Loading...
HomeMy WebLinkAbout11723 11729 11732 11737 W. 45th Place0A.4k r 9" e3PEcONOOMVWN1HGY1f611CI[NCY March 24, 2021 11723 W 4511 Place Wheat Ridge CO 80033 Re: Duct leakage test for 11723 W 45' Place To whom it may concern: E3 Power performed a Duct leakage test on the above mentioned building on March 24, 2021 at 11:00 AM. The total duct leakage measurement was 76 CFM @-25 pascals. The duct system meets the air tightness requirement of 4 CFM per 100 square feet of area served and is compliant with code. Please let me know if I can be of further assistance to you. Sincerely, Digitally signed Jessica W. Kurela (e3 power) Jessica by Jessica W. 303-292-1233 Ku re l a Building Analyst (BPI) W. KurelaDate: 2021.03.24 15:13:45 -06'00' 303.292.1233 720.201.0940 Opower.oef , efME fix WEB >, *A,- e 3 ECONOMIC ENERGY EEFlCIENCY March 24, 2021 11729 W 4511 Place Wheat Ridge CO 80033 Re: Duct leakage test for 11729 W 45th Place To whom it may concern: E3 Power performed a Duct leakage test on the above mentioned building on March 24, 2021 at 11:00 AM. The total duct leakage measurement was 52 CFM @-25 pascals. The duct system meets the air tightness requirement of 4 CFM per 100 square feet of area served and is compliant with code. Please let me know if I can be of further assistance to you. Digitally signed Sincerely, Jessica by Jessica W. �! Kurela Jessica W. Kurela (e3 power) W • KurelaDate: 2021.03.24 303-292-1233 15:12:23 -06'00' Building Analyst (BPI) 303.292.1233 120.281.0040 dpoweiml Ad fix WEB * 4-A c r *Otv*o% 3 P,,,,ON,,w,,,GYff6KU,Y March 24, 2021 11731 W45 1h Place Wheat Ridge CO 80033 Re: Duct leakage test for 11731 W 45th Place To whom it may concern: E3 Power performed a Duct leakage test on the above mentioned building on March 24, 2021 at 11:00 AM. The total duct leakage measurement was 47 CFM @-25 pascals. The duct system meets the air tightness requirement of 4 CFM per 100 square feet of area served and is compliant with code. Please let me know if I can be of further assistance to you. Sincerely, Jessica W. Kurela (e3 power) 303-292-1233 Building Analyst (BPI) Jessica W. Kurela Digitally signed by Jessica W. Kurela Date: 2021.03.24 15:10:59 -06'00' 303.292.1133 120,201.0946 dpowefml PHU fix WEe *4�Ak o r ;V 3 ECONOMIC wNNY EfflC1ENCY March 24, 2021 11737 W 45th Place Wheat Ridge CO 80033 Re: Duct leakage test for 11737 W 45th Place To whom it may concern: E3 Power performed a Duct leakage test on the above mentioned building on March 24, 2021 at 10:30 AM. The total duct leakage measurement was 56 CFM @-25 pascals. The duct system meets the air tightness requirement of 4 CFM per 100 square feet of area served and is compliant with code. Please let me know if I can be of further assistance to you. Sincerely, Jessica W. Kurela (e3 power) 303-292-1233 Building Analyst (BPI) Jessica W. Kurela Digitally signed by Jessica W. Kurela Date: 2021.03.24 15:08:52 -06'00' 303.292.1233 720.26NP6 B3powofmi AdOEEICE fix WEB March 26, 2021 Mr. Dan Garcia Mr. Duane Cemiglia Clear Creek Terrace, L.L.C. Suite 314 S. Galena Street 6143 South Willow Drive, Suite 300 Suit Centennial, CO 80112 Greenwood Village, Colorado 80111 T: 303.377.6601 RE: Framing Observation F: 303.377.6656 11723, 11729, 11731, 11737 West 45`" Place www.mnaengineering.com Lots 22, 21, 20, 19, Building 4, Clear Creek Terrace Subdivision Wheat Ridge, Colorado Structural Plans: Prepared by MNA, Inc. Project Number: 4440TSTH Dated: September 10, 2018, Revised July 17, 2020 Framing Observation Report: Prepared by NINA, Inc. Dated: March 16, 2021 Attn. Mr. Garcia and Mr. Cerniglia: At your request MNA, Inc. conducted two observations of the framing at the above referenced address. The framing was observed on March 12 and 25, 2021. The roof and exterior sheathing nailing cannot be verified during this observation. The exterior sheathing and strapping were not observed at the time of the observation due to the installation of finish materials. Not all items are visible during the observation and no destructive testing was completed to verify framing covered with finish material, sheathing or covered by other construction material. Any modifications to structural members made by HVAC, electrical or plumbing needs to be verified by the contractor performing the work and are not reviewed as part of this observation. The roof and floor truss profiles are not observed as part of the observation. The framing was found to be in general compliance with the above referenced structural plans and framing observation report on March 25, 2021. This report is based on the limited accessibility of the elements and components of the structure at the time of the observation. This report is based on accepted general practice and is limited to the data available to our office. We make no warranty either expressed or implied. No invasive testing or inspections were performed. MNA Inc does not accept responsibility for hidden structural deficiencies not evident during an investigation of this type. Should you have any additional questions or concerns, please do not hesitate to call me at 303-377-6601. Sincerely, MNA, Inc. L ter/ f jw+ I J/VfF Gabriel Andrews, P.E. Structural Project Manager Reviewed by: AA "Novi } F Naim G. Nassar, PE President/CEO STRUCTURAL ENGINEERING - CIVIL ENGINEERING • PLANNING - ARCHITECTURE