HomeMy WebLinkAboutResolution-1995-1460
RESOLUTION NO. 1460
SERIES OF 1995
TITLE:
A RESOLUTION ESTABLISHING PERMIT AND INSPECTION FEES
FOR ORDNANCE 987 REGULATING STREETS AND SIDEWALKS
WHEREAS, section 21-20 of Section 21 of the city of Wheat Ridge
Municipal Code, adopted by Ordinance 987, regulating work in the
Public Way requires that the City Council shall, by Resolution
determine the cost of issuance of permits and inspection fees.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the city of
Wheat Ridge, colorado, that:
SECTION 1. Pursuant to section 21-20 of the Wheat Ridge
Municipal Code, the rate schedule for permit and inspection fees
charge to a permittee working in the pUblic Way shall be as
follows:
The following permit fees and inspection fees shall apply to and
be paid by the permittee:
CONCRETE
BASIC PERMIT FEE
$75.00
plus the following inspection fees
Sidewalk
Curb and Gutter
Combination curbwalk
Driveway
crosspan/filets/curb ramps
Storm Sewer Inlet
Storm Sewer Manhole
Miscellaneous structures
$0.10/U
.10/U
.15/U
.15/U
10.00 min
10.00 min
15.00 min
15.00 each
15.00 each
15.00 each
15.00 each
15.00 each
STREET CONSTRUCTION
BASIC PERMIT FEE
(FOR EACH OPERATION)
$75.00
plus the following inspection fees
Total
$O.os/sy
.05/sy
.10/sy
.20/sy
10.00 min
10.00 min
20.00 min
Earthwork
subgrade preparation
Pavement
40.00 min
EXCAVATIONS
1
BASIC PERMIT FEE
$75.00
plus the following inspection fees
All excavated areas .30/sf
includes pavement restoration
15.00 min
The above fees include one follow up inspection visit to verify
that deficiencies previously found are corrected. Additional
inspections of previously inspected work past the follow up visit
will be charged against the Contractor at the above fee schedule.
Non continuous excavations shall be assessed the basic permit fee
and inspection fee for each separate excavation. A separate
permit is required for construction of each water and sewer
lateral when constructed during construction of the water and
sewer main.
If the permittee will be performing two or more consecutive
operations under one permit, ie, earthwork, subgrade and pavement
construction, the basic permit fee will not be more that $150.00
plus the inspection fees for each type of work contained in the
permit.
The preceding inspection fees will entitle the Contractor to all
necessary inspections for the proposed work.
NOW, THEREFORE, BE IT RESOLVED THAT:
Sec 1. The above permit and inspection fee structure be
adopted and remain in force until superceded.
DONE AND RESOLVED THIS
9th
day of January, 1995
&-,.-,__,~,LJ4~
Dan wilde, Mayor
Attest:
\ ./
/,j,'c, Ci-(.-
Wanda Sang,
I
I
~}; t ~ J. l(
City Clel"k
_J
2