Loading...
HomeMy WebLinkAbout2002 - Impact Marketing IncoE WHEqT City of Wheat Ridge cm Planning and Development Department Memorandum TO: Fi:e FROM: Alan White, Planning and Development Director DW SUBJECT: Bus Bench Permits DATE: September 9, 2002 Due to the 38' Avenue Streetscape Project, one bench for which Impact Mazketing had been issued a pernut for 2002 had to be removed. Impact will receive credit for this one pernut when their 2003 pernut application is submitted. vind CMDOCUmencsaudSettinysWanVvlyDocumev[s\WPFiles\Projec¢\busbevches\busbeuchpermitcredi[.wpd lJ The CiPy of 7500 WEST 29TH AVENUE ~Wh e at WHEAT RIDGE, CO 80215-6713 (303) 234-5900 City Admin. Fax # 234-5924 Police DepL Fax ri 235-2949 GRidge May 1, 2002 Mr. Don Goette Impact Marketing 2601 Tremont Drive, Suite 100 Fort Collins, CO 80524 Dear pon: The City of Wheat Ridge has reconsidered your proposal to defray the cost of the replacement of bus benches along 38`" Avenue within our streetscape project area. Rather than waiving the bus bench fees next yeaz, we aze proposing that we pay the $8,000.00 for the 16 benches from our streetscape budget this year. This letter authorizes the production of the 16 bus benches as presented to us in photographs, except that the benches will be painted black. The $8,000.00 covers the cost of manufacturing the 16 benches. Installation will be free of charge. We will follow the normal bus bench permitting process next year which will include these 16 benches. Your previous let'ter to me indicated that delivery could be expected within six to eight weeks. We will need to coordinate placement of the benches with the construction along 38' Avenue. Please indicate your acceptance of the terms of this letter agreement by signing below, Sincerely, A, c' Alan C. White, AICP Planning and Development Director Accepted By: - !1 Impact Marketing Z e7~- ~ pa°ay REGVCLED PAPER Bob Goebel, 09:14 AM 4/25/2002 -0600, Bus Benches Page 1 of 1 X-Sender: bobg/ci.wheatridge.co.us@pop3.norton.antivirus X-Mailer: QUALCOMM Windows Eudora Version 4.3.2 Date: Thu, 25 Apr 2002 09:14:41 -0600 To: AIanW@ci.wheatridge.co.us From: Bob Goebel <bobg@ci.wheatridge.co.us> Subject: Bus Benches Cc: GregK@ci.wheatridge.co.us Alan, Confirmed with Randy that we would pay the $8,000 from the project and still require his permit fee. Randy asked me to ask you to send Mr. Goette, of the bus bench company, letter indicating this and to request a reply of his agreement with these terms. Also, authorize the production of the benches (in black) and obtain a delivery date. Thanks for you help. j Bob MfSC-/ Oi~O L~EzTEK--s/ CoorEs pomiN--~Jc~ C pre-2D~3~ , Printed for Alan White <alanw@ci.wheatridge.co.us> 4/25/2002 IMPACT April 9, 2002 Mr. Alan White, AICP Planning and Development Director City of Wheat Ridge 7500 West 29"' Avenue Wheat Ridge, CO 80215 RE: New benches for Streetscape project Dear Alan: This letter is in reference to the sixteen (16) new benches requested for the Ciry of Wheat Ridge Streetscape project. Due to the high cost of installing our current benches throughout the City of Wheat Ridge, and the fact that they are nice looking and fully functiaial; we do not believe it is necessary for us to incur the expense of changing these sixteen (16) benches due to a city streetscape project. If the City of Wheat Ridge decides that it is necessary to change these 16 permitted benches, we are willing to manufacture theses custom benches for the city in exchange for waiving the bench costs toward the 2003 permit fees. Because of the increased cost of the new metal slat style benches and the small number of benches for this custom manufacturing order, sixteen benches will cost $8,000. This is our manufacturing cost and NOT our resale cost. Installation will be free of charge. Please allow six to eight weeks notice before installation date, due to manufacturing time line. Sincerely, r *Robinette IMPACT Marketing, Inc. 2601 Treemont Drive • Suire 100 Phone 970.221.0222 0 1.888.646.0222 • e-mail: impact@frii.com Fort Collins, CO 80524 Fa~ 970.493.2075 DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 - (303-235-2855) Building Permit Number Date 13476 2/26/02 Property Owner: Property Address : CITY OF WHEAT RIDGE BUS BENCEHS Contractor License No. : 20410 Company : Impact Marketing Inc. Phone: Phone: 970-221-0222 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application areacwrate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable Wheat Ridge ordinances, for work under this permit. (OWNER)(CONTRACTOR) Description : 188 BUS BENCH LOCATIONS AT VARIOUS LOCATION Construction Value : $32,000.00 Permit Fee : $9,400.00 Plan Review Fee : $0.00 Use Tax : $0.00 Total: $9,400.00 Use: 1~ 5 JV Electrical License No : Company : Expiration Date : Approval: Plumbing License No : Company: Expiration Date : Approval: Mechanical License No : Company: Expiration Date : Approval: (1) This permit was issued in accordance with the provisions set forth in yopur application and is subject to the laws of the State of Colorado and to the Zoning Regulations and Building Code of Wheat Ridge, Coloredo or any other applicable ordinances of (he Ciry. (2) This permit shall expire if (A) the work auihorized is not commenced within sixty (60) days from issue date or (B) ihe building authorized is suspended or abandoned for a period of 720 days. (3) If this permit expires, a new permit may 6e acquired for a fee of one-half the amount normally required, provided no changes have been or wiil be made in the original plans antl specifcations antl any suspension or abandonment has not exceetletl one (1) year If changes are matle or ir suspension or ananrionm?W exceeds one (i) year, full fees shail be paid for a new permit. (4) No work of any manner shall be done thatwili change the natural flow of water causing a drainageproblem. (5) Contractor shall notify the Builtling Inspectortwenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceediing with successive phases of the job. . (6) The is9 e of a per ' or the approval of drawings and specifications shall not be constmetl to be a permit for, nor an approval of, any violation of the ptav on f ~ codes or any other ordinance, law, mle or regulation. . . P p~P~ P Chief Building spector