Loading...
HomeMy WebLinkAbout7018 W. 38th Avenue� ► 44" City of Wheat Ridge '/� Commercial Roofing PERMIT - 202100418 PERMIT NO: 202100418 ISSUED : JOB ADDRESS: 7018 W 38th Ave EXPIRES: JOB DESCRIPTION: Reroof with Mod Bit rolled roofing, 2/12 pitch, 18 squares & Tamko Heritage asphalt shingles, 4/12 & 8/12 pitch, 25 squares; 48 squares total *** CONTACTS *** OWNER (303)564-0024 MOLLY MARIE PROPERTIES LLC SUB (720)327-1321 JIM RAMIREZ 150112 RC ROOFING DENVER *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 521 / BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 29,000.00 FEES Total Valuation 0.00 Use Tax 609.00 Permit Fee 488.05 ** TOTAL ** 11097.05 *** COMMENTS *** *** CONDITIONS *** COMMERCIAL FLAT ROOFS: In order to pass a final inspection on commercial elastomeric or similar type roofing, a WARRANTY LETTER from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. LADDER MUST BE SET FOR ALL ROOF INSPECTIONS: A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. ALL PITCHED ROOFS REQUIRE A MIDROOF INSPECTION REGARDLESS OF PITCH. MIDROOF & SHEATHING: Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and Mid -roof inspections may be called in at the same time, 100 percent of the sheathing must be complete and 25-75 percent of the midroof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. REGARDING ROOF VENTILATION: Roof ventilation shall comply with Building Division Policy BD -18-001 for Balanced Ventilation Systems, or manufacturer installation instructions, whichever is more stringent. FOR ROOF PITCH 6/12 AND OVER: Midroof & Final Roof inspections for ROOFS with 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. � ► 44" City of Wheat Ridge '/� Commercial Roofing PERMIT - 202100418 PERMIT NO: 202100418 ISSUED : JOB ADDRESS: 7018 W 38th Ave EXPIRES: JOB DESCRIPTION: Reroof with Mod Bit rolled roofing, 2/12 pitch, 18 squares & Tamko Heritage asphalt shingles, 4/12 & 8/12 pitch, 25 squares; 48 squares total I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this�permrt. I further attest that I am leg ally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180, days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and��procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all requ�ired inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any �pplicabje code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. From: no-reolv(alci.wheatridae.m. us To: CommDev Farm is Subject: Online Form Submittal: Roofing permit Application Date: Friday, May 28, 20217:07:31 AM Roofing Permit Application THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this property Commercial Commercial or Residential? PROPERTY INFORMATION Property Address 7018 W. 38th Ave Property Owner Name Property Owner Phone Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email Address Molly Marie Properties 191819N7 E,981 z"! nathan@compassmechanical.net Do you have a signed Yes contract to reroof this property? CONTRACTOR INFORMATION Contractor Business RC Roofing Denver Name Contractor's License Number Contractor Phone Number (enter WITH dashes, eg 303-123- 4567) Contractor Email Address 150112 r`z�acj•�dKj•� opmjram@gmail.com Retype Contractor opmjram@gmail.com Email Address Attach City of Wheat Safari app z Ridge Electronic Payment Form - "DO NOT ATTACH A PICTURE OF A CREDIT CARD" DESCRIPTION OF WORK TOTAL SQUARES of 43 the entire scope of wo rk: Project Value (contract 29,000 value or cost of ALL materials and labor) Are you re -decking the No roof? Is the permit for a flat Flat roof (less than 2:12 pitch), Pitched roof (2:12 pitch or roof, pitched roof, or greater) both? (check all that apply) What is the pitch of the 2/12 FLAT roof? How many squares are 18 part of the FLAT roof? Describe the roofing Modified Bitumen material for the FLAT roof: Type of material for the Rolled FLAT roof: What is the specific 4/12 and 8/12 pitch of the PITCHED roof? How many squares are 25 part of the PITCHED roof? Describe the roofing 30 year Tamko Heritage materials for the PITCHED roof Type of material for the Asphalt PITCHED roof: Provide any additional N/A detail here on the description of work. (Is this for a house or garage? Etc) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Applying for Jim Ramirez Permit Email not displaying correctly? View it in your browser.