Loading...
HomeMy WebLinkAbout2023 - RESO - 28 - Amending Agreement with WR Sanitation District in Phase II of Improve Wadsworth ProjectCITY OF WHEAT RIDGE, COLORADO RESOLUTION NO. 28 Series of 2023 TITLE: A RESOLUTION APPROVING AN AMENDMENT TO AN AGREEMENT WITH THE WHEAT RIDGE SANITATION DISTRICT REGARDING PHASE II OF THE IMPROVE WADSWORTH PROJECT WHEREAS, the City of Wheat Ridge (the City) has completed plans for the reconstruction of Wadsworth Boulevard between W. 35th Avenue and Interstate 70 (Project); and WHEREAS, the Wheat Ridge Sanitation District (the District) owns sanitary sewer facilities located within Wadsworth Boulevard right-of-way (District Facilities); and WHEREAS, the District wishes to install new sanitary sewer mains, manholes, and appurtenances (Sewer Line Work) as part of the Project; and WHEREAS, the District wishes to extend this work to include work generally between 41st Avenue and 35th Avenue which is within the portion of the Project referred to as Phase II; and WHEREAS, the District has prepared plans for the Sewer Line Work, which the City finds acceptable; and WHEREAS, generally the placement and use of private and public utilities in the public rights-of-way, including the District Facilities, are subject to the reasonable regulations and requirements of the City; and WHEREAS, with respect to this Project, the work and cost to install, maintain, or relocate utilities in the public right-of-way are the responsibility of the respective utility owners; and WHEREAS, the City and District agree that it is in their best interest for the City to include the Sewer Line Work as part of the Scope of Work under the City’s contract amendment for Phase II of the Project and for the District to reimburse the City in accordance with the terms of an Agreement between the City and the District, approved by the City on February 22, 2021; and WHEREAS, an Amendment to the Agreement provides for the completion of the Sewer Line Work, a true and correct copy of which is attached hereto as Exhibit 1; and WHEREAS, the Council is authorized to approve intergovernmental agreements by resolution under Section 14.2 of the home rule charter. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Wheat Ridge, Colorado, that: Section 1. Agreement Approved. The First Amendment to the Agreement with the Wheat Ridge Sanitation District, is hereby approved and the Mayor and City Clerk are authorized and directed to execute the same. DONE AND RESOLVED this 8th day of May 2023. _______________________ Bud Starker, Mayor ATTEST: __________________________ Steve Kirkpatrick, City Clerk EXHIBIT 1 8th May SITE LOCATION WA D S W O R T H W I D E N I N G SA N I T A R Y S E W E R P L A N S PH A S E I I FO R C O N S T R U C T I O N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 MA I N 3 0 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M C000 CO V E R S H E E T 811 VICINITY MAP WADSWORTH WIDENING 38TH TO 48TH LOCATED IN SECTION 23, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON STATE OF COLORADO ////////////// WA D S W O R T H W I D E N I N G SA N I T A R Y S E W E R P L A N S PH A S E I I FO R C O N S T R U C T I O N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 MA I N 3 0 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M C001 GE N E R A L N O T E S “ " “” “ " “” · · · · · · · · WA D S W O R T H W I D E N I N G SA N I T A R Y S E W E R P L A N S PH A S E I I FO R C O N S T R U C T I O N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 MA I N 3 0 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M C001 GE N E R A L N O T E S WADSWORTH BOULEVARD SANITARY SEWER 4' Ø S S W R M H 1 5 811 WA D S W O R T H W I D E N I N G SA N I T A R Y S E W E R P L A N S PH A S E I I FO R C O N S T R U C T I O N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 MA I N 3 0 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M C200 SA N I T A R Y S E W E R P L A N A N D P R O F I L E WADSWORTH BOULEVARD SANITARY SEWER 4' Ø S S W R M H 1 7 4' Ø S S W R M H 1 6 811 WA D S W O R T H W I D E N I N G SA N I T A R Y S E W E R P L A N S PH A S E I I FO R C O N S T R U C T I O N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 MA I N 3 0 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M C201 SA N I T A R Y S E W E R P L A N A N D P R O F I L E C400 DE T A I L S WA D S W O R T H W I D E N I N G SA N I T A R Y S E W E R P L A N S PH A S E I I FO R C O N S T R U C T I O N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 MA I N 3 0 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M SS SS SS SS SS SS SS SS SS C401 DE T A I L S WA D S W O R T H W I D E N I N G SA N I T A R Y S E W E R P L A N S PH A S E I I FO R C O N S T R U C T I O N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 MA I N 3 0 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M March 10, 2023 Wadsworth Widening– Sanitary Phase II 004113-1 SECTION 004113 BID FORM 1.1 BID FORM The bid form bound with this Project Manual must be used in submitting a bid. Substitute forms are not acceptable. See Instructions to Bidders for requirements concerning proper completion and submittal of the Bid Form. END OF SECTION March 10, 2023 Wadsworth Widening– Sanitary Phase II 004113-2 BID FORM March 10, 2023 Wheat Ridge Sanitation District 7100 W 44th Ave #104 Wheat Ridge, CO 80033 Re: Wheat Ridge Sanitation District – Wadsworth Widening 38th to 48th - Sanitary Phase II PROJECT NUMBER 17.0633.C.10 Ladies and Gentlemen: The undersigned hereby states that they have carefully examined the project manual, drawings, and other contract documents; and that they have fully investigated the location, character, and extent of the work to be performed as described under the Invitation to Bid for the referenced project. The undersigned hereby further states they are familiar with the type of work involved. The undersigned declares that they have exercised their own judgment regarding the interpretation of subsurface information and have, in arriving at their conclusions, utilized data from the Engineer, Owner, and their own sources, which they believe pertinent to arriving at the amounts for the work to be completed under these contract documents. March 10, 2023 Wadsworth Widening– Sanitary Phase II 004113-3 BID SCHEDULE The Bidder, in compliance with the Instructions to Bidders hereby proposes to do all work called for in said Project Manual and as shown on said drawings and detail drawings, and to furnish all labor, materials, tools, construction equipment, operation equipment, and all appurtenances necessary for completion of said work at the unit prices shown on the following Bid Schedules. Unit bid prices will be used in case of a discrepancy with total price extensions. It is understood that the description of work and the quantities of work and materials, as included herein, are brief and are intended only to indicate the general nature of the work that is more particularly described in Measurement and Payment. The actual final quantities will be field measured and agreed to for final payment. The right is reserved to award any or all bid schedules or portions thereof. GENERAL CLARIFICATIONS Please note the following information in regards to planned work. 1.Entry into easements where repairs are located is not allowed until written authorization is provided. Martin/Martin, acting as the District Engineer, must contact the Owners prior to entry. This timing does not constitute grounds for Contractor delay. Contractor shall complete repair and maintain associated materials needed for repair inside easement at all times. Contractor work area is defined by the easement boundaries. 2.Testing requirements – Testing and material requirements for the project must meet applicable City of Wheat Ridge, Wheat Ridge Sanitation District, and local jurisdiction standards. 3.If unsuitable soil is encountered during the project, the use of import material is required. 4.Infiltration/Exfiltration Testing – If video recording of the mainline shows the quality of work to be questionable, an infiltration/exfiltration test may be required. 5.Bypass Pumping: If Contractor believes that upstream to downstream bypassing is not possible, an alternate plan shall be submitted to the Engineer for bypassing needs. 6.Construction Staking/Certified Record Drawings – Certified survey record drawings will be required for mainline removals/replacements. 7.All existing utility lines within project area are required to be protected or relocated as necessary to facilitate the work and is the Contractor’s responsibility. 8.Contractor is responsible for maintenance and uninterrupted operation of all utility services. Forty- eight (48) hour notification to all customers possibly affected by outage of sewer service during construction is required. 9.Reference Information – Contractor shall provide three (3) references for jobs completed in the past three (3) years. Contractor shall include job description, estimated and actual cost, construction time frame, and person of contact for reference. 10.Erosion/Sedimentation Control – All erosion/sedimentation devices and installation and maintenance of said devices for sanitary improvements shall be included in the sanitary sewer costs. 11.Geotechnical Material Testing – As stated in “Summary of Work”, the Contractor will employ a qualified independent geotechnical testing agency. However, the Owner reserves the right to employ their own independent geotechnical testing agency to verify project results. The Contractor shall furnish testing agency access to work, facilities, and incidental labor required for testing as well as March 10, 2023 Wadsworth Widening– Sanitary Phase II 004113-4 being responsible for coordination and scheduling of testing times to meet requirements. All testing shall meet the frequencies required by the District, City/ County for compacting of trench and pavement testing at a minimum. 12.Tracer Wire and Test Stations - The tracer wire system including but not limited to wire, insulation, access boxes, grounding rods, and connectors. Must meet City of Wheat Ridge standards and all requirements of CRS Title 9. Bid Schedule A (PROPOSED WADSWORTH SANITARY MAINLINE) A.STA 41+73.02 to 47+39.96: Proposed Wadsworth Boulevard Sanitary Sewer Mainline ITEM UNIT DESCRIPTION QUANTITY UNIT PRICE PRICE 1. LF 12” PVC Sanitary Mainline 590 _____ _____ 2. EA New 4’ Diameter Manhole 2 _____ _____ 3.EA East side sanitary service- removal of existing 4 _____ _____ service currently connected to existing sanitary mainline and reconnection to new mainline. 4.LF Import Fill Class 2 (full depth, trench wide – 100 _____ _____ if necessary) 5.LF Trench Stabilization (if necessary) 100 _____ _____ 6.EA Cutoff Wall (if necessary) 1 _____ _____ 7.LS Subsurface Locating System 1 _____ ______ Bid Schedule A - TOTAL $_______________________ Total price written: dollars and cents. March 10, 2023 Wadsworth Widening– Sanitary Phase II 004113-5 Bid Schedule A - GRAND TOTAL $___________________________________ Total price written: dollars and cents. In submitting this bid it is understood that the right to reject any and all bids has been reserved by the Owner. Dated this ___________day of _________________, 2023 Name of Bidder Address Telephone Number Authorized Officer Title March 10, 2023 Wadsworth Widening– Sanitary Phase II 01025-1 SECTION 012200 MEASUREMENT AND PAYMENT 1.1 GENERAL The method of measurement and basis of payment described are for work itemized in the Bid Form and in the sections of the specifications. Items may include work within a single section or in more than one section. 1.2 MEASUREMENT A. Unless otherwise specified, all longitudinal measurements will be made horizontally, and computations will be neat dimensions as shown on drawings and details. B. Quantities will be rounded off to the nearest whole number. 1.3 PAYMENT A. Unit bid prices, as quoted in the Bid Form, shall be full compensation for mobilization, labor, materials, equipment, rentals, overhead, profit, and incidentals to complete all work for each pay item; and for all risk, loss, damage, or expense of whatever nature arising from the nature of the work or the prosecution thereof. B. Work or materials that are essential to the work, but for which there are no pay items, will not be measured and paid for separately, but shall be included in other items of work. 1.4 BID ITEMS A. Section 03-3053 Miscellaneous Cast-in-Place Concrete: 1. No separate measurement or payment made. To be included under related items. B. Section 31-2333 Trenching and Backfilling: 1. No separate measurement or payment made. To be included under related items. C. Section 333100 Sanitary Sewer System: 1. Sanitary Sewer Main: PER LINEAR FOOT for mainline installation, for each size and material indicated in Bid Form, measured horizontally in place through manholes and fittings. Includes all mobilization, survey, erosion control, utility locates, excavation, exploratory excavations including potholing prior to and during construction, soil groundwater analysis, sheeting and bracing, trench box, dewatering, dewatering permits, pipe bedding, pipe material, fittings, pipe laying, protection of existing facilities at all utility crossings or parallel utilities whether shown on drawings or not, transition couplings, concrete, backfill, compacting, testing, post construction CCTV, leak repair, disposal of materials, March 10, 2023 Wadsworth Widening– Sanitary Phase II 01025-2 clearing, cleanup, underdrain, rock excavation, and all appurtenances necessary for construction per Wheat Ridge Sanitation District standards. Contractor is also responsible for curb, gutter, cross pan, and sidewalk replacement, as required per authority having jurisdiction, including base course, compaction, rolling, reinforcement, forming, vibration, jointing, curing compound, additives, finishing, and cleanup. Contractor is responsible for all erosion and sedimentation control requirements associated with sanitary sewer main construction, including all items necessary, including permits, to comply with all applicable state, county, and city erosion and sedimentation rules and regulations. Contractor is responsible for traffic control in accordance with City of Wheat Ridge regulations including pedestrian protection, temporary striping, re-striping, arrow boards, construction signs, barricades and channelization devices, flaggers as necessary, phasing, night work setup and removal of all necessary traffic control devices. Contractor is responsible for survey control monument, range box replacement if they are disturbed or destroyed. 2.Sanitary Sewer Manhole: Measured PER EACH for each size indicated on the Bid Form. Includes precast or cast-in-place concrete base, precast concrete riser sections, precast concrete cone section, concrete grade adjustment rings, cast iron ring and cover, waterstop gaskets, connection to existing mainline, and all appurtenances necessary for construction per Wheat Ridge Sanitary District standards. Includes all mobilization, survey, excavation, exploratory excavations including potholing prior to and during construction, soil groundwater analysis, sheeting and bracing, trench box, dewatering, dewatering permits and associated water quality discharge requirements, traffic control, erosion and sedimentation control, bedding, pipe laying, pipe lowering, suitable fill for unstable trench bottom and wet trench material to meet compaction requirements, protecting existing facilities at all utility crossings or parallel utilities, whether shown on drawings or not, concrete, rebar, backfill, compaction, testing, disposal of materials, clearing, cleanup, rock excavation, and provisions for continuous use of paved streets/roadways/driveways. 3.Sanitary Sewer Service Reconnection: Measured PER EACH. Includes all mobilization, survey, erosion control, utility locates, excavation, exploratory excavations including potholing prior to and during construction, removal of existing service line per construction drawings, soil groundwater analysis, sheeting and bracing, trench box, dewatering, dewatering permits, pipe bedding, pipe material, fittings, pipe laying, protection of existing facilities at all utility crossings or parallel utilities whether shown on drawings or not, transition couplings, concrete, backfill, compacting, testing, leak repair, disposal of materials, clearing, cleanup, underdrain, rock excavation, and all appurtenances necessary for construction per Wheat Ridge Sanitation District standards. Contractor is also responsible for curb, gutter, cross pan, and sidewalk replacement, as required per authority having jurisdiction, including base course, compaction, rolling, reinforcement, forming, vibration, jointing, curing compound, additives, finishing, and cleanup. Contractor is responsible for all erosion and sedimentation control requirements associated with water main construction, including all items necessary, including permits, to comply with all applicable state, county, and city erosion and sedimentation rules and regulations. March 10, 2023 Wadsworth Widening– Sanitary Phase II 01025-3 Contractor is responsible for traffic control in accordance with City of Wheat Ridge regulations including pedestrian protection, temporary striping, re-striping, arrow boards, construction signs, barricades and channelization devices, flaggers as necessary, phasing, night work setup and removal of all necessary traffic control devices. 4.Import Fill Class 2 (full depth, trench wide – if necessary): PER LINEAR FOOT for point repairs and mainline remove/replace. Only as agreed to by Engineer prior to placement. Measured horizontally in place along sanitary sewer mainline to full depth. Exporting of unsuitable material to be included under this bid item. Import material shall be in accordance with City of Wheat Ridge/Jefferson County and Colorado Department of Transportation (CDOT). 5.Trench Stabilization (if necessary): PER LINEAR FOOT. Measured horizontally in place along sanitary sewer mainline. Only as agreed to by Engineer prior to placement. Depth shall be a minimum 2’ below and 2’ above pipe installation. Includes over-excavation and disposal of unsuitable soil, dewatering, 1 ½-inch washed rock, consolidation and shoring. Import backfill necessary to meet compaction standards and moisture content shall be the contractor’s responsibility and will not be paid for on a per linear foot basis. 6.Cut-off Walls (if necessary): PER EACH. Only as agreed to by Engineer prior to installation. Includes excavation, shaping, forming, reinforcing, concrete and backfill, import fill, compacting, dewatering as needed, all as detailed and required. 7.Export Unsuitable Backfill Material: No separate measurement or payment made. To be included under related items. 8.Traffic Control: No separate measurement or payment made. To be included under related items. 9.Erosion/Sedimentation Control: No separate measurement or payment made. To be included under related items. 10.Mobilization/Demobilization: No separate measurement or payment made. To be included under related items. 11.Tracer Wire and Test Stations: PER LUMP SUM. Includes, but is not limited to, wire, insulation, access boxes, grounding rods, connectors and all testing required to show a working system. System must be in compliance with City of Wheat Ridge standards and all requirements per C.R.S. Title 9. END OF SECTION