Loading...
HomeMy WebLinkAboutClear Creek MasterCity of CW hcat Rj,�gc mum"TY DMLOPM1N•1 IF Building & Inspection Services 7500 W. 291' Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permitsad wheatridge.co.us FOR OFFICE USE ONLY Date: I/ �glIq Plan/Permit # au Plan Review Fee* 9o0 q Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incompl to applications may not be processed. **'" DbCkdr .-Ct-d.d.-� GrassI Y%e3 Za C Gr ► b tic lc I.d�- C Property Address: �jc�G � � �r Property Owner (please print): -ygt5agb r CrSAd Crr�s v►a (.,� C Phone: 3O3 .757 l Property Owner Email:_GOM Tenant Name (Commercial Projects Only) u A Property Owner Mailing Address: (if different than property address) Address: te�7 3 Sd.l State, Zip: rc i�, A?,_ T' ArchitectlEngineer E-mail:kariS� vl l,a 6bh1 Phone: 303- 83 Z --14 7-1 Contractor Nal City of Wheat Ridge License #: l f)0 2-�,9"L Phone: 51 — 71"727 -040 Contractor E-mail Address:_t" ,Volc'c� ��� rte' �m For Plan Review Questions & Comments (please print): CONTACT NAME (please print): 11 Phone: -f X32 CONTACT EMAIL(please Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Plumbing: Mechanical: Electrical: W.R. Cit License # W.R. City License # W.R. City License # Y Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields, if applicable. XCOMMERCIAL ❑ RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. 61-11 U t o -I' d- i , ��� - aur- - }A' ) - 7- u y) A JPu i U i n WL k Sq. FULF BTUs Gallons Amps Squares For Solar: Kw —# of Panels Requires Structural For Commercial Projects Only: Occupancy Type: 2. Construction Type: V -J& ► Occupancy Load: Square Footage:-54� Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ r., 3f,,,7 2aD E Z1,r5-qeI&on`To-6al OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 1, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE:(OWNER (CONTRACTOR) or ( TN RIZED REPRESENTAT/VE) Of (OWNER) (CONTRACTOR) . e DATE: Signature (first and last name). Printed Name: 0 DEPARTMENT USE ONLY ZONING COMMMENTS: l)j 2 S5 j 1 ct V.i0 h CQ Cl 1 ori e-3 (O. t C ri W-U-tx..:^ ct',.a.S ) Reviewer: Jc--11 BUILDING DEPARTMENT COMMENTS: Reviewer: —96 �11 PUBLIC WORKS COMMENTS: OCCUPANCY CLASSIFICATION: �— CONSTRUCTION TYPE!_ a, I Reviewer. Building Division Valuation: City of ' W heat I?�c�e Commom iY DEVELO3'WNT FOR OFFICE USE ONLY Date: Plan/Permit # VPrkUND Building & Inspection Services , 7500 W. 291' Ave., Wheat Ridge, CO 80033 LPIanReviewFee; Office: 303-235-2855 * Fax: 303-237-8929 �f) Inspection Line: 303-234-5933 Email: permits di wheatridpe.co.us Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. incomplete applications may not be processed. "* Qu�-�oa�.G� rCQLd.-� Grosst h� 1�t-��.�- i�am�. Property Address: �(c�G� Z �•�r C Gr�S I h° SU bclt�t 151L�11. �1�1VI9 lug 3 Property Owner (please print):C-_V Crda�cCrrbs►tn,5 L,.L,6.Phone: 303 •?57 '��� Property Owner Email: Tenant Name (Commercial Projects Only) ---r Property Owner Mailing Address: (if different than property address) Address: ZiD. Archi k AFIT Architect/Engineer E-mail: S a Gbl1'L— Phone: 303- 83 Z --'147-1 Contractor Name Nd-(t.,IS u t tctd--tS City of Wheat Ridge License #: I P�C> ��i'� Phone: ?OS— 757-640 Contractor E-mail Address: I'' For Plan Review Questions & Comments (please print): CONTACT NAME (please print): k7 � Phone -3C3 -83Z -11-474 CONTACT EMAIL(please print): Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Plumbing: Electrical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields, if applicable. COMMERCIAL ] RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work TO De performed, including current use of areas, proposed uses, square amount ,mat 1 riang ls t condationbe and etc. proposed new condition, appliance size and efficiency, type and 1 } Tt aL �3� ' b�-1 r- '5 ter - U to 1 �-- -% U i t � i Y) �U t ►cl l V1 �ar39`Q.S U Sq. FULF BTUs Gallons Ams Squares For Solar: Kw # of Panels Requires Structural P For Commercial Projects Only: Occupancy Type: KI? Construction Type: u--� Occupancy Load: Square Footage: Project Value: (Contract value or the cost of all materials and labor included in the entire project) NER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT OW I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that l have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE: (OWNER (CONTRACTOR) or (RUTH RIZ REPRESENTATIVE) of (OWNER) (CONTRACTOR) 1 DATE: Signature (first and\ last name): p Printed Name: DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION; ZONING COMMMENTS: 10 I Z1� lC( (-)Pj�,MAJQ.d W1 th M&t. rUS i�(�(lt�i �fCkt.trf`a� iS� CONSTRUCTION TYPE: • A Reviewer: BUILDING DEPARTMENT COMM NTS: Reviewer: t�lt�ta PUBLIC WORKS COMMENTS: Reviewer: Building Division Valuation: < Lit) of W heat Idgc %(:ommuslr Y DEVFtaG1P9v INT Building & Inspection Services 7500 W. 291' Ave., Wheat Ridge, CO 80033 Office: 303-235-2855' Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits(Mci.wheatridge.co.us FOR OFFICE USE ONLY Date: ? d,q J q 1/ Plan/Permit # Plan Review Fee: Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. incompIllpte applications may not be processed. *** QU�-IoaGla..a � Grosst �� Ft -q&, - �4Md_ t � I � Z Iedr � Gros51 ha Su�c�t�l lS Ibl1. �iI Property Address: oC. C Property Owner Property Owner Email: Tenant Name (Commercial Projects Only) N Property Owner Mailing Address: (if different than property address) Address. 1b73 S City, State, Zip: Phone: ArchitectlE k -�'N A FIT Architect/Engineer E-mail: K� S �a C rn Phone: 30- 83 Z -14 Contractor Name: 1 a_X �-+ u-► City of Wheat Ridge License #: 1 Fi0 ?JT') Phone:?6S-- 7r-.7--040 Contractor E-mail Address:_t" klol r� C� �V - < bt 1 For Plan Review Questions & Comments (please print): CONTACT NAME (please print): �� Phone:363 -63Z 'I CONTACT EMAIL(please print): NO3 14 Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields, if applicable,. ,COMMERCIAL RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. T - (3> - Two s� , 3-c�Ih � �- 6u ► Id ► h� � I �� a4aJ Sq. FULF BTUs Amps Squares For Solar: Gallons KW # of Panels Requires Structural For Commercial Projects Only: Occupancy Type: Construction Type: V - Occupancy Load: Square Footage: 3T?53 Project Value: (Contract value or the cost of all materials and labor included in the entire project) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application arc accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE: Signature (first Printed Name: --- -- ` (OWNER) (CONTRACTOR) ITE: sOCo DEPARTMENT USE ONLY ZONING COMMMENTS: loiz.a l tq i ppt-wkd W-irh �'4LC l,tr\¢d ( Cil+ TCCA -LL,- L-6) Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: ll(t.li� PUBLIC WORKS COMMENTS: Reviewer: OCCUPANCY CLASSIFICATION: CONSTRUCTION TYPE: Building Division Valuation f l City of W heat j�dge COMMUNI-JY DFV1L0F TNT Building & Inspection Services 7500 W. 291' Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 - Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: Qermits(cDci wheatridge.co.us FOR OFFICE USE ONLY Date: Plan/Permit# � O I qo( Vt Plan Review Fee: Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. incomplete applications may not be processed. "** �t-��.-% �m z l CCK. Gr ► S �l�l Sl �il Property Address: �icx� t� G der DSS Y14 t� l bit . Property Owner Property Owner Email: Tenant Name (Commercial Projects Only) C Property Owner Mailing Address: (if different than property address) 3 S. State, Zi Phone: Archit wEng k t�N AIFIT Architect/Engineer E-mail: KGit�S _ na C Phone: 3C3- Si Z -147' 1 Contractor Name Na -&J S U t�d l-- G City of Wheat Ridge License #: (&Q � Phone: 5d;�757-D40 Contractor E-mail Address: I" �.Ic�r-� �GVQ M - e_�n v For Plan Review Questions & Comments j�(please print): CONTACT NAME (please print):. r- tl1- Phone:3h3 —&3Z -1174 CONTACT EMAIL(please print): NOS 14 Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields, if applicable, JR[COMMERCIAL ❑ RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. I1' � � (i J - ')I I� s� , �o>M v,�1oV) use ,� m �vti t 1'Y�d�Y1 bca ► �c� t V� w l�k U r Sq. Ft.1LF BTUs Gallons Amps Squares For Solar: KW # of Panels Requires Structural For Commercial Projects Only: Occupancy Type: Construction Type: V Occupancy Load: Square Footage: CQ,. ? Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE: (OWNER (CONTRACTOR) or (AU HORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) DATE: Signature (first and last name): Printed Name: O_ DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: ' T '' ZONINGCOMMMENTS: \Oi2ItG r�PpCC1l.Vt�Yii�C���' C-a�cr ,VtCAt'�'` S� CONSTRUCTION TYPE: _ " Reviewer. Qlr> BUILDING DEPARTMENT COMMENTS: Reviewer. 1t I t I Ch PUBLIC WORKS COMMENTS: � rolo Reviewer: 1. T� X� Building Division Valuation:—i-t=-0=_� Karl Schuch From: NoReply@mobile-eyes.com Sent: Wednesday, August 28, 2019 2:13 PM To: Karl Schuch Subject: Permit application accepted - West Metro Fire Protection District Your permit request for Unknown at 4040 Clear Creek Drive Wheat Ridge, CO 80401 has been accepted. The Job Number is: 190828003 Description: New dwelling unit buildings with tuck -under garages - (4) 37 -unit buildings, (3) 51 -unit buildings, (3) 3 - unit buildings, a common -use amenity building with pool, and detached garages. Please provide EXPEDITED plan review. Thank you for submitting to West Metro Fire. Our typical review turnaround is approximately 4 - 5 weeks. You can now see where your review is at in our review queue, here is a link to that webpage: http://www.westmetrofire.org/1013/Plan-Review-Status . If additional information is required, you'll receive a notice from the reviewer assigned, or a no -reply notice from Mobile Eyes. Please be sure to check your junk folder if you feel you are not receiving the Mobile Eyes notices and select "Not Junk". NOTE: Re -submissions shall only include the pages that are affected and additional pages that may be required for the needed corrections. Re -submission of full sets, unless specifically requested, shall result in the rejection of plans. Wheat id c CITY OF WHEAT RIDGE BUILDING AND INSPECTION SERVICES DIVISION 7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.235.2855.f 303.237.8929 Proof of Submission for Permitting/Plan Review A copy of this form must be completed by each agency indicated on the Permit Submittal Checklist for the project type and be attached to the Building Permit Application at the time of submission. Applications presented for submission without a completed Proof of Submission form from a required agency will not be accepted or processed. Date: 8/12/19 Project Address: Outlook Clear Creek Crossing (SW corner of Interstate 70 and CO -Hwy 58) Name of Firm/Individual submitting documents: Karl Schuch, KEPHART Project Type/Description: New V-A and V -B multi -family dwelling unit buildings, common -use amenity building with pool, and detached garages Signature of Firm Representative or Individual: DO NOT WRITE BELOW THIS POINT - FOR AGENCY USE ONLY Casey Burtis , am a duly authorized representative of the agency indicated below and do, by my signature below, hereby acknowledge receipt of documents necessary for review and approval of the project indicated above. Agency represented: (Please check one) o West Metro Fire Protection o Arvada Fire Protection o Wheat Ridge Water District )o Consolidated Mutual Water District o Valley Water District o Denver Water o Wheat Ridge Sanitation District o Clear Creek Sanitation District o Fruitdale Sanitation District o Westridge Sanitation District o Other Agency Notes: Consolidated Mutual has received one formal submittal of plans on 3/8/19 for review. Comments called out concerns regarding the on-site layout and the off-site connections. Plans are not yet approved by Consolidated Mutual. Signature: Date: 8/12/19 (Agency Representative) City ul Wheat ] id e CITY OF WHEAT RIDGE BUILDING AND INSPECTION SERVICES DIVISION 7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.235.2855.f 303.237.8929 Proof of Submission for Permitting/Plan Review A copy of this form must be completed by each agency indicated on the Permit Submittal Checklist for the project type and be attached to the Building Permit Application at the time of submission. Applications presented for submission without a completed Proof of Submission form from a required agency will not be accepted or processed. Date: Project Address: Outlook Clear Creek Crossing (SW corner of Interstate 70 and CO -Hwy 58) Name of Firm/Individual submitting documents: Karl Schuch, KEPHART Project Type/Description: New V-A and V -B multi -family dwelling unit buildings, common -use amenity building with pool, and detached garages Signature of Firm Representative or Individual: ^-� DO NOT WRITE BELOW THIS POINT - FOR AGENCY USE ONLY 1. C'ATP-tc br.- g-Vi569:1-5 am a duly authorized representative of the agency indicated below and do, by my signature below, hereby acknowledge receipt of documents necessary for review and approval of the project indicated above. Agency represented: (Please check one) o West Metro Fire Protection o Arvada Fire Protection o Wheat Ridge Water District o Consolidated Mutual Water District o Valley Water District o Denver Water Agency Notes: o Wheat Ridge Sanitation District o Clear Creek Sanitation District o Fruitdale Sanitation District o Westridge Sanitation District x Other Applewood Sanitation District Signature: ��J�--- _------7 Date: S�z /Z.d/9 mi A I N C O R P O R A T E D GEOTECHNICAL INVESTIGATION CLEAR CREEK CROSSING APARTMENTS NORTHWEST OF 32ND AVENUE AND YOUNGFIELD STREET WHEAT RIDGE, COLORADO Wheat Ridge �s robe CAA I q Prepared for: EVERGREEN DEVELOPMENT 1873 South Bellaire Street, Suite 1106 Denver, Colorado 80222 Attention: Ron Wolford Project No. DN48,890-125-R1 October 26, 2017 1971 West 12th Avenue i Denver, Colorado 80204 1 Phone: 303-825-0777 1 Fax: 303-825-4252 TABLE OF CONTENTS SCOPE............................................................................................................................ 1 SUMMARY...................................................................................................................... 1 SITECONDITIONS......................................................................................................... 2 PREVIOUSINVESTIGATION......................................................................................... 4 PROPOSEDCONSTRUCTION...................................................................................... 5 INVESTIGATION............................................................................................................. 5 SUBSURFACE CONDITIONS........................................................................................ 5 ExistingFill...........................................................................................................6 Sandand Gravel...................................................................................................6 Groundwater......................................................................................................... 6 SITEPREPARATION...................................................................................................... 7 Filland Backfill...................................................................................................... 7 Detention Pond Backfill and Stabilization............................................................. 8 Sub-Excavation.................................................................................................... 8 FOUNDATIONS.............................................................................................................. 9 FLOOR SYSTEMS AND SLABS-ON-GRADE.............................................................. 11 ExteriorFlatwork................................................................................................. 12 SUBSURFACEDRAINAGE.......................................................................................... 12 SURFACEDRAINAGE................................................................................................. 12 POOLAND DECK......................................................................................................... 13 CONCRETE.................................................................................................................. 14 PAVEMENTS................................................................................................................ 15 CONSTRUCTION OBSERVATIONS............................................................................ 16 GEOTECHNICALRISK................................................................................................. 17 LIMITATIONS................................................................................................................ 18 FIG. 1 — LOCATIONS OF EXPLORATORY BORINGS FIG. 2 — CONCEPTUAL POOL DRAIN DETAIL APPENDIX A — SUMMARY LOGS OF EXPLORATORY BORINGS APPENDIX B — LABORATORY TEST RESULTS AND TABLE B -I EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING -APARTMENTS CTL I T PROJECT NO. DN48.890-125-R1 SCOPE This report presents the results of our Geotechnical Investigation for the Clear Creek Crossing Apartment project planned northwest of the intersection of 32nd Avenue and Youngfield Street in Wheat Ridge, Colorado (Fig. 1). The purpose of our investiga- tion was to evaluate the subsurface conditions in order to provide geotechnical design and construction recommendations for the planned buildings and improvements. The scope was described in an Agreement for Consulting Services dated July 5, 2017. This report is based on conditions found in our exploratory borings, results of field and laboratory tests, engineering analysis of field and laboratory data, previous investigations, and our experience. It includes our opinions and recommendations for design criteria and construction details for foundations and floor systems, slabs -on - grade, and drainage precautions. The report was prepared for the exclusive use of Evergreen Development and your team in design and construction of the referenced apartments, clubhouse, pool, and associated improvements. Other types of construction may require revision of this report and the recommended design criteria. A brief sum- mary of our conclusions and recommendations follows, with more detailed discussion and design criteria provided within the report. SUMMARY Strata encountered in our exploratory borings consisted of 14 to 30 feet of fill underlain by silty to clayey sand with gravel to the maximum explored depth of 30 feet. Samples of the upper fill were moderately to highly ex- pansive. We were not provided with records of placement and compaction testing of the fill. Historical air photos indicate fill was placed in about 2005 and 2008. Penetration testing and density measurements indicate the fill was compacted. 2. Groundwater was encountered at depths of 18.5 to 29 feet in seven bor- ings during drilling. When holes were checked several days after drilling was completed, water was measured at depths of 8 to 21 feet in eight bor- ings. Groundwater may be encountered during sub -excavation and deep EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING - MULTI -FAMILY PARCEL CTL IT PROJECT NO. DN48,890-125-R1 utility installation. Water levels may fluctuate seasonally, and develop or rise in response to precipitation and landscape irrigation. 3. The presence of existing fill and expansive fill constitutes a geologic haz- ard. There is risk that slabs -on -grade and foundations will experience set- tlement and/or heave and damage. We recommend sub -excavation 10 feet below proposed grade or 5 feet below existing grade (whichever is deeper) to limit potential heave, except in the area of the existing pond. We believe the recommendations presented in this report will help to con- trol risk of damage; they will not eliminate that risk. 4. Significant import fill is needed to achieve proposed site grades. This fill will be obtained from sites with variable soil conditions. Based on subsur- face conditions at this site and proposed grading, we recommend post - tensioned slab -on -grade (PTS) foundations. Design and construction crite- ria are presented in the report. 5. We judge there is moderate to high risk of poor ground -supported slab performance. Sub -excavation and recommended moisture conditioning of existing and import fill should reduce this risk to low. Structurally support- ed floors should be used for finished living areas unless PTS are used. Slab -on -grade garage floors, driveways and exterior flatwork may experi- ence movement and cracking. 6. Surface drainage should be designed, constructed, and maintained to provide rapid removal of surface runoff away from the structures and off nearby pavements and flatwork. Conservative irrigation practices should be followed to avoid excessive wetting. 7. The design and construction criteria for foundations and floor system al- ternatives in this report were compiled with the expectation that all other recommendations will be incorporated into the project and that building owners will maintain the structures, use prudent irrigation practices and maintain surface drainage. It is critical that all recommendations in this re- port are followed. SITE CONDITIONS Clear Creek Crossing is located northwest of the Youngfield service road and West 40th Avenue in Wheat Ridge, Colorado (Fig. 1). A detention pond is located in the north part of the site and contained water at the time of our investigation. Clear Creek is about 250 feet north of the site. A man-made lake identified as a Coors Water Storage facility is south of the site, and a detention pond/marsh area is north. Additional reser- EVERGREEN DEVELOPMENT 2 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 voirs are about 500 feet west. Applewood Golf Course is about'/4-mile west, residences are further south, and 1-70 is east. A dirt road provides access throughout the site. Portions of the ground were covered in grass and weeds. We observed standing water within the subject site and surrounding areas during our investigation. Through review of available mapping, Google Earth historical imagery and a pre- vious report (Kumar & Associates, Inc.; December 17, 2004), we understand the site was used for gravel mining. We understand the site was graded around 2005. We reviewed Mass Grading Plans prepared by Martin/Martin Consulting Engineers dated December 20, 2004 which indicated about 40 feet of fill was placed to raise site grades in the southwestern area included in this investigation. Compaction test records were not available for our review. The northeastern portion of the site was graded around 2008. We do not know how much fill was placed in this area, and compaction test records were not available for our review. At the time of our investigation import material was being stockpiled on-site. Google Earth Aerial Photograph November 9 2003 Pre -Site Grading Site Conditions EVERGREEN DEVELOPMENT 3 CLEAR CREEK CROSSING -- APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 Google Earth Aerial Image October 9 2015 Post- Mass Site Grading PREVIOUS INVESTIGATION We performed a Preliminary Geotechnical Investigation (CTL Project No. DN48,890-115; report dated June 14, 2017) for the subject site. We encountered 25 to 40 feet of existing fill underlain by silty sandy with gravel. Groundwater was encoun- tered at depths of 9 to 23 feet. Samples of the fill were expansive. Compaction test records were not available for our review. Field penetration resistance tests and meas- ured densities suggested the fill was compacted. Due to the presence of deep fill, we indicated a post -tensioned slab (PTS) foundation would likely perform best at this site. We recommended sub -excavation to a depth of 10 feet below existing grade to allow use of post -tensioned slab foundations. EVERGREEN DEVELOPMENT 4 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 PROPOSED CONSTRUCTION We understand seven apartment buildings, a clubhouse with a pool, and eight parking garages are planned. The apartment buildings will be 4 -story, wood -framed structures with attached garages. There will be paved access drives and parking areas. No below -grade areas are planned in the buildings. INVESTIGATION We investigated subsurface conditions by drilling and sampling 13 additional exploratory borings at the approximate locations shown on Fig. 1. Boring locations were staked and surveyed by others. The borings were drilled to depths of 25 to 30 feet using 4 -inch diameter, continuous -flight, solid -stem auger and truck -mounted CME -45 drill rigs. We obtained samples at 5 -foot intervals using a 2.5 -inch diameter (O.D.) modified California barrel sampler driven by blows of an automatic 140 -pound hammer falling 30 inches. Our field representative was present to observe drilling operations, log the strata encountered and obtain samples for laboratory testing. Graphical logs of the borings, are presented on the Summary Logs of Exploratory Borings in Appendix A. Samples were returned to our laboratory where they were examined. Laboratory tests included moisture content, dry density, percent silt and clay -sized particles (pass- ing No. 200 sieve), Atterberg limits, swell -consolidation, standard Proctor testing, and water-soluble sulfate concentration. Swell -consolidation tests were performed by wet- ting the samples under approximate overburden pressure (the pressure exerted by overlying soils). Results of laboratory tests are presented in Appendix B and summa- rized in Table B -I. SUBSURFACE CONDITIONS Strata encountered in our exploratory borings consisted of 14 to 30 feet of fill underlain by silty to clayey sand with gravel to the maximum explored depth of 30 feet. EVERGREEN DEVELOPMENT 5 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 Some pertinent engineering characteristics of the subsoils are described in the following paragraphs. Existing Fill The fill was stiff to very stiff based on field penetration resistance tests. Seven samples compressed 0.1 to 4.1 percent, one sample did not swell, and thirty samples swelled 0.1 to 5.5 percent when wetted. Ten samples of fill contained 55 to 99 percent fines (passing the No. 200 sieve) and exhibited moderate to high plasticity. Compaction test records were not available for our review. We performed standard Proctor testing (ASTM D 698) on three bulk samples of auger cuttings obtained from TH-13, 16, and 19. The samples had maximum dry densities of 103, 105, and 109.5 pounds per cubic foot (pcf) and optimum moisture contents of 19.5, 15.5, and 18 percent, respectively. We also obtained a bulk sample during our preliminary investigation (TH-6) that had a maximum dry density of 100 pcf and an optimum moisture content of 22.0 percent. We compared moisture content and dry density values of samples obtained during drilling to Proctor maximum dry densities and optimum moisture contents (Figure B-30). The moisture -density plots and penetration resistance tests indicate the existing fill was compacted. Sand and Gravel Silty to clayey sand with gravel was encountered below the fill in the northeastern portion of the site at depths ranging from 14 to 19 feet. The sand was medium dense to very dense. Two samples contained 15 and 21 percent fines. We judge the sand is non - expansive or low swelling. Groundwater Groundwater was encountered at depths of 18.5 to 29 feet in seven borings during drilling. When holes were checked several days after drilling was completed, EVERGREEN DEVELOPMENT 6 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 water was measured at depths of 8 to 21 feet in eight borings. Groundwater may be encountered during sub -excavation and deep utility installation. Water levels may fluctuate seasonally, and develop or rise in response to precipitation and landscape irrigation. SITE PREPARATION The soil and groundwater conditions encountered during this investigation were consistent with those found during our Preliminary Geotechnical Investigation. The primary geotechnical concern that will influence site development and building perfor- mance is the presence of deep existing fill composed of expansive soil. This concern can be mitigated with proper planning, engineering, design, and construction. All rec- ommendations regarding site development presented in our June 14, 2017 report not addressed below remain appropriate and should be followed. Fill and Backfill Substantial import fill is necessary to achieve proposed site grades. Some import fill had already been stockpiled on-site at the time of our investigation. Standard Proctor maximum dry densities and optimum moisture contents from samples obtained from these stockpiles will be presented in a forthcoming letter. We understand additional import fill is being obtained from sites with variable soil conditions. Samples should be submitted to our office for approval prior to importing. Proper moisture -conditioning and compaction of import fill discussed below should help control potential swell and settle- ment of imported material. We understand import material with higher plasticities are being considered for use in "deep" fill areas. We agree with this approach. Prior to fill placement, debris, vegetation/organics, and other deleterious materi- als should be substantially removed from areas to receive fill. The surface to be filled should be scarified to a depth of at least 8 inches, moisture -conditioned between 1 and 4 percent above optimum moisture content for clay and within 2 percent of optimum for EVERGREEN DEVELOPMENT 7 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 sand, and compacted to 95 percent of standard Proctor maximum dry density (ASTM D 698). Detention Pond Backfill and Stabilization We understand the existing detention pond will be emptied and backfilled during site grading. Organic material present in the pond bottom and sides will need to be removed. The pond bottom will likely require stabilization. This may be accomplished by crowing crushed rock or recycled concrete into the pond bottom. A layer of geosynthetic grid or woven fabric can also be used, which should reduce the amount of aggregate needed. Typically, a biaxially woven fabric such as Mirafi 500x (or equal) or geogrid (such as Tensar BX1100 or equal) topped with 1.5 -inch to 3 -inch crushed rock or recycled concrete placed over the fabric is effective. We anticipate a 12" to 18" thick layer of crushed rock or recycled concrete may be necessary. Other means of stabiliz- ing can also be considered. Backfill should be moisture -conditioned and compacted as discussed in Fill and Backfill. Sub -Excavation We estimate total potential ground heave at the proposed ground surface may range up to 6.5 inches considering a depth of wetting of 20 feet. Considering proposed grades and data from our additional borings, we believe sub -excavation to a depth of 10 feet below proposed grade or 5 feet below existing grade (whichever is deeper) in building areas will create more stable soil conditions and control risk of excessive movements. Over -excavation is not required below the existing pond. The excavation slopes should meet OSHA, state, and local safety standards. The bottom of sub -excavated areas should extend laterally at least 5 feet outside the largest possible foundation footprint to ensure foundations are constructed over moisture conditioned fill. The sub -excavation areas should be staked by a surveyor, and we recommend periodic surveying verification of the "as -built" bottom of the excavations. EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING - APARTMENTS CTLI T PROJECT NO. DN48,890-125-R1 Grading and sub -excavation fill should be moisture -conditioned between 1 and 4 percent above optimum moisture content for clay, and within 2 percent of optimum for sand, and compacted to at least 95 percent of maximum standard Proctor dry density (ASTM D 698). FOUNDATIONS We encountered deep fill in our borings. The fill may pose settlement -related is- sues. Samples of the upper fill were expansive. If sub -excavation of building areas is performed as discussed previously, we believe post -tensioned slab -on -grade founda- tions may perform best at this site considering the type of product planned. Design criteria are presented below. These criteria are developed from analysis of field and laboratory data and our experience and are based on current construction. PTS design is based on a method developed by the Post -Tensioning Institute (PTI) and is outlined in PTI's third edition of Design of Post -Tensioned Slabs -on -Ground (2004). Various climate and relevant soil factors are required to evaluate the PTI design criteria. These include the Thornthwaite Moisture Index (Im), suction compression index (yn), unsaturated diffusion coefficient (a), depth of probable moisture variation, initial and final soil suction profiles, and percent clay fraction and predominant clay mineral. In the Denver Metro area, Im is about -25. The PTS foundation design method is based on the potential differential move- ment of the slabs due to settlement and heave of the subsoils that is primarily controlled by climate. In the 2004 design manual, PTI estimates movements for a depth of wetting of 9 feet below the ground surface. Based on our experience and field and laboratory test results, the depth of wetting can be about 15 to 20 feet or more below the ground surface. It is possible wetting will not penetrate this deep; however, we believe it is a reasonable design assumption for this site. The PTI design method does not predict soil movement caused by site conditions such as irrigation or poor surface drainage. If EVERGREEN DEVELOPMENT 9 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 deeper wetting occurs, the foundation movement may exceed the design movements estimated in the PTI design method. In the PTI design method, two mechanisms of soil movement (edge lift and cen- ter lift) are evaluated based on assumptions that wetting and drying of the foundation soils are primarily affected by the climate. Our experience indicates the foundation soils will normally undergo an increase in moisture due to covering the ground surface with buildings and flatwork, coupled with the introduction of landscape irrigation. Considering the limitations of the current PTI design method, we believe a conservative approach with reasonable engineering judgment is merited in PTS foundation design. Design criteria for post -tensioned slab -on -grade foundations are presented be- low. Criteria were developed from analysis of field and laboratory data, the PTS design method outlined in PTI's third edition of Design and Construction of Post -Tensioned Slabs -on -Ground (2004), and our experience. PTS foundations should be underlain by moisture -conditioned, compacted fill as discussed in Sub -Excavation. Where soils are loosened during ex- cavation or in the forming process, or if any loose, soft, or dry soils are ex- posed in excavations, the soils should be removed and re -compacted, pri- or to placing concrete. 2. PTS foundations should be designed for a maximum allowable soil pres- sure of 3,000 psf. 3. Using the PTI design method, we recommend a differential soil movement (ym) of 2 inches for edge lift and 3 inches for center lift conditions. 4. The PTI 3rd Edition includes two methods for determining the edge mois- ture variation distance (em) and states that the higher values should be used. Based on Thornwaite Index, center lift and edge lift em values of 5.5 feet and 2.5 feet are indicated. Based on the unsaturated diffusion coeffi- cient, center lift and edge lift em values of 7.5 feet and 4 feet are indicated. We believe it is probable that use of average values (em center lift of 6.5 feet and edge lift of 3.5 feet) may yield acceptable performance. EVERGREEN DEVELOPMENT 10 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 5. We understand the PTI design method assumes the slab is somewhat flexible. Above -grade construction, such as framing, drywall, brick, and stucco, are not as flexible. We are aware of situations where minor differ- ential slab movement has caused distress to finish materials. One way to enhance performance would be to place reinforcing steel in the bottom of stiffening beams. The structural engineer should evaluate the merits of this approach, as well as other potential alternatives to reduce damage to finish materials. 6. Stiffening beams may be poured "neat" into excavated trenches. Soil may cave or slough during trench excavation for the stiffening beams. Dis- turbed soil should be removed from trench bottoms prior to placement of concrete. Formwork or other methods may be required for proper stiffen- ing beam installation. 7. Exterior stiffening beams should be protected from frost action. Normally 3 feet of frost cover is assumed in the area. If exterior patios are incorpo- rated into PTS, we believe the stiffening beams around the patios should be as deep as those around the building exterior to increase the likelihood they will perform similarly to the rest of the PTS. 8. For slab tensioning design, a coefficient of friction value of 0.75 or 1.0 can be assumed for slabs on polyethylene sheeting or a sand layer, respec- tively. A coefficient of friction of 2.0 should be used for slabs on clay or clay fill. We believe use of polyethylene is preferable because it serves as a vapor retarder which helps to control moisture migration through the slabs. 9. A representative of our firm should observe the completed excavations. A representative of the structural engineer or our firm should observe the placement of the reinforcing tendons and any mild reinforcement prior to placing the slabs and beams. FLOOR SYSTEMS AND SLABS -ON -GRADE Based on results of our investigation, we judge there is moderate to high risk of poor slab performance at this site. Sub -excavation should reduce this risk to low and result in potential heave or settlement of about 2 to 3 inches. For PTS, the foundations are structurally integral with the floor and should perform better than a conventional slab -on -grade floor. EVERGREEN DEVELOPMENT 11 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 Exterior Flatwork Garage aprons and sidewalks are normally constructed as slab -on -grade. Per- formance of conventional slabs on expansive soils is erratic. Various properties of the soils and environmental conditions influence magnitude of movement and other perfor- mance. Increases in the moisture content in these soils will cause heaving or settlement and may result in cracking of slabs -on -grade. Fill and backfill below slabs should be moisture conditioned and compacted to reduce settlement, as discussed in Fill and Backfill. Slabs constructed on the backfill may settle and crack if the backfill is not properly moisture treated and compacted. We recommend exterior flatwork and side- walks (which are not part of the PTS foundation) be isolated from foundations to reduce the risk of transferring heave, settlement, or freeze -thaw movement to the structures. Frequent control joints should be provided to reduce problems associated with shrink- age. Panels that are approximately square perform better than rectangular areas. SUBSURFACE DRAINAGE Foundation drains are not typically installed for PTS because there is no backfill associated with edge beam trenches cut neat, and no below -grade floors. If any portion of PTS floors will be below exterior grade, a drain is recommended. SURFACE DRAINAGE Performance of foundations, flatwork, pavements and other surface improve- ments is influenced by the moisture conditions existing within the foundation or sub - grade soils. The risk of wetting the foundation and floor subgrade soils can be reduced by carefully planned and maintained surface grades and drainage. Excessive wetting before, during and/or after construction may cause movement of foundations and slabs - on -grade. We recommend the following precautions be observed during construction and maintained at all times after construction is completed. EVERGREEN DEVELOPMENT 12 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 Wetting or drying of open foundation, utility and earthwork excavations should be avoided. 2. Positive drainage should be provided away from the structures. For build- ings with no basements, we recommend a minimum slope of at least 5 percent in the first 5 to 10 feet away from the foundations in landscaped areas. A minimum slope of 2 percent is suggested for pavement. Concrete curbs and sidewalks may "dam" surface runoff adjacent to the building and disrupt proper flow. Use of "chase" drains or weep holes at low points should be considered to promote proper drainage. 3. Backfill around foundations (if any) should be moistened and compacted according to criteria presented in Fill and Backfill. Areas behind curb and gutter should be backfilled and well compacted to reduce ponding of sur- face water. 4. Landscaping should be carefully designed to minimize irrigation. Plants used close to foundation walls should be limited to those with low moisture requirements. Irrigation should be limited to the minimum amount suffi- cient to maintain vegetation. Application of more water will increase likeli- hood of foundation, slab and pavement movements and associated dam- age. Landscaped areas should be adequately sloped to direct flow away from the building and improvements. Use of area drains can assist drain- ing areas that cannot be provided with adequate slope. 5. Impervious plastic membranes should not be used to cover the ground surface immediately surrounding foundations. These membranes tend to trap moisture and prevent normal evaporation. Geotextile fabrics can be used to control weed growth and allow evaporation. 6. Roof drains should be directed away from the building and discharge be- yond backfill zones or into appropriate storm sewer or detention areas. Downspout extensions and splash blocks should be provided at all dis- charge points. Roof drains can also be connected to buried, solid pipe out- lets. Roof drains should not be directed below slab -on -grade floors. Roof drain outlets must be maintained. POOL AND DECK We anticipate the pool will be up to about 5 feet deep and be cast -in-place concrete or gunite. Rigid concrete or gunite pools are brittle and can crack from shrink- age or movement. Use of a well -reinforced gunite or concrete pool can reduce potential cracking. EVERGREEN DEVELOPMENT 13 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 A pool deck is normally constructed as a slab -on -grade. The most common problem with swimming pool facilites is heave or settlement and cracking of the deck slabs surrounding the pool. Infiltration of surface water from precipitation or pool splash can cause moisture seepage through cracks in the pool deck and the joints between the deck and pool. This wetting causes the underlying soils to swell or compress and results in cracking and distress of the deck. In our opinion, the hazard can be reduced, but not prevented, by construction considerations and maintenance. We recommend over - excavation of the pool, similar to building areas. The deck and surrounding areas should be sloped to provide positive drainage away from structures. We recommend exterior slabs be isolated from the building and pool, and well -reinforced to function as independent units. Cracking of the pool decks may occur and will require maintenance. Cracks and joints in the decks should be sealed regularly. Cracking of the pool and pool deck can allow water to infiltrate the subgrade soils which can lead to possible hydrostatic uplift of the pool shell when empty. This free water should be captured in a drain. The drain should be sloped to a positive gravity outlet. In addition, impermeable plastic sheeting (20 mil or more) should be placed between the gravel drain and the subgrade to reduce the potential for exces- sive heave or softening of the subsoils. A conceptual detail for construction of the pool drainage layer is shown on Fig. 2. CONCRETE Concrete in contact with soil can be subject to sulfate attack. We measured wa- ter-soluble sulfate concentrations of 0.01 to 0.1 percent in five samples from this study. For this level of sulfate concentration, we believe Type I or Type II cement can be used for concrete which comes into contact with the subsoils. Superficial damage can occur to the exposed surfaces of highly permeable concrete, even though sulfate levels are generally less than 0.1 percent. To control this, the water to cement ratio should not exceed 0.50 for concrete in contact with soils which are likely to be moist. EVERGREEN DEVELOPMENT 14 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 PAVEMENTS Pavement subgrade soils will likely consist of sandy clay fill. Clay is considered poor subgrade. According to the American Association of State Highway and Transpor- tation Officials (AASHTO), bulk samples obtained from the existing fill classified as A-7- 6 soils with group indices 9, 33, and 37 respectively. We assume some import soils will be similar. Pavements may experience heave and distress due to expansive soil and settlement due to compression of existing fill. Shallow sub -excavation of 3 to 5 feet can reduce potential movements and enhance performance. We anticipate paved areas will be used for automobile parking and fire truck/access lanes. The following table provides pavement alternatives. PAVEMENT ALTERNATIVES Our experience indicates problems with asphalt pavements can occur where heavy trucks drive into loading and unloading zones, and turn at low speeds. In areas of concentrated loading and turning movements by heavy trucks, such as at entrances, loading and unloading areas, and trash collection areas, we recommend portland cement concrete pavement placed directly on prepared subgrade. We recommend installing 7 -inch thick concrete pads at garbage dumpster areas, sufficient in size to support the entire trash truck. The design of a pavement system is as much a function of paving materials as support characteristics of the subgrade. If the pavement system is constructed of inferi- or material, then the life and serviceability of the pavement will be substantially reduced. Materials and placement methods should conform to the requirements of the City of EVERGREEN DEVELOPMENT 15 CLEAR CREEK CROSSING - APARTMENTS CTL IT PROJECT NO. DN48,890-125-R1 Hot -Mix Asphalt + Anticipated Traffic Type Hot -Mix Asphalt (HMA) Aggregate Base Course Portland Cement HMA +ABC Concrete (PCC) Automobile Parking Only Assumed EDLA: 5 5.5" HMA 4" HMA + 6" ABC 5.5" PCC Access Drive and Fire/Truck Lanes 65' HMA 4" HMA + 8"ABC 6.0" PCC (Assumed EDLA: 10) Our experience indicates problems with asphalt pavements can occur where heavy trucks drive into loading and unloading zones, and turn at low speeds. In areas of concentrated loading and turning movements by heavy trucks, such as at entrances, loading and unloading areas, and trash collection areas, we recommend portland cement concrete pavement placed directly on prepared subgrade. We recommend installing 7 -inch thick concrete pads at garbage dumpster areas, sufficient in size to support the entire trash truck. The design of a pavement system is as much a function of paving materials as support characteristics of the subgrade. If the pavement system is constructed of inferi- or material, then the life and serviceability of the pavement will be substantially reduced. Materials and placement methods should conform to the requirements of the City of EVERGREEN DEVELOPMENT 15 CLEAR CREEK CROSSING - APARTMENTS CTL IT PROJECT NO. DN48,890-125-R1 Wheat Ridge and Jefferson County. All materials planned for construction should be tested to confirm their compliance with project specifications. Control joints should separate concrete pavements into panels with patterns and spacings as recommended by ACI. No de-icing salts should be used on paving concrete for at least one year after placement. Routine maintenance, such as sealing and repair of cracks and overlays at 5 to 7 -year intervals, are necessary to achieve long-term performance of an asphalt system. We recommend application of a rejuvenating sealant such as fog seal after the first year. Deferring maintenance usually results in accelerat- ed deterioration of pavements leading to higher future maintenance costs. Maintenance guidelines are provided in Appendix C. A primary cause of early pavement deterioration is water infiltration into the pavement system. The addition of moisture usually results in heave or softening of the subgrade and eventual failure of the pavement. We recommend drainage be designed for rapid removal of surface runoff. Curb and gutter should be backfilled and the backfill compacted to reduce ponding adjacent to the pavements. Final grading of the subgrade should be carefully controlled so that design cross -slope is maintained and low spots in the subgrade which could trap water are eliminated. The joint between curb and pave- ment should be sealed to reduce moisture infiltration. Landscaped areas and detention ponds in pavements should be avoided. Recommended material properties and construction criteria for pavements are provided in Appendix C. These criteria were developed from analysis of the field and laboratory data and our experience. If the materials cannot meet these recommenda- tions, then the pavement design should be re-evaluated based upon available materials. CONSTRUCTION OBSERVATIONS This report has been prepared for the exclusive use of Evergreen Development and your team for design and construction of the proposed project. The information, EVERGREEN DEVELOPMENT 16 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 conclusions, and recommendations presented herein are based upon consideration of many factors including, but not limited to, the type of structures proposed, the geologic setting, and the subsurface conditions encountered. The conclusions and recommenda- tions contained in the report are not valid for use by others. Standards of practice evolve in geotechnical engineering. The recommendations provided are appropriate for about three years. If the project is not constructed within about three years, we should be contacted to determine if we should update this report. We recommend that CTL I Thompson, Inc. provide construction observation ser- vices to allow us the opportunity to confirm whether soil conditions are consistent with those found during this investigation. If others perform these observations, they must accept responsibility to judge whether the recommendations in this report remain ap- propriate. GEOTECHNICAL RISK The concept of risk is an important aspect with any geotechnical evaluation, prk marily because the methods used to develop geotechnical recommendations do not comprise an exact science. We never have complete knowledge of subsurface condi- tions. Our analysis must be tempered with engineering judgment and experience. Therefore, the recommendations presented in any geotechnical evaluation should not be considered risk-free. Our recommendations represent our judgment of those measures that are necessary to increase the chances that the structures will perform satisfactorily. It is critical that all recommendations in this report are followed during construction. Property managers must assume responsibility for maintaining the struc- ture and use appropriate practices regarding drainage and landscaping. EVERGREEN DEVELOPMENT 17 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 LIMITATIONS Our borings were spaced to obtain a reasonably accurate indication of foundation soil conditions. Variations in the subsurface conditions not indicated by our borings are possible. Our representative should test moisture and density of fill. We believe this investigation was conducted with that level of skill and care ordi- narily used by geotechnical engineers practicing under similar conditions. No warranty, express or implied, is made. If we can be of further service in discussing the contents of this report or in the analysis of the influence of subsoil conditions on design of the structures, please call. CTL I THOMPSON, INC. EZW Erin C. Beach, E.I.T. Staff Engineer Reviewed by: 7 Ronald M. McOmber, P.E. Chairman & CEO ECB:RMM/nn Ronald M. MCOmber (3 copies) Oct 26 2017 Via e-mail: rwolford(a)evgre.com rplace(D_evgre.com EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 18 NOT TO SCALE POOL DECK DRAIN P.. .a•.���F I IIII III I I I- .a•�•.�III III III III _ .�•� �� I I I III' ��III III' 4 TO 6 INCHES OF WASHED 3/4 -INCH TO NO. 4 CONCRETE "•. ,.III I I (- AGGREGATE WITH A MAXIMUM OF 3 PERCENT SIEVE. PASSING (SLO ETODRAIN) 200 ::•'III III_ POOL SLABS .a• � I I III_ II III' e � .. � �a:• :' � III _ a� . ...'Q '•� .e °�'a' e a a a I I I I I- o. •° d I III III,,,III,,,III„.I I I,,,I I I,,,I I I,,,I1(- IMPERVIOUS PLASTIC MOISTURE BARRIER INSTALLED IMMEDIATELY AFTER EXCAVATION (20 MIL. PLASTIC SHEETING GLUED AT SEAMS). Conceptual Pool Drain EVERGREEN DEVELOPMENT Detail CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL\T Project No. DN48,890-125-R1 Fig. 2 APPENDIX A SUMMARY LOGS OF EXPLORATORY BORINGS EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 TH-4 TH-6 TH-7 TH-8 EL. 5452.90 EL. 5446.78 EL. 5442.05 EL. 5441 AT GRADE FILL 4' FILL 5' FILL 7' 5,460 5,460 5,450 34/12 WC=19.0 DD=107 SW -5.0 T30/12 WC=16.9 DD=108 SW --1.85,440 ss=<0.01 29/12 WC=19.1 DD=106 SW=0.5 24/12 ♦ �.J AM 5,390 5,380 27/12 WC=19.5 DD=106 SW=2 5 SS=<0.01 37/12 WC=17.5 DD=112 SW --2.6 1 25/12 WC=18.8 DD= 109 SW -0.8 18/12 WC=12.1 DD=117 LL=53 PI=33 -200=47 20/12 33/12 20/12 WC=19.7 DD=102 SW -13 25/12 WC=14.5 DD=110 sw=1.5 26/12 WC=15.2 DD=111 Sw=0.1 24/12 24/12 37/12 WC=15 2 DD=114 SW --5.5 WC=19.2 DD=100 COM=1 1 LL=53 PI=31 -200=95 33/12 WC=15.9 DD=108 SW -0.4 5,450 5,440 5,430 5,420 I_ w w 24/12 1 z O F Q w J 5,410- -5,370 ,410 —5,370 SUMMARY LOGS OF EXPLORATORY BORINGS EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT N0. DN48,890-125-R7 5,400 5,390 5,380 5,370 FIG. A- 1 TH-9 EL. 5441.5 FILL 4' 5,450 TH-10 EL. 5448 FILL 2' pq 15/12 WC=20.2 DD=106 sw-zs 5,440 ss=o.o1 5,430 5,420 Lu5,410 Lu Ill LL Z O LU J Lu 5,400 390 5,380 5,370 THTH-11 EL. 5444 3.14 EL. 5441 FILL 4' FILL 7' 5,450 L-5,360 SUMMARY LOGS OF EXPLORATORY BORINGS EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 23/12 WC=19.6 DD=107 SW --1.3 WC=12.9 DD=89 COM=4.1 32/12 WC=13.2 DD=116 SW --0.6 20/12 5,440 5,430 5,420 5,410 LU w w LL Z O w J 5,400 `L' 5,390 5,380 5,370 5,360 FIG. A- 2 33/12 9/12 WC=18.6 WC=16.9 DD=109 WC=23.2 SW --22 DD=107 SW -8.6 DD=95 pF=4.19 SW --0.4 2$112 31112 WC=16.0 DD=112 WC=19.1 119/12 SW=3.4 DD=102 pF=4.12 SW=1.0 LL=61 PI=42 25/12 -200=91 32/12 WC=19.7 WC=18.2 DD=101 WC=16.8 COM=1.6 DD=106 SW=0.7 DD=98 LL=41 PI=23 pF=3.65 COM=4.0 -200=95 30/12 31/12 WC=16.1 DD=106 WC=17.9 SW=0.1 DD=104 pF=3 89 SW -0.2 31/12 WC=17.5 DD=109 SW=0.1 pF=3.71 25/12 WC=20.6 DD=106 SW=0.1 pF=3.71 30/12 Q 42/12 L-5,360 SUMMARY LOGS OF EXPLORATORY BORINGS EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 23/12 WC=19.6 DD=107 SW --1.3 WC=12.9 DD=89 COM=4.1 32/12 WC=13.2 DD=116 SW --0.6 20/12 5,440 5,430 5,420 5,410 LU w w LL Z O w J 5,400 `L' 5,390 5,380 5,370 5,360 FIG. A- 2 TH-1 TH-12 TH-5 TH-3 EL. 5449.74 EL. 5446 EL. 5439.91 EL. 5438.81 Hill FILL 5' FILL 2' FILL 1' FILL 2' 5,460 5,460 5,450 �5,420 W W W z 0 Q W J W 5,410 5,400 5,390 5,380 25/12 WC=19.0Nou 45/12 DD=107 WC=20.0 WC=15.6 DD=107 pF=4.16 DD=115 SW --3.2 13/12 SW=6.4 WC=21.2 20/12 SS=0.03 5,440 SW=1.1 40/12 WC=17.0 DD=113 pF=3.63 ViC_ 1s 7 SW=3.1 SW=1,6 45/12 DD=108 - 00 981=31 SW=0.9 DD=106 25/12 COM=0.4 40/12 WC=17.4 WC=16.5 WC=14 5 DD=108 S=2.5 WC=18.5 DD=115 SS=0.07 DD=109 pF=4.12 SW --1.7 16/12 -200=98 WC=18.2 1� DD=109 5,430 SW=0.3 28/12 pF=3.68 t 20/12 14/12 15/12 24/12 �5,420 W W W z 0 Q W J W 5,410 5,400 5,390 5,380 25/12 WC=19.0Nou 28/12 DD=107 WC=20.0 SW 4.8 DD=107 pF=4.16 SW --3.2 13/12 WC=21.2 20/12 DD=106 WC=17.3 SW=1.1 DD=105 pF=3.63 SW=0.1 23/12 WC=18.8 45/12 DD=108 WC=13.6 SW=0.9 DD=106 pF=3.81 COM=0.4 32/12 WC=16.5 21/12 DD=112 WC=18.5 SW -2.0 DD=109 pF=4.12 i LL=51 P1=29 16/12 -200=98 WC=18.2 19/12 DD=109 SW=0.3 pF=3.68 20/12 14/12 _5,370 SUMMARY LOGS OF EXPLORATORY BORINGS EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 5,450 5,440 5,430 5,420 w W W U - z 0 H Q W J 5,410 W 5,400 5,390 5,380 5,370 FIG. A- 3 5,390 5,390 5,380 5,380 5,370 5,370 L--5,360 SUMMARY LOGS OF EXPLORATORY BORINGS 5,360 EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-87 FIG. A- 4 TH-13 TH-14 TH-15 TH-16 EL. 5435 EL. 5437 EL. 5440 EL. 5440 FILL 12' FILL 8' FILL 6' FILL 4' 5,450 5,450- -5,440 5,440- 24/12 WC 19.3 WC=17.6 LL=58 PI=39 DD=95 DD=111 -200=88 18/12 SWI-0.1 sw=1.1 WC=19 2 SS=0.03 5,430 DD=7 �� DD=98 SS ° o 12/12 WC=23.8 WC=17.4 5,430 SW--0 SW 0.4 1 DD=101 DD=109 SW--1.9 LL=61 PI=41 LLN 52 PI=32 i -200=89 WC=18.1 -200=61 14/12 DD=105 50/12 WC=19.7 sw=o.1 WC=20.6 DD=99 DD=92 SW=1.1 20/12 WC=7.9 5,420 DO 116 11/12 5,420 WC=22.3 DD=97 Q LLO--34 PI=18 WC=24.5 DD=100 wC=25.8 DD=97 COM=0.5 LL=62 P1=42 SW-0.2 SW--0.5 LL=56 P1=38 -200=99 -200=76 21/12 18/12 10/12 WC=20.1 DD=101 SW--0.2 38/12 w 5,410 W 19- 5,410 SW o.1 w Lwi w LL Z 0 Z f- O Q w w LU 5,400 5,400 w 5,390 5,390 5,380 5,380 5,370 5,370 L--5,360 SUMMARY LOGS OF EXPLORATORY BORINGS 5,360 EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-87 FIG. A- 4 TH-19 TH-20 E L. 5444 E L. 5445 CUT 2' CUT 3' LL=47 PI=28 -200'54- 16/12 WC=8.3 DD=114 SW=1 1 SS=0.07 26/12 WC=20.4 LL=50 PI=31 -200=55 16/12 WC=13 1 DD=115 SW --l.2 50/3 50/8 50/9 15/12 WC=16 0 DD=1D4 SW=2.6 11/12 WC=15 4 DD=104 SW --O 6 50/10 50/6 wC=6.D DD=131 -200=21 50/9 76/12 EXPLORATORY BORINGS 5,450 5,440 5,430 5,420 5,410 5,400 5,390 5,380 5,370 5,360 LEGEND: FILL, CLAY, SANDY, STIFF TO VERY STIFF, SLI( GRAY, TAN, WHITE. FlCLAY, SANDY, STIFF, MOIST, BROWN, TAN (CL; SANDY, CLAYEY, SOME GRAVEL, MEDIUM DEN MOIST, BROWN, GRAY, WHITE, TAN (SC). SAND, CLAYEY, SILTY, SOME GRAVEL, DENSE BROWN, TAN (SM, SP). GRAVEL, CLAYEY, VERY DENSE, SLIGHTLY MC {f GRAVEL, SANDY, SILTY, MEDIUM DENSE TO VI DRIVE SAMPLE. THE SYMBOL 37/12 INDICATE HAMMER FALLING 30 INCHES WERE REQUIRE'. INCHES. 3 -INCH DIAMETER, THIN-WALLED SHELBY TUB w W w LL z SZ WATER LEVEL MEASURED AT TIME OF DRILL11 O 1 WATER LEVEL MEASURED SEVERAL DAYS AF W J w Y WATER LEVEL MEASURED AFTER DRILLING 0 NOTES: 1. THE BORINGS WERE DRILLED ON AUGUST 22,: CONTINUOUS -FLIGHT SOLID -STEM AUGER ANC 2. BORING LOCATIONS AND ELEVATIONS WERE E OUR FIRM REFERENCING THE TEMPORARY BE 3. WC INDICATES MOISTURE CONTENT (%). DD INDICATES DRY DENSITY (PCF). SW INDICATES SWELL WHEN WETTED UNDE COM- INDICATES COMPRESSION WHEN WETTI LL INDICATES LIQUID LIMIT. PI INDICATES PLASTICITY INDEX. -200 - INDICATES PASSING NO. 200 SIEVE (%). SS INDICATES WATER-SOLUBLE SULFATE C pF INDICATES SOIL SUCTION VALUE (pF). 4. THESE LOGS ARE SUBJECT TO THE EXPLANAT CONTAINED IN THIS REPORT. � - LABORATORY TEST RESULTS TABLE B-1 - SUMMARY OF LABORATORY TEST RESULTS EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 6 5 4 3 2 1 0 -2 -3 Z O -4 N Z Q X -5 W 0 Z O -6 W W 0- M O U -8 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-8 AT 4 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLlT PROJECT NO. DN48,890-125-R1 10 100 DRY UNIT WEIGHT= 114 PCF MOISTURE CONTENT= 15.2 % Swell Consolidation Test Results FIG. B-1 X S UNDER C NS AN R S R C UE TO ETTII G 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-8 AT 4 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLlT PROJECT NO. DN48,890-125-R1 10 100 DRY UNIT WEIGHT= 114 PCF MOISTURE CONTENT= 15.2 % Swell Consolidation Test Results FIG. B-1 6 5 4 3 2 1 0 -2 -3 '92 N Z Q X -5 W 0 Z 0 -6 N N W 0 -7 - E 0 V -8 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-8 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 MPREPS10 SSUR DUI 10 100 DRY UNIT WEIGHT= 100 PCF MOISTURE CONTENT= 19.2 % Swell Consolidation Test Results FIG. B-2 3 2 1 Z 0 O V5 z Q -1 IL x w 0 z -2 O N rn w -3 IX a 2 O U -4 1 1 1 1 1 1 1 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-8 AT 14 FEET 3 `m 1 z O 0 z a X w 0 z O -2 N w W -3 a O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-9 AT 4 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 1.0 1.0 ION UNIIER (SON 10 sum 100 DRY UNIT WEIGHT= 108 PCF MOISTURE CONTENT= 15.9 % ION UNDER 10 100 DRY UNIT WEIGHT= 95 PCF MOISTURE CONTENT= 23.2 % Swell Consolidation Test Results FIG. B-3 6 5 4 3 2 1 0 -2 -3 N Z Q X -5 W 0 Z O -6 F5 cn W 0' a 2 O V -8 U 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-9 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 10 100 DRY UNIT WEIGHT= 102 PCF MOISTURE CONTENT= 19.1 % Swell Consolidation Test Results FIG. B-4 EXPANSION UNDER CONSTANT R S UR UE TO WET -TING 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-9 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 10 100 DRY UNIT WEIGHT= 102 PCF MOISTURE CONTENT= 19.1 % Swell Consolidation Test Results FIG. B-4 6 5 4 3 2 1 0 -2 Z 0 -a N Z Q X 5 - W 0 Z 0 -6 N N W IX (L -7 2 0 U -8 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-9 AT 14 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 1.0 ESSURE D 10 100 DRY UNIT WEIGHT= 98 PCF MOISTURE CONTENT= 16.8 % Swell Consolidation Test Results FIG. B-5 3 2 1 Z 0 O U) z a -1 a x III 0 Z -2 O W -3 w a 2 O -4 I I 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-9 AT 19 FEET 4 3 2 z O 1 N z a a 0 X w 0 z O 1 w w -2 a 2 O U -3 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-10 AT 4 FFFT EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 1.0 1.0 ION UNIDER 10 Li 100 DRY UNIT WEIGHT= 104 PCF MOISTURE CONTENT= 17.9 % ION UN 10 100 DRY UNIT WEIGHT= 106 PCF MOISTURE CONTENT= 202 % Swell Consolidation Test Results FIG. B-6 6 5 4 3 2 1 0 6� -2 -3 `•9 N Z Q X -5 W 0 Z O -6 N N W CL 2 O V -8 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-10 AT 9 FEET U EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUT PROJECT NO. DN48,890-125-R1 1.0 10 100 DRY UNIT WEIGHT= 109 PCF MOISTURE CONTENT= 18.6 % Swell Consolidation Test Results FIG. B-7 6 5 4 3 2 0 -2 -3 5-21 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-10 AT 19 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 1.0 MPRE�SI SSUR D 10 100 DRY UNIT WEIGHT= 101 PCF MOISTURE CONTENT= 19.7 % Swell Consolidation Test Results FIG. B-8 7 6 5 4 3 2 1 0 -2 -3 Z 6 -4 N Z Q X -s W 0 Z O -6 47 W W a 7 2 O U -8 Li 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-11 AT 4 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLJT PROJECT NO. DN48,890-125-R1 10 100 DRY UNIT WEIGHT= 107 PCF MOISTURE CONTENT= 19.6 % Swell Consolidation Test Results FIG. B-9 X S NDER C NS AN RRE S R �UE TO ETTI G 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-11 AT 4 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLJT PROJECT NO. DN48,890-125-R1 10 100 DRY UNIT WEIGHT= 107 PCF MOISTURE CONTENT= 19.6 % Swell Consolidation Test Results FIG. B-9 5 4 3 2 0 -2 -3 -4 -5 0. 1 CO) Z Q d -7 x w 0 C•Z LU W -9 a E O U -10 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-11 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 MPRE§SIGN UN SSURR DUEIITO 10 Ir 100 DRY UNIT WEIGHT= 89 PCF MOISTURE CONTENT= 12.9 % Swell Consolidation Test Results FIG. B-10 3 2 1 Z 0 O U) z Q -1 (L x w 0 z -2 O us U) W -3 W IL 2 O U -a 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-11 AT 14 FEET a 3 2 1.0 z O 1 T) z Q a 0 X w 0 z -1 O V5 N LU a -2 O U -3 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-12 AT 4 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUT PROJECT NO. DN48,890-125-R1 ON UNDER CONST 10 100 DRY UNIT WEIGHT= 116 PCF MOISTURE CONTENT= 13.2 % ION UNDER OONIST 10 100 DRY UNIT WEIGHT= 113 PCF MOISTURE CONTENT= 17.0 % Swell Consolidation Test Results FIG. B-11 3 2 Z 0 O U) z a x LU 0 z -2 O W LiJ -3 IX a 2 O Ci -4 1 I I I 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-12 AT 9 FEET 3 2 1 z O 0 75 z Q CL 1 X w 0 z O -2 LU x -3 a M O U -4 1.0 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-12 AT 24 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUT PROJECT NO. DN48,890-125-R1 N UN 10 100 DRY UNIT WEIGHT= 108 PCF MOISTURE CONTENT= 17.4 % ION UN 10 100 DRY UNIT WEIGHT= 110 PCF MOISTURE CONTENT= 16,9 % Swell Consolidation Test Results FIG. B-12 3 2 1 Z 0 O N z Q -1 a x III 0 z -2 O LLI -3 W a O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-13 AT 4 FEET 3 2 1 z O 0 ro z Q d -1 X LU 0 z O2 rh U) W W -3 a 2 O U -4 1.0 ION UNDER CON 10 100 DRY UNIT WEIGHT= 97 PCF MOISTURE CONTENT= 16.6 % 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-13 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 1.0 10 DRY UNIT WEIGHT= MOISTURE CONTENT= IUV 99 PCF 19.7 % Swell Consolidation Test Results FIG. B-13 EXPNq3ION PRES3JRE UNDER DUE TO V ONSTANT ETI G 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-13 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 1.0 10 DRY UNIT WEIGHT= MOISTURE CONTENT= IUV 99 PCF 19.7 % Swell Consolidation Test Results FIG. B-13 3 2 1 z 0 O z a -1 CL x W 0 Z -2 O cl) N L.0 -3 W a E O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-13 AT 14 FEET 3 2 z O 0 Fn z a X LU 0 z O -2 LU W -3 a n O v -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-13 AT 19 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUIT PROJECT NO. DN48,890-125-R1 1.0 1.0 10 100 DRY UNIT WEIGHT= 97 PCF MOISTURE CONTENT= 22.3 % ION UNDER 10 100 DRY UNIT WEIGHT= 101 PCF MOISTURE CONTENT= 20,1 % Swell Consolidation Test Results FIG. B-14 ADD LIND TQ T ER VIIEJTING ONAL COIAPRESS113N CONSTANT P ES SU RE DL E 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-13 AT 14 FEET 3 2 z O 0 Fn z a X LU 0 z O -2 LU W -3 a n O v -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-13 AT 19 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUIT PROJECT NO. DN48,890-125-R1 1.0 1.0 10 100 DRY UNIT WEIGHT= 97 PCF MOISTURE CONTENT= 22.3 % ION UNDER 10 100 DRY UNIT WEIGHT= 101 PCF MOISTURE CONTENT= 20,1 % Swell Consolidation Test Results FIG. B-14 7 6 5 4 3 2 1 0 5■ -2 -3 `•2 N Z Q X5 W 0 Z O -6 N N W R 0- 2 O U -g 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-13 AT 24 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 1.0 NS TO 10 100 DRY UNIT WEIGHT= 105 PCF MOISTURE CONTENT= 19.0 % Swell Consolidation Test Results FIG. B-15 3 2 Z 0 O U) z Q -1 a x LU a Z -2 O N U) LV -3 a 2 O 0 -4 1 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-14 AT 4 FEET 3 2 z O 0 z Q d -1 X W a z 0 -2 U) w W -3 a 2 O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-14 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUT PROJECT NO. DN48,890-125-R1 1.0 10 100 DRY UNIT WEIGHT= 98 PCF MOISTURE CONTENT= 16.2 % El 1.0 10 100 DRY UNIT WEIGHT= 105 PCF MOISTURE CONTENT= 18,1 % Swell Consolidation Test Results FIG. B-16 3 2 1 Z 0 O z a x W 0 z -2 O W -3 a O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-14 AT 14 FEET 3 2 1 z O 0 z Q X W 0 z O -2 W W -3 a 2 O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-15 AT 4 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL(T PROJECT NO. DN48,890-125-R1 1.0 1.0 NAL COMP :.ONSTANT 10 100 DRY UNIT WEIGHT= 116 PCF MOISTURE CONTENT= 7.9 % ION UNDER 10 100 DRY UNIT WEIGHT= 95 PCF MOISTURE CONTENT= 19.3 % Swell Consolidation Test Results FIG. B-17 3 2 z 0 O z Q -1 a x LU 0 z -2 O N LV -3 W CL 2 O () _4 1 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-15 AT 9 FEET 3 2 1 z O 0 V5 z Q a -1 x LU 0 z 0 -2 N W W -3 0- 2 2 O U -4 1 1 1 1 1' I 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-15 AT 19 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUT PROJECT NO. DN48,890-125-R1 1.0 1.0 ION UNC►ER 10 100 DRY UNIT WEIGHT= 101 PCF MOISTURE CONTENT= 23,8 % ON UNDER 10 100 DRY UNIT WEIGHT= 100 PCF MOISTURE CONTENT= 24.5 % Swell Consolidation Test Results FIG. B-18 3 PM 1 Z 0 O U) z Q -1 IL x w 0 z -2 O N U) LU -3 W a 2 O V -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-16 AT 4 FEET 3 2 1 z O 0 V5 z Q a -1 x W 0 z O2 N cn W W -3 a 2 O U -4 1.0 N UNDER 10 100 DRY UNIT WEIGHT= 111 PCF MOISTURE CONTENT= 17.6 % 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-16 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 1.0 10 100 DRY UNIT WEIGHT= 109 PCF MOISTURE CONTENT= 17.4 % Swell Consolidation Test Results FIG. B-19 [:XPIk PRES IONUNDERCONSTANT RE.DUE TO WETTING 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-16 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 1.0 10 100 DRY UNIT WEIGHT= 109 PCF MOISTURE CONTENT= 17.4 % Swell Consolidation Test Results FIG. B-19 6 5 4 3 2 1 0 -3 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-16 AT 19 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 10 100 DRY UNIT WEIGHT= 97 PCF MOISTURE CONTENT= 25.8 % Swell Consolidation Test Results FIG. B-20 EXPANSION R S UR UNDER C UE TO WETTI NS AN G 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-16 AT 19 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTL/T PROJECT NO. DN48,890-125-R1 10 100 DRY UNIT WEIGHT= 97 PCF MOISTURE CONTENT= 25.8 % Swell Consolidation Test Results FIG. B-20 3 `a 1 Z 0 O U) z Q -1 a x w 0 z -2 O N U) W -3 W a 2 O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-17 AT 9 FEET 3 2 1 1.0 z O 0 z Q d -1 X W 0 z Q -2 fn W a -3 2 O U -4 0.1 1.0 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-17 AT 14 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUT PROJECT NO. DN48,890-125-R1 i "H UNDER 10 100 DRY UNIT WEIGHT= 105 PCF MOISTURE CONTENT= 14.3 % CONST 10 100 DRY UNIT WEIGHT= 95 PCF MOISTURE CONTENT= 24.5 % Swell Consolidation Test Results FIG. B-21 3 2 Z 0 O U) z Q -1 a x III 0 z -2 O LU -3 a O () _4 1 I I 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-18 AT 9 FEET 3 2 1 z O 0 7) z Q (L 1 x LU 0 z O -2 V5 U) LU IX -3 CL 2 O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-18 AT 14 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUT PROJECT NO. DN48,890-125-R1 1.0 1.0 UNDER 10 100 DRY UNIT WEIGHT= 95 PCF MOISTURE CONTENT= 22.4 % ION UNIbER 10 100 DRY UNIT WEIGHT= 103 PCF MOISTURE CONTENT= 19.9 % Swell Consolidation Test Results FIG. B-22 3 2 1 Z 0 O cn z a x LU 0 z -2 O U) LU -3 R a O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-19 AT FEET 3 2 1 z O 0 z Q a X LU 0 z O -2 LU IX -3 a 2 O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-19 AT 14 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CM PROJECT NO. DN48,890-125-R1 1.0 1.0 ION UNDER 10 100 DRY UNIT WEIGHT= 114 PCF MOISTURE CONTENT= 8.3 % ON 10 luv DRY UNIT WEIGHT= 115 PCF MOISTURE CONTENT= 13.1 % Swell Consolidation Test Results FIG. B-23 3 2 1 Z 0 O U) z Q -1 a x LU 0 z -2 _O N N LU -3 W a 2 O U _4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-20 AT 4 FEET 3 2 z O 0 fN z Q a -1 x w 0 z O -2 W W -3 a 2 O U -4 0.1 APPLIED PRESSURE - KSF Sample of FILL, CLAY, SANDY From TH-20 AT 9 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTUT PROJECT NO. DN48,890-125-R1 1.0 ON UNDER 10 Li 100 DRY UNIT WEIGHT= 104 PCF MOISTURE CONTENT= 16.0 % UNDER 1.0 10 100 DRY UNIT WEIGHT= 104 PCF MOISTURE CONTENT= 15.4 % Swell Consolidation Test Results FIG. B-24 Sample of SAND, SILTY, GRAVELLY (SM) GRAVEL 19 % SAND _ 66 io From TH - 18 AT 19 FEET SILT & CLAY 15 % LIQUID LIMIT PLASTICITY INDEX .1 11 11 1 •1 1 1 •1 •1 /1 11 1 1 1 / ������ MA'ME 1 ®AMENEM. ME EMEME ME ME ME SCC MEN �iNEI 11 11 off /1 11• 1 • 1 1 •1 1 1 11 11 1 11 11 11• 1 1 1 •1 1 1 11 Sample of SAND, SILTY, GRAVELLY (SM) GRAVEL 19 % SAND _ 66 io From TH - 18 AT 19 FEET SILT & CLAY 15 % LIQUID LIMIT PLASTICITY INDEX Sample of SAND, SILTY, GRAVELLY (SM) From TH - 20 AT 19 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 GRAVEL 16 % SAND 63 % SILT & CLAY 21 % LIQUID LIMIT PLASTICITY INDEX Gradation Test Results FIG. B-25 .1 11 11 1 •1 1 1 •1 1 ®AMENEM. EMEME ME :1 MEN �iNEI 11 11 off /1 11• 1 • 1 1 •1 1 1 11 Sample of SAND, SILTY, GRAVELLY (SM) From TH - 20 AT 19 FEET EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 GRAVEL 16 % SAND 63 % SILT & CLAY 21 % LIQUID LIMIT PLASTICITY INDEX Gradation Test Results FIG. B-25 140 135 130 125 110 105 100 95 0 5 SAMPLE DESCRIPTION LOCATION 10 15 20 25 30 35 MOISTURE CONTENT (%) CLAY, SANDY, LIGHT BROWN LIQUID LIMIT 34 PLASTICITY INDEX 19 TH-16 (0-10') GRAVEL - % SAND - % COMPACTION TEST PROCEDURE ASTM D698-07 SILT AND CLAY 64 % EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL Laboratory Compactigg B-26 CTLIT PROJECT NO. DN48,890-125-R1 Test Results 140 135 130 125 110 105 100 95 0 5 10 15 20 25 30 MOISTURE CONTENT (%) SAMPLE DESCRIPTION CLAY, SANDY, LIGHT BROWN LIQUID LIMIT 58 PLASTICITY INDEX 39 LOCATION TH-13 (0-5') GRAVEL - % SAND % COMPACTION TEST PROCEDURE ASTM D698-07 SILT AND CLAY 88 % EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 35 Laboratory Compaction Test Results FIG. B-27 140 135 130 125 110 105 100 95 0 5 SAMPLE DESCRIPTION 10 15 20 25 30 MOISTURE CONTENT (%) CLAY, SANDY, LIGHT BROWN LIQUID LIMIT 34 PLASTICITY INDEX 19 LOCATION TH-16 (0-10') GRAVEL - % SAND - % COMPACTION TEST PROCEDURE ASTM D698-07 SILT AND CLAY 64 % 35 EVERGREEN DEVELOPMENT Laboratory Compaction CLEAR CREEK CROSSING MULTI -FAMILY PARCEL Test Results CTLIT PROJECT NO. DN48,890-125-R1 FIG. B-28 140 135 130 125 110 105 100 95 0 5 10 15 20 25 MOISTURE CONTENT (%) SAMPLE DESCRIPTION CLAY, SANDY, LIGHT BROWN LIQUID LIMIT PLASTICITY INDEX LOCATION TH-19 (0-10') GRAVEL SAND COMPACTION TEST PROCEDURE ASTM D698-07 SILT AND CLAY EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 30 35 47 28 54 % Laboratory Compaction Test Results FIG. B-29 130 125 120 115 110 105 100 LL 95 V a w z W 90 a 85 A 0 - *-TH-6 Proctor -0-TH-13 Proctor -13-TH-16 Proctor -0-TH-19 Proctor Zero Air Voids • Drill Samples ZERO AIR VOIDS SPECIFIC GRAVITY = 2.70 5 10 15 20 EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING MULTI -FAMILY PARCEL CTLIT PROJECT NO. DN48,890-125-R1 25 30 35 Drill Sample Moisture/Density FIG. B-30 TABLE B - I SUMMARY OF LABORATORY TEST RESULTS ,EVELOPMENT CROSSING MULTI -FAMILY DEVELOPMENT T NO. DN48,890-125-R1 SWELL TEST DATA ATTERBERG LIMITS SOLUBLE PASSING G DEPTH MOISTURE DRY SULFATE NO. 200 SOIL TV SWELL COMPRESSION APPLIED SWELL LIQUID PLASTICITY CONTENT DENSITY PRESSURE PRESSURE LIMIT INDEX CONTENT SIEVE ft % Of % °/ S (I)of)o� o� 4 15.2 114 5.5_ 1,400 FILL, CLAY, SAN 9 19.2 100 1.1 2,500 53 31 95 FILL, CLAY, SAN 14 15.9 108 0.4 3,100 FILL, CLAY, SAN 4 23.2_ 95 0.4 1,100 1,600 _ FILL, CLAY, SAN 9 19.11 102 1.0 1,100 2,200 61_ 42 - 91 FILL, CLAY, SAN 14 16.8 98 4.0 2,400 FILL, CLAY, SAN 19 17.9 104 0.2 3,000 FILL, CLAY, SAS 4 20.2 106 2.9 500 _4,100 0.01 FILL, CLAY, SAS 1 9 18.6 109 2.2 1,100 _ _ _ FILL, CLAY, SAS 1 19 19.7 101 1.6 2,400 _ 41 23 9_5 FILL, CLAY, SAN 1,400 FILL, CLAY, SAN 4 19.6 107 1.3 - - - 9 - - 12.9 - 89 - - - 4.1 1,800 - _ _ _ FILL, CLAY, SAN 14 13.2 116 0.6 2,400 FILL, CLAY, SAN 3.1 500 52 FILL, CLAY, SAN 4 17.0 1_13 31 _ 98 9 _ 17.4 108 2.5 1,1 00 _ _ 0.07 FILL, CLAY, SAN FILL, CLAY, SAS ! 24 16.9 110 0.3 3,000 _ FILL, CLAY, SAN i 0 5 -- - - - - - 58 39 88 t 4_ 16.6 970.4 _ _ _ 500 700 -_ 61 -- 41 _ _ _ 89 FILL, CLAY, SAN t 9 19.7 99 1.1 - - 1,100 - FILL, CLAY, SAN t 14 22.3 97 0.5 1,800 62 42 99 FILL, CLAY, SAN t 19 20.1 _ 101 0.2 2,400 3,000 _ FILL, CLAY, SAN S 24 19.0 105 0.1 3,000 3,400 FILL, CLAY, SAN 98 0.0 1,000 0.1 FILL, CLAY, SAN t 4 16_.2_ _ 1 9 18.1 105 0.1 1,600 _ _ FILL, CLAY, SAN 1 14 7.9 116 0_._2 2,300 34 1_8 FILL, CLAY, SAS i 4 19.3 95 0.1 500 FILL, CLAY, SAN FILL, CLAY, SAN i 9 23.8 101 0.6 1,100 52 32 - - -- 61 i 14 20.6 92 _ _ __- _ _ _ FILL, CLAY, SAN _ 100 0.2 2,400 _ _ FILL, CLAY, SAN i 19 24.5 i 0-10 _ _ 34 19 _ _ _ 64 _ FILL, CLAY, SAN S 4 17.6 111 1.1 _ _ 500 0.03 FILL, CLAY, SAN 9 17.4 109 1.9 _ 1,100 _ _ _ _ _ _ _ _ _ _ _ _ FILL, CLAY, SAN _ 0.5 FILL, CLAY, SAN S 19 _ _ 25.8 _ _ 97_ _ _ _ _ _ 2,400 _ _ 56 38 76 _ 4 13.3 5_2_ 3_3 59 FILL, CLAY, SAN 9 14.3 105 0.5 11100 _ _ FILL, CLAY, SAN FILL, CLAY, SAS 14 24.5 95 0.1 1,800 t 9 22.4 95 900 _ _ _ _ _ - FILL, CLAY, SAN FILL, CLAY, SAN t 14 19.9 103 _0.5_ 0.2 1,500 - -- - SAND, SILTY, G S 19 4.8 - 128 - - - - - _ _ 15 FILL, CLAY, SAN 1 0-10 _47 2_8 54 1 4 8.3 114 1.1 500 0.07 - __ FILL, CLAY, SAS i 9 20.4 50 31 55 FILL, CLAY, SAS ,EVELOPMENT CROSSING MULTI -FAMILY DEVELOPMENT T NO. DN48,890-125-R1 TABLE B - I SUMMARY OF LABORATORY TEST RESULTS ,EVELOPMENT CROSSING MULTI -FAMILY DEVELOPMENT T NO. DN48,890-125-R1 SWELL TEST DATA ATTERBERG LIMITS SOLUBLE PASSING SWELL COMPRESSION APPLIED SWELL LIQUID PLASTICITY G DEPTH MOISTURE DRY SULFATE NO. 200 SOIL TY CONTENT DENSITY PRESSURE PRESSURE LIMIT INDEX CONTENT SIEVE ft % cf % % sf sf % 14 13.1 115 1.2 1,800 FILL, CLAY, SAID 1 4 16.0 104 2.6 500 FILL, CLAY, SAN I 915.4 104 0.6 1,100 _ FILL, CLAY, SAS 19 6.0 SAND, SILTY, G I 131 21 ,EVELOPMENT CROSSING MULTI -FAMILY DEVELOPMENT T NO. DN48,890-125-R1 APPENDIX C FLEXIBLE AND RIGID PAVEMENT MATERIALS, CONSTRUCTION AND MAINTENANCE GUIDELINES EVERGREEN DEVELOPMENT CLEAR CREEK CROSSING -APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 MATERIAL GUIDELINES FOR FLEXIBLE AND RIGID PAVEMENTS Aggregate Base Course (ABC) A Class 5 or 6 Colorado Department of Transportation (CDOT) specified aggre- gate base course should be used. A recycled concrete alternative which meets the Class 5 or 6 designations is also acceptable. 2. Aggregate base course should have a minimum Hveem stabilometer value of 78. Aggregate base course or recycled concrete material must be moisture stable. The change in R -value from 300 psi to 100 psi exudation pressure should be 12 points or less. 3. Aggregate base course or recycled concrete should be laid in thin lifts not to ex- ceed 9 inches, moisture treated to within 2 percent of optimum moisture content, and compacted to at least 95 percent of maximum modified Proctor dry density (ASTM D 1557, AASHTO T 180). 4. Placement and compaction of aggregate base course or recycled concrete should be observed and tested by a representative of our firm. Placement should not commence until the underlying subgrade is properly prepared and tested. Hot -Mix Asphalt (HMA) HMA should be composed of a mixture of aggregate, filler, hydrated lime and as- phalt cement. Some mixes may require polymer modified asphalt cement, or make use of up to 20 percent reclaimed asphalt pavement (RAP). A project mix design is recommended and periodic checks on the proiect site should be made to verify compliance with specifications. 2. HMA should be relatively impermeable to moisture and should be designed with crushed aggregates that have a minimum of 80 percent of the aggregate retained on the No. 4 sieve with two mechanically fractured faces. 3. Gradations that approach the maximum density line (within 5 percent between the No. 4 and 50 sieves) should be avoided. A gradation with a nominal maxi- mum size of 1 or 2 inches developed on the fine side of the maximum density line should be used. 4. Total void content, voids in the mineral aggregate (VMA) and voids filled should be considered in the selection of the optimum asphalt cement content. The opti- mum asphalt content should be selected at a total air void content of about 4 percent. The mixture should have a minimum VMA of 14 percent and between 65 percent and 80 percent of voids filled. 5. Asphalt cement should meet the requirements of the Superpave Performance Graded (PG) Binders. The minimum performing asphalt cement should be PG 64-22 for use along the Front Range. The use of PG 58-28 or PG 58-22 asphalt cement has been known to cause tenderness in pavements in the Front Range area and should be avoided. EVERGREEN DEVELOPMENT C-1 CLEAR CREEK CROSSING - APARTMENTS CTLI T PROJECT NO. DN48,890-125-R1 6. Hydrated lime should be added at the rate of 1 percent by dry weight of the ag- gregate and should be included in the amount passing the No. 200 sieve. Hy- drated lime for aggregate pretreatment should conform to the requirements of ASTM C 207, Type N. 7. Paving should only be performed when subgrade temperatures are above 40`F and air temperature is at least 40'F and rising. 8. HMA should not be placed at a temperature lower than 245'F for mixes contain- ing PG 64-22 asphalt, and 290'F for mixes containing polymer modified asphalt. The breakdown compaction should be completed before the mixture temperature drops 20'F. 9. The maximum compacted lift should be 3.0 inches and joints should be stag- gered. No joints should be placed within wheel paths. 10. HMA should be compacted to between 92 and 96 percent of Maximum Theoreti- cal Density. The surface shall be sealed with a finish roller before the mix cools to 185'F. 11. Placement and compaction of HMA should be observed and tested by a repre- sentative of our firm. Placement should not commence until the subgrade is properly prepared, tested and proof -rolled. Proof -rolling should be performed with the heaviest machine available at the time. The proof roller should be selected from machines providing both mass and high contact pressure. Portland Cement Concrete (PCC) Portland cement concrete should meet CDOT Class P concrete and have a min- imum compressive strength of 4,200 psi at 28 days and a minimum modulus of rupture (flexural strength) of 650 psi. A bob mix design is recommended and peri- odic checks on the bob site should be made to verify compliance with specifica- tions. 2. Portland cement should be Type II "low alkali" and should conform to ASTM C 150. Portland cement should conform to ASTM C 150. 3. Portland cement concrete should not be placed when the subgrade or air tem- perature is below 40°F. 4. Free water should not be finished into the concrete surface. Atomizing nozzle pressure sprayers for applying finishing compounds are recommended whenever the concrete surface becomes difficult to finish. 5. Curing of the portland cement concrete should be accomplished by the use of a curing compound. The curing compound should be applied in accordance with manufacturer recommendations. 6. Curing procedures should be implemented, as necessary, to protect the pave- ment against moisture loss, rapid temperature change, freezing, and mechanical injury. EVERGREEN DEVELOPMENT C-2 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 7. Construction joints, including longitudinal joints and transverse joints, should be formed during construction or sawed after the concrete has begun to set, but pri- or to uncontrolled cracking. 8. All joints should be properly sealed using a rod back-up and approved epoxy sealant. 9. Traffic should not be allowed on the pavement until it has properly cured and achieved at least 80 percent of the design strength, with saw joints already cut. 10. Placement of portland cement concrete should be observed and tested by a rep- resentative of our firm. Placement should not commence until the subgrade is properly prepared and tested. EVERGREEN DEVELOPMENT C-3 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 FLEXIBLE PAVEMENT CONSTRUCTION GUIDELINES Experience has shown that construction methods can significantly affect the life and serviceability of a pavement system. A site-specific mix design is recommended and periodic checks during the project should be made to verify compliance with specifications. We recom- mend the proposed pavement be constructed in the following manner: The subgrade should be stripped of debris, vegetation/organics and other delete- rious materials, scarified, moisture conditioned and compacted. Subgrade soils should be moisture conditioned to within 2 percent of optimum moisture content and compacted to at least 95 percent of maximum standard Proctor dry density (ASTM D 698, AASHTO T 99). 2. Utility trenches and all subsequently placed fill should be moisture conditioned, compacted, and tested prior to paving. As a minimum, fill should be compacted to 95 percent of maximum standard Proctor dry density. 3. After final subgrade elevation has been reached and the subgrade compacted, the resulting subgrade should be checked for uniformity and all soft or yielding materials should be replaced prior to paving. Concrete should not be placed on soft, spongy, frozen, or otherwise unsuitable subgrade. 4. If areas of soft or wet subgrade are encountered, the material should be sub - excavated and replaced with properly compacted structural backfill. Where ex- tensively soft, yielding subgrade is encountered, we recommend the excavation be inspected by a representative of our office. 5. Aggregate base course should be laid in thin, loose lifts, moisture treated to with- in 2 percent of optimum moisture content, and compacted to at least 95 percent of modified Proctor maximum dry density (ASTM D 1557, AASHTO T 180). 6. Asphaltic concrete should be hot plant -mixed material compacted to between 92 and 96 percent of maximum Theoretical density. The temperature at laydown time should be at least 245°F. The surface shall be sealed with a finish roller pri- or to the mix cooling to 185°F. 7. The maximum compacted lift should be 3.0 inches and joints should be stag- gered. No joints should be within wheel paths. 8. Paving should only be performed when subgrade temperatures are above 40°F and air temperature is at least 40°F and rising. 9. Subgrade preparation and placement and compaction of all pavement material should be observed and tested. Compaction criteria should be met prior to the placement of the next paving lift. The additional requirements of the City of Wheat Ridge and Jefferson County should apply. EVERGREEN DEVELOPMENT C-4 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 RIGID PAVEMENT CONSTRUCTION GUIDELINES Rigid pavement sections are not as sensitive to subgrade support characteristics as flexible pavement. Due to the strength of the concrete, wheel loads from traffic are distributed over a large area and the resulting subgrade stresses are relatively low. The critical factors affecting the performance of a rigid pavement are the strength and quality of the concrete, and the uniformity of the subgrade. We recommend subgrade preparation and construction of the rigid pavement section be completed in accordance with the following recommendations: The subgrade should be stripped of debris, vegetation/organics and other delete- rious materials, scarified, moisture conditioned to within 2 percent of optimum moisture content and compacted to at least 95 percent of standard Proctor max- imum dry density (ASTM D 698, AASHTO T 99). 2. After final subgrade elevation has been reached and the subgrade compacted, the resulting subgrade should be checked for uniformity and all soft or yielding materials should be replaced prior to paving. Concrete should not be placed on soft, spongy, frozen, or otherwise unsuitable subgrade. 3. The subgrade should be kept moist prior to paving. 4. Curing procedures should protect the concrete against moisture loss, rapid tem- perature change, freezing, and mechanical injury for at least 3 days after place- ment. Traffic should not be allowed on the pavement for at least one week. 5. Curing of the portland cement concrete should be accomplished by use of a cur- ing compound in accordance with manufacturer recommendations. 6. Construction joints, including longitudinal joints and transverse joints, should be formed during construction or should be sawed shortly after the concrete has be- gun to set, but prior to uncontrolled cracking. All joints should be sealed. 7. Construction control and inspection should be performed during the subgrade preparation and paving procedures. Concrete should be carefully monitored for quality control. The additional requirements of the City of Wheat Ridge and Jef- ferson County should apply. The design sections are based upon 10 -year and 20 -year periods. Experience in the Denver area indicates virtually no maintenance or overlays are necessary for a 20 -year design period. We believe some maintenance and sealing of concrete joints will help pavement perfor- mance by helping to keep surface moisture from wetting and softening or heaving subgrade. To avoid problems associated with scaling and to continue the strength gain, we recommend deicing salts not be used for the first year after placement. EVERGREEN DEVELOPMENT C-5 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 MAINTENANCE GUIDELINES FOR FLEXIBLE PAVEMENTS A primary cause for deterioration of pavements is oxidative aging resulting in brittle pavements. Tire loads from traffic are necessary to "work" or knead the asphalt concrete to keep it flexible and rejuvenated. Preventive maintenance treatments will typically preserve the original or existing pavement by providing a protective seal or rejuvenating the asphalt binder to extend pavement life. Annual Preventive Maintenance Visual pavement evaluations should be performed each year. Reports documenting the progress of distress should be kept current to provide information on effective times to apply preventive maintenance treatments. Crack sealing should be performed annually as new cracks appear. 3 to 5 -Year Preventive Maintenance The owner should budget for a preventive treatment (e.g. chip seal, fog seal, slurry seal) at approximate intervals of 3 to 5 years to reduce oxidative embrit- tlement problems. 5 to 10 -Year Corrective Maintenance Corrective maintenance (e.g. full -depth patching, milling and overlay) may be necessary, as dictated by the pavement condition, to correct rutting, cracking and structurally failed areas. EVERGREEN DEVELOPMENT C-6 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 MAINTENANCE GUIDELINES FOR RIGID PAVEMENTS High traffic volumes create pavement rutting and smooth, polished surfaces. Preventive maintenance treatments will typically preserve the original or existing pavement by providing a protective seal and improving skid resistance through a new wearing course. Annual Preventive Maintenance Visual pavement evaluations should be performed each spring or fall. Reports documenting the progress of distress should be kept current to provide information of effective times to apply preventive maintenance. Crack sealing should be performed annually as new cracks appear. 4 to 8 Year Preventive Maintenance The owner should budget for a preventive treatment at approximate intervals of 4 to 8 years to reduce joint deterioration. Typical preventive maintenance for rigid pavements includes patching, crack sealing and joint cleaning and sealing. Where joint sealants are missing or distressed, resealing is mandatory. 15 to 20 Year Corrective Maintenance Corrective maintenance for rigid pavements includes patching and slab replace- ment to correct subgrade failures, edge damage and material failure. Asphalt concrete overlays may be required at 15 to 20 year intervals to improve the structural capacity of the pavement.0 EVERGREEN DEVELOPMENT C-7 CLEAR CREEK CROSSING - APARTMENTS CTL I T PROJECT NO. DN48,890-125-R1 WHEATRIDGE BLDG DEPT Mr Randy Sulsser 7500 W 29th Avenue Wheat Ridge, Colorado 80033 303-235-2803 rslusser ci.wheatridge.co.us Dear Mr Slusser, 9-24-2019 528o Engineering rogerb@5280engineering.com 303-320-7755 www.DesianMEP.com Re: OUTLOOK CLEARCREEK CROSSING (2017-045) Plan Check No: 201901819-201901824 Please accept this letter as our response to your plan review 9-20/2019 regarding outstanding items. Please note there are no updated plumbing or mechanical sheets in our response to this plan review. PLUMBING: 5. Provide drainage information on plans for hot water heaters and pans within the units. Response: The water heater pan -drain including Pressure -Relief Valves is shown in the isometric on sheet P3.10. MECHANICAL: 6. Provide information regarding exhaust clearance terminations for S1 units, notes 1, 7, and 17 Response: Discussing clearance between the 4" Dryer Exhaust hood, the water heater flue concentric vent, and the 6"Exhaust Hood with the architect, it is intended to mount all three thru the exterior wall horizontally in-line. The architect is indicating those mechanical items on the elevation drawings. Minimum distance from bath/kitchen exhaust outlet to an opening in the building is 3ft. The top of each window is fixed therefore allowing the exhaust outlet near the window. 7. Provide information regarding exhaust clearance terminations for 81 units, notes 1, 7, and 2 Response: Please see response for item -2 above. 8. Is exhaust fan EFK-100 rated at 50cfm like EF 50? They both refer to the same Panasonic model on page Response: Yes. Although exhaust fan EFK-100 has the capability of 100 CFM by internal switching from 50-80-100 CFM, the setting of 50CFM satisfies both the required mechanical ventilation in the kitchen of 25 CFM continuous and the mechanical ventilation required for the entire living unit. 9. MO -0.0: in the Apartment Mechanical Equipment List table, provide information regarding the supply air side of the Mechanical Ventilation in the units. How is this to be provided? Response: Referring to 20121MC Code Section 403, Table 403.3, the present Mechanical Ventilation design does not include a "ducted supply air side" method; an "Exhaust -only method" is incorporated as noted in IMC Section 403. 1, "Mechanical Ventilation shall be provided by a method of supply air and return or exhaust air". Please note the IBC Code requires a maximum of 3.0 AirChanges per hour which is difficult to attain for apartment envelope tightness. The mechanical ventilation exhaust fan pulls outside air thru exterior surfaces at approximately 0.35 AirChanges per hour satisfying mechanical ventilation requirements. 10. In the unit corridors, please explain how the existing air is to be exhausted to offset supplied OSA through item number 2,113cfm on each floor Response: As noted in item -5 above, the exterior wall exfiltrates air from the corridor outside air intake, providing Mechanical Ventilation to each corridor at 0.06CFM/sqft. 11. Please clarify routing and location of OSA ductwork and termination in Clubhouse as shown on MC1-1. Response: A 14"round OSA UP THRU ROOF TO SMACNA INTAKE CAP with 1/4"GALV MESH" is presently shown just adjacent to the WOMEN bathroom. There are three 10"round OSA ducts connected to this 14"round, each connecting to the respective furnace return air with Outlook CCC Page 1 of 2 RBlank Response#1 9-24-2019 a manual damper set of each of these dampers is per OUTSIDE AIR CALCULATIONS as noted on sheet MCI -1: FR1-5T = 400 CFM; FR2-5T =400 CFM; FR3-4T = 280 CFM. 12. Please identify equipment/appliance shown in Business Lounge area that requires a concentric roof vent also located in the clubhouse. Response: The item is a gas fireplace, model Napoleon model HD81-1 rated 60,000 BTU/Hr input. Please contact me if there are any Sincerely, 528olEngineering Roger Blank, P.E., President ��pp*' �"_gyp REG/S., ",1111 24341 � \\ 9-24-2019 \\-\' Outlook CCC Page 2 of 2 RBlank Response#1 9-24-2019 PLAN REVIEW COMMENT RESPONSES —SEPTEMBER 25, 2019 1sT ARCHITECTURAL REVIEW Project: Outlook Clear Creek Crossing (KA# 215093) Plan Check No: 201901819 -201901824 Reviewer: Randy Slusser, Chief Building Official Building Division, City of Wheat Ridge 303.235.2803 rslusser@ci.wheatridge.co.us Mr. Slusser: Please let this letter serve as a response to the architectural comments received dated 9.20.2019 for Outlook Clear Creek Crossing. Responses from other disciplines are submitted under separate cover. If you have any additional comments or concerns, please contact me at the contact information listed below. Thank you, Karl Schuch, AIA KEPHART community ■ planning ■ architecture 2555 Walnut Street Denver, CO 80205 303.832.4474 ext. 7139 303.832.4476 fax KarlS e,KeI2hart.com -www kel2hart.com 1. Please justify use of using residential energy compliance. Multifamily projects over 3 stories are classified commercial buildings as defined in 2012 IECC, and shall comply with the commercial provisions. Verify location on compliance certificate is listed as Wheat Ridge, not Westminster as it is now shown. Revise all energy compliance certificates accordingly. Response: REScheck calculations have been replaced with COMcheck compliance certificates on sheet AO -3.0. Location revised to Wheat Ridge. Per COMcheck analysis, foundation insulation was found to be unnecessary to achieve 2012 IECC compliance, and has been removed from foundation details 3 and 8 on sheet A7-1.1, and foundation plan sheets A2-1.0 and A2-2.0. Outlook Clear Creek Crossing Plan Check No. 201901819 -201901824 Page 1 of 2 2. AO -3.0: Code analysis for Elevator Lobby Separation. Clarify what type of fire partition and assembly is being provided. Response: Sheet AO -3.0 has been revised to identify assembly as GA FILE NO. 3605. Sheet AO - 6.0 has been revised to indicate 1 -HR ELEVATOR LOBBY SEPARATION at GA FILE NO. 3605. 3. AR8-1.0: Detail 1—Typical Stair Plan. Clarify why location of water heater is in stairway (Most likely typo) Response: The water heater shown in 1/AR8-1.0 is located in a first floor mechanical closet under the stair landing. The stair has a section cut in plan to allow garage level to show in full. Water heater does not occur at top of landing. See 2/AR2-1.0 for further clarity on water heater locations (keynoted as 22.13). 4. Revise wall type legend and roof/ceiling type legend to reference ACO -1.2 on sheets AC4-1.0, AC6-1.0, AC6-2.0, and AC6-3.0. Response: Legends have been revised on sheets AC4-1.0, AC6-1.0, AC6-2.0, and AC6-3.0. End of Narrative. Outlook Clear Creek Crossing Plan Check No. 201901819 -201901824 Page 2 of 2 NCHOR ENGINEERING October 4,%OI9 Kephart Architects Atten:Karl Schu[h 2S55Walnut Street Denver, [D8O20S RE: Outlook Clear Creek Crossing VVheathdge,[{J Anchor Job #: 170548 Permit #: 201901819-0I824 As per your request, our office has reviewed the City ofVVheathdge building department comments dated Oq/33/I9and for the above-mentioned project. OurOffce has the following responses: 37.Sheet SI'l.O:Verify the foundation keynote #9. See page 3Z2ofthe structural calculation for the special rebans@ hnldovvns. Per page 32Zofthe structural calculation, need 1D-#5 @I0"oc.x9'-6" around hu|dovvnHD12and 8'$5@10"oz.x7'-9"around ho|dovvnHD1l. |6Keynote #9onsheets S1 - l.0 8'S1'I.0for all ho|dovvns or just for some ho|dOvvns? Ho|dnwns are HD7, HDO etc' on the plans. It is better to specify the type of holdowns that require the special require the special reinforcement. Verify if the special reinforcement is required for the following locations. a\ Sheet S1-1.0: @ upper and lower left ofthe building, units 828'Blfor HDl1& @upper and lower right ofthe building, Units 82 & 13lfor HD1I. b\ Sheet S1-2.0: @ upper and lower left ofthe building, units B2Q'B1for HD11& @upper and lower right ofthe building, units B2 &Rlfor HDll. Response: Special reinforcement has been added tothe locations noted above nnSheet S2'1.0and S2' 50. 5heetSCl'1.Ci foundation notes: Cannot find reference sheet5[O'O.l & details .S, ' 0.0. Foundation Note #G:Referencedetail 1/SO-0.2 shall be 7/SO-0.2 and 8/SSC3-0.0sha|| beD/SC3-D.0. 8/S3-O.Oisshown onthe plan. Nbmodifications to note 6have been made since it already indicates 0. 53. Sheet SC1-1.0: Verify the total strands in each direction. Also verify the spacing of the strands. See pages 475,4QO,5O1,5l4,626&534ofthe structural calculation for the details. Verify the length nf the strands @ rectangular 1. |nlong direction, itshall be04'approximately instead ofZS'-4" In short direction, itshall beZ8'approx. instead of38'-9" Verify the length ofall ofthe strands. See attached �p 2535 17`" Srnser' Dswven' CO 80211 � 383'783'4797 � 303-830-9133 FAX * MCHOR A ENGINEERING STRUCTURAL FNGINEERS mark-up sheet for the locations, The structural calculation is ok. Verify the length on the plan (sheet SCl-LO). There are seven places. Marked -up sheet will beresent with this review. Our office reviewed the spacingondtheco8outs/oro8tendVnsondrectono&esforthePT slab on page SC1-1.0. Clarification to the structural documents have been made. Sincerely, Anchor Engineering, Inc. mom Charles D. Petzinger, P.E. Project Engineer Reviewed by: YsidoroGutierrez' P.E. Project Manager /, 2535 17,° Srnsar' Dsmvsn' CO 80211 * 303'783'4797 � 303-830-9133 FAX �� ANCHOR ENGINEERING STRUCTURAL ENGINEERS October 4, 2019 Kephart Architects Atten: Karl Schuch 2555 Walnut Street Denver, CO 80205 RE: Outlook Clear Creek Crossing Wheatridge, CO Anchor Job #: 170548 Permit #: 201901819-01824 As per your request, our office has reviewed the City of Wheatridge building department comments dated 09/23/19 and for the above-mentioned project. Our office has the following responses: 37. Sheet S1-1.0: Verify the foundation keynote #9. See page 322 of the structural calculation for the special rebars @ holdowns. Per page 322 of the structural calculation, need 10-#5 @ 10" o.c. x 9'-6" around holdown HD12 and 8-$5 @ 10" o.c. x 7'-9" around holdown HD11. Is Keynote #9 on sheets 51- 1.0 & S1-2.0 for all holdowns or just for some holdowns? Holdowns are HD7, HD8 etc... on the plans. It is better to specify the type of holdowns that require the special require the special reinforcement. Verify if the special reinforcement: is required for the following locations. a) Sheet S1-1.0: @ upper and lower left of the building, units B2 & 131 for IID11 & @ upper and lower right of the building, units B2 & 131. for HD1L b) Sheet S1-2.0: @ upper and lower left of the building, units B2 & 131 for FID11 & @ upper and lower right of the building, units B2 & B.I. for HD1.1.. Response: Special reinforcement has been added to the locations noted above on Sheet S1-1.0 and 51- 2.0 for the holdowns HD11. 50. Sheet SC1-1.0, foundation notes: Cannot find reference sheet SCO -0.1 & details 7/SCO-0.3, 8/SSC3- 0.0. Foundation Note #6:Reference detail 1/SO-0.2 shall be 7/SO-0.2 and 8/SSC3-0.0 shall be 8/SC3-0.0. 8/S3-0.0 is shown on the plan. Response: No modifications to note 6 have been made since it already indicates 8/SC3-0.0. 53. Sheet SC1-1.0: Verify the total strands in each direction. Also verify the spacing of the strands. See pages 475, 488, 501, 514, 526 & 534 of the structural calculation for the details. Verify the length of the strands @ rectangular 1. In long direction, it shall be 64' approximately instead of 25'-4". In short direction, it shall be 28' approx. instead of 38'-9". Verify the length of all of the strands. See attached 2535 17r" STREET, DENVER, CO 80211 303-783-4797 ❖ 303-830-9133 FAX •: ENGINEERING STRUCTURAL ENGINEERS mark-up sheet for the locations. The structural calculation is ok. Verify the length on the plan (sheet SCI-I.Ui There are seven places. Marked -up sheet will beresent with this review. Our office reviewed the spacingmnd the collouts for a// tendons and rectangles for the PT slab on page SC1-1.0. Clarification to the structural documents hove been made. Sincerely, Anchor Engineering, Inc. Charles O. Petzinger, P.E. Project Engineer Reviewed by: YsidoroGutierrez, P.E. Project Manager � 2535 17`" Srnssr' Dcmvsn^ CO 80211 �, 303'783'4797 �, 303-830-9133 FAX * ANCHOR ENGINEERING STRUCTURAL ENGINEERS October 2, 2019 Kephart Architects Atten: Karl Schuch 2555 Walnut Street Denver, CO 80205 RE: Outlook Clear Creek Crossing Wheatridge, CO Anchor Job #: 170548 Permit #: 201901819-01824 As per your request, our office has reviewed the City of Wheatridge building department comments dated 09/23/19 and for the above-mentioned project. Our office has the following responses: 5. Detail 3/SO-0.3: The reference sheet for 2x6 & 2x4 wall shall be SO -0.1 instead of SO -0.2. Response: Note in detail has been revised. 6. Detail 7/SO-0.3: Verify the reference detail 9/SO-0.3. Cannot find this detail. New detail 11/S4-0.0 is not shown on plan. Response: Note in detail has been revised to reference detail 11/S4-0.0 11. Sheets S1-1.0 & S1-2.0, foundation note #9: Verify the reference detail 8/S3-0.0. Verify the new reference detail 13/S3-0.0 Response: Note #9 has been revised on S1-1.0 and S1-2.0 to reference detail 8/S3-0.0. It has been verified that the previously provided referenced detail 8/S3-0.0 is correct. 37. Sheet S1-1.0: Verify the foundation keynote #9. See page 322 of the structural calculation for the special rebars @ holdowns. Per page 322 of the structural calculation, need 1045 @ 10" o.c. x 9°-6" around holdown HD12 and 8-$5 @ 10" o.c. x 7"-9" around holdown HD11. Is Keynote #9 on sheets 51- 1..0 & S1-2.0 for all holdowns or just for some holdowns? Holdowns are HD7, HD8 etc... on the plans. It is better to specify the type of holdowns that require the special require the special reinforcement. Response: The intent for foundation keynote 9 is to specifically indicate locations of additional reinforcement. Keynote 9 has been revised to provide additional clarity. Please note keynote 9 has 2535 17TH STREET, DENVER, CO 80211 ❖ 303-783-4797 303-830-9133 FAX •. ANCHOR ENGINEERING STRUCTURAL ENGINEERS October 2, 2019 Kephart Architects Atten: Karl Schuch 2555 Walnut Street Denver, CO 80205 RE: Outlook Clear Creek Crossing Wheatridge, CO Anchor Job #: 170548 Permit #: 201901819-01824 As per your request, our office has reviewed the City of Wheatridge building department comments dated 09/23/19 and for the above-mentioned project. Our office has the following responses: 5. Detail 3/SO-0.3: The reference sheet for 2x6 & 2x4 wall shall be SO -0.1 instead of SO -0.2. Response: Note in detail has been revised. 6. Detail 7/SO-0.3: Verify the reference detail 9/SO-0.3. Cannot find this detail. New detail 11/S4-0.0 is not shown on plan. Response: Note in detail has been revised to reference detail 11/S4-0.0 11. Sheets S1-1.0 & S1-2.0, foundation note #9: Verify the reference detail 8/S3-0.0. Verify the new reference detail 13/S3-0.0 Response: Note #9 has been revised on S1-1.0 and S1-2.0 to reference detail 8/S3-0.0. It has been verified that the previously provided referenced detail 8/S3-0.0 is correct. 37. Sheet S1-1.0: Verify the foundation keynote #9. See page 322 of the structural calculation for the special rebars @ holdowns. Per page 322 of the structural calculation, need 10-#5 @ 10" o.c. x 9'-6" around holdown HD12 and 8-$5 @ 10" o.c. x 7'-9" around holdown HD11. Is Keynote #9 on sheets S1- 1.0 & S1-2.0 for all holdowns or just for some holdowns? Holdowns are HD7, HD8 etc... on the plans. It is better to specify the type of holdowns that require the special require the special reinforcement. Response: The intent for foundation keynote 9 is to specifically indicate locations of additional reinforcement. Keynote 9 has been revised to provide additional clarity. Please note keynote 9 has 2535 17T" STREET, DENVER, CO 80211 0• 303-783-4797 • 303-830-9133 FAX •: been revised to state "where shown thus". Additional reinforcement not required at HD7, HD8, HD9 & HD10. 50. Sheet SC1-1.0, foundation notes: Cannot find reference sheet SCO -0.1 & details 7/SCO-0.3, 8/SSC3- 0.0. Foundation Note #6:Reference detail 1/SO-0.2 shall be 7/SO-0.2 and 8/SSC3-0.0 shall be 8/SC3-0.0. Response: Note 6 has been revised to reference 6/SO-0.2 and the extra "S" has been removed from the reference section. 53. Sheet SC1-1.0: Verify the total strands in each direction. Also verify the spacing of the strands. See pages 475, 488, 501, 514, 526 & 534 of the structural calculation for the details. Verify the length of the strands @ rectangular 1. In long direction, it shall be 64' approximately instead of 25'--4". In short direction, it shall be 28' approx. instead of 38'-9". Verify the length of all of the strands. See attached mark-up sheet for the locations. Response: Our office has reviewed the spacing of the strands. Per the calculation on page 475 of the original calculation package, the dimensions of the rectangle "Rectangle 1" in long direction is 64' and short direction is 28'. No modifications required. 56. Details 1,3,6/SG1-2.0 and 1/SG1-3.0: Cannot find the reference sheets SGO-0.1 & SGO-0.2. The revised sheet SG1-3.0 was not included in this submittal. Response: Sheet SG1-3.0 was not included in the submittal because there were no revisions to this page. Detail 1/SG1-3.0 did not reference a SGO-0.1 or SGO-0.2 but rather the correct page SO -0.1. Please reference previously provided structural sheet SG1-3.0. Sincerely, Anchor Engineering, Inc. Charles D. Petzinger, P.E. Project Engineer Reviewed by: Ysidoro Gutierrez, P.E. Project Manager 2535 17111 STREET, DENVER, CO 80211 303-783-4797 303-830-9133 FAX •: been revised to state "where shown thus". Additional reinforcement not required at HD7, HD8, HD9 & HD10. 50. Sheet SC1-1.0, foundation notes: Cannot find reference sheet SCO -0.1 & details 7/SCO-0.3, 8/SSC3- 0.0. Foundation Note #6:Reference detail 1/SO-0.2 shall be 7/SO-0.2 and 8/SSC3-0.0 shall be 8/SC3-0.0. Response: Note 6 has been revised to reference 6/SO-0.2 and the extra "S" has been removed from the reference section. 53. Sheet SC1-1.0: Verify the total strands in each direction. Also verify the spacing of the strands. See pages 475, 488, 501, 514, 526 & 534 of the structural calculation for the details. Verify the length of the strands @ rectangular 1. In long direction, it shall be 64' approximately instead of 25'-4". In short direction, it shall be 28' approx. instead of 38'-9". Verify the length of all of the strands. See attached mark-up sheet for the locations. Response: Our office has reviewed the spacing of the strands. Per the calculation on page 475 of the original calculation package, the dimensions of the rectangle "Rectangle 1" in long direction is 64' and short direction is 28'. No modifications required. 56. Details 1,3,6/SG1-2.0 and 1/SG1-3.0: Cannot find the reference sheets SGO-0.1 & SGO-0.2. The revised sheet SG1-3.0 was not included in this submittal. Response: Sheet SG1-3.0 was not included in the submittal because there were no revisions to this page. Detail 1/SG1-3.0 did not reference a SGO-0.1 or SGO-0.2 but rather the correct page SO -0.1. Please reference previously provided structural sheet SG1-3.0. Sincerely, Anchor Engineering, Inc. Charles D. Petzinger, P.E. Project Engineer Reviewed by: Ysidoro Gutierrez, P.E. Project Manager 2535 1711 STREET, DENVER, CO 80211 303-783-4797 303-830-9133 F A x •.