HomeMy WebLinkAboutResolution-1992-1319
RESOLUTION NO. 1319
Series of 1992
TITLE: A RESOLUTION AUTHORIZING AN INTERGOVERNMENTAL AGREEMENT
WITH THE TOWNS OF LAKESIDE AND MOUNTAIN VIEW FOR THE
REHABILITATION OF WEST 44TH AVENUE BETWEEN HARLAN
STREET AND SHERIDAN BOULEVARD.
WHEREAS, section l4. 2 of the Home Rule Charter of Wheat
Ridge provides express authority to enter into intergovernmental
Agreements providing for cooperative efforts between governments;
and
WHEREAS, The city of Wheat Ridge and the Towns of Lakeside
and Mountain View wish to jointly improve the condition of West
44th Avenue in their individual jurisdictions between Harlan
street and Sheridan Boulevard; and
WHEREAS, in the spirit of cooperation the City Wheat Ridge,
has offered to design, advertise, award and construct the pro-
ject, including the segments within the Towns Lakeside and Moun-
tain View; and
WHEREAS, in order to insure that the project costs for the
segments of West 44th Avenue belonging to the Towns of Lakeside
and Mountain View are reimbursed to the City of Wheat Ridge, it
is necessary to enter into an intergovernmental agreement with
the Towns of Lakeside and Mountain View.
NOW, THEREFORE, BE IT RESOLVED that:
See. l. The Mayor of the City of Wheat Ridge is hereby
authorized to execute an intergovernmental agreement with the
Towns of Lakeside and Mountain View for the Rehabilitation of
West 44th Avenue between Harlan Street and Sheridan Boulevard.
DONE AND RESOLVED THIS
26th
day of October, 1992.
/-~ I L
~ g CL-ff; ',{~-_~~,N
Ray . ( tfiger, J~. )!ayor
ATTEST:
!J
//+1C-(:(
Wanda Sang,
city
,
\" , i ,--
Clerk'.
\
\
INTERGOVERNMENTAL AGREEMENT
THIS AGREEMENT MADE AND ENTERED INTO THIS Ie DAY OF ' rY ,fmEE!l', 1992,
by and between the city of Wheat Ridge, with offices a~ ?500.West.29~h
Avenue, Wheat Ridge, colorado 80215, a Home Rule Mun1c1pa11ty w1th1n
the County of Jefferson, state of Colorado, hereinafter referred to as
"Wheat Ridge", the Town of Lakeside, with offices at 4601 Sheridan
Boulevard, Denver 802l2, County of Jefferson, state of Colorado,
hereinafter referred to as "Lakeside", and the Town of Mountain View,
a Home Rule Municipality with offices at 4176 Benton street, Denver,
Colorado 802l2, County of Jefferson, state of Colorado, hereinafter
referred to as Mountain View; Wheat Ridge, Lakeside and Mountain View
hereinafter sometimes referred to as "Parties".
WITNESSETH THAT:
WHEREAS, sections 29-1-20l and 29-l-203 Colorado Revised statutes,
1972, as amended, permit and encourage governments to make the most
efficient use of their powers and responsibilities by cooperating and
contracting with other governments to provide authorized services;
and,
WHEREAS, Wheat Ridge, Lakeside
rehabilitate West 44th Avenue
Boulevard, hereinafter sometimes
and Mountain View desire to jointly
between Harlan street and Sheridan
referred to as the "Project"; and,
WHEREAS, Parties desire to cooperate to the fullest extent possible
to ensure that the planning, engineering and construction of the
Project are accomplished according to the mutual desires of each party
for the best interests of their respective citizens.
NOW, THEREFORE, in order to accomplish the
in consideration of the mutual covenants
forth, the Parties agree as follows:
above stated desires,
and promises herein
and
set
l. Parties understand and agree that the rehabilitation of West
44th Avenue between Harlan Street and Sheridan Boulevard will be in
accordance with engineering specifications and design standards mutu-
ally acceptable and beneficial to Parties in order to bring West 44th
Avenue to an acceptable service level as defined by each party.
2. Wheat Ridge agrees to design, advertise, award a construction
contract and provide contract administration and project inspection
for the project in accordance with the mutual desires of Parties.
3. Parties agree that engineering costs associated with design,
advertisement, contract administration and project inspection will be
5% of the bid amount submitted by the lowest qualified bidder for the
Project. Engineering costs will be split based upon the portion of
the surface area of West 44th Avenue within the corporate limits of
each party. The percentages for Lakeside, Wheat Ridge and Mountain
View are 58.6, ll.7 and 29.7, respectively.
4. Parties agree that the Project costs associated with traffic
control, mobilization, milling, placement of pavement fabric and
overlay material will be split based upon the portion of the surface
area of West 44th Avenue within the corporate limits of each party.
The percentages for Lakeside, Wheat Ridge and Mountain View are 58.6,
ll.7 and 29.7, respectively. The Project costs shall consist of the
following:
A. Construction costs as incurred by the lowest
bidder.
qualified
B. Authorized written change or work orders issued by the
Engineer.
c. contingencies mutually agreeable to the Parties.
D. Early Completion Incentive Bonus as provided for in the
Contract Documents.
1
E. Lakeside will pay lOO% of the costs associated with con-
struction of proformed plastic traffic marking matorial for the
entire roadway.
F. Lakeside will pay lOO% of the costs associated with recon-
struction of the northwest corner of the intersection of West
44th and Sheridan. This reconstruction will provide a xx foot
flow line radius and related traffic signal and site improve-
ments.
G. Work associated with the traffic signal at the east Lakeside
Mall entrance near 44th and Depew will be borne by Lakeside.
H. Work associated with the traffic signal at 44th and Fenton
will be allocated to Wheat Ridge, Lakeside and Mountain View at
a 25%, 50% and 25% ratio, respectively.
I. Repair of traffic detector loops inside the Lakeside Mall
property will be borne by Lakeside.
J. Each entity will be responsible for isolated roadway pave-
ment reconstruction and repair of curb, gutter and sidewalk,
alley pans, and paving behind 44th Avenue's curb line within
the bounds of their respective frontages.
5. The estimated cost of the Project is $26l,000. The estimated
cost for each entity is included in attachment A which is attached and
expressly made part of this agreement. The estimated engineering costs
for the project are $l3,000. Lakeside's, Mountain View's and Wheat
Ridge's share of this cost is $7,000, $3,900 and $2,lOO, respectively.
6. Prior to award of the construction contract by Wheat Ridge,
Lakeside and Mountain View will deposit with Wheat Ridge their respec-
tive share of the Project costs based upon the low bidder's bid prices
for the project plus l5% for contingencies and incentive bonus as well
as their share of the Engineering costs. Wheat Ridge will place these
funds and Wheat Ridge's share of the project into the appropriate
Capital Improvement Fund Account and will make progress payments from
this account. Upon completion of the project, Wheat Ridge will pre-
pare a final estimate of cost for each entity based upon work actually
completed within the owning jurisdiction. In the event additional
funds are required from either or both entities, Lakeside and Mountain
View agree to deposit with Wheat Ridge such funds within 30 days of
written notice. In the event excess funds remain after completion of
the project, these funds will be returned to the owning entity within
30 days after final acceptance of the work and release of retained
amounts. Funds deposited with Wheat Ridge for Engineering costs will
not be returned.
7. Wheat Ridge agrees to jointly contract with a licensed and
reputable contractor for the Project.
8. Wheat Ridge agrees to be responsible for the administration
of the construction contract according to applicable state and federal
laws. Lakeside and Mountain View agree to assist as needed or re-
quested to accomplish such administration.
9. Wheat Ridge agrees to prepare engineering estimates, adver-
tise for construction bids, conduct a formal bid opening, prepare
formal contract documents, and award construction contracts. The
construction documents shall be submitted to Lakeside and Mountain
View for review prior to bid opening and any addendum thereto shall be
submitted to Lakeside and Mountain View for review.
Lakeside and Mountain View will be allowed to review all bids submit-
ted and a Contract will not be awarded without prior approval of
Lakeside and Mountain View.
10. Wheat Ridge agrees to prepare and issue all written change
or work orders to the construction contracts. Lakeside and Mountain
View will be allowed to review any change orders to the Project.
2
ll. Wheat Ridge will conduct a final inspection of the Project
upon completion and certify the results to Lakeside and Mountain View.
l2. Parties agree that each shall own the improvements located
within their respective jurisdictions.
l3. Parties agree that the contractor to whom the Project is
awarded will be required to carry, at a minimum, adequate workers
compensation, casualty and liability insurance in amounts mutually
acceptable to the Parties. Contractor will be required to name all
parties as additional insured in his insurance policies.
14. Parties agree that the contractor to whom the Project is
awarded shall be required to present a five percent (5%) bid bond, 100
percent (lOO%) performance and labor and materials payment bonds,
contractor I s agreement to a maximum five percent (5%) retainage on
periodic and final payments, and contractor's compliance with any
other applicable statutory provisions required of Parties.
l5. Each party shall be responsible for its own negligent acts.
Wheat Ridge shall be solely responsible for the design, construction,
inspection and administration of said Project, and shall be solely
responsible for any liability resulting from or relating to said
design, construction, inspection and administration of said project,
and shall reimburse the Town of Lakeside and the Town of Mountain View
for any costs, expenses, or legal fees that the Towns may incur for
any liability resulting from said project.
16. The Agreement embodies the entire understanding of Parties
and shall be deemed to be a contract extending and binding upon Par-
ties hereto, their representatives, agents, administrators, successors
and assigns.
7-f1 /
ENTERED INTO this Ie - day of~c~
, 1992.
CITY OF !fHEAT RIDGE
CITY OF WHEAT RIDGE
A colorado Municipal corporation
ATTEST:
., ./",
APPRov-EtJ KS ~FeRM.:
/ . ( / J/
I - (' ,'~~
City Attorney _./ //
/ ,/ TOWN OF LAKESIDE
,
Zj-< 0~,/ ~ ~
-;' -"!:"~ -:0 _ --
TOWN OF LAKESIDE
A COLORADO MUNICIPAL CORPORATION
~-
Robert Gordanier, Mayor
ATTEST:
City Clerk
APPROVED AS TO FORM:
~~~/;:b~
City Attorney
TOWN OF MOUNTAIN VIEW
ATTEST:
TOWN OF MOUNTAIN VIEW
A COLORADO MUNICIPAL CORPORATION
,
/~ J' /7!/~ ~ , -y-~ I 115:: }!:.
Betty Van Harte, Mayor
3
WEST 44TH AVENUE REHABILITATION PROJECT
ATTACHMENT A
The following items are common to all parties
l04 construction zone traffic control
202 removal of asphalt mat (planing)
210 adjust manhole to grade
210 adjust water valve box to grade
403 HBP Grade CX
420 geotextile (paving)
614 flagging
614 traffic control supervisor
620 sanitary facility
626 mobilization
202
202
202
202
202
304
403
403
total
LAKESIDE SHARE (58.6%)
MOUNTAIN VIEW SHARE (29.7)
WHEAT RIDGE SHARE (ll.7%)
MOUNTAIN VIEW COSTS
removal of asphalt mat
concrete sawing
removal of sidewalk
removal of curb and gutter
removal of concrete pavement
abc (class 6)
HBP (box paving)
recycled asphalt
lO,OOO
27,500
3,750
2,500
47,600
l7,200
8,500
4,000
1,000
20,000
l42,050
83,24l
42,l89
l6,692
12,000
225
200
2,850
3,000
5,000
24,000
6,000
403 HBP (patching)
411 emulsified asphalt
412 concrete pavement (8")
412 concrete pavement (lO")
608 concrete sidewalk (4" )
608 sidewalk ramp
608 concrete ramp (radius)
609 curb and gutter
total
TOTAL PROJECT
LAKESIDE COSTS
202 removal of asphalt mat
202 removal of curb and gutter
304 abc (class 6)
403 HBP (box)
403 recycled asphalt
403 HBP (patching)
4ll emulsified asphalt
608 6' concrete flowpan (8")
609 curb and gutter
~~~~~ep~astic pavement marking
614 loop detector wire
total
TOTAL PROJECT
5,000
100
3,400
6,171
325
990
4,950
4,250
78,46l
l20,650
l,800
350
500
3,000
600
2,500
88
5,285
600
20,000
6,000
40,723
l23,'JG4