak due to a manufacturing defect during the Warranty Period, CT shall, during the first year and at its sole discretion, provide the appropriate replacement materials or refund the original cost of the Product determined by CT to be defective. After the first year, CT's maximum liability is the original cost of the Product used on the roof reduced by 8.3% for 12 -year warranties and 10% for 10 -year warranties during each subsequent year, less any costs previously incurred by CT for replacement. Note: The Owner is responsible to repair leaks promptly to avoid water damage, including mold growth EXCLUSIONS FROM COVERAGE This Limited Warranty does not cover leaks, damages or injuries of any type, including, but not limited to, damage to roof insulation/cover boards, roof decks, roof membrane or other bases over which Product is applied and attributable directly or indirectly to any of the following: 1. Natural disasters, such as falling objects, cyclones, hurricanes, tornadoes, or other winds or gusts exceeding Force 7 on the Beaufort scale; earthquakes; lightning; hail or fire; 2. Misuse, abuse, falling objects, tools, foot traffic, or equipment or sign installation; 3. Clogged drains or lack of adequate drainage that does not promptly and readily remove water from the roof; 4. Ponding water (as defined by the National Roofing Contractors Association); 5. Settlement, cracking, warping, expansion, contraction, deflection or other movement of the building structure; 6. Improper installation of Product; 7. Failure to maintain Product as required under the Commercial Roof Systems Specification Manual; 8. Mold and other damage caused by water entering building; and 9. Any other damage not attributable to a manufacturing defect of the Product. This Limited Warranty does not cover damages caused by leaks. This Limited Warranty covers to material only and does not include installation or labor costs of any kind. The existing roof deck has not been inspected by CT and is NOT part of this Limited Warranty. ROOF MAINTENANCE This Limited Warranty is not a maintenance agreement or an insurance policy. Routine inspections and maintenance of the roof system must be completed by the Owner on a regular basis and are the Owner's responsibility. Inspections by Owner shall take place at least on a semi-annual basis and shall be documented. Periodic inspections are the Owner's responsibility and shall include such things as making minor repairs, cleaning off debris, cleaning filters and gutters, unclogging drains and removing standing water. Lack of regular maintenance shall void this Limited Warranty. For specific information on roof maintenance requirements please visit our website at www.certainteed.com. UNAPPROVED REPAIRS, ALTERATIONS, DELETIONS OR ADDITIONS All repairs, alterations, deletions or additions to any aspect of the roof that affects the Product or any material contiguous thereto must have prior written approval of CT's Commercial Roofing Technical Services Department, 20 Moores Road, Malvern, PA 19355, (800) 396-8134 ext. 2. If Owner without prior written consent of CT, makes or permits any repairs, alterations, deletions or additions to the roof that affect the Product, all of CT's obligations, duties and coverage under this Limited Warranty will terminate and the Limited Warranty will be voided. NOTICE OF CLAIMS Any claim or request for CT to perform under this Limited Warranty must be made by Owner in writing within thirty (30) days of discovery of the defect, and Owner must send proof of purchase and samples that demonstrate the alleged manufacturing defect to CT's Commercial Roofing Technical Services Department. This notice of claim must include a general description of the alleged defect as well as photographs. Owner shall grant access to the entire roofing system as necessary for CT to investigate the claim. If access is not granted, CT shall have the right to determine, at its sole discretion that this Limited Warranty is void as to that portion of the roof to which access is denied. Contract or invoice from roofer for service, product or work completed does not constitute Proof of Purchase of CT products. Original Proof of Purchase is required and best obtained from the place of purchase. Copies are not acceptable. Failure to notify CT in a timely manner shall relieve CT of any obligation under this Limited Warranty. Note: Notice of claim to your contractor does not constitute notice to CT. CertainTeed Corporation, 20 Moores Road, Malvern, PA 19355 ©1/lb Ce^o nTeed Co,ro,al or. Co e No COMM -soy In the event an emergency condition exists which requires immediate repair to avoid damage to the building or its contents, Owner may make essential temporary repair(s) performed by a qualified roofer. CT will only reimburse Owner for essential temporary repair expenses of Product that would have been covered under this Limited Warranty, excluding labor costs. TRANSFERABILITY This Limited Warranty may be transferred to one subsequent owner only if CT's Commercial Roofing Technical Services Department is notified at the above listed address within thirty (30) days of real estate title transfer. If it is determined at CT's sole discretion that the roof is in a state of poor maintenance or in disrepair, CT reserves the right to reject the transfer and void this Limited Warranty. EXCLUSIVE WARRANTY AND LIMITATIONS OF REMEDIES THIS DOCUMENT CONSTITUTES THE EXCLUSIVE WARRANTY AND SOLE REMEDIES PROVIDED BY CERTAINTEED. THE WARRANTY AND REMEDIES CONTAINED IN THIS DOCUMENTARE EXPRESSLY IN LIEU OFANYANDALL OTHER OBLIGATIONS, GUARANTEES, WARRANTIES AND REPRESENTATIONS, WHETHER WRITTEN, ORAL, IMPLIED BY STATUTE, AT LAW OR IN EQUITY, INCLUDING WITHOUT LIMITATION, THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR USE AND FITNESS FORA PARTICULAR PURPOSE. SOME STATES OR JURISDICTIONS MAY NOT ALLOW THE EXCLUSION OF IMPLIED WARRANTIES OR MAY DETERMINE THE PERIOD OF TIME FOLLOWING THE SALE THATA PURCHASER MAY SEEK REMEDY UNDER IMPLIED WARRANTIES, SO THE ABOVE EXCLUSION MAY NOT APPLY TO YOU. CERTAINTEED'S OBLIGATIONS, RESPONSIBILITIES AND LIABILITY SHALL BE LIMITED TO PROVIDING REPLACEMENT PRODUCT OR REFUNDING THE ORIGINAL COST OF THE DEFECTIVE PRODUCT AS SET FORTH IN THIS LIMITED WARRANTY. IN NO EVENT SHALL CERTAINTEED BE LIABLE FOR ANY SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY KIND, INCLUDING ANY DAMAGE TO THE PROPERTY, THE BUILDING OR ITS CONTENTS, OR FOR INJURY TO ANY PERSONS, THAT MAY OCCUR AS A RESULT OF THE USE OF CERTAINTEED'S PRODUCTS OR AS A RESULT OF THE BREACH OF THIS WARRANTY. IF YOUR STATE OR JURISDICTION DOES NOT ALLOW EXCLUSIONS OR LIMITATIONS OF SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES, THE ABOVE LIMITATIONS MAY NOT APPLY TO YOU. IN NO EVENT SHALL CERTAINTEED'S TOTAL LIABILITY ARISING OUT OF OR RELATED TO THE PRODUCT COVERED UNDER THIS LIMITED WARRANTY EXCEED THE ORIGINAL PURCHASE PRICE OF THE PRODUCT TO THE OWNER OF THE PRODUCT THAT WAS ORIGINALLY INSTALLED. This Limited Warranty gives you specific legal rights, and you may also have other rights which vary from State to State or Province to Province. MODIFICATIONS TO LIMITED WARRANTY Except as noted herein, this Limited Warranty may not be modified, altered or expanded by anyone, including product distributors, dealers, sellers, installers and/or CertainTeed field representatives. Only CT's Commercial Roofing Technical Services Department is authorized to modify coverage provided by this Limited Warranty. Issuance of this Limited Warranty or review or inspection of plans, the building or product application by a CT representative does not waive any exclusions or conditions of this Limited Warranty. Application of the Product materials that deviates from CT's Commercial Roof Systems Manual specifications voids coverage, unless prior written approval is provided by CT's Commercial Roofing Technical Services Department. INSPECTION CT does not practice engineering or architecture. Issuance of this Limited Warranty or any roof inspections conducted by CT or its authorized agent, do not constitute an approval of the roof, the roof design plans or specifications, or the construction or installation of the roof. Roof designs, construction plans or installation of the roof system should be approved by Owner or Owner's professional. Any roof inspections are solely for the benefit of CT and do not constitute any approval, representation or warranty that the roof meets building code standards. Warranty Chart Product Applied Flintlastic® STA Flintlastic STA Plus Flintlastic GTA Flintlastic GTA -FR Flintlastic FR Cap 30 Flintlastic FR Cap 30 T Flintlastic FR -P Flintlastic Premium FR -P Flintlastic GMS Flintlastic GTS -FR Flintlastic SA Cap Flintlastic SA Cap FR Warranty Period in Years Product Applied 10 Flintlastic® GTA CoolStar® 12 Flintlastic GTA -FR CoolStar 12 Flintlastic FR Cap 30 CoolStar 12 Flintlastic FR Cap 30T CoolStar 12 Flintlastic FR -P CoolStar 12 Flintlastic Premium FR -P CoolStar 12 Flintlastic GMS CoolStar 12 Flintlastic GTS -FR CoolStar 12 Flintlastic SA Cap CoolStar 12 Flintlastic SA Cap FR CoolStar 12 12 This Limited Warranty applies to Product installed on or after October 1, 2017. Warranty Period in Years 12 12 12 12 12 12 12 12 12 12 CertainTeed corporation, 20 Moores Road, Malvern, PA 19355 ©1/18 CertainTeed Corporation, Code No. COMM -365 CertainTeed FLAINTLASTJICOSA Self -Adhering SBS Modified Bitumen Roof Systems 11.49 II�1«�• B U R T - U P PROTECTION ° R 0 V E F PERFORMANCE After more than a century of making reliable, durable roofing materials, CertainTeed remains a leading trusted brand for roofing distributors and contractors. We're rated #1 with America's building and remodeling professionals. So whether you have a residential or commercial project, you can turn to CertainTeed with confidence. We've been around a long time, and our expertise goes into giving you better products. We manufacture complete systems and protect you with strong warranties. We use the highest quality materials, and that makes for better roofs — not to mention lower life -cycle costs. It's all a part of our promise to you. TM Quality made certain. Satisfaction guaranteed. Goes down fast. Stays on strong. Flintlastic' SA performs in all the right ways. What's more important to you? Speed of installation, durability or appearance? The Flintlastic SA (self -adhering) SBS modified bitumen low slope roofing system is a premium performer in all these areas. What Is the SA system? With high quality materials bottom to top, components of the Flintlastic SA system include: Flintlastic" SA NailBase (mechanically attached) Flintlastic' SA PlyBase (self -adhering) Flintlastic' SA MidPly (self -adhering) Flintlastic" SA Cap (self -adhering) Flintlastic" SA Cap FR (fire -rated, self -adhering) Flintlastic" SA Cap CoolStar (self -adhering) Flintlastic' SA Cap FR CoolStar (fire -rated, self -adhering) FlintPrime SA (quick -dry primer) Please see page 12 for product detalis. What are the advantages? No torches, no hot asphalt, no fumes and no mess — all of which means application is much cleaner and faster. Plus, equipment needs are minimal. These advantages are even more amazing considering the long system life you can expect. Where can I use it? The value associated with labor savings and safety can be applied to any roof project. In addition, Flintlastic SA roof systems are ideal when access to the roof is limited, such as high-rise buildings. And no asphalt kettle means no odor, which makes SA systems an ideal solution on healthcare, education, hospitality and residences/condos where occupant comfort is tremendously desirable. Considerations for Intended Use Energy Savings Flintlastic SA Cap and SA Cap FR are available with highly reflective granules, meeting ENERGY STAR' requirements for cool roofs. Specific product details can be found on product technical data sheets or by viewing www.energystar.gov. The Flintlastic SA Family of Products CertainTeed offers two types of primers for use with Flintlastic SA systems. FlintPrime) asphalt primer and FlintPrime) SA quick -dry primer are designed to enhance the adhesion of self-adhesive roofing membranes. Available in 14 oz spray cans, 1 -gallon cans, 3.5 -gallon buckets, and 5 -gallon pails. FlintBond" SBS Modified Bitumen Adhesive is a premium grade adhesive. With Flintlastic SA membranes, the trowel and caulk grade are used for encilap, sidelap bead and vertical flashing details. Available in caulk, 3 gallon, 5 gallon and 55 gallon drums. If multiple SA products are listed, products are listed in order of warranty duration from shortest to longest, with the exception of SA Cap and SA Cap -FR; SA Cap FR is intended for use where Class A fire rating is required (see UL Directory for Class A system specification). NOTE: Removal of the roof system (at end of life) may be difficult when adhering PlyBase or MidPly direct to a roof deck (i.e. wood, concrete). Deck Insulation/Coverboard* SA Anchor/Base SA Interply SA Cap Steel Required NailBase (MF) Optional SA Cap PlyBase (SA) PlyBase (SA) MidPly (SA) (SA) SA Cap FR MidPly (SA) (SA) Wood/LWIC/ Other, i.e. Optional Yes PlyBase, MidPly No NailBase (MF) Gypsum, Cementitious Wood Fiber, Wood Planks Structural Wood Fiber, etc Concrete Optional Yes PlyBase, MidPly No - Requires FlintPrime SA *FlintPrime or FlintPrime SA may be recommended, contact CertainTeed Technical Services for more information. System Warranties at a Glance SA System with Adhered Base Ply Warranty Warranty Fee Insulation/ Base Interply Cap Re -Cover Spec* Duration (100 SQ Min.) Coverboard 15 years $7.50/SQ Optional SA PlyBase SA Cap Prior approval required by SA -C -2-S SA -1-2-S 15 years $7.50/SQ Optional SA MidPly SA Cap FR 20 years $12.50/SQ Optional SA PlyBase SA PlyBase SA Cap SA -C -3-S SA -N -2-S 15 years $7.50/SQ SA Cap FR CertainTeed Technical SA -1-3-S 20 years $12.50/SQ Optional SA MidPly Optional SA Cap SA -C -2-S SA Cap FR Department SA -1 -213 S 25 years $15.00/SQ Double layer, SA MidPly SA Cap -S SA-C-2ndlayer PlyBase SA Cap FR Technical SA -1-3 adhered Department SA System with Mechanically Attached Anchor Sheet Warranty Warranty Fee Insulation/ Base Interply Cap Re -Cover Spec* Duration (100 SO Min.) Coverboard 12 years $4.00/SQ Optional SA NailBase SA Cap Approved SA -C -2-S SA Cap FR SA -IN -2-S SA -N -2-S 15 years $7.50/SQ Optional SA NailBase SA PlyBase Prior approval SA -C -3-S SA -IN -3-S 20 years $12.50/SQ Optional SA NailBase SA MidPly required by CertainTeed SA -N -3-S 20 years $12.50/SQ Optional SA NailBase 2 -SA SA -IN -4-S PlyBase Technical SA -N -4-S Department NOTE: Gold Star contractors have the option to offer their customers a 25% warranty duration extension with the CertainTeed Integrity Maintenance Coverage program. *Refer to CertainTeed Commercial Systems Specifications. Important Application Considerations If the material isn't bonding, STOP the application! Every professional roofer is familiar with the tools needed • Always remember to put safety first and follow all OSHA to complete a roof installation, but just as a recap, safety guidelines with any roofing installation. specific tools you'll need to install Flintlastic' SA include: • A weighted roller for pressing the membrane into place, 2" to 4" in diameter (40-75 lbs.). • Suitable trowel for applying adhesive to flashing details. • Roofer's knife with hooked blade. • Long -handled (standing) roller with 1/8"-1/4" nap for applying primer (1/8" nap for smooth surfaces, 1/4" nap for more porous surfaces). • Caulk gun for applying beads of FlintBond adhesive. • Seam probing tool to check for small voids. Please Keep in Mind: • Do not attempt application if ice, snow, moisture or dew are present. Ambient temperature must be 50OF or above. • Substrates must be free of dust, dirt, oil, debris and moisture. • Store Flintlastic SA rolls indoors on pallets, protected from the elements. Rolls that are improperly stored or have been warehoused for prolonged periods of time may lose their tack and should not be used. E • Primer, if used, must be applied at the specified rate and must be allowed to thoroughly dry. • Work with manageable lengths of MidPly and Cap for the particular job. Where appropriate, cut rolls into 1/3- or 1/2 -roll lengths and allow material to relax prior to installation. In cooler weather, a hand-held hot air welding gun such as the Lester Triac" (110 volt power required) or Primus Sievert PNS -4 Hot Air Kit, can be used to warm the sidelap areas and improve adhesion (prior to application of the FlintBond SBS Modified Bitumen Adhesive). • Target 1/4" FlintBond bleed out at endiap areas. Use caution not to roll weighted roller into bleed out." • All plies of the assembly should be installed in one day. If blue film must be exposed for longer periods of time, cover with tarp or suitable alternate protection. • When applying MidPly (or PlyBase) directly to substrate, design adequate roof ventilation into the system through the use of roof relief vents. • Do not mix Flintlastic SA membranes with other types of roof membranes. Flintlastic SA membranes are specifically designed to be applied together. The permanent top film of the MidPly, PlyBase and NailBase cannot receive torching, hot asphalt or other non self -adhering application methods. The Flintlastic SA Cap (or SA Cap FR), PlyBase and MidPly cannot be applied to any surfaces other than as described herein. • Do not use cold adhesives with Flintlastic SA membranes other than for flashing details and cap sheet overlaps as described herein. • Refer to the CertainTeed Commercial Roof Systems Manual for complete requirements. • When applying Flintlastic SA on slopes exceeding 1" in 12", membranes shall be back nailed. When applied parallel to the slope, Flintlastic SA shall be blind -nailed at end laps 2" in from top edge, 6" o.c. through tin discs and to wood nailers. See General Requirements Section of the CertainTeed Commercial Roof Systems Specifications for details. Application of Base Sheet Flintlastic SA NailBase may be used as an anchor sheet (mechanically fastened); PlyBase or MidPly may be used as a base ply (fully adhered). Beginning at the low point of the roof, mechanically fasten Flintlastic SA NailBase to nailable deck using appropriate fasteners (see fasteners chart). Start with an appropriate roll width (1/3 or 1/2 roll) to accommodate offsetting of sidelaps of subsequent layers of MidPly and/or Cap sheet. Install so that no sidelaps are against the flow of water. A minimum fastening pattern is every 9" on center on sidelaps and every 18" on center in two staggered rows in the field of the sheet. •IN's:'• ` �..a ,,�'-u Overlap base sheet sidelaps 2" and endlaps 4". Offset endlaps a minimum of 3'. Turn base sheet over 3 Standard (Round Head) Roofing Nails and Cap (Note: CertainTeed does not permit the use of plastic caps) For use with Base Sheet, Flash/ Termination Bar on Plywood Decks, Non Veneer Decks, Wood Plank Decks Large Head Roofing Nails For use with Base Sheet, Flash/Termination Bar on Plywood Decks, Non Veneer Decks, Wood Plank Decks Base Sheet Fasteners for some Cementitious Roof Decks For use with Base Sheet on Light Weight Insulation Concrete, Poured Gypsum Self -Locking Fasteners For use with Base Sheet on Cement/Wood Fiber Insulation Fasteners When using FlintPrime° SA, allow to dry thoroughly, but no more than four hours to retain tack -enhancing properties. It is recommended to prime fasteners with FlintPrime Aerosol before installing the base ply. Before adhering a base ply, sweep the surface of the deck or insulation to remove any debris that could interfere with adhesion. Start application at the low point of the roof. Install flush to roof edge. Design layout so that no sidelaps are against the flow of water. Cut rolls into manageable lengths. Fold the membrane back halfway lengthwise to remove the split release film. facia by 2" and fasten. Do Not Leave Base Sheet Exposed To The Weather. Cover in the same day with optional SA interply and SA Cap/SA Cap FR. SA PlyBase/MidPly may be adhered to mechanically fastened or adhered FlintBoard, ISO/FlintBoard ISO Cold, or direct to primed substrates (i.e. concrete roof decks, gypsum coverboards, etc). 3 Standard (Round Head) Roofing Nails and Cap (Note: CertainTeed does not permit the use of plastic caps) For use with Base Sheet, Flash/ Termination Bar on Plywood Decks, Non Veneer Decks, Wood Plank Decks Large Head Roofing Nails For use with Base Sheet, Flash/Termination Bar on Plywood Decks, Non Veneer Decks, Wood Plank Decks Base Sheet Fasteners for some Cementitious Roof Decks For use with Base Sheet on Light Weight Insulation Concrete, Poured Gypsum Self -Locking Fasteners For use with Base Sheet on Cement/Wood Fiber Insulation Fasteners When using FlintPrime° SA, allow to dry thoroughly, but no more than four hours to retain tack -enhancing properties. It is recommended to prime fasteners with FlintPrime Aerosol before installing the base ply. Before adhering a base ply, sweep the surface of the deck or insulation to remove any debris that could interfere with adhesion. Start application at the low point of the roof. Install flush to roof edge. Design layout so that no sidelaps are against the flow of water. Cut rolls into manageable lengths. Fold the membrane back halfway lengthwise to remove the split release film. Press membrane securely into place and repeat with the opposite half of the membrane. Use a heavy, weighted roller over the entire surface of the PlyBase or MidPly to secure the membrane. Work outwards to eliminate voids Overlap sidelaps of subsequent PlyBase or MidPly membrane lengths 2" and endlaps 4". Offset (stagger) endlaps minimum 3'. Out endlaps at opposing diagonal corners at an angle approximately 5-1/2" long by the selvage dimension from the corners to minimize "T" -seams. Apply a bead or small trowel dab (quarter size) of FlintBondl SBS Modified Bitumen Adhesive, trowel or caulk grade, at the edge of the angled cut to avoid a capillary. Use of a hand-held hot air gun at the joint area prior to rolling the membrane will maximize adhesion. In areas prone to cold temperatures, snow and freeze -thaw cycles, it may be more effective to use the hot air gun to form joints, and to completely fill all mole holes with asphalt that has been slightly melted using the gun. It is recommended to apply a bead of FlintBond SBS Modified Bitumen Adhesive, caulk grade, at all MidPly (or PlyBase) side and endlaps to eliminate a capillary. Do Not Leave Base Sheet Exposed To The Weather. Cover in the same day with optional SA Interply and SA Cap/SA Cap FR. Refer to CertainTeed Commercial Systems Specifications for comprehensive construction details. Application of Interply (optional) Note: Proceed to "Before Installing Flintlastic' SA Cap (or SA Cap FR)" if installing a 2 -ply system. Before installing Flintlastic SA PlyBase or MidPly sweep the underlying anchor sheet or base ply to remove any debris that could interfere with adhesion. Start with PlyBase or MidPly at the low point of the roof with appropriate roll width to offset sidelaps 18" from sidelaps of anchor sheet or base ply. all flush to roof edge. Design layout so that no sidelaps are against the flow of water. Out rolls into manageable lengths. Fold the membrane back halfway lengthwise to remove the split release film. Press membrane securely into place and repeat with the opposite half of the membrane. Use a heavy, weighted roller over the entire surface of the PlyBase or MidPly to secure the membrane. Work outwards to eliminate voids. Overlap sidelaps of subsequent PlyBase or MidPly membrane lengths 2" and endlaps 4". Offset (stagger) endlaps minimum 3'. Cut endlaps at opposing diagonal corners at an angle approximately 5-1/2" long by the selvage dimension from the corners to minimize "T" -seams. Apply a bead or small trowel dab (quarter size) of FlintBond SBS Modified Bitumen Adhesive, trowel or caulk grade, at the edge of the angled cut to avoid a capillary. Use of a hand-held hot air gun at the joint area prior to rolling the membrane will maximize adhesion. In areas prone to :d cold temperatures, snow and freeze -thaw cycles, it may be more effective to use the hot air gun to form joints, and to completely fill all mole holes with asphalt that has been slightly melted using the gun. It is recommended to apply a bead of FlintBond SBS Modified Bitumen Adhesive, caulk grade, at all MidPly (or PlyBase) side and endlaps to eliminate a capillary. Do Not Leave Base Sheet Exposed To The Weather. Cover in the same day with optional SA Interply and SA Cap/SA Cap FR. Refer to CertainTeed Commercial Systems Specifications for comprehensive construction details. Before Installing Flintlastic SA Cap or SA Cap FR If roof edge detail utilizes edge metal, proceed as follows. If MidPly or (PlyBase) has been applied, install minimum :TA 26 gauge edge metal using appropriate fasteners, and set entirely in a uniform 1/8"-1/4" thick troweling of FlintBond SBS Modified Bitumen Adhesive, trowel grade. Remove any oil from the metal surface using a vinegar and water solution. Prime the horizontal surface of the metal with FlintPrime SA and allow primer to dry. Apply a bead of caulk grade FlintBond adhesive to the edge of the metal where it meets the MidPly (or PlyBase). Proceed with Flintlastic SA Cap (or SA Cap FR) installation. If an interply is not specified, install a 9" wide flashing strip of PlyBase or MidPly (material assumed to match base ply) "onto the field of the roof and flush to the roof edge, self -adhered. Install minimum 26 gauge edge metal using appropriate fasteners, set entirely in a uniform 1/8"-1/4" thick troweling of FlintBond SBS Modified Bitumen Adhesive, trowel grade. Remove any oil from the metal surface using a vinegar and water solution. Prime the horizontal surface of the metal with FlintPrime SA and allow primer to dry. Apply a bead of caulk grade FlintBond at the roof side edge of the metal where it meets the flashing strip. Similarly, complete your sheet metal flashing installation using cut PlyBase or MidPly flashing collars at all flashing details prior to flashing application. Seal edges of PlyBase or MidPly flashing collars with a bead of FlintBond. See "Typical Construction Details" pages for examples. If an interply is specified, set flanges in trowel grade FlintBond and properly fasten. If an interply is not specified, complete sheet metal flashing installation using cut PlyBase or MidPly flashing collars at all flashing details. All cap sheet flashings installed to transitions that overlap onto mineral surface must be set in a uniform troweling of FlintBond, trowel grade adhesive. Application of Flintlastic SA Cap (or SA Cap FR) Before installing Flintlastic, SA Cap or SA Cap FR, sweep the underlying anchor sheet or base ply to remove any debris that could interfere with adhesion. To install Flintlastic SA Cap (or SA Cap FR), start at the low point of the roof with an appropriate roll width to offset sidelaps from the underlying membrane a minimum of 18". Work with manageable lengths for proper handling. 4:' VW Position SA Cap (or SA Cap FR) with selvage edge release strip at high side of roof. Install in weather -lapped fashion, with no laps against the flow of water. Once positioned, lift and fold back (lengthwise) the lower half of the membrane. Remove the split release film and press firmly into place. Then repeat with the other (high side of the roof) half of the membrane. F, Follow the same layout and split release film procedures as for MidPly (or PlyBase), but overlap sidelaps 3" and endlaps 6". Use a weighted roller over the entire surface of Flintlastic SA Cap (or SA Cap FR) to secure it in place and prevent voids, working outward from the center of the sheet. As subsequent membrane lengths are installed, remove the selvage edge release strip just prior to overlapping to keep the adhesive area protected and clean. Cut endlaps at opposing diagonal corners at an angle approx. 3" by 5-1/2" from the corners to minimize T -seams. FlintBond trowel grade is required on the entire 6" width of each endlap prior to overlapping. Apply a uniform 1/8"-1/4" troweling of the FlintBond on the entire width of the endlaps to the underlying membrane. Install the overlapping sheet. Always apply FlintBond (extend beyond underlying lap minimum 1/4") on the entire width of any overlap when applying SA Cap (or SA Cap FR) over another mineral surface such as the SA Cap (or SA Cap FR) endlap. At all vertical and other flashing points, apply FlintBond trowel grade wherever there is an overlap onto mineral surfacing. Once the membrane has had a chance to bond, check all laps and joints for full adhesion. If the membrane can be lifted at any area it is not properly adhered. A seam probing tool can be helpful to check for small voids at laps. If necessary, use appropriate hand-held hot air welding tool and seam roller or an application of FlintBond to seal small unbonded areas if they exist. Construction Details Included in this manual are a few common construction details. Please refer to CertainTeed's standard details or the NBCA for details not found within this manual. Important to note with all details, all metal must be primed and set in FlintBond" trowel grade adhesive and all overlaps over mineral surfacing must utilize FlintBond trowel grade adhesive. The Proper T -Seam Detail • Before adhering Flintlastic' SA PlyBase or MidPly, Cap (or SA Cap FR) endlaps, trim the underlying sheet's lower corner at the end of the roll. m'0" MOdPb **of"" &4000Mr vow" 0" #eww"V-A-raWaw k% Ma • Follow with the overlapping sheet, trimming the upper outside corner. • Corners should be trimmed on a diagonal angle 5-1/2" long from end of roll to outside edge. • Width of trim should be equal in width to the sidelap specified (3" for Flintlastic SA Cap [or SA Cap FR] and 2" for Flintlastic SA MidPly [or PlyBase]). • Trimmed corners should be completely covered by application of succeeding courses. • Note: If using Flintlastic SA PlyBase or MidPly, apply quarter -size dab of FlintBond at T -seam area. If using Flintlastic SA Cap (or SA Cap FR), the endlap should be completely set in trowel grade FlintBond along the entire 6" lap width. X Rake Edge Detail • Cut selvage area at an angle at all rake edges. • Apply a bead of FlintBond caulk along cut edge to eliminate mole holes. Typical Construction Details - Flintlastic° SA 2 -Ply System Vent Pipe Collar Detail vPw it"PlIMM■ IIIA kA t. i�illYir Inside Corner Drain Detail �NMiriYtll��.L�Yif 1 _ Outside Corner k„� GY�ris 3. V44kish: .tom #. :L Ow! 1L firm M�Ifui ho"M Outside Corner k„� GY�ris 3. V44kish: .tom #. Typical Construction Details - Flintlastic° SA 2 -Ply System Wood Parapet Wall Detail i, r4ramw SA Ibltot Scupper Detail t. MWOM14W Ip "MAN U 0-010" #.4ftid�elill � f ' �I�1r�4MAlfi M �. � la►�.:tit tam f"SAA VAPNW *W 8 Concrete Wall Termination 3 ne-404 SA N#ALW with Surface Mount Flashing [Eta t ShOR VOW h11r�iMj� �, 'r { r+L'tiw ;,-WAS illi! 4 SA CO Oft O 1: 01*40W #3tNr Citi 13peft ;t L 11001110C SA QW i, r4ramw SA Ibltot Scupper Detail t. MWOM14W Ip "MAN U 0-010" #.4ftid�elill � f ' �I�1r�4MAlfi M �. � la►�.:tit tam f"SAA VAPNW *W 8 Concrete Wall Termination with Surface Mount Flashing t ShOR VOW h11r�iMj� �, 'r ftiM w lop r+L'tiw 4 SA CO Oft O 1: 01*40W #3tNr Citi 13peft ;t Ir 1. i4W4W 1A ftfto ar VWv4JJftv Imo.-- iFF* UPOPM sm OW41aw Nd so pb*vtwn la Ks Edge Detail with Insulation f. IIMlim a v e 1 f" 4, 3+► oft d M4MIIlwtl4 A�ai�l M14r MIN man req WAW tWW 1011160 Jtiiii�d atlYla lie >tll Mur V OUNT" 2 -Ply System Specifications SPECIFICATION: SA -N -2-S Fiintlastic� SA NailBase, nailed. Flintlastic SA Cap (FR), self -adhered. For use over nailable decks N, 4" End Lap 393/." , End Laps (Fasten as per Staggered course 2) 3' Apart (min) 13 1:. Nails (-. 3' Lap 13" i...... 393/8" : 6" , t y.....�......�.... End 19"h s" 2„ Lap Lap w SA -N -2-S Note: Flintlastic SA MidPly, FlintBond Trowel Grade and FlintBond Caulk Grade are needed for flashing details and mineral surface membrane overlaps. FlintPrime (SA) is needed for surfaces that require priming. Cants In angles of roof deck and vertical surfaces, the roofing contractor shall furnish and install an approved cant strip with a minimum 3" face. 9 SPECIFICATION: SA -C -2-S Flintlastic SA NailBase, applied using hot asphalt, or Flintlastic SA PlyBase or MidPly, self -adhered as base ply. Flintlastic SA Cap (FR), self -adhered. For use over non-nailable decks or approved insulation (Flintlastic SA Base required over insulation) tic 14 I'l & 1 .::.. 6" End Lap End Laps Staggered 3' Apart (min) Dr�a�nar;c 1 393/8° 3" Lap 4Lap........3/8" 6" , End 19"h6' Lap _ ,n r", r,. c.:. SA -C -2-S Note: Flintlastic SA MidPly, FlintBond Trowel Grade and FlintBond Caulk Grade are needed for flashing details and mineral surface membrane overlaps. FlintPrime (SA) is needed for surfaces that require priming. Cants In angles of roof deck and vertical surfaces, the roofing contractor shall furnish and install an approved cant strip with a minimum 3" face. Roof System Ventilation Roof system as shown requires ventilation as per NBCA recommendations. Typical Construction Details - Flintlastic° SA 3 -Ply System Vent Pipe Collar Detail t. Ar#AM AIltgl IM fto VOOMMOANOW Drain Detail I IAC* IfiMlt Edge Detail 10 4 3 -Ply System Specifications SPECIFICATION: SA -N -3-S Flintlastic"' SA NailBase, nailed. Flintlastic SA PlyBase or MidPly, self -adhered. Flintlastic SA Cap (FR), self -adhered. For use over nailable decks SA -N -3-S Note: Flintlastic SA MidPly, FlintBond Trowel Grade and FlintBond Caulk Grade are needed for flashing details and mineral surface membrane overlaps. FlintPrime (SA) is needed for surfaces that require priming. Cants In angles of roof deck and vertical surfaces, the roofing contractor shall furnish and install an approved cant strip with a minimum 3" face. 11 SPECIFICATION: SA -C -3-S Flintlastic SA NailBase, applied using hot asphalt, or Flintlastic SA PlyBase or MidPly, self -adhered as base ply. Flintlastic SA PlyBase or MidPly, self -adhered. Flintlastic SA Cap (FR), self -adhered. For use over non-nailable decks or approved Insulation 4' , End I- Lap 4" End Lap _._End Laps ' - +--- -- Staggered } 3' Apart (min) 2" Lap , ' 3 3/8". ' r 3" Lap ' _..i.. 393/e" 6, , End La + ' Lap Lap S A- G 3-S Note: Flintlastic SA MidPly, FlintBond Trowel Grade and FlintBond Caulk Grade are needed for flashing details and mineral surface membrane overlaps. FlintPrime (SA) is needed for surfaces that require priming. Cants In angles of roof deck and vertical surfaces, the roofing contractor shall furnish and install an approved cant strip with a minimum 3" face. c...•.. -,. �� -r�, 4" End-.: . rill lir Lap (Fasten as per course 2) ' )'m.T"t 2" Lap End Laps ... _.�. Staggered l 13" 3' Apart (min) •� Nails 2' Lap { �• 9 393/8" _ .......... ... 13" 3" Lap 393/8" 6.. End 26Yn" La p SA -N -3-S Note: Flintlastic SA MidPly, FlintBond Trowel Grade and FlintBond Caulk Grade are needed for flashing details and mineral surface membrane overlaps. FlintPrime (SA) is needed for surfaces that require priming. Cants In angles of roof deck and vertical surfaces, the roofing contractor shall furnish and install an approved cant strip with a minimum 3" face. 11 SPECIFICATION: SA -C -3-S Flintlastic SA NailBase, applied using hot asphalt, or Flintlastic SA PlyBase or MidPly, self -adhered as base ply. Flintlastic SA PlyBase or MidPly, self -adhered. Flintlastic SA Cap (FR), self -adhered. For use over non-nailable decks or approved Insulation 4' , End I- Lap 4" End Lap _._End Laps ' - +--- -- Staggered } 3' Apart (min) 2" Lap , ' 3 3/8". ' r 3" Lap ' _..i.. 393/e" 6, , End La + ' Lap Lap S A- G 3-S Note: Flintlastic SA MidPly, FlintBond Trowel Grade and FlintBond Caulk Grade are needed for flashing details and mineral surface membrane overlaps. FlintPrime (SA) is needed for surfaces that require priming. Cants In angles of roof deck and vertical surfaces, the roofing contractor shall furnish and install an approved cant strip with a minimum 3" face. '. ■ . 64'6" x 39-3/8" 64'6" x 39-3/8" 32'1" x 39-3/8" 32'11" x 39-3/8" 32'11" x 39-3/8" 1.5 mm 1.5 mm 2.8 mm 4.0 mm 3.2 mm 82 lbs 86 lbs 63 lbs 95 lbs 88 lbs. - 2 Squares 2 Squares 1 Square 1 Square 1 Square - Permanent Film Permanent Film Permanent Film Mineral Mineral - Sand Removable Release Film Removable Release Film Removable Release Film Removable Release Film - Fiberglass Mat Fiberglass Mat Fiberglass Mat Non -Woven Polyester Mat Heavy Duty Fiberglass Mat - 65/40 (MD/CD) 65/40 (MD/CD) 75/50 (MD/CD) 85/67 (MD/CD) 64/58 (MD/CD) 6/5 (MD/CD) 6/5 (MD/CD) 5/5 (MD/CD) 61/66 (MD/CD) 4/4 (MD/CD) Palletized, Bands Individual Cartons 20 Rolls Per Pallet 20 Rolls Per Pallet Individual Cartons Individual Cartons Individual Cartons, 20 Rolls Per Pallet 20 Roils Per Pallet 20 Rolls Per Pallet 12 CertainTeed Full Systems I- 61 Caution: CertainTeed Flintlastic roofing products are intended for use by professional roofing contractors only. It is the responsibility of the installer to follow all appropriate and required safety precautions in conjunction with the installation of any CertainTeed roofing product. Meets or exceeds ASTM D6164 (SA Mid Ply and SA Cap), ASTM D6163 (SA Cap FR) and ASTM D4601 (SA NailBase and PlyBase). © UL 2218 Class 4 Impact Resistance - Certain systems are UL classified as to impact resistance as described in the a k^' FM ICC -E5 ESR-1388 11-1mK Materials and Systems Directory. APPROVED ASK ABOUT ALL OF OUR OTHER CERTAINTEED 2 PRODUCTS AND SYSTEMS: CertainTeed Corporation 20 Moores Road ROOFING SIDING • TRIM • DECKING • RAILING • FENCE Malvern, PA 19355 GYPSUM CEILINGS • INSULATION Professional: 800-233-8990 www.certainteed.com http://blog.certainteed.com Consumer: 800-782-8777 O 2016 CertainTeed Corporation, Printed in U.S.A. Code No. COMM -123 SAINT GOBAIN C. C Q c V cs 0 0 i! 3 A o tea. co 0 4 0 O O a a � X co m v a C: D a 2 Pm m v 0 1� a 3 O m r m a D Z O V O n a A 0 z W 0 a D a o < o T 2 m m O x Z D O D m m a m { Om a m O �+ m � a m D m c 3 O m m D co D r Z v Z D r 9 x Z ° ++ D m m z m a D ~m m m 0 o a n m Z m D Q < � m 3 pD C � O ' 0 m =1 A ® � 3 x r � m m d - �i rF to C m O O }" . MILLS ROOFING CO. r� 2221 GRAY ST DENVER COLORADO 80214 PHONE # 303-232-0324 f' April 26, 2018 To whom it may concern, This is to verify that the Certainteed modified bitumen roofing has been installed in accordance with the manufacturers specifications. Micha rAW-"" �� /3 i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: L-1 ° C) - r' Job Address: 3 a S !9 -- Permit Permit Number: -9 o/ S 0 C -7) 1, f- i �lal La 3.- o� 1 we Il. b f n C 4 C �i 1-4 /) LL, t'4 A O r-i!� I nn/ lob ch;C, �-o Carilp�� Co -r C) i, ❑ No one available for inspection: Time CY : r�Vl /PM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: L1 a Inspector: DO NOT REMOVE THIS NOTICE r A i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office - (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: q0q- Rwf Job Address: -:N'T f'01,101 Permit Number: '201000 716 I Roo -� t- A,y i 0 /1-: t 3 Lj No one available for inspection: Time PM Re -Inspection required: es No When corrections have been made, call for re -inspection at 303-234-5933 Date: X 311 -inspector: bl(10e, 410f DO NOT REMOVE THIS NOTICE i_? i CITY OF WHEAT RIDGE Building Inspection Division (3 03) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 3 0 4, - ffl , d Job Address: 3'61957 Cl T- )ekA S4 Permit Number: -0 0 1 S D 6 -7) 4,- i ) ra o n 1 nei ❑ No one available for inspection: Time )-3= 44, A Re -Inspection required: Yes When corrections have been made, call for re -inspection at 303-234- Date:--3,b,? 03-234-Date:-3ba i ig Inspector: 'T'6 DO NOT REMOVE THIS NOTICE