HomeMy WebLinkAboutYARROW GARDENSYork,�° N'Iheal Ria.
IEngineering
Structural 0 a s i g n e4 Ing Oris
(7201 990-5900
Date: 9 March 2021
Wheatridge City Building Department
Attn: Builder Official
Subject: Transfer of Engineer of Record, Thrive Home Builders, Yarrow Gardens Townhomes
York Engineering shall assume the role as engineer of record on the structural plans for the
Yarrow Gardens Townhomes project for Thrive Home Builders in Wheat Ridge, CO. The engineered plans
originally submitted by EV Studio and stamped by Ross R. Maxwell have been reviewed by York
Engineering. York Engineering performed an independent design on the structures and walked through
buildings under construction. Through this, we found our design to be in general conformance with the
permitted design performed by EV Studio. Subsequent letters/reports will outline both required and
allowed structural changes. Any inspections and subsequent letters/reports performed by EV Studio on
existing buildings shall be addend ums to inspections/reports provided by York Engineering.
A representative of York Engineering spoke with Ross R. Maxwell and discussed this transition.
York Engineering will be reviewing submitted and constructed foundation designs at existing buildings to
additionally assume the responsibility of Engineer of Record for those designs. Address specific letters
will be provided.
Please feel free to call with any questions or concerns.
Respectfully yours,
oPp00 LIC'e
Helena N. Dopita, P. O�'Af" 'Pte
U' O
1
q C
STOMAL EN
GOVERNING CODE
2018 IRC
SEISMIC
SPAN <5-0"
CATEGORY= B
1=1.00
SPAN 5'-1" - 10'-0"
(2) TRIMMERS AND (3) KING STUDS
(2) TRIMMERS AND (2) KING STUDS
SPAN 10'-1" - 18'-0"
R=6.5
(2) TRIMMERS AND (3) KING STUDS
FOR WALLS TALLER THAN 10', SEE PLAN
RISK II
ULT. WIND SPEED (3—SECOND
GUST)
135 MPH
EXPOSURE C
0
1
ROOF LOADS
DEAD
20 PSF
0g�i^
SNOW
30 PSF
W
DEFLECTION
LL=L/360 TL=L/240
FLOOR LOADS
DEAD
15 PSF
0:�z
LIVE
40 PSF
DECK LOADS
DEAD
12 PSF
LIVE
60 PSF
Q
W
NOTE: THIS ENGINEERING DESIGN ASSUMES THE LOADS
AND CRITERIA LISTED ABOVE.
CONTRACTOR SHALL REVIEW
THE LOADS & GEOTECHNICAL
REPORT AND CONTACT YORK
ENGINEERING PRIOR TO CONSTRUCTION IF ANY
ADJUSTMENTS ARE REQUIRED.
THE LOADS ABOVE ASSUME
NO RADIANT HEAT FLOORING.
SOIL REPORT, IF AVAILABLE,
SHALL BE REVIEWED BY YORK
ENGINEERING PRIOR TO
CONSTRUCTION. IF NO SOILS REPORT IS AVAILABLE, THIS
DESIGN ASSUMES THE SOIL PRESSURE ABOVE AND THAT
NO LIQUEFACTION, EXPANSIVE,
SLOPE STABILITY OR OTHER
ADVERSE CONDITIONS EXIST.
PREBABRICATED ENGINEERED TRUSSES
TRUSS LAYOUT AND CALCULATIONS TO BE SUBMITTED TO YORK ENGINEERING FOR
RENEW PRIOR TO CONSTRUCTION.
TRUSS/ GIRDER CONNECTION
UNLESS NOTED OTHERWISE, USE SIMPSON H2.5T OR EQUIVELANT TIES EACH END
OR EACH TRUSS/JOIST, SEE ROOF TRUSS AT WOOD WALL DETAIL AT GIRDERS,
INSTALL TIES EACH PER PLAN
HEADER TO TRIMMERAING STUD CONNECTION
-NAIL HEADER TO KING STUDS WITH (6) 16d EACH END U.N.O, SEE PLAN.
-FOR HEADERS GREATER THAN 6' LONG, USE (2) LCE CUPS OR PCZ OR BC POST
CAP EACH END OF HEADER TO TRIMMER CONN., OR USE CS16 STRAPS EACH
SIDE OF HEADER TO TRIMMERS, SEE HEADER TO TRIMMER CONNECTION DETAIL
CONTRACTOR AND ALL SUB -CONTRACTORS SHALL FOLLOW ALL STANDARD BUILDING CODES, PRACTICES, AND
REQUIREMENTS AS LISTED IN THE IRC. CONTRACTOR TO VERIFY ALL DIMENSIONS, SPANS, & CONDITIONS AND NOTIFY
ENGINEER OF ANY ERRORS, OMISSIONS, OR DISCREPANCIES PRIOR TO CONSTRUCTION. IF DISCREPANCIES ARE FOUND,
THE MORE STRINGENT SPECIFICATION SHALL BE FOLLOWED. DIMENSIONS SHOWN ARE BASED ON ARCHITECTURAL
DRAWINGS PROVIDED TO YORK ENGINEERING. IF DISCREPANCIES EXIST, DIMENSIONS SHOWN ON ARCHITECTURAL
DRAWINGS SHALL BE FOLLOWED. CONTRACTOR SHALL ASSURE THAT ALL MATERIALS ARE USED PER MANUFACTURER
RECOMMENDATIONS
SHEATHING NOTES
1. STAGGER ROOF AND FLOOR SHEATHING JOINTS, SEE ROOF SHEATHING LAYOUT DETAIL
2. INSTALL ROOF AND FLOOR SHEATHING WITH LONG DIMENSION PERPENDICULAR TO TRUSSES/JOISTS U.N.O., SEE
PLAN. SHEATHING INSTALLED WITH LONG DIMENSION PARALLEL TO JOISTS/TRUSSES SHALL BE 5 PLY PLYWOOD
CONFORMING TO APA STANDARD PS -1.
3. NAILS SHALL BE In MIN FROM SHEATHING EDGE.
4. ALL FLOOR AND ROOF SHEATHING PIECES SHALL BE 48" X 48" MIN.
5. PROVIDE EDGE NAILING AT ALL SUPPORTED AND BLOCKED PANEL EDGES AND PER DETAILS.
WALL SHEATHING: 7/16" APA RATED 24/16 MIN. U.N.O., SEE PLAN. ALL EXTERIOR WALLS AND VERTICAL SURFACES
SHALL BE SHEATHED WITH SHEATHING MANUFACTURED WITH EXTERIOR GLUE SEE PLANS AND SHEAR WALL SCHEDULE
FOR NAIUNG REQUIREMENTS WALL SHEETING MAY HAVE UP TO 4" ROUND HOLES SPACED MIN 12" APART.
ROOF SHEATHING: 7/16° APA RATED 24/16 MIN. WITH 8d NAILS AT 6" O.C. EDGE NAILING AND 12" O.C. FIELD
NAIUNG FOR ROOF SNOW LOAD LESS THAN OR EQUAL TO 40 PSF. FOR ROOF SNOW LOAD GREATER THAN 40 PSF
USE 5/8" APA RATED 40/20 MIN. WITH 10d NAILS AT 6" O.C. EDGE NAILING AND 12" O.C. FIELD NAIUNG U.N.O, SEE
PLAN.
FLOOR SHEATHING: 3/4" T&G APA RATED 40/20 MIN. (48/24 WHEN FLOOR TRUSSES/JOISTS ARE AT 24" O.C.) 1WTH
8d NAILS AT 6" O.C. EDGE NAILING AND 12" D.C. FIELD NAILING U.N.O., SEE PLAN. GLUE SHEATHING TO
JOISTS/TRUSSES WITH ADHESIVE CONFORMING TO APA SPECIFICATIONS
FRAMING NOTES
1. SILL PLATE J -BOLTS SHALL HAVE A 1" STANDARD WASHER AT EACH BOLT. IF SLOTTED WASHER IS USED, ADD
CUT WASHER.
2. ALL FOUNDATION HOLDOWN STRAPS/ANCHORS SHALL BE ALIGNED WITH END OF SHEAR WALL AND/OR INTER LEVEL
STRAP ABOVE (WHERE OCCURS) AND SHALL ATTACH TO FULL HEIGHT KING STUDS U.N.O., SEE PLAN. PROVIDE
WOOD POST AT EACH HOLDOWN PER THE HOLDOWN SCHEDULE.
& STRAPS CALLED CUT ON FLOOR AND FLOOR FRAMING PLANS ARE VERTICAL INTER LEVEL STRAPS AND SHALL BE
CENTERED ON RIM BOARD AND ALIGNED WITH END OF SHEAR WALL ABOVE AND ATTACHED TO FULL HEIGHT KING
STUDS UNLESS NOTED OR SHOWN OTHERWISE, SEE PLANS
4. WALL DBL TOP PLATES SHALL BE 2X MIN. AND SHALL LAP 36" AT ALL SPLICES WITH (12) 16d NAILS STAGGERED
EACH SIDE OF SPLICE U.N.O, SEE PLAN. WHERE PLATES DO NOT LAP, PROVIDE CS16X32" STRAP TO SPLICE
PLATES ALIGN WALL STUD WITH PLATE JOINTS
5. PROVIDE DBL CANTILEVER FLOOR JOISTS BELOW (2) PLY (OR MORE) TRIMMERS/POSTS AND WHERE SHEAR WALL
HOLDOWN STRAPS ARE INDICATED.
6. ATTACH (2) PLY HEADERS TOGETHER WITH (3) 16d AT 12" O.C. [(2) 16d OK FOR 2X6 HEADERS1 USE (3) 16d AT
12" O.C. EACH SIDE FOR (3) PLY HEADERS, USE (4) 16d AT (2) AND (3) PLY HEADERS WHEN HEADER HEIGHT IS
GREATER THAN 11". ATTACH (4) PLY HEADERS TOGETHER 1WTH (2) In THROUGH BOLTS AT 16" O.C. OR (2) SDS
1/4" X 6" SCREWS AT 16" O.0 EACH SIDE OF HEADER U.N.O., SEE PLAN.
7. SEE BEARING WALL CONSTRUCTION TABLE FOR WALL FRAMING REQUIREMENTS.
8 NAIL STUDS OF INTERSECTING WALLS W/16d NAILS 0 6" O.C.
9. EDGE NAIL SHEATHING TO ALL DRAG MEMBERS.
10. WHEN CHIMNEY IS SUPPORTED BY ROOF/FLOOR FRAMING, TRUSS/JOIST MFR TO DESIGN TRUSSES/JOISTS TO
SUPPORT CHIMNEY WEIGHT INCLUDING VENEER WHERE OCCURS CHIMNEYS CANTILEVERING MORE THAN 4' ABOVE
ROOF SHALL BE FRAMED WITH 2X6 012" O.C., USE LSL 2X6 0 12" O.C. FOR CHIMNEYS EXTENDING MORE THAN 8'
ABOVE THE ROOF. CHIMNEYS EXTENDING MORE THAN IV ABOVE THE ROOF SHALL BE LATERALLY BRACED (WITHIN
4' OF CHIMNEY TOP) TO THE ROOF FRAMING WITH CABLES OR RODS ANCHORED TO RESIST SEISMIC AND WIND
LOADS. CHIMNEYS THAT EXTEND MORE THAN 6' ABOVE THE ROOF AND ARE SUPPORTED BY ROOF FRAMING
(FRAMING DOES NOT EXTEND CONTINUOUS THROUGH ROOF) SHALL HAVE A MSTC4BB3 ANCHOR AT EACH CORNER
(HOOKED UNDER ROOF JOIST OR TRUSS TOP CHORD).
11.ATTACH STEEL BEAMS TO WOOD POSTS PER BEAM POCKET IN WOOD WALL DETAIL
12. ALL HARDWARE SHOWN ON PLANS TO BE AS SPECIFIED OR EQUIVALENT
OPENINGS ON BEARING WALLS
UNLESS OTHERWISE NOTED
2X4 WALL
2X6 WALL
SPAN <5-0"
(1) TRIMMER AND (2) KING STUDS
(1) TRIMMER AND (1) KING STUD
SPAN 5'-1" - 10'-0"
(2) TRIMMERS AND (3) KING STUDS
(2) TRIMMERS AND (2) KING STUDS
SPAN 10'-1" - 18'-0"
SEE PLAN
(2) TRIMMERS AND (3) KING STUDS
FOR WALLS TALLER THAN 10', SEE PLAN
)f THIO( X 10" X 10" AM STEEL
PLATE W/ (4) )¢"0 THRU-BOLTS
1"1 A36 THREADED
1'0 A36 THREADED
)f X 4" X e A36 PLA
Yin THICK X8"X8"A36
STEEL PLATE W/ (4) )4"®J
2x10 PRESSURE TREATED LEDGER ATTACHED TO LVL
RIM BOARD W/ (3) Y" X 5" SDS SCREWS OR (3) Y"
X 5" LEDGERLOK SCREWS 0 16" D.C.
1/2"
SHEATHING, SEE PLAN.
EXTEND EXTERIOR SHEATHING TO
CENTER OF RIM OR PROVIDE VERT.
CS16 STRAPS PER PLAN NOTE
2X4 HORIZONTAL BLOCKS TOP &
BOTTOM 0 48" O.C.
11;11fa'1
LVL RIM BOARD
SHEATHING, SEE PLAN.
EXTEND EXTERIOR SHEATHING TO
CENTER OF RIM OR PROVIDE VERT.
CS16 STRAPS PER PLAN NOTE
2X4 HORIZONTAL BLOCKS TOP &
BOTTOM 0 48" O.C.
ATi�CiIT,�:IIL1;1 O
2X10 LEDGER ATTACHED TO LVL RIM
W/ (3) Y4" X 5" SDS SCREWS OR (3)
Y4" X 5" LEDGERLOK SCREWS 0 16"
O.C.
2 -PLY LVL RIM FULL LENGTH OF
cam• Of
"(PI" heat —d, e
�1wn e�[vunFeu�
APPROVED
I m r.,uu 1"arflellartita,
Mike Theisen 05/06/2021
1y�v�; 711x. �sleM�ar #lewrslien awAcri..e
s�r9�,id�lFR.�hx�aitwa'.�Pw3�►5�w�1'+F •�re�»aw+h
"q,pj'i�"enwWre�`eVa4�is,�m4.p+dal'A�R giana w.se"
cam eru@an,talrFre�: oFUe SFR 1MN��i wra,a
(2) 2X10
0
2 -PLY LVL RIM ALONG FULL LENGTH
OF WALL
CS16 FLOOR TIE STRAPS
LAP UPPER LEVEL WALL SHEATHING TO CENTER OF RIM
OR WALL DBL TOP PL BELOW OR INSTALL VERTICAL
CS16X36" STRAPS AT 32" O.C. (CENTERED ON RIM).
LAP LOWER AND MAIN LEVEL WALL SHEATHING TO
CENTER OF RIM OR ONTO SILL PLATE BELOW OR INSTALL
VERTICAL CS16X24" STRAPS AT 32" O.C. (CENTERED ON
WALL BOTT. PLATE).
AT SW -1 WALLS. CS16 STRAPS NOT NEEDED IF
SHEATHING IS BROKE AT CENTER OF WALL BOTT. PLATE.
AT DBL SIDED SHEAR WALLS, EXTERIOR SHEATHING MUST
LAP TO LOWER RIM OR WALL/SILL PLATE AS DESCRIBED
ABOVE (CS16 STRAP RETROFIT NOT ALLOWED).
DBL PORTAL FRAME, (4) 1 Y4" X 14" LVL
FRAME A DBL 2X4 11 HEADER, 2 IN EACH
WALL THIS WALL LINE IT WALL /
/(2)1%" X 91 LVL
(3) 2X8
GIRDER TRUSS
GIRDER TRUSS
P3 -E
ry
GIRDER TRUSS
W
,3
J
�OrJ
1
mx
J
0
1
x 7
ry
0
0g�i^
M LL
m x
W
�J
w g
I
L
0:�z
o
AFL
�6
Ic
Q
W
LL _j
IJ
m
1
0
J
all
"
1
m2
1
J
LL
m_
N
J
1
N
J
1
=
1
� r
I
(2) 2XVS
III Niel - - 2X8 0 16" D.C:
i,. GIRDER TRUSS
(2)!1 3/4-' X 11 7/8' -LVL \ I I(2) p;
In
RAISED PLA
2 -PLY LVL RIM ALONG FULL
LENGTH OF WALL
NOTE: ALL BEARING WALL STUDS SHALL BE 16" O.C. MAX
0
t
f
m=
x0
O LL
(2) 2XVS
REV1510N5
DATE: # DESCRIPTION: BY:
--- --- --
DBL PORTAL FRAME, (4) 1 X 14" LVL
FRAME A DBL 2X4 11 HEADER, 2 IN EACH
WALL THIS WALL LINE p WALL /
GIRDER TRUSS
GIRDER TRUSS
(3) 2X8
I I I IIS
@ 16" O.C. W/ LUS 8 1 04X
I I 1
Pi -1 P2 -E
SECOND LEVEL FLOOR FRAMING PLAN
rn
NN
of W healR.
co
0
G/jdn9 [05
c
2 -PLY LVL RIM ALONG FULL LENGTH
OF WALL
2X10 LEDGER ATTACHED TO LVL RIM
W/ (3) Y4 X 5" SDS SCREWS OR (3)
Y4 X 5" LEDGERLOK SCREWS 0 16"
O.C.
3/9/2021
cp
C
O
uj
S2
W
Q
U)
0
ry
0
zo
0
W
0
L
0:�z
o
Q
CD
0
Q
W
0
all
S2
OPENINGS ON BEARING WALLS
UNLESS OTHERWISE NOTED
2X4 WALL
2X6 WALL
SPAN <5'-D"
(1) TRIMMER AND (2) KING STUDS
(1) TRIMMER AND (1) KING STUD
SPAN 5'-1" - 10'-0"
(2) TRIMMERS AND (3) KING STUDS
Q
(2) TRIMMERS AND (2) KING STUDS
SPAN 10'-1" - 18'-D"
SEE PLAN
(2) TRIMMERS AND (3) KING STUDS
FOR WALLS TALLER THAN 10', SEE PLAN
TRUSS LAYOUT AND CALCULATIONS TO BE SUBMITTED TO YORK ENGINEERING FOR
RENEW PRIOR TO CONSTRUCTION.
UNLESS NOTED OTHERWISE, USE SIMPSON H2.5T OR EQUIVELANT TIES EACH END
OR EACH TRUSS/JOIST, SEE ROOF TRUSS AT WOOD WALL DETAIL AT GIRDERS,
INSTALL TIES EACH PER PLAN
HEADER TO TRIMMER/KING STUD CONNECTION
-NAIL HEADER TO KING STUDS WITH (6) 16d EACH END U.N.O, SEE PLAN.
-FOR HEADERS GREATER THAN 6' LONG, USE (2) LCE CUPS OR PCZ OR BC POST
CAP EACH END OF HEADER TO TRIMMER CONN., OR USE CS16 STRAPS EACH
SIDE OF HEADER TO TRIMMERS, SEE HEADER TO TRIMMER CONNECTION DETAIL
CONTRACTOR AND ALL SUB -CONTRACTORS SHALL FOLLOW ALL STANDARD BUILDING CODES, PRACTICES, AND
REQUIREMENTS AS LISTED IN THE IRC. CONTRACTOR TO VERIFY ALL DIMENSIONS, SPANS, & CONDITIONS AND NOTIFY
ENGINEER OF ANY ERRORS, OMISSIONS, OR DISCREPANCIES PRIOR TO CONSTRUCTION. IF DISCREPANCIES ARE FOUND,
THE MORE STRINGENT SPECIFICATION SHALL BE FOLLOWED. DIMENSIONS SHOWN ARE BASED ON ARCHITECTURAL
DRAWINGS PROVIDED TO YORK ENGINEERING. IF DISCREPANCIES EXIST, DIMENSIONS SHOWN ON ARCHITECTURAL
DRAWINGS SHALL BE FOLLOWED. CONTRACTOR SHALL ASSURE THAT ALL MATERIALS ARE USED PER MANUFACTURER
RECOMMENDATIONS.
1. STAGGER ROOF AND FLOOR SHEATHING JOINTS, SEE ROOF SHEATHING LAYOUT DETAIL
2. INSTALL ROOF AND FLOOR SHEATHING WITH LONG DIMENSION PERPENDICULAR TO TRUSSES/JOISTS U.N.O., SEE
PLAN. SHEATHING INSTALLED WITH LONG DIMENSION PARALLEL TO JOISTS/TRUSSES SHALL BE 5 PLY PLYWOOD
CONFORMING TO APA STANDARD PS -1.
3. NAILS SHALL BE J¢" MIN FROM SHEATHING EDGE
4. ALL FLOOR AND ROOF SHEATHING PIECES SHALL BE 48" X 48" MIN.
5. PROVIDE EDGE NAILING AT ALL SUPPORTED AND BLOCKED PANEL EDGES AND PER DETAILS.
WALL SHEATHING: 7/16" APA RATED 24/16 MIN. U.N.O., SEE PLAN. ALL EXTERIOR WALLS AND VERTICAL SURFACES
SHALL BE SHEATHED WITH SHEATHING MANUFACTURED WITH EXTERIOR GLUE. SEE PLANS AND SHEAR WALL SCHEDULE
FOR NAILING REQUIREMENTS. WALL SHEETING MAY HAVE UP TO 4' ROUND HOLES SPACED MIN 12" APART.
ROOF SHEATHING: 7/16" APA RATED 24/16 MIN. WITH 8d NAILS AT 6" O.C. EDGE NAILING AND 12" O.C. FIELD
NAILING FOR ROOF SNOW LOAD LESS THAN OR EQUAL TO 40 PSF. FOR ROOF SNOW LOAD GREATER THAN 40 PSF
USE 5/8" APA RATED 40/20 MIN. WITH 10d NAILS AT 6" O.C. EDGE NAILING AND 12" O.C. FIELD NAILING U.N.O, SEE
PLAN.
FLOOR SHEATHING: 3/4" T&G APA RATED 40/20 MIN. (48/24 WHEN FLOOR TRUSSES/JOISTS ARE AT 24" O.C.) WITH
8d NAILS AT 6° D.C. EDGE NAILING AND 12" O.C. FIELD NAILING U.N.O., SEE PLAN. GLUE SHEATHING TO
JOISTS/TRUSSES WITH ADHESIVE CONFORMING TO APA SPECIFICATIONS
FRAMING NOTES
1. SILL PLATE J -BOLTS SHALL HAVE A 1" STANDARD WASHER AT EACH BOLT. IF SLOTTED WASHER IS USED, ADD
CUT WASHER.
2. ALL FOUNDATION HOLDOWN STRAPS/ANCHORS SHALL BE ALIGNED WITH END OF SHEAR WALL AND/OR INTER LEVEL
STRAP ABOVE (WHERE OCCURS) AND SHALL ATTACH TO FULL HEIGHT KING STUDS U.N.O., SEE PLAN. PROVIDE
WOOD POST AT EACH HOLDOWN PER THE HOLDOWN SCHEDULE.
3. STRAPS CALLED OUT ON FLOOR AND FLOOR FRAMING PLANS ARE VERTICAL INTER LEVEL STRAPS AND SHALL BE
CENTERED ON RIM BOARD AND ALIGNED WITH END OF SHEAR WALL ABOVE AND ATTACHED TO FULL HEIGHT KING
STUDS UNLESS NOTED OR SHOWN OTHERWISE, SEE PLANS.
4. WALL DBL TOP PLATES SHALL BE 2X MIN. AND SHALL LAP 36" AT ALL SPLICES WITH (12) 16d NAILS STAGGERED
EACH SIDE OF SPLICE U.N.O, SEE PLAN. WHERE PLATES DO NOT LAP, PROVIDE CS16X32" STRAP TO SPLICE
PLATES, ALIGN WALL STUD WITH PLATE JOINTS
5. PROVIDE DBL CANTILEVER FLOOR JOISTS BELOW (2) PLY (OR MORE) TRIMMERS/POSTS AND WHERE SHEAR WALL
HOLDOWH STRAPS ARE INDICATED.
6. ATTACH (2) PLY HEADERS TOGETHER WITH (3) 16d AT 12" O.C. [(2) 16d OK FOR 2X6 HEADERS1 USE (3) 16d AT
12" O.C. EACH SIDE FOR (3) PLY HEADERS, USE (4) 16d AT (2) AND (3) PLY HEADERS WHEN HEADER HEIGHT IS
GREATER THAN 11°. ATTACH (4) PLY HEADERS TOGETHER WITH (2) %' THROUGH BOLTS AT 16' D.C. OR (2) SDS
1/4" X 6" SCREWS AT 16" O.C. EACH SIDE OF HEADER U.N.O., SEE PLAN.
7. SEE BEARING WALL CONSTRUCTION TABLE FOR WALL FRAMING REQUIREMENTS.
& NAIL STUDS OF INTERSECTING WALLS W/16d NAILS 0 6" O.C.
9. EDGE NAIL SHEATHING TO ALL DRAG MEMBERS.
10. WHEN CHIMNEY IS SUPPORTED BY ROOF/FLOOR FRAMING, TRUSS/JOIST MFR TO DESIGN TRUSSES/JOISTS TO
SUPPORT CHIMNEY WEIGHT INCLUDING VENEER WHERE OCCURS CHIMNEYS CANTILEVERING MORE THAN 4' ABOVE
ROOF SHALL BE FRAMED WITH 2X6 012" O.C., USE LSL 2X6 012" O.C. FOR CHIMNEYS EXTENDING MORE THAN 8'
ABOVE THE ROOF. CHIMNEYS EXTENDING MORE THAN 10' ABOVE THE ROOF SHALL BE LATERALLY BRACED (WITHIN
4' OF CHIMNEY TOP) TO THE ROOF FRAMING WITH CABLES OR RODS ANCHORED TO RESIST SEISMIC AND WIND
LOADS. CHIMNEYS THAT EXTEND MORE THAN 6' ABOVE THE ROOF AND ARE SUPPORTED BY ROOF FRAMING
(FRAMING DOES NOT EXTEND CONTINUOUS THROUGH ROOF) SHALL HAVE A MSTC48B3 ANCHOR AT EACH CORNER
(HOOKED UNDER ROOF JOIST OR TRUSS TOP CHORD).
11.ATTACH STEEL BEAMS TO WOOD POSTS PER BEAM POCKET IN WOOD WALL DETAIL
12. ALL HARDWARE SHOWN ON PLANS TO BE AS SPECIFIED OR EQUIVALENT
LAP UPPER LEVEL WALL SHEATHING TO CENTER OF RIM
OR WALL DBL TOP PL BELOW OR INSTALL VERTICAL
CS16X36" STRAPS AT 32" O.C. (CENTERED ON RIM).
LAP LOWER AND MAIN LEVEL WALL SHEATHING TO
CENTER OF RIM OR ONTO SILL PLATE BELOW OR INSTALL
VERTICAL CS16X24" STRAPS AT 32" O.C. (CENTERED ON
WALL BOTT. PLATE).
AT SW -1 WALLS, CS16 STRAPS NOT NEEDED IF
SHEATHING IS BROKE AT CENTER OF WALL BOTT. PLATE.
AT DBL SIDED SHEAR WALLS, EXTERIOR SHEATHING MUST
LAP TO LOWER RIM OR WALL/SILL PLATE AS DESCRIBED
ABOVE (CS16 STRAP RETROFIT NOT ALLOWED).
REVISIONS
DATE: # DESCRIPTION: BY:
P3 -E Pi -1 P2 -E
THIRD LEVEL FLOOR FRAMING PLAN
SCALE: 1/4" =1'-0"
of W hear.
O
3/9/2021
0
W
U
Q
U)
0
O
z0
0
W
0
Ld0
n, -z
6)
Q
CD
0
Q
W
0
Q
OPENINGS ON BEARING WALLS
UNLESS OTHERWISE NOTED
(2) 1
2X4 WALL
LVL
2X6 WALL
SPAN <5'-0"
(1) TRIMMER AND (2) KING STUDS
X 7Y4'
(1) TRIMMER AND (1) KING STUD
SPAN 5'-1" - 10'-0"
(2) TRIMMERS AND (3) KING STUDS
Q
(2) TRIMMERS AND (2) KING STUDS
SPAN 10'-1" - 18'-0"
SEE PLAN
TY4" LV
(2) TRIMMERS AND (3) KING STUDS
FOR WALLS TALLER THAN 10', SEE PLAN
V /
PREBABRICATED ENGINEERED TRUSSES
TRUSS LAYOUT AND CALCULATIONS TO BE SUBMITTED TO YORK ENGINEERING FOR
RENEW PRIOR TO CONSTRUCTION.
UNLESS NOTED OTHERWISE, USE SIMPSON H25T OR EQUIVELANT TIES EACH END
OR EACH TRUSS/JOIST, SEE ROOF TRUSS AT WOOD WALL DETAIL AT GIRDERS,
INSTALL TIES EACH PER PLAN
-NAIL HEADER TO KING STUDS WITH (6) 16d EACH END U.N.O, SEE PLAN.
-FOR HEADERS GREATER THAN 6' LONG, USE (2) LCE CLIPS OR PCZ OR BC POST
CAP EACH END OF HEADER TO TRIMMER CONN., OR USE CS16 STRAPS EACH
SIDE OF HEADER TO TRIMMERS, SEE HEADER TO TRIMMER CONNECTION DETAIL
CONTRACTOR AND ALL SUB -CONTRACTORS SHALL FOLLOW ALL STANDARD BUILDING CODES, PRACTICES, AND
REQUIREMENTS AS LISTED IN THE IRC. CONTRACTOR TO VERIFY ALL DIMENSIONS, SPANS, & CONDITIONS AND NOTIFY
ENGINEER OF ANY ERRORS, OMISSIONS, OR DISCREPANCIES PRIOR TO CONSTRUCTION. IF DISCREPANCIES ARE FOUND,
THE MORE STRINGENT SPECIFICATION SHALL BE FOLLOWED. DIMENSIONS SHOWN ARE BASED ON ARCHITECTURAL
DRAWINGS PROVIDED TO YORK ENGINEERING. IF DISCREPANCIES EXIST, DIMENSIONS SHOWN ON ARCHITECTURAL
DRAWINGS SHALL BE FOLLOWED. CONTRACTOR SHALL ASSURE THAT ALL MATERIALS ARE USED PER MANUFACTURER
RECOMMENDATIONS.
SHEATHING NOTES
1. STAGGER ROOF AND FLOOR SHEATHING JOINTS, SEE ROOF SHEATHING LAYOUT DETAIL
2. INSTALL ROOF AND FLOOR SHEATHING WITH LONG DIMENSION PERPENDICULAR TO TRUSSES/JOISTS U.N.O., SEE
PLAN. SHEATHING INSTALLED WITH LONG DIMENSION PARALLEL TO JOISTS/TRUSSES SHALL BE 5 PLY PLYWOOD
CONFORMING TO APA STANDARD PS -1.
3. NAILS SHALL BE %A MIN FROM SHEATHING EDGE.
4. ALL FLOOR AND ROOF SHEATHING PIECES SHALL BE 48" X 48" MIN.
5. PROVIDE EDGE NAILING AT ALL SUPPORTED AND BLOCKED PANEL EDGES AND PER DETAILS.
WALL SHEATHING: 7/16" APA RATED 24/16 MIN. U.N.O., SEE PLAN. ALL EXTERIOR WALLS AND VERTICAL SURFACES
SHALL BE SHEATHED WITH SHEATHING MANUFACTURED WITH EXTERIOR GLUE SEE PLANS AND SHEAR WALL SCHEDULE
FOR NAIUNG REQUIREMENTS. WALL SHEETING MAY HAVE UP TO 4" ROUND HOLES SPACED MIN 12" APART.
ROOF SHEATHING: 7/16" APA RATED 24/16 MIN. WITH Bd NAILS AT 6" O.C. EDGE NAILING AND 12" O.C. FIELD
NAILING FOR ROOF SNOW LOAD LESS THAN OR EQUAL TO 40 PSF. FOR ROOF SNOW LOAD GREATER THAN 40 PSF
USE 5/8" APA RATED 40/20 MIN. WITH 10d NAILS AT 6" O.C. EDGE NAILING AND 12" O.C. FIELD NAILING U.N.O, SEE
PLAN.
FLOOR SHEATHING: 3/4" T&G APA RATED 40/20 MIN. (48/24 WHEN FLOOR TRUSSES/JOISTS ARE AT 24" O.C.) WITH
8d NAILS AT 6" O.C. EDGE NAILING AND 12" O.C. FIELD NAILING U.N.O., SEE PLAN. CLUE SHEATHING TO
JOISTS/TRUSSES WITH ADHESIVE CONFORMING TO APA SPECIFICATIONS
1. SILL PLATE J -BOLTS SHALL HAVE A 1" STANDARD WASHER AT EACH BOLT. IF SLOTTED WASHER IS USED, ADD
CUT WASHER.
2 ALL FOUNDATION HOLDOWN STRAPS/ANCHORS SHALL BE ALIGNED WITH END OF SHEAR WALL AND/OR INTER LEVEL
STRAP ABOVE (WHERE OCCURS) AND SHALL ATTACH TO FULL HEIGHT KING STUDS U.N.O., SEE PLAN. PROVIDE
WOOD POST AT EACH HOLDOWN PER THE HOLDOWN SCHEDULE.
3. STRAPS CALLED OUT ON FLOOR AND FLOOR FRAMING PLANS ARE VERTICAL INTER LEVEL STRAPS AND SHALL BE
CENTERED ON RIM BOARD AND ALIGNED WITH END OF SHEAR WALL ABOVE AND ATTACHED TO FULL HEIGHT KING
STUDS UNLESS NOTED OR SHOWN OTHERWISE SEE PLANS.
4. WALL DBL TOP PLATES SHALL BE 2X MIN. AND SHALL LAP 36" AT ALL SPLICES WITH (12) 16d NAILS STAGGERED
EACH SIDE OF SPLICE U.N.O, SEE PLAN. WHERE PLATES DO NOT LAP, PROVIDE CS16X32" STRAP TO SPLICE
PLATES ALIGN WALL STUD WITH PLATE JOINTS
5. PROVIDE DBL CANTILEVER FLOOR JOISTS BELOW (2) PLY (OR MORE) TRIMMERS/POSTS AND WHERE SHEAR WALL
HOLDOWN STRAPS ARE INDICATED.
6. ATTACH (2) PLY HEADERS TOGETHER WITH (3) 16d AT 12" O.C. [(2) 16d OK FOR 2X6 HEADERS USE (3) 16d AT
12" O.C. EACH SIDE FOR (3) PLY HEADERS, USE (4) 16d AT (2) AND (3) PLY HEADERS WHEN HEADER HEIGHT IS
GREATER THAN 11'. ATTACH (4) PLY HEADERS TOGETHER WITH (2) N' THROUGH BOLTS AT 16" O.C. OR (2) SDS
1/4" X 6" SCREWS AT 16" O.C. EACH SIDE OF HEADER U.N.O., SEE PLAN.
7. SEE BEARING WALL CONSTRUCTION TABLE FOR WALL FRAMING REQUIREMENTS.
8, NAIL STUDS OF INTERSECTING WALLS W/16d NAILS 0 6" O.C.
9. EDGE NAIL SHEATHING TO ALL DRAG MEMBERS.
10. WHEN CHIMNEY IS SUPPORTED BY ROOF/FLOOR FRAMING, TRUSS/JOIST MFR TO DESIGN TRUSSES/JOISTS TO
SUPPORT CHIMNEY WEIGHT INCLUDING VENEER WHERE OCCURS CHIMNEYS CANTILEVERING MORE THAN 4' ABOVE
ROOF SHALL BE FRAMED PATH 2X6 012" O.C., USE LSL 2X6 012" O.C. FOR CHIMNEYS EXTENDING MORE THAN 6
ABOVE THE ROOF. CHIMNEYS EXTENDING MORE THAN 10' ABOVE THE ROOF SHALL BE LATERALLY BRACED (WITHIN
4' OF CHIMNEY TOP) TO THE ROOF FRAMING WITH CABLES OR RODS ANCHORED TO RESIST SEISMIC AND WIND
LOADS. CHIMNEYS THAT EXTEND MORE THAN 6' ABOVE THE ROOF AND ARE SUPPORTED BY ROOF FRAMING
(FRAMING DOES NOT EXTEND CONTINUOUS THROUGH ROOF) SHALL HAVE A MSTC48133 ANCHOR AT EACH CORNER
(HOOKED UNDER ROOF JOIST OR TRUSS TOP CHORD).
11.ATTACH STEEL BEAMS TO WOOD POSTS PER BEAM POCKET IN WOOD WALL DETAIL
12. ALL HARDWARE SHOWN ON PLANS TO BE AS SPECIFIED OR EQUIVALENT
CS16 FLOOR TIE STRAPS
LAP UPPER LEVEL WALL SHEATHING TO CENTER OF RIM
OR WALL DBL TOP PL BELOW OR INSTALL VERTICAL
CS16X36" STRAPS AT 32" O.C. (CENTERED ON RIM).
LAP LOWER AND MAIN LEVEL WALL SHEATHING TO
CENTER OF RIM OR ONTO SILL PLATE BELOW OR INSTALL
VERTICAL CS16X24" STRAPS AT 32" O.C. (CENTERED ON
WALL BOTT. PLATE).
AT SW -1 WALLS, CS16 STRAPS NOT NEEDED IF
SHEATHING IS BROKE AT CENTER OF WALL BOTT. PLATE.
AT DBL SIDED SHEAR WALLS, EXTERIOR SHEATHING MUST
LAP TO LOWER RIM OR WALL/SILL PLATE AS DESCRIBED
ABOVE (CS16 STRAP RETROFIT NOT ALLOWED).
REVISIONS
DATE: # DESCRIPTION: BY:
P 3 — E
P1
ROOF FRAMING PLAN
SCALE: 1/4" =1'-0"
P2—E
Imm
LRS
N1 heat
`o Q:
Vco
G�arn9 pis0 c
3/9/2021
.N a
}
m
Q N V1
o
v � o
C m l!1
o m
L �
VI �
a --
o
a o
mm
J o
�o�
u
m
�m
`m
c
ms�ml�
0
Lu
0
(2) 1
/4"X71/'
LVL
(2) f/4"
X 7Y4'
LVL
Q
5
D
TYP
2) 1%"
TY4" LV
U)
V /
(2
2X6'S
O
zo
(2) 19/4"
_ _
X 7Y4" L
_
L
0
N
coLE
X
N
NI
0
�z
o
Q
CD
0
Q
W
CD I
I
—
T1
� I
X
N
N
0
Q
FL
----
----
L
(2) 1
LVL
OE NAIL
OP PLA
6d NAIL
.C. (TYF
HEAR W
TRUSS
S W/
0 12"
AT GYF
LLS)
0
(2) 13/4'
x I
N
`"
4' X 7Y4
X E
1/2" LVI.
--------
---
---FL
Iry
(2)13/
"X91/
"LVL
()
2
TYP
)2,(6 -SD
(
P 3 — E
P1
ROOF FRAMING PLAN
SCALE: 1/4" =1'-0"
P2—E
Imm
LRS
N1 heat
`o Q:
Vco
G�arn9 pis0 c
3/9/2021
.N a
}
m
Q N V1
o
v � o
C m l!1
o m
L �
VI �
a --
o
a o
mm
J o
�o�
u
m
�m
`m
c
ms�ml�
0
Lu
0
LLJU
Q
U)
V /
W
O
zo
0
W
0
0
�z
o
Q
CD
0
Q
W
0
Q
REVISIONS
DATE: # DESCRIPTION: BY:
.N a
a
NOTE: MAX 4" HOLES IN SHEAR WALLS }_
ALLOWED
Q N V1
0
v s o
C � m l!1
o ¢ m
W heat T L
o o
U� rna� -
Lim
a
—_
DBL PORTAL FRAME, DBL PORTAL FRAME,
FRAME A DBL 2X4 FRAME A DBL 2X4 11 el, 5\\I\
o`° o`° WALL THIS WALL LINE p o.° °.° Jy Jy o`° 01� WALL THIS WALL LINE p o`° o`' ` o
- - u m
u SW -2
D D
D D
0i
0i
Emm
Lu
i
3
N
C�A C7
C7
W
U
Ll
Q
�� o
SW -2 W of
J
sOG SODS bOGs sOGS
SW -2 z O O
SW -2 �11 J� �0� J� �0� W L
`b �1}� CD
SW -2 PORTAL FRAME Z
Of
Q
>D 0 _
O
Q
P3 -E P1- P2 -E
LOWER FLOOR SHEAR WALL PLAN°PP�� `��F"
z S 5
3/9/2021 ,���
S/OVAL EN
SHEAR WALL NOTES
ALL EXTERIOR WALLS AND VERTICAL SURFACES SHALL BE SHEATHED PER TYPICAL SHEAR WALL REQUIREMENTS MIN. U.N.O., WITH SHEATHING MANUFACTURED
WITH EXTERIOR GLUE. SHEATHING SHALL BE APA RATED 24/16 MIN., NAILS SHALL BE SPACED 1/2" MIN. FROM PANEL EDGE AND DRIVEN FLUSH BUT SHALL
NOT FRACTURE THE SURFACE OF THE SHEATHING. BLOCK AND EDGE NAIL ALL HORIZONTAL SHEATHING JOINTS.
SHEAR WALL SCHEDULE
NAIL/SCREW
SPACING
TYPE SHEATHING NAIL/SCREW EDGE FIELD STAPLE EQ. BDTT, PL TO RIM ATTACHMENT RIM/BLOCK T❑ PL ATTACHMENT
SIZE BELOW DBL SIDED SHEAR WALLS
TYPICAL 7/16' ONE SIDE2 8d 6' D.C. 12' D.C. 16G @ 3' D.C. 16d @ 6' O.C. LTP4 OR A35 @ 16' D.C.
SW -14.10 7/16' ONE SIDE2 8d 4' ❑.C.2 12' O.C. 16G @ 2' D.C. 16d @ 6' D.C. LTP4 DR A35 @ 16' D.C.
SW -210 7/16' ONE SIDE2 8d 3' ❑.C.2 12' O.C. NOT ALLOWED 4' SDS SCREWS @ 8' ❑,C,7•8 LTP4 OR A35 @ 12' D.C.
SW -33.10 7/16' ONE SIDE2 8d 2' D,C,2 12' D.C. NOT ALLOWED 4' SDS SCREWS @ 8' D,C,-7
7•8 LTP4 DR A35 @ 9' D.C.
Na, 6 TYPE S
GYP 1/2' ONE SIDE OR W 1�4' 4' D.C. 12' D.C. NOT ALLOWED 16d @ 6' D.C. N/A
LONG
NOTES:
1. 16 GAGE X 1-1/2" STAPLES MAY BE SUBSTITUTED FOR Sd NAILS AT 1/2 SPACING ON TYPICAL AND SW -1 WALLS.
2. WHERE SHEAR WALLS ARE INDICATED ON PLANS AT BOTH SIDES OF WALL, PROVIDE SHEATHING BOTH SIDES OF WALL (DBL SIDED SHEAR WALL) AND
STAGGER EDGE NAILS.
3. PROVIDE 3X OR DBL 2X MEMBERS AT ADJOINING PANEL EDGES AT SW -3 AND LAP SHEATHING 1 1/4" MIN. ONTO FRAMING MEMBERS AT PANEL EDGES.
4. AT TYPICAL AND SW -1 WALLS, LAP SHEATHING 3/4" ONTO FRAMING MEMBERS AT PANEL EDGES.
5. LAP SHEATHING 1 1/4" MIN. ONTO SILL PLATES ON FOUNDATIONS.
6. NAILS TO BE COMMON OR GALVANIZED BOX.
7. AT SINGLE SIDED SHEAR WALLS WHERE SHEATHING IS LAPPED TO CENTER OF RIM, WALL TOP PL OR TO SILL PLATE BELOW, 1
6d ®6" O.C. MAY BE USED
FOR WALL BOTTOM PLATE TO RIM ATTACHMENT.
8. USE 5" SCREWS FOR WALL PLATE TO RIM ATTACHMENT IF FLOOR SHEATHING IS GREATER THAN 3/4" THICK.
9. EDGE NAIL SHEATHING TO POSTS AT HOEDOWNS WITH (2) ROWS EDGE NAILING.
REVISIONS
DATE: # DESCRIPTION: BY:
.N a
a
NOTE: MAX 4" HOLES IN SHEAR WALLS }_
ALLOWED
Q N V1
0
v s o
C � m l!1
o ¢ m
W heat T L
o o
U� rna� -
Lim
a
—_
DBL PORTAL FRAME, DBL PORTAL FRAME,
FRAME A DBL 2X4 FRAME A DBL 2X4 11 el, 5\\I\
o`° o`° WALL THIS WALL LINE p o.° °.° Jy Jy o`° 01� WALL THIS WALL LINE p o`° o`' ` o
- - u m
u SW -2
D D
D D
0i
0i
Emm
Lu
i
3
N
C�A C7
C7
W
U
Ll
Q
�� o
SW -2 W of
J
sOG SODS bOGs sOGS
SW -2 z O O
SW -2 �11 J� �0� J� �0� W L
`b �1}� CD
SW -2 PORTAL FRAME Z
Of
Q
>D 0 _
O
Q
P3 -E P1- P2 -E
LOWER FLOOR SHEAR WALL PLAN°PP�� `��F"
z S 5
3/9/2021 ,���
S/OVAL EN
SHEAR WALL NOTES
ALL EXTERIOR WALLS AND VERTICAL SURFACES SHALL BE SHEATHED PER TYPICAL SHEAR WALL REQUIREMENTS MIN. U.N.O., WITH SHEATHING MANUFACTURED
WITH EXTERIOR GLUE. SHEATHING SHALL BE APA RATED 24/16 MIN., NAILS SHALL BE SPACED 1/2" MIN. FROM PANEL EDGE AND DRIVEN FLUSH BUT SHALL
NOT FRACTURE THE SURFACE OF THE SHEATHING. BLOCK AND EDGE NAIL ALL HORIZONTAL SHEATHING JOINTS.
SHEAR WALL SCHEDULE
NAIL/SCREW
SPACING
TYPE SHEATHING NAIL/SCREW EDGE FIELD STAPLE EQ. BDTT, PL TO RIM ATTACHMENT RIM/BLOCK T❑ PL ATTACHMENT
SIZE BELOW DBL SIDED SHEAR WALLS
TYPICAL 7/16' ONE SIDE2 8d 6' D.C. 12' D.C. 16G @ 3' D.C. 16d @ 6' O.C. LTP4 OR A35 @ 16' D.C.
SW -14.10 7/16' ONE SIDE2 8d 4' ❑.C.2 12' O.C. 16G @ 2' D.C. 16d @ 6' D.C. LTP4 DR A35 @ 16' D.C.
SW -210 7/16' ONE SIDE2 8d 3' ❑.C.2 12' O.C. NOT ALLOWED 4' SDS SCREWS @ 8' ❑,C,7•8 LTP4 OR A35 @ 12' D.C.
SW -33.10 7/16' ONE SIDE2 8d 2' D,C,2 12' D.C. NOT ALLOWED 4' SDS SCREWS @ 8' D,C,-7
7•8 LTP4 DR A35 @ 9' D.C.
Na, 6 TYPE S
GYP 1/2' ONE SIDE OR W 1�4' 4' D.C. 12' D.C. NOT ALLOWED 16d @ 6' D.C. N/A
LONG
NOTES:
1. 16 GAGE X 1-1/2" STAPLES MAY BE SUBSTITUTED FOR Sd NAILS AT 1/2 SPACING ON TYPICAL AND SW -1 WALLS.
2. WHERE SHEAR WALLS ARE INDICATED ON PLANS AT BOTH SIDES OF WALL, PROVIDE SHEATHING BOTH SIDES OF WALL (DBL SIDED SHEAR WALL) AND
STAGGER EDGE NAILS.
3. PROVIDE 3X OR DBL 2X MEMBERS AT ADJOINING PANEL EDGES AT SW -3 AND LAP SHEATHING 1 1/4" MIN. ONTO FRAMING MEMBERS AT PANEL EDGES.
4. AT TYPICAL AND SW -1 WALLS, LAP SHEATHING 3/4" ONTO FRAMING MEMBERS AT PANEL EDGES.
5. LAP SHEATHING 1 1/4" MIN. ONTO SILL PLATES ON FOUNDATIONS.
6. NAILS TO BE COMMON OR GALVANIZED BOX.
7. AT SINGLE SIDED SHEAR WALLS WHERE SHEATHING IS LAPPED TO CENTER OF RIM, WALL TOP PL OR TO SILL PLATE BELOW, 1
REVISIONS
DATE: # DESCRIPTION: BY:
m
r w
�}
NOTE: MAX 4" HOLES IN SHEAR WALLS -
ALLOWED a to o
v o
c m in
m of m
L I
r� �fJ heat
O M1
U� -tom m
a
O
u o
c
�o�
} m
� m
fjJT� lip
IrSW-1 SW-1 SSW-1 SW-1
SW-1 SW-1 N
cp
0i
0i
C
cp
Lu
3
N
I
3
N
C�7
C�7 �
U'
W
y
O
3
N
�/ /
LLJ Of
O
w0 U
sw—� sw—1 �,ST sw—1 �,ST� sW� Z 0
Q ~
0 0 w
sw—z s����
0
Q
P3-E P1-1 P2-E
MAAINl'-O"
SHEAR WALL PLAN y�
oPppO LIEF
SSG �:
S6
^�'•� 3/9/2021 ; ��
NAL
SHEAR WALL NOTES
ALL EXTERIOR WALLS AND VERTICAL SURFACES SHALL BE SHEATHED PER TYPICAL SHEAR WALL REQUIREMENTS MIN. U.N.O., WITH SHEATHING MANUFACTURED
WITH EXTERIOR GLUE. SHEATHING SHALL BE APA RATED 24/16 MIN., NAILS SHALL BE SPACED 1/2" MIN. FROM PANEL EDGE AND DRIVEN FLUSH BUT SHALL
NOT FRACTURE THE SURFACE OF THE SHEATHING. BLOCK AND EDGE NAIL ALL HORIZONTAL SHEATHING JOINTS.
SHEAR WALL SCHEDULE
NAIL/SCREW
SPACING
TYPE SHEATHING NAIL/SCREW EDGE FIELD STAPLE EQ. HDTT, PL TO RIM ATTACHMENT RIM/BLOCK TO PL ATTACHMENT
SIZE BELOW DBL SIDED SHEAR WALLS
TYPICAL4 7/16' ONE SIDE2 8d 6' D.C. 12' D.C. 16G @ 3' D.C. 16d @ 6' D.C. LTP4 DR A35 @ 16' D.C.
SW-14.10 7/16' ONE SIDE2 8d 4' ❑.C.2 12' O.C. 16G @ 2' D.C. 16d @ 6' D.C. LTP4 DR A35 @ 16' D.C.
SW-210 7/16' ONE SIDE2 8d 3' ❑.C.2 12' O.C. NOT ALLOWED 4' SDS SCREWS @ 8' ❑,C,7•8 LTP4 OR A35 @ 12' D.C.
SW-33.10 7/16' ONE SIDE2 8d 2' ❑.C.2 12' O.C. NDT ALLOWED 4' SDS SCREWS @ B' ❑,C,7•8 LTP4 OR A35 @ 9' D.C.
No, 6 TYPE S
GYP 1/2' ONE SIDE DR W IYi 4' D.C. 12' D.C. NOT ALLOWED 16d @ 6' D.C. N/A
LONG
NOTES:
1.16 GAGE X 1-1/2" STAPLES MAY BE SUBSTITUTED FOR 8d NAILS AT 1/2 SPACING ON TYPICAL AND SW-1 WALLS.
2. WHERE SHEAR WALLS ARE INDICATED ON PLANS AT BOTH SIDES OF WALL, PROVIDE SHEATHING BOTH SIDES OF WALL (DBL SIDED SHEAR WALL) AND
STAGGER EDGE NAILS.
3. PROVIDE 3X OR DBL 2X MEMBERS AT ADJOINING PANEL EDGES AT SW-3 AND LAP SHEATHING 1 1/4" MIN. ONTO FRAMING MEMBERS AT PANEL EDGES.
4. AT TYPICAL AND SW-1 WALLS, LAP SHEATHING 3/4" ONTO FRAMING MEMBERS AT PANEL EDGES.
5. LAP SHEATHING 1 1/4" MIN. ONTO SILL PLATES ON FOUNDATIONS.
6. NAILS TO BE COMMON OR GALVANIZED BOX.
7. AT SINGLE SIDED SHEAR WALLS WHERE SHEATHING IS LAPPED TO CENTER OF RIM, WALL TOP PL OR TO SILL PLATE BELOW, 1
6d ®6" O.C. MAY BE USED
FOR WALL BOTTOM PLATE TO RIM ATTACHMENT.
8. USE 5" SCREWS FOR WALL PLATE TO RIM ATTACHMENT IF FLOOR SHEATHING IS GREATER THAN 3/4" THICK.
9. EDGE NAIL SHEATHING TO POSTS AT HOEDOWNS WITH (2) ROWS EDGE NAILING.
REVISIONS
DATE: # DESCRIPTION: BY:
m
r w
�}
NOTE: MAX 4" HOLES IN SHEAR WALLS -
ALLOWED a to o
v o
c m in
m of m
L I
r� �fJ heat
O M1
U� -tom m
a
O
u o
c
�o�
} m
� m
fjJT� lip
IrSW-1 SW-1 SSW-1 SW-1
SW-1 SW-1 N
cp
0i
0i
C
cp
Lu
3
N
I
3
N
C�7
C�7 �
U'
W
y
O
3
N
�/ /
LLJ Of
O
w0 U
sw—� sw—1 �,ST sw—1 �,ST� sW� Z 0
Q ~
0 0 w
sw—z s����
0
Q
P3-E P1-1 P2-E
MAAINl'-O"
SHEAR WALL PLAN y�
oPppO LIEF
SSG �:
S6
^�'•� 3/9/2021 ; ��
NAL
SHEAR WALL NOTES
ALL EXTERIOR WALLS AND VERTICAL SURFACES SHALL BE SHEATHED PER TYPICAL SHEAR WALL REQUIREMENTS MIN. U.N.O., WITH SHEATHING MANUFACTURED
WITH EXTERIOR GLUE. SHEATHING SHALL BE APA RATED 24/16 MIN., NAILS SHALL BE SPACED 1/2" MIN. FROM PANEL EDGE AND DRIVEN FLUSH BUT SHALL
NOT FRACTURE THE SURFACE OF THE SHEATHING. BLOCK AND EDGE NAIL ALL HORIZONTAL SHEATHING JOINTS.
SHEAR WALL SCHEDULE
NAIL/SCREW
SPACING
TYPE SHEATHING NAIL/SCREW EDGE FIELD STAPLE EQ. HDTT, PL TO RIM ATTACHMENT RIM/BLOCK TO PL ATTACHMENT
SIZE BELOW DBL SIDED SHEAR WALLS
TYPICAL4 7/16' ONE SIDE2 8d 6' D.C. 12' D.C. 16G @ 3' D.C. 16d @ 6' D.C. LTP4 DR A35 @ 16' D.C.
SW-14.10 7/16' ONE SIDE2 8d 4' ❑.C.2 12' O.C. 16G @ 2' D.C. 16d @ 6' D.C. LTP4 DR A35 @ 16' D.C.
SW-210 7/16' ONE SIDE2 8d 3' ❑.C.2 12' O.C. NOT ALLOWED 4' SDS SCREWS @ 8' ❑,C,7•8 LTP4 OR A35 @ 12' D.C.
SW-33.10 7/16' ONE SIDE2 8d 2' ❑.C.2 12' O.C. NDT ALLOWED 4' SDS SCREWS @ B' ❑,C,7•8 LTP4 OR A35 @ 9' D.C.
No, 6 TYPE S
GYP 1/2' ONE SIDE DR W IYi 4' D.C. 12' D.C. NOT ALLOWED 16d @ 6' D.C. N/A
LONG
NOTES:
1.16 GAGE X 1-1/2" STAPLES MAY BE SUBSTITUTED FOR 8d NAILS AT 1/2 SPACING ON TYPICAL AND SW-1 WALLS.
2. WHERE SHEAR WALLS ARE INDICATED ON PLANS AT BOTH SIDES OF WALL, PROVIDE SHEATHING BOTH SIDES OF WALL (DBL SIDED SHEAR WALL) AND
STAGGER EDGE NAILS.
3. PROVIDE 3X OR DBL 2X MEMBERS AT ADJOINING PANEL EDGES AT SW-3 AND LAP SHEATHING 1 1/4" MIN. ONTO FRAMING MEMBERS AT PANEL EDGES.
4. AT TYPICAL AND SW-1 WALLS, LAP SHEATHING 3/4" ONTO FRAMING MEMBERS AT PANEL EDGES.
5. LAP SHEATHING 1 1/4" MIN. ONTO SILL PLATES ON FOUNDATIONS.
6. NAILS TO BE COMMON OR GALVANIZED BOX.
7. AT SINGLE SIDED SHEAR WALLS WHERE SHEATHING IS LAPPED TO CENTER OF RIM, WALL TOP PL OR TO SILL PLATE BELOW, 1
SHEAR WALL NOTES
W
ALL EXTERIOR WALLS AND VERTICAL SURFACES SHALL BE SHEATHED
PER TYPICAL SHEAR WALL REQUIREMENTS
MIN. U.N.O., WITH SHEATHING MANUFACTURED
WITH EXTERIOR GLUE. SHEATHING SHALL BE APA RATED 24/16 MIN.,
NAILS SHALL BE
SPACED 1/2" MIN. FROM
PANEL EDGE AND DRIVEN FLUSH BUT SHALL
NOT FRACTURE THE SURFACE OF THE SHEATHING. BLOCK AND EDGE
NAIL ALL HORIZONTAL SHEATHING JOINTS.
SHEAR WALL SCHEDULE
U�
NAIL/SCREW
o
(/)
W
o
SPACING
0
W
TYPE
SHEATHING
NAIL/SCREW
EDGE
FIELD
STAPLE EQ.
BOTT, PL TO RIM ATTACHMENT
RIM/BLOCK TO PL ATTACHMENT
Q
SIZE
CD
0
w
Q
w
BELOW DBL SIDED SHEAR WALLS
TYPICAL4
7/16' ONE SIDE2
8d
6' D.C.
12' D.C.
16G @ 3' D.C.
16d @ 6' D.C.
LTP4 OR A35 @ 16' D.C.
SW -14.10
7/16' ONE SIDE2
8d
4' O.C.2
12' D.C.
16G @ 2' O.C.
16d @ 6' D.C.
LTP4 OR A35 @ 16' D.C.
SW -210
7/16' ONE SIDE2
8d
3' O.C.2
12' D.C.
NOT ALLOWED
4' SDS SCREWS @ 8'
O,C,7,8
LTP4 OR A35 @ 12' D.C.
SW -33.10
7/16' ONE SIDE2
8d
2' O.C.2
12' D.C.
NOT ALLOWED
4' SDS SCREWS @ 8'
O,C.7,8
LTP4 OR A35 @ 9' D.C.
No. 6 TYPE S
GYP
1/2' ONE SIDE
OR W IYa'
4' D.C.
12' D.C.
NOT ALLOWED
16d @ 6' D.C.
N/A
LONG
NOTES:
1.16 GAGE X 1-1/2" STAPLES MAY BE SUBSTITUTED FOR 8d NAILS
AT 1/2 SPACING
ON TYPICAL AND SW -1 WALLS.
2. WHERE SHEAR WALLS ARE INDICATED ON PLANS AT BOTH SIDES OF WALL, PROVIDE
SHEATHING BOTH SIDES
OF WALL (DBL SIDED SHEAR WALL) AND
STAGGER EDGE NAILS.
3. PROVIDE 3X OR DBL 2X MEMBERS AT ADJOINING PANEL EDGES AT
SW -3 AND LAP
SHEATHING 1 1/4" MIN. ONTO FRAMING MEMBERS AT PANEL EDGES.
4. AT TYPICAL AND SW -1 WALLS, LAP SHEATHING 3/4" ONTO FRAMING MEMBERS AT PANEL EDGES.
5. LAP SHEATHING 1 1/4" MIN. ONTO SILL PLATES ON FOUNDATIONS.
6. NAILS TO BE COMMON OR GALVANIZED BOX.
7. AT SINGLE SIDED SHEAR WALLS WHERE SHEATHING IS LAPPED TO
CENTER OF RIM, WALL TOP PL OR TO SILL
PLATE BELOW, 16d ® 6" O.C. MAY BE USED
FOR WALL BOTTOM PLATE TO RIM ATTACHMENT.
8. USE 5" SCREWS FOR WALL PLATE TO RIM ATTACHMENT IF FLOOR SHEATHING IS GREATER THAN 3/4" THICK.
9. EDGE NAIL SHEATHING TO POSTS AT HOLDOWNS WITH (2) ROWS EDGE NAILING.
NOTE: MAX 4" HOLES IN SHEAR WALLS
ALLOWED
Sw-1 Sw-1 c
D) -1 F
D
I
N
L
I1�
SW -3
n
Sw-1 Sw-1
P3 -E
UPPER FL
SrAI F- 114" = 1'-0"
Sw-1
n
SW -3
P1
Sw-1
9
U'
REVISIONS
DATE: # DESCRIPTION: BY:
Sw-1 Sw-1
OOR SHEAR WALL PLAN
I
SW -1
P2 -E
SW -1
of W healR.
r;~l\1� It
co
V
G//arn9 D�.0 c
3/9/2021
S7
W
U
Q
U�
o
(/)
W
o
z0
0
W
Ld0
n, -z
6
Q
CD
0
w
Q
w
0
nz
Q
i
S7
OF ROOF SHEATHING, SEE PLAN
ROOF TRUSS/JOIST, SEE PLAN
VARIABLE GAP (2' MAX) BETWEEN BLOCK AND SHEATHING
FOR VENTILATION
2X BLOCKING, TOE NAIL BLOCK INTO TOP PLATE
W/ 16d 0 6' O.C.
H2.5T AT EACH END OF EACH TRUSS/JOIST. USE VPA CUP AT
SLOPED WOOD I -JOISTS AND H2.5 CUP AT I -JOISTS AT FLAT
ROOFS U.N.D, SEE PLAN. SEE PLAN NOTE FOR GIRDER
CONNECTION
BEARING
BLOCKS INTO SIDE OF
;SES W/
16d NAILS AT EACH END OF
;K
NG BETWEEN
I I y I I
TRUSSES
(BLACK NOT REWIRED TO
FRONT VIEW
ATTACH TO SHEATHING,
LEDGER NAILS TO BE 16d- 0
2. SOS SCREWS TO BE SPACED 3' O.C., 1 1/2" FROM
LEDGER EDGE
3. WHERE LEDGER IS INSTALLED DIRECTLY ON WALL STUDS
(NOT ON WALL SHEATHING) 3 1/2' SCREWS MAY BE USED
4. CENTER URGER SCREWS/NAILS IN WALL STUDS
U.N.O., SEE PLAN)
ROOF TRUSS
AT WOOD WALL
1 NTS
12'
TYPICAL DETAIL, USE
WHEN APPUES
BLOCKING OR
TRUSSES JOISTS, SEE PLAN
OUTRIGGER WHERE
2X6's 0 8' O.C.
REQ'D, SEE DETAIL
WALL
4/SD2�
NOTES:
1. FOR WALLS TALLER THAN 20' AND/OR OPENINGS GREATER THAN 18' WIDE, SEE PLAN.
2. USE 2X6 STUDS FOR ALL WALLS SUPPORTING 3 OR MORE FLOOR/ROOF LOADS,
3. KING STUDS/TRIMMERS NOTED REQUIRED AT EACH END OF WALL OPENING.
4. NAIL KING/TRIMMER PLYS TOGETHER W/ (2) 16d NAILS 0 9' O.C.
TIL
x i
w
� � x
J
�U W
x
WALL DOUBLE w o
TOP PLATE SEE PLAN
NOTE
HEADER WHERE OCCURS,
SEE PLAN
RIM.
-SEE ARCT DRAWINGS FOR HEEL HEIGHT
-IF TRUSS HEEL IS OVER 15 1/4' TALL
SEE DETAIL 2/SD2 FOR TRUSS DEPTH
BLOCKING
-PROVIDE WEB FILLER PER JOIST MFR
AT WOOD I -JOISTS FOR CUP NNUNG
ROOF SHEATHING, SEE
PLAN
STAGGER SHEATHING
JOINTS
1';WII�N:�yI�1�7i41;1
-EDGE NAILING REQUIRED AT ALL SUPPORTED AND BLOCKED SHEATHING EDGES. ALSO PROVIDE
EDGE NAILING PER DETAILS 3/SD2, 4/SD2 AND PER PLAN NOTES.
-BRACING REQUIRED PER DETAIL 4/SD2 NOT SHOWN FOR CLARITY
5 ROOF SHEATHING LAYOUT
NTS
TYPICAL DETAIL, USE WHEN APPUES
2X NAILER
(2) 16d
SIMPSON CS16X36' ON WALL DBL
TOP PLATE AT BEAM END
1/4' PLATE WEB STIFFENER EACH
SIDE OF BEAM AT END OF BEAM
BEAM, SEE PLAN
16d 0 3" O.C. EACH SIDE,
STAGGERED
1/2'0 X 5' LAG EACH SIDE OF
BEAM, INSTALL ON ANGLE AS
SHOWN
KING STUD EACH SIDE OF BEAN
WOOD POST, SEE PLAN. MATCH
POST WIDTH TO BEAM WIDTH—
UNLESS NOTED OTHERWISE.
&tEAM
POCKETIN WOOD WALL
CAL DETAIL, USE WHEN APPLIES
1:T49�:ay\I:II:[�
ROOF TRUSS/JOIS
e
SHEATHING/NAIUNG TO IAA
WALL BELOW. USE 8d NAIL
WHERE SHEAR WALL DOES
BELOI
16d NAIL
i
WALL DOUBLE
BFJ
2 TRUSS DEPTH BLOCKING
NTS
TYPICAL DETAIL, USE WHEN APPLIES
ROOF SHEATHING,
2'
ROOF TRUSS/J
2X
AT EACH END OF EACH TRUSS
IJTIECIe3
FRONT VIEW
TO MATCH SHEAR
id NAILS AT 6'
WALL DOES NOT
PLAN.
)TE:
)RE -FABRICATED SHEAR PANEL BLOCKING DESIGNED BY THE TRUSS MANUFACTURE MAY BE USED IN LIEU OF BLOCKING SHOWN HERE. BLOCKING TO BE DESIG
XR 350 PLF SHEAR LOAD AT TOP OF BLOCK. ATTACH BLOCKING TO WALL TOP PLATE W/ NAWNG NOTED OR (1) A35 CUP OR (1) LTP4 CUP AT EACH BLOCK
VERTICAL STRAP OPPOSITE OF SHEATHING (INSIDE WALL, CS16X36' MIN OR EQ.), LOWER TRIMMER TO HEADER
OR UPPER STUD WHERE OCCURS, OR INSTALL FULL HEIGHT 2X6 NAILED TO TRIMMERS AND HEADER WITH 16d
19-1.
-SIR,
OR M
MIN. LEDGER SIZE AND ATTACHEMENT TO WALL STUDS AT 16' O.C. (U.N.O., SEE PLAN)
TABLE NOTES
IN 3' GRID PATTERN AS SHOWN AND 3' O.C. IN ALL FRAMING (STUDS,
ROOF OR FLOOR UVE/SNOW LOAD (PSF)
LEDGER NAILS TO BE 16d- 0
2. SOS SCREWS TO BE SPACED 3' O.C., 1 1/2" FROM
LEDGER EDGE
3. WHERE LEDGER IS INSTALLED DIRECTLY ON WALL STUDS
(NOT ON WALL SHEATHING) 3 1/2' SCREWS MAY BE USED
4. CENTER URGER SCREWS/NAILS IN WALL STUDS
MAX TRUSS/JOIST SPAN (FT)
40-50 PSF
NAIL 0 6" O.C. STAGGERED
2X6, (3) 16d
12'
2X8, (4) 16d
16'
PO Y
26
1 3/4' X 11 7/8' LVL, (4) 1/4' SDS X 4 1/2'
2X6's 0 8' O.C.
16'-1' - 26
WALL
EXTEND HEADER THROUGH WINGWALLS, 3' X 11 1/4'
NOTES:
1. FOR WALLS TALLER THAN 20' AND/OR OPENINGS GREATER THAN 18' WIDE, SEE PLAN.
2. USE 2X6 STUDS FOR ALL WALLS SUPPORTING 3 OR MORE FLOOR/ROOF LOADS,
3. KING STUDS/TRIMMERS NOTED REQUIRED AT EACH END OF WALL OPENING.
4. NAIL KING/TRIMMER PLYS TOGETHER W/ (2) 16d NAILS 0 9' O.C.
0
6. ALL ATERALS/PROUICIS 94ALL E ISLLEO PER THE MANUFACTURERS EDIMmem
HEIGHT
MIN. HEADER SIZE
z
1p,
0
& AIDW SOUL E RATED ON TE SRUCBEE SUCH THAT THE DESIGN IDADS STATED N TIE ESOT CRE. TABLE ARE NOT EXCEL AND TIE LOAD EARD CAPALCIY OF TEMPORARY 9RNG AND BRACING 5 NOT DICOM
IF
TO 18'
i0. EACH PIECE OF STRUCTURAL UU (ALD SHEATHING) WALL E MAMM BY A COMMENT ALD MIKE ONHNUATM WAIS REGULAR BUSIES S TO ESTABLISH URR WAGES THE ORGANIZATION. GRADING AND ARAE MARROS 9WL E 9BECT TO NPROYA BY THE ENGINEER.
0
=
L�
FASTEN SHEATHING TO HEADER WITH 8d COMMON OR GALVANIZED BOX NAILS
11 NEE A SPECIFIC CONECTdt W41MODEL IS HOT NBGTEQ PRONDE A MUM GOOD 10 RT THE METERS BERG COWLCRA
c�
11 SANT LUIffA SAL E TEN RR R OR BETTER U.N.Q. SE RVI. POSTS AID TWO SHALL E DOING FR %H OR ETIFR LAWWTD VENEER IIARER SHALL E 201E 2601F UAQ WWARD STRAND LUMBER SILL E TSE 23N UAQ 131" BERMS SAL E 24F -V4 UAQ PNMIWI
IN 3' GRID PATTERN AS SHOWN AND 3' O.C. IN ALL FRAMING (STUDS,
EAS SNL E 2.GE 29001' UAQ PAIWUN POSTS SILL E 18 25Fc UN.Q
O
=
BLOCKING, AND SILLS) TYP.
17. PE-MMUFACIU ED WISES AND JOSIS SILL E BAITED PER THE MANUFACTURERS ECLEERRS BILIHLY IEl®LS SILL E ATTACHED MOM PER THE MAN FACBAERS EWFBDni
1& P E-NAMFACTU ED PRODUCTS SAN AS WOOD MUM AND F,O515 SELL ONLY E ALTERED NTIH TIE ,APPROVAL OF TE AMFACREER AND SELL E REPAIRED (NEVI EUERD) PER THE NNFEACBAEKS MMOO S
O
1& BOTs/U6 AT ALL 1000 TO EOD, 1000 TO STEEL ALD 1000 TO CONCRETE OONECOOS SHALL E ANA UBO, SE RAH.
3
FASTEN TOP PLATE TO HEADER WITH TWO ROWS OF 16d SINKER
22 ALL WOOD N CONTACT WITH MASONRY OR CONpEIE OR EXPOSED 10 NEATER WALL E PRESSURE WAIED UR% SE RAI.
M X
NAILS AT 3' D.C. TYP.
24. DO NOT CANTER SIN BELTAIAG IEAIS INTO WOOD OHM UN ESS SPECIFICALLY NOTED M RAS OR APPROVED BY THE RISIM
25. ALL NNLNM 9LL E PER RC FABLE 23O IQ1 &N.&, SE RAL ATTACH 2X4 SODS 10 WNL TO' AND BOTT. RATES WITS M IN NNS USE (3)16d NNS FOR US SRDS. 01ST -UP 2X POSIS SAIL E FATE: WED TOGETHER WIH (2) IN AT 9' D.C.
PIVRDE POSTS SUPPORTED WMAEADERS PLAK CONTINUE RM SOM R(EXING BE 10
Ua�W�AAINCLUDING
HEIGHT
MIN. 2X4 FRAMING
pPPD• • - • F�Y
SE INTERIOR SEAR NALL AT WOOD FLOOR DEIN.
28. WOOD WALLS SKI. E BALLOON FRAMED FROM FOUNDATION 10 RODE E1APT WIRE TIDOS BEAK WNL STUDS PER ROM JOST AT WOOD WALL DELL
o~. �,N O • �F
,
7/16' MIN. THICKNESS WOOD STRUCTURAL PANEL SHEATHING ONE SIDE
30. EREPT NEE HIED OTIERSE RUM METAL FRAMING CONNECTOR (HANGER. CUP, CN, ETC) AT ALL RWD 10 CONCRETE, WOU) TO SIER AND RIM 10 RIM C(IMM MS
x
1
32 Rum 5' X 3 1/2' X 5)16' STEEL NSE TO SUPPORT Gin vE EONS ATOM NUE RR (2) 7/N" X 4' LAGS AT 16' QC, USE (1) H' 2 4 W THEN ID BELT AT 15' QC FOR AOMFENT TO CONCRETE M MASONRY.
33. WOOD NNFRS ON SM SAYS SAL E 2X VIII )E' CHEADED DED ST DS AT 32' O.C. U A SE RIM HANDS M D STEEL FRA E BEANS E SHALL 3X W' RAIL AT WTH SIDS 24' O.C.UAQE RAL S
7Z v
34 X' EB STIFFENERS SHALL BE PROVIDED EACH SIE OF STEM ENS AT ALL BEARD POUTS.
N
STEEL )
DIAM. LIZ SSE AT
MR �9 N�SRN
LLES
� GUT
FOR A PANEL SPLICE (IF NEEDED), PANEL EDGES SHALL BE BLOCKED AND
OEM STEEL U(F USDSHALL BE 5O0D PMOUE
37. ALL WON SHALL BE DOE PER NSC AND AN SELWO19M WODE S SAIL BE AIS TEAIFED,
OCCUR WITHIN 24' OF MID -HEIGHT. ONE ROW OF TYP. SHEATHING - TO -
S. DWI WIND 10 E 1 1/01' W. LL0. SE RAR
40. YDN FNSIEEEI6 uAeutt S UY1FD 70 RYE TIES TIE FEE ceDE,0TED FM SANDS 7HLE WXIRACIOR(5) MUST EAC, IEDOSTAND AJD ACOPr ALL TON RSERWO oDCISIIs APRICABE 70 MS ESM PNM 70 MI01C 7HLE O.9M. BY uS0 CUTS ®01, TIE oNEn/CM1RACIM
FRAMING NAILING IS REWIRED. IF 2X4 BLOCKING IS USED, THE 2X4'S MUST BE
AL1OPI5 TIE DE901, /SSIIED LOADS AD OURS M uAERY STAWn
41. PR6OUC 9EOA IISECIIOS ECLIED M 7011GS MIMIC AT 7BISSS OWR 5-0' TALL LINES WNVD R BIEDIIG CNN.
NAILED TOGETHER WITH (3) 16D SINKERS
STEEL BEAML
DETAILS MAY NOT BE APPLICABLE TO YOUR
PLANS
ED
SIMPSON STHD14(RJ) OR HOI15 W/ SB5/8X24
LOCATIONS
(1) 5/8'0 X 12' OR (2) 1/2'0 X 12' J -BOLTS OR (1) 3/4' X 10' TITEN HD
BOLT W/ 3' X 3' X 1/4' WASHER
°
a
° a °' ° , • ' d ° .' y y 5
0191E NAILING AT POST PLYS NOT
SHOWN FOR CLARITY.
PORTAL FRAME 1ST STORY
11
NTS
USE ONLY IF CALLED OUT ON PLANS
19-1.
-SIR,
OR M
MIN. LEDGER SIZE AND ATTACHEMENT TO WALL STUDS AT 16' O.C. (U.N.O., SEE PLAN)
TABLE NOTES
IN 3' GRID PATTERN AS SHOWN AND 3' O.C. IN ALL FRAMING (STUDS,
ROOF OR FLOOR UVE/SNOW LOAD (PSF)
LEDGER NAILS TO BE 16d- 0
2. SOS SCREWS TO BE SPACED 3' O.C., 1 1/2" FROM
LEDGER EDGE
3. WHERE LEDGER IS INSTALLED DIRECTLY ON WALL STUDS
(NOT ON WALL SHEATHING) 3 1/2' SCREWS MAY BE USED
4. CENTER URGER SCREWS/NAILS IN WALL STUDS
MAX TRUSS/JOIST SPAN (FT)
40-50 PSF
S 6
2X6, (3) 16d
12'
2X8, (4) 16d
16'
2X10, (3) 1/4' SOS X 4 1/2'
26
1 3/4' X 11 7/8' LVL, (4) 1/4' SDS X 4 1/2'
W/ MIN. 2 NAILS PER
HEIGHT FOR POSTS S 9'
-NLY SPACED FOR POSTS
CANTILEVERED 2X4 FLAT 0
24' O.C. REQ'D WHEN ROOF
SNOW LOAD IS 2 40 PSF,
SEE PLAN. EXTEND BACK
SPAN ONE BAY (24' MIN.)
AND NAIL TO 2X BLOCKING
U.N.O., SEE PLAN. GABLE
TRUSS TO BE DESIGNED
WITH OVER SIZED TOP
CHORD TO ALLOW FOR
NOTCHING
SHEATH GABLE TO MATCH
WALL SHEATHINGMAILING
BELOW, SEE PLAN
2X BLOCK AT
24' O.C.
EDGE
NAILING
END TRUSS
EDGE NAIUNG-J
16d TOE NAIL 0 6'
O.C.
3 ROOF TRUSS AT WOOD WALL
NTS
TYPICAL DETAIL, USE WHEN APPLIES
INTER LEVEL STRAPS WHERE
REWIRED, SEE PLAN
SIMPSON CS16X32' STRAP,
U.N.O., SEE PLAN. CENTER ON
BEAM END
SOLID BLOCKING EACH CORNER OF
OPENING. PROVIDE 2X BLOCKING
FOR 1r WIDE STRAPS, AND 4X
BLOCKING FOR STRAPS GREATER
THAN 1 1/2' WIDE
SHEATHING EDGE
W/ SOLID BLOCKING
ONE CONTINUOUS OSB PIECE CUT
AROUND SHEARWALL OPENING.
PLACE EDGE AS CLOSE TO MIDDLE -
AS POSSIBLE
FOUNDATION HOLDOWN WHERE
REWIRED, SEE PLAN. ALIGN W/
STRAP ABOVE (WHERE OCCURS)
KING
STUDS/POST,
SEE PLAN
ROOF TRUSSES,
SEE PLAN
2X6 BRACE 0
8' O.C.
AWGN 2X ON TRUSS
BOTT. CHORDS W/ BRACE
NOTE
-FOR ITEMS NOT NOTED
SEE DETAIL 1/SD2
HEADER, SEE PLAN. IF FRAMED HIGH,
NAIL STRAP TO BLOCKING DIRECTLY
ABOVE OPENING
SHEAR WALL
OPENING(S)
WALL SHEATHING SHOWN ONE SIDE FOR CLARITY. SHEATHMAIL ABOVE AND E
OPENING PER SHEAR WALL REQUIREMENTS OF WALLS EACH SIDE OF OPENING
ONLY IF CALLED OUT ON PLANS
WALL DBL TOP PLATE, SEE FRAMING NOTES,
HDTT. PLY NAY BREAK AT HEADER AS
SHOWN
USE (2) LCE/PCZ/BC POST CAP WHEN HEADER
LENGTH EXCEEDS 6'-0'
BEAM/HEADER, SEE PLAN
TRIMMERS POST, SEE PLAN
7/16" OSB SHEATHING
2 x STUDS
2 x PLATE W/ 16d 0 6" O.C.
3/4" T & G OSB SHEATHING
EDGE AT EA. TRUSS
NAILING
MULTIPLE TRIMMERS
RIBBON BOARD
DOUBLE TOP PLATE
BELOW
Ok W h ear .
4 FLOOR TRUSS AT WOOD WALLv :�co
NTS
TYPICAL DETAIL, USE WHEN APPLIES - oC
RETROFIT 16 VERTICAL STRAP OPPOSITE OF SHEATHING (INSIDE WALL, CS16X36" WN"OR EQ.), LOWER TRIMMER TO HEADER
D OR UPPER STUD WHERE OCCURS, OR INSTALL FULL HEIGHT 2X6 NAILED TO TRIMMERS AND HEADER WITH 16d
NAIL 0 6' O.C. STAGGERED
P06
WALLEXTEND HEADER THROUGH WINGWALLS, 3 X 11 1/4'
HFIr.HT �� MIN. HEADER SIZE
r I I FJ) \ III FASTEN SHEATHING TO HEADER WITH 8d COMMON OR GALVANIZED BOX NAILS
iv I I Rl fR FOR A PANEL SPLICE (IF NEEDED), PANEL EDGES SHALL BE BLOCKED AND
OCCUR WITHIN 24' OF MID -HEIGHT. ONE ROW OF TYP. SHEATHING - TO -
FRAMING NAIUNG IS REQUIRED. IF 2X4 BLOCKING IS USED, THE 2X4'S MUST BE
NAILED TOGETHER WITH (3) 16D SINKERS
SIMPSON STHD14 OR HDU5
(2) 1/2'0 X 12' J -BOLTS
9 PORTAL FRAME 1ST ST(
NTS
USE ONLY IF CALLED OUT ON PLANS
BEARING WALL CONSTRUCTION TABLE
IN 3' GRID PATTERN AS SHOWN AND 3' O.C. IN ALL FRAMING (STUDS,
NTS
=
V-10'
BLOCKING, AND SILLS) TYP.
2X4's 0 16' D.C.'
J
3
2X6's 0 24' O.C. U.N.O., SEE PLAN
FASTEN TOP PLATE TO HEADER WITH TWO ROWS OF 16d SINKER
GENOM STRUCTURAL NOTES
1 SIN-ONIIRACINIS) SHALL FOULOF ALL PEpI1f1Q115 STATED IN PEN MMMENIB RO ALL APPUCl9E NN11N6 COMES RO STANDARDS AND SHALL E QINim TO F41FON AND E641N71® N PERFORMING 11E FDIN DECLARED FOR 11E PROJECT.
2X6's 0 12' O.C.
M
X NAILS AT 3' O.C. TYP.
2X6's 0 8' O.C.
16'-1' - 26
HEIGHT
MIN. 2X4 FRAMING
NOTES:
1. FOR WALLS TALLER THAN 20' AND/OR OPENINGS GREATER THAN 18' WIDE, SEE PLAN.
2. USE 2X6 STUDS FOR ALL WALLS SUPPORTING 3 OR MORE FLOOR/ROOF LOADS,
3. KING STUDS/TRIMMERS NOTED REQUIRED AT EACH END OF WALL OPENING.
4. NAIL KING/TRIMMER PLYS TOGETHER W/ (2) 16d NAILS 0 9' O.C.
0
6. ALL ATERALS/PROUICIS 94ALL E ISLLEO PER THE MANUFACTURERS EDIMmem
7/16' MIN. THICKNESS WOOD STRUCTURAL PANEL SHEATHING ONE SIDE
7. SPECIFIC NOTES AND DETAILS SRL GOVERN OAER TY ICA. NOTES AND STNS.
z
1p,
0
& AIDW SOUL E RATED ON TE SRUCBEE SUCH THAT THE DESIGN IDADS STATED N TIE ESOT CRE. TABLE ARE NOT EXCEL AND TIE LOAD EARD CAPALCIY OF TEMPORARY 9RNG AND BRACING 5 NOT DICOM
i0. EACH PIECE OF STRUCTURAL UU (ALD SHEATHING) WALL E MAMM BY A COMMENT ALD MIKE ONHNUATM WAIS REGULAR BUSIES S TO ESTABLISH URR WAGES THE ORGANIZATION. GRADING AND ARAE MARROS 9WL E 9BECT TO NPROYA BY THE ENGINEER.
0
1.Tf S13NG AND SLWACNG GE ALL U1Rm CULL E ILL SIZED AND SLUACED ON ALL 4 SIDES URO., SE RAN. ALL UMBER SHALL E FEE GE HEART CHER S'UCES S6NL NOTE FEARED DU" WIDE TUNED OR AR'ROO BYTE UMM
iv I I Rl fR FOR A PANEL SPLICE (IF NEEDED), PANEL EDGES SHALL BE BLOCKED AND
OCCUR WITHIN 24' OF MID -HEIGHT. ONE ROW OF TYP. SHEATHING - TO -
FRAMING NAIUNG IS REQUIRED. IF 2X4 BLOCKING IS USED, THE 2X4'S MUST BE
NAILED TOGETHER WITH (3) 16D SINKERS
SIMPSON STHD14 OR HDU5
(2) 1/2'0 X 12' J -BOLTS
9 PORTAL FRAME 1ST ST(
NTS
USE ONLY IF CALLED OUT ON PLANS
BEARING WALL CONSTRUCTION TABLE
WALL HEIGHT
NTS
STUD FRAMING
V-10'
TYPICAL DETAIL, USE WHEN APPLIES
2X4's 0 16' D.C.'
6-12'
2X6's 0 24' O.C. U.N.O., SEE PLAN
12'-1' - 14'
GENOM STRUCTURAL NOTES
1 SIN-ONIIRACINIS) SHALL FOULOF ALL PEpI1f1Q115 STATED IN PEN MMMENIB RO ALL APPUCl9E NN11N6 COMES RO STANDARDS AND SHALL E QINim TO F41FON AND E641N71® N PERFORMING 11E FDIN DECLARED FOR 11E PROJECT.
2X6's 0 12' O.C.
14-1' '- 16'
2X6's 0 8' O.C.
16'-1' - 26
A THE CONTRACTOR SHALL E RESUME FUR NEVIS AID M1:NM5 GE COSIRUCBM ADD KU RUM SUWB AND DRACNG AS EM O) TO PRONDE SMICWAL SDEITY AT ALL 11E5 DURA COISIffir IL
2X6 LSL 0 8' O.C.
NOTES:
1. FOR WALLS TALLER THAN 20' AND/OR OPENINGS GREATER THAN 18' WIDE, SEE PLAN.
2. USE 2X6 STUDS FOR ALL WALLS SUPPORTING 3 OR MORE FLOOR/ROOF LOADS,
3. KING STUDS/TRIMMERS NOTED REQUIRED AT EACH END OF WALL OPENING.
4. NAIL KING/TRIMMER PLYS TOGETHER W/ (2) 16d NAILS 0 9' O.C.
NTS
I i
NTS
TYPICAL DETAIL, USE WHEN APPLIES
TYPICAL DETAIL, USE WHEN APPLIES
U
GENOM STRUCTURAL NOTES
1 SIN-ONIIRACINIS) SHALL FOULOF ALL PEpI1f1Q115 STATED IN PEN MMMENIB RO ALL APPUCl9E NN11N6 COMES RO STANDARDS AND SHALL E QINim TO F41FON AND E641N71® N PERFORMING 11E FDIN DECLARED FOR 11E PROJECT.
Q
2 CONTRACTOR SLL FOLLOW ALL EWi]EX15 STATED N ALL OBER OUCNETS APPLICABLE TO TIE PRU17.. F NY OSOEPNDES OCCUR BETWEEN THE STRUCTURAL DOCUMENTS ANO OTHER PROW COCUE1115, NM VAN ENGINEERING GE TIE DISCREPANCY POOR 10 CONSTRUCTION.
1 CONTRACTOR SHALL ADNY ALL ENSING CONDITIONS, DIMENSIONS, ELEVATIONS, ETC, PBM 1O WNSRUCIDIL
A THE CONTRACTOR SHALL E RESUME FUR NEVIS AID M1:NM5 GE COSIRUCBM ADD KU RUM SUWB AND DRACNG AS EM O) TO PRONDE SMICWAL SDEITY AT ALL 11E5 DURA COISIffir IL
U)
& IT 5 THE RESPONSIBILITY OF THE CONTRACTOR 10 RNNE ADEOUAIE OO BOSON PPOIECBON OF ALL SRUCWAL ORSRS
0
6. ALL ATERALS/PROUICIS 94ALL E ISLLEO PER THE MANUFACTURERS EDIMmem
W
7. SPECIFIC NOTES AND DETAILS SRL GOVERN OAER TY ICA. NOTES AND STNS.
z
E MCA HOLES ANO ECUS APPLY MERE SIEOFIC HOMES AND DETAILS NE NO NUGTFA
0
& AIDW SOUL E RATED ON TE SRUCBEE SUCH THAT THE DESIGN IDADS STATED N TIE ESOT CRE. TABLE ARE NOT EXCEL AND TIE LOAD EARD CAPALCIY OF TEMPORARY 9RNG AND BRACING 5 NOT DICOM
i0. EACH PIECE OF STRUCTURAL UU (ALD SHEATHING) WALL E MAMM BY A COMMENT ALD MIKE ONHNUATM WAIS REGULAR BUSIES S TO ESTABLISH URR WAGES THE ORGANIZATION. GRADING AND ARAE MARROS 9WL E 9BECT TO NPROYA BY THE ENGINEER.
0
1.Tf S13NG AND SLWACNG GE ALL U1Rm CULL E ILL SIZED AND SLUACED ON ALL 4 SIDES URO., SE RAN. ALL UMBER SHALL E FEE GE HEART CHER S'UCES S6NL NOTE FEARED DU" WIDE TUNED OR AR'ROO BYTE UMM
L�
E
12 ALL FROM HARDWARE SHALL E SIMPSON SROMG IE OR APPROVED AIA URQ AND SHALL N D BY THE RACAER DAG, SRAL
L STALIID PER THE MANUFACTURERSRCLAREEUM USE THE MAgWN NIU@R AND SID: OF FASTENERS SPECIFIED MAN
11 NEE A SPECIFIC CONECTdt W41MODEL IS HOT NBGTEQ PRONDE A MUM GOOD 10 RT THE METERS BERG COWLCRA
0.3
11 SANT LUIffA SAL E TEN RR R OR BETTER U.N.Q. SE RVI. POSTS AID TWO SHALL E DOING FR %H OR ETIFR LAWWTD VENEER IIARER SHALL E 201E 2601F UAQ WWARD STRAND LUMBER SILL E TSE 23N UAQ 131" BERMS SAL E 24F -V4 UAQ PNMIWI
EAS SNL E 2.GE 29001' UAQ PAIWUN POSTS SILL E 18 25Fc UN.Q
O
1& INSTALL SOD RILL MERIT 01,00410 BETWEEN ITAMES/,0515 a ALL KONG KIM LLQ SE RRL
1& MEET RILOS SHALL E PROWED M RS OF WOOD I-10515 PER TILE ,OST ALAN FACAER'S EOIEa]EX15 AND PER THE MOIRE MAIRRACTU ER'S EALAEE EFTS VIER HNDNNE ATUCES 10 THE I-gST.
17. PE-MMUFACIU ED WISES AND JOSIS SILL E BAITED PER THE MANUFACTURERS ECLEERRS BILIHLY IEl®LS SILL E ATTACHED MOM PER THE MAN FACBAERS EWFBDni
1& P E-NAMFACTU ED PRODUCTS SAN AS WOOD MUM AND F,O515 SELL ONLY E ALTERED NTIH TIE ,APPROVAL OF TE AMFACREER AND SELL E REPAIRED (NEVI EUERD) PER THE NNFEACBAEKS MMOO S
O
1& BOTs/U6 AT ALL 1000 TO EOD, 1000 TO STEEL ALD 1000 TO CONCRETE OONECOOS SHALL E ANA UBO, SE RAH.
20. BOTS N WOOD SILL E MT40 N HOFS 1/16' N DIAMETER URGER THAN THE FELT DIAMETER AND SOUL HAVE WASHERS EDERI HFADAIIUT AND WOOD WAR
21. TAE SHALL E NSTALIED N FREES P E-pE1ID AT SNE ONEIER AS LN SILT FOR UNTREATED 91AFT PORTION OF FREE AND 4011-7O11 OF SHAFT DIAMETER FOR TREADED PORTIO.
22 ALL WOOD N CONTACT WITH MASONRY OR CONpEIE OR EXPOSED 10 NEATER WALL E PRESSURE WAIED UR% SE RAI.
21 ALL FASTENERS AND CONNECTORS (NNS, SCHEN& BOL75, NUTS, WASHERS, EIC.) N CONTACT WIH PMERVARIE TIEATID AND FEE RETARDANT TEEMED NUM SAIL MEET TIE EO11@IENR OF SC 230410.5.
24. DO NOT CANTER SIN BELTAIAG IEAIS INTO WOOD OHM UN ESS SPECIFICALLY NOTED M RAS OR APPROVED BY THE RISIM
25. ALL NNLNM 9LL E PER RC FABLE 23O IQ1 &N.&, SE RAL ATTACH 2X4 SODS 10 WNL TO' AND BOTT. RATES WITS M IN NNS USE (3)16d NNS FOR US SRDS. 01ST -UP 2X POSIS SAIL E FATE: WED TOGETHER WIH (2) IN AT 9' D.C.
PIVRDE POSTS SUPPORTED WMAEADERS PLAK CONTINUE RM SOM R(EXING BE 10
Ua�W�AAINCLUDING
LIC
Q•
ffiEN INLS9
27 wDE US5/OaPNLCO NNSENDING AUDIW//MM LIMWILL INCPUTE OR RUM FULL HEIGHT s9166- O.C. Pumacam TO WILL AND NG MOO ODER WNL PROW DE ,UST/MSS UNION OE QED SWA Wi
pPPD• • - • F�Y
SE INTERIOR SEAR NALL AT WOOD FLOOR DEIN.
28. WOOD WALLS SKI. E BALLOON FRAMED FROM FOUNDATION 10 RODE E1APT WIRE TIDOS BEAK WNL STUDS PER ROM JOST AT WOOD WALL DELL
o~. �,N O • �F
A 9FAM SILL E POW M W OEM AND NAMED PER RWUNUM OF SEAR WNL VIRE
30. EREPT NEE HIED OTIERSE RUM METAL FRAMING CONNECTOR (HANGER. CUP, CN, ETC) AT ALL RWD 10 CONCRETE, WOU) TO SIER AND RIM 10 RIM C(IMM MS
31. ATTACH BBC( YDEFRS TO FRAMING PER RC RN1&
;
32 Rum 5' X 3 1/2' X 5)16' STEEL NSE TO SUPPORT Gin vE EONS ATOM NUE RR (2) 7/N" X 4' LAGS AT 16' QC, USE (1) H' 2 4 W THEN ID BELT AT 15' QC FOR AOMFENT TO CONCRETE M MASONRY.
33. WOOD NNFRS ON SM SAYS SAL E 2X VIII )E' CHEADED DED ST DS AT 32' O.C. U A SE RIM HANDS M D STEEL FRA E BEANS E SHALL 3X W' RAIL AT WTH SIDS 24' O.C.UAQE RAL S
'. 3/9/2021 '
34 X' EB STIFFENERS SHALL BE PROVIDED EACH SIE OF STEM ENS AT ALL BEARD POUTS.
�
�FSSIpNAL
STEEL )
DIAM. LIZ SSE AT
MR �9 N�SRN
LLES
� GUT
OEM STEEL U(F USDSHALL BE 5O0D PMOUE
37. ALL WON SHALL BE DOE PER NSC AND AN SELWO19M WODE S SAIL BE AIS TEAIFED,
S IND YAMM. 911a DEAD ILS Mfl
S. DWI WIND 10 E 1 1/01' W. LL0. SE RAR
40. YDN FNSIEEEI6 uAeutt S UY1FD 70 RYE TIES TIE FEE ceDE,0TED FM SANDS 7HLE WXIRACIOR(5) MUST EAC, IEDOSTAND AJD ACOPr ALL TON RSERWO oDCISIIs APRICABE 70 MS ESM PNM 70 MI01C 7HLE O.9M. BY uS0 CUTS ®01, TIE oNEn/CM1RACIM
AL1OPI5 TIE DE901, /SSIIED LOADS AD OURS M uAERY STAWn
41. PR6OUC 9EOA IISECIIOS ECLIED M 7011GS MIMIC AT 7BISSS OWR 5-0' TALL LINES WNVD R BIEDIIG CNN.
�LL
�
DETAILS MAY NOT BE APPLICABLE TO YOUR
PLANS
IF MARKED TYPICAL, USE AT ALL APPLICABLE
LOCATIONS
Na
a
m
Q N n
o
v - o
a m l!1
m m
L �
C T
N F
-Lxm
a --
C3 = C
a o
— rnm
J o
� C3
u m
�m
`m
cr
C
■
0i
V'
Lu
0
W
U
Q
U)
(f)
0
W
Of
O
z
o
0
LLJ
0
L�
�z
0.3
CD
O
Q
LLI
O
Q
SDI
1* � � i City of Wheat Ridge
Res. Master Plans PERMIT - 202001070
PERMIT NO: 202001070 ISSUED: 07/15/2020
JOB ADDRESS: YARROW GARDENS EXPIRES: 07/15/2021
JOB DESCRIPTION: Yarrow Gardens -Master P2E-New single family -3 Story -2 car attached garage
- 2 Bdrm-2 Full Bath+2 1/2 bath- 2142 sq ft total( includes unfinished)
***REVISION***Revised Master Set Structural Plans for Do More TH's-Plans
P3E P1 and P2E- Structural Engineer Change from EV Studio to York
Engineering- All Bldgs on Block 3
*** CONTACTS ***
OWNER (303)766-7772 TH YARROW GARDENS LLC
*** PARCEL INFO ***
ZONE CODE: MU -N / Mixed Use Neighborh USE: UA / Unassigned
SUBDIVISION CODE: 2 / Multi -Family Vacant BLOCK/LOT#: /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 191,250.00
FEES
Total Valuation 0.00
Plan Review Fee 11121.54
** TOTAL ** 11121.54
*** COMMENTS ***
*** CONDITIONS ***
Approved per Case No. WSP-20-03
I, by my signature, do hereby attest that the work to, be performed shall comply with all accompanying approved plans and specifications,
applicae building codes, and all applicable municpal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this�permrt. I further attest that I am leg ally authorized to include alI entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180, days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and��procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all requ�ired
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any
�pplicabje code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
07/15/2020
Signature of Chief Building Official Date