Loading...
HomeMy WebLinkAboutResolution 17, 2018TITLE: CITY OF WHEAT RIDGE, COLORADO RESOLUTION N0.17 Series of 2018 A RESOLUTION APPROVING AN INTERGOVERNMENTAL AGREEMENT BETWEEN THE CITY OF WHEAT RIDGE AND THE LONGS PEAK METROPOLITAN DISTRICT FOR CONSTRUCTION OF THE 1-70 AND 32No AVENUE INTERCHANGE WHEREAS, pursuant to Charter Section 14.2 and C.R.S. § 29-1-203, the City of Wheat Ridge is authorized to enter into cooperative agreements with other governmental entities; and WHEREAS, the City and the Longs Peak Metropolitan District have negotiated an intergovernmental agreement for construction of hook ramps in connection with the l- 70/32"d Avenue interchange project; -and WHEREAS, in accordance with Section 14.2 of the City's Home Rule Charter, the City Council wishes to approve said intergovernmental agreement by resolution. NOW, THEREFORE, BE IT RESOLVED by the Wheat Ridge City Council, that: The Intergovernmental Agreement by and between the Longs Peak Metropolitan District and the City of Wheat Ridge attached to this resolution and incorporated herein by reference, is hereby approved, and the Mayor and City Clerk are authorized and directed to execute the same. DONE AND RESOLVED this ~fe#i day of '1lJMeft.,1 , 2018. Buq Starker, Mayor ATIEST: H. The District has entered into a Pre-Construction and Construction Management Sen'ices Agreement with M.A. Mortenson . Company (the "CM") to provide pre-construction and construction management services for the ·ccc Project' (the "CM Agreement"). I. The District has entered into an Agreement for Development Director Services with Evergreen (hereinafter referred to as the "DD"), to direct, coordinate and administer the pre-construction and constniction phases of the CCC Project in conjunction with the CM . (the:,"DD Agreement"). J. The District has or will enter into an Agreement for Engineering Services with Martin/Martin, Inc. (the "Engineer") to provide pre-construction and construction engineering services for the CCC Project (the "Engineer Agreement"). K. The City desires to use 2E Funds to pay for the District's construction of the Project in coordination with the CCC Project. L. The City has entered into an Investing 4 The Future Projects Professional Consulting Services Agreement with AECOM Te.chnical Services, Inc. ("AECOM'') to provide (1) management and review of public infrastructure projects; (2) construction project management and inspection; (3) assistance in obtaining additional funding; and, (4) ruisistance .in communications during projects to be paid for with 2E Funds on behalf of the City (the "AECOM Agreeme11t"). M. The City and the District have entered into this Agreement in order to: 1. Provide for the District to construct the Project on behalf of the City pursuant to the Project Documents; ii. Provide for the pty' s payment to the District of all costs of the Project utilizing the City's 2E Funds and other City funds necessary to complete the Project; iii. Provide for reimbursement to the City of any Construction Costs, as defined herein, paid in excess of the 2E Funds; and iv. Provide for CO()rdination of activitjes performed under the CM Agreement, DD Agreement, Engineer. Agreeme11.t and AECOM . Agreement in a manner th~t ensures the Project is completed in accordance with the Project Documents. · · NOW THEREFORE, the parties have entered into this Agreement. COVENANTS AND AGREEMENTS 1. SCOPE OF SERVICES. The· District will provide pre-coristructfon, construction management and construction services for the Project (the "District Services"), all as required under the CM Agreement, the DD Agreement, the Engineer Agreement, and those certain construction contracts the· district is required to enter into irt order to complete the District Services. {00334893} 2 A. Scope. The scope of the District Services is more specifically described in Exhibit C. B. Coordination. District Services will be provided in coordination with the City's authorized representative: Stephen McQuilkin, AECOM Technical Services, Inc., 6200 S. Quebec Street, Greenwood Village, CO 80111 (303.843.2127; stephen.mcquilkin@aecom.com) (the "City Representative") (references to the City include the City Representative). C. No Intended Beneficiaries. The District is responsible only for construction of the Project pursuant·· to the Project Documents, this Agreement and the intergovernmental Agreement for Hook Ramp cost Reimbursement attached hereto as Exhibit E. It is not responsible to the City for any obligations or performance owed to CDOT, AECOM or any other person or entity. Neither CDOT, AECOM nor any other person or entity is an intended beneficiary of this Agreement. D. Additional Services. The City may request the District to provide additional services not set forth in Exhibit C in writing (the "Additional Services"). The City and the District will negotiate the scope, cost and method ·of payment for Additional Services, which must be memorialized by a written agreement. E. Standard of Performance. The. District will perform the District· ServiCes using that degree of skill and knowledge customarily employed by professionals performing similar general contracting/construction management services in the Denver metropolitan area~ 1. The City represent~ that the Project Documents listed in Exhibit B are all the documents and information necessary to complete the Project as required by this Agreement. ii. The District acknowledges that coordination of certain District Servi'ces with the City Represent~tive is necessary (the <'.•coordinated Service~"). The Coordinated Services are separately identified in Exhibit C. The City Representative is the agent of the City for all Coordinated Services. 2. TERM OF AGREEMENT. ·The temi of this Agreement begins on the date of execution and ends (1) three years after the Project has been deemed substantially completed in the manner described ·at Paragraph 4.C.ii, (2) by mutual written agreement of the parties; or, (3) by the exercise of the terminatiqn provisions in paragraph 9. 3. · SCHEDULE: The District will undertake the District Se..Vices in a manner arid sequence that assures their timely completion in light of the purposes of this Agreement and coordination with the CCC Project requirements. Estimated performance dates for components of the District Services are set forth separately in Exhibit C. · 4. Payment of Project Costs. A. Waiver of District Fee~ The District will 'not charge a construction management or other" fee for the District Services. The City shall waive any ·Right of W~y Permit Fee(s) or other fees customarily imposed by the City. . · · {00334893} 3 B. Cost of District Services and the Project to be Paid by City. Except as provided in Paragraph 4(F) below, the ·City acknowledges that the District is agreeing to complete the Project with th.e understanding that no cost whatsoever. wilI be borne by the District. The City shall pay to the District all amounts necessary to pay District costs, obligations and expenses incurred in the performance of the District Services (the "Construction Costs"). A list of some estimated Constniction Costs is attached as Exhibit -D (the "Construction Cost Estimates"). The City represents that it shall consider apprdprfation of furids for payment in 2018 in an amount equal to or in excess of the total Constnicti01t Cost ·Estimates for the Project and that it shall consider appropriation of appropriate additional funds needed in future years. The District is not obligated to enter into any construction contracts until sufficient funds to pay the contract amount have been appropriated and made available by the City. C. Applications for Payment. The City acknowledges that the District is relying on payment from the City to pay Construction Costs and that funds therefor must be made available to the District to pay Construction Costs in a timely manner. The District will submit applications for payment to the City requesting funds to pay Construction Costs. (each an "Application for Payment" and together, . the . "Applications for Payment") .. Applications for Payment shall be submitted on a form approved.by the Gity as substantially set forth in Exhibit G. Applications for Payment will (a) describe and provide a cppy, of any. Trade/Con~truction Contract the District intends to enter into imd provide construction cost s.chedules for. each construction, materials or trade.contract, outlining those costs and the sched,ule under which such costs are anticipat«!d to become payable; and, (b) describe any other Construction Costs that (i) have been incurred and (ii) are anticipated to be incurred during the ensuing 60 day period along with a similar construction cost schedule. The construction cost schedules shall be provided to the City in advance off any Application for Payment, and may be revised from tinie to time, so long as the revised schedules are similarly provided to the City._ The City wiJI consider and approve the Application for Payment and make all approved funds available to the District to timely pay costs as they become due under the construction cost schedule or when actually due. The City shall deliver or otherwise m11ke. the. approve.cl. funds. available for use by the District so the District can timely pay Constructio11 ·Costs in a .manner, to b.e agreed upon by the. District accountant and City Finance Director. 1. The District, using a form approved by the City,. shall submit on a monthly basis an itemized list demonstrating the c;;onstruction Costs paid with .funds approve4 under an Application for Payment (the "Evidence of Cos~"), including but not limited to the following: . · · I) 2) {00334893} an itemized list of costs paid .. by the District pursuant to the Cl\1 Agreement, including the "applications. for . payment;'. for ~'services", t~ade contractor "work'', materials, supplies, and ~quipment performed or procured for purposes of the Project; 1;1nd . . . .. . . an itemized list of costs paid by the District pursuant to the. DD Agreement for services under that Agreement; and . 4 3) an itemized list of costs paid by the District pursuant to the Engineer Agreement for services under that Agreement; and 4) an itemized list(s) demonstrating other costs paid by the District for purposes of performing such District Services, including but not limited to costs of legal, accounting, testing, insurance, performance or other bonds, or any other consulting or construction services, to the extent such costs are within tile scope of Exhibit C .. 11. In no event shall the City be obligated to pay or reimburse any Construction Costs when payment or reimbursement is requested more than three (3) years after the Project is deemed substantially completed as "substantial completion" is defined in §24-91-102(5), Colorado Revised Statutes so long as the delay is not the fault of the City. The District is not obligated to accept bid proposals, execute contracts for construction or incur other obligations for construction of the Project without funds approved under an Application for Payment being made available to the District. D. Payment Objection Resolution. The City and District acknowledge the importance of timely performance of and payment for the Project. If the City has an objection to Construction Costs that have been submitte4 on a monthly Application for payment or Evidence of Costs, the City shall immediately notify _the District, CM, and DD of the objection. If the issue cannot be resolved, the City may submit the issue to mediation pursuant to Paragraph 13 of this Agreement. The District agrees to reimburse the City the amount of Construction Costs agreed to by the Parties in mediation, if any, pursuant to the Reimbur~ement Agreement attached as Exhibit E, Either party may pursue t~e C()llecticm . of a disputed amount in the Jefferson County District Court after fl?.ediation. . . · ·:-' ' •• # • • E. Multi-Year Fiscal Obligation. The District acknowledges that the City's obligation to pay all of the District's Construction Costs under this Agreement is subject to its appropriation of sufficient funds_ therefor .. City represents that. it presently intenqs to properly consider for appropriation the necessary funds· to complete t~e Project in 2018 and budget years subsequent to 2018 and will instruct its . budget officer to include the appropriation in all draft budgets. Non-appropriation of such funds shall be a cause for immediate termination of this Agreement by the District..,_ The. City ~erebY 'Yaives the Di~tri_cr s obligations .. und~r thi~ Agreement if the District_ exercises its right to teriniriate un,der_ this s.ub~ Paragrap~ E. F. Contingency Payment.,, The City an<;i Pistrici acknowledge tha~ the, Cicy shall allocate the 2E Funds to p~y for the Project, and that such funds shall be utiliz_ed entirely to pay Construction Costs until Project completion (the "Allocation"). ·The District ~c~o,\:Vledges the City has or will first utilize the 2E Funds to pay 1) Denver Water conduit work located within the hook-ramp construction limits in tlie estimated amount of $.557 ,33~.63 (or actual cost); .. 4) Reimpursement Request.#1.for ,Engineering and Design Services from Evergreen Development in the amount of $176,305 (or actual cost); 3) Reimbursement Request #2 for Preconstruction Management Services ·fro~.E"'.ergreen pevel()pnwnt in the estjm_ated amount of $74,442.32 (or {00334893} actual cost); and 4) Reimbursement Request #3 for Engineering, Design and Preconstruction Services in the amount of $250, 74 7 .32 (or actual cost) (the actual costs paid being "Construction Costs" for purposes of this Sub-:-Paragr3:ph F). The City acknowledges that the District currently lacks and may continue to la~k sufficie11t funds to pay Construction Costs that exceed the Allocation. I. If Construction Costs exceed the Allocation, cthe City will appropriate and make available to the District additional· funds to pay. Construction Costs necessary. to complete the Project (the "Contingency Funds"). II. The District will reimburse the City for the Contingency Funds paid to the District (i.e. funds paid to finance Construction Costs that exceed the $10,000,000 Allocation) (the "Contingency Reimbursement") in the manner described in the Longs Peak Metropolitan District/City of Wheat Ridge Hook Ramp Cost Reimbursement Agreement attached as Exhibit E (the "Reimbursement Agreement"). 5. STATUS OF DISTRICT AND RELATIONSIDP TO CITY. A. District is an independent contractor and nothing contained herein shall be construed as constituting any relationship with the City other than that expressed herein, nor shall it be construed as creating any relationship whatsoever between the City and the District's employees. Neither the District nor any of its employees, nor the CM, DD, or Engineer are or shall be deemed employees or agents of the City. The District is not, and shall not act as, the agent of the City. The District shall be responsible for paying all amounts due to consultants, the CM, DD, and Engineer in connection with the performance of the District Services. Further, except as otherwise provided herein, the District has sole authority and responsibility to contract with, terminate, and otherwise control whom it engages to perform the District Services. The District has sole authority and responsibility for its agents, employees, sub-contractors and all others it hires to perform or assist in performing the District Services. B. The District and the District's employees and subcontractors are not entitled to workers' compensation benefits under any workers' compensation insurance policy of the City. The District is responsible for any federal and state income tax and other applicable taxes and other amounts that may be due on any moneys pursuant to this Agreement. 6. WARRANTIES AND REPRESENTATIONS. The District represents, warrants and covenants that: A. It has the required authority, ability, skills and capacity to, and shall, perform the District Services in a manner consistent with this Agreement. B. It has knowledge of all of the legal requirements and business practices in the state of Colorado that must be followed in performing the District Services, and the District Services shall be performed in conformity with such requirements and practices. {00334893} 6 C. The execution, delivery and performance of this Agreement and the consummation of the transactions contemplated hereby have been duly authorized by all necessary action of the board of directors of the District. All such consents and approvals are in full force and effect. D. This Agreement constitutes the legal, valid and binding obligation of the District enforceable in accordance with its terms. 7. INSURANCE, INDEMNIFICATION AND BONDS. A. Governmental Immunity. Neither the District nor the City waive(s) any of the immunities or limitation of liability, defenses, and protections provided by the Colorado Governmental Immunity Act, CRS 24-10-lOlet seq. or the common law. B. Indemnification. Within the limitation of the Colorado Constitution and Statutes, the District shall defend, release, indemnify and save harmless the City, its officers, agents and employees from any and all claims or damages, including but not limited to death, personal injury, property loss or damage occurring as a result of the negligence of the District, its agents, employees or contractors, and, the City shall defend, release, indemnify and save harmless the District, its officers, agents and employees from any and all claims or damages, including but not limited to death personal injury, property loss or damage occurring as a result of negligence of the City, its agents, employees or contractors. The Parties acknowledge that provisions of this paragraph are not intended to waive any of the rights and defenses afforded the City or the District under the Colorado Governmental Immunity Act (Section 24-10-101, et. seq., C.R.S.). In addition, the Parties acknowledge that all such liabilities, claims and demands made by third parties shall be subject to any notice requirements, defenses, immunities, and limitations of liability that the City, the District, and their officers, agents and employees may have under the Colorado Governmental Immunity Act and under any other law. {00334893} C. District Insurance. i. 11. The District shall not commence District Services under this Agreement until it has obtained all insurance required herein. For the duration of this Agreement, the District will maintain the insurance coverage required in this Paragraph 7(C). The District agrees to procure and maintain, as Construction Costs, the following policy or policies of insurance. The District shall not be relieved of any liability, claims, demands, or other obligations arising from the District Services by reason of its failure to procure or maintain insurance, or by reason of its failure to procure or maintain insurance in sufficient coverage amounts, durations, or types. All policies shall be continuously maintained from the date of commencement of the District Services. In the case of any claims-made policy, the necessary retroactive dates and extended reporting periods shall be procured to maintain ,such continuous coverage. 7 m. Workers' Compensation insurance to cover obligations imposed by the Workers' Compensation Act of Colorado and any other applicable laws for any employee engaged in the performance of District Services under this Agreement, and Employers' Liability insurance with minimum limits of FIVE IillNDRED THOUSAND DOLLARS ($500,000) each accident, FIVE HUNDRED THOUSAND DOLLARS ($500,000) disease -policy limit, and FIVE HUNDRED THOUSAND DOLLARS ($500,000) disease - each employee. 1v. Comprehensive General Liability insurance with minimum combined single limits of TWO MILLION DOLLARS ($2,000,000) each occurrence and TWO MILLION DOLLARS ($2,000,000) aggregate. The policy shall be applicable to all premises and operations. The policy shall include coverage for bodily injury, broad form property damage (including completed operations), personal injury (including coverage for contractual and employee acts), blanket contractual, independent contractors, products, and completed operations. The policy shall include coverage for explosion, collapse, and underground hazards. The policy shall contain a severability of interest provision and shall name the City as an additional named insured. v. Comprehensive Automobile Liability insurance with minimum combined single limits for bodily injury and property damage of not less than ONE MILLION DOLLARS ($1,000,000) each occurrence and ONE MILLION DOLLARS ($1,000,000) aggregate with respect to each of the District's owned, hired and/or non-owned vehicles assigned to or used in performance of the District Services. The policy shall contain a severability of interest provision. VI. Every policy required above shall be primary insurance, and any insurance carried by the City, its officers, or its employees, shall be excess and not contributory insurance to that provided by the District. Deductible losses under each of the required policies above are Construction Costs. vu. Certificates of insurance shall be completed by the District's insurance agent as evidence that policies providing the required coverages, conditions, and minimum limits are in full force and effect, and shall be subject to review by the City upon request. Failure on the part of the District to procure or maintain policies providing the required coverages, conditions, and minimum limits shall constitute a default of this Agreement. Upon written notice to the District of such default, the District shall have 30 days to cure the default, the failure of which shall constitute a material breach of contract upon which the City may immediately terminate this Agreement, or at its discretion may procure or renew any such policy or any extended reporting period thereto and may pay any {00334893} 8 and all premiums in connection therewith, and all monies so paid by the City shall be considered Construction Costs. 8. CONTRACTOR/ PROJECT SUB-CONTRACTORS. The District is solely and fully responsible to the City for the performance of the District Services. Every agreement entered into by the District for services, materials or supplies related to the District Services shall require the posting of adequate performance and payment bonds to extent customarily required in the industry with the City included as an additional beneficiary or obligee. The District is solely and exclusively responsible for payment to all contractors, subcontractors, consultants and materials suppliers. The District will ensure contractors and sub-contractors comply with all insurance requirements in forms and amounts as set forth in Exhibit F and all warranties (express or implied) resulting from any such agreements shall inure to the benefit of the City and its successors and assigns. The District shall require performance and payment bonds of all contractors and materials suppliers adequate, in form and amount, to ensure the completion of all phases of the Project subject to such contracts. The District shall obtain from all contracted entities providing service the statutory illegal alien certifications, in form approved by the City Attorney. 9. TERMINATION: REMEDIES. A. This Agreement may be terminated by either party in the event of a material breach by the other party. Upon material breach, the non-breaching party will give the other party 45 days' notice and an opportunity to cure or to enter into an agreement with the non- breaching party as to how the cure will be accomplished. B. The District may terminate this Agreement immediately upon failure of the City to appropriate funds for the Project in any fiscal year or to make funds available to pay Construction Costs pursuant to Paragraph 4(C) herein. C. In the event this Agreement is terminated, the City will pay for all District Services performed prior to the designated termination date. Neither party shall be entitled to claim or receive any form of damages, whether economic (including lost profits), consequential, punitive or compensatory; the only remedies permitted hereunder for termination of the Agreement being the right of the District to receive payment for so much of the District Services as have been performed by the date of termination, and the right of the City to receive all physical Project improvements, whether complete or incomplete, interests in real property, materials delivered to the Project site or in transit and which have been paid for by the City, all warranties, and rights of collection on performance and payment bonds obtained or owing under Paragraph 8, and all Work Product of the District (as described in Paragraph 10). 10. WORK PRODUCT. All work product of the District prepared pursuant to this Agreement, including, but not limited to, all maps, plans, drawings, specifications, reports, electronic files, as-built drawings, and other documents, in whatever form, shall become the property of the City, whether or not the District Services are completed. When requested, all work product shall be delivered to the City in a format compatible to the City's computer {00334893} 9 applications. Work product in original or modified form will be provided to the District without charge if needed for maintenance, operation or construction of other public infrastructure. 11. REAL PROPERTY CONVEYANCES. The District shall convey the completed Project by quit claim bill of sale as directed by the City upon completion of the District Services, or upon Termination of this Agreement, in the event of termination under Paragraph 9. Such conveyance shall be free and clear of all liens and include all warranties and as built drawings. 12. NOTICES. Any notices or other communications required or permitted by this Agreement or by law to be served on, given to or delivered to either party hereto, by the other party shall be in writing and shall be deemed duly served, given or delivered when personally delivered to the party to whom it is addressed or in lieu of such personal service, upon receipt in the United States mail, first-class postage prepaid, or by personal delivery service addressed as follows: to the City of Wheat Ridge: Patrick Goff, City Manager City of Wheat Ridge 7500 W. 29th Ave., Wheat Ridge, CO 80033 with a copy to Wheat Ridge City Attorney: Gerald Dahl, City Attorney Murray Dahl Kuechenmeister & Renaud, LLP 710 Kipling Street, Suite 300 Lakewood, CO 80215 with a copy to the City Representative Stephen McQuilkin AECOM Technical Services, Inc. 6200 S. Quebec Street Greenwood Village, CO 80111 to the Longs Peak Metropolitan District c/o: Kim J. Seter, Esq. Seter & Vander Wall, P.C. 7400 E. Orchard Rd., Suite 3300 Greenwood Village, CO 80111 with a copy to Evergreen-Clear Creek Crossing, L.L.C. c/o: {00334893} Christine McRight, Development Director Tyler Carlson, Executive Vice President Evergreen Devco, Inc. IO 1873 S. Bellaire St., Suite 1200 Denver, CO 80222 with a copy to the CM: Derek Brown, Construction Executive M.A. Mortenson Company 1621 18th Street, Suite 400 Denver, CO 80202 Either party, the District or the City, may change its address for the purpose of this paragraph by giving written notice of such change to the other party in the manner provided in this paragraph. 13. DISPUTE RESOLUTION. All conflicts shall be discussed for immediate resolution between the individuals involved. Conflicts shall include unsettled claims, counterclaims, disputes and other matters in question arising out of or relating to this Agreement or the breach thereof. All conflicts shall be brought to the attention of the relevant parties within a reasonable time period after the dispute has arisen. Should the individuals fail to resolve the conflict, then the conflict shall be raised to the next level of management within the structure of each party. Should these efforts fail to resolve the conflict, the City and District shall submit to mediation of the dispute, which shall be a requirement prior to any litigation or other dispute resolution. The City and District agree that each is entitled to terminate this Agreement should mediation fail to settle the dispute. 14. USE TAX. Pursuant to Section 22-67 of the City's Code of Laws, building materials and supplies purchased for the District Services are exempt from the City's use tax. If necessary, the District shall make application for this exemption on behalf of its contractors and suppliers, on forms provided by and in compliance with the procedures of the City's Tax Division. 15. ENTIRE AGREEMENT. This Agreement constitutes the entire agreement between the parties hereto relating to the District Services and sets forth the rights, duties and obligations of each party to the other as of the date of this Agreement. Any prior City and District agreements, promises, negotiations or representations regarding the Project or District Services not expressly set forth in this Agreement are of no force and effect. This Agreement may not be amended except in writing executed by both the District and the City. 16. BINDING AGREEMENT. This Agreement shall inure to and be binding on the successors, and assigns of the parties hereto. 17. NO WAIVER. No waiver of any of the provisions of this Agreement shall be deemed to constitute a waiver of any other of the provisions of this Agreement, nor shall such waiver constitute a continuing waiver unless otherwise expressly provided therein, nor shall the waiver of any default hereunder be deemed a waiver of any subsequent default hereunder. 18. OBSERVE ALL LAWS. The District shall keep fully informed and comply with all federal, state and local laws, ordinances and regulations and all orders and decrees of {00334893} 11 bodies or tribunals that may affect those engaged or employed in the performance of this Agreement. 19. CONTROLLING LAW. This Agreement shall be governed by and construed in accordance with the laws of the state of Colorado, and any disputes hereunder shall be tried in the courts of the state of Colorado. Jurisdiction and venue shall be proper and exclusive in the district court for Jefferson County. 20. INCONSISTENCIES WITH SCOPE OF SERVICES. The intent and purposes of this Agreement and the scope of District Services provided in Exhibit C is to complement each other; however, the terms and provisions of this Agreement shall prevail in the event of discrepancies with, or conflicts of, terms or provisions contained in Exhibit C and other contract documents. 21. FORCE MAJEURE. Neither party will be liable or responsible for any delay or failure in performance if such delay or failure is caused in whole or in part Force Majeure. Force Majeure means delays resulting from causes beyond the reasonable control of the City or District, including, without limitation, acts of God, any delay caused by any action, inaction, order, ruling, moratorium, regulation, statute, condition or other decision of any governmental or quasi-governmental agency or entity having regulatory jurisdiction over any portion of the Project property, over the construction of the Project or over any uses thereof, or by delays caused by any action, inaction, condition or other decision by any utility company responsible for "dry" utilities, or by delays in inspections or in issuing approvals or permits by governmental or quasi-governmental agencies, or by fire, casualty, flood, adverse weather conditions such as, by way of illustration and no limitation, wind, snow storms which prevent outdoor work from being accomplished, severe rain storms or below freezing temperatures of abnormal degree or for an abnormal duration, tornadoes, earthquakes, floods, strikes, lockouts or other labor or industrial disturbance (whether or not on the part of agents or employees of either party hereto engaged in the construction of the Project), civil disturbance, order of any government, court or regulatory body claiming jurisdiction or otherwise, act of public enemy, war, riot, sabotage, blockage, embargo, inability to secure materials or labor due to regional or national shortages (including labor and materials shortages caused by national weather or other national events), or other natural or civil disaster, delays caused by any dispute resolution process, or any delays by injunctions or lawsuits concerning the Project. Lack of funds and inability to obtain internal or CDOT approvals shall not constitute Force Majeure. 22. ADDITIONAL MATTERS. A. {00334893} Wheat Ridge Code of Laws. This Agreement is subject to the applicable requirements of the Wheat Ridge Code of Laws, including without limitation, Code Section 2-3 (Fiscal year, budget contains appropriations, no contract to exceed appropriation), and Section 2-4 (No-damages-for- delay clauses in public works contracts. 12 EXHIBIT A CDOT Approved Depiction of Project {00334893} 14 z--+--= LNl>SCN'ED MEA f :/' CUMDRAIL &TWEEN RAW~ ~~~~~~~,~0;''~~~~~-::JZ~~;lllO--------~------':"":_~_~_'!':'l:!:""~"""i ................ ~ / ....... / ,,,,,.,, .. / ···~:)...-.:::· CHAUUNK f'ENCE ..... / -·····--·--- ---.., ', ! I I \ \ ' I I I ~a.: tt.9'21D17 RtNIN: ..... ~ f --1:tlll \llrt.Scllli:All~ = i ... ,_,_ .,.,__ = I = ~~ ForRavlaw Plqoc,t No./Code ... C:Cl•llU1'l•••••1•lfll IClA EXHIBIT 1 ... _ --, ..... _-.s-•-. --· ---............ --...... 11 .. 100 ---fllOloea!JJ.•Cll,•ON ------- ! I I J l I I l I i --tt/WZOl7 ........... ... -.... ho!ll.lklitll: 11100 .... _ Sheet Revisions --V~N!n.11 c:::> ............ -. c:::> I ~ '1 ~~-~~~!~!:~ For Review Pmjact No./Ccde ... .._ IGA EXHIBIT 2 --I ....... _...-............... -....... _.,., .. .., ... --Cod• I ""-•"•·•••.-~• -,_ Yokt --, __ ! i I l r I J ---------·-·-----.... EXHIBITB PROJECT DOCUMENTS I. I-70/32"d Avenue Interstate Access Request/1601 System Level Feasibility Study February 2018 2. CDOT Resolution Approving Interchange Modifications at 1-70 and 32"d Avenue 3. Department of Transportation State of Colorado, Final Highway Construction Bid Plans of Proposed CDOT Project No. CC M361-004, Interstate 70/32"d Ave Interchange Jefferson County Construction Project Code No. 16063, Bid Set December 14, 2017. 4. FHW A IAR Approval 5. NEPA Re-Evaluation 6. CDOT and City Contract Project: CC 0703-453 (22417) 7. Permits {00334893} 15 EXHIBITC SCOPE OF DISTRICT SERVICES The District shall perform the District Services necessary to construct the Project more or less consisting of the following items: A. Pre-Construction Services 1. Program Review and Evaluation. The District shall, in coordination with the CM and DD, review the Engineer's program, Project Documents, and the contractual requirements to ascertain the requirements to construct the Project, or any phase thereof. 2. Construction Schedule. The District shall provide the City with a construction schedule for the Project, or any phase thereof. The construction schedule shall coordinate services required by the District, CM, DD, Engineer, AECOM and any related City responsibilities with the anticipated schedule(s). The construction schedule shall also include a list of anticipated vendor purchase orders, trade contracts, recommended form of contract and summary of the services and work to be performed under each. 3. Construction Cost Estimate and Budget. The District shall provide the City with a construction cost estimate for the Project, or any phase thereof, including an itemized budget for work, materials, equipment and other costs based on requirements set forth in the Engineer's program for the same. The construction cost estimate shall include value engineering cost evaluations of alternative materials and systems, if any. 4. Design and Project Documents Review. The District shall provide the City with the CM's written reports regarding the CM's review of the Project Documents and any other design document related to the Project, or any phase thereof. 5. City Approval. Prior to commencement of any Bidding and Contracting Services for construction of the Project, or any phase thereof, the City must approve the most current construction schedule, construction cost and budget, and the form of contract document(s) for the same. 6. Other Professional Services. The District shall select, retain and coordinate the professional services of surveyors, special consultants and testing laboratories required for the Project, or any phase thereof, and shall otherwise coordinate surveys and other pre-mobilization activities. 7. Obtaining Permits. The District shall ensure that all permits and governmental approvals are obtained for the Project by the "Trade Contractors", except for the CDOT construction and access permit which shall be obtained by the City. The City will not unreasonably require any inspection prior to issuance of a permit and will expedite the issuance of all permits necessary to complete the Project or obtain final acceptances. {00334893} 16 8. CDOT Approvals. The City shall ensure that CDOT has provided its approval(s) of the Project Documents pursuant to Section B(A)(l)(h) of the CDOT IGA. B. Bidding and Contracting 1. Compliance. The District shall ensure compliance with all bidding and contracting requirements of the District, including all laws of the State of Colorado with respect to public projects of a special district. 2. Bidding Package Preparation and Approval. Upon the City's approval pursuant to Paragraph A(5) above, and, the approval of any applicable governmental entity of the Construction Documents for the Project, or any phase thereof, the District shall prepare and provide for the City's approval the Bidding Package(s) for the Project, or applicable phase thereof. 3. Bidding Packages. Upon the City's approval of a Bidding Package for the Project, the District shall issue the Bidding Package. The District shall review and forward to the City for the City's review, a tally of all bids received for a Bidding Package, including a detailed bidding analysis prepared by the CM and the District's determination of the lowest responsible, and if applicable, responsive bidder. 4. Award of Bid Trade Contracts/Purchase Orders. Upon the City's approval of the District's recommended lowest responsible and responsive bidder, or alternative bid, and subject to the requirements of Paragraph 4(C), including those regarding Application(s) for Payment and making funds available, the District shall accept the bid and award the respective trade contract(s) or purchase order(s). All awarded trade contracts and purchase orders shall be between the District and the trade contractor or vendor. The City shall not be a party to any trade contract, purchase order, or other agreement approved for a Bidding Package. 5. No Bid: Rejection of Bid. If the District receives no bid for a Bidding Package, the District shall re-advertise the Bidding Package. If only one bid is received or the lowest negotiated bid from a responsible bidder for a Bidding Package exceeds the construction budget for such Bidding Package work, materials, equipment or services, the District shall recommend to the City whether to re-advertise the Bidding Package or accept such bid. The City shall have sole discretion in determining whether the District may accept such bid or re-advertise the Bidding Package. 6. Insurance and Bonds. The City shall be named as a beneficiary on all required insurance and performance bonds related to construction of the Project. 7. Assignment and Termination. In the event the Agreement is terminated, the City may instruct the District to assign, to the extent it is authorized to, any trade contract or vendor purchase order related to the Project, provided the District is released from any obligation thereunder and the City agrees to indemnify the District from and against any and all claims or damages related thereto. {00334893} 17 C. Construction I. Coordination. The District shall ensure that construction of the Project, or any phase thereof, is administered, managed and coordinated in a manner consistent with the Project Documents, the latest approved construction cost, budget and schedule, and the Contract Documents for the same. 2. Meeting Records. The District shall keep for the City's review upon request all records from any meetings held to discuss procedures, progress and scheduling related to construction of the Project. The District shall forward to the City all progress reports prepared by the CM that relate to construction of the Project. 3. Schedule Update. The District shall ensure the construction schedule for the Project, or any phase thereof, is updated at appropriate times but not more frequent than monthly to reflect current conditions. The District will provide the City written notice if the District learns that the construction schedule for the entire Project will not be met and inform the City of actions it is taking to correct or mitigate the effects thereof. 4. Construction Observation. The District shall ensure that on-site observations of the Project construction are made at all appropriate intervals, and that it is apprised of the progress, quantity and quality of the construction work, and that such work, when completed, will be in accordance with the Project Documents and Contract Documents. The District shall ensure that on-site observations include the exercise of reasonable judgment to guard the City against any defects or deficiencies in the Project construction. The District shall keep all reports of on-site observations for the City's review and shall promptly provide written notice to the City, including the applicable report, should a report identify material defects or deficiencies in such construction or any other issue that may affect compliance with the Project Documents, Contract Documents, or the construction cost, budget or schedule. The City may, but is not required to, perform on-site observations of the Project construction. 5. Limits on District Responsibilities. The District is exclusively responsible for the construction of the Project in the manner described in the Paragraph 1 of this Agreement pursuant to the Project Documents. 6. Testing. The District shall ensure that all third-party structural, mechanical, soils, laboratory, tests, inspections and reports required by, the Construction Documents, or by federal, State or local regulatory approvals are performed in accordance with the same. 7. Unforeseen or Concealed Conditions. The District shall give the City written notice of any unforeseen or concealed condition related to or that may otherwise impact the Project construction within a reasonable time after discovery of such condition, including but not limited to notice of pre-existing hazardous materials or toxic substances. Such notice shall include estimated impacts on the construction cost, budget and schedule, and recommendations to correct or mitigate such impacts. 8. Hazardous Materials. The District's mitigation of hazardous materials or toxic substances discovered on the construction site, their handling, removal, and/or disposal are each {00334893} 18 Construction Costs to be paid by the City. However, such mitigation costs incurred by the District will not be included as Construction Costs for purposes of calculating any Contingency Reimbursement. The District shall, to the fullest extent permitted by law, defend, indemnify and hold harmless the City and any City employees or agents from and against claims, damages, losses and expenses, including but not limited to attorneys' fees, fines, judgements and penalties arising out of or resulting from the introduction of hazardous materials or toxic substances from the performance of the District Services in any area affected by hazardous materials or toxic substances, except to the extent that such damage, loss or expense is due to the fault or negligence of the City. 9. Change Orders. The District shall have sole discretion in executing change orders for or amendments to trade contracts, vendor purchase orders or any other agreement related to Project construction, except that the District must obtain the City's approval of any change order or amendment that would result in the inability to meet the construction schedule. If a change order would cause Construction Costs to exceed the amount . made available under the corresponding Application for Payment, the District shall submit an Application for Payment for such additional funds and shall have no obligation to execute the change order until the application is approved and the funds are made available. 10. Record Copies. The District shall make available to the City record copies of all Contract Documents and any permits, reports, drawings, test results, required submittals, or other documentation related to the Project. 11. Provision of Warranties. The District shall secure and assign (or otherwise transmit) to the City warranties and similar submittals required by the Contract Documents for the Project construction, and deliver to the City all keys, manuals, record drawings and maintenance stocks. The District shall ensure that annual warranty inspections are performed in accordance with a warranty period set forth in the Contract Documents. If any unsatisfactory condition or damage develops within the warranty period due to materials or workmanship that are defective, inferior, or not in accordance with this Project Documents, as reasonably determined by the City, then the District shall, when notified by the City, immediately place such guaranteed work in a condition satisfactory to the City. The District shall, at the City's request, enforce all warranty obligations to correct the work. Costs incurred by the District to enforce warranties or otherwise place guaranteed work in a condition satisfactory to the City, and, costs paid by the City, shall be considered Construction Costs. 12. Evidence of Satisfaction of Liens. The District shall provide the City with written evidence that all persons who have done work or furnished material under this Agreement and are entitled to liens therefor under any laws of the State of Colorado have been fully paid or are not entitled to such liens. 13. Acceptance of Improvements. No act of the City or of any representative thereof, whether providing approvals required hereunder, performing the Coordinated Services, or through granting or any extension of time for the completion of the Project, shall be regarded as an acceptance of such District Services or improvements or any part thereof, or of materials used therein, either wholly or in part. Acceptance of the Project, or a designated portion thereof, shall {00334893} 19 be evidenced only by a final certificate of the City. Before any final certificate shall be issued, the District shall execute an affidavit on the certificate that it accepts the same in full payment and settlement of all Construction Costs. D. Accounting Records. The District shall maintain and keep accurate records consistent with general accounting standards, as applicable, and satisfactory to the City, regarding the District's incurrence of Construction Costs. E. Coordinated Services. 1. Preconstruction; Bidding and Contracting. The District shall ensure that the City has a reasonable opportunity to observe or, otherwise verify its satisfaction with the District's performance of District Services set forth in Paragraphs A and B of this Exhibit C. 2. Construction. The District shall ensure that the City has a reasonable opportunity to observe or, otherwise verify through inspection, testing or other means, the satisfactory performance of the District Services set forth in Paragraph C of this Exhibit C. 3. Applications for Payment and Evidence of Costs. The District shall direct the CM, DD, Engineer, and other applicable consultants to coordinate with the City the preparation of Applications for Payment and Evidence of Costs as follows: i. The CM, DD and District consultants, as applicable, in consultation with the City, shall prepare and submit Applications for Payment. ii. The DD, in consultation with the City, shall review, and as appropriate, either certify an "application for payment" from the CM to the District or return the "application for payment" to the CM indicating in writing the Construction Costs in dispute as set forth in Section 2.5.5 of the CM Agreement and Section 6 of the DD Agreement. iii. The DD, in consultation with the City, shall review and verify the CM Fee and CM Cost of Services submitted with an "application for payment" to be paid to the CM pursuant to Section 4.2.1 of the CM Agreement. iv. The DD, in consultation with the City, shall prepare and submit to the District a request for reimbursement of costs incurred by the DD in the performance of the DD Agreement. v. The Engineer, in consultation with the City, shall prepare and submit to the District invoices for payment of services related to the Project. vi. Other consultants, in consultation with the City, shall prepare and submit to the District invoices for payment of services related to the Project. F. Estimated Performance Dates. Substantial completion of the Project shall be achieved no later than 24 months after the date on which the District awards the first bid for the Project, or the City and all other authorities have issued final permits necessary for construction, whichever {00334893} 20 occurs later. The 24-month window shall be extended to accommodate any delay caused by Force Majeure. The City shall determine whether the work has been substantially completed, using factors deemed appropriate by the City, listed in the definition of "substantial completion" provided in §24-91-102(5), Colorado Revised Statutes. {00334893} 21 {00334893} EXHIBITD CONSTRUCTION COST ESTIMATES To be provided before or at the public hearing on March 26, 2018 22 EXHIBITE INTERGOVERNMENTAL AGREEMENT FOR HOOK RAMP COST REIMBURSEMENT This INTERGOVERNMENTAL AGREEMENT FOR HOOK RAMP COST REIMBURSEMENT ("Agreement") is entered into this _day of , 2018, by and between the City of Wheat Ridge, a Colorado home-rule municipality (the "City"), and the Longs Peak Metropolitan District, a quasi-municipal corporation and political subdivision of the State of Colorado (the "District"). RECITALS N. The City is a Colorado home rule municipality, organized and existing pursuant to Section 6 of Article XX of the Colorado Constitution. 0. The City has authority under Article XN Section 18 of the Colorado Constitution and CRS 29-1-201 et seq. to enter into intergovernmental agreements for lawful purposes authorized to it. P. The City and District entered into that certain Intergovernmental Agreement for Construction of the I-70 and 32nd Avenue Interchange dated , 2018 (the "IGA"), whereby the City agreed to finance the construction of the I-70 and 32na Avenue Interchange (the "Project") and the District agreed to construct the Project pursuant to the terms set forth therein. Q. The IGA requires the City to finance all "Construction Costs" incurred by the District in performance of the "District Services" provided therein. R. Paragraph 4(F)(ii) of the IGA requires the District to reimburse the City for Construction Costs paid by the City in excess of the City's "Allocation" of $10,000,000 for the Project (the "Contingency Reimbursement"). S. Paragraph 4(D) of the IGA requires the District to reimburse the City for Construction Costs that have been objected to and are subsequently agreed to at mediation (the "Mediation Reimbursement"). T. The City and District desire to enter into this Agreement to set forth the terms and conditions for the District's payment to the City of any Contingency Reimbursement and Mediation Reimbursement arising from the IGA. NOW THEREFORE, the City and District have entered into this Agreement. 1. PURPOSE. This Agreement sets forth the terms by which the District will reimburse the City for certain Construction Costs paid to the District pursuant to the IGA. The City's payment to the District of (1) any Mediation Reimbursement, and, (2) Construction Costs {00334893} 23 amounting to Contingency Funds pursuant to Paragraph 4(F)(ii) of the IGA are each made in consideration of the District's completion of the Project and the execution and performance of this Agreement. Capitalized terms not defined herein shall have the meaning provided in the IGA. 2. REIMBURSEMENT. The District covenants to pay to the City any Contingency Reimbursement and Mediation Reimbursement (collectively, the "Reimbursement") as follows: a. Distribution Agreement. The District is a party to that certain Distribution Agreement for Reimbursement of Capital Advances and Purchase of Public Infrastructure by and between the District, Cabela's Wholesale, Inc., Evergreen-Clear Creek Crossing, L.L.C., and Coors Brewing Company dated December 16, 2016 (the "Distribution Agreement"). Paragraph 6 of the Distribution Agreement sets forth a mandatory order for the District's distribution of "district revenues" to reimburse certain capital advances and pay for public infrastructure identified as the "Additional Infrastructure". Paragraph 6(II) provides that the District may distribute "district revenues" to "cause the construction of the Additional Infrastructure, by financing the construction directly and/or paying to Evergreen the cost of any Additional Infrastructure constructed by Evergreen and acquired by the District... until the District has financed the cost of all Additional Infrastructure". The "Additional Infrastructure" is the Project and CCC Project. b. Payment from Bond Proceeds. The District currently anticipates the issuance of one or more series of bonds to finance the distributions set forth in Paragraphs 6(1) and 6(11) of the Distribution Agreement (the "Bonds"). The District covenants to include the Reimbursement in the approved uses for the Bonds subject to its ability to issue the Bonds with sufficient proceeds and reasonable terms therefor. If the Reimbursement is included in the approved uses for the Bonds, the District shall pay to the City all remaining proceeds up to the Reimbursement amount after the CCC Project has been financed and completed in its entirety. In no event shall the City be entitled to any Reimbursement payment from the Bonds until the District has completed and paid for the CCC Project "Additional Infrastructure" in its entirety. c. Payment from General Fund. If the District is unable to pay to the City the entire Reimbursement pursuant to Paragraph 2(b) of this Agreement, the District, in any year, and subject t~ the requirements of the Distribution Agreement, may appropriate and pay from its general fund some or all of the Reimbursement. d. Sub ject to Annual Appropriation. The District's obligation to pay the {00334893} Reimbursement to the City is subject to the annual appropriation of funds by the District upon a determination by the District's Board of Directors that funds are available therefor and that such funds are not needed or pledged for other District obligations. Accordingly, the District's obligation to pay the Reimbursement to the City does not constitute a debt, indebtedness, or multiple fiscal year obligation of the District. 24 e. No Interest. The City agrees that the Reimbursement shall accrue interest at a rate of zero percent (0%) per annum and shall not be subject to any statutory interest or penalty of any kind whatsoever. 3. TERM. This Agreement shall become effective upon the creation of a Contingency Reimbursement or Mediation Reimbursement and shall continue in effect until the District has paid the Reimbursement in full. This Agreement may be terminated by the mutual agreement of the City and District, upon which all obligations herein shall be deemed satisfied. 4. ACCOUNTING FOR FUNDS. The City and District shall direct their accounting staff and consultants to account for ~d determine the amount of any Reimbursement obligation to be paid by the District. Any dispute over the amount of the Reimbursement shall be resolved in the same manner as a payment objection as set forth in Paragraph 4(D) of the IGA. 5. NOTICES. Any notices or other communications required or permitted by this Agreement or by law to be served on, given to or delivered to either party hereto, by the other party shall be in writing and shall be deemed duly served, given or delivered when personally delivered to the party to whom it is addressed or in lieu of such personal service, upon receipt in the United States mail, first-class postage prepaid, or by personal delivery service addressed as follows: to the City of Wheat Ridge: Patrick Goff, City Manager City of Wheat Ridge 7500 W. 29th Ave. Wheat Ridge, CO 80033 with a copy to Wheat Ridge City Attorney: Gerald Dahl, City Attorney Murray Dahl Kuechenmeister & Renaud, LLP 710 Kipling Street, Suite 300 Lakewood, CO 80215 to the Longs Peak Metropolitan District c/o: Kim J. Seter, Esq. Seter & Vander Wall, P.C. 7400 E. Orchard Rd., Suite 3300 Greenwood· Village, CO 80111 Either party, the District or the City, may change its address for the purpose of this paragraph by giving written notice of such change to the other party in the manner provided in this paragraph. 6. ASSIGNMENT. This Agreement may be assigned only with the prior written consent of the non-assigning party. {00334893} 25 EXHIBITF CONTRACTED ENTITY INSURANCE REQUIREMENTS For the duration of this Agreement, the following insurance requirements apply. 1. Contracted entities shall not be relieved of any liability, claims, demands, or other obligations assumed pursuant to the contract documents by reason of failure to procure or maintain insurance, or by reason of failure to procure or maintain insurance in sufficient amounts, durations, or types. 2. Unless a contracted entity's activity is insured under the District's own policy required by this Agreement under Paragraph 9(C), a contracted entity shall procure and maintain, and shall cause each of its subcontractor(s) to procure and maintain (or shall insure the activity of the subcontractor(s) in the contracted entity's own policy with respect to), the minimum insurance coverages listed below. Such coverages shall be procured and maintained with forms and insurers acceptable to the District, as required by the City. All coverages shall be continuously maintained from the date of commencement of the contracted entity's work or services. In the case of any claims-made policy, the necessary retroactive dates and extended reporting periods shall be procured to maintain such continuous coverage. A. Workers' Compensation insurance to cover obligations imposed by the Workers' Compensation Act of Colorado and any other applicable laws for any employee engaged in the performance of work or services under the agreement, and Employers' Liability insurance with minimum limits of FIVE HUNDRED THOUSAND DOLLARS ($500,000) each accident, FIVE HUNDRED THOUSAND DOLLARS ($500,000) disease -policy limit, and FIVE HUNDRED THOUSAND DOLLARS ($500,000) disease -each employee. B. Comprehensive General Liability insurance with minimum combined single limits of TWO MILLION DOLLARS ($2,000,000) each occurrence and TWO MILLION DOLLARS ($2,000,000) aggregate. The policy shall be applicable to all premises and operations. The policy shall include coverage for bodily injury, broad form property damage (including completed operations), personal injury (including coverage for contractual and employee acts), blanket contractual, independent contractors, products, and completed operations. The policy shall include coverage for explosion, collapse, and underground hazards. The policy shall contain a severability of interests provision. C. Comprehensive Automobile Liability insurance with minimum combined single limits for bodily injury and property damage of not less than ONE MILLION DOLLARS ($1,000,000) each occurrence and ONE MILLION DOLLARS ($1,000,000) aggregate with respect to each of the contracted entity's owned, hired and/or non-owned vehicles assigned to or used in performance of the services. The policy shall contain a severability of interests provision. 3. The policies required above, except for the Workers' Compensation insurance and Employers' Liability insurance, shall be endorsed to include the District, the {00334893} 27 City, and their officers and employees, as additional insureds. Every policy required above shall be primary insurance, and any insurance carried by the District, its officers, or its employees, shall be excess and not contributory insurance to that provided by the contracted entity. The additional insured endorsement for the Comprehensive General Liability insurance required above shall not contain any exclusion for bodily injury or property damage arising from completed operations. The contracted entity shall be solely responsible for any deductible losses under each of the policies required above. 4. Certificates of insurance shall be completed by the contracted entity's insurance agent as evidence that policies providing the required coverages, conditions, and minimum limits are in full force and effect, and shall be subject to review and approval by the City. Each certificate shall identify the Project and shall provide that the coverages afforded under the policies shall not be cancelled, terminated or materially changed until at least 30 days prior written notice has been given to the District. If the words "endeavor to" appear in the portion of the certificate addressing cancellation, those words shall be stricken from the certificate by the agent(s) completing the certificate. The City reserves the right to request and receive a certified copy of any policy and any endorsement thereto. 5. Failure on the part of the contracted entity to procure or maintain policies providing the required coverages, conditions, and minimum limits shall constitute a material breach of contract upon which the District may immediately terminate its contract with the entity, or at its discretion may procure or renew any such policy or any extended reporting period thereto and may pay any and all premiums in connection therewith, and all monies so paid by the District shall be repaid by the contracted entity to the District upon demand, or the District may offset the cost of the premiums against any monies due to the contracted entity from the District . {00334893} 28 EXHIBITG CITY APPLICATION FOR PAYMENT FORM INTERGOVERNMENTAL AGREEMENT FOR CONSTRUCTION OF THE I-70 AND 32ND A VENUE INTERCHANGE Application for Payment No. ___ _ [Date] A. Trade Contract • Bid Approved on [add date] • Bid/Contract Amount B. Additional Construction Costs • [List oflncurred Construction-Costs] • [List Construction Costs Anticipated to be Incurred in Ensuing 60 Days] [Attach Trade Contract] [Attach Construction Cost Schedule re Trade Contract] [Attach Invoices for Incurred Construction Costs] [Attach Construction Cost Schedule for Anticipated Construction Costs] {00334893} 29 z 0 -~ a:: I-V') ::::> __. __. V') 1-z UJ ~ UJ > 0 a:: c.. ~ V') V') UJ u u <( ~ z Q 15 I ! e 8 0