HomeMy WebLinkAbout02-02-23- 6A�
City of
WheatRidge
PLANNING COMMISSION
AGENDA
February 2, 2023
Notice is hereby given of a Public Meeting to be held before the City of Wheat Ridge Planning
Commission on February 2, 2023 at 6:30 p.m.
This meeting will be conducted as a virtual meeting and in person at 7500 W. 29' Avenue,
Municipal Building, if allowed to meet on that date per COVID-19 restrictions. Members of
the Planning Commission and City staff will be physically present at the Municipal Building
for this meeting if allowed by health guidelines. The public may participate in these ways:
1. Provide comment in advance at www.wheatridgespeaks.org (comment by noon on February 1)
2. Virtually attend and participate in the meeting through a device or phone:
• Click hereto join and provide public comment (create a Zoom account to join)
• Or call 1-669-900-6833 with Meeting ID 859 8570 6155 and Passcode: 268801
3. View the meeting live or later at www.wheatridgespeaks.org, Channel 8, or YouTube Live at
htti)s://www.ci.wheatridge.co.us/view
4. Attend in person (meeting will be in -person unless prohibited by COVID-19 restrictions).
1. CALL THE MEETING TO ORDER
2. ROLL CALL OF MEMBERS
3. PLEDGE OF ALLEGIANCE
4. APPROVE THE ORDER OF THE AGENDA
5. APPROVAL OF MINUTES — December 1, 2022
6. PUBLIC FORUM (This is the time for any person to speak on any subject not
appearing on the agenda. Public comments may be limited to 3 minutes.)
(continued on neat page)
Planning Commission Agenda — February 2, 2023
PUBLIC HEARING *
Page 2
A. Case No. WZ-22-06: An application filed by Davis Partnership Architects on
behalf of Intermountain Healthcare for approval of a Specific Development Plan
(SDP) to facilitate construction of a 137,000 sq. ft., 5-story Medical Office
Building on a property zoned Planned Mixed -Use Development (PMUD) and
located at 12905 West 40a' Avenue.
B. Case No. ZOA-23-02: An ordinance amending Section 26-803.G of the Wheat
Ridge Code of Laws, to adopt the flood hazard delineation maps for Clear Creek
dated September 2, 2022 as a local flood hazard area.
C. Case No. ZOA-23-01: An ordinance amending Section 26-115.E of the Wheat
Ridge Code of Laws, concerning request for interpretation by the Board of
Adjustment.
8. NEW BUSINESS
A. Update on the Affordable Housing Strategy and Action Plan
B. Upcoming Dates
C. Project and Development Updates
9. OLD BUSINESS
10. ADJOURNMENT
Public comment is welcome during any public hearing item. The standard procedure for a
public hearing is as follows:
a. Staff presentation
b. Applicant presentation — if applicable
c. Public comment —time may be limited at the discretion of the Chair, often to 3 minutes
d. Staff/applicant response
e. Close public hearing
f. Commission discussion and decision
Individuals with disabilities are encouraged to participate in all public meetings sponsored by
the City of Wheat Ridge. Call Amanda Harrison, Public Information Officer at 303-235-2877
at least one week in advance of a meeting if you are interested in participating and need
inclusion assistance.
1.
2.
3.
4.
I��/ City of
WheatMidge
PLANNING COMMISSION
Minutes of Meeting
December 1, 2022
CALL THE MEETING TO ORDER
The meeting was called to order by Chair ANTOL at 6:32 p.m. This meeting was held in
person and virtually, using Zoom video -teleconferencing technology. As duly announced
and publicly noticed, the City previously approved this meeting format in order to
continue with normal business amid the COVID-19 pandemic and the related public
emergency orders promulgated by the State of Colorado and the Wheat Ridge City
Council. Before calling the meeting to order, the Chair stated the rules and procedures
necessitated by this virtual meeting format.
ROLL CALL OF MEMBERS
Commission Members Present:
Commission Members Absent:
Staff Members Present:
PLEDGE OF ALLEGIANCE
Melissa Antol
Kristine Disney
Will Kerns (arrived at 6:36 p.m.)
Daniel Larson
Janet Leo
Jonathan Schelke
Julianne Stern
Jerry DiTullio
Stephanie Stevens, Senior Planner
Alayna Olivas-Loera, Planner I
Tammy Odean, Recording Secretary
APPROVE ORDER OF THE AGENDA
It was moved by Commissioner DISNEY and seconded by Commissioner LEO to
approve the order of the agenda. Motion carried 6-0.
5. APPROVAL OF MINUTES —November 3, 2022
Planning Commission Minutes
December 1, 2022
-I—
It was moved by Commissioner LARSON and seconded by Commissioner STERN
to approve the minutes of November 3, 2022, as written. Motion carried 4-0-3 with
Commissioner DISNEY, KERNS and LEO abstaining.
6. PUBLIC FORUM (This is the time for any person to speak on any subject not appearing
on the agenda.)
No one wished to speak at this time.
PUBLIC HEARING
A. Case No. MS-22-05: an application filed by Frank Zwolinski for approval of a
minor subdivision to replat 5 lots into 2 lots on property zoned Residential -Three
(R-3) and located at 2812 and 2838 Depew Street.
Ms. Olivas-Loera gave a short presentation regarding the minor subdivision and
the application. She entered into the record the contents of the case file, packet
materials, the zoning ordinance, and the contents of the digital presentation. She
stated the public notice and posting requirements have been met, therefore the
Planning Commission has jurisdiction to hear this case.
Commissioner STERN inquired if the new lot lines will run through the existing
structures.
Ms. Olivas-Loera explained that the existing structures will be demolished for new
homes and Ms. Stevens added the new structures will follow setbacks.
Commissioner LARSON asked when the property to the north was replatted.
Ms. Olivas-Loera said the property was replatted around 2019.
Commissioner LARSON also inquired if there will be one owner for the 5 lots.
Ms. Olivas-Loera confirmed there will only be one owner.
In response to a question from Commissioner LARSON regarding the rear alley,
Ms. Stevens described the alley as prescriptive right-of-way (ROW) in an easement
that will be formally dedicated as ROW by this plat, like the property to the north.
Commissioner Larson then asked what public improvements will be done to the
property.
Ms. Olivas-Loera explained the applicant will not have to install any improvements
but will be paying fees for sidewalks, curb and gutter. Ms. Stevens added the
current sidewalk is substandard at 2 feet so the fees in -lieu will get the sidewalk to
5 feet.
Planning Commission Minutes -2—
December 1, 2022
Commissioner SCHELKE commented that he liked the historic plat in the report.
Public Comment
No one wished to speak at this time.
Commissioner LARSON said this proposal seems appropriate for this property.
It was moved by Commissioner KERNS and seconded by Commissioner
DISNEY to APPROVE Case No. MS-22-05, a request for approval of a minor
subdivision to replat five lots into two lots on property zoned Residential -
Three (R-3) and located at 2812 and 2838 Depew Street, for the following
reasons:
1. All agencies can provide services to the property with improvements
installed at the developer's expense.
2. The requirements of Article IV of the zoning and development code
have been met.
With the following conditions:
Fees in lieu of public improvements shall be provided at time of plat
recordation.
8. OLD BUSINESS
9. NEW BUSINESS
A. 441' Avenue Subarea Plan Recommendations
Ms. Stevens gave a brief introduction to the 441' Avenue Subarea Plan and
introduced Mark De La Torre the Planning Consultant.
Mark De La Torre, MIG Planning Consultant
4345 Brentwood, Wheat Ridge
Mr. De La Torre gave a presentation explaining the 44"' Avenue Subarea Plan
recommendations.
Commissioners DISNEY and STERN were happy to see there are plans to spruce
up the truck stop/travel center area and also wondered what the impact of the truck
stop/travel center has on the City's sales tax base.
Planning Commission Minutes - 3 —
December 1, 2022
Mr. De La Torre confirmed the truck stop/travel center is a revenue generator in
the City which is important, and Ms. Stevens added there will be a separate
economic analysis done and there will be communication with property owners
about their long-term plans.
Commissioner STERN also commented on the mixed -use node, and she likes the
idea of 2 major corridors and would like to see a push on urban design standards to
give a more walkable pedestrian -oriented feel and is also excited about the family -
focused activity center at Anderson Park
Commissioner KERNS mentioned he is in -favor of less impervious area and the
need for more trees on the 441h Avenue corridor. He added he likes the streetscape
design with the wide sidewalk on the south side of 441h Avenue and the buffer zone
on the north edge.
In response to multiple questions regarding bike lanes on 40' Avenue, Ms. Stevens
and Mr. De La Torre clarified that the southern sidewalk, because of its width, is
intended to be a multi-use/bike path and there will be connectivity to the Clear
Creek Trail as well. He also mentioned there is no intent for on -street bike lanes
on 44h'. Ms. Stevens added that staff can take a deeper look at the Bike/Ped Master
Plan, but a multi -use path is supported by the Bike/Ped Master Plan and Jefferson
County Open Space trails plan.
Commissioner LARSON talked about keeping 40' Avenue as a commercial base
as it historically has been and finding a commercial anchor on 441h Avenue and
Field Street.
Commissioner DISNEY inquired why the truck driving school is closer to I-70 but
still a part of the 44h' Avenue Subarea Plan.
Mr. De La Torre explained there is a lot of connectivity to 44h' Avenue and the
boundaries of the plan extend from I-70 to Clear Creek, so there is a larger
geographic area included beyond the 441h Avenue corridor.
Commissioner STERN mentioned there are a lot of community members who are
passionate about the urban fabric in neighborhoods. She wanted to draw the
connection of enhancing the commercial character of the corridor and greater
density and how they go hand in hand.
Commissioner STERN stated that she feels the plan misses the opportunity to
connect Anderson Park to Wadsworth Blvd. in a safe way to get around town.
Mr. De La Torre mentioned it will be addressed in the strategy plan.
Commissioner LARSON asked for more explanation on the northwestern loop.
Planning Commission Minutes - 4 —
December 1, 2022
Mr. De La Torre explained it will involve the I-70 Frontage Road and there will be
a wayfinding component with a new cross-section accommodating pedestrian and
vehicular movement.
In response to a question from Commissioner ANTOL about why the subarea plan
is only looking at curb to curb on 44a' Avenue, Ms. Stevens mentioned 44a' Ave
was improved within the last 10 years and is going to continue as a 4-lane street
but could look into it further. Mr. De La Torre added that traffic volumes on 44ffi
Avenue brings community opposition, and the speeds of the vehicles cause concern
with regards to pedestrian safety.
There continued to be discussion back and forth about possible bike lanes on 44"'
Avenue and the pros and cons. There was also discussion about traffic
slowing/calming with possible roundabouts and islands.
Commissioner ANTOL asked if there is an action plan moving forward.
Mr. De La Torre said the next big stage is an implementation strategy and ranking
financial magnitude and a prioritization of phasing.
Commissioners DISNEY, STERN, KERN and LARSON complemented staff and
MIG and hope the community appreciated the work that has been done.
B. Upcoming Dates
Ms. Stevens mentioned there will be no December 15 meeting, but possible cases
to be heard in January and February.
C. Project and Development Updates
Ms. Stevens mentioned the Boards and Commissions gift for those who did not
attend the Board and Commissions dinner.
Let's Talk is currently in Paramount Park and a survey currently live.
Mestizo Brewing just received their CO and Esther's at Gold's Marketplace is
opening soon as well.
Commissioner KERNS inquired about snow plowing on 38a' Avenue. Ms. Stevens
said staff can follow-up.
There was then discussion of the ex-Lucky's space as maybe a temporary art space.
10. ADJOURNMENT
Planning Commission Minutes - 5—
December 1, 2022
It was moved by Commissioner STERN and seconded by Commissioner SCHELKE
to adjourn the meeting at 8:26 p.m. Motion carried 7-0.
Melissa Antol, Chair Tammy Odean, Recording Secretary
Planning Commission Minutes
December 1, 2022
6—
TO:
CASE MANAGER:
CASE NO. & NAME:
l41
Wh6atRi:i.d e
g
CITY OF WHEAT RIDGE
PLANNING DIVISION STAFF REPORT
Planning Commission MEETING DATE: February 2, 2023
Stephanie Stevens
WZ-22-06 / SCL MOB at Clear Creek Crossing
ACTION REQUESTED: Approval of a Specific Development Plan (SDP) for the construction of a
137,000-square foot medical office building on the 26.93-acre hospital
campus
LOCATION OF REQUEST: 12905 W. 40th Ave (Planning Area 1 of Clear Creek Crossing)
APPLICANT (S): Davis Partnership Architects
OWNER (S): SCL Health/Intermountain Healthcare
APPROXIMATE AREA: 1,173,113 square feet (26.93 acres)
PRESENT ZONING: Planned Mixed Use Development (PMUD)
COMPREHENSIVE PLAN: Mixed Use Commercial
ENTER INTO RECORD:
(X) CASE FILE & PACKET MATERIALS (X) COMPREHENSIVE PLAN
(X) ZONING ORDINANCE (X) DIGITAL PRESENTATION
Location Map
Planning Commission
Case No. WZ-21-01 ISCL at Clear Creek Crossing
JURISDICTION:
All notification and posting requirements have been met; therefore, there is jurisdiction to hear this
case.
I. REQUEST
Case No. WZ-22-06 is an application for approval of a Specific Development Plan (SDP) for the
purpose of developing a 137,000-square foot medical office building on the 26.93-acre hospital
campus. The subject site is located at the north end of the Clear Creek Crossing planned
development, known as Planning Area 1 (PA 1) of Clear Creek Crossing, on the east side of Clear
Creek Drive and north of W. 40' Avenue (12905 W. 40"' Avenue). Interstate 70 borders the site to
the east.
This request for SDP approval is the second step in a two-part approval process pertaining to planned
developments. The first step occurred in 2018 when Planning Commission and City Council
approved the Clear Creek Crossing Planned Mixed Use Outline Development Plan (ODP) which
established zoning (Case No. WZ-16-07). The zone change also included approval of a Vision Book
that establishes the intended design and architectural themes and materials, as well as a Design
Pattern Book that includes the more substantive development regulations. In 2020, Planning
Commission and City Council approved an ODP Amendment specific to this site to modify
permissible height of the hospital (Case No. WZ-19-10).
The second step is approval of the subject Specific Development Plan (SDP), which focuses on
specific details of a development such as site design, architecture, landscaping, and drainage design.
Section 26-302 of the Municipal Code allows for concurrent or sequential applications for the ODP
and SDP. This is the ninth of numerous SDP applications to be heard before the Planning
Commission for the different phases or "Planning Areas" as the mixed use project at Clear Creek
Crossing is developed, including the second phase of apartments on the north end which are covered
under a separate Planned Development approved in 2021. SDPs must be found to be compliant with
the ODP and supporting documents in order to be approved. Each SDP application must be heard at a
public hearing before the Planning Commission, who is the final deciding body for SDP approval. In
2021, Planning Commission approved an SDP for the hospital and parking garage (Case No. WZ-21-
01).
Architectural Control Committee
An Architectural Control Committee (ACC) was established specifically for this the Clear Creek
Crossing development to ensure compliance with the Design Pattern Book, third -party review,
consistency across the project, and to conduct schematic design review prior to the City's planning
review. The ACC is comprised of 6 members: 3 appointed by mutual agreement between the
Developer and the City of Wheat Ridge Community Development Director, 2 seats held by the
Developer, and 1 seat held by a City of Wheat Ridge Planning Division staff member.
The ACC has fulfilled the requirement to review this SDP two times: first, prior to the City's pre -
application meeting and second, as part of the City's referral process. The ACC has provided their
recommendation of approval of the subject SDP as their referral response, provided in Exhibit 7.
Planning Commission
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
Planning Commission Review
As previously noted, the Planning Commission is the final authority for approval of an SDP. The
intent of the public hearing is to allow a publicly appointed body and the public at large to verify
staffs conclusion that the project meets the intent and standards of the underlying zoning. The plan
sheets and exhibits relevant to this purpose are included. Construction details, such as utility and
grading plans, are not included for review by Planning Commission and are under review by the
Engineering Division.
II. PROPERTY HISTORY
Property History & Development Status
Rezoning to a planned development in the City of Wheat Ridge involves a two-step process, and for
the subject property, the 2018 approval of the ODP and DPB comprised the first step. These two
regulatory documents establish the allowed uses and development standards for the property and
establish access configurations for vehicles, pedestrians, and bicycles. While rare in Wheat Ridge, a
design pattern book is common for developments of this size, for which formatting flexibility
including photos and graphics are necessary to explain substantive development standards.
Links to the ODP, DPB, and Vision Book documents can be found at the following link:
httys://www.ci.wheatridge.co.us/1559/Clear-Creek-Crossing
The second step for development in a Planned Mixed Use Development (PMUD) requires approval
of Specific Development Plans (SDPs) for each building, lot, or phase. The Commission has thus far
approved the SDPs for the hospital on the subject site, two multi -unit apartment projects north of the
site, offices and a credit union north of the hook ramps, a quick -serve coffee shop just south of the
hook ramps, a gas station/convenience store at the south end of the site on the east side, and a fitness
facility and hotel on the west side.
In terms of infrastructure, Denver Water completed their construction of a new 80-inch water line in
2019, hook ramps were opened in 2020, and roadway infrastructure (Clear Creek Drive and W. 40'
Avenue) was installed in 2021. The final phase of construction associated with the I-70 and 32°1
Avenue interchange was also completed in 2021. Currently, the extension of Clear Creek Drive
right-of-way cul-de-sac is underway which will provide access to the second phase on multi -unit
apartments on the west side, furthest north. The private road network on the west side of Clear Creek
Drive is also underway.
Surrounding Land Uses and Zoning
The site is entirely surrounded by land that is also within the Clear Creek Crossing PMUD zoning.
The medical office building is proposed alongside the approved hospital which is currently under
construction and anticipated to open in the first quarter of 2024. Multi -unit apartments exist directly
northwest of the hospital campus site with a second phase approved and under construction across
Clear Creek Drive. The adjacent site across Clear Creek Drive to the west is a commercial subdistrict
with an approved SDP application for a hotel in PA 7 (Harvest District). Retail/restaurant uses are
called for in PA 5 (Vineyard District) to the south across W. 40' Avenue, which is currently vacant.
The site to the north (PA 8) contains the regional trail and is part of the Wagon District which is
reserved for open space. To the east is Interstate 70, which is elevated slightly above the site
(Exhibit 2, Zoning Map and Exhibit 3, Design Pattern Book Excerpts).
Planning Commission
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
III. SPECIFIC DEVELOPMENT PLAN
The site is located in Planning Area 1 (PA 1) which is also called the Mill District denoting this area
as an employment -based subdistrict in the Clear Creek Crossing development. The overall vision for
the 26.93-acre site along I-70 in the development is to create a medical campus to serve Wheat Ridge
residents and the West Metro community. Key components of the site design are described below.
The site data table on the cover sheet confirms the SDP complies with the development standards
provided by the ODP JLxhibit 4, Specific Development Plan).
Site Design & Internal Circulation
The medical office building (MOB) is proposed to be located just south of the hospital and west of
the parking garage at approximately 137,000 square feet in size to contain an Ambulatory Surgery
Center and multiple other medical office tenants. The building is proposed to be five stories and 87
feet tall. The primary entry is located on the west side of the building with a vehicular pull out for
patient drop off, and another pull out for surgery patient pick up on the south side. The entrances are
aligned with parking lot drive aisles to the south. An enclosure to house a generator and trash is
planned at the southeast corner adjacent to a loading area for service vehicles.
Much of the roadway and pedestrian infrastructure will already be in place per the approved plans for
the hospital. The hospital campus and medical office building can be accessed from two main
vehicular entrance points along W. 40' Avenue and one along Clear Creek Drive, which interconnect
to form an internal loop (aka Crossing Drive). Overall vehicular connectivity complies with the
Design Pattern Book (DPB) requirements for internal circulation. The main access at Clear Creek
Drive, which will eventually become a signalized intersection, is designed to be a street -like drive
with sidewalks on both sides leading up to the buildings. The connections provided with the hospital
construction fulfill the ODP requirement for a loop road connecting different planning areas within
the development and functioning like a local street network.
The hospital campus and medical office building can also be accessed via sidewalk from multiple
points along W. 40' Avenue to the south as well as from Clear Creek Drive to the west, allowing for
pedestrian access through the site, to the hospital and medical office building, to the apartment site on
the northwest, out to Clear Creek Drive on the west, and to the regional trail on the east side.
Sidewalks have been added to surround the medical office building on all sides that will improve
internal campus connectivity. See sheet 2 of the SDP provided in Exhibit 4 for a view of the overall
campus, including the proposed medical office building.
Parking
The previously approved SDP for the hospital anticipated the parking needs of both the hospital and
the MOB. The site provides atotal of 1,253 surface parking spaces and 379 garage parking spaces
for a total of 1,632 parking spaces on site. Sixteen additional bike parking spaces are proposed at the
south and southwest sides of the medical office building. A parking study and verification memo
affirm the needs of the medical campus are met by the provided parking. The amount of parking
provided complies with the Design Pattern Book for the use and size of the hospital and MOB.
Building Orientation
The Design Pattern Book sets forth setback and building orientation requirements specific to each
development district within Clear Creek Crossing. For PA 1 within the Mill District, there are no
build -to requirements related to primary employment uses. Setback requirements are imposed by the
Planning Commission
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
DPB, and the SDP complies with those standards. Parking is setback and buffered from the roadway,
and adequate buffering is provided adjacent to the apartment site.
Architecture
The architectural style is driven by the Clear Creek Crossing Design Pattern Book and Vision Book
which call for a modern agrarian aesthetic that blends traditional agrarian forms and materials with a
modern feel. It also requires strong attention to be paid to the pedestrian realm. The applicant has
evolved the building design based on feedback from staff and the ACC over the past few months. The
final design is cohesive with the hospital and reflects primarily gray precast concrete and a variety of
bronze metal panels and accents, glass curtainwall systems, and fiber cement board, with stone
veneer accents at the base of the primary entry. The materials carry over to the west, south, and north
elevations resulting in four-sided architecture.
The primary entrances are emphasized with varying roof forms, transparent doors, and a curved entry
canopy that corresponds to the hospital's curvilinear features. Metal accents form the glass curtain
walls, elevator and stair vestibules. Incorporation of stone on the first floor creates visual interest and
enhances the ground level pedestrian experience. A majority of the east fagade will be hidden by the
parking garage, however, this fagade has also been enhanced at the ground level to improve the
pedestrian environment between the medical office building and parking garage.
An analysis of proposed architecture and compliance with standards of the Design Pattern Book can
be referenced in the architectural exhibits provided by the applicant in Exhibit 7.
Landscaping, Open Space, andAmenities
The overall campus exceeds the minimum requirements for 20% of the gross lot size to be
landscaped by utilizing parking lot landscaping islands, primary and secondary frontages for trees,
shrubs, ornamental grasses and perennials. Landscaping surrounds the medical office building and re -
enforces the organic shapes and curved lines
Grading, Utilities, Drainage and Traffic
This SDP complies with all grading, drainage, and traffic plans. Sanitary sewer and water service will
be provided by Applewood Sanitation District and Consolidated Mutual Water Company,
respectively. All internal site utilities will be privately owned and maintained by SCL Health and will
be placed in utility easements. All utility infrastructure was accounted for with the hospital SDP.
IV. SDP CRITERIA
Staff has provided an analysis of the SDP criteria outlined in Section 26-305.D. The Planning
Commission shall base its recommendation in consideration of the extent to which the following
criteria have been met:
1. The proposed specific development plan is consistent with the purpose of a planned
development as stated in section 26-301 of this article.
The purpose of utilizing planned development zoning is to provide flexibility while
accommodating well -designed, innovative developments that demonstrate efficient use of land
and may not be feasible under a standard zone district. As an employment center, it brings people
to the development on both a short-term and long-term basis, activating the planned development
Planning Commission
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
and contributing to the economy further by supporting housing, retail, and commercial uses in the
Clear Creek Crossing development and surrounding area. The site and building were designed to
reinforce the character of Clear Creek Crossing as established in the Design Pattern Book.
Staff concludes this criterion has been met.
2. The proposed specific development plan is consistent with the design intent or purpose of
the approved outline development plan.
The SDP is consistent with the intent and character statements of the outline development plan.
The site incorporates quality landscaping, shared connections, and follows architectural
guidelines to complement the modern agrarian theme of Clear Creek Crossing and the hospital.
Staff concludes this criterion has been met.
3. The proposed uses indicated in the specific development plan are consistent with the uses
approved by the outline development plan.
The SDP is consistent with the use standards of the outline development plan. The ODP for Clear
Creek Crossing lists hospitals and supporting medical uses as permitted in Planning Area 1 or the
Mill District which includes the subject site.
Staff concludes this criterion has been met.
4. The site is appropriately designed and is consistent with the development guidelines
established in the outline development plan.
The site and building designs adhere to development standards for the Mill District. This includes
the setback requirements for PA 1, landscaping coverage, vehicle and bicycle parking, and
gathering space. That site is integrated into the development as a whole with vehicular and
pedestrian connections to adjacent sites, planning areas, and streets as called for in the ODP.
Staff concludes this criterion has been met.
5. Adequate infrastructure/facilities are available to serve the subject property, or the
applicant will upgrade and provide such where they do not exist or are under capacity.
All responding agencies have indicated they can serve the property with improvements installed
at the developers' expense. All required infrastructure and services are provided for within this
SDP.
Staff concludes this criterion has been met.
6. The proposed specific development plan is in substantial compliance with the applicable
standards set forth in the Architectural and Site Design Manual, Streetscape Design Manual,
and other applicable design standards.
Planning Commission
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
As described above, the SDP is in compliance with the Clear Creek Crossing Design Pattern
Book, which addresses architectural, site, and streetscape design.
Staff concludes this criterion has been met.
Staff concludes that the criteria used to evaluate the SDP support the request.
V. AGENCY REFERRAL
All affected service agencies were contacted for comment on the SDP and subdivision, specifically
regarding the ability to serve the property. Referral responses follow:
Wheat Ridge Planning Division: No remaining comments.
Wheat Ridge Engineering Division: The SDP is approvable. Minor corrections remain on
the construction documents and will be approved prior to issuance of building permit.
Wheat Ridge Police Department: No concerns.
Wheat Ridge Public Works: No comments provided.
Wheat Ridge Parks & Recreation Department: No concerns. It was confirmed that all
infrastructure will be maintained by SCL Health/Intermountain Healthcare.
Wheat Ridge Economic Development/Urban Renewal Authority: No conflict with the
I70/Kipling Corridors Urban Renewal Area.
West Metro Fire District: Can serve. Coordination will continue through development.
Xcel Energy: Can serve. Utility coordination is ongoing.
Century Link: Can serve. Utility coordination is ongoing.
Comcast Cable: No comments provided. Utility coordination is ongoing.
Consolidated Mutual Water District: Can serve. Utility coordination is ongoing.
Applewood Sanitation District: Can serve. Utility coordination is ongoing.
Denver Water: No concerns.
Jefferson County Planning Department: No concerns.
Prospect Recreation and Parks District: No comments provided.
Colorado Department of Transportation: No objections.
Regional Transportation District: No comments provided.
Planning Commission
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
Clear Creek Crossing Architectural Control Committee (ACC): The ACC has reviewed
and provided a recommendation of approval of the SDP.
VI. STAFF CONCLUSIONS AND RECOMMENDATION
Staff has concluded that the proposed SDP is consistent with the planned development regulations,
with the goals and policies of the City's guiding documents, and with the proposed ODP and
supporting documents. Because the review criteria support the SDP, Staff recommends approval of
the Specific Development Plan. As noted above, the Planning Commission is compelled to review the
application against the SDP criteria for review. The intent of the Planning Commission's review is to
allow a publicly appointed body and the public at large to verify staff conclusion that the project
meets the intent and standards of the underlying zoning.
VII. SUGGESTED MOTIONS — SPECIFIC DEVELOPMENT PLAN
Option A:
"I move to APPROVE Case No. WZ-22-06, a request for approval of a Specific Development Plan
for the construction of a 137,000-square foot medical office building on property located at
12905 W. 40 Avenue within Planning Area 1 of Clear Creek Crossing, for the following reasons:
1. The specific development plan is consistent with the purpose of a planned development, as
stated in Section 26-301 of the Code of Laws.
2. The specific development plan is consistent with the intent and purpose of the outline
development plan.
3. The proposed uses are consistent with those approved by the outline development plan.
4. All responding agencies have indicated they can serve the property with improvements
installed at the developer's expense.
5. The specific development plan is in substantial compliance with the applicable standards set
forth in the outline development plan and with the City's adopted design manuals.
With the following conditions:
1. Prior to commencing construction, civil construction drawings shall be approved and
appropriate permits shall be obtained.
2. Building permit submittals shall be consistent with the SDP.
Option B:
"I move to DENY Case No. WZ-22-06, a request for approval of a Specific Development Plan for the
construction of a 137,000-square foot medical office building on property located at
12905 W. 40 Avenue within Planning Area 1 of Clear Creek Crossing, for the following reasons:
1.
2. ...
Planning Commission
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
EXHIBIT 1: AERIAL
2020 Aerial. Multiple sites have progressed to construction and/or completion which is not reflected here, including hospital on the
subject site, two multi-urdt apartment projects north and west of the site, Foothills Credit Union north of the hook ramps, Dutch Bros.
Coffee just south of the hook ramps, a Kum & Go at the south end of the development on the east side, and a Lifetime Fitness facility
and Hampton Inn hotel on the west side.
Planning Commission
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
Planning Commission
Case No. W 22061 SCL MOB at Clear Creek Crossing
YOUNGROUDSTPRET
MILL
COMMERC AL
:WAGON
PEN SPACE
PAL_
DISTRICT
WOMESTEA
mammas
RESIDENTIAL
DISTRICTa
MORRIS
.....�
.. P
T
VINEYARD PA PA
COMMERCIAL
DISTRICT
RAS
HARVEST Pa
EXHIBIT 3: DESIGN PATTERN BOOK EXCERPTS
(CONTINUED)
Planning Area 1 Standards
MENT STANDARDS: MILL DISTRICT
DEVELOPMENT
MEL
,,.,
PERMITTED USES REFER TO CLEAR CREEK CROSSING OUTLINE DEVELOPMENT PLAN AMENDMENT FOR ALL PERMITTEDUSES
PRIMARY EMPLOYMENT USES
• NOMORETHAN30%OFTHEFRONTAGEO-PA-1 MAY HAVE SURFACE PARKING WITHIN 20
FEET OF AROADWAY. PARKING MUST BE BUFFERED FROM THE ROADWAY BY LANDSCAPING
AND / OR ABUILDING
• MINIMUM SETBACK ADJACENT TO PA-2 SHALL BE 5PER STORY
COMMERCIAL / RETAIL / OTHER USES
PRIMARY STREET FRONTAGE CLEAR CREEKDRIVE
SETBACKS AND . ATLEAST 50% OF THE PROPERTY S FRONTAGE ALONG CLEAR CREEK DRIVE MUST CONTAIN
A BUILDING WITHIN THE REQUIRED 0-20 FOOT BUILD TO AREA
BUILDING ORIENTATION
SECONDARY STREET FRONTAGE 40TH AVENU E
• ATLEAST 30% OF THE PROPERTY S FRONTAGE ALONG 40TH AVENUE MUST CONTAIN
BUILDING WITHIN THE REQUIRED 0-20 FACT BUILD TO AREA
• WHERE THE PROVIDED BUILD -TO EXCEEDS THE MINIMUM REQUIREMENT ,THE EXCESS
SHALL BE TRANSFERED TO MEET THE STANDARD ON THE OTHER STREET FRONTAGE
• MINIMUM SETBACK ADJACENT TO PA-2 SHALL BE 5' PERSTORY
• NOTE. BUILDING PLACEMENT, HEIGHT, DENSITY AND SETBACKS REFLECT THE SITE'S
LOCATION AT THE JUNCTION OF A STATE HIGHWAY AND AN INTERSTATE FREEWAY
MAXIMUM LOT COVERAGE 80%
MINIMUM LANDSCAPE REQUIRED 20%
PRIMARY EMPLOYMENT USES. 90-0
HOSPITALS. 102-0'
ELEVATORSAND ENTRY
VESTIBULES FOR ACCESSTO 135-0' LIMITED TOAMAXIMUMAREAOF 2,500 SF OF BUILDING FOOTPRINT
ROOFTOP HELIPADSON HOSPITALS
MAXIMUM BUILDING HEIGHT COMMERC1AL/RETAIL/OTHER 62-0'
SINGLE COMMERCIAL USES.
RESIDENTIAL USES. 6540'
MIXED USE (DEFINEDAS 90-0'
VERTICAL INTEGRATION OF USES).
PARKING SURFACEAND/OR STRUCTURED PARKING PER SECTION 234(PARKING AND SERVICE)AND SECTION 38(PARKING
STRUCTURES). ALL PARKING SHALL MEET THE CITY OF WHEAT RIDGE STANDARDS, CHAPTER 26, ARTICLE V, SEC 26501
BICYCLE PARKING BICYCLE PARKING PER SECTION 241 (BICYC_E PARKING)
1 BICYCLE SPACE PER EVERY 20 AUTOMOBILE PARKING SPACES, BUT NO LESS THAN 4 SPACES
REFER TO SECTION 30 (BUILDING DESIGN)
REFER TO SECTION 40 (MATERIALS)
REFER TO SECTION 50 (LANDSCAPE)
REFER TO SECTION 60 (LIGHTING)
SIGNAGE REFER TO SECTION T 0(SIGNAGE)
PLAZAAND GATHERING AREA REQUIREMENT, REFER TO SECTION 27
OTHER REQUIREMENTS
PUBLICART REQUIREMENT, REFER TO SECTION 29
Planning Commission 12
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
Planning Commission 12
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
EXHIBIT 4: SPECIFIC DEVELOPMENT PLAN
(see attached)
Planning Commission 13
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
LEGAL DESCRIPTION
LOT 1, BLOCK 1,
SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
26.931 ACRES OR 1,173,113 SQ. FT. +/-
SITE DATA TABLE
ALL CALCULATIONS ARE BASED ON OVERALL CAMPUS AREA
EXISTING ZONING PLANNED MIXED USE DEVELOPMENT
PROPOSED LAND USE HOSPITAL+ MEDICAL OFFICE BUILDING
TOTAL AREA
26.931 ACRES OR 1,173,113 SQ. FT. +/-
PROPOSED BEDS
210
EMPLOYEES ON MAXIMUM SHIFT
1,769 (1,380 FTE + 389 PHYSICIANS)
GROSS FLOOR AREA BY USE
HOSPITAL
636,808 SF
CENTRAL UTILITY PLANT
25,000 SF
PARKING GARAGE
146,095 SF
MEDICAL OFFICE BUILDING
137,006 SF
REQUIRED
PROPOSED
SETBACKS
BUILDING
30' (5' PER STORY)
62'
PARKING
20'
20'
BUILDING HEIGHT
HOSPITAL
102' MAX
99,
ELEVATOR & ENTRY VESTIBULE FOR
ACCESS TO HELIPAD
135' MAX
12T-7"
GARAGE
90' MAX
58'-411
MEDICAL OFFICE BUILDING
90' MAX
7T-10" TO TOP OF PARAPET
8T-0" TO TOP OF ELEVATOR
OVER RUN
BUILDING COVERAGE
N/A
21.3% / 249,573 SF
HARDSCAPE (CONCRETE + ASPHALT)
N/A
58.5% / 686,378 SF
LANDSCAPE (WITHIN PROPERTY LINE)
20% MIN / 234,663 SF
20.2% / 237,162 SF
SOD
30% MAX / 84,183 SF
18.5% / 43,773 SF
PARKING
HOSPITAL
1 SPACE / 5 BEDS +
1 SPACE / FTE ON MAX SHIFT =
1,103 SPACES
MEDICAL OFFICE BUILDING
1/200 SF OF FLOOR AREA
124,185 SF FLOOR AREA / 200 =
621 SPACES
TOTAL VEHICLE PARKING
1,724
1,632
SURFACE -STANDARD
-
1,197
SURFACE - ACCESSIBLE (# VAN)
51 (9)
56 (13)
GARAGE -STANDARD
-
349
GARAGE - ACCESSIBLE (# VAN)
11 (2)
30 (5)
BICYCLE PARKING
82
(1 PER 20 PARKING SPACES)
100
(80 HOSPITAL SDP,
20 MOB SDP)
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 203 293 & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
c
p
1-70
w
F
Z
Q
U)
p
Q
�
a
Y
W 44TH AVE
HWY 58
SITE
MOB SITE AREA
W 38TH AVE
W 40TH AVE
p
Y
W
w
U
O
Q
-
w
J
U
W 32ND AVE
U)
0
W 26TH AVE
p
p
J
W
4 VICINITY MAP
NORTH
PROJECT STATEMENT / CHARACTER OF DEVELOPMENT
1 If
= 2000'
THE SITE IS WITHIN PLANNING AREA 1 (PA 1) OF THE CLEAR CREEK CROSSING PLANNED MIXED USE
DEVELOPMENT ZONING AND THE DESIGNATED MILL DISTRICT. THE OVERALL VISION FOR THE 26.93-ACRE SITE
ALONG I-70 IN THE CLEAR CREEK CROSSING DEVELOPMENT IS TO CREATE A MEDICAL CAMPUS TO SERVE
WHEAT RIDGE RESIDENTS AND THE WEST METRO COMMUNITY. THE MEDICAL OFFICE BUILDING IS 5 STORIES
AND APPROXIMATELY 137,000 GSF. PEDESTRIAN CONNECTIVITY TO REST OF THE MEDICAL CAMPUS, THE
ADJACENT APARTMENTS, THE CLEAR CREEK TRAIL, AND THE REST OF THE CLEAR CREEK CROSSING
DEVELOPMENT ARE PROVIDED AS PART OF THE SITE DESIGN. THE MATERIALS SELECTED FOR THE BUILDING
COMPLIMENT THE OVERALL DEVELOPMENT THEME BY USING MODERN AGRARIAN MATERIALS AND WARM
TONED ACCENTS THAT PROVIDES A SCALABLE EXPERIENCE AROUND MAIN ENTRY POINTS. THE LANDSCAPE
HAS ALSO BEEN DESIGNED TO INCORPORATE THE MODERN AGRARIAN THEME OF CLEAR CREEK CROSSING.
STANDARD NOTES
1. ALL DEVELOPMENT THAT IS PART OF THIS SITE DEVELOPMENT PLAN SHALL CONFORM WITH THE CLEAR
CREEK CROSSING PLANNED MIXED USE OUTLINE DEVELOPMENT PLAN AS IT RELATES TO PLANNING AREA 1.
2. ALL EXTERIOR LIGHTING SHALL COMPLY WITH THE CLEAR CREEK CROSSING DESIGN PATTERN BOOK AND
SECTION 26-503 OF THE WHEAT RIDGE MUNICIPAL CODE.
3. ALL SIGNAGE SHALL COMPLY WITH THE CLEAR CREEK CROSSING DESIGN PATTERN BOOK AND ARTICLE VII
OF CHAPTER 26 OF WHEAT RIDGE MUNICIPAL CODE. A MASTER SIGN PLAN SHALL BE REQUIRED IF
PROPOSED SIGNAGE EXCEEDS THESE SIGN STANDARDS.
4. ALL SITE IMPROVEMENTS SHALL BE OWNED AND MAINTAINED BY THE OWNER OF PA-1.
5. SEE PARKING STUDY COMPLETED BY WALKER CONSULTANTS DATED FEBRUARY 17, 2021 AND VERIFICATION
LETTER DATED NOVEMBER 2, 2022 FOR ANALYSIS OF THE FUNCTIONAL PARKING NEEDS OF THE MEDICAL
CAMPUS.
SHEETINDEX
CASE HISTORY
SHEET 1
- COVER SHEET
WZ-22-06
WZ-11-02
SHEET 2
- CAMPUS SITE PLAN
WZ-22-04
WZ-11-01
SHEET 3
- SITE PLAN
MS-21-01
ANX-11-01
SHEET 4
- LANDSCAPE PLAN
WZ-21-01
SUP-10-01
SHEET 5
- ELEVATIONS
WZ-19-01
MS-06-10
SHEET 6
- ELEVATIONS
WZ-19-09
MS-06-09
SHEET 7
- PHOTOMETRIC PLAN
WZ-19-10
WS-06-01
SHEET 8
- DETAILS
MS-19-02
WZ-06-03
WS-19-04
SUP-06-05
WS-17-07
SUP-05-04
WZ-16-07
WZ-05-02
WS-11-01
WZ-05-01
SUP-05-01
ANX-05-01
OWNER'S CERTIFICATE
The below signed owner(s), or legally designated agent(s)
thereof, do hereby agree that the property legally described
hereon will be developed as a Planned Development in
accordance with the uses, restrictions and conditions
contained in this plan, and as may otherwise be required by
law. I (we) further recognize that the approval of this specific
development plan, does not create a vested property right.
Vested property rights may only arise and accrue pursuant to
the provisions of Section 26-121 of the Wheat Ridge Code of
Laws.
Tajquah Hudson
TITLE: EVP - Chief Strategy and Growth Officer
Intermountain Healthcare
State of Colorado )
County of Broomfield )
The foregoing instrument was acknowledged before me this
—day of A.D. 20_ by Tajquah Hudson,
as Executive Vice President, Chief Strategy and Growth Officer.
Witness my hand and official seal. My commission expires:
Notary Public
SURVEYOR'S CERTIFICATE
I, do hereby certify that the survey of
the boundary of SCL Health Lutheran Medical Center at Clear
Creek Crossing was made by me
or under my direct supervision and to the best of my
knowledge, information and belief, in accordance with all
applicable Colorado statutes, current revised edition as
amended, the accompanying plan accurately represents said
survey.
COUNTY CLERK AND RECORDERS CERTIFICATE
State of Colorado )
) SS
County of Jefferson )
I hereby certify that this plan was filed in the office of
the County Clerk and Recorder of Jefferson County at
Golden, Colorado, at --o'clock.
day of A EbAhe
Reception
JEFFERSON COUNTY CLERK AND RECORDER
0
Deputy
PLANNING COMMISSION CERTIFICATION
Approved this
day of by the Wheat Ridge
Planning Commission.
Chairperson
CITY CERTIFICATION
Approved this day of
by the City of Wheat Ridge
IG\11111=1
City Clerk
Mayor
Signature Community Development Director
PROPERTY OWNER:
DEVELOPER:
INTERMOUNTAIN HEALTHCARE
18TH STREET DEVELOPMENT LLC
500 ELDORADO BLVD
1550 MARKET STREET
SUITE 4300
SUITE 200
BROOMFIELD, CO
DENVER, CO
303.813.5130
303.244.0700
TAJQUAH HUDSON AARON BREWSTER
TAJQUAH.HUDSON@IMAIL.ORG AARON.BREWSTER@NEXCOREGROUP.COM
BRUCE FONG TOM KELLY
BRUCE.FONG@IMAIL.ORG TOM.KELLY@NEXCOREGROUP.COM
ARCHITECT LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET
SUITE 100
DENVER, CO 80205
303.861.8555
ANN ADAMS
ANN.ADAMS@DAVISPARTNERSHIP.COM
CIVIL ENGINEER
MARTIN/MARTIN CONSULTING ENGINEERS
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303.431.6100
NICOLE KONTOUR
NKONTOUR@MARTINMARTIN.COM
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET
SUITE 100
DENVER, CO 80205
303.861.8555
CHARLEY MEYER
CHARLEY.MEYER@DAVISPARTNERSHIP.COM
ELECTRICAL ENGINEER
CATOR, RUMA, & ASSOCIATES, CO.
896 TABOR STREET
LAKEWOOD, CO 80401
303.232.6200
JERRY OBRIEN
JOBRIEN@CATORRUMA.COM
COVER SHEET
aul-m
MENEM
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/O NEXCORE GROUP LLC
1550 MARKET ST M200
DENVER, CO80202
30A244-0700
LANDSCAPE ARCH I TECT
DAYS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE. 30A861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE. 30A861-8555
CIVILENGI NEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD CO 80215
30A431-6100
ELECTRICAL ENGINEER
CATOR RUMA &ASSOCIATES
896 TABOR STREET
LAKEWOOD CO 80401
30A232-6200
ZZ
DN
M-
W
w�
Vw
LLo
0
U
v
Z
a
Z
ww
G
a
0
w
00
J
ci
wV
2�
W
0
V
V
a
LL -
IL
PROJECT NO.
21454.00
DATE.
01 /13/2(
SHEET NUMBER.
01
of 08
Vj
CURVE TABLE
NUMBER
DELTA ANGLE
RADIUS
ARC LENGTH
CHORD DIRECTION
CHORD LENGTH
Cl
32'33'58"
17.50'
9.95'
N17'00'28"W
9.81'
C2
43'1 T31"
17.50'
13.22'
S20'55'16"W
12.91'
C3
49'04'26"
22.50'
19.27'
N25'15'42"W
18.69'
C4
49'04'26"
22.50'
19.27'
S23'48'44"W
18.69'
C5
47'48'26"
360.50'
300.80'
S65'22'19"W
292.15'
C6
90,00,001,
36.00'
56.55'
N86'28'07"W
50.91'
C7
10°11'18"
523.65'
93.12'
N43'13'58"W
92.99'
C8
1'58'39"
2096.50'
72.36'
N38'55'23"W
72.36'
C9
48'48'26"
22.50'
19.17'
N24'20'25"E
18.59'
C10
41'13'52"
532.00'
382.84'
N69'23'04"E
374.63'
LINE TABLE
NUMBER
DIRECTION
DISTANCE
L1
S89'16'31"W
28.88'
L2
N00°43'29"W
13.08'
L3
S89'16'31"W
45.00'
L4
S00°43'29"E
10.50'
L5
S89'16'31"W
316.51'
L6
N00°43'29"W
10.50'
L7
S89'16'31"W
73.00'
L8
S00°43'29"E
10.50'
L9
S89'16'31"W
199.38'
L10
S41'28'07"W
14.00'
L11
N48'31'53"W
147.48'
L12
N48'46'08"E
10.50'
L13
N40'4406 W
83.00'
L14
N48'4608 E
51.17'
L15
N90'00'00"E
51.86'
LEGEND
AREA OF APPROVED CAMPUS NOT AFFECTED BY THIS SDP
PEDESTRIAN WALKS / PLAZAS
LANDSCAPED AREA
PROPERTY LINE
. . . . . . . . . . .
LIMITS OF MEDICAL OFFICE BUILDING SDP
- -
EXISTING EASEMENT
SETBACK
♦
BUILDING ENTRY
i
PEDESTRIAN LIGHT POLE
PARKING LOT LIGHT POLE
RETAINING WALL
CANOPY
-
100 YEAR FLOOD PLAIN
\
SIGHT TRIANGLE
L
AASHTO SIGHT TRIANGLE
.....................
ADA ROUTE
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING .•..■
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO ------ J �-� BENCH ;ENE;
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING DAVIS
SITUATED IN SECTIONS 19, 203 293 & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN N8001V9,,E 167`55 100YE R FLOOD PLAIN PARTNERSHIP
ARCHITECTS
CITY OF WHEAT RIDGE COUNTY OF JEFFERSON STATE OF COLORADO�500' _ a OWNER
1STREET
Oc30' FI�AC-2ESS & UT TY C/ EXCORE GROUP DEVELOPMENT ��c
C/6 N50 MARKET T #200 LLc
N6g° 5 EASEMENT DENVERRCO 8020 goo
EK DENVER, co eo2o2
c�E0700
ply- i N86053'19"E 165.00' LANDS30A24APE
" IAVISPART PARTNERSHIP
c 2291BI-SKE STREET SUITE 100 Ts
�' / 1�0• ��_� �� COLORADO e6265
\ w PHONP. 303861-8555
10 'UTILITY EASEMENT2 �_�s ARCHITECT
N� / '-- J M DAVIS PARTNERSHIP ARcwrecTe
O O O O O N DENVER COLORADO 0206100
PHONE. 383661.8555
CI VI LENGI NEER
100 YEAR FLOOD PLAIN °� V / 12499 WEST CO
3�Q PHYSICIAN O EXISTING ,A99WMARTIN COLFAX AVE
(� 30A431 co e6215
N� o 00
KI MULT -USE TRAIL LAKEWOOD OD
CENTRAL ❑
E2ECTRICA2 ENcwEER
UTILITY 30' S RM EAS MENT CATOR PUMA&ASSOCIATES
PLANT aIT 896 TABOR STREET
/ __ • 25,000 SF y ��-� LAKEWOOD, CO 80401
❑ i A\ : 71 SPACES 383232-6200
0 r y �� C �1l 30' WATER E SEMENT
30' FIREj ACCESS ► A ONC E STEP
& UTILITY--r��fAf t®OCiE < C R T S
EASEMENT- 6 I
M ♦ LJ ♦ 4 BIKE 26' FIRE ACCESS & UTILITY 1 UTILITY ASEMEN
PARKING SPACES EASEMENT
10' U -is--
I I o
o CANOPY ADA OUTE
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN
MEDICAL CENTER AT CLEAR CREEK
SOILED DOCK CROSSING ST-BENCH
♦ 1,1173,113SF AMBULANC
26.93 AC
0OD AMBULANCE •
v 210 BED HOSPITAL ENTRY
00 626,948 SF CANOPY / 26' FIRE ACC SS & UTI ITY
LEVELLU p TOP GARDEN
EAS MENT
6 BIKE
0 CANOPY PARKING SPACES O -
1�€P (�TEMFR - TRASH/RECYCLING NCY � 0' MULTI- SE TRAI
O MAIN RECEPTACLES a \
O P
30'WATER EASEMENTZ TRASH/RECYCLING RECEPTACLES ENTRY EMERGENCY 48 CES
EMPLOYEE ENTRANCE _ DEPARTMENT
20 8 BIKE $ ENTRY r
26 BIKE PARKING SPACES �� �� �` - s`� ' v
PARKING 2
SPACES 7q�u� i f
TRELLIS t " -1 R f.falty. AX - TRAS ECEPTAC E
4 BIKE IRKING SPACES
30' SETBACK = uuulluu ::
® 17
o LU
ADA RAMP r LU w
•, � ��
" BRIDGE >
ss 4 ' PUBLIC ART^ w r
4 BIKE Z !r
10' CROSS ACCESS EASEMENT \n1
it (SEP�,R¢TE
„ "PARKING SUB I AL) J.'
SPACES
24SBLOCK 1, LOT 2, CLEAR 3"00'
ANI EW .00,
CREEK CROSSING - ME `- (I? MEDICAL OFFICE 379 SPACE
SUBDIVISION FILING NO. 3 _ 3 M D E,
PARKING GARAGE
�t
-WQkTE
R EASEMENT V!, BUILDING 146,095 SF rn
MAIN ENTRY nj
-� VESTIBULE O
rn
EXISTING 5' UTILITY EASEMENT - �+� RAMP C_C3 LLI
NT R + } yII i' TRASH ENCLOSURE
AR j GENERATOR
2 S ;, 16 BIKE ENCLOSURE
°'' PARKING O
w r-' O
10' CROSS ACCESS F� o SPACES
EASEMENT -W' WATER EASEMENT F
CROSS ACCESS
C10 J
EASEMENT L15
�I f• I,ul'm'lu
30' SETBBENC
ACK _ y® l '' _ '- _ T-- , I
f
A
-is--- - --1,-- 4 BIKE PARKENGAS ACES
-
/ HT LE CONCRE E STEPS
; A < e 6. 6. 6. 6 EASEMENT
�\
//.. T LITY EASEMENT. = 24' STORM EASEM NT _ v 10' TRAIL
NT/ VFq MR/
a o-
YEE G
u i 8SP
i�--sT-----sr-' =_-i N-is-----is--- 30' STORM DRAINAGE �I' T
EASEMENT 3 e
�� it ���AIN
\ = EMPLOYEE PARKING n 3e - - 30' FIRE CCESS
TER NT Er & UTILITY
230 SPACES 3 r EASE ENT
C 1 co.� / It L7 C�D} n w
�I L2
\\ \\ C /IT/ -p�0�\� ' YEE RKIN =�� L8 �, L3 _ �` t4. C1 a
I �L �LII I� I <
338 SP S - a
\ \ \ 20' PARKING SETBACK ❑ C4 rl
v
L1
AGO
T--- -- T---
/ - e
\ Ig
A W 40TH AVF - . - \ _ --ss� -jgs-
\ q o _ - 70'R-0�/9js - - __ - - -.-.- -.-.-.y.-.-.-.- ------ - - EXISTING SIDEWALK
IVA'
y
DR,
\ \\ OY _ i -- BENCH
\ \ - - - - - - AASHTO SIGHT TRIANGLE
sar
\ \ \ 9d cQ \ \�\ \ \ L10 ' / 25' SIGHT TRIANGLE SETBACKNG
F z
\ AA�O T s\ \\\ \ �_ 5 BLOCK 2, LOT 1, CLEAR
\ \ \ �sO�2 \\ / CREEK CROSSING A
\ A, \'' / SUBDIVISION FILING NO. 3
/
\ /
\ /
\ o
V DO � � PR
\ e�
\ \
DA
/ A,
SH
CAMPUS SITE PLAN 0' 40' 80' 160'
SCALE: 1" = 80'-0' NORTH 6mmmmmmm6mmommil� 4 CAMPUS SITE PLAN
zZ
DN
M-
W
IlI
VW
LL
0
v
U
U
�
Ill
Z
a
Z
Ww
G
a
0
W
0
J
ci
wV
�Q
0
W
0
V
LI
0
a
N
a
� o �
O
LEGEND
LIMITSOFMEDICAL
OFFICE BUILDING SDP
AREA OF APPROVED CAMPUS
NOT AFFECTED BY THIS SDP
�a PEDESTRIAN WALKS / PLAZAS
I, rm , ow"
COLORED CONCRETE
PEDESTRIAN WALKS / PLAZAS
PROPERTY LINE
- — — — — — — — — — - EXISTING EASEMENT (NONE WITHIN LIMITS OF MOB SITE)
SETBACK
♦ BUILDING ENTRY
� PEDESTRIAN LIGHT POLE
0 PARKING LOT LIGHT POLE
RETAINING WALL
---------------- CANOPY/BUILDING OVERHANG
BENCH
BIKE RACK
8 TRASH & RECYCLING RECEPTACLE
OPLANTER POT
111111111111111111111 ADA ROUTE
LSIGHT TRIANGLE
r AASHTO SIGHT TRIANGLE
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO p{7��yj�yly
A 4A,� I
A r — —
\�
I d
I— -- e ' A r{f F
T —
O ,
EXISTING SANITARY0k
SEWER EASEMENT
EASEMENT ---may = -.•
/ I EXISTING
— r / I FIRE ACCESS & _��- �•••
UTILITY EASEMENT
sauna
o co
�.
4.
■ ° CONCRETE WALK
■ / �� UNDERGROUND BICYCLE RACKS
■ o ° TELECOM VAULT (4 BIKE PARKING SPACES)
■ �15' SIGHT TRIANGLE
4. ■ 1 30' SIGHT TRIANGLE
■ co
■ �. 1 CONCRETE WALK
■ EXISTING 30' STORM
■ 1 b� . ° DRAINAGE, WATER
1 — EASEMENT
■ 11
I
■
°
30.00 ■ �a 5 STO RY
■ MEDICAL OFFICE BUILDING
4 , 137,006 SF
■ "'� `� . BENCH, TYP.
II ■ �e
r
EXISTING
FIRE ACCESS
& UTILITY
EASEMENT
E:ZiI�I�:XiI�ll■
�I�Illllltll
15' SIGHT TRIANGLE
30' SIGHT TRIANGLE
-- T--- I I
e :° d
y ;
°
e4
bT
.o °
o w I
I
w I
w I
13:43 1
�,
Cod
I I
� I rI
. , A.
8 ;
°
In
d .
° a4
O �.
TRASH &
�
RECYCLING
RECEPTACLE
MAIN ENTRY CANOPY OVERHANG
CONCRETE PLANTER POTS
MAIN ENTRY CANOPY OVERHANG
CANOPY COLUMN
BENCH, TYP.
NO PARKING, LOADING ONLY
PATIENT DROP OFF
BOLLARD
BRIDGE ABOVE
PEDESTRIAN LIGHT POLE
TRANSFOMERS
0.5' TALL CONCRETE
RETAINING WALL
RAMP
0.5' TALL CONCRETE
RETAINING WALL
1.5' TALL CONCRETE
RETAINING WALL
I
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO p{7��yj�yly
A 4A,� I
A r — —
\�
I d
I— -- e ' A r{f F
T —
O ,
EXISTING SANITARY0k
SEWER EASEMENT
EASEMENT ---may = -.•
/ I EXISTING
— r / I FIRE ACCESS & _��- �•••
UTILITY EASEMENT
sauna
o co
�.
4.
■ ° CONCRETE WALK
■ / �� UNDERGROUND BICYCLE RACKS
■ o ° TELECOM VAULT (4 BIKE PARKING SPACES)
■ �15' SIGHT TRIANGLE
4. ■ 1 30' SIGHT TRIANGLE
■ co
■ �. 1 CONCRETE WALK
■ EXISTING 30' STORM
■ 1 b� . ° DRAINAGE, WATER
1 — EASEMENT
■ 11
I
■
°
30.00 ■ �a 5 STO RY
■ MEDICAL OFFICE BUILDING
4 , 137,006 SF
■ "'� `� . BENCH, TYP.
II ■ �e
r
EXISTING
FIRE ACCESS
& UTILITY
EASEMENT
E:ZiI�I�:XiI�ll■
�I�Illllltll
15' SIGHT TRIANGLE
30' SIGHT TRIANGLE
-- T--- I I
e :° d
y ;
°
e4
bT
.o °
o w I
I
w I
w I
13:43 1
�,
Cod
I I
� I rI
. , A.
8 ;
°
In
d .
° a4
O �.
TRASH &
�
RECYCLING
RECEPTACLE
MAIN ENTRY CANOPY OVERHANG
CONCRETE PLANTER POTS
MAIN ENTRY CANOPY OVERHANG
CANOPY COLUMN
BENCH, TYP.
NO PARKING, LOADING ONLY
PATIENT DROP OFF
BOLLARD
BRIDGE ABOVE
PEDESTRIAN LIGHT POLE
TRANSFOMERS
0.5' TALL CONCRETE
RETAINING WALL
RAMP
0.5' TALL CONCRETE
RETAINING WALL
1.5' TALL CONCRETE
RETAINING WALL
I
TRASH &
�
RECYCLING
RECEPTACLE
MAIN ENTRY CANOPY OVERHANG
CONCRETE PLANTER POTS
MAIN ENTRY CANOPY OVERHANG
CANOPY COLUMN
BENCH, TYP.
NO PARKING, LOADING ONLY
PATIENT DROP OFF
BOLLARD
BRIDGE ABOVE
PEDESTRIAN LIGHT POLE
TRANSFOMERS
0.5' TALL CONCRETE
RETAINING WALL
RAMP
0.5' TALL CONCRETE
RETAINING WALL
1.5' TALL CONCRETE
RETAINING WALL
I
BICYCLE RACKS
2.5' TALL CONCRETE
1
' ' 114 e:d
(8 BIKE PARKING SPACES)
11
■
RETAINING WALL WITH
11
—�4.STONE
VENEER TO
a°°
�e 11I.
TRASH ENCLOSURE MATCH BUILDING
FIRE DEPARTMENT CONNECTION
° rd °
■
o
d
t. 43
° `Rm °
R ASC PICKUP GENERATOR ENCLOSURE
CANOPY OVERHANG
d
■
° ''.1I.. . ° °
e
BICYCLE RACKS
- CONCRETE STEPS
d
° .�
p
1
■
w CANOPY COLUMN (8 BIKE PARKING SPACES) d 411 ■
1' ° d TRASH & o ° . ° ■
° . d� ° 1■■ ■■ RECYCLING 5:00. o ° �. °' °
Ilfl' 111 IIII11�1�11 �11�11 1` RECEPTACLE ° `� c N RETE ■
a001 I ° .
°d.. e. S F2VICE. °: ■
HIM aj� I �.. �. .. c� e °- AIIEA ■
° ° 0 ° ° ° °
1 r. d 1 ■ ■■d a �... o d °� ° e II d ■
.° 1 1 ° II °
N■'Q 1----- — —--- I NIX
e.
1�■ a � � ° � "o II &
4. ° 1
11 , ° ° .
0 co
ASC PICKUP rn _ _ _
00
o ° - NO PARKING, LOADING ONLY � - -- -- -' - -� -
------ a ° I\T- -- -°. - o T-----
T---d °
z °
z '32.004
o
m ° �
EXISTING FIRE o F�y,NG FIRE
ACCESS & UTILITY
ACCESS & UTILITY
EASEMENT N
- IIIIIII �� �,�I IIIIII
384 SPACE
PARKING GARAGE
I
■■■■■
MmEN..
.■■■■
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/O NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
303-232-6200
0
Q
0
Y_
\
Z
D^
0
cc
Z-
.0
W�
V
LL
LL
Z
N
W
W
z
a
H
Z
W
a
0
W
O
J
V
-
W
�
�
�
J
V
Q
Q
-
LL
V
W
a
N
- "LOADING ONLY" SIGN G 9 G
Y m N m
Q � z
N O ¢
LI J
w
C o
IIIIII � �"�
PROJECT NO.
21454.00
0' 10, 20' 40' DATE:
'1 01 /13/2023
NORTH SHEET NUMBER:
SITE PLAN 0
of 08
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 203 293 & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
LANDSCAPE REQUIREMENTS CHART - CAMPUS TOTALS
REQUIRED
PROPOSED
BUILDING COVERAGE (INCLUDING
PARKING STRUCTURE)
80% MAX/ 938,490 SF
21.3% / 249,573 SF
LANDSCAPING (WITHIN PROPERTY LINE)
20% MIN / 234,663 SF
20.2% / 237,162 SF
SOD
30% MAX / 84,183 SF
18.5% / 43,773 SF
NATIVE SEED
17.0% / 40,330 SF
PLANTING BEDS
64.5% / 153,059 SF
PEDESTRIAN HARDSCAPE
6.4% / 75,192 SF
CLEAR CREEK DRIVE & 40TH AVE
1,470 LF PUBLIC FRONTAGE, 1 TREE PER 30 LF
49
72
ON SITE TREES
1 TREE PER 1,000 SF REQUIRED LANDSCAPE (234,663 SF)
235 TREES
313 TREES
ON SITE SHRUBS
10 SHRUBS PER 1,000 SF REQUIRED LANDSCAPE (234,663 SF)
2,350 SHRUBS
4,013 SHRUBS
PARKING ISLANDS 1ISLAND /25PARKING SPACES
1 TREE AND 4 SHRUBS PER REQUIRED ISLAND
50ISLANDS
50 TREES & 200 SHRUBS
83ISLANDS
83 TREES & 1,305 SHRUBS
M INIMUM TOTAL TREES
PUBLIC FRONTAGE +ON SITE TREES + PARKING ISLANDS
334 TREES
385 TREES
MINIMUM TOTAL SHRUBS
ON SITE SHRUBS + PARKING ISLANDS
2,550 SHRUBS
5,318 SHRUBS
PLANT SCHEDULE (MOB SITE ONLY)
QTY. ABBR. BOTANIC NAME
DECIDUOUS TREES
0
TOTAL
0
TOT0AL
0
00
0
00
0
TOTAL
Ob
TOTAL
^o
sw*
riYp
+ow
TOTAL
COMMONNAME
PLANTING NOTES
SIZE
3
AM
ACER MIYABEI'MORTON'
STATE STREET MAPLE
2.5" Cal.
B&B
1
CS
CATALPA SPECIOSA
WESTERN CATALPA
2.5" Cal.
B&B
2
GB
GINGKO BILOBA'AUTUMN GOLD'
AUTUMN GOLD GINGKO
2.5" Cal.
B&B
3
GD
GYMNOCLADUS DIOICUS'ESPRESSO'
ESPRESSO KENTUCKY COFFEETREE
2.5" Cal.
B&B
1
QM
QUERCUS MACROCARPA
BUR OAK
2.5" Cal.
B&B
5
UP
ULMUS PARVIFOLIA'EMERII'
ALLEE ELM
2.5" Cal.
B&B
15
ORNAMENTALTREES
1
CC
CERCIS CANADENSIS
EASTERN REDBUD
2.5" Cal.
B&B
3
CT
CRATAEGUS CRUS-GALLI'INERMIS'
THORNLESS COCKSPUR HAWTHORN
2.0" Cal.
B&B
3
MS
MALUS X'SPRING SNOW
SPRING SNOW CRAB
2.0" Cal.
B&B
7
DECIDUOUS SHRUBS
7
CCD
CARYOPTERIS CLANDONENSIS'DARK KNIGHT'
DARK KNIGHT SPIREA
#5
Container
52
CSA
CORNUS SERICEA'ARCTIC FIRE'
ARCTIC FIRE DOGWOOD
#5
Container
17
RGS
RHUS GLABRA
SMOOTH SUMAC
#5
Container
84
RTA
RHUS TRILOBATA'AUTUMN AMBER'
AUTUMN AMBER SUMAC
#5
Container
22
RRD
ROSA'DOUBLE KNOCKOUT'
DOUBLE KNOCKOUT ROSE
#5
Container
40
SJG
SPIRAEA JAPONICA'GOLDFLAME"
GOLDFLAME SPIREA
#5
Container
60
SJL
SPIRAEA JAPONICA'LITTLE PRINCESS'
LITTLE PRINCESS SPIREA
#5
Container
282
EVERGREEN SHRUBS
18
MAC
MAHONIAAQUIFOLIUM'COMPACTA'
COMPACT OREGON GRAPE HOLLY
#5
Container
18
ORNAMENTAL
GRASSES/PERENNIALS
178
BGB
BOUTELOUA GRACILIS BLONDE AMBITION
BLONDE AMBITION BLUE GRAMA
#1
Container
42
CAA
CALAMAGROSTIS X ACUTIFLORA'AVALANCHE'
AVALANCHE FEATHER REED GRASS
#1
Container
112
CAF
CALAMAGROSTIS XACUTIFLORA'KARL FOERSTER'
KARL FOERSTER FEATHER REED
#1
Container
140
PVH
PANICUM VIRGATUM'HEAVY METAL'
HEAVY METAL SWITCH GRASS
#1
Container
472
NOTES:
1. TREE CANOPIES WILL BE PRUNED TO A MINIMUM CLEARANCE OF 13-6"
OVER ANY FIRE LANES. THE FULL WIDTH OF THE FIRE LANE SHALL BE
CLEAR OF ANY LANDSCAPE MATERIAL UP TO 13-6" IN HEIGHT.
LEGEND
0000000001 LIMITS OF MEDICAL \
OFFICE BUILDING SDP
AREA OF APPROVED CAMPUS
NOT AFFECTED BY THIS SDP (1 ZGB •1
_-s
—_-55'
---rs�--
_ -ss" —
+ss'
IRRIGATED SOD
_ O GB
1 (t)AM_
AT GRADE PLANTING BED WITH ___s -- ■ • _ — ,, - a
1.5" ROCK MULCH
H— � / • � a -T ° ° o° STD ST 9 XS a
PROPERTY LINE --- / �r Q e
-
- BICYCLE
EXISTING EASEMENT • / ° u — RACKS ° ■
BUILDING ENTRY
PEDESTRIAN LIGHT POLE
PARKING LOT LIGHT POLE
RETAINING WALL
CANOPY
DECIDUOUS TREES
+
,n,lno°j + = EVERGREEN TREES
+ _ _
r
ORNAMENTALTREES
r
00�{
DECIDUOUS SHRUBS
jkI
ORNAMENTAL GRASSES
o8Bco
EVERGREEN SHRUBS
NINE
BENCH
BIKE RACK
8
TRASH & RECYCLING RECEPTACLE
OPLANTER
POT
SIGHT TRIANGLE
r —
AASHTO SIGHT TRIANGLE
PEDESTRIAN LIGHT POLE
PARKING LOT LIGHT POLE
/ / 4 TURF GRASS (1) GD (31) BGB ■
/ 30' SIGHT TRIANGLE (8) RTA (55) CAF (20) RTA
(33) CSA L-- ■
TURF GRASS 1.5" ROCK MULCH AT (9) SJL ■
i (3) CT ALL PLANTING BEDS (3) RGS
(3) MS (8) MAC
O 22 CAF
(13) RRD (17) SJL
(f\/ (2) GD -
STEEL EDGER
(19) RTA
(18) CAF
(18) SJG
(17) CAF
(2) UP
(14) RRD
MAIN ENTRY
MAIN ENTRIES
(20) BGB
MEDICAL OFFICE BUILDING
(3) RGS
(2) RGS
(6) CSA
(10) MAC
(8) CAA
(13) CSA
(3) RGS
(34) CAA
(12) RTA
co
(8) CAF
0.5' TALL CONCRETE
RETAINING WALL
■
■
RAMP
I
■
(5) RTA
■�
0.5' TALL CONCRETE
RETAINING WALL
P
°
(3) RGS
°
1.5' TALL CONCRETE
■
RETAINING WALL
(9) SJL
�
■
BICYCLE RACKS (1) CC ■
(23) BGB (18) SJL ° 6 ■
(25) SJG
(1) AM ■
(8) SJG (5) SJL
2.5' TALL CONCRETE ■
R (8) BGB RETAINING WALL WITH ■
(7) SJG STONE VENEER TO ■
(81) BGB ASC PICKUP ENTRY (3) RGS MATCH BUILDING ■
(9) RRD ■
■� . ■■ BICYCLE RACKS ■
(16) BGB a001° ■
u° ■
° TRASH °
° b I
■■ ° ■�w • DDC� .I
I � I
° �J I■
— -- - --- ------ -- - GENERATO�
I 1.5" ROCK MULCH AT
= j ALL PLANTING BEDS
— —E— F--E--F--E----E--F--E--F— —F--E— F--E-- _ F-- 'E-- —
° -- T----- --
. \
/ I -
�� ■ ■ on on
■■ NONE ■ NONE (7) CCD N■■■■■■■■�■�
I
(26) PVH (6) RTA — (14) RTA
P MC PVH
(2) U
(1)AM � (1)QM (70)PVH -(1)UP
t_—AX`
/
CA
/ /
IN
TRANSFORMERS
cu
7
co
move
.■.■•
MOON•
DAVIS
PARTNERSHIP
ARCHITECTS
zZ
DN
M—
W
IlI
IL
0
v
U
U
=W
m
Z
a
Z
S
G
a
0
W
00
J
0W
LL,
�Q
0
V
a
N
F,
m
g
/ FIT
-
w
a
o m o
\ PROJECT NOo
21454.00
0' 10, 20' 40' ' DATE.
01 /13/20,
NORTH SHEET NUMBER.
LANDSCAPE PLAN O4
of 08
EXTERIOR ELEVATION - WEST
1 /16" = 1'-0"
15' - 9 1 /2"
CPC.M11
SFS.21
PMF.M21
PMF.M21
PAINTED
H.2 I ( H
SS.M
EXTERIOR ELEVATION - EAST
% 1 /16" = 1'-0"
IS
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
F
ISFS.11
E
229' - 8"
PMF.M21
7
-4" 1' 4"' 1' - 4" 1' -
r -
MSS.M CWS.1
B
A.2 I ( A ) ( A.A
- OFF
7 O
5,53
T.O. METAL SCREEN
STUD
184'-0"
T.O. STEEL
172'-7"
LEVEL159'-1 "
LEVEL145'-9"
LEVEL132'-5"
LEVEL 2 &�
119'-1" v
\
LEVEL100'-0"
5, 454.50'
BUILDING MATERIALS SUMMARY - EAST AND WEST FACADE
REQUIRED
IPROPOSED
EAST ELEVATION - NOT STREET OR PUBLIC FACING
TOTAL TRANSPARENCY (%)
INO REQUIREMENT
6%
BUILDING FACADE (3'-0"- 8'-011)
1050 SF
GLAZING (3'-0"- 8'-0")
158 SF
WEST ELEVATION - STREET
TOTAL TRANSPARENCY(%)
40%
52%
BUILDING FACADE (3'-0"- 8'-011)
1050 SF
GLAZING (3'-0"- 8'-0")
469 SF
BUILDING MATERIAL TYPES
PRIMARY
SECONDARY
GLAZING
100%
0%
METAL PANEL
PRECAST CONCRETE
STONE
MATERIAL LEGEND
0 SFS.1
0 SFS.2
0 CWS.1
0 LCWS.2:]
0 PMF.M1
PMF.M2
EcPc.M1
STOREFRONT SYSTEM
BLACK ANODIZED
STOREFRONT SYSTEM
CLEAR ANODIZED
CURTAIN WALL SYSTEM
BLACK ANODIZED
CURTAIN WALL SYSTEM
CLEAR ANODIZED
METAL PANEL
COPPER PENNY
METAL PANEL
CHAMPAGNE BRONZE
WELLS INFINITE FACADE
GRAY PRECAST CONCRETE
BUFF STRIP STONE
RANDOM LENGTHS
METAL PANEL - GRAY
PIVIF. IVIO ROOFTOP EQUIPMENT SCREEN
GLASS WINDOWS
■■ems■
m now
MOORE
■■..
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/O NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
303-232-6200
Z
cc
Z—
a
N
JD
Z
LLI
m V �
0
CPC.M1
5,538.50'
LV J
LL LV LLI
T.O.
METAL SCREEN
STUD AL
ILL
184'-0"
0
L
Q
J
�
T.O. STEEL
Q
172'-7"
SFS.2
TYP.
co
V
UJ
LEVEL 5
159'-1 "
LV
�
�
�
♦aA
N
PMF.M2
LEVEL 4
0
145'-9"
v �
00
co
LEVEL 3
o
132'-5"
v
Q
o
Y
�
LEVEL 2
S
o^
0
LEVEL1
100'-0"
5, 454.50'
OIL
BRIDGE CONNECTION
TO PARKING GARAGE
G � G
Y g
Q � z
N O ¢
w
o^
w
LU
PROJECT NO.
21454.00
DATE:
011131204
SHEET NUMBER:
WEST AND EAST ELEVATIONS of os
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
7 6 5 4 3 2 1 0.8
5'- 10 1 /2"
28'-81/2" 1o'-0" 35'-0" 35'-0" 30'-0" 30'-0" 8'-0"
45' - 2 1/2" 30' - 9" 11 37' - 1" 29' - 6" 27' - 0" 33' - 4" 5,538.50'
ROOFTOP EQUIPMENT SCREEN CPC.M1 BUILDING
GRAY METAL PANE SIGNAGE o T.O. METAL SCREEN
o �_N STUD
184'-0"
BRIDGE CONNECTION�-\ Cfun CPC .M1 N M1
TO PARKING GARAGE CP° -
4 r
T.O. STEEL
°
172'-7"
PARKING GARAGE SFS.2 a 8 SFS.2
4] TYP
°- - _ a° r
.
�
_a ° °.
° LEVEL 5
° 159'-1 "
°
1 It]PMF M1 ;
°o LEVEL 4
° a _ o
145'-9"
3'-0"
co
CW .2 co
a_
LEVE4-1 L 3
132'-5"
° a d -
e- °° v
° PMF M1
a_ o
o _ LEVEL 2
0
N � 119' 1
2a o
N PMF M2
CONCRETE _
COLUMNS TO - _ '
CWS.1 � _ _ -co
MATCH HOSPITAL o
BRIDGE PAINTED
1 - 0 LEVE-14 L 1
100'-0"
SFS.1
5,454.50'
PMF.M2 MSS.M PMF.M2 SFS.1 MSS.M
CWS.1 CWS.1 MSS.M CWS.1
EXTERIOR ELEVATION - NORTH
1 1/16" = 1'-0"
0.8 1 2 3 4 5 6
5' - 10 1/2" 30' - 0" 30' - 0" 35' - 0" 35' - 0" 10' - 0" 24' - 3"
4'- 4" 24' - 6" 29' - 5" 37' - 2" 32' - 0" 32' - 8 1 /2"
BUILDING CPC.M1 ROOFTOP EQUIPMENT SCREEN CPC.M1
SIGNAGE
GRAY METAL PANEL T.O. METAL SCREEN
STUD
184'-0"
CPC.M1 0 0
T.O. STEEL
172'-7"
-
PMF.M2
d
b LEVEL 5
q BRIDGE CONNECTION 159'-1"
°
E
TO PARKING GARAGE
SFS.2
PMF.M1 ° aEU
TYP. PARKING GARAGE
0 4 LEVEL 4
° 145'-9"
°a °
CWS.2 00
co
a a
LEVEL 3
-17
132'-5"
3'-0" �
co
-cD
CW .1 PMF.M1 S
°�LL �` °
LEVEL 2
119'-1„
PMF.M2 2' - o" a 2' - o"' CONCRETE COLUMN
TO MATCH -
_ HOSPITAL BRIDGE
� N
PAI NTE D LEVEL 1
100'-0"
SFSA CWS.1 rPAI
.2 PMF.M2 MSS.M PMF.M2 5,454.50'
MSS.M PAINTED NTED CWS.1 CWS.1
EXTERIOR ELEVATION - SOUTH
1/16" = 1'-0"
BUILDING MATERIALS SUMMARY - NORTH AND SOUTH
REQUIRED
NORTH ELEVATION - STREET
TOTALTRANSPARENCY(%)
25%
BUILDING FACADE (3'-0"- 8'-011)
GLAZING (3'-0"- 8'-0")
SOUTH ELEVATION - STREET
TOTALTRANSPARENCY(%)
25%
BUILDING FACADE (3'-0"- 8'-011)
GLAZING (3'-0"- 8'-0")
BUILDING MATERIAL TYPES
PRIMARY
GLAZING
100
METAL PANEL
PRECAST CONCRETE
STONE
MATERIAL LEGEND
SFS.1 s-
B1
SFS.2 Cl
Ows-1 c'
BI
� LCWS.2
PMF.
PMF.M2
EcPc.M1
MSS.M
PMF.
GLASS WINDOWS
OREFRONT SYSTEM
ACK ANODIZED
OREFRONT SYSTEM
EAR ANODIZED
PROPOSED
28%
665 SF
187 SF
25%
665 SF
164 SF
SECONDARY
RTAIN WALL SYSTEM
ACK ANODIZED
0%
CURTAIN WALL SYSTEM
CLEAR ANODIZED
METAL PANEL
COPPER PENNY
METAL PANEL
CHAMPAGNE BRONZE
WELLS INFINITE FACADE
GRAY PRECAST CONCRETE
BUFF STRIP STONE
RANDOM LENGTHS
METAL PANEL - GRAY
ROOFTOP EQUIPMENT SCREEN
■��so
mnow
MOOR■
■mom
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/O NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
303-232-6200
Z-
oN
JD
m
W�
V
LL
ILL
Z
V
W
W
m
Z
a
Z
W
�
a
0
W
0
J
Q
W
u
�
J
V
a
�
LL
V
W
a
G � G
Q z
N O ¢
w _ w
o
w
w
o
PROJECT NO.
21454.00
DATE:
01 13 204
SHEET NUMBER:
ELEVATIONS of 08
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
0. `0. `0.5 `0.7 W.2 �2.4 `4 4 t
NOTES:
1. MEDICAL OFFICE BUILDING IS LOCATED CENTRALLY WITHIN HOSPITAL CAMPUS
BOUNDARIES, THE ADDITION OF BUILDING MOUNTED LIGHTS DOES NOT AFFECT LEVELS
AT THE PROPERTY LINES OF THE ENTIRE CAMPUS.
2. SITE POLE LUMINAIRES WERE PROVIDED UNDER BASE CONTRACT FOR MAIN HOSPITAL
(LABELED AS EXISTING). POLE AND PEDESTRIAN LIGHT HEIGHTS WERE INCLUDED FOR
THE MAIN HOSPITAL SITE DEVELOPMENT PLAN.
�;!
I - �2.9- 3. / '5.1 '5.3 '4.4
✓ T-
j i 3. NG 6.1 7.0 5.6
PEDESTG'CAMPUS
/ r PEDESTRIAN UGHTI � iG
lie-asT
Statistics
6.5
' `
�`
Description
Avg
Max
Min
4►�+P
'4Ajl
-16�e���
Main • •
Entrance
9
IA��al
North
m
m
I °
Main Entrance Canopy
*
South1►
rt'
4
,!►f+�y�
��eq0
Walkway Around
I
A
I
1
�''r
-
ll*a�3.0
f
Building
MI
LUMINAIRE SCHEDULE
GENERAL NOTES:
A. CATN NUMBER REFERS TO FIRST NAME LISTED UNDER MANUFACTURER MR WMINAIRE TWE. REMAINING MANUFACTURERS USIFD ARE CONSIDERED EWIVNENT PRODUCTS FOR THIS PROJECT AND SHALL MEET ALL
CRRERIA LISTED INCLUDING TIAT CALLED FOR BY THE SPECIFIC WMIHARE CATALOG NUMBER. CATALOG NUMBERS DO NOT NECESSNtILY REPRESENT COMPLETE CATALOG NUMBERS. ALL ITEMS UBIFD IN TIE
UUSILAL DESPTION BE PROVIDED.
B. REFER TO LIGHTING SPECIFICATIONS MR ADDMCIUL 15 REOUIRET1ER.
C. PROVIDE UNG PNICINO Fpi Nl WMINNREB BYTYPE AND BIIBMG WITH BID FIXiM.
D. PROVIDEANEMERGENCYBAUI$TTESTSW'ITCHFORRECESSEDDO WWSONCEIUNGA EHTTOWMINNRE.
SPECIFIC NOTES:
1. VERIFY EXACT MOUNTING HEIGHT WITH ARCHITECT AND PMOWDE APPRDPRATE SUSPENSION LENGTH.
2 VERIFYFINISH WITHARCHIIECT
TYPE
DESOU"ON
RAPS
VDLT-AAPS
VDLTNE
MANUFACNRER
CATALOG SERIES
FINISH
MOUNTING
RECESS
NOTES
EXTERIOR RECESSED C DMNETR LED DO Iumo NT. WET
INDWMERS
ED1
LDCATIDN. MEDIUM WIDE OISTRBUTIXN. SEMVSPECUWitFN3
3500K
9
2"
GOTNAM
EWK
SEMISPECUWt
SE
REDEEMED
P cm
E%TERIIXi 115 WIDE XP TALL LED WALL SCONCE. VISUAL UAL
EW1
c0MMRT.MRWARDTHROWDISTWBUTK)N
3500K
10
2"
UMONM
MGM LED P1
BIRO(
SURFACE, WALL
BIHCRI
E%TERIOR 115WIDEXP TALL LED WALLSCDNCE, VISUAL
=WMENS
EWt.t
CDMMRT.FORWARDTHROWDISTRIBUTWN
3500K
15
2"
IRHONM
MGM LED P2
BLACK
SURFACE, WALL
Bu. cw
LIGHTING LEGEND
(W all s .Ws listed blow are used do tllaas drawl .)
SYMBOL
DESCRIPTION
SYMBOL
DESCRIPTION
®
LINEARLUMNNRE RECESSED
WALLMJUNTEDLUMNARE
y=�''•1''[L;Z3�
B e
DOAMI 'GM -RECESSED
7.,.�?,.yC
E{
PDLELUMIUURE-ANAMWIREO
C 9
BOIURD
}
;
KLELUMNAIRE-POSTTOP
+0.9 +2.8
+0.8 +2.7
+0.8 +2.7
I��
r1
i
4.1
I!1,
+3.2
+2.0 +2.5
�'0'1 ��I ej+S4O"�/i • 1 1 9 1 1 1 1 1 1
s ISO`/ICE IvNp�i� �►�5//
*�yl•regso-�psi�nen��� % _
IT
1
IWIPIP
=11mom
-000011 mMR
Wo+TFY-C
-------------------- -----
F
EXISTING CAMPUS
PEOESTMAN UCMT
4
�I
EXISTING CAMPUS
PEDESTRIAN UGHT
.T a
.4 < �A.5"+1 d J1 0 +0.5.' +0.2
i a
C uc011 ►
mamas I i�e��� �♦
R".,301 T A■Ilwl■1■IL AI 19 'L.F +�
1 n d [ A 1 1 1 II 0 ON
1 II i
�r� a .I►'s �i I A�I�I�lal�ll��llI [� e��►� �rar� �®�� �����
I �3TY� .► j �, �, � �i1r��1� � � ����L���.�I��lill��9111����-� � .:•: �I...�.r - D r , �, .III 1. � 11� 1 O•�A�A��1 . K�,:a ' �31'iF" n?Yt::" v�nE�i' ■nl■mnnoll
e1 re Nd � • s) f3 1■aliiilGi.iil�ii
If,�jpeci�♦I� N,� A��Y)��,�o-�•���kYyi���;-- --- ���IE .�.�
• 1 1 1 1 1 1 A1P117IC1D
�1► �;a� �i� . , °.� � ' e�'J"=1� � ✓ilH���'�k �'" <.. i ili�ri' it I I .i ,L:1' y� �♦.oT'�i,
i tio� ° >•. I C �� ��
1��1!��'4`°i�� �O�a°�y� ���4♦al�°%��,-��'�� �� l� mL�l I�l �. �l �-Til•C w�a� r.
:T3�
A 1 E IllI�OII ,�• 1 1^dl��'I 7T. �� `A#����Y�I��T � �'l,` +�i ��/
e°a'a°o°e°e1���♦J�O��►1 / �1� 1 I� I� 4A ®.r �� �:�
f .,moo, .. �O"�r.'ar��l0'� � � ,♦ i s♦ fir rT�s r, ����ff �.,i��, r
j� � A A � f €^ ^'(Art 0 �1+►.l�sLi�/"a�1e�lw^.�Aw�� 4���*k�n'I)V' °1G
in �
's^�fP`•w.r l^^�a'7/ IG'e„. �� �� ' �.�■��®I'=���i",
38 `S:flZ• ems. G, £� .it. MINOR
..v'; .ir:...c_,c.�w..l., r r:.5a.�i`e.E A€ ✓ a::r aa..+rt. sil .,lc se s...r...a..' .. mIEJ-lam I I.� T
ul•�Ir��gl. � �IT->_
� PL
_ 4
•°�"°��"°/� y �__ �1�•,i � I�DI��il��`� � �'�If�lll�� : ���Illli� li��
e�.e.° �°tip �p J•E�� (eA�•aw♦4e ♦e /\ ��A� ��� �� •v A�
N 1 PHOTOMETRIC • A
a
0
DAVIS
PARTNERSHIP
ARCHITECTS
Z
z?
a
°iINM
N
O
z
LLI
w�e
0
LL
M
W
00
Q
V
W
iL
wv
0
�Q
a
N
21454.00
DATE:
01 /13/
SHEET NUMBER:
7
of 8
70 11778 001
MAGLIN SITE FURNITURE INC THE INFORMATION CONTAINED IN THIS DRAWING
W-n
WWW MAGLIN CIFM S THE SOLE PROPERTY OF MAGLIN SITE FURNITURE
M A L I N TEL 800-716-5506 INC. ANY REPRODUCTION IN PART OR AS A
WHOLE WITHOUT THE WRITTEN PERMISSION OF
FAX' 877-260-9393 MAGLIN SITE FURNITURE INC. IS PROHIBITED
TITLE
BENCH, 970, METAL, W/CENTER ARM
PART NO
MLB970-M-C
SCALE (A) WEIGHT DATE
1'16 11412LBS 25/05/2015
BACKLESS BENCH - MAGLIN 970 BENCH
4'-611
4'-611
M04
4'-611
ail II II II II Ilia
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
35.53
23.03ID
TOP VIEW
10.24
48.74 ISOMETRIC VIEW
W/O LEVELER
38.50 34.00
DOOR HEIGHT
CUSTOMER APPROVAL:
X
2.25 DATE:
FRONT VIEW SIDE VIEW X
UNLESS OTHERWISE SPECIFIED:
I.PRIM ARYDIM. ARE IN INCHES8 +FORMS+SURFACES Tel
Pine) 781-903Far IPA 15223
SECONDARY [DIM] IN MM Tel (4121 Street,
A003 Foxy4121 385-4715
2. TOLERANCES
FRACTIONAL:t1/32:ANGULAR/BEND:21° NAME DATE DESCRIPTION:
TWO PLACE DECIMAL 1.030
THREE PLACE DECIMAL 1.020 DWN ABM 11-25-2020
3.REMOVE ALL BURRS AND SHARP EDGES
® THIRD ANGLE PROJECTION CHK MGJ 11-25-2020
MATERIAL: SEE DATA SHEET DO NOT SCALE DRAWING
FINISH:- SEEDATASHEET PROPRIETARY AND CONFIDENTIAL TONYO RECEPTACLE, 60 GAL, SST,
THE INFORMATION CONTAINED IN THIS
WEIGHT: - SEE DATA SHEET DRAWINGISTHESOLEPROPERTYOF SIZE DWG. NO. REV SHEET
FORMS i SURFACES. ANY REPRODUCTION
SCALE: NOT TO SCALE WRIIIEIJOPERMISSIONWHOLE
P OITHOUT HIBRED. B SLTNO-2305-HAT-CS 0 1 OF 1
TRASH / RECYCLING RECEPTACLES - TONYO 60 GAL.
N.T.S
WELD STEEL CAP TO TOP OF BOLLARD
6" DIA. STEEL BOLLARD, TYP., PAINT BOLLARD TO
MATCH GATE FRAME
4" PRECAST CONCRETE CAP
4"X4"X2" HSS TUBE STEEL, 09 9600 - HIGH
PERFORMANCE COATING, COLOR TO BE DECIDED BY
ARCHITECT
ADHERED STONE MASONRY VENEER TO MATCH
BUILDING, TYP.
LOCKABLE LATCH FOR EACH DOOR
HEAVY DUTY STEEL HINGE, QUANTITY TBD BY
DELEGATED DESIGN
PERFORATED METAL, BASIS OF DESIGN: MCNICHOLS,
16 GAUGE, 2" ROUND ON 1-" STAGGERED CENTERS,
CENTER IN FRAME, PAINT TO MATCH STEEL
FINISHED GRADE
d J
•v'. a d •�. -'. d d •�. e a':•...d .. TR AND
d ,IIORCEMENT
III II II II II II II II II II II II II II II II II II II II II II II II
TRASH & GENERATOR ENCLOSURE
3/811 = 11-011
STONE VENEER ON
EXTERIOR OF WALLS
II:L'�y:1:11►Is] [063110:aNTIMII
SECTION
STEEL HANDRAIL
3-6"
CONCRETE STAIR
WITH HANDRAIL
.. . . •d:..j ..I' 1'd p '�.• :A . A • u.: :.
b. 1/2" SEALED
EXPANSION JOINT,
BOTH SIDES
ba .
d a d
d -
SERVICE AREA RAMP WALLS AND STAIR.
3/811 = 11-011
FI
-
TOP VIEW
2311
B 0 l Q ® Blke rack, Pmbedded
Product Drawing
28 9/64 [7151
Drawing BD661-01
Dimensions are In Inches Imml
Date 11/5/2014
www landscaoef orris core Ph 800 5212546
01 1 /2" [381
TUBING
CONFIDENTIAL DRAWING INFORMATION CONTAINED HEREIN IS THE PROPERTY OF LANDSCAPE FORMS, INC
INTENDED USE IS LIMITED TO DESIGN PROFESSIONALS SPECIFYING LANDSCAPE FORMS, INC PRODUCTS AND
THEIR DIRECT CLIENTS DRAWING IS NOT TO BE COPIED OR DISCLOSED TO OTHERS WITHOUT THE CONSENT
OF LANDSCAPE FORMS, INC @2013 LANDSCAPE FORMS, INC ALL RIGHTS RESERVED
BICYCLE RACK - LANDSCAPE FORMS - BOLA
N.T.S
ISOMETRIC VIEW
NOTE:
APPROX. 990 LBS.
NOTES:
1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS.
2. DO NOT SCALE DRAWINGS.
3. CONTRACTORS NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info
REFERENCE NUMBER 2894-028.
LANDSCAPE FORMS DUNE PLANTER - DS-38
NTS
DETAILS
■■ms■
ii
mmi
■Nns0
.■..■
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/O NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
303-232-6200
ZZ
�N
mV
VW
LL
O
�
Z
a
Z
W
�
a
O
W
00NMI
W
2
U
A""'
Q
LL
W
a
a
a
cn
m
DO
Y
m
=
Q
z
N
O
W
w
=
I.>L
W
W
N
N
O
N
N
O
N
N
O
QLn
N
rn
0
o
a
�
o
PROJEDO
CT NO.
21454.00
DATE:
01/13/2023
SHEET NUMBER:
08
of 08
EXHIBIT 5: ARCHITECTURAL RENDERINGS
AND PERSPECTIVE VIEWS
(see attached)
Planning Commission 14
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
�s • t
HOSPITAL •� `~
(NOT IN SCOPE)... •
a 4 _.e ♦ ' �_ _►_
aw -44 `
.. 04W
,„-
. r C PARKING GARAGE
NOT IN SCOPE
■■ME■
Noun.
■■N■■
.■.■.
.■..■
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/ONEXCOREGROUPLLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA &ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
303-232-6200
Z—
oN
JD
m
vw
Memos
LL
LL
V
Z
�
v
W
M
a
�
Z
W
�
a
0
j
W
00
J
0w
—
13
uI0
�Q
M
J
0
V
LL
Memos
0
a
N
Y
�
G
LU
o
LU
w
o=
w
p
PROJECT NO.
21454.00
DATE:
01 /13/2023
AERIAL PERSPECTIVE
SHEET NUMBER:
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
L
COLOR EXTERIOR ELEVATION - WEST
1 /16" = V-0"
COLOR EXTERIOR ELEVATION - EAST
1 /16" = V-0"
T.O. METAL SCREEN
STUD
184'-0"
BUILDING MATERIALS SUMMARY - EAST AND WEST FACADE
■�■..
REQUIRED
PROPOSED
EAST ELEVATION -NOT STREET OR PUBLIC FACING
N now
MOORE
■EMIMM
TOTAL TRANSPARENCY (%)
INO REQUIREMENT
6%
BUILDING FACADE (3'-0"- 8'-011)
1050 SF
ENRON
GLAZING (3'-0"- 8'-0")
158 SF
DAVIS
PARTNERSHIP
ARCHITECTS
WEST ELEVATION - STREET
TOTAL TRANSPARENCY (%)
40%
52%
BUILDING FACADE (3'-0"- 8'-011)
1050 SF
GLAZING (3'-0"- 8'-0")
469 SF
OWNER
18TH STREET DEVELOPMENT LLC
C/0 NEXCORE GROUP LLC
1550 MARKET ST #200
BUILDING MATERIAL TYPES
PRIMARY
SECONDARY
GLAZING
100%
0%
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
METAL PANEL
PRECAST CONCRETE
STONE
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
MATERIAL LEGEND
SFS.1
T.O. STEE MIW:] �
172'-7"
�SFS.2
STOREFRONT SYSTEM
BLACK ANODIZED
STOREFRONT SYSTEM
CLEAR ANODIZED
LEVEL �� /� /�+ . 1 CURTAIN WALL SYSTEM
159'-1' V V �7
BLACK ANODIZED
WALL
LEVEL 4
CWS.2 C EARIANODIZED STEM
145'-9" v
EP M F. M 1METAL PANEL
COPPER PENNY
LEVEL 3
132'-5" v
METAL PANEL
EPIVIF. M2 CHAMPAGNE BRONZE
LEVEL2 51 CPC. p 1 WELLS INFINITE FACADE
119'-1' � V �
GRAY PRECAST CONCRETE
Emss-ml
LEVEL
100'-01 P M F. M 0
:.REEN
STUD
184'-0"
STEEL
172'-7"
EVEL 5
159'-1 "
EVEL 4
145'-9"
EVEL 3
132'-5"
EVEL 2
119'-1"
EVEL 1
100'-0"
VISION GLASS
SPANDREL GLASS
BUFF STRIP STONE
RANDOM LENGTHS
METAL PANEL - GRAY
ROOFTOP EQUIPMENT SCREEN
**Colored elevations for reference only. Refer to sheet A5 for
images of specified materials
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
303-232-6200
(30
Z-
ON
.0
m
W
V
LL
W
Z
V
�
W
W
M
Z
ill
a
H
Z
W
�
a
0
W
0
J
Q
W
�
V
�
J
V
0
LL
V
W
a
A
N
O
¢
LU
o^
w
o^
w
o
o
o
Q
0
PROJECT NO.
aElUSIRIN
DATE:
01 /13/2023
COLORED BUILDING ELEVATIONS
SHEET NUMBER:
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
COLOR EXTERIOR ELEVATION - NORTH
1 /16" = V-0"
T.O.
METAL SCREEN
STUD
184'-0"
T.O. STEEL
172'-7"
LEVEL 5
159'-1 "
0
LEVEL 4
145-9"
00
LEVEL 3
132'-5"
v
LEVEL 2
119'-1"
BRIDGE CONNECTION
TO PARKING GARAGE
PARKING GARAGE
0
v
�
w
co
CWS.1
CONCRETE COLUMN
TO MATCH -
HOSPITAL BRIDGE
LEVEL 1
100'-0"
BUILDING MATERIALS SUMMARY - NORTH AND SOUTH
REQUIRED
NORTH ELEVATION - STREET
TOTALTRANSPARENCY(%)
BUILDING FACADE (3'-0"- 8'-011)
GLAZING (3'-0"- 8'-0")
SOUTH ELEVATION - STREET
TOTALTRANSPARENCY(%)
BUILDING FACADE (3'-0"- 8'-011)
GLAZING (3'-0"- 8'-0")
BUILDING MATERIAL TYPES
GLAZING
METAL PANEL
PRECAST CONCRETE
STO N E
MATERIAL LEGEND
SFS.1
0 ESFS.2
CWS.1
25%
25%
PRIMARY
100
STOREFRONT SYSTEM
BLACK ANODIZED
STOREFRONT SYSTEM
CLEAR ANODIZED
CURTAIN WALL SYSTEM
BLACK ANODIZED
LCWS.2:]
CURTAIN WALL SYSTEM
CLEAR ANODIZED
P M F. M 1METAL PANEL
COPPER PENNY
PM F. M2 METAL PANEL
CHAMPAGNE BRONZE
CPC.M1
0 Emss.ml
PMF.MO
PROPOSED
28%
665 SF
187 SF
25%
665 SF
164 SF
SECONDARY
0%
WELLS INFINITE FACADE
GRAY PRECAST CONCRETE
BUFF STRIP STONE
RANDOM LENGTHS
METAL PANEL - GRAY
ROOFTOP EQUIPMENT SCREEN
■��so
Nnow
MOOR■
■SRO■
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/O NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
303-232-6200
VISION GLASS Z
0a
EEL] SPANDREL GLASS Z Z a
Colored elevations for reference only. Refer to sheet A5 for J CD
O Z
images of specified materials — W
m
W� a
V W �
LL W W
T.O. METAL SCREEN ILL M
STUD O
184'-0" 0
J �
T.O. STEEL
172'-7"
W V V
W
LEVEL 5 Q
159'-1 " N
LEVEL 4
145'-9"
LEVEL 3 I M
132'-5" D_
Q
LEVEL 2
119'-1"
G � G
LEVEL 1 Q a z
100'-0" w
o^
w
o^
w
o
PROJECT NO.
COLOR EXTERIOR ELEVATION - SOUTH DATE: 21454.00
01 13 202
SHEET NUMBER:
COLORED BUILDING ELEVATIONS I A3
r
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
sma
DRI aoffnoaa���g7
,.,an r mot
4
X.R.
im
r 1.;Ji"a y
is
p� q Ip
im
E 11
KEY PLAN
DAVIS
PARTNERSHIP
ARCHITECTS
CM NEXC ORE GROUP ULC
DAY S PAR TO POST A ARC HITECTS
DAVS PARTNERSHIP ARCHITECTS
MARTINOMARTIN
303 .1 ADD
ELECTRICAL POOR PER
896 LABOR STREET
ZZ
°N
00
LU
Vw
LLw
LL
0
�
Z
a
z
a
0
w
OV
Vw
wV
�Q
0
V
w
a
N
BUILDING PERSPECTIVES A4
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 203 293 & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
goo 0
:::;:
MENEM
MENEM
DAVIS
PARTNERSHIP
ARCHITECTS
ONMER
18TH STREET DEVELOPMENT LLC
C 0 NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO80202
303241W00
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BIAKESTREEf, SUITE 100
DENVER, COLORADO 80205
PHONE 303 861 8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BIAKESTREEI, SUITE 100
DENVER, COLORADO 80205
PHONE 303 861 8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST C0LFAX AVE
IAIW VOOD, C000215
303431-6100
ELECTRICAL ENGINEER
CATOR PUMA &ASSOCIATES
896LABOR STREET
LAKE FOOD, CO 80401
303232 6200
Z
ZZ a
CURTAINWALL SYSTEM - - (A
BLACK ANODIZED (CWS.1) j O Z
STOREFRONT SYSTEM -m
FOR- WOOD LOOK CANOPY SOFFIT -
BLACK ANODIZED (SFS.1) OAK PRINT CHERRYWOOD (SMF.M1) W a
CURTAINWALL SYSTEM - V W OJ
CLEAR ANODIZED (CWS.2) '
W
LL
LLI
STOREFRONT SYSTEM - j V Q
CLEAR ANODIZED (SFS.2)
W V
0
LL
PRECAST CONCRETE - W V V
GRAY (CPC.M1) W
�Q N
METAL PANEL -
COPPER (PMF.M1)
METAL PANEL -
CHAMPAGNE (PMF.M2)
BUFF STRIP STONE
RANDOM LENGTHS (MSS.M)
V,
k_
PC
2
W
_
>2
W
2
W
DATE'.
21454.00
SHEET NUMBER'.
DIGITAL MATERIAL BOARD A5
EXHIBIT 6: APPLICANT'S RESPONSE TO SDP
CRITERIA
(see attached)
Planning Commission 15
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
■MERE
SENSE
Medical Office Building at the Lutheran Medical Center Replacement Hospital MENEM
Campus at Clear Creek Crossing Wheat Ridge, Colorado unman
August 10, 2021 DAV I S
PARTNERSHIP
ARCHITECTS
SPECIFIC DEVELOPMENT PLAN APPLICATION
Response to SDP Review Criteria — Section 26-305.D
Per the City of Wheat Ridge regulating documents, this development intends to meet
the following criteria as noted below:
Criteria 1. The proposed specific development plan is consistent with the purpose of
a planned development as stated in section 26-301 of this article.
The Medical Office Building at the Lutheran Medical Center Replacement Hospital
Campus is consistent with the purpose of the Clear Creek Crossing planned
development which is based on the City'sArticle 111—Planned Development. Specific
to section 26.301 of this article, this project will further promote the public health, DENVER OFFICE
safety, and general welfare by providing critical medical services to the City of 2901 Blake Street, Suite 100
Wheat Ridge. Additionally, this is consistent with the defined purposes of this Denver, Co 80205-2303
Article as follows: T303.861,8555
F 303.861.3027
1. To accommodate extraordinary or unique development proposals that
are not feasible under standard zone districts. w .davispartnemhlpxom
This unique, full -service hospital and medical campus use is supported
by, and contributes to, the overall design intent and uses in the greater
Clear Creek Crossing planned development. As an employment center,
it brings people to the development on both a short-term and long-
term basis, activating the planned development and contributing to
the economy further by supporting housing, retail, and commercial
uses in the Clear Creek Crossing development and surrounding area.
2. To accomplish compatible development with adjacent commercial,
residential and/or industrial land uses through proper land use
transitions and buffering techniques.
This project will complement the development's mix of uses, vehicular
and pedestrian circulation routing, interface with adjacent land uses
through shared vehicle and pedestrian connections, and landscape
treatments. The medical office building is proposed at the location
indicated in the approved SDP for the full27 acre medical campus.
3. To promote flexibility in design and permit diversification in the location
of structures.
This development is intent on creating a "campus" in the truest sense;
placing buildings where appropriate for safety, efficiency, and
connectivity of medical services, as well as leveraging the spaces
ARCHITECTURE • LANDSCAPE ARCHITECTURE • PLANNING • INTERIOR DESIGN elegant solutions
Medical Office Building at the Lutheran Medical Center Replacement Hospital
Campus at Clear Creek Crossing — SDP Application
August 10, 2022
between these buildings to augment mission -critical programs and to
create a high -quality experience for the users. The medical office
building's primary visitor entrance has been located in a highly visible
location on the west side of the building. It is connected to the campus
pedestrian network planned as part of the approved SDP for the
campus.
4. To promote the efficient use of land to facilitate a more economic
arrangement of building, circulation systems, land use and utilities.
Working within a tight site area, careful attention has been placed on
the location of the hospital building, central utility plant (CUP) parking
structure, and medical office building to enhance visibility of these
important community medical services, while minimizing the impact
of a dense campus on the surrounding uses and infrastructure. The
design of the site integrates the ODP's defined vehicle corridors as key
access routes into and through the campus, serving both medical users
and those of the greater planned development. Similarly, a network
of pedestrian connections linking to the public streetscape and the
regional trail are present throughout the campus to encourage
walkability and bicycle use. This SDP for the medical office building
fits into network approved as part of the hospital SDP.
5. To preserve, to the greatest extent possible, the existing landscape
features and to minimize impacts on other natural features of the site.
Clear Creek and the adjacent open space/recreational area and the
western views of the mountains are the most significant existing
landscape features influencing the campus. Pedestrian connections
link the campus to the Clear Creek Open Space, and the multi -use
regional trail is being redeveloped to safely connect the Clear Creek
Crossing planned development to this open space and to
trails/recreational facilities beyond. The medical campus provides
several connections to the trail to provide direct access to these
important recreational spaces and landscape and other amenities
(seating, lighting) are provided to enhance the experience. The
orientation of the medical office building embraces the western views
whenever possible and the outdoor spaces on the campus provide
view corridors to the valley and foothills.
6. To combine and coordinate architectural styles, building forms and
building relationships within the planned developments.
While supporting very specific medical uses, the building forms of the
hospital are layered with step backs on upper floors to scale and
enhance the ground level pedestrian experience. The exterior building
planes are articulated with different materials, transparencies, and
dimensional changes to create shadow lines and visual interest. The
Clear Creek Crossing Planned Development is based on a modern
0
Medical Office Building at the Lutheran Medical Center Replacement Hospital
Campus at Clear Creek Crossing — SDP Application
August 10, 2022
agrarian aesthetic for the buildings and site/landscape. This medical
campus integrates these design principles throughout the campus in
many ways including natural materials and rusticated finishes on
buildings, and strong patterning and lines in the landscape that
emphasize agricultural character. These deliberate design moves are
intended to compliment and strengthen the cohesiveness and
commonality of the planned development where the modern agrarian
theme is intuitively recognizable. The medical office building has been
designed to compliment the campus architecture established in the
approved hospital SDP.
7. To promote conformance with the adopted comprehensive plan,
established policies and guidelines for the area and for the community.
This proposed state-of-the-art hospital and medical campus supports
the City's adopted comprehensive plan, policies, and guidelines in
many ways. Of significance, this provides to the Wheat Ridge
residents and the greater community critical medical and other
services. As an employment base, it supports the economy through
employment as well as feeds into the surrounding business
enterprises. It will bring people into this area — employees and visitors
- who will likely spend time and money at nearby businesses, take
active use of local and regional amenities, and activate an area that
has not been previously occupied. Sustainability is at the forefront in
the design of the building, site systems and landscape. When
complete, this development will also offer a high -quality aesthetic,
visible to local traffic and regional passersby from its proximity to an
interstate highway. It is our hope that the medical office building at
Clear Creek Crossing will not only contribute to the fabric and economy
of the City but will also be a source of pride for the City of Wheat Ridge
and your residents.
Criteria 2. The proposed specific development plan is consistent with the design
intent or purpose of the approved outline development plan.
The SDP is consistent with the intent and purpose of the Clear Creek Crossing Outline
Development Plan and to the intent of the complementary Design Pattern Book.
This project provides a clear and consistent design aesthetic that contributes to the
unity of the Planning Areas and to the City of Wheat Ridge as a whole. The building
and site design along with the seamless integration of this medical campus into the
surrounding Clear Creek Crossing planned development and greater community is
our goal.
Criteria 3. The proposed uses indicated in the specific development plan are
consistent with the uses approved by the outline development plan.
The proposed use of medical office is consistent with the uses defined in Design
Pattern Book for Planning Area 1- Mill District as follows: employment uses;
medium to high density development; campus uses including hospital; combination
Medical Office Building at the Lutheran Medical Center Replacement Hospital
Campus at Clear Creek Crossing — SDP Application
August 10, 2022
of surface and structured parking; and building height, density and setbacks that
reflect the site's location at the junction of a State highway and Interstate freeway.
Criteria 4. The site is appropriately designed and is consistent with the development
guidelines established in the outline development plan.
The site design is based on the guidelines described in the ODP's Design Pattern
Book and the City regulations/guidelines combined with the unique technical design
requirements of a hospital and medical campus on this property. Specifically.
• Vehicle Corridors: The design of the site embraces the ODP's defined
vehicle corridors as key access routes into and through the campus,
serving both medical users and those of the greater planned development.
Three points of entry into this approx. 27-acre campus from 40' are
provided to accommodate different users and provide ample choices for
arrival. Intersections with public streets are aligned for safety and direct
access to other uses in the planned development. The internal road
network supports safe and efficient flows and movements for all campus
vehicles with careful consideration given to the separation of emergency
and service vehicles from everyday staff and visitors. The campus drives
are separated from the parking areas for safety and aesthetic reasons and
these expand the intent of the Design Pattern Book's road section by
providing wider walkways and increased landscape/amenity zones in
many locations. An expansive, multi -lane drop-off to amply accommodate
patients and visitors is located at the entry to the hospital. The parking
structure is served by multiple access roads supporting smooth
ingress/egress.
• Pedestrian Access/Circulation: Our priority is to create a safe and vibrant
environment for pedestrians throughout the campus that encourages
walkability and provides direct access to all campus and surrounding uses
and amenities. We offer a network of direct and comfortable pedestrian
connections to the campus facilities, plazas and gathering areas, the
public Clear Creek regional trail and recreational open space. Detached
sidewalks of ample dimensions are flanked by landscaped amenity areas
throughout the campus that are supported by seating, pedestrian scale
lighting, and directional signage for wayfinding. Clear circulation paths
are provided between parking and building entries and other campus
amenities with accessible routes provided.
• Open Space & Views: Views to the valley and foothills to the west are
provided where possible and primarily along road corridors that are not
impeded by other buildings. Access to the Clear Creek Open Space and the
multi -use regional trail leads to the Clear Creek riparian corridor where
views of this natural ecosystem is offered.
M
Medical Office Building at the Lutheran Medical Center Replacement Hospital
Campus at Clear Creek Crossing — SDP Application
August 10, 2022
• Landscape Design: In addition to the specific guidelines of the ODP, the
campus landscape design takes its cues from the surrounding context, land
uses and history. Consistent patterns, forms and textures in the landscape
are provided and intended to be a unifying element with the entire planned
development. Strong patterning and the use of flowing lines is intended
to convey an agrarian/creek theme throughout. The planting palette is
consistent with the other Districts and there is an emphasis on
sustainability through utilization of water -wise, xeric plantings
appropriate to our semi -arid climate. A naturalized design aesthetic is the
driver for the landscape with an emphasis on native and adapted plant
species and efficient irrigation. More formality and human scaled
plantings are introduced in locations surrounding building entries and in
outdoor gathering and garden spaces. Streetscapes are lined with a
variety of plantings to support human comfort, safety and navigation and
parking lots are visually enhanced through linear planting/walkway zones
in addition to the required parking lot islands. Landscape is also used for
visual screening, wind buffering, framing views, pedestrian comfort,
emphasis of special areas, wayfinding, spiritual nurturing, and general
user well-being. Our landscape emphasizes sensitivity to the ecology
sensitive and will require fewer resources than a traditional landscape.
Criteria 5. Adequate infrastructure/facilities are available to serve the subject
property, or the applicant will upgrade and provide such where they do not exist or
are under capacity.
Infrastructure/facilities are adequate and available to provide utility and other
services needed to support this medical project. New utility lines serving the
campus are designed to integrate with the existing infrastructure in the area.
Criteria 6. The proposed specific development plan is in substantial compliance with
the applicable standards set forth in the Architectural and Site Design Manual,
Streetscape Design Manual, and other applicable design standards.
The Architectural and Site Design Streetscape Manual, the Official Development
Plan and Design Pattern Book are the basis for design of this project, resulting in
compliance with the criteria set forth in these documents.
5
EXHIBIT 7: ARCHITECTURAL EXHIBITS
(see attached)
Planning Commission 16
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
LEGEND
3"IOW IdO ,L-,,V 30
S30NVHD 3NV1d Z
:NJIS3d
d3SOdOlid
,,L-i'V
NIW
V
HlIM
Hld3a
3NV1d
NI
NOUVI'dVA
3NO
1SY31
iV
= �&,09 / ,8-,6ZZ :3a03
n
O
v
m
00
� o
J
O U
mu O
(On o
m =
v1I
v>
Vf r
ZNO
.. cn
wp>0
�Zrc
rn rn � \
m > z
220 �
ny��
_�_>
y_.. n
ZO>
G)Z�p
m -
tAZvm
O- _
-n�:
KV Z
m
�v
= M
O-0
Oq
m =
D
z
IV
BASE FACAD E
ROOFTOP EQUIPMENT SCREEN, 24'-6" IN FROM BASE FACADE
SLOT GLASS, 6" IN FROM BASE FACADE
NORTH AND SOUTH STAIRS, 9'-11" OUT FROM BASE FACADE
COPPER BOX, 2'-0" OUT FROM BASE FACADE
CHAMPAGNE HOOP, 4'-4" OUT FROM BASE FACADE
CHAMPAGNE BAND, 2'-0" OUT FROM BASE FACADE
MAIN CANOPY, 14'-10" OUT FROM BASE FACADE
ASC CANOPY, 25'-8" OUT FROM BASE FACADE
,,8-,6ZZ : Hi9N3l IViOi
3a`dJ`dd iSV3
WEST FACADE
TOTAL LENGTH: 229'-8"
CODE: 229'-8" / 50'-0" =
AT LEAST
ONE VARIATION IN
PLANE DEPTH WITH A MIN N-7"
PROPOSED
DESIGN:
2
PLANE
CHANGES
OF
NJ"
OR
MORE
N
Z
Q
= W
_p
�i
2 �
�O
W =
o�
W i
Z N
:� LL
CL O
LuZN
0�0—W
�z(D
Q�pz
U ••—Q
LL Q � Q =
=zQZ
Lu J'
W
0JZCL
HOM
Z p �— ••
cn Z
QO
W _
J W
Qo
II 0
W
O �
'O
oa
In
�a
••
W
0
O
u
■��so
■know
■■SIN
■mEmm
■umm■
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/0 NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
301232-6200
�Z
z-
oN
�0
5
mV
W�
V
LL
ILL
�
�
W
W
m
z
a
z
W
�
a
0
W
Ov
J
Q
V
w
�
�
�
J
v
�
V
—
ILL
V
W
a
y
Y
m
N
m
Q
z
°
N
°
Lu
o^
�
w
w
PROJECT NO.
21454.00
DATE:
01 13 2023
SHEET NUMBER:
**Colored elevation for reference only, refer to sheet A5 for images of specified materials
PLANE DEPTH VARIATION A6
Z
O
2
T
D
n
D
v
M
V)
M
M
3AI1D3dS213d 1S`d31-11MON
h�ll�lllnllnnl
r�
' ' `Il�iil�l I I I fllrlll�lll��
°puuuulll
°1I
���� �1���1
ll�d1�:■ I1 I Il l IIIIIIIIII
�����u I IIIIIIIII
�JJ
lil ��II�II
I� I� J
I II II
4 "�'�11■�I.1�771'I'1'�iilll�
IIIII
Y u:a
NORTHWEST PERSPECTIVE
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
1 �
111111
I (IIIII irl-
uunuu �-
Illlillnullu-I"' 1111fIII1IIIIIP
Il��lllt111111ilil
t I li illi �llllll!!
.................................. nellen��_a.i■eue;
■Y■ �.JIIIIIIl1
11111111illlllilli11111111111� -
3AI1D3dS213d 3(]VD`d3 1S`d3
F f I '1
444 1
----- ate ii" E� 1!!■ IIIII fl�-- - .. .....
1-1 F- -1
77
1 1 1 III 1 1 11III-1-III-1� 11II�1I-111_I_lO � �11��� l
1 7F FF 1 11 0111111 _II IF F � 7 q, I I
�` `- .■I I ! it I �■i`rl�■IIIIIIIIIII ,; �--�,�II �—r- II I
®®�®®..i®®Wr�r�rrrr�l r`_� ■r`1fil. ■�rd e I 1 I. .
x _� ■■■A■■■■■■�1111111111111 Jim- I
L Nonni
m, ow
T _
�c
fe3 _
�.
.,. iii .
WEST FACADE PERSPECTIVE
e
PARKING GARAGE
(NOT PART OF THIS
PROJECT SCOPE)
CONCEALS A LARGE
PORTION OF THE MOB
EASTFACADE
PORTION OF MOB
EAST ELEVATION
VISIBLE OVER
PARKING GARAGE
3AI1D3dS213d 1S`d31-l1f10S
j liu7
I
�� ��
IIIIIII
--
�-�r�� IIIII
II III
IWO
� Ala
0 1
E_EA�luI,
c_IL—®■����,
MVP
—�!ME
MIND -
le..
At
PIK
4-
1
SOUTHWEST PERSPECTIVE
W
W
Ul
W
CL
0
Q
U
LL
D
O
Ul
so
MEN
.
ENRON
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/0 NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER COLORADO 80205
PHONE 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOD, CO 80401
303-232-6200
Z-
oN
JD
m
W�
V
LL
Z
W
M
Z
a
Z
W
a
0
W
0
J
Q
V
-
W
M
�
J
V
Q
Q
(II
-
LL
V
W
a
0
G � G
Y m N m
N O ¢
U
w
PROJECT NO.
21454.00
DATE:
01 /13/2023
I **Renderings are for design intent only, refer to sheet A5 for specified materials and sheet 05 of the SDP set for accurate landscape diagrams.
BUILDING PERSPECTIVE DIAGRAM
SHEET NUMBER:
A7
MEDICAL OFFICE BUILDING AT CLEAR CREEK CROSSING
A SPECIFIC DEVELOPMENT PLAN IN THE CITY OF WHEAT RIDGE, CO
BLOCK 1, LOT 1, SCL HEALTH LUTHERAN MEDICAL CENTER AT CLEAR CREEK CROSSING
SITUATED IN SECTIONS 19, 20, 29, & 30, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
k"
4
P OPOSE
OFFICE
L
D nebicAL)ll j
BUIEDNG
IIN
�I�'jjlll 1.
i
b
AMNON
M,
Er
■■�■■
MMEN..
ENRON
DAVIS
PARTNERSHIP
ARCHITECTS
OWNER
18TH STREET DEVELOPMENT LLC
C/0 NEXCORE GROUP LLC
1550 MARKET ST #200
DENVER, CO 80202
303-244-0700
LANDSCAPE ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET, SUITE 100
DENVER, COLORADO 80205
PHONE: 303-861-8555
CIVIL ENGINEER
MARTIN/MARTIN
12499 WEST COLFAX AVE
LAKEWOOD, CO 80215
303-431-6100
ELECTRICAL ENGINEER
CATOR RUMA & ASSOCIATES
896 TABOR STREET
LAKEWOOO CO 80401
303-232-6200
...........�40
H � 7
z-
oN
J0
m
W�
V
LL
W
�
V
W
W
M
z
a
z
W
�
a
0
W
0
J
Q
V�
-
W
V
�
J
V
Q
0
V
-
ILL
V
W
a
0
0
CY 9
m N
u N o
U-I
_< W
W
W
W
C)
o o
o 9 o
PROJECT NO.
21454.00
DATE:
01 /13/2023
I **Renderings are for design intent only, refer to sheet A5 for specified materials and sheet 05 of the SDP set for accurate landscape diagrams.
PEDESTRIAN PERSPECTIVE DIAGRAM
SHEET NUMBER:
A8
EXHIBIT 8: ACC APPROVAL LETTER
(see attached)
Planning Commission 17
Case No. WZ-22-06/ SCL MOB at Clear Creek Crossing
Clear Creek Crossing
Architectural Control Committee
January 17, 2023
Stephanie Stevens, AICP
Senior Planner, Community Development Department
City of Wheat Ridge
7500 W. 291h Avenue
Wheat Ridge, CO 80033
sstevens@ci.wheatridge.co.us
RE: ACC Review and Recommendation WZ-22-06/SCL MOB at CCC
Dear Ms. Stevens:
The Clear Creek Crossing Architectural Control Committee has reviewed the SDP submittal regarding
Case No. WZ-22-06/SCL MOB at CCC. ACC review is focused on the application meeting the intent of the
CCC ODP including the Vision Book and Design Pattern Book. The applicant, SCL Health, as required, met
with the Committee prior to submitting its SDP application. The ACC believes that the building
architecture is unique and consistent with the design intent set forth in both the Vision Book and Design
Pattern Book, embracing the modern agrarian theme through proposed materials and simple modern
building shapes, offering a hospital building typical for a medical facility of similar scope and magnitude,
that will serve as a gateway building at a prominent location on I-70. The Committee has no further
comments.
As Representative for the ACC, I recommend approval of WZ-21-01. I will attend the Planning
Commission to address any additional questions.
Sincerely,
Derek Lis
Clear Creek Crossing Architectural Control Committee Representative
II City of
Wheatldge PLANNING COMMISSION
COMMUNITYDEVELOPMENT LEGISLATIVE ITEM STAFF REPORT
MEETING DATE: February 2, 2023
TITLE: AN ORDINANCE AMENDING SECTION 26-803.G OF THE
WHEAT RIDGE CODE OF LAWS, TO ADOPT THE FLOOD
HAZARD DELINEATION MAPS FOR CLEAR CREEK DATED
SEPTEMBER 2, 2022 AS A LOCAL FLOOD HAZARD AREA
(CASE NO. ZOA-23-02)
® PUBLIC HEARING ® CODE CHANGE ORDINANCE
Case Manager: Mark Westberg, Floodplain Administrator
Date of Preparation: January 20, 2023
SUMMARY:
The attached ordinance proposes amending Section 26-803.G of Article VIII (Floodplain
Control) of Chapter 26 of the Wheat Ridge Code of Laws. Because this is an amendment to the
zoning code, Planning Commission will be making a recommendation to City Council on the
legislation.
The revision adopts the flood hazard areas identified on the Clear Creek Flood Hazard
Delineation Map (FHAD) as a Local Flood Hazard Area (LFHA).
The Colorado Water Conservation Board (CWCB) has designated the updated FHAD for Clear
Creek as a State floodplain map. The Mile High Flood District (MHFD) adopted the FHAD at its
January 19 Board meeting. The City can now adopt the FHAD as a LFHA.
Notice for this public hearing was provided as required by the Code of Laws.
BACKGROUND:
Clear Creek is a major drainageway traversing the City for about nine miles, spanning from the
west City limit to Harlan Street. In addition to parks and open space, land use adjacent to Clear
Creek is predominately residential with some areas of industrial and commercial development
scattered throughout the basin.
MHFD, along with the Cities of Wheat Ridge and Golden and Jefferson and Adams Counties,
have been working since 2016 to update the 2007 FHAD for Clear Creek to reflect the reduction
in the flows that was approved by the Federal Emergency Management Agency (FEMA) in early
2017 and to reflect any other changes that have occurred along the creek.
ZOA-19-XX / Sloan's Lake FHAD Adoption 1
In 2015. the City of Golden and MHFD conducted a preliminary study of the Clear Creek
regulatory flows to determine whether an updated hydrologic model was warranted. The results
of that study indicated that a reduction to the regulatory hydrology was warranted, based on the
long record of stream gauge data
In 2015, MHFD and the four agencies developed a Conditional Letter of Map Revision
(CLOMR) based on the reduced flows for Clear Creek from its confluence with the South Platte
River to upstream of U.S. Highway 6. The CLOMR was approved by FEMA in January 2017.
MHFD and the four cities and counties recognized the need to modify the floodplain to reflect
the lower historical recorded flow data of Clear Creek as outlined in the CLOMR.
The Clear Creek Flood Hazard Area Delineation has been updated and has replaced the 2007
FHAD. The new Clear Creek FHAD includes segments of Clear Creek in the Cities of Wheat
Ridge and Golden and Jefferson and Adams Counties. Each jurisdiction was responsible for its
share of the cost, as determined by creek length that traverses through each jurisdiction. The
FHAD update was administered by MHFD. MHFD financed about 67% of the total project. The
City of Wheat Ridge is responsible for just under 9% of the project cost (about $13,000).
The City continues to regulate the Clear Creek floodplain with the current Jefferson County
Digital Flood Insurance Rate Map (DFIRM) as the official federally regulated Special Flood
Hazard Area (SFHA). The floodplain shown on the DFIRM also determines whether a federally
backed mortgage is required to have flood insurance. The FHAD will eventually replace the
floodplains shown in the DFIRM after being reviewed and adopted by FEMA. The FEMA
adoption process typically takes two to four years.
Since the regulatory flows are around 30% lower, in most places the boundaries of the floodplain
and floodway shown on the FHAD is closer to the creek. There a few instances, however, where
the boundaries have widened. Therefore, staff would like to adopt the FHAD as a LFHD now so
in those instances the more restrictive boundary can be used. This will prevent property owners
from developing their properties within the future boundary prior to the adoption of the FHAD
by FEMA. The reason for adopting the FHAD is that it better reflects actual flood risk since it is
based on more current data. Furthermore, it is best practice to have the local flood boundary
match the boundary adopted by the State and expected to be adopted by FEMA.
Public Outreach and Next Steps
A neighborhood meeting will be held prior to the City Council public hearing to notify the
residents of the changes that will occur with the potential adoption of the FHAD as a LFHA.
During the neighborhood meeting, the residents will be notified of the adoption process,
including the upcoming public hearings. Postcards will be mailed to all owners and tenants with
properties that are within the Clear Creek Floodplain.
Any feedback received from the meeting will be shared with City Council prior to final review of
the ordinance. The ordinance is scheduled for public hearing before Council on March 13.
ZOA-19-02 /Sloan's Lake LFHA
RECOMMENDED MOTION:
"I move to recommend approval of the proposed ordinance amending Section 26-803.G of the
Wheat Ridge Code of Laws, to adopt the flood hazard delineation maps for Clear Creek dated
September 2, 2022 as a local flood hazard area.
Exhibits:
1. Proposed Ordinance
ZOA-19-02 /Sloan's Lake LFHA
CITY OF WHEAT RIDGE, COLORADO
INTRODUCED BY COUNCIL MEMBER
Council Bill No. _
Ordinance No.
Series of 2023
TITLE: AN ORDINANCE AMENDING SECTION 26-803.G OF THE
WHEAT RIDGE CODE OF LAWS, TO ADOPT THE FLOOD
HAZARD DELINEATION MAPS FOR CLEAR CREEK DATED
SEPTEMBER 2, 2022 AS A LOCAL FLOOD HAZARD AREA
WHEREAS, the City of Wheat Ridge, Colorado (the "City"), is a Colorado home
rule municipality, duly organized and existing pursuant to Section 6 of Article XX of the
Colorado Constitution; and
WHEREAS, pursuant to its home rule authority and C.R.S. § 31-23-301(1), the
City, acting through its City Council (the "Council'), is authorized to adopt rules and
regulations concerning the location, construction, occupancy and use of buildings and
structures on and along any storm or floodwater runoff channel or basin; and
WHEREAS, under such authority, the Council previously adopted floodplain
regulations, codified as Article VI II of Chapter 26 of the Wheat Ridge Code of Laws
("Code"); and
WHEREAS, On September 2, 2022, the Colorado Water Conservation Board
(CWCB) designated the updated Flood Hazard Delineation Map (FHAD) for Clear Creek
as a State floodplain map; and
WHEREAS, the Council desires to amend a section of said Article VIII to adopt
the FHAD as a Local Flood Hazard Area (LFHA); and
WHEREAS, the Council desires to amend Paragraph G of said Article VIII to
adopt the FHAD as a Local Flood Hazard Area (LFHA).
NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
WHEAT RIDGE, COLORADO:
Section 2. Paragraph G of Subsection 26-803 of the Code, concerning official maps
and engineering reports, is hereby repealed and replaced in its entirety as follows:
G. Official maps and engineering reports. The location and boundaries of the SFHA
shall be as identified by the Federal Emergency Management Agency in "The
Flood Insurance Study for Jefferson County, Colorado and Incorporated Areas,"
dated August 2, 2022, and any amendments or revisions thereto are hereby
adopted by reference and declared to be a part of this article.
The location and boundaries of the SFHA shall be as shown in the following
engineering reports and accompanying maps:
1. Digital flood insurance rate map (DFIRM) panels dated August 2, 2022 for
portions within the City of Wheat Ridge.
The location and boundaries of the LFHA shall be as shown in the following
engineering reports and accompanying maps:
4-2. Sloan's Lake FHAD dated July 2018 for portions within the City of Wheat
Ridge.
3. Clear Creek FHAD dated September 2, 2022 for portions within the city
of Wheat Ridge.
The DFIRM constitutes the current flood insurance study for the City of Wheat
Ridge and is fully incorporated herein by this reference. True and correct copies
of the DFIRM and FHAD are available on the City website and are on file at the
Wheat Ridge Municipal Building, 7500 West 29th Avenue, Wheat Ridge,
Colorado, and are available for inspection and copying during normal business
hours.
Section 3. Safety Clause. The City Council hereby finds, determines, and declares
that this Ordinance is promulgated under the general police power of the City of
Wheat Ridge, that it is promulgated for the health, safety, and welfare of the public
and that this Ordinance is necessary for the preservation of health and safety and for
the protection of public convenience and welfare. The City Council further
determines that the Ordinance bears a rational relation to the proper legislative
object sought to be attained.
Section 4. Severability: Conflicting Ordinances Repealed. If any section,
subsection or clause of this Ordinance shall be deemed to be unconstitutional or
otherwise invalid, the validity of the remaining sections, subsections and clauses
shall not be affected thereby. All other ordinances or parts of ordinances in conflict
with the provisions of this Ordinance are hereby repealed.
Section 5. Effective Date. This Ordinance shall take effect fifteen (15) days after
final publication, as provided by Section 5.11 of the Charter.
INTRODUCED, READ, AND ADOPTED on first reading by a vote of _ to _
on this 27th day of February 2023, ordered published in full in a newspaper of general
circulation in the City of Wheat Ridge and Public Hearing and consideration on final
passage set for March 13, 2023, at 7:00 p.m., as a virtual meeting and in the Council
Chambers, 7500 West 29th Avenue, Wheat Ridge, Colorado, if allowed to meet in
person on that date per COVID-19 restrictions.
READ, ADOPTED AND ORDERED PUBLISHED on second and final reading by
a vote of to , this day of 12023.
SIGNED by the Mayor on this day of 12023.
Bud Starker, Mayor
ATTEST:
Steve Kirkpatrick, City Clerk
Approved As To Form
Gerald E. Dahl, City Attorney
First Publication: , 2023
Second Publication: , 2023
Wheat Ridge Transcript
Effective Date: , 2023
_ City of
Com�WheatPLANNING COMMISSION
muNITr DEVELOPMENT LEGISLATIVE ITEM STAFF REPORT
MEETING DATE: February 2, 2023
TITLE: AN ORDINANCE AMENDING SECTION 26-115.E OF THE CODE
OF LAWS CONCERNING REQUESTS FOR INTERPRETATION
BY THE BOARD OF ADJUSTMENT
CASE NO. ZOA-23-01
® PUBLIC HEARING
Case Manager: Lauren Mikulak
Date of Preparation: January 18, 2023
® CODE CHANGE ORDINANCE
SUMMARY:
The proposed ordinance establishes a deadline by which an applicant may appeal an
administrative code interpretation to the Board of Adjustment (BOA). No such deadline currently
exists in the code, and the lack of a deadline is inconsistent with best practice and inconsistent
with other code provisions which clearly establish a timeframe for appeal.
Notice for this public hearing was provided by the Code of Laws.
BACKGROUND:
The Zoning and Development Code (Chapter 26 of the Wheat Ridge Code of Laws) is interpreted
and applied on a daily basis by Community Development staff. From time to time, individuals
request a formal code interpretation which is provided in the form of a written letter by the
Community Development Director. Individuals who disagree with a Director's determination can
appeal such determination to the Board of Adjustment (BOA).
Section 26-115.E (Variances/waivers/temporary permits/interpretations) of the zoning code
empowers the BOA to hear and decide upon requests for interpretation of the zoning code. This
code section does not establish a deadline by which an individual must appeal to the BOA. The
attached ordinance proposes that an appeal must be submitted within 30 days of the Director's
determination.
Such interpretation requests are rare only two BOA interpretations have occurred in the last ten
years. Last year, a determination was made on March 30, 2022 regarding the eligibility of a
property for a billboard. Over five months later, on September 9, 2022, the applicant submitted an
appeal and requested a hearing before the BOA.
In the context of last year's appeal, the City Attorney has advised that a time limit on the BOA's
interpretation authority would be appropriate, and 30 days is recommended. Similar appeal
deadlines appear elsewhere in the zoning code:
• Section 26-115.C.2 — Regarding administrative variances: "A written appeal shall be
submitted by the applicant to the community development department within ten (10) days
of such administrative decision."
• Section 26-119.E.2 — Regarding interpretation of zone district boundaries: "Appeals of the
community development director's decisions and interpretations under this section may be
taken to city council by the subject property owner or an adjacent property owner. A
written appeal must be received by the community development department within ten
(10) days of issuance ofthe appealed decision."
• Section 26-305.A.4 — Regarding specific development plans (SDPs): "If the applicant
objects to conditions placed on the approval, or if the specific development plan is denied
by the planning commission, an appeal of the decision may be filed with the city clerk's
office within ten (10) working days from the date of the planning commission's decision,
whereupon the specific development plan will be scheduled for public hearing before city
council..."
• Section 26-4061— Regarding subdivision plats: "A written appeal shall be submitted to
the community development department within ten (10) days of a decision."
• Section 26-808.B.3 — Regarding floodplain permits: "The floodplain administrator shall
render a written decision granting or denying each floodplain permit application. [... ]
Applicants shall have the right to appeal any decision or condition to the [Building Code
Advisory Board (BCAB)]. Such appeal must be filed with the BCAB within thirty (30)
days from the date of the floodplain administrator's decision."
Appeal of any local land use decision to district court (a Rule 106 challenge) is required by state
statute to occur within 28 days of the City's final decision.
The attached ordinance was drafted by the City Attorney's office. A public hearing before City
Council is scheduled for March 13, 2023.
RECOMMENDED MOTION:
"I move to recommend approval ofthe proposed ordinance amending Section 26-115.E ofthe Wheat
Ridge Code of Laws concerning requests for interpretation by the Board of Adjustment."
Exhibits:
1. Proposed Ordinance
ZOA-23-01 / BOA Appeal
CITY OF WHEAT RIDGE, COLORADO
INTRODUCED BY COUNCIL MEMBER
COUNCIL BILL NO.
ORDINANCE NO.
Series 2023
TITLE: AN ORDINANCE AMENDING SECTION 26-116.E OF THE WHEAT RIDGE
CODE OF LAWS CONCERNING REQUESTS FOR INTERPRETATION BY
THE BOARD OF ADJUSTMENT
WHEREAS, the City of Wheat Ridge is a home rule municipality having all
powers conferred by Article XX of the Colorado Constitution; and
WHEREAS, pursuant to its home rule authority and C.R.S. § 31-23-101, the City,
acting through its City Council (the "Council'), is authorized to adopt ordinances for the
protection of the public health, safety or welfare; and
WHEREAS, in the exercise of this authority the Council has previously adopted
Section 26-115.E of the Code of Laws which provides for requests for interpretation by
the Board of Adjustment of the meaning of words and terms in Chapter 26 of the Code
of Laws; and
WHEREAS, the Council wishes to impose a reasonable time limitation on the
right to request this relief from the Board of Adjustment by amending Section 26-115 of
the Code.
NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF WHEAT RIDGE, COLORADO:
Section 1. Section 26-115.E of the Code is amended to read
E. Interpretations. The board of adjustment is empowered to hold
public hearings to decide upon requests for interpretation of certain of
the provisions of this chapter in such a way as to carry out their intent
and purpose. ANY SUCH REQUEST MUST BE FILED WITHIN
THIRTY (30) DAYS OF THE CITY DECISION INTERPRETING THE
RELEVANT CODE PROVISION. This authority shall extend only to
the following:
1. The basic intent and purpose of words, phrases or paragraphs as
applied to a specific proposal or instance.
2. Use of property as an 'other similar use;" however in no instance
shall the board make an interpretation that a particular use may be
permitted in a zone district where that use is specifically enumerated
in a higher; that is more intensive, zone district.
3. Administrative decisions taken by the city engineer following final
approval by the planning commission or city council, as appropriate,
may be appealed to the board, which is empowered to reverse or
modify such decisions, in whole or in part, upon a showing by the
applicant that the effect of the director's decision would impose a
particular and unique hardship upon the owner of the subject property,
as distinguished from mere inconvenience, and which hardship has
not been created by any person presently having an interest in the
subject property.
Section 2. Severability, Conflicting Ordinances Repealed. If any section,
subsection or clause of this Ordinance shall be deemed to be unconstitutional or
otherwise invalid, the validity of the remaining sections, subsections and clauses shall
not be affected thereby. All other ordinances or parts of ordinances in conflict with the
provisions of this Ordinance are hereby repealed.
Section 3. Effective Date. This Ordinance shall take effect immediately upon
adoption at second reading and signature by the Mayor, as permitted by Section 5.11 of
the Charter.
INTRODUCED, READ, AND ADOPTED on first reading by a vote of _ to _
on this 27th day of February 2023, ordered published in full in a newspaper of general
circulation in the City of Wheat Ridge, and Public Hearing and consideration on final
passage set for March 13, 2023 at 7:00 p.m., as a virtual meeting and in the Council
Chambers, 7500 West 29th Avenue, Wheat Ridge, Colorado if allowed to meet in
person on that date per COVID-19 restrictions.
READ, ADOPTED AND ORDERED PUBLISHED on second and final reading by
a vote of _ to _, this 13th day of March, 2023.
SIGNED by the Mayor on this day of 2023.
Bud Starker, Mayor
ATTEST:
Stephen Kirkpatrick, City Clerk
Approved as to Form
Gerald E. Dahl, City Attorney
First Publication:
Second Publication:
Wheat Ridge Transcript
Effective Date:
Published:
Wheat Ridge Transcript and www.ci.wheatridge.co.us