HomeMy WebLinkAbout10-26-2026 City Council Meeting Agenda PacketAGENDA
CITY COUNCIL MEETING
CITY OF WHEAT RIDGE, COLORADO
Monday, October 26, 2026
6:30 p.m.
This meeting will be conducted as a virtual meeting, and in person, at: 7500 West 29th
Avenue, Municipal Building, Council Chambers.
City Council members and City staff members will be physically present at the
Municipal building for this meeting. The public may participate in these ways:
1. Attend the meeting in person at City Hall. Use the appropriate roster to sign up
to speak upon arrival.
2. Provide comment in advance at www.wheatridgespeaks.org (comment by noon
on October 26, 2026)
3. Virtually attend and participate in the meeting through a device or phone:
Click here to pre-register and provide public comment by Zoom (You must
preregister before 5:00 p.m. on October 26, 2026)
4. View the meeting live or later at www.wheatridgespeaks.org, Channel 8, or
YouTube Live at https://www.ci.wheatridge.co.us/view
Individuals with disabilities are encouraged to participate in all public meetings
sponsored by the City of Wheat Ridge. The City will upon request, provide auxiliary
aids and services leading to effective communication for people with disabilities,
including qualified sign language interpreters, assistive listening devices, documents
in Braille, and other ways of making communications accessible to people who have
speech, hearing, or vision impairments. To request auxiliary aid, service for effective
communication, or document in a different format, please use this form or contact
ADA Coordinator, (Kelly McLaughlin at ada@ci.wheatridge.co.us or 303-235-2885) as
soon as possible, preferably 7 days before the activity or event.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL OF MEMBERS
APPROVAL OF MINUTES
• City Council Meeting Minutes, September 28, 2026
• Study Session Notes, October 5, 2026
APPROVAL OF AGENDA
PROCLAMATIONS AND CEREMONIES
1. Dominick Breton Community Champion Award
2. Proclamation – Wheat Ridge Optimist Club
3. Recognition of the Everitt Middle School Art Students
PUBLICS’ RIGHT TO SPEAK
a. Public may speak on any matter not on the agenda for a maximum of 3 minutes
under Publics’ Right to Speak. Please speak up to be heard when directed by
the mayor.
b. Members of the Public who wish to speak on a Public Hearing item or Decision,
Resolution, or Motion may speak when directed by the mayor at the conclusion
of the staff report for that specific agenda item.
c. Members of the Public may comment on any agenda item in writing by noon on
the day of the meeting at www.WheatRidgeSpeaks.org. Comments made on
Wheat Ridge Speaks are considered part of the public record.
1. CONSENT AGENDA
a. Motion awarding a contract to Lighthouse Transportation Group, LLC in the
amount of $651,975.30 with a contingency amount of $65,197.53 for a total
approved amount of $717,172.83 for the 44th Avenue and Tabor Street traffic
signal
b. Resolution No. 50-2026 – a resolution approving a Ditch Maintenance
Agreement with the Watrous Lateral Ditch Company and authorizing the Mayor
to execute the agreement for improvements adjacent to the Route 32 bus stop at
West 32nd Avenue and Kipling Street
c. Resolution No. 51-2026 – a resolution of support for an application to the
Jefferson County Parks and Open Space Land Conservation Partnership
program for the acquisition of 2.71 acres of the Wilmore-Davis property
PUBLIC HEARINGS AND ORDINANCES ON SECOND READING
2. Council Bill No. 18-2026 – an ordinance amending Chapter 11 of the Wheat
Ridge Code of Laws through adoption of a new Article IV to authorize and
regulate communal outdoor dining areas
3. Council Bill No. 19-2026 – an ordinance amending the Wheat Ridge Code of
Laws concerning the occupation tax on basic local exchange service
ORDINANCES ON FIRST READING
4. Council Bill No. 20-2026 – an ordinance amending the Wheat Ridge Code of
Laws to address the regulations of social clubs and making conforming
amendments in connection therewith
5. Council Bill No. 21-2026 – an ordinance amending Chapter 26 of the Wheat
Ridge Code of Laws concerning sign and billboard regulations
DECISIONS, RESOLUTIONS, AND MOTIONS
6. Motion awarding a contract to JR Engineering in the amount of $1,860,448 with a
contingency amount of $186,045 for a total approved amount of $2,046,493 for
design services for the 35th Avenue Multimodal Improvements project
7. Motion awarding a contract to Goodland Construction Inc., in the amount of
$10,000,000 for construction of the Sidewalk Gap project
8. Motion awarding a contract to Muller Engineering Company in the amount of
$2,645,613 with a contingency amount of $264,561 for a total approved amount
of $2,910,174 for design services for the Tabor Street Multimodal Improvements
project
CITY MANAGER’S MATTERS
CITY ATTORNEY’S MATTERS
ELECTED OFFICIALS’ MATTERS
MINUTES
CITY COUNCIL MEETING
CITY OF WHEAT RIDGE, COLORADO
Monday, September 28, 2026, 6:30 p.m.
This meeting was conducted as a virtual meeting, and in person, at: 7500 West 29th Avenue,
Municipal Building, Council Chambers.
CALL TO ORDER
Mayor Stites called the City Council Regular Meeting to order on September 28, 2026, at 6:30
p.m.
PLEDGE OF ALLEGIANCE
Those present stood, if able, and recited the Pledge of Allegiance.
ROLL CALL OF MEMBERS
Councilmembers Present: Rachel Hultin; Dan Larson; Kathleen Martell; Mike Okada; Patrick
Quinn; Jenny Snell; Susan Wood; and Scott Ohm.
A quorum was established.
ABSENT
None
STAFF IN ATTENDANCE:
City Manager Patrick Goff; City Attorney Gerald Dahl; Deputy City Manager Marianne Schilling;
Community Development Director Lauren Mikulak; Division Chief Shawn Ray; Deputy City Clerk
Lucy Spalenka;
APPROVAL OF MINUTES
• City Council Meeting Minutes, September 14, 2026 • Special Study Session Notes, September 14, 2026
Minutes and notes approved as presented
APPROVAL OF AGENDA
No changes to the agenda were proposed.
PROCLAMATIONS AND CEREMONIES
1. Proclamation – National Suicide Prevention Awareness Month
Mayor Stites read a proclamation declaring September as Suicide Prevention Month in the City
of Wheat Ridge. Kristen Thome, Deputy Chief Clinical Officer at Jefferson Center for Mental
Health, accepted the proclamation on behalf of Jefferson Center. She expressed gratitude for
the recognition, noting that suicide prevention is a community-wide responsibility requiring
friends, schools, healthcare providers, and community leaders to create spaces where people
feel seen, heard, and cared for.
2. Proclamation – Breast Cancer Awareness Month
Mayor Stites read a proclamation declaring October 2026 as Breast Cancer Awareness Month
in the City of Wheat Ridge. Andrea Walden and Casey Bogenshutz from Intermountain Health
Lutheran Hospital accepted the proclamation, encouraged residents to schedule screenings, and thanked the city for its commitment to community health and well-being.
3. Dominick Brenton Community Champion Award
Mayor Stites presented the Dominick Brenton Community Champion Award to 10-year-old
Jocelyn Maguire, recognizing her for safely corralling a neighbor's dog, Felix, that had gotten loose near a busy intersection, ensuring the dog had water, attention, and monitoring until the
owners could retrieve him. Jocelyn offered brief remarks expressing her care for dogs and
pride in helping Felix.
4. Proclamation – Indigenous People’s Day Mayor Stites read a proclamation formally designating October 12, 2026, as Indigenous
Peoples' Day in the City of Wheat Ridge, acknowledging the traditional territory of the
Cheyenne, Arapahoe, and Ute tribes, and recognizing the 48 contemporary tribal nations of
Colorado. Two members of the Native community, Rick Waters and Fred Mosqueda offered
remarks accepting the proclamation. Rick Waters, a citizen of the Kiowa Nation and descendant of the Cherokee Nation of Oklahoma, accepted on behalf of the organization
People of the Sacred Land, noting the historical significance of the proclamation compared to
Governor John Evans's 1864 proclamations, which were not rescinded until 2021. Fred
Mosqueda, speaking on behalf of Governor Reggie Wasson of the Cheyenne Arapaho Tribes,
expressed deep gratitude and highlighted the strong historical presence of Cheyenne and
Arapaho chiefs throughout the Colorado region.
PUBLICS’ RIGHT TO SPEAK
a. In Person:
Riley Heger (works in Wheat Ridge), constituent service representative for Congresswoman
Brittany Petterson, provided a congressional update covering the following: a bipartisan
continuing resolution was signed into law keeping the federal government funded through
December 11, with appropriations work still ongoing; community project funding requests for
Wheat Ridge, including the Family Tree building renovation and an outdoor commons micro-
studio project, remain pending appropriations; the 21st Century Road to Housing Act,
described as the most significant housing legislation in 30 years, passed with several
Congresswoman Patterson-led provisions; back-to-school supply costs are up 11% attributed
to federal tariff policies; a telephone town hall on September 1st drew over 18,000 participants;
and the district office has recovered or saved $3,500,000 for constituents through casework in
2026.
Renee Schreiner (interim president, Wheat Ridge Chamber of Commerce) highlighted the
recent successful Wine Walk event on 38th Avenue and announced an upcoming "Meet the
Board" continental breakfast on Thursday morning at 7:30 a.m. at the Chamber office, 7230
West 38th Avenue.
Betsy Coppock (District 3, member of Sustainable Wheat Ridge) announced the Wheat Ridge
Energy Efficiency Fair to be held Tuesday, October 20th from 4:30 to 6:30 p.m. at the Active
Adult Center. She noted the event stems from the City 's 2024 Sustainable Action Plan and will
focus on educating residents about energy audits, air sealing, insulation, and heat pumps, with
opportunities to sign up for estimates. Partners include Xcel Energy's Partners in Energy
Program, DRCOG, and industry representatives.
Alex Gouldsmith (District 2) also spoke regarding the Energy Efficiency Fair, emphasizing the
goal of making rebates and incentives more accessible to Wheat Ridge residents, particularly
those on fixed incomes in older homes. He invited council members to participate in the event
and noted that Wheat Ridge's housing stock from the 1950s and 1960s represents a significant
opportunity for efficiency improvements.
c. Via Wheat Ridge Speaks:
Riley Heger
Sep 28, 2026, at 9:56 a.m.
The Office of Congresswoman Brittany Pettersen would be happy to provide an update on her legislative work, provided by her staffer Riley Heger. Riley recently joined the team and handles
the geographic zone of Wheat Ridge in her portfolio.
ORDINANCES ON FIRST READING
1. Title: Council Bill No. 18-2026
An ordinance amending Chapter 11 of the Wheat Ridge Code of Laws by adding a new Article
XVII, entitled “Communal Outdoor Dining Areas,” to authorize and regulate Communal Outdoor
Dining Areas
Issue: Item under consideration is Council Bill No. 18-2026, which would amend Chapter 11 of
the Wheat Ridge Code of Laws through the adoption of a new Article XVII to authorize and
regulate Communal Outdoor Dining Areas, or CODAs, consistent with state law.
Item introduced by Council Member Wood
Motion by Council Member Wood: Moved to approve Council Bill 18-2026, An ordinance
amending Chapter 11 of the Wheat Ridge Code of Laws by adding a new Article XVII, entitled
“Communal Outdoor Dining Areas,” to authorize and regulate Communal Outdoor Dining Areas,
order it published and public hearing set for October 26, 2026, in City Council Chambers and if
adopted on 2nd reading to take effect immediately. Seconded by Council Member Quinn
Vote: 8-0, Motion carried.
2. Title: Council Bill No. 19-2026
An ordinance amending the Wheat Ridge Code of Laws concerning the occupation tax on
basic local exchange service
Issue: The City imposes an occupation tax on telecommunications telephone
service, which also applies to cell phone service. This ordinance amends the relevant definition
to restore it to the pre-2023 version, to be consistent with a decision in 2024 by the Colorado
Supreme Court.
Item introduced by Council Member Okada
Motion by Council Member Okada: Moved to approve Council Bill 19-2026, An ordinance
amending the Wheat Ridge Code of Laws concerning the occupation tax on basic local
exchange service. Order it published and public hearing set for Monday, October 26, 2026, at
6:30 p.m. as a virtual meeting and in City Council chambers, 7500 West 29th Avenue, and that
it takes effect 15 days after final publication as provided by section 5.11 of the charter.
Seconded by Council Member Ohm
Vote: 8-0, Motion carried.
DECISIONS, RESOLUTIONS, AND MOTIONS
3. Title: Resolution No. 47-2026
A resolution affirming the Wheat Ridge City Council’s support for protecting civil rights, human
dignity, public safety, and community trust
Issue: Adoption of Resolution No. 47 affirms the City ’s commitment to protecting civil rights,
human dignity, public safety, and community trust, and establishing policy
direction regarding local participation in federal civil immigration enforcement and the use of
City property and facilities.
Item introduced by Council Member Snell
Staff Presentation: City Manager Patrick Goff provided a staff presentation summarizing the
resolution. He noted the item follows community requests concerning immigration
enforcement and the role of the Wheat Ridge Police Department and follows the council's
August 24th study session. Key provisions include: keeping the police department focused on
Colorado criminal law and municipal ordinances; establishing that City personnel will not
undertake federal civil immigration enforcement as an independent municipal function;
prohibiting operational support and the affirmative use of City facilities and resources for
federal civil immigration enforcement, subject to legal obligations and public safety
exceptions; reaffirming the short-term local law enforcement purposes of police holding cells
and the existing zoning prohibition on confinement facilities; and directing expedited review
and enforcement of prohibited uses. City Manager Goff confirmed no significant financial
impact is anticipated and that staff recommends adoption.
Public Comment: Kallen Marques (owner, Little Brazil, Wheat Ridge), expressed support for the
resolution on behalf of her business. She described 14 years of community involvement,
including donations to schools, catering City events, and participating in community activities.
She noted a significant drop in immigrant patronage in 2026, attributing it directly to federal
immigration enforcement actions and community fear. She shared her personal experience as
a naturalized citizen who won a green card lottery, emphasizing the difficulty and limited
pathways in the immigration process, and urged council to pass the resolution.
Charlie Myers (District 1 resident) thanked City Council and City staff for their work on the
resolution, giving special recognition to Council Member Okada and Mayor Pro Tem Hultin for
their engagement with the community throughout the drafting process. He expressed that the
resolution places the community and the Wheat Ridge Police Department on safer ground and
commended the council for protecting civil rights.
Council Discussion: Council Member Martell asked for clarification on Section 9 regarding
expedited enforcement of prohibited confinement facilities and what would happen to any
individuals already confined once a violation is confirmed. City Attorney Dahl explained that the
matter would be treated as an urgent zoning violation, requiring immediate cessation of new
admissions and prompt follow-up, while the City would coordinate an appropriate response
based on the specific property and circumstances, with attention to the rights of confined
individuals and property owners. He noted the City ’s role would be similar to a civil standby,
helping ensure safety without directing outcomes. Council Member Martell confirmed that
understanding, and Attorney Dahl agreed. Mayor Pro Tem Hultin noted a typographical
correction in Section 4, which Attorney Dahl said had already been addressed in the final
document. Council Member Snell asked about implementation of Section 10 regarding
communication of policies and reporting suspected civil rights concerns, and City Manager
Goff said existing tools would be made more accessible and transparent. Council members
expressed support for the resolution and thanked community advocates, council colleagues,
and staff for their collaborative work. Council Member Larson said he had initially questioned
the need for the resolution and potential negative publicity, but concluded the City ’s zoning
code provides a sound basis for support.
Motion by Council Member Snell: Moved to approve Resolution No. 47-2026, A resolution
affirming the Wheat Ridge City Council’s support for protecting civil rights, human dignity,
public safety, and community trust
Seconded by Council Member Martell
Vote: 8-0, Motion carried.
4. Title: Resolution No. 45-2026
A resolution approving an Intergovernmental Agreement for Proposition 123 unit sharing
between the Cities of Arvada, Edgewater, Golden, Lakewood, Westminster, Wheat Ridge and
Jefferson County
Issue: Wheat Ridge has a shortfall of eligible affordable housing units needed to meet its
Proposition 123 commitment for the 2024–2026 cycle. The proposed Intergovernmental
Agreement establishes a regional unit-sharing program that will allow the City to receive
surplus eligible units from Jefferson County and other participating municipalities, helping the
City satisfy its first-cycle commitment and remain eligible for the next Proposition 123 funding
cycle.
Item introduced by Mayor Pro Tem Hultin
Staff Presentation: Community Development Director Lauren Mikulak provided a brief
presentation. She explained that Proposition 123, approved by voters in 2022, created a
statewide housing fund accessible only to communities making formal commitments to
support the production and preservation of affordable housing. Wheat Ridge's first compliance
cycle unit count was 218 units, while the City 's eligible unit count in the first cycle is
approximately 40 units. By pooling commitments and completed units regionally across
Jefferson County, the participating jurisdictions are collectively able to complete the first cycle
and remain eligible for the second cycle of Prop 123 funding. She noted the IGA reflects the
program's encouragement of regional collaboration.
Council Discussion: Council Member Larson asked Director Mikulak to define an eligible
affordable housing unit. She clarified that units must be newly constructed with a permit
issued or certificate of occupancy within a specific timeframe and must be affordable to
households at or below 60% AMI or alternatively must be an existing unit with a new land use
restriction or covenant applied. She noted that the Fruitdale project, while furthering affordable
housing, will not be counted due to the program's strict eligibility criteria. Mayor Pro Tem Hultin
and Council Members Ohm and Wood offered comments in support of the regional
collaboration approach and the City's strong record of affordable housing activity.
Motion by Mayor Pro Tem Hultin: Moved to approve Resolution Number 45-2026, a resolution
approving an Intergovernmental Agreement for Proposition 123 unit sharing between the City,
Jefferson County, and municipalities in Jefferson County, and further moved to authorize and
direct the mayor and City attorney to execute the same with instruments as necessary to
facilitate and complete the obligations under the agreements.
Seconded by Council Member Snell
Vote: 8-0, Motion carried.
5. Title: Resolution No. 46-2026
A resolution in support of the City filing a commitment to the State of Colorado to increase the
City ’s supply of affordable housing to be eligible for Proposition 123 funding
Issue: Proposition 123 provides funding for affordable housing programs statewide. To remain
eligible for state funding during the second cycle (2027-2029), the City must file a commitment
with the State of Colorado to increase its supply of affordable housing by November 1, 2026.
Item introduced by Council Member Ohm
Staff Presentation: City Manager Goff noted this item is a companion to the prior resolution
and that Director Mikulak's preceding presentation covered the relevant background. Council
Member Larson encouraged residents watching at home to review the detailed staff report,
which documents completed and in-progress affordable housing units in Wheat Ridge.
Motion by Council Member Ohm: Moved to approve Resolution Number 46-2026, a resolution
in support of the City filing a commitment to the State of Colorado to increase the City 's supply
of affordable housing to be eligible for Proposition 123 funding.
Seconded by Mayor Pro Tem Hultin
Vote: 8-0, Motion carried.
6. Title: Resolution No. 48-2026
A resolution approving an Intergovernmental Agreement concerning Regional Cold Weather
Response for those experiencing homelessness
Issue: The County of Jefferson and the cities of Arvada, Edgewater, Golden, Lakewood,
Westminster, and Wheat Ridge are proposing a second year renewal of an Intergovernmental
Agreement (IGA) to establish a collaborative, regional approach to addressing cold weather
response for those experiencing homelessness in Jefferson County for the 2026-2027 cold
weather season and potentially beyond. This initiative aims to address the increasing number
of individuals experiencing homelessness in Jefferson County, which is recognized as a
regional issue affecting the health, safety, and welfare of each community.
Item introduced by Council Member Quinn
Staff Presentation: After introduction, City Manager Goff provided additional details. The
service period runs from October 1 through April 30. The program supports family shelter,
motel vouchers, congregate shelter, an after-hours severe weather hotline, coordinated
outreach, and transportation assistance. Jefferson County coordinates weather activations
using National Weather Service forecasts. The total program cost is approximately $1,600,000,
with Wheat Ridge's population-based share at $97,440 — a decrease of $5,500 over the prior
season. Jefferson County serves as the fiscal agent. Staff recommends approval.
Motion by Council Member Quinn: Moved to approve Resolution Number48-2026, a resolution
approving an Intergovernmental Agreement concerning regional cold weather response for
those experiencing homelessness.
Seconded by Council Member Wood
Vote: 8-0, Motion carried.
7. Title: Resolution No. 49-2026
A resolution of the City of Wheat Ridge, Colorado approving an Intergovernmental Agreement
concerning operational funding for the Navigation Center
Issue: The County of Jefferson and the cities of Arvada, Edgewater, Golden, Lakewood,
Westminster, and Wheat Ridge propose an Intergovernmental Agreement (IGA) to fund
operations of the Navigation Center in Lakewood for calendar year 2027. The Center provides
shelter, professional case management, and year-round, 24-hour services to people
experiencing homelessness in Jefferson County.
Item introduced by Council Member Martell
Staff Presentation: After introduction, City Manager Goff provided additional context. This is
the first full year the Lakewood Navigation Center will be open for operations, having opened in
approximately March or April of 2026 with Lakewood covering initial costs and receiving
significant grant funding. The minimum operating cost for 2027 is estimated at $3,000,000.
Approximately $700,000 in savings from the prior cold weather IGA — due to a mild winter —
will be applied to reduce the regional cost to $2,300,000. Wheat Ridge's share of $143,200 is
included in the proposed 2027 budget. The City of Lakewood manages the operating contract
with Volunteers of America, which runs the shelter. Wheat Ridge housing navigators would
refer clients to the center as needed. Staff recommends approval. City Manager Goff also
noted the region will likely explore a different funding structure for 2028 and beyond.
Council Discussion: Council Member Larson asked about the Navigation Center’s status,
capacity, and services. City Manager Goff said the Lakewood facility is open and operating
with approximately 100 beds of transitional housing, with stays generally lasting from a day to
several months. Housing Navigator Marianne explained that clients are referred through
navigators and that the center provides wraparound services such as job and benefits support.
Council Member Okada asked about Westminster’s contribution, and City Manager Goff
clarified that only Westminster’s Jefferson County population is counted and that its $100,000
contribution may be revisited as the regional funding formula is renegotiated for 2028. Mayor
Pro Tem Hultin emphasized the importance of regional collaboration in building homelessness
services infrastructure in Jefferson County.
Motion by Council Member Martell: Moved to approve Resolution Number 49-2026, a
resolution of the City of Wheat Ridge, Colorado approving an Intergovernmental Agreement
concerning operational funding for the Navigation Center.
Seconded by Council Member Snell
Vote: 8-0, Motion carried
8. Title: A motion approving a Settlement Agreement between the City of Wheat Ridge and
Concrete Works of Colorado, Inc. related to the Improve Wadsworth Project
Issue: Approval of a Settlement Agreement with Concrete Works of Colorado, Inc. related to
the CenturyLink Delay associated with the Improve Wadsworth Project.
Item introduced by Council Member Larson
Staff Presentation: City Manager Goff presented the item, requesting council approval of a
settlement agreement with Concrete Works of Colorado in the amount of $1,581,982, related to
CenturyLink utility relocation delays on the Improve Wadsworth Project. The delays affected
the contractor's work. The City previously granted 43 additional working days for the delay. The
contractor subsequently requested an additional $4,260,000 in compensation, including a
claim from an electrical subcontractor. After negotiations and mediation failed to resolve the
dispute, both parties submitted the matter to a dispute review board, which recommended the
settlement amount before council. Both parties accepted the board's recommendation subject
to council approval. Funds are available in existing capital improvement program budgets.
Payment will be due within 10 days of approval. The settlement resolves all CenturyLink delay
claims, including the electrical subcontractor's pass-through claim, and does not constitute an
admission of fault or liability by either party. City Attorney Dahl was noted as having been
heavily involved in the matter.
Council Discussion: Council Member Wood asked for confirmation that approval of the
$1,581,982 payment would fully close the matter. City Manager Goff confirmed it would.
Council Member Larson expressed that when the dispute first arose, he believed the City had a
fairly solid case and had anticipated pursuing it further. He expressed disappointment that the
matter did not proceed with full litigation, noting the loss of approximately $1,500,000 in
capital project funds. He stated, however, that he understood from his corporate experience
that attorneys typically recommend settlement to avoid expensive and time-consuming
litigation, and indicated he would support the motion while registering his disappointment.
Motion by Council Member Larson: Moved to approve a settlement agreement between the
City of Wheat Ridge and Concrete Works of Colorado Inc. related to the improved Wadsworth
project.
Seconded by Mayor Pro Tem Hultin
Vote: 8-0, Motion carried
CITY MANAGER’S MATTERS
City Manager Goff provided an update on the Interstate 70 closure at the Kipling Bridge. He
noted that a resident email had been circulated expressing concern about traffic detours
caused by the closure. He reported receiving a CDOT update indicating the project remained on
schedule for completion by approximately 4:00 a.m. the following morning. He explained that
the eastbound bridge, built in 1969, presented unexpected complications not encountered
during the westbound bridge replacement, which had finished a day early. He noted the bridges
were in an unsafe condition and posed a liability risk, and that completing the work over a long
weekend allowed CDOT to minimize the disruption compared to a multi-month construction
window.
CITY ATTORNEY’S MATTERS
City Attorney Dahl had nothing to report.
ELECTED OFFICIALS’ MATTERS
Mayor Pro Tem Hultin expressed enthusiasm for the upcoming Energy Efficiency Fair, noting
her own 1950s home presents challenges with heating and cooling. She also recognized the
importance of the Suicide Prevention Month proclamation, sharing that it has personally
impacted her household, and encouraged anyone struggling to reach out to a trusted person or
community organization. She announced the Courageous Colorado Civic Conversation event to
be held the following evening at the Wheat Ridge Recreation Center from 5:30 to 7:00 p.m.,
describing it as a 90-minute dialogue on civic health and access to civic voice. She reported
that Wheat Ridge had more registrants than any other community Courageous Colorado had
previously visited, by approximately 30 percent.
Council Member Ohm recognized the Wheat Ridge Business Awards Breakfast, commending
the event format and the staff of businesses honored. He highlighted his conversation with
Caitlin Marquez of Little Brazil following the event, praising Economic Development Manager
Jill Mendoza for engaging with her on business questions. He encouraged all businesses
experiencing challenges to contact City staff or their council representative. He also endorsed
the regional collaboration reflected in the evening's housing and homelessness items, calling
housing production a priority requiring continued attention to policy and building innovation.
Council Member Larson announced the Jefferson County Library Foundation's semi-annual
Shred-a-Thon event on Saturday at the Jefferson County Fairgrounds, running from 9:00 AM
until the shred truck is full. He recognized the Longer Table event on Sunday as a big success
and thanked sponsors Intermountain Health, Esther's, and Honey Bucket. He announced that
the Wheat Ridge Business of the Year award went to Get Rights Bakery, calling it well-deserved,
and recognized the Wheat Ridge City Clerk's Office as the recipient of the Council Partnership
Award.
Council Member Okada expressed enthusiasm for attending Wheat Ridge 101 the prior week,
describing it as energizing and impressive to see a room full of engaged, knowledgeable
community members discussing the City 's work and identity. He committed to evangelizing
for the next Wheat Ridge 101 class.
Council Member Snell recognized the importance of the proclamations presented during the
evening, singling out the Suicide Prevention Month recognition and thanking Jefferson Center
for their community work. She also called out Jocelyn McGuire's Dominick Brenton Award
acceptance speech as a moving moment, referencing a Gandhi quote about how a nation's
moral progress can be judged by how its animals are treated. She praised the Longer Table
event and recognized Parks and Recreation staff and the Community Development team,
including Ashley Holland, for the significant lift involved in producing the event.
Council Member Martell reflected on a busy Wheat Ridge week that included City Council on
Monday, the 2A Yes kickoff on Tuesday, Wheat Ridge 101 on Wednesday, the Business Awards
Breakfast on Thursday, a soil web and compost potluck event at Happiness Gardens on Friday,
and Longer Table Wheat Ridge on Sunday. She also revealed that Felix, the dog rescued by
Jocelyn McGuire, is her dog, and expressed personal gratitude for Jocelyn's actions. She
invited all residents to District 1's second annual soup night at the Wheat Ridge Center for
Music and Arts on October 4th from 5:00 to 6:30 p.m. She also again promoted the Energy
Efficiency Fair on October 20, 2026.
Council Member Quinn echoed appreciation for the Business Awards Breakfast, noting the
diversity and quality of Wheat Ridge's business community made it difficult to select a single
winner. He thanked community members who attended in support of the civil rights resolution.
He noted that he and Council Member Wood had spent time over the weekend meeting with
community members about various issues and concerns and working toward solutions. He
closed with a lighthearted remark about the Denver Broncos' performance.
Council Member Wood remarked on a fulfilling week of community events and meetings with
new people. She thanked Council Member Martell for a ticket to the Longer Table event, noting
she met a neighbor from her street for the first time. She reported attending a morning event
hosted by the Commonsense Institute and Civic Results focused on the Starter Home Initiative,
which featured a panel discussion on tools and impediments to building middle-income and
missing middle housing. She described the conversation as a valuable and ongoing one she
plans to continue attending.
Mayor Stites reflected on a busy week. He noted attending a meeting with Foothills Regional
Housing, county commissioners, and local landlords to learn about available resources. He
praised Wheat Ridge 101, describing the value of helping community members understand the
government process and demystify how things work. He commended the Business Awards
event, specifically recognizing the Clerk's Office, Get Rights Bakery, and honoring former Mayor
Bud Starker with the Mayor's Award. He thanked Jill Mendoza and staff for their work on the
business awards. He shared that he visited Peak Elementary School to speak with a third-grade
class about how math is used in local government, noting the students' surprise at figures like
$106,000,000 budgets. He recognized the Wheat Ridge Chamber's Wine Walk on 38th Avenue
as a fun opportunity to visit businesses. He highlighted the Sustainable Applewoods Block
Party on Saturday, describing a turnout of several hundred people with bounce houses and
food trucks, and thanked Local Works for their block party grants. He closed by thanking all
who contributed to the Longer Table event, citing Beth June, Ashley Holland, Paige Piper, and
Renee Shriner among the organizers, and described it as one of the best community events
Wheat Ridge residents had shared with him.
ADJOURN
Regular meeting adjourned at 8:20 p.m.
_________________________________________________
Rachel Hultin, Mayor Pro Tem
__________________________________________________
Lucy Spalenka, Deputy City Clerk
STUDY SESSION AGENDA
CITY COUNCIL MEETING
CITY OF WHEAT RIDGE, COLORADO
Monday, October 5, 2026, 6:30 p.m.
This meeting was conducted as a virtual meeting, and in person, at: 7500 West 29th
Avenue, Municipal Building, Council Chambers.
CALL TO ORDER
Mayor Korey Stites called the City Council Study Session of October 5, 2026, to order
at 6:30 p.m.
ATTENDANCE
Councilmembers Present: Rachel Hultin; Dan Larson; Kathleen Martell; Mike Okada; Patrick Quinn; and Susan Wood; Scott Ohm.
ABSENT:
Councilmember Jenny Snell
STAFF IN ATTENDANCE:
City Manager Patrick Goff; Deputy City Manager Marianne Schilling; Community
Development Director Lauren Mikulak; Senior Planner Scott Cutler; Assistant to the City
Manager Wyatt Peterson; Homeless Navigator Maddy Horgan; Housing Navigator Korey Kolar; Deputy City Clerk Lucy Spalenka.
Public Comment on Agenda Items
Jeff Richards (resident, 20+ years in Wheat Ridge; employed in Lakewood) addressed
the Council. Mr. Richards thanked the Council for keeping public forums open and expressed appreciation for the opportunity for citizens and business owners to engage
with the city. He requested that the city allocate money, resources, and staff time to
better organize efforts around arts, humanities, culture, diversity, equity, and inclusivity.
He noted that while the city has a percent-for-art program, it addresses only plastic arts
and does not account for performance art, flash art, poetry, or literature. He asked that the city develop a broader plan so that Wheat Ridge becomes not only a safe
community but a culturally enriched one.
Council Member Hultin offered a point of order, reminding all present that public
comment during study sessions should be pertinent to the items on the study session
agenda.
1. Event Venue Business
Community Development staff Scott Cutler and Lauren Mikulak presented an update on
event venue business regulations, seeking Council consensus on enforcement strategies
following June's consensus on zoning code changes.
Staff Presentation:
Zoning Code Update (Recap): Staff summarized the previously approved four-tiered
framework: (1) Indoor Event Venues, (2) Outdoor Event Venues, (3) Accessory Outdoor
Entertainment for commercial properties, and (4) Residential/Agricultural properties over
one acre with accessory outdoor entertainment, subject to a Special Use Permit (SUP)
process.
Enforcement Strategies Presented: Special Use Permit Enforcement: Staff proposed
clarifying intermediate enforcement steps between SUP approval and a potential Council
hearing, including formal written notice of noncompliance, an opportunity to correct
noncompliance, director ability to modify conditions of approval, and retention of existing
hearing language allowing Council to modify or revoke an SUP.
Business Licensing: Staff recommended moving enforcement language from the former
social club ordinance into the general business license section rather than creating a
separate license category. Updates were also proposed to close gaps in liquor license
requirements under Chapter 11.
Nuisance Code (Chapter 15): Staff proposed amending the nuisance definition to include
violations of the building code (Chapter 5) and licensing code (Chapter 11), closing a gap
that previously excluded these chapters.
Noise Ordinance: Staff indicated that noise would be handled as a separate ordinance
given the breadth of the topic. Attorney Dahl noted that the City of Salida was the subject of
a Colorado Supreme Court case holding that a government may not issue permits allowing
private businesses to exceed state noise limits. He explained that Wheat Ridge's existing
outdoor amplified sound permit program currently allows that and must be brought into
compliance with state law. He confirmed the intent is to make targeted amendments —
primarily adjusting decibel levels to match state law — without reopening the entire noise
ordinance. Attorney Dahl also noted that the legislature attempted to pass a bill this past
session exempting governments from the ruling, but it did not pass.
Council Discussion:
Council Member Hultin observed that many of the proposed changes would have broader
applicability beyond event venues and asked for clarification on how the changes would be
communicated to the public. Staff confirmed that event venues would be regulated as a
land use through the zoning code rather than as a business license type, and that a public-
facing "how-to" guide was being developed for the city website. Council Member Hultin
also suggested that the Council consider, in 2027, whether SUP hearings should be
referred to a hearing officer rather than heard by Council. Staff noted that special use
permits would appear on a forthcoming list of code items to be reviewed following the city
plan adoption.
Council Member Ohm inquired about how the Richard Hart Estate would be regulated
under the new framework. Staff indicated that city-owned institutional properties are
typically exempt from such regulations and confirmed the intent is to regulate privately
operated commercial event venues only.
Council Member Martell asked whether house parties and block parties would be affected.
Staff confirmed there is no proposed change to the regulation of residential events; the
same noise, nuisance, and courtesy rules apply.
Council Member Snell requested a preview of how Chapter 16 (unreasonable noise) would
be revised. Attorney Dahl explained that the primary change would be limited adjustments
to decibel levels to comply with state law following the Salida Supreme Court decision,
with no intent to substantially alter the core language of Section 16-103. Council Member
Snell emphasized the importance of retaining the section's existing standard — that noise
unreasonably disturbs, injures, or endangers persons of ordinary sensitivity — as the heart
of the ordinance.
Staff Recommendation: Staff identified a target of October 15 for Planning Commission
review of Chapter 26 changes and a November 9 City Council vote on the combined zoning
and enforcement ordinance.
Consensus: Council confirmed consensus to move forward with staff recommendations.
2. Homeless Navigation Program Update
Staff Presentation:
Program Overview: Staff reviewed the Wheat Ridge Homeless Navigation Program, part
of the Jeffco Homeless Navigation Collaborative, and noted the active service
agreement with Edgewater. Navigators conduct weekly outreach, complete HMIS
assessments, help clients secure documents and benefits, and work toward housing
solutions.
Program Data and Placements: Referrals continue to trend upward, especially during colder months, with most coming from community partners, city staff, police, and word-
of-mouth. About 18.2% of referrals become active clients. Staff reported 210 housing placements since January 2023 and noted that time to placement varies widely
depending on client needs and housing availability.
Aftercare and Funding: Staff said the Aftercare program helps clients remain stably housed through rental assistance, transportation support, and help with landlord
communication and paperwork. Since January 2023, program spending has totaled about $427,414, with the largest costs being bridge housing, move-in expenses, and
aftercare. Funding includes city operational dollars and grant support, including
Colorado Gives and DOLA, with an additional Intermountain Health grant application
pending.
Community Court and Drop-In Hours: Staff said the community court program at
Jefferson Avenue Church has ended because it did not improve attendance and created
strain on court staff; navigators will continue participating at City Hall. Staff also
highlighted weekly drop-in hours on Mondays and Tuesdays from 1:00 to 3:00 PM through a partnership with Holy Cross Lutheran Church.
Severe Weather Season: Staff reviewed severe weather operations for October 1 through April 30. Jefferson County Public Health determines activation thresholds.
Because Jefferson County currently has no congregate shelter option, motel vouchers
will again be used, with navigators distributing them under the existing IGA. An extreme weather response managed by the Jeffco Office of Emergency Management remains
available for the most severe conditions.
Council Discussion:
Council Member Okada confirmed that updated data in the presentation reflected the
most recent quarter, slightly different from packet materials. She asked about the family
navigation referral pathway for households with children under 18; staff explained that
referrals go directly to the Jefferson County family navigation team and the White Swan shelter on Colfax.
Council Member Okada also inquired about why Golden separated from the
collaborative. City Manager Patrick Goff explained that Golden experienced higher demand than anticipated and chose to establish its own local program.
Council Member Martell asked about services for clients with pets. Staff confirmed that the Foothills Animal Shelter has been a reliable partner, citing an example where the
shelter arranged spay/neuter and vaccination documentation for a client's cats prior to
a housing move-in.
Council Member Martell also asked about safe overnight parking options for individuals living in vehicles, referencing a prior discussion about overnight parking in parks. Staff
confirmed awareness of the Colorado State Parking Initiative (CSPI), which operated church-based overnight parking lots, but noted that CSPI no longer has funding. Some
church lots continue independently, but without the organizational infrastructure.
Council Member Wood asked whether navigators refer clients to shelters outside Wheat Ridge. Staff confirmed that referrals are made to Denver walk-up shelters and to the
Volunteers of America transitional facility (formerly Recovery Works) at 8000 West Colfax, which operates on a referral basis and includes on-site case management.
Council Member Larson commended the program and asked whether the annual budget
of approximately $427,414 had grown. Staff confirmed expenditures have remained relatively stable year over year and indicated the current funding level feels adequate,
with a commitment to return to Council if additional resources are needed.
Council Member Ohm asked about resources for unaccompanied homeless high school
students. Staff indicated they primarily serve single adults and couples, and noted that
school district McKinney-Vento liaisons are the appropriate resource for unaccompanied minors. City Manager Goff noted that Foothills Regional Housing has a
program for youth leaving foster care.
Council Member Quinn noted his role on the Workforce Colorado board and suggested
connecting navigators with apprenticeship opportunities, specifically referencing a
Lockheed Martin apprenticeship program with strong outcomes for participants.
Navigators welcomed the connection.
Council Member Hultin referenced a contact from Cross Purpose, a workforce
development organization, encountered at a recent District 2 community meeting, and
indicated she would schedule a follow-up meeting and loop in navigators and interested
Council Members.
Council Member Hultin praised the Aftercare program as responsive and bespoke to
individual needs and expressed disappointment that the Colorado State Parking Initiative's safe parking program lost funding given its importance as a safety net.
3. Staff Report(s)
City Manager Patrick Goff reminded Council that the following Monday, October 12, is
Indigenous Peoples' Day and no Council meeting will be held that evening.
4. Elected Officials’ Report(s)
Council Member Quinn announced the Jeffco Career Expo on October 15 at
Jefferson County Stadium, open to high school students interested in career
paths outside of college. He noted that Local Union 111 and Xcel Energy
would have displays at the event.
Council Member Ohm shared that he attended a Denver farmer's market and
was pleased to encounter Wheat Ridge business Get Wright's represented
there. He also attended a fundraiser for the Denver Children's Advocacy
Center, which partners with Denver PD to support child sex abuse victims,
describing the experience as humbling. He reminded residents that mail
ballots are arriving and encouraged everyone to vote.
Council Member Martell reported attending the Courageous Colorado
convening, describing it as a valuable exercise focused on what expanded
civic participation looks and feels like in practice rather than the process of
getting there. She also attended a Wheat Ridge Chamber of Commerce
breakfast to meet the incoming board and expressed optimism about the
Chamber's direction. She reminded the public that the IDEA Committee and
Sustainable Wheat Ridge are co-hosting an energy efficiency program on
October 20 at the Active Adult Center. She noted she would be participating
remotely via Zoom for the next two Council meetings following the Indigenous
Peoples' Day recess.
Council Member Hultin reported on the Courageous Colorado metro area
activation tour convening held in Wheat Ridge, noting that Wheat Ridge had
the highest attendance and the most elected officials of any of the
approximately 20 communities visited. She noted that Courageous Colorado
plans to work with Wheat Ridge community members to explore expanding
access to democracy and civic voice. She also reported that public art has
been installed at The Green, describing the installation as a departure from
traditional monumental pieces — instead featuring approximately 14 to 16
dispersed fungi/mushroom sculptures intended to represent community
connectedness. She noted that the artist has been collaborating with
students at Stevens Elementary to create stories about each sculpture. She
also noted that a large mural on Wadsworth is expected to begin installation
within the coming weeks.
Council Member Wood echoed remarks about the Courageous Colorado
convening, noting his primary takeaway was that broader and more diverse
representation leads to better decision making. He also shared that he spent
the weekend in Summit County, remarking on the beauty of the fall foliage and
noting Wheat Ridge's proximity to the mountains as one of the city's great
amenities.
Council Member Larson reported attending the Courageous Colorado event,
the Wheat Ridge Chamber of Commerce breakfast, and volunteering at the
Jefferson County Library Foundation's shred-a-thon and electronics recycling
event. He encouraged residents to attend the Whale of a Used Book Sale at
the Jefferson County Fairgrounds, running Friday, October 23 through Sunday,
October 25, featuring over 90,000 items. He also highlighted the public art
installations along the Youngfield corridor and encouraged residents to view
them up close rather than from the highway. Council Member Larson also
announced that he and Council Member Cotta (District 4) will host informal
drop-in office hours on Friday, October 10, from 10:30 AM to noon at
Starbucks at 50th and Kipling, open to all residents with no agenda.
The Mayor reminded attendees of Coffee with the Mayor on Saturday morning
at 9:00 AM at The Chalet. He noted the Council would next convene in two
weeks due to the Indigenous Peoples' Day observance, and adjourned the
meeting.
Mayor Stites adjourned the Study Session at 7:50 pm
_________________________________________________
Rachel Hultin, Mayor Pro Tem
__________________________________________________
Lucy Spalenka, Deputy City Clerk
��A .,-"" � City of _rWheatRi_,dge
Dominick Breton Community Champion Award ➔>>--------------------------------((�
PROUDLY PRESENTED TO
In recognition of your outstanding dedication, service, and commitment
to the Wheat Ridge community. Through your leadership, generosity,
and positive impact on others, you exemplify the spirit of a true
Community Champion and help make Wheat Ridge a stronger, more
connected, and welcoming place for all.
MAYOR DATE
PROCLAMATION
Wheat Ridge Optimist Club
WHEREAS, the Wheat Ridge Optimist Club is one of over 2,900 clubs worldwide affiliated with
Optimist International, whose core values reflect a belief in the power of hope, positive thinking, and
action; and
WHEREAS, the Club’s commitment to bringing out the best in youth, communities, and
individuals is guided by four core values: Optimism, Respect, Integrity, and Global Community; and
WHEREAS, the Wheat Ridge Optimist Club was founded in 1957 by local businessmen,
including Carl Cerveny of the Scotsman Diner, and continues to focus on youth service and
community improvement; and
WHEREAS, the Club’s work includes youth service projects; community outreach; annual Christmas gifts and food cards for more than 300 children and 100 families; more than $4,000 in
scholarships annually; and support for 10 to 12 students each year to attend Red Rocks Community
College through the AWRSAY program; and
WHEREAS, the City of Wheat Ridge is proud to partner with the Wheat Ridge Optimist Club to advance the Club’s mission and values.
NOW THEREFORE, I, Korey Stites, Mayor of the City of Wheat Ridge, together with the
Wheat Ridge City Council, do hereby proclaim October 26, 2026, as
WHEAT RIDGE OPTIMIST CLUB DAY
IN WITNESS WHEREOF, on this 26th day of October 2026.
Janeece Hoppe, City Clerk Korey Stites, Mayor
ITEM NUMBER: 1a
DATE: October 26,
REQUEST FOR CITY COUNCIL ACTION
MOTION
TITLE: MOTION AWARDING A CONTRACT TO LIGHTHOUSE
TRANSPORTATION GROUP, LLC IN THE AMOUNT OF
$651,975.30 WITH A CONTINGENCY AMOUNT OF
$65,197.53 FOR A TOTAL APPROVED AMOUNT OF
$717,172.83 FOR THE 44TH AVENUE AND TABOR STREET
TRAFFIC SIGNAL
☐PUBLIC HEARING
☒BIDS/MOTIONS
☐RESOLUTIONS
☐ORDINANCES FOR 1st READING ☐ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
Seven (7) bids were received in response to the city’s Invitation for Bids (ITB) to complete the 44th Avenue and Tabor Street Traffic Signal project. The lowest responsive
bidder is Lighthouse Transportation Group, LLC. It is recommended that the city enter
into a contract with Lighthouse to perform the work for the 44th Avenue and Tabor
Street Traffic Signal project.
PRIOR ACTION:
City Council adopted the 44th Avenue Subarea Plan in 2023. The Plan recommends
many transportation improvements along this corridor, including a new traffic signal at
44th and Tabor. This new signal will also complement the future Tabor Street
Multimodal Improvements project which will create a new north/south pedestrian connection from the G Line Station to Clear Creek.
FINANCIAL IMPACT:
The total project cost, including contingency, is $717,172.83. Funding in the amount of
$1,500,000 was budgeted as a part of the Wheat Ridge Next Chapter 2J Bond Fund.
BACKGROUND:
Tabor Street serves as the sole crossing of I-70 between Ward Road and Kipling Street,
creating a vital link from the G Line station—via Ridge Road—to the Clear Creek Trail.
Council Action Form – 44th Avenue and Tabor Street Traffic Signal October 26, 2026
Page 2
Currently, there are no multimodal facilities south of the I-70 Frontage Road North. The
existing bridge over I-70 is narrow and heavily trafficked, particularly by trucks exiting
the adjacent truck stop for westbound I-70. Additionally, the segment of Tabor Street
south of 44th Avenue functions more like an alley, with barely enough space for a single
vehicle.
The Tabor Street Mulit-Modal project aims to extend multimodal infrastructure
southward across I-70, connecting with the Clear Creek Trail. This enhancement will
provide essential pedestrian and bicycle access—especially for residents without
vehicles—linking the G Line station with nearby residential areas, employment centers,
and the Clear Creek Crossing development.
Traffic signal infrastructure at 44th and Tais an important component of the City's
transportation system, supporting the safe and efficient movement of vehicles,
pedestrians, and other roadway users.
An ITB was posted on September 2, 2026. Formal bids for the project were opened on
October 9, 2026. Seven bids were received; with the lowest responsive bidder determined to be Lighthouse Transportation Group, LLC.
A summary of the bids received are shown in the following table:
Bidder Bid Amount
Lighthouse will have 150 calendar days to complete the project in accordance with the
“Notice to Proceed”. The project is scheduled to start in December 2026 and will finish
by April 2027.
Information on the project will be posted to the City’s website and through the City’s social media channels.
Council Action Form – 44th Avenue and Tabor Street Traffic Signal October 26, 2026
Page 3
RECOMMENDATIONS:
Staff recommend awarding a contract to Lighthouse Transportation Group, LLC in the
amount of $651,795.30 for the 44th Avenue and Tabor Street Traffic Signal project, with
a contingency amount of 10% or $65,179.53 for a total not-to-exceed amount of $717,172.83.
RECOMMENDED MOTION:
“I move to award a contract to Lighthouse Transportation Group, LLC in the amount of
$651,795.30 with a contingency amount of $65,179.53 for a total approved amount of $717,172.83 for the 44th Avenue and Tabor Street Traffic Signal project.”
Or,
“I move to deny award of a contract to Lighthouse Transportation Group, LLC in the
amount of $651,795.30 with a contingency amount of $65,179.53 for a total approved
amount of $717,172.83 for the 44th Avenue and Tabor Street Traffic Signal project for the following reason(s).”
REPORT PREPARED/REVIEWED BY:
Daniel Martinez, CIP Program Manager Kent Kisselman, Director of Public Works
Patrick Goff, City Manager
ATTACHMENTS:
1. Lighthouse Transportation Group, LLC Contract and Bid Documents
ITB-26-47-West 44th Avenue and Tabor Street Signal Poles
CITY OF WHEAT RIDGE
26-47-West 44th Avenue and Tabor Street Signal Poles
AGREEMENT
THIS AGREEMENT, made this 27th day of October, 2026 by and between the City of Wheat Ridge, Colorado, hereinafter
called "Owner" and Lighthouse Transportation Group, LLC., 811 W 56th Ave, Denver, CO 80216, hereinafter called "Contractor".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned the parties agree as follows:
1.The Contractor agrees to furnish all materials, supplies, tools, equipment, labor, and other services necessary tocomplete the construction of the Project titled, ITB-26-47-West 44th Avenue and Tabor Street Signal Poles, in
accordance with the Contract Bid Documents.
2.The Contractor agrees to perform all the Work described in the Contract Bid Documents and comply with the
terms therein for the Total Contract amount of six hundred fifty-one thousand seven hundred ninety-fivedollars and thirty cents, ($651,795.30).
3.The Contractor agrees to commence the Work required by the Contract Documents within Fourteen (14)calendar days after the date of the Notice to Proceed and to complete the same within 120 working days after the
date of the Notice to Proceed unless the time for completion is extended otherwise by written changes to theContract Bid Documents.
4.The term "CONTRACT BID DOCUMENTS" means and includes the following:
A Signature Page K Agreement
B Advertisement for Bids L Payment Bond C Information for Bidders M Performance Bond
D Contractor Qualification N Notice to Proceed E Bid Form O Final Receipt
F Bid Schedule P Project Special Provisions G List of Subcontractors Q General Provisions H Non-Discrimination Assurance R Addenda I Non-Collusion Affidavit Q Drawings/ Exhibits
J Bid Bond S Keep Jobs in Colorado
5.The Owner will pay to the Contractor in the manner and at such times as set forth in the General Conditions, suchamounts as required by the Contract Documents.
6.Section 2-3 (a) – (e) of the City's Code of Laws is presented below:
(a)Fiscal year. Fiscal year for the city shall commence on January 1 and end on December 31.
(b)Budget contains appropriations. The city council shall annually adopt a budget in a mannerconsistent with the provisions of Chapter X of the Home Rule Charter of the City of Wheat Ridge.
Upon the annual adoption by the city council of each fiscal year's budget, levels of authorizedexpenditures from the funds indicated within the annual budget itself and/or the adopting resolution
shall constitute the appropriation of the amounts specified therein for the purposes specified therein.During the course of each fiscal year, approval by the city council of contracts for goods or services,
and/or approval of bids for the provision of specified goods or services, shall likewise constituteappropriations of the amounts specified therein for the purposes specified therein.
ATTACHMENT 1
ITB-26-47-West 44th Avenue and Tabor Street Signal Poles
(c)No contract to exceed appropriation. During each and any fiscal year, no contract entered into by oron behalf of the city shall expend or contract to expend any money, or incur any liability, nor shallany contract be entered into nor any bid be awarded by or on behalf of the city which, by its terms,involves the expenditure of money for any of the purposes for which provision is made either in theadopted budget or adopting resolution, including any legally authorized amendments thereto, inexcess of the amount appropriated in the budget or the approved contract or bid award. Any contract
or bid award, either verbal or written, made in violation of the provisions of this section shall be voidas to the city and no city monies from any source whatsoever shall be paid thereon.
(d)Amendments and authorized expenditures. Nothing contained herein shall preclude the city councilfrom adopting a supplemental appropriation in a manner consistent with the provisions of Section10.12 of the Home Rule Charter of the city. Further, nothing contained in this section shall preventthe making of contracts for governmental services or for capital outlay for a period exceeding one (1)
year if such contracts are otherwise allowed by the Home Rule Charter of the city; provided,however, any contract so made shall be executory only for the amounts agreed to be paid for such
services to be rendered in succeeding fiscal years.
(e)Notice to parties contracting with the city. All persons contracting with, or selling goods or servicesto, the city are hereby placed upon notice of the provisions of this section. The provisions of thissection shall become a part of the Merit System Personnel Rules and Regulations of the City of
Wheat Ridge; shall be referred to specifically in all public works bid documents and contracts; andshall be incorporated into, and specially noted within, all other contracts entered into by or on behalf
of the city wherein city funds are used to pay for said contract.
7.Section 2-4 of the City Code of Laws is presented below:
(a)The city may, by contract, require the contractor awarded a public works contract to waive, releaseor extinguish its rights to recover costs or damages, or obtain an equitable adjustment, for delays in
performing such contract if such delay is caused, in whole or in part, by acts or omissions of the cityor its agents, if the contract provides that an extension of time for completion of the work is thecontractor's remedy for such delay. Such a clause is valid and enforceable, any provision of statelaw to the contrary notwithstanding.
(b)The city council, by this ordinance (Ordinance No. 812), declares its local contracting powers to be amatter of purely local concern, and further specifically intends to supersede, pursuant to its powers
under Article XX of the Colorado Constitution, the provisions of Sections 24-91-101 and 24-91-103.5, C.R.S., insofar as they conflict with the provisions of this section of the Code of Laws of theCity of Wheat Ridge, Colorado.
8.Any notice or communication given pursuant to this Agreement to the City shall be made in writing:
Contact Information City Contractor
John Behan
Office Phone: 303-205-7628 303-898-9116
Email Address: lhuffaker@wheatridge.gov john.behan@lighthouse.org
Address: 7500 W 29th Ave 811 W 56th Ave
City, State, Zip Code Wheat Ridge, CO 80033 Denver, CO 80216
9.The Contractor agrees to abide by the requirements under EXECUTIVE ORDER NO. 11246 as amended,including specifically the provisions governed by the Equal Opportunity Commission and also to abide by therequirements of the IMMIGRATION REFORM AND CONTRACT ACT OF 1986 and the requirements of theAMERICANS WITH DISABILITIES Act of 1991; and the United States Department of Transportation Title VIRegulations at 49 CFR Part 21 requirements under the Civil Rights Act of 1964, assuring that no person shall onthe grounds of race, color, or national origin be excluded from participation in the opportunity to bid, or bediscriminated against in consideration of award of this project.
10.In accordance with CRS Title 24, Article 91, Section 103.6, Paragraph 2, Subparagraph a, the City of WheatRidge hereby states that funds have been appropriated for this Project in an amount equal to or in excess of theOriginal Contract Amount.
In accordance with CRS Title 24, Article 91, Section 103.6, Paragraph 2, Subparagraph a, the City of WheatRidge hereby states that funds have been appropriated for this Project in an amount equal to or in excess of the
Original Contract Amount.
ITB-26-47-West 44th Avenue and Tabor Street Signal Poles
11. Vendor Performance Feedback The City of Wheat Ridge has implemented a requirement for Project Managers to assess each vendor’s performance and issue a determination as to whether the City should award the vendor future City contracts. All contracts will need to be considered as part of the requirement. The following criteria will be evaluated annually for renewable contracts and at contract closeout for one-time agreements: a. Work completed on time
b. Work completed within budget c. Work completed as per the Scope of Work d. Future awards recommendation 12. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.
13. Each party has reviewed the items contained within this contract and recommend executing this contract to proceed with the agreed upon Statement of Work. ______________________________________ __________ Whitney Mugford-Smith, Procurement Manager Date Signed ______________________________________ __________
Logan Huffaker, Infrastructure Project Manager Date Signed ______________________________________ __________ Kent Kisselman, Public Works Director Date Signed
ITB-26-47-West 44th Avenue and Tabor Street Signal Poles
IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies, each of which shall be deemed an original on the date first above written.
ATTEST: OWNER
CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE Lucy Spalenka, Deputy City Clerk WHEAT RIDGE, C0 80033
303-234-5900
Date Patrick Goff, City Manager
APPROVED AS TO FORM: CONTRACTOR
Lighthouse Transportation Group, LLC Gerald Dahl, City Attorney 811 W 56th Ave Denver, CO 80216 ATTEST TO CONTRACTOR:
Authorized Signature
Full Name Signature
Title Title
Date Date
ITB-26-47-West 44th Avenue and Tabor Street Signal Poles
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
Lighthouse Transportation Group, LLC (Name of Contractor)
811 W 56th Ave, Denver, CO 80216 (Address of Contractor)
A hereinafter called "PRINCIPAL", and
(Name of Surety)
(Address of Surety)
hereinafter called "Surety", are held and firmly bound unto the City of Wheat Ridge, 7500 West 29th Avenue, Wheat
Ridge, Colorado 80033, hereinafter called "Owner", in the penal sum of dollars, ($651,795.30) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the
Owner, dated the day of _________, 2026, a copy of which is hereto attached and made a part hereof for the Project titled, ITB-26-47-West 44th Avenue and Tabor Street Signal Poles, in accordance with the Contract Bid
Documents including:
Base Bid – $651,795.30
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, Subcontractors and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such contract, and any
authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such Work,
and all insurance premiums on said WORK, and for all labor performed in such work whether by Subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed or the Specifications accompanying
the same shall in any wise affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Specifications.
*Insert "a corporation", "a partnership", or "an individual" as applicable.
ITB-26-47-West 44th Avenue and Tabor Street Signal Poles
IN WITNESS WHEREOF, this instrument is executed in one part, each of which shall be deemed an original, this the
day of , 2026
ATTEST: PRINCIPAL
CORPORATE SECRETARY PRINCIPAL
ADDRESS BY
ADDRESS
(SEAL)
SURETY ATTEST:
SURETY
ADDRESS BY (ATTORNEY IN FACT)
ADDRESS
(SEAL)
Note: Date of Bond must not be prior to date of Contract. If Contractor is partnership, all partners should execute bond.
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the State of Colorado.
ITB-26-47-West 44th Avenue and Tabor Street Signal Poles
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: that
Lighthouse Transportation Group, LLC (Name of Contractor)
811 W 56th Ave, Denver, CO 80216 (Address of Contractor)
A hereinafter called "PRINCIPAL", and
(Name of Surety)
(Address of Surety)
hereinafter called "Surety", are held and firmly bound unto the City of Wheat Ridge, 7500 West 29th Avenue, Wheat
Ridge, Colorado 80033, hereinafter called "Owner", in the penal sum of six hundred fifty-one thousand seven hundred ninety-five dollars and thirty cents, ($651,795.30) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the
Owner, dated the day of _________, 2026, a copy of which is hereto attached and made a part hereof for the Project titled ITB-26-47-W 44th Avenue and Tabor Street Signal Poles , in accordance with the Contract Bid Documents including:
Base Bid – $651,795.30
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants,
terms, conditions, and agreements of said Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety and during the one year guarantee period, and if he
shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed or the Specifications accompanying
the same shall in any wise affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
*Insert "a corporation", "a partnership", or "an individual" as applicable.
ITB-26-47-West 44th Avenue and Tabor Street Signal Poles
IN WITNESS WHEREOF, this instrument is executed in one part, each of which shall be deemed an original, this the
day of , 2026
ATTEST: PRINCIPAL
CORPORATE SECRETARY PRINCIPAL
ADDRESS BY
ADDRESS
(SEAL)
SURETY ATTEST:
SURETY
ADDRESS BY (ATTORNEY IN FACT)
ADDRESS
(SEAL)
Note: Date of Bond must not be prior to date of Contract. If Contractor is partnership, all partners should execute bond.
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the State of Colorado.
Line Item Description Quantity Unit of Measure Unit Cost Total
1 CLEARING AND GRUBBING 1 LS $5,883.00 $5,883.00
2 REMOVAL OF PIPE 15 LF $45.00 $675.00
3
REMOVAL OF CONCRETE MEDIAN COVER
MATERIAL 4 SY $56.00 $224.00
4 REMOVAL OF SIDEWALK 109 SY $34.00 $3,706.00
5 REMOVAL OF CURB AND GUTTER 211 LF $23.00 $4,853.00
6 REMOVAL OF CONCRETE CURB RAMP 32 SY $37.00 $1,184.00
7 REMOVAL OF CONCRETE PAVEMENT 32 SY $39.00 $1,248.00
8 REMOVAL OF ASPHALT MAT 171 SY $34.00 $5,814.00
9 REMOVAL OF GROUND SIGN 2 EACH $65.00 $130.00
10 REMOVAL OF SIGN PANEL 4 EACH $87.00 $348.00
11 MUCK EXCAVATION 3 CY $118.00 $354.00
12 POTHOLING (SPECIAL)16 EACH $330.00 $5,280.00
13 RESET SIGN PANEL 2 EACH $168.00 $336.00
14 ADJUST MANHOLE 1 EACH $1,715.00 $1,715.00
15 HOT MIX ASPHALT (PATCHING) (ASPHALT)10 SY $334.00 $3,340.00
16 CONCRETE PAVEMENT (8 INCH)7 CY $2,223.00 $15,561.00
17 CAISSON (SPECIAL)58 LF $791.00 $45,878.00
18 12 INCH REINFORCED CONCRETE PIPE (CIP)12 LF $678.00 $8,136.00
19 TYPE 13 INLET (10 FOOT)1 EACH $11,200.00 $11,200.00
20 FENCE (PLASTIC)250 LF $5.00 $1,250.00
21 CONCRETE SIDEWALK (6 INCH)127 SY $115.00 $14,605.00
22 CONCRETE CURB RAMP 61 SY $182.00 $11,102.00
23 CURB AND GUTTER TYPE 2 (SECTION II-B)216 LF $70.00 $15,120.00
24
MEDIAN COVER MATERIAL (6 INCH PATTERNED
CONCRETE)453 SF $34.00 $15,402.00
25 3 INCH ELECTRICAL CONDUIT (BORED)660 LF $31.00 $20,460.00
26 2 INCH ELECTRICAL CONDUIT (PLASTIC)30 LF $25.00 $750.00
27 3 INCH ELECTRICAL CONDUIT (PLASTIC)150 LF $27.00 $4,050.00
28 PULL BOX (24"X36"X18")4 EACH $2,499.00 $9,996.00
29 PULL BOX (30"X48"X24")1 EACH $3,358.00 $3,358.00
30 WIRING 1 LS $20,518.00 $20,518.00
31 LUMINAIRE (LED)4 EACH $1,014.00 $4,056.00
32 SERVICE METER CABINET 1 EACH $10,462.00 $10,462.00
33 SIGN PANEL (CLASS I)81.3 SF $41.00 $3,333.30
34 PEDESTRIAN SIGNAL FACE (16) (COUNTDOWN)8 EACH $723.00 $5,784.00
35 TRAFFIC SIGNAL FACE (12-12-12)16 EACH $953.00 $15,248.00
36 TRAFFIC SIGNAL CONTROLLER AND CABINET 1 EACH $30,292.00 $30,292.00
37 PEDESTRIAN PUSH BUTTON 8 EACH $1,277.00 $10,216.00
38 PEDESTRIAN PUSH BUTTON POST ASSEMBLY 4 EACH $3,307.00 $13,228.00
39 FIRE PREEMPTION UNIT AND TIMER 4 EACH $3,298.00 $13,192.00
40 INTERSECTION DETECTION SYSTEM (MIOVISION)4 EACH $9,095.00 $36,380.00
41
TRAFFIC SIGNAL-LIGHT POLE STEEL (1-20 FOOT
MAST ARM)2 EACH $24,537.00 $49,074.00
42
TRAFFIC SIGNAL-LIGHT POLE STEEL (1-40 FOOT
MAST ARM)1 EACH $28,248.00 $28,248.00
43
TRAFFIC SIGNAL-LIGHT POLE STEEL (1-50 FOOT
MAST ARM)1 EACH $31,280.00 $31,280.00
44
TRAFFIC SIGNAL PEDESTAL POLE (ALUMINUM
(10 FOOT)2 EACH $5,055.00 $10,110.00
45 TELEMETRY (FIELD)1 EACH $4,985.00 $4,985.00
46 UNINTERRUPTED POWER SUPPLY 1 EACH $7,930.00 $7,930.00
47
CLOSED CIRCUIT TELEVISION CAMERA (TRAFFIC
SURVEILLANCE)1 EACH $6,534.00 $6,534.00
48 TEST FIBER OPTIC CABLE 1 LS $4,350.00 $4,350.00
49 ETHERNET SWITCH 1 EACH $7,265.00 $7,265.00
50 CONSTRUCTION SURVEYING 1 LS $17,576.00 $17,576.00
51 MOBILIZATION 1 LS $42,957.00 $42,957.00
52 MODIFIED EPOXY PAVEMENT MARKING 5 GAL $278.00 $1,390.00
53
PREFORMED THERMOPLASTIC PAVEMENT
MARKING (WORD-SYMBOL)32 SF $20.00 $640.00
54
PREFORMED THERMOPLASTIC PAVEMENT
MARKING (XWALK-STOPLINE)762 SF $15.00 $11,430.00
55 UNIFORMED TRAFFIC CONTROL 20 HR $185.00 $3,700.00
56 CONSTRUCTION TRAFFIC CONTROL (SPECIAL)1 LS $49,659.00 $49,659.00
Sales Tax (@ 7.9998%)$0.00
Total $651,795.30
City of Wheat Ridge
Procurement
Whitney Mugford-Smith, Procurement Manager
7500 W. 29th Ave., Wheat Ridge, CO 80033
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
RESPONSE DEADLINE: October 9, 2026 at 2:00 pm
Report Generated: Wednesday, October 14, 2026
Lighthouse Transportation Group, LLC Response
CONTACT INFORMATION
Company:
Lighthouse Transportation Group, LLC
Email:
estimating@lighthousetg.org
Contact:
Samantha Larson
Address:
811 W 56th Ave
Denver, CO 80216
Phone:
(303) 390-0210 Ext: 4
Website:
www.lighthousetg.org
Submission Date:
Oct 9, 2026 11:17 AM (Mountain Time - Denver)
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 2
ADDENDA CONFIRMATION
Addendum #1
Confirmed Oct 9, 2026 7:46 AM by Samantha Larson
QUESTIONNAIRE
1. Bid Bond*
Pass
Please download the below documents, complete, and upload.
• BID_BOND_FORM.pdf
44th_Ave_and_Tabor_Street_Signal_Poles_BB_executed_signed.pdf
2. Sample Performance Bond
Pass
To be completed by awarded vendor at time of award.
• PERFORMANCE_BOND_(1).docx
PERFORMANCE_BOND.pdf
3. Sample Payment Bond
Pass
To be completed at time of award by awarded vendor.
• PAYMENT_BOND_(1).docx
PAYMENT_BOND.pdf
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 3
4. Bond Acknowledgement*
Pass
By clicking "Please confirm", Contractor acknowledges that they need to:
1. Provide a copy of the Bid bond (uploaded to Bid Bond above), and
2. Either mail-in or drop-off the Original version of the bond to the City of Wheat Ridge
Confirmed
5. Sample Notice to Proceed
Pass
Please download the below documents for review.
• NOTICE_TO_PROCEED.docx
NOTICE_TO_PROCEED.pdf
6. Sample Final Receipt
Pass
Please download the below documents for reference.
• FINAL_RECEIPT.docx
FINAL_RECEIPT.pdf
7. Sample Agreement
Pass
Please download the below documents, complete, and upload.
• Sample_Agreement.pdf
Sample_Agreement.pdf
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 4
8. Bidder Acknowledgement Form*
Pass
Please download the below documents, complete, and upload.
• Bidder_Acknowledgement_Form...
Bidder_Acknowledgement_Form_Signed.pdf
9. What is your FEIN/SSN?*
Pass
88-0943128
10. Certification Statement for Keep Jobs in Colorado Act*
Pass
Please download the below documents, complete, and upload.
• Certification_Statement_for...
Certification_Statement_for_Keep_Jobs_in_Colorado_Act.pdf
11. Contractor's Qualification Form*
Pass
Please download the below documents, complete, and upload.
• Contractor's_Qualification_...
Contractors_Qualification_Form.pdf
12. List of Subcontractors and Amount*
Pass
Please download the below documents, complete, and upload.
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 5
• List_of_Subcontractors_and_...
List_of_Subcontractors_and_Amount.pdf
13. Non-Collusion Affidavit Confirmation*
Pass
Bidder confirms they are of lawful age, being duly sworn, on oath says that (s)he is the agent authorized by the Bidder to submit the
attached bid. Affidavit further states that the Bidder has not been a party of any collusion among Bidders in restraint of freedom of
competition by agreement to bid at a fixed price or to refrain from bidding; or any Federal, State or Municipal official or employees as
to quantity, quality, or price in the prospective Contract, or any other items of said prospective Contract; or in any discussions
between bidders and any Federal, State or Municipal official concerning exchange of money or other thing of value for special
consideration in the letting of a Contract.
Confirmed
14. Non-Discrimintation Assurance Affidavit Title VI Regulations at 49CFR Part 21*
Pass
Title VI of the Civil Rights Act of 1964 prohibits discrimination of the basis of race, color or national origin by any entity receiving
federal financial assistance.
The City of Wheat Ridge is a recipient of Federal financial assistance and as such, it, as well as all of its responsible agents, contractors
and consultants, is required by the United States Department of Transportation Title VI Regulations at 49 CFR Part 21 (the
Regulations) to assure nondiscrimination. The City of Wheat Ridge assures that no person shall be excluded from participation in, be
denied the benefits of, or be otherwise subjected to discrimination on the grounds of race, color, or national origin under any
program or activity conducted by the City.
All bidders are hereby notified that the City of Wheat Ridge will affirmatively ensure that disadvantaged business enterprises will be
afforded full opportunity to submit bids in response to all invitations and will not be discriminated against on the grounds of race,
color or national origin in consideration for an award. This applies to all solicitations for bids for work or material subject to the
Regulations, and for all proposals for negotiated agreements.
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 6
The bidder, whose name and signature appear below, certifies and agrees as follows:
1. The bidder shall comply with the provisions of Title VI of the Civil Rights Act of 1964.
2. The bidder assures the City of Wheat Ridge that disadvantaged business enterprises are afforded full opportunity to submit
bids as sub-contractors or sub-consultants and will not be discriminated against on the grounds of race, color or national origin
in consideration for award.
3. The bidder shall comply with all reasonable requests made in the course of an investigation of Title VI, the Regulations and this
assurance by the Colorado Department of Transportation, the US Department of Transportation or the City of Wheat Ridge, as
a sub-recipient of Federal financial assistance.
4. The bidder agrees that the United States has a right to seek judicial enforcement with regard to any matter arising under Title
VI, the Regulations and this assurance.
Confirmed
15. Proposal Form*
Pass
Please download the below documents, complete, and upload.
• PROPOSAL_FORM.docx
PROPOSAL_FORM.pdf
16. Bidder Acceptance*
Pass
The Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Contract
Bid Documents, to complete all Work as specified or indicated in the Contract Bid Documents for the Contract Sum and within the
Contract time indicated in accordance with the Contract Bid Documents.
Bidder accepts all of the terms and conditions of the Instructions to Bidders. The Bid will remain open for sixty days after the day of
Bid opening. Bidder will sign the Agreement and submit any documents required by the Contract documents within seven (7) calendar
days after notification or the designated date.
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 7
By submission of this Bid, each Bidder certifies, and in the case of a joint Bid, each party thereto certifies as to his own organization,
that this Bid has been arrived at independently without consultation, or communication with any competitor. Every bid submitted to
the City shall contain a statement certifying that the Bidder has not participated in any collusion or taken any action in restraint of free
competitive bidding. This statement shall be in the form of an affidavit provided by the City and included in the Bid Proposal. The
Bidders proposal will be rejected if it does not contain the completed Non-collusion Affidavit.
Bidder agrees to abide by the following federal requirements:
Executive Order No. 11246 as amended, including specifically, the provisions of the Equal Opportunity Clause, the Immigration Reform
and Contract Act of 1986, and the Americans with Disabilities Act of 1991.
United States Department of Transportation Title VI Regulations at 49 CFR Part 21 the Civil Rights Act of 1964, assuring that no person
shall on the grounds of race, color, or national origin be excluded from participation in the opportunity to bid, or be discriminated
against in consideration of award of this project.
The Notice to Proceed shall be issued within fourteen (14) days of the execution of the Agreement by the Owner. Should there be
reason why the Notice to Proceed cannot be issued within such period, the time may be extended by mutual agreement between the
Owner and Contractor. If the Notice to Proceed has not been issued within the period mutually agreed upon, the Contractor may
terminate the Agreement without further liability on the part of either party.
The Owner may make such investigations as he deems necessary to determine the ability of the Bidder to perform the Work, and the
Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the
right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is
properly qualified to carry out the obligations of the Agreement.
Bidder has examined the site and locality where the Work is to be performed, the legal requirements (federal, state and local laws,
ordinances, rules and regulations) and the conditions affecting cost, progress, or performance of the Work and has made such
independent investigation as Bidder deems necessary.
Bidder will complete the Work for all accepted bid items.
Confirmed
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 8
PRICE TABLES
TABLE 1
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 CLEARING AND GRUBBING 1 LS $5,883.00 $5,883.00
2 REMOVAL OF PIPE 15 LF $45.00 $675.00
3 REMOVAL OF CONCRETE MEDIAN COVER MATERIAL 4 SY $56.00 $224.00
4 REMOVAL OF SIDEWALK 109 SY $34.00 $3,706.00
5 REMOVAL OF CURB AND GUTTER 211 LF $23.00 $4,853.00
6 REMOVAL OF CONCRETE CURB RAMP 32 SY $37.00 $1,184.00
7 REMOVAL OF CONCRETE PAVEMENT 32 SY $39.00 $1,248.00
8 REMOVAL OF ASPHALT MAT 171 SY $34.00 $5,814.00
9 REMOVAL OF GROUND SIGN 2 EACH $65.00 $130.00
10 REMOVAL OF SIGN PANEL 4 EACH $87.00 $348.00
11 MUCK EXCAVATION 3 CY $118.00 $354.00
12 POTHOLING (SPECIAL) 16 EACH $330.00 $5,280.00
13 RESET SIGN PANEL 2 EACH $168.00 $336.00
14 ADJUST MANHOLE 1 EACH $1,715.00 $1,715.00
15 HOT MIX ASPHALT (PATCHING) (ASPHALT) 10 SY $334.00 $3,340.00
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 9
Line Item Description Quantity Unit of
Measure
Unit Cost Total
16 CONCRETE PAVEMENT (8 INCH) 7 CY $2,223.00 $15,561.00
17 CAISSON (SPECIAL) 58 LF $791.00 $45,878.00
18 12 INCH REINFORCED CONCRETE PIPE (CIP) 12 LF $678.00 $8,136.00
19 TYPE 13 INLET (10 FOOT) 1 EACH $11,200.00 $11,200.00
20 FENCE (PLASTIC) 250 LF $5.00 $1,250.00
21 CONCRETE SIDEWALK (6 INCH) 127 SY $115.00 $14,605.00
22 CONCRETE CURB RAMP 61 SY $182.00 $11,102.00
23 CURB AND GUTTER TYPE 2 (SECTION II-B) 216 LF $70.00 $15,120.00
24 MEDIAN COVER MATERIAL (6 INCH PATTERNED CONCRETE) 453 SF $34.00 $15,402.00
25 3 INCH ELECTRICAL CONDUIT (BORED) 660 LF $31.00 $20,460.00
26 2 INCH ELECTRICAL CONDUIT (PLASTIC) 30 LF $25.00 $750.00
27 3 INCH ELECTRICAL CONDUIT (PLASTIC) 150 LF $27.00 $4,050.00
28 PULL BOX (24"X36"X18") 4 EACH $2,499.00 $9,996.00
29 PULL BOX (30"X48"X24") 1 EACH $3,358.00 $3,358.00
30 WIRING 1 LS $20,518.00 $20,518.00
31 LUMINAIRE (LED) 4 EACH $1,014.00 $4,056.00
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 10
Line Item Description Quantity Unit of
Measure
Unit Cost Total
32 SERVICE METER CABINET 1 EACH $10,462.00 $10,462.00
33 SIGN PANEL (CLASS I) 81.3 SF $41.00 $3,333.30
34 PEDESTRIAN SIGNAL FACE (16) (COUNTDOWN) 8 EACH $723.00 $5,784.00
35 TRAFFIC SIGNAL FACE (12-12-12) 16 EACH $953.00 $15,248.00
36 TRAFFIC SIGNAL CONTROLLER AND CABINET 1 EACH $30,292.00 $30,292.00
37 PEDESTRIAN PUSH BUTTON 8 EACH $1,277.00 $10,216.00
38 PEDESTRIAN PUSH BUTTON POST ASSEMBLY 4 EACH $3,307.00 $13,228.00
39 FIRE PREEMPTION UNIT AND TIMER 4 EACH $3,298.00 $13,192.00
40 INTERSECTION DETECTION SYSTEM (MIOVISION) 4 EACH $9,095.00 $36,380.00
41 TRAFFIC SIGNAL-LIGHT POLE STEEL (1-20 FOOT MAST ARM) 2 EACH $24,537.00 $49,074.00
42 TRAFFIC SIGNAL-LIGHT POLE STEEL (1-40 FOOT MAST ARM) 1 EACH $28,248.00 $28,248.00
43 TRAFFIC SIGNAL-LIGHT POLE STEEL (1-50 FOOT MAST ARM) 1 EACH $31,280.00 $31,280.00
44 TRAFFIC SIGNAL PEDESTAL POLE (ALUMINUM (10 FOOT) 2 EACH $5,055.00 $10,110.00
45 TELEMETRY (FIELD) 1 EACH $4,985.00 $4,985.00
46 UNINTERRUPTED POWER SUPPLY 1 EACH $7,930.00 $7,930.00
47 CLOSED CIRCUIT TELEVISION CAMERA (TRAFFIC SURVEILLANCE) 1 EACH $6,534.00 $6,534.00
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
ITB No. 26-47
West 44th Avenue and Tabor Street Signal Poles
[LIGHTHOUSE TRANSPORTATION GROUP, LLC] RESPONSE DOCUMENT REPORT
Invitation For Bid - West 44th Avenue and Tabor Street Signal Poles
Page 11
Line Item Description Quantity Unit of
Measure
Unit Cost Total
48 TEST FIBER OPTIC CABLE 1 LS $4,350.00 $4,350.00
49 ETHERNET SWITCH 1 EACH $7,265.00 $7,265.00
50 CONSTRUCTION SURVEYING 1 LS $17,576.00 $17,576.00
51 MOBILIZATION 1 LS $42,957.00 $42,957.00
52 MODIFIED EPOXY PAVEMENT MARKING 5 GAL $278.00 $1,390.00
53 PREFORMED THERMOPLASTIC PAVEMENT MARKING (WORD-SYMBOL) 32 SF $20.00 $640.00
54 PREFORMED THERMOPLASTIC PAVEMENT MARKING (XWALK-STOPLINE) 762 SF $15.00 $11,430.00
55 UNIFORMED TRAFFIC CONTROL 20 HR $185.00 $3,700.00
56 CONSTRUCTION TRAFFIC CONTROL (SPECIAL) 1 LS $49,659.00 $49,659.00
[*] Denotes item is taxable
Sales Tax (@ 7.9998%)
$0.00
TOTAL $651,795.30
BID BOND FORM
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned,
(name and address of Contractor)
as Principal, and
(name and address of surety)
as Surety, are hereby held and firmly bound unto the City of Wheat Ridge as Owner in the penal sum of
for the payment of which, well and truly to be made,
we hereby jointly and severally bind ourselves, successors, and assigns.
Signed this day of , 2024
The condition of the above obligation is such that whereas the Principal has submitted to the City of Wheat Ridge a certain BID, attached hereto and hereby made a part hereof, to enter a contract in writing for the Project titled ITB-
26-47 -West 44th Avenue and Tabor Street Signal Poles
NOW, THEREFORE,
1. If said Bid shall be rejected or,
2. If said Bid shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with the said Bid) and shall furnish a Bond for his faithful
performance of said Contract, and for the payment for all persons performing labor or furnishing materials in
connection therewith and shall in all other respects perform the agreement created by the acceptance of said
Bid.
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood
and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount
of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its Bond shall be in no way impaired or affected by an extension of the time within which the Owner may accept such Bid; and said Surety
does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper
officers, the day and year first set forth above.
(Principal/Contractor)
(Surety)
By:
IMPORTANT: Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular
570 as amended) and be authorized to transact business in the State where the project is located.
Jennifer L. Clampert, Amy Coonts, Michael Lischer Jr, Nicole L. McCollam, Brandi J. Tetley,
Danielle Waring, Mary Ashley Allen, Celine Bibonne
Bid Bond
9th October 2026
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor)
A hereinafter called "PRINCIPAL", and
(Name of Surety)
(Address of Surety)
hereinafter called "Surety", are held and firmly bound unto the City of Wheat Ridge, 7500 West 29th Avenue, Wheat
Ridge, Colorado 80033, hereinafter called "Owner", in the penal sum of
dollars
($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the
Owner, dated the day of , 2024, a copy of which is hereto attached and made a part hereof for the Project titled, [PROJECT NAME].
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of said Contract during the original term thereof, and any extensions thereof which
may be granted by the Owner, with or without notice to the Surety and during the one year guarantee period, and if he
shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the
Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the
Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be
void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of
time, alteration or addition to the terms of the Contract or to the Work to be performed or the Specifications accompanying the same shall in any wise affect its obligation on this Bond, and it does hereby waive notice of any such
change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any
beneficiary hereunder, whose claim may be unsatisfied.
*Insert "a corporation", "a partnership", or "an individual" as applicable.
IN WITNESS WHEREOF, this instrument is executed in one part, each of which shall be deemed an original, this the
day of , 2024
ATTEST: PRINCIPAL
CORPORATE SECRETARY PRINCIPAL
ADDRESS BY
ADDRESS
(SEAL)
SURETY
ATTEST:
SURETY
ADDRESS BY (ATTORNEY IN FACT)
ADDRESS
Note: Date of Bond must not be prior to date of Contract. If Contractor is partnership, all partners should execute bond.
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular
570, as amended) and be authorized to transact business in the State of Colorado.
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor)
A hereinafter called "PRINCIPAL", and
(Name of Surety)
(Address of Surety)
hereinafter called "Surety", are held and firmly bound unto the City of Wheat Ridge, 7500 West 29th
Avenue, Wheat Ridge, Colorado 80033, hereinafter called "Owner", in the penal sum of
dollars
($ ) in lawful money of the United States, for the payment
of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and
severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract
with the Owner, dated the day of , 2024, a copy of which is hereto attached and made a part hereof for the Project titled, [PROJECT NAME].
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, Subcontractors
and corporations furnishing materials for or performing labor in the prosecution of the Work provided
for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools,
consumed or used in connection with the construction of such Work, and all insurance premiums on
said WORK, and for all labor performed in such work whether by Subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the Contract or to the Work to be
performed or the Specifications accompanying the same shall in any wise affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to
the terms of the Contract or to the Work or to the Specifications.
*Insert "a corporation", "a partnership", or "an individual" as applicable.
IN WITNESS WHEREOF, this instrument is executed in one part, each of which shall be deemed an original,
this the
day of , 2024
ATTEST: PRINCIPAL
CORPORATE SECRETARY PRINCIPAL
ADDRESS BY
ADDRESS
(SEAL)
SURETY
ATTEST:
SURETY
ADDRESS BY (ATTORNEY IN FACT)
ADDRESS
Note: Date of Bond must not be prior to date of Contract. If Contractor is partnership, all partners
should execute bond.
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current
list (Circular 570, as amended) and be authorized to transact business in the State of Colorado.
NOTICE TO PROCEED
TO:
FROM: CITY OF WHEAT RIDGE, CO
RE: [ITB-YR-##, PROJECT NAME]
You are hereby notified to commence Work in accordance with the Agreement dated , [BID YEAR], on or before , [BID YEAR], and you are to complete the work within [#
of working days] working days. The date of completion of all work is , [Bid
Year].
Dated this day of [BID YEAR].
By:
Title: Engineering Manager
* * * * * * * * * * * * * * * * * * * * * * * * * * * * *
RECEIPT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged by
on this of , [BID YEAR].
Printed Name
Signature
Title
FINAL RECEIPT
DATE:
TO:
(Contractor)
(Address)
FROM: CITY OF WHEAT RIDGE, CO
RE: [ITB-YR-##, PROJECT NAME]
Received this date, of the Owner, as full and final payment of the cost of the improvements provided for in the Project Contract Documents, the amount of $ in cash, being the remainder of the
full amount accruing to the undersigned by virtue of said contract.
Said cash also covers and includes full payment for the cost of all extra work and material furnished by the undersigned
in the construction of said improvements, and all incidentals thereto.
The undersigned hereby releases said Owner from all claims whatsoever which may develop from said contract. These presents are to certify that all persons doing work upon or furnishing materials for said improvements under the
foregoing contract have been paid in full.
Printed Name
Signature
Title
Date
ITB-XX-XXXX-PROJECT NAME 1
CITY OF WHEAT RIDGE
ITB-XX-XXX-Project Name
SAMPLE AGREEMENT
THIS AGREEMENT, made this day of [Bid Year] by and between the
City of Wheat Ridge, Colorado, hereinafter called "Owner" and , doing business as an
individual, whose business address is , hereinafter called
"Contractor".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned the parties agree
as follows:
1) The Contractor agrees to furnish all materials, supplies, tools, equipment, labor and other services necessary to
complete the construction of the Project titled, ITB-[YR-###], [PROJECT NAME], in accordance with the Contract
Bid Documents.
2) The Contractor agrees to perform all the Work described in the Contract Bid Documents and comply with the terms
therein for the Total Contract amount of
_______________________________________________________________________________________ Dollars
($_____________________________________) which includes any alternates.
3) The Contractor agrees to commence the Work required by the Contract Documents within Fourteen (14) calendar
days after the date of the Notice to Proceed and to complete the same within [# of working days] working days
after the date of the Notice to Proceed unless the time for completion is extended otherwise by written changes to
the Contract Bid Documents.
4) The term "CONTRACT BID DOCUMENTS" means and includes the following:
a) Advertisement for Bid b) Information for Bidders
c) General Provisions
d) Bidder Acknowledgement Form
e) Contractor Qualification Form
f) List of Subcontractors and Amount g) Non-Discrimination Assurance Form
h) Illegal Alien Compliance Form
i) Non-Collusion Affidavit
j) Keep Jobs in Colorado Form
k) Proposal Form l) Pricing Schedule
m) Bid Bond Form
n) Agreement o) Payment Bond
p) Performance Bond
q) Notice to Proceed
r) Final Receipt
s) Project Specifications t) Addenda
u) Drawings/Exhibit
5) The Owner will pay to the Contractor in the manner and at such times as set forth in the General Conditions, such
amounts as required by the Contract Documents.
6) Section 2-3 (a) – (e) of the City's Code of Laws is presented below:
a) Fiscal year. Fiscal year for the City shall commence on January 1 and end on December 31.
b) Budget contains appropriations. The City Council shall annually adopt a budget in a manner consistent with the provisions of Chapter X of the Home Rule Charter of the City of Wheat Ridge. Upon the annual
ITB-XX-XXXX-PROJECT NAME 2
adoption by the City Council of each fiscal year's budget, levels of authorized expenditures from the funds
indicated within the annual budget itself and/or the adopting resolution shall constitute the appropriation of the amounts specified therein for the purposes specified therein. During the course of each fiscal year,
approval by the City Council of contracts for goods or services, and/or approval of bids for the provision of
specified goods or services, shall likewise constitute appropriations of the amounts specified therein for
the purposes specified therein.
c) No contract to exceed appropriation. During each and any fiscal year, no contract entered into by or on
behalf of the City shall expend or contract to expend any money, or incur any liability, nor shall any
contract be entered into nor any bid be awarded by or on behalf of the City which, by its terms, involves
the expenditure of money for any of the purposes for which provision is made either in the adopted
budget or adopting resolution, including any legally authorized amendments thereto, in excess of the
amount appropriated in the budget or the approved contract or bid award. Any contract or bid award, either verbal or written, made in violation of the provisions of this section shall be void as to the City and
no City monies from any source whatsoever shall be paid thereon.
d) Amendments and authorized expenditures. Nothing contained herein shall preclude the City Council from
adopting a supplemental appropriation in a manner consistent with the provisions of Section 10.12 of the
Home Rule Charter of the City. Further, nothing contained in this section shall prevent the making of contracts for governmental services or for capital outlay for a period exceeding one (1) year if such
contracts are otherwise allowed by the Home Rule Charter of the City; provided, however, any contract so
made shall be executory only for the amounts agreed to be paid for such services to be rendered in
succeeding fiscal years.
e) Notice to parties contracting with the City. All persons contracting with, or selling goods or services to,
the City are hereby placed upon notice of the provisions of this section. The provisions of this section shall
become a part of the Merit System Personnel Rules and Regulations of the City of Wheat Ridge; shall be
referred to specifically in all public works bid documents and contracts; and shall be incorporated into, and specially noted within, all other contracts entered into by or on behalf of the City wherein City funds
are used to pay for said contract.
7) Section 2-4 of the City Code of Laws is presented below:
(a) The City may, by contract, require the contractor awarded a public works contract to waive, release or
extinguish its rights to recover costs or damages, or obtain an equitable adjustment, for delays in performing such contract if such delay is caused, in whole or in part, by acts or omissions of the City or its agents, if the
contract provides that an extension of time for completion of the work is the contractor's remedy for such
delay. Such a clause is valid and enforceable, any provision of state law to the contrary notwithstanding.
(b) The City Council, by this ordinance (Ordinance No. 812), declares its local contracting powers to be a matter
of purely local concern, and further specifically intends to supersede, pursuant to its powers under Article XX of the Colorado Constitution, the provisions of Sections 24-91-101 and 24-91-103.5, C.R.S., insofar as they
conflict with the provisions of this section of the Code of Laws of the City of Wheat Ridge, Colorado.
8) Any notice or communication given pursuant to this Agreement to the City shall be made in writing:
City Contact: Contractor Contact:
9) The Contractor agrees to abide by the requirements under EXECUTIVE ORDER NO. 11246 as amended, including
specifically the provisions governed by the Equal Opportunity Commission and also to abide by the requirements of
the IMMIGRATION REFORM AND CONTRACT ACT OF 1986 and the requirements of the AMERICANS WITH DISABILITIES
Act of 1991; and the United States Department of Transportation Title VI Regulations at 49 CFR Part 21 requirements under the Civil Rights Act of 1964, assuring that no person shall on the grounds of race, color, or
national origin be excluded from participation in the opportunity to bid, or be discriminated against in
consideration of award of this project.
ITB-XX-XXXX-PROJECT NAME 3
10) In accordance with CRS Title 24, Article 91, Section 103.6, Paragraph 2, Subparagraph a, the City of Wheat Ridge
hereby states that funds have been appropriated for this Project in an amount equal to or in excess of the Original Contract Amount.
11) To the extent that the agreement may be executed and performance of the obligations of the parties may be
accomplished within the intent of the agreement, the terms of this agreement are severable. Should any term
or provision hereof be declared invalid or become inoperative for any reason, such invalidity or failure shall
not affect the validity of any other term or provision hereof. The waiver of any breach of a term hereof shall
not be construed as a waiver of any other term, or the same term upon subsequent breach.
12) This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators,
successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this
Agreement in two (2) copies, each of which shall be deemed an original on the date first above written.
ATTEST: OWNER
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
STEVE KIRKPATRICK, CITY CLERK WHEAT RIDGE, C0 80033 303-234-5900
DATE BUD STARKER, MAYOR
(Seal)
APPROVED AS TO FORM: CONTRACTOR
GERALD DAHL, CITY ATTORNEY COMPANY NAME
ADDRESS
ATTEST TO CONTRACTOR:
AUTHORIZED SIGNATURE
PRINT NAME
NAME
TITLE
TITLE
DATE DATE
CITY OF WHEAT RIDGE ITB-YR-NUM-Name
BID DUE DATE: TUESDAY, BID DATE 2024 BY 1:00 PM Local Time
ELECTRONIC BIDS MUST BE SUBMITTED VIA:
procurement.opengov.com
IMPORTANT: PLEASE READ ENTIRE DOCUMENT Per the attached specifications, terms and conditions.
FEIN/SSN (Required)
Federal I.D. Number/DUNS Number
COMPANY NAME
ADDRESS
CITY/STATE/ZIP
PHONE EMAIL
TYPED/PRINTED NAME
AUTHORIZED SIGNATURE
This is required. Must be digital or in ink.
TITLE
ACKNOWLEDGE ADDENDAS, MUST INITIAL NUMBER OF ADDENDA
(Bidder is responsible for following up on all addendums)
DO YOU ACCEPT VISA OR ACH FOR PAYMENT? WHICH IS THE PREFERRED METHOD
Do not contact the requesting department or members of the evaluation committee.
Signature acknowledges that Bidder: has read the bid documents thoroughly before submitting a bid, will fulfill the
obligations in accordance to the scope of work or specifications, terms, and conditions, and is submitting without
collusion with any other individual or firm. Do not submit more than one bid from your firm or both bids will be disqualified. Submit bid with authorized signature.
Point of Contact: Whitney Mugford-Smith, Procurement Manager wmsmith@ci.wheatridge.co.us or phone 303-235-2811. Do not contact the requesting department.
CITY OF WHEAT RIDGE, CO CERTIFICATION STATEMENT FOR KEEP JOBS IN COLORADO ACT (80% Colorado Labor), COMPLIANCE TO H.B. 13-1292
Effective January 1, 2014, the Keep Jobs in Colorado Act requires that Colorado labor be employed to perform at least
80% of the work on a public works project, as defined in C.R.S. 8-19-102(2).
References
Keep Jobs in Colorado Act - 8-17-101, et.seq., C.R.S.
Definition of Public Projects - 8-19-102, C.R.S.
Construction Bidding for Public Projects – 24-92-102, C.R.S.
House Bill 13-1292, Keep Jobs in Colorado Act
The Vendor, whose name and signature appear below, certifies and agrees as follows:
1. The Vendor shall comply with the provisions of House Bill 13-1291 and CRS 8-17-101 et seq.
2. The Vendor represents, warrants, and agrees that it (i) Colorado labor will be employed to perform at least 80%
of the work on a public works project, or (ii) otherwise, shall comply with the notification requirements and/or
waiver request of CRS 8-17-101 et seq.
3. The Vendor shall comply with all reasonable requests made in the course of an investigation by the Colorado
Department of Labor and Employment. If the Vendor fails to comply with any requirement of this Act or CRS 8-
17-101 et seq., the City may terminate the above referenced purchase order for breach and the Vendor shall
be liable for actual and consequential damages to the City of Wheat Ridge.
CERTIFIED and AGREED to this day of , 2024
BID NUMBER:
FIRM:
(Print Full Legal Name)
AUTHORIZED SIGNATURE:
Print Name:
Print Title: Date:
Attestation: (A corporate attestation is required.)
BY: Corporate Secretary or Equivalent
CONTRACTOR’S QUALIFICATION FORM
Your Bid Will Not Be Processed If Incomplete
SECTION I - IDENTIFICATION
1. Identification of Applicant Firm
A.
Exact Legal Name of Applicant Firm DUNS #
B.
Street Address City State Zip Code
C.
(Mailing Address, if different from above)
D. Primary Company Telephone No. E-mail.
E. Applicant Firm's Contact Person for Public Works Office follow-up:
Print or Type Name Position Telephone Number
F. Has the Applicant Firm changed its address or has the Firm or its Owner(s) operated under any other name(s)
including other DBAs in the past five years? If yes, explain fully on a separate sheet of paper. ☐ No ☐ Yes
G. Type of business organization:
YEAR organization established: NUMBER of current full time employees:
☐ Sole Proprietor ☐ Corporation – [Date and State of Incorporation
☐ Limited Partnership ☐ General Partnership
[Date and State of Partnership filing
☐ Limited Liability Company ☐ Limited Liability Partnership
[Date and State of filing
☐ Other (describe)
Type of service(s) to be provided to the City of Wheat Ridge.
☐ General Contractor ☐ Concrete Flatwork
☐ Storm Sewer ☐ Concrete Structures
☐ Traffic Signals ☐ Slurry Seal
☐ Grading ☐ Fog Seal
☐ Asphalt Paving ☐ Crack Sealing
☐ Concrete Paving ☐ Landscaping
☐ Signing ☐ Striping
☐ Traffic Control ☐ Other (describe)
SECTION II - OWNERSHIP/MANAGEMENT, PROJECT MANAGEMENT,
SUPERVISORS, AND RELATED ENTITIES
1. Owners
List Owners of Applicant Firm.
[Use additional sheets if necessary]
2. Project Management Team, Supervisors and Employees Who Will Be Working Directly On the Project(s).
List the full names of the primary employees of the proposed Project Team.
Related Devoted to Licenses
[Use additional sheets if necessary]
3. Resume
Attach resumes of the Project Management Team showing the last five years of employment in this field. Resumes must be comprehensive and include of Firms worked for and dates of employment. (RESUMES are not
required from Materials Suppliers (Vendors).
4. Contractor’s License(s)
The awarded Contractor must obtain or have a current City of Wheat Ridge Municipal Contractor’s License
within 7 days of Council approval of bid award.
SECTION III - CONTRACTING HISTORY
1. Contracting History
A. List the applicant Firm’s six largest contracts in the last three years.
1. Company Name Contact Name
Street Address
City State Zip Code
Phone No: E-mail:
Contract Name & Number
Contract Amount Start/Completion Dates
Description of Work
Prime or Subcontractor
2. Company Name Contact Name
Street Address
City State Zip Code
Phone No: E-mail:
Contract Name & Number
Contract Amount Start/Completion Dates
Description of Work
Prime or Subcontractor
3. Company Name Contact Name
Street Address
City State Zip Code
Phone No: E-mail:
Contract Name & Number
Contract Amount Start/Completion Dates
Description of Work
Prime or Subcontractor
SECTION III - CONTRACTING HISTORY – (Continued)
4. Company Name Contact Name
Street Address
City State Zip Code
Phone No: E-mail:
Contract Name & Number
Contract Amount Start/Completion Dates
Description of Work
Prime or Subcontractor
5. Company Name Contact Name
Street Address
City State Zip Code
Phone No: E-mail:
Contract Name & Number
Contract Amount Start/Completion Dates
Description of Work
Prime or Subcontractor
6. Company Name Contact Name
Street Address
City State Zip Code
Phone No: E-mail:
Contract Name & Number
Contract Amount Start/Completion Dates
Description of Work
Prime or Subcontractor
SECTION III - CONTRACTING HISTORY – (Continued)
In the past five years has the Applicant Firm or any Affiliate been the subject of any of the following actions?
A. Been suspended, debarred, disqualified, or otherwise declared ineligible to bid? ☐ No ☐ Yes
B. Failed to complete a contract for a commercial, private owner or Government agency? ☐ No ☐ Yes
C. Been denied a low-bid contract in spite of being the low bidder? ☐ No ☐ Yes
D. Had a contract terminated for any reason, including default? ☐ No ☐ Yes
E. Had liquidated damages assessed against it during or after completion of a contract? ☐ No ☐ Yes
If “Yes” to Sections IV, V or VI, provide details including a brief summary of cause(s) of action, indicate if
Applicant Firm, Owner or Affiliate Firms were plaintiffs (P) or defendants (D); define charges explicitly, by what
authority, court or jurisdiction, etc. Complete details are required!
NOTE: For Sections IV and V below, the definition of an "investigation" includes: an appearance before a grand
jury by representatives of the Firm; any oral or written inquiry or review of the Firm’s documents by a
governmental or law enforcement agency or investigative agency; or questioning of employees concerning the general operation or a specific project or activities of the Firm
SECTION IV - CIVIL ACTIONS
1. Violations Of Civil Law
In the past five years has Applicant Firm, any of its Owners, or any Affiliate been the subject of an investigation of
any alleged violation of a civil antitrust law, or other federal, state or local civil law? ☐ No ☐ Yes
2. Lawsuits With Public Agencies
At the present time is, or during the past five years has the Applicant Firm, any of its Owners, or any Affiliate been
a plaintiff or defendant in any lawsuit regarding services or goods provided to the City of Wheat Ridge or to a public agency? ☐ No ☐ Yes
3. Bankruptcy
During the past five years, has the Applicant Firm or any Affiliate filed for bankruptcy or reorganization under the
bankruptcy laws? ☐ No ☐ Yes
4. Judgments, Liens And Claims
During the past five years, has the Applicant Firm been the subject of a judgment, lien or claim of $10,000 or more
by a subcontractor or supplier? ☐ No ☐ Yes
5. Tax Liens
During the past five years, has the Applicant Firm been the subject of a tax lien by federal, state or any other tax
authority? ☐ No ☐ Yes
SECTION V - COMPLIANCE WITH LAWS AND OTHER REGULATIONS
1. Criminal
In the past five years has the Applicant Firm, any of its Owners, or Affiliates:
A. Been the subject of an investigation involving any alleged violation of criminal law? ☐ No ☐ Yes
B. Been arrested, indicted or named as an unindicted co-conspirator in any indictment or other accusatory
instrument? ☐ No ☐ Yes
C. Been convicted, after trial or by plea, of any felony under state or federal law? ☐ No ☐ Yes
D. Been convicted of any misdemeanor involving business-related crimes? ☐ No ☐ Yes
E. Entered a plea of nolo contendere to a charge of embezzlement, theft, forgery, bribery, falsification or
destruction of records, receiving stolen property, or a violation of any antitrust laws? ☐ No ☐ Yes
F. Entered into a consent decree? ☐ No ☐ Yes
G. Been granted immunity from prosecution for any business-related conduct constituting a crime under state or federal law? ☐ No ☐ Yes
H. Taken the Fifth Amendment in testimony on any business-related crime? ☐ No ☐ Yes
I. Paid a fine or settlement to resolve any criminal or civil violations or allegations involving a business activity? ☐ No ☐ Yes
J. Do any Owners in Applicant Firm have any felony charges pending against them that were filed either before,
during, or after their employment with the Applicant Firm? ☐ No ☐ Yes
1. Regulatory Compliance
In the past five years, has Applicant Firm, any of its Owners, or Affiliates been cited for:
A. A violation of any labor law or regulation, including prevailing wage rates and fair labor practices? ☐ No ☐ Yes
B. An OSHA violation? ☐ No ☐ Yes
C. A violation of federal, state or local environmental laws or regulations? ☐ No ☐ Yes
D. Any other administrative, statutory or regulatory violations? ☐ No ☐ Yes
SECTION VI - ETHICS
1. False Statements, Bribes, Collusion
In the past five years has the Applicant Firm, any of its Owners, or Affiliates:
A. Filed with a government body (including City of Wheat Ridge) or submitted to a government employee
(including City of Wheat Ridge employee) any form of document known by the Applicant Firm, any of its
Owners, or by the person submitting the document, to contain false information? ☐ No ☐ Yes
B. Created or maintained false business records? ☐ No ☐ Yes
C. Given, or offered to give, money or any other benefit to a public official or employee with intent to influence
that person regarding any of their official acts, duties or decisions? ☐ No ☐ Yes
D. Given, or offered to give, money or other benefit to an official or employee of a private business with intent to induce that official or employee to engage in unethical or illegal business activities (including but not limited
to improper gratuities, and/or violations of lobbying regulations)? ☐ No ☐ Yes
E. Agreed with another to bid below prevailing market rate? ☐ No ☐ Yes
F. Agreed with another to submit identical or complimentary bids or otherwise not to bid competitively? ☐ No ☐ Yes
G. Agreed with another not to submit competitive bids in another's territory established either by geography or customers? ☐ No ☐ Yes
H. Agreed with another to take turns in obtaining contracts by pre-determining which Firm shall submit the lowest
bid? ☐ No ☐ Yes
2. Conflict Of Interest
A. Does the Applicant Firm, any of its Owners or Project Team Members have any existing relationships that could
be construed as either personal or organizational conflicts of interest, or which would give rise to a conflict if
Applicant Firm should be a recipient of a contract with the City of Wheat Ridge? ☐ No ☐ Yes
B. Has any Owner or Project Team member of Applicant Firm ever (if yes explain fully):
1. Been an employee of the City of Wheat Ridge, or served as a Member of Wheat Ridge City Council? ☐ No ☐ Yes
2. Been related by blood or marriage to a City of Wheat Ridge employee or Council Member? ☐ No ☐ Yes
SECTION VII - ADDITIONAL DOCUMENTATION REQUIRED
Additional document copies to be submitted with this application:
Letter of Reference from your Firm’s Surety, which states current available aggregate and single project
bonding capacity (This Application will not be processed without this letter)
Certification of all IMSA certified personnel, if applying for traffic signal project(s). A minimum of two full
time employees must be certified at Level II or higher.
Cole Kring
Cole.Kring@lighthousetg.org
11861 Bradburn Blvd
Westminster, CO 80031
(720) 360-6645
Educaon
University of Wyoming
May 2021
Bachelor of Science
Civil Engineering
Cerficaons
- Engineering Intern
Experience
Lighthouse Transportaon Group
Project Manager
Westminster, CO
2024 – Present
- Manage mul1ple projects concurrently from project award to comple1on
- Monitor and track material ordering to installa1on for compliance with drawings and
specifica1ons
- Liaised with project team and subcontractors to acquire resources to meet project deadlines
- Develop and alter standard opera1ng procedures
Lumin8
Project Manger
Arvada, CO
2022 – 2024
- Managed mul1ple projects concurrently from project award to comple1on
- Monitored and tracked material ordering to installa1on for compliance with drawings and
specifica1ons
- Liaised with project team and subcontractors to acquire resources to meet project deadlines
- Developed and altered standard opera1ng procedures
Company
Project Engineer
Arvada, CO
2021 – 2022
- Provided guidance and support to Project Teams
Joel Flores
Joel.Flores@lighthousetg.org
11861 Bradburn Blvd
Westminster, CO 80031
(303) 304-5560
Educaon
University
Month YYYY
Degree
Major
Cerficaons
- IMSA Traffic Signal Technician Level II
- Digger and crane operator cer3fied
Experience
Lighthouse Transportaon Group
Superintendent
Westminster, CO
March 2022 – Present
- Full responsibility for all field opera3ons in the SE region of Lighthouse’s build division
- Lead a crew of up to 10 with experience on projects up to $5 million in size
WL Contractors / Lumin8
Foreman
Arvada, CO
January 2012 – January 2022
- Lead a crew of 2-4 groundsman comple3ng projects up to $5 million in size
- Lead a self-performing crew, with support of a superintendent, comple3ng projects up to $5
million in size
- Full knowledge of opera3on of all equipment related to ITS scope (crane, digger derrick, bucket
truck, skid-steer, track hoe, etc.)
- Read & understand plans, send RFIs to PM, order commodi3es
- Management of documenta3on (as-builts, safety briefings, vehicle inspec3on reports, daily logs)
John Behan
John.Behan@lighthousetg.org
811 W 56th Ave
Denver, CO 8021
(303) 898-9116
Educa
on
University of Colorado Boulder
May 2015
Bachelor of Science
Civil Engineering
Cer
fica
ons
- Licensed Professional Engineer
Experience
Lighthouse Transporta
on Group
Managing Member
Westminster, CO
March 2022 – Present
- Oversight / self-performance capability in all aspects of business opera3ons, including but not
limited to: Opera3ons, Project Management, Es3ma3on, Scheduling, AR, AP, Payroll, HR, and
financial repor3ng
WL Contractor / Lumin8
Director of Construc3on
Arvada, CO
November 2017 – February 2022
- Oversight of construc3on division, responsible for approximately $50m in annual revenue
- Problem solver – address concerns with project teams on various self-performed and
subcontracted scope
- Management of financials to include accurate projec3ons, es3mates, and work in progress
City of Thornton
Project Manager
Thornton, CO
2016 – November 2017
- Project Manager for the design and construc3on of Thornton’s traffic signal and ligh3ng capital
improvements projects
- Program Manager for the iWatch™ Residen3al Speed Awareness Program
- Review of transporta3on related project documents such as construc3on drawings, traffic
impact studies, project manuals, bid tabs, and others
is hereby certified as a
by completing all requirements for certification
IMSA Traffic Signal Field Technician II
Certification #BE_133183
Chase Blount
on March 26, 2024
Valid thru March 26, 2027
CITY OF WHEAT RIDGE
Public Works Division
7500 W 29TH AVE
WHEAT RIDGE CO 80033-8001 (303)205-7615
Municipal Contractors License # - MCL-468
Lighthouse Transportation Group LLC
John Behan
11861 Bradburn Blvd
Westminster CO 80031
Bus Phone: 3033900210
Type of License Expires On Amount
A January 28, 2027 $300.00
Kent Kisselman
CIP Manager
Public Works January 28, 2026
1/28/26, 9:39 AM about:blank
about:blank 1/1
Joel Flores
is hereby certified as a
IMSA Traffic Signal Construction Tech II - Renewal
by completing all requirements and examination for certification
on 6/17/2024
Valid thru 6/17/2027
Certification #BC_100020
Joel Flores
is hereby certified as a
IMSA Traffic Signal Field Tech II - Renewal
by completing all requirements and examination for certification
on 6/17/2024
Valid thru 6/17/2027
Certification #BE_100020
October 9, 2026
Re: Lighthouse Transportation Group, LLC
To Whom It May Concern:
As an agent for First Founders Assurance Company (part of Trisura Insurance Company), our agency manages the surety
bond program for Lighthouse Transportation Group, LLC. The IMA team knows the principals of Lighthouse
Transportation Group, LLC to be individuals of high integrity, with a vast knowledge of the construction industry,
producing a quality product, in a timely and cost-effective manner.
Surety bonds for Lighthouse Transportation Group, LLC are underwritten by First Founders Assurance Company (part of
Trisura Insurance Company), which holds an A- “VIII” rating by A.M. Best Company and is listed on the U.S. Department
of Treasury register of approved surety companies. While no maximum bonding limits (single or aggregate) have been
established for Lighthouse Transportation Group, LLC, the surety has approved individual projects in the $10,000,000
range, with an aggregate program of $25,000,000, and they would positively consider both performance and payment
bonds and bid bonds in this range, in which Lighthouse Transportation Group, LLC might have an interest.
Approval of all bonds is based upon the size, type and location of project, the surety’s favorable review of the contract
documents, bond forms and financing for each project, as well as other pertinent underwriting criteria. This letter is
written as a general reference of our client and should not be construed as a commitment to provide bonds to you or
any third party. Neither the surety nor IMA assume any liability to you or third parties, if for any reason bonds are not
written.
We are proud to recommend Lighthouse Transportation Group, LLC to you. If you have any questions, please contact
me at (303) 534-4567.
Sincerely,
Michael Lischer, Jr.
Senior VP, Director of Surety
cc: Lighthouse Transportation Group, LLC
First Founders Assurance Company
Trisura Insurance Company
LIST OF SUBCONTRACTORS AND AMOUNT
ITB-YR-NUM-Name
Important: This form must be submitted and completed. If you are not using sub-contractors, state “None”. Failure to
submit a completed form will result in a non-responsive bid.
Contractor’s organization shall perform work amounting to 50% or more of the total contract cost.
COMPANY SUBMITTING BID
NAME TYPE OF WORK AMOUNT % OF WORK
PROPOSAL FORM
This is the Proposal (Bid) of (hereinafter called "BIDDER") or organized and existing under the laws of the State of doing business as a (Insert "a
corporation", "a partnership", or "an individual" as applicable.)
To the CITY OF WHEAT RIDGE (hereinafter called "Owner").
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Contract Bid Documents, to complete all Work as specified or indicated in the Contract Bid Documents for the Contract Sum and within the Contract time indicated in accordance with the Contract Bid Documents.
Bidder accepts all of the terms and conditions of the Instructions to Bidders. The Bid will remain open for sixty days after the day of Bid opening. Bidder will sign the Agreement and submit any documents required by the Contract documents within seven (7) calendar days after notification or the designated date.
By submission of this Bid, each Bidder certifies, and in the case of a joint Bid, each party thereto certifies as to his own organization, that this Bid has been arrived at independently without consultation, or communication with any competitor. Every bid submitted to the City shall contain a statement certifying that the Bidder has not participated in any collusion or taken any action in restraint of free competitive bidding. This statement shall be in the form of an affidavit provided by the City and included in the Bid
Proposal. The Bidders proposal will be rejected if it does not contain the completed Non-collusion Affidavit.
Bidder agrees to abide by the following federal requirements:
Executive Order No. 11246 as amended, including specifically, the provisions of the Equal Opportunity Clause,
the Immigration Reform and Contract Act of 1986, and the Americans with Disabilities Act of 1991.
United States Department of Transportation Title VI Regulations at 49 CFR Part 21 the Civil Rights Act of 1964, assuring that no person shall on the grounds of race, color, or national origin be excluded from
participation in the opportunity to bid, or be discriminated against in consideration of award of this project.
Bidder hereby agrees to commence Work under this contract on or before a date to be specified in the Notice to Proceed and to fully complete the Project within _________ working days.
The Notice to Proceed shall be issued within fourteen (14) days of the execution of the Agreement by the Owner. Should there be reason why the Notice to Proceed cannot be issued within such period, the time may be extended by mutual agreement between the Owner and Contractor. If the Notice to Proceed has not been issued within the period mutually agreed upon, the Contractor may terminate the Agreement without further liability on the part of either party.
The Owner may make such investigations as he deems necessary to determine the ability of the Bidder to perform the Work, and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any Bid if the evidence submitted by, or
investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement.
Bidder has examined the site and locality where the Work is to be performed, the legal requirements (federal,
state and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress, or performance of the Work and has made such independent investigation as Bidder deems necessary.
Bidder will complete the Work for all accepted bid items.
Provide all materials, labor, and equipment to complete the work as per the specifications. It is the Owner’s intent to award a single contract to the lowest qualified bidder.
Project: [Project Name]
Company Name Date
Authorized Signature Title
Printed Name
Title
License No. Type Expiration Date
ATTEST:
Printed Name
Signature Title
SEAL
(If bid is by corporation)
ADDENDA
Bidder acknowledges receipt of the following Addenda:
Bid Schedule
Bidder acknowledges the attachment of the completed electronic BID SCHEDULE (Protected Excel Spreadsheet) under separate cover.
Signature Title
1
INVITATION TO BID
26-47 - West 44th Avenue and Tabor Street Signal Poles
Submission Due Date
Friday, October 9, 2026 by 2:00 pm Mountain Time
Documents Prepared by:
Procurement & Contracts Division
On behalf of
Public Works
Anticipated Project Schedule
ITB Issued September 2, 2026
Mandatory/Optional Pre-Bid
Conference/Meeting (Non-Mandatory)
September 18, 2026, 11:00am
Microsoft Teams meeting
Join:
https://teams.microsoft.com/meet/27482201
3241721?p=Wd3rl4g98zc0PzcD3Q
Meeting ID:
274 822 013 241 721
Passcode:
rV7Z9vx6
2
Deadline for Questions September 25, 2026, 2:00pm
Question Response Deadline October 2, 2026, 5:00pm
Bid Due Date October 9, 2026, 2:00pm
Please read the entire document. Do not remove any pages. Do not contact the issuing department as this
may result in disqualification. All communication is to be directed to the City’s Procurement Manager,
Whitney Mugford-Smith, wmsmith@wheatridge.gov
Late submissions will not be considered. Only submissions received to OpenGov eProcurement prior to the
deadline will be considered.
Table Of Contents
1. INFORMATION FOR BIDDERS
1.1. Bid Submission Requirements
1.2. Scope of Work
1.3. Bid Documents
1.4. Contract Award
2. GENERAL PROVISIONS
2.1. GENERAL PROVISIONS
2.2. INSURANCE
3. CDOT SPECIFICATIONS AND PROVISIONS
3.1. Introduction
4. VENDOR RESPONSES
4.1. Bid Proposal
4.2. Vendor Questionnaire
Attachments:
A - BID BOND FORM
B - Bidder Acknowledgement Form
C - Certification Statement for Keep Jobs in Colorado Act
D - Contractor's Qualification Form
E - FINAL RECEIPT
F - List of Subcontractors and Amount
G - Non-Collusion Affidavit
H - Non-Discrimination Assurance Form
I - NOTICE TO PROCEED
J - PAYMENT BOND
K - PERFORMANCE BOND
L - Sample Agreement
M - PROPOSAL FORM
N - 44th and Tabor Traffic Improvement Stamped Plans
O - 44th and Tabor Stamped Specs
1. INFORMATION FOR BIDDERS
1.1. Bid Submission Requirements
1. Electronic Bids for West 44th Avenue and Tabor Street Signal Poles will be received by the City of
Wheat Ridge, Office of Procurement and Contracts via OpenGov Procurement, as stated in the
Advertisement.
Point of Contact: Whitney Mugford-Smith, by email wmsmith@wheatridge.gov. Questions about this
bid should be posed on the OpenGov Procurement platform.
2. Bid Documents are available on the OpenGov Procurement platform at
https://procurement.opengov.com/portal/wheatridgeco.
The City does not assume any responsibility for errors or misinterpretations resulting from the use of
incomplete sets of bidding documents.
The City in making copies of the bidding documents available on the terms in this Project Manual
does so only for the purpose of obtaining bids on the Work and does not confer a license of grant for
use.
3. Electronic Project Document/Proposal must be submitted and signed, either digitally or in ink and
scanned. All blank spaces for prices must be filled in and the Proposal Form must be fully completed
and executed when submitted. In the case of discrepancies, the unit price shall govern the extension
and subsequent total. No alteration in bid prices by erasures, deletions or strike-outs, will be
acceptable unless each alteration is signed or initialed by the Bidder. A conditional or qualified Bid
will not be accepted.
The Project Documents contain an affidavit certifying that the Bidder has not participated in any
collusion or taken any action in restraint of free competitive bidding. This form must be signed and
submitted with the Bid.
Names of all subcontractors and the amounts of their subcontract work shall be provided on the List
of Subcontractors, as provided in this bid. If none, state “none”.
4. Each Bid must be accompanied by a digital Bid Bond payable to the City for five percent (5%) of the
total amount of the Bid. Securities may not be substituted for Bid Bonds.
Attorneys-in-Fact who sign Bid Bonds must file with each Bond a certified and effective dated copy of
their Power of Attorney.
Surety companies executing bid and performance bonds must appear on the Treasury Departments
most current list (Circular 570 as amended) and be authorized to transact business in the State of
Colorado.
5. A bidder may withdraw or revise a proposal after it has been deposited with the City. Withdrawal of
bids may be made either in writing or in person; however, any bid withdrawn for purpose of revision
must be re-deposited with the City before the time set for opening of bids. Bids may not be
withdrawn after the time set for opening of bids.
6. The City assumes no responsibility for late deliveries of e-mail. Only electronic bids received by the
Procurement & Contracting Division will be accepted.
7. Issuance of this Request for Bid does not commit The City of Wheat Ridge to award any contract or to
procure or contract for any equipment, materials, or services. The City further reserves the right to
waive informalities or irregularities, and the right to accept or reject any and all bids, including but
not limited to, any bid which does not meet bonding requirements, or bids which do not furnish the
quality, or offer the availability of materials, equipment or services as required by the specifications,
description or scope of services, or bids from bidders who lack experience or financial responsibility,
or bids which are not to form, or to award bids to the lowest and most responsive and responsible
bidder, or to require new bids.
No award will be made to any person, firm, or corporation that is in arrears upon any obligation to
the City.
8. The City of Wheat Ridge is exempt from City, County, State and Federal Sales/Excise Taxes.
Certificates will be issued upon request.
1.2. Scope of Work
1.2.1. West 44th Avenue and Tabor Street Signal Poles
Scope Of Work:
The City of Wheat Ridge is soliciting proposals from qualified contractors for the construction of a new
traffic signal improvement at the intersection of Tabor Street and West 44th Avenue, per the attached plans
and specs. The contractor will be responsible for the related intersection upgrades, including roadway,
sidewalk, curb, drainage, electrical, signing, and signal components needed to support the new signal
installation, and shall adhere to all relevant standards.
Contractors are required to fill in the pricing table included with the bid request within the OpenGov
system.
1.3. Bid Documents
1. The Contract Documents consist of the Contract Bid Documents including construction specifications,
if any. The Contract Bid Documents contain the provisions required for the bidding and construction
of the Project. The Owner shall provide to Bidders, prior to Bidding, all information that is pertinent
to, and delineates and describes, the Work. This may occur on the plans or on a separate document.
2. Each Bidder is responsible for inspecting the site and for reading and being thoroughly familiar with
the Contract Documents, including Addenda. The failure or omission of any Bidder to do any of the
foregoing shall in no way relieve any Bidder from any obligation in respect to his Bid. After Bids have
been submitted, the Bidder shall not assert that there was a misunderstanding concerning the
quantities of Work or of nature of the Work to be done or any materials specified for the Work.
3. If it should appear to a Bidder that the work to be done or matters relative thereto are not
sufficiently described or explained in the Contract Documents or that the Contract Documents are
not definite and clear, the Bidder may make written inquiry regarding same to the Procurement
Contact at least five (5) working days or a designated date set by the Procurement Contact, before
the scheduled closing time for filing Bids. Then, if in the judgment of the Procurement Manager,
additional, information or interpretation is necessary, such information will be supplied in the form
of an Addendum, and will be delivered to all individuals, firms and corporations who have received
the Contract Documents. Such Addendum shall have the same binding effect as though contained in
the main body of the Contract Documents. Oral instructions or information concerning the contract
documents or the project given out by officers, employees, or agents of the owner to prospective
bidders shall not bind the owner. If no request is made in the five working days or the designated
time, Bidder waives right to any conflict in the Contract Documents.
4. All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction
over construction of the Project shall apply to the Contract throughout. Further, the Bidder agrees to
abide by the following federal requirements: Executive Order No. 11246 as amended, including
specifically the provisions of the Equal Opportunity Clause, the Immigration Reform and Contract Act
of 1986 and the Americans with Disabilities Act of 1991.
As a recipient of Federal funds, subject to United States Department of Transportation Title VI
Regulations at 49 CFR Part 21 the Civil Rights Act of 1964, the City of Wheat Ridge, and its
responsible agents, contractors and consultants assure that no person shall on the grounds of race,
color, or national origin be excluded from participation in the opportunity to bid or be discriminated
against in consideration of award of this project. Disadvantaged business enterprises will be afforded
full opportunity to submit bids in response to all invitations subject to the Regulations. The United
States has a right to seek judicial enforcement with regard to any matter arising under Title VI, 49
CFR Part 21 and assurances.
5. Bidder must complete and submit the Contractor Qualification Form provided with the bid
document. Failure to complete this form and submit with bid may result in the disqualification of
the contractor. The City’s acceptance of this bid shall be based on information provided by the
contractor in this form. Bid amount and qualification shall be evaluated after bid opening to
determine the successful bidder. The City does not pre-qualify contractors.
1.4. Contract Award
1. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder
and Subcontractors to perform the Work, and the Bidder shall furnish to the Owner all such
information and data for this purpose as the Owner may request. The Owner reserves the right to
reject any Bid if the evidence submitted, or investigation fails to satisfy the Owner that such Bidder
or any Subcontractor is properly qualified to carry out the obligations of the Agreement. If the owner
rejects any Subcontractor as unqualified, the Bidder may substitute another Subcontractor for
approval by the Owner but no change to the Bid Price will be allowed.
2. The Award of Contract, is anticipated, within 60 calendar days after the opening of bids to the
lowest most responsive, responsible qualified bidder whose bid complies with all the requirements of
this request for bids. Evaluation and award will only include the alternate if the base bid and the
alternate price combined are within the advertised cost range. If more than one alternate, the order
or the selection of the alternates for award is at the discretion of the City. Award is in the best
interest of the City.
3. The successful bidder shall be notified of the recommendation for award and to provide signed
agreements, insurance, and bonds. A Performance Bond and Payment Bond, each in the amount of
100 percent (100%) of the Contract Price, with a corporate surety approved by the Owner, will be
required for the faithful performance of the Contract. Securities may not be substituted for Payment
or Performance Bonds. Attorneys-in-Fact who sign Payment and Performance Bonds must file with
each Bond a certified and effective dated copy of their Power of Attorney.
4. The successful bidder shall return copies of the executed Agreement and acceptable Performance
and Payment Bonds by a designated date. In case the Bidder fails to comply by the designated date
or if the Bidder fails to provide acceptable bonds, the Owner may, at its option, consider the Bidder
in default, in which case the Bid Bond accompanying the Proposal (Bid) shall become the property of
the Owner.
5. The Owner, within 10 working days of receipt of the requirement stated in C above, shall execute
the Agreement and issue the Notice to Proceed at a pre-construction meeting with the Contractor. If
the Owner cannot issue the Notice to Proceed within such time period, the time period will be
extended by mutual agreement between the Owner and Contractor. If the Notice to Proceed has not
been issued within the 10 working day period or within the period mutually agreed upon, the
Contractor may terminate the Agreement, by Written Notice, without further liability on the part of
either party.
6. Upon receiving notice of award, the Contractor may obtain from the City three sets of documents at
no cost. Additional sets of drawings and specifications may be purchased on a cash sale basis from
the City. The Contractor and the Owner will agree on the date that Work will commence which shall
be within 10 working days of the date of the Notice to Proceed, unless a time extension is approved
by the Owner.
7. Section 2-3 of the City's Code of Laws is presented below:
a. Fiscal year. Fiscal year for the City shall commence on January 1 and end on December 31.
b. Budget contains appropriations. The City Council shall annually adopt a budget in a manner
consistent with the provisions of Chapter X of the Home Rule Charter of the City of Wheat Ridge.
Upon the annual adoption by the City Council of each fiscal year's budget, levels of authorized
expenditures from the funds indicated within the annual budget itself and/or the adopting
resolution shall constitute the appropriation of the amounts specified therein for the purposes
specified therein. During the course of each fiscal year, approval by the City Council of contracts
for goods or services, and/or approval of bids for the provision of specified goods or services,
shall likewise constitute appropriations of the amounts specified therein for the purposes
specified therein.
c. No contract to exceed appropriation. During each and any fiscal year, no contract entered into by
or on behalf of the City shall expend or contract to expend any money, or incur any liability, nor
shall any contract be entered into nor any bid be awarded by or on behalf of the City which, by
its terms, involves the expenditure of money for any of the purposes for which provision is made
either in the adopted budget or adopting resolution, including any legally authorized
amendments thereto, in excess of the amount appropriated in the budget or the approved
contract or bid award. Any contract or bid award, either verbal or written, made in violation of
the provisions of this section shall be void as to the City and no City monies from any source
whatsoever shall be paid thereon.
d. Amendments and authorized expenditures. Nothing contained herein shall preclude the city
council from adopting a supplemental appropriation in a manner consistent with the provisions of
Section 10.12 of the Home Rule Charter of the City. Further, nothing contained in this section
shall prevent the making of contracts for governmental services or for capital outlay for a period
exceeding one (1) year if such contracts are otherwise allowed by the Home Rule Charter of the
City; provided, however, any contract so made shall be executory only for the amounts agreed to
be paid for such services to be rendered in succeeding fiscal years.
e. Notice to parties contracting with the City. All persons contracting with, or selling goods or
services to, the city are hereby placed upon notice of the provisions of this section. The
provisions of this section shall become a part of the Merit System Personnel Rules and Regulations
of the City of Wheat Ridge; shall be referred to specifically in all public works bid documents and
contracts; and shall be incorporated into, and specially noted within, all other contracts entered
into by or on behalf of the City wherein City funds are used to pay for said contract.
8. Section 2-4 of the City Code of Laws is presented below:
a. The city may, by contract, require the contractor awarded a public works contract to waive,
release or extinguish its rights to recover costs or damages, or obtain an equitable adjustment,
for delays in performing such contract if such delay is caused, in whole or in part, by acts or
omissions of the City or its agents, if the contract provides that an extension of time for
completion of the work is the contractor's remedy for such delay. Such a clause is valid and
enforceable, any provision of state law to the contrary notwithstanding.
b. The City Council, by this ordinance (Ordinance No. 812), declares its local contracting powers to
be a matter of purely local concern, and further specifically intends to supersede, pursuant to its
powers under Article XX of the Colorado Constitution, the provisions of Sections 24-91-101 and
24-91-103.5, C.R.S., insofar as they conflict with the provisions of this section of the Code of
Laws of the City of Wheat Ridge, Colorado.
c. To the extent that the agreement may be executed and performance of the obligations of the
parties may be accomplished within the intent of the agreement, the terms of this agreement are
severable. Should any term or provision hereof be declared invalid or become inoperative for any
reason, such invalidity or failure shall not affect the validity of any other term or provision
hereof. The waiver of any breach of a term hereof shall not be construed as a waiver of any other
term, or the same term upon subsequent breach.
2. GENERAL PROVISIONS
2.1. GENERAL PROVISIONS
2.1.1. Definitions
"City" (also sometimes referred to as "Owner") means the City of Wheat Ridge, Colorado. The City is
represented by employees who will assume Project administration, oversight, and inspection responsibilities
as further defined in the Contract, the General and Special provisions, and the current edition of CDOT
Standard Specifications for Road and Bridge Construction. At the time of the preconstruction meeting, or
when requested by the Contractor, the City shall provide an official list of City representatives and their
titles as applies to the Project.
"Contractor" means the person, partnership, firm or corporation responsible for the physical accomplishment
of the project.
"Subcontractor" means only those having a direct contract with the Contractor and includes one who
furnished materials worked to a special design according to the plans or specifications for the work under
the Contract, but does not include one who merely furnishes material not so worked.
"Notice" means written demand, instruction or order duly served. Written notice shall be deemed to have
been duly served if delivered in person to the Contractor, or if delivered in person or sent by registered mail
to the address given in the Contract and shall have been duly served upon the City if delivered to the City
Clerk of the City of Wheat Ridge, Municipal Building, Wheat Ridge, Colorado, either in person or by
registered mail.
"Work" means performance of the Contractor or Subcontractor including labor and materials and all services
incidental thereto.
"Cost" means all charges and expenditures of every kind applicable to the accomplishment of the work.
"Final Completion" means when all items are one hundred percent (100%) complete and when all known
defective work has been corrected as certified by the City Representative.
"Substantial Completion Date" is the date on which the City Representative certifies the readiness of the
work for beneficial occupancy or use, and is the date for terminating liability for liquidated damages and for
determining incentive payments due for early completion.
2.1.2. Materials, Services, and Facilities
The Contractor shall and will, in good workmanlike manner, do and perform all work and furnish and pay for
all labor, superintendence, material, utilities, machinery, equipment, tools, transportation, facilities,
temporary construction of every nature and all other services and facilities of every nature, except as
herein otherwise expressly specified, necessary or proper to perform and complete all the work, within the
time stated, in accordance with the plans, drawings and specifications covered by the Contract, and any and
all supplemental plans, drawings and specifications. He shall furnish, erect, maintain and remove such
construction plant and such temporary works as may be required. It will be the responsibility of the
Contractor to locate/negotiate a staging area. The City will not provide a staging area on City owned
property. Any work necessary to be performed after regular working hours, on Saturdays, Sundays, or Legal
Holidays, shall be performed without additional expense to the City.
2.1.3. Contractor's Title to Materials
No materials or supplies for the work shall be purchased by the Contractor or by any Subcontractor subject
to any chattel mortgage or under a conditional sale contract or other agreement by which an interest is
retained by the seller. The Contractor warrants that he has good title to all materials and supplies used by
him in the work, free from all liens, claims or encumbrances
2.1.4. Observation and Testing
All work performed and all workmanship, equipment and materials used in the construction shall be subject
to Observation, examination and test, at any and all times during construction.
2.1.5. Weather Conditions
In the event of temporary suspension of work, or during inclement weather or whenever the City shall
direct, the Contractor will, and will cause his Subcontractors to, protect carefully his and their work and
materials against damage or injury from weather. If, in the opinion of the City, any work or materials have
been damaged or injured by reason of failure on the part of the Contractor or any of his Subcontractors to
so protect his work, such materials shall be removed and replaced at the expense of the Contractor.
2.1.6. Emergency Protection of Life and Property
In case of an emergency which threatens loss of injury or property, and/or safety of life, the Contractor is
hereby permitted to act at his own discretion and in a diligent manner without prior instructions from the
City to prevent the threatened loss or injury. He shall notify the City immediately thereafter. Any claim for
compensation by the Contractor due to such extra work shall be promptly submitted in writing to the City
for approval. The amount of any reimbursement claimed by the Contractor shall be determined in the
manner provided in Article 9 of this Contract.
2.1.7. Reports, Records. and Data
The Contractor shall submit to the City such schedule of quantities and costs, progress schedules, payrolls,
reports, estimates, records and other data as may be requested concerning work performed or to be
performed under this Contract.
2.1.8. Superintendence by Contractor
At the site of the work, the Contractor shall employ a construction superintendent or foreman who shall
have full authority to act for the Contractor. It is understood that such Representative shall be acceptable
to the City and shall be one who can be continued in that capacity for the particular job involved unless he
ceases to be on the Contractor's payroll. All directions given to such Representative in the Contractor's
absence shall be as binding as if given to the Contractor.
2.1.9. Changes in the Work
The City may, at any time, by written order and without notice to the sureties, require the performance of
extra work or make changes by altering, adding to, or deducting from the work. The amount of
compensation to be paid to the Contractor shall be adjusted accordingly without invalidating the Contract
and in accordance with whichever of the following plans the City elects: (1) a price agreed upon, (2) a price
based on unit prices of the Contract; or (3) a price determined by adding fifteen percent (15%) to the
reasonable cost of the extra work, addition, alteration, or deduction; provided however, that no additions
to the Contract Price shall be agreed upon by, or shall be binding upon the City if the effect of said price
increase is to increase the Contract amount beyond the amount of money appropriated by the City Council,
as specified in Section 2 3 of the Code of Laws of the City of Wheat Ridge.
In giving instructions, the City may authorize minor changes in the work, not involving extra cost and not
inconsistent with the purpose of the project. Otherwise, except in an emergency endangering life or
property, no extra work or change shall be made unless in pursuance of a written approved Change Order or
RFI response by the City.
2.1.10. Time Extensions
The Contractor shall, within seven (7) days from the beginning of any delay, notify the City, in writing, of
the causes thereof and the City shall ascertain the facts, the extent of the delay and notify the Contractor
of the decision in the matter.
The completion time shall be extended when delay in completion of the work by the Contractor is due to
unforeseeable causes beyond his control and without his fault or negligence, including, but not restricted
to, acts of God or the public enemy, acts or neglect of the City, acts of neglect of any other contractor,
fires, floods, epidemics, quarantine restrictions, strikes, riots, civil commotions or freight embargoes. The
time of completion of his work shall be extended by such time as shall be fixed by the City.
No such extension of time shall be deemed a waiver by the City of its right to terminate the Contract for
abandonment or delay by the Contractor as herein provided or relieve the Contractor from full responsibility
for performance of his obligations hereunder. The City's liability for delay shall be limited pursuant to the
provisions of Section 2-4 of the Code of Laws of the City of Wheat Ridge and shall be limited to granting a
time extension to the Contractor.
2.1.11. Defective Work
The observation of the work by the City shall not relieve the Contractor of any of his obligations to fulfill his
Contract as herein prescribed, and defective work shall be made good, and unsuitable materials may be
rejected, notwithstanding that such work and material have been previously overlooked by City
representative(s) and accepted or estimated for payment or paid for. If the work or any part thereof shall
be found defective or at any time before the final acceptance of the whole work, or the final payment
therefore, the Contractor shall forthwith make good such defect in a manner satisfactory to the City and if
any material brought upon the ground for use in the work, or selected for the same, shall be condemned by
the City as unsuitable, the Contractor shall forthwith remove such materials from the vicinity of the work
and shall replace, at his own expense, damaged or unsuitable materials with the new materials of
satisfactory quality.
Neither the foregoing nor any provision of these Contract Documents, nor any special guarantee time limit,
shall be held to limit the Contractor's liability for defects to less than the legal limit of liability in
accordance with the law of the place of the construction.
The Contractor shall pay the City all expenses, losses, and damages as determined by the City incurred in
consequence of any defect, omission, or mistake of the Contractor or his employees or the making good
thereof.
2.1.12. Unexpected Underground Structures; Change of Conditions
Should the Contractor encounter underground structures at the site materially differing from those shown on
the Plans or indicated in the Specifications, he shall immediately give notice to the City of such conditions
before they are disturbed. The City will thereupon promptly investigate the conditions, and if it is
determined that they materially differ from those shown on the Plans, may authorize changes to be made to
the Plan and/or Specifications as may be necessary.
It is understood and agreed that the Contractor has considered in his bid all of the permanent and
temporary utility appurtenances in their present or relocated position as shown on the plans and that
additional compensation will not be allowed except for any unreasonable delays, or damage sustained by
him due to any interference from the said utility appurtenances. Unreasonable delays shall constitute delays
caused by a complete shutdown of all operations. It is understood that utilities are not owned, operated or
controlled or subject to control by the City of Wheat Ridge. Relocations of facilities owned by said utilities
are not a matter over which the City has control. The Contractor shall adjust his schedule in anticipation of
such delays so that work in other areas may be completed away from the area of utility conflict.
The locations of all utilities shown on the Project plans should be considered approximate. It is therefore
the responsibility of the Contractor to notify the appropriate utility and obtain more precise locations. No
compensation will be made to the Contractor for any damage, delay or additional cost incurred as a result
of failure to obtain utility locations.
Information on the Plans in the Contract Documents referring to the existence of utilities or other
underground structures is not guaranteed to be correct or to be a complete representation of all existing
data. Every effort has been made, however, to make this information complete and accurate on the basis of
all data and information which could be procured by the City. The Contractor shall make his own
examination and shall draw his own conclusions as to the underground facilities which will be encountered,
and he shall have no claim for damages of any kind on account of any errors, inaccuracies or omission that
may be found.
There shall be no adjustment in Contract Price based on changed site conditions. The Contractor is required
hereby to make an on site inspection and investigation, which includes determination of location of utilities
and said and other natural conditions. Representations regarding site and soil conditions and utility locations
are based on the best information available to the Owner and final determination as to both site and soil
conditions and utility locations is left to the Contractor, without recourse to the City. The City shall allow
reasonable and necessary access to the site to Contractor and his representatives to make such
determination and site review.
2.1.13. Claims for Extra Costs
No claim for extra work or cost shall be allowed unless the same was done in pursuance of written order of
the City, as provided for in Article 9, and the claim was presented prior to the issuance of the final
payment. When work is performed under the "reasonable cost" method as outlined in Article 9 of the
General Conditions, the Contractor shall furnish satisfactory bills, payrolls and vouchers covering all items of
cost, and when requested by the City, give the City access to accounts relating thereto.
NO adjustments will be allowed for fuel cost of asphalt cement.
2.1.14. Right of City to Terminate Contract
If (1) the Contractor or any of his Subcontractors shall be adjudged bankrupt or (2) if he shall make a
general assignment for the benefit of his creditors or (3) if a receiver shall be appointed of his property, or
(4) if the work to be done under this Contract shall be abandoned, or (5) if this Contract or any part hereof
shall be sublet, without the previous written consent of the City, or (6) if the Contract or any claim
thereunder shall be assigned by the Contractor otherwise than as herein specified, or (7) at any time the
City shall certify in writing that the rate of progress of the work or any part thereof is unsatisfactory or (8)
that the work or any part thereof is unnecessarily or unreasonably delayed, or (9) that the Contractor, his
subcontractors, agents or employees have violated any of the provisions of this Contract, or of the plans and
specifications, or construction schedule, the City shall notify Contractor and the Surety, and shall be
entitled immediately to terminate the Contract. The Surety shall have the right to take over and perform
the Contract, provided, however, that if the Surety does not commence performance thereof within ten (10)
days from the date of the mailing to such Surety of notice of termination, the City may take over the work
and prosecute the same to completion by contract or by force account for the account and at the expense
of the Contractor, and the Contractor and his Surety shall be liable to the City for any excess cost
occasioned the City thereby, and in such event the City may take possession of and utilize in completing the
work, such materials, machinery, appliances and plant as may be on the site of the work and necessary
therefore. The Contractor, by signing this Contract, gives to the City in the event of default, right to use
such aforesaid articles to the full extent which they could be used by the Contractor. The City shall not be
liable to the Contractor for trespass or conversion.
All expenses charged under this article shall be deducted and paid for by the City out of money then due to
become due the Contractor under this Contract or any part thereof, and in such account the City shall not
be held to obtain the lowest figures for the work of completing the Contract or any part thereof or for
insuring its proper completion, but all sums actually paid hereafter shall be charged to the Contractor and
his Surety. In case the expenses so charged are less than the sum which would have been payable under this
Contract if the same had been completed by the Contractor, the City shall be entitled to retain the
difference and in case such expenses shall exceed the said sum, the Contractor and his Surety shall pay the
amount of the excess to the City upon completion of the work without further demand being made
therefore.
2.1.15. Construction Schedule
Before any work is begun, the Contractor shall provide to the City a written schedule detailing the order and
manner of doing the work. Before the first partial payment is made, the Contractor shall deliver to the City
an estimated construction progress schedule in form satisfactory to the City, showing the proposed dates of
commencement and completion of each of the various subdivisions of work required under the Contract.
The Contractor shall provide an updated schedule every 30 days.
2.1.16. Payments to the Contractor
During the course of construction, the Contractor shall request payment of work actually performed during
the preceding month. The City will once each month make a progress payment to the Contractor on the
basis of an evaluation of the claim by the City as to amount of work done and that the City has received full
value thereof. In accordance with House Bill 11-1115, the City shall retain five percent (5%) of the value of
the completed work. Retainage shall be held until final completion and acceptance of all work, as part
security for the fulfillment of the Contract by the Contractor. The amount of the progress payments shall be
the balance not retained as aforesaid, after deducting all previous payments and all other sums to be kept
or retained under the provisions of this Contract. The Contractor shall have no right to either terminate the
Contract or to claim damages if he considers partial payments inadequate.
2.1.17. Certificate of Completion
Upon completion of all work whatsoever required including completion of all known defective work, the City
shall file a written certificate with the Contractor as to the entire amount of work performed and
compensation earned by the Contractor including Extra Work and compensation therefore, and including the
date of completion.
2.1.18. Final Payment
After the filing of the Certificate of Completion, the City shall pay to the Contractor in accordance with
applicable Colorado laws (Article 38, Chapter 26, Section 101 Et. Seq. Colorado Revised Statutes) and C.R.S.
38-26-107 (2012), upon authorization of funds disbursement by the City Council the amount therein stated,
less all prior payments and advances whatsoever, to or for the Account of the Contractor. All prior estimates
and payments including those relating to extra work shall be subject to correction by this payment.
2.1.19. Payment Withheld
The City, as a result of subsequent discovered evidence, may withhold or nullify the whole or a part of any
payment to such extent as may be necessary to protect the City from loss on account of:
1. Defective work not remedied.
2. Claims filed or reasonable evidence indicating probable filing of claim.
3. Failure of the Contractor to make payments properly to Subcontractor or for material or labor, or to
comply with laws relative thereto.
4. A reasonable doubt that the Contract can be completed for the balance then unpaid.
5. Damage to another Contractor.
6. Damage to the real or personal property of another and failure to repair or replace the same.
When the grounds for withholding payment have been corrected to the satisfaction of the City, the City
shall proceed to process any amounts due.
2.1.20. Final Payment to Terminate Liability of City
The acceptance by the Contractor of the last payment made as aforesaid under the provisions of Article 19
shall operate as and shall be a release to the City, its officers, or agents from all claims and liability to the
Contractor, his vendors, laborers or Subcontractors for anything done or furnished for, relating to, or for any
act or neglect of the City or of any persons relating to, or affecting the work, except the claim against the
City for the remainder, if any there be, of the amounts kept or retained as provided in Article 17, 19 and 20
of these. Said acceptance shall also operate as a general release of the City by the Contractor.
2.1.21. Effect of Certification and Payment
Neither the certification nor payment made to the Contractor, not partial or entire use or occupancy of the
work by the City shall be an acceptance of any work or materials not in accordance with the Contract. The
making and acceptance of the final payment shall constitute a bar of all claims by the Contractor, except
those previously made in writing and still unsettled.
2.1.22. General Warranty
The Contractor shall guarantee the work against defective materials or workmanship for a period of one (1)
year from the final completion date. Upon discovery of any defects including any damage to other work
resulting, repair and replacement that is required, in the opinion of the City, shall be done immediately by
the Contractor at the Contractor's expense. Should the Contractor fail to repair such defective material
and/or workmanship, or to make replacement within five (5) days after written notice by the City, it is
agreed that the City shall make such repairs and replacements and the actual cost of the required labor and
materials shall be chargeable to and payable by the Contractor.
2.1.23. Responsibility for Work; Priority of Documents
1. Debts and claims: The Contractor shall pay all debts for labor and materials contracted for by him on
account of the work herein contemplated. The Contractor shall assume the defense of, and
indemnify and save harmless, the City and its officers and agents, from all claims relating to labor
and materials furnished for the work; to infringement or alleged infringement of invention patents
and patent rights used in, or in connection with the work or however originating from any of the
work under this Contractor from conditions created thereby; to injuries to any persons or corporation
caused by the acts or negligence of the Contractor or any of his agents or employees, or of any
Subcontractor or any agents or employees of any Subcontractors, in doing the work or in
consequence of any improper materials, implements or labor used therein; and shall fully reimburse
and repay to the City all outlay and expense which the City may incur by reason of his failure to do
so. The Contractor shall satisfy all suits and claims against the City arising from the violation of any
law, ordinance, regulation, order, or decree on the part of the Contractor or any of his agents or
employees, or any Subcontractor, or agent or employees of any Subcontractor; shall fully indemnify
and save harmless the City against and from all cost, loss, and damage which the City may suffer by
reason of his failure to do so; and shall fully reimburse and repay to the City all outlay and expense
which the City may incur in making good any such default. The Contractor shall fully complete the
work required to be done under this Contract, free from all liens and claims of any kind whatsoever.
2. Plans and Specifications: It shall be the duty of the Contractor to carefully study and compare all
drawings, specifications and instructions, visit the project site and acquaint himself with all
conditions, and call to the attention of the City any discrepancy, error, omission or inconsistency
that may exist in the plans or specifications, or between the plans and specifications, or any conflict
between existing conditions and requirements of the plans and specifications. The execution or work
in accordance with the plans, specifications or other instructions will be considered as evidence that
the Contractor is thoroughly familiar with the true intent of the plans, specifications or other
instructions. Change orders will not be issued to cover any cost, loss, or expense for additional labor
or material required to rectify any discrepancies discovered or reported to the City after the
execution of the work, unless the discrepancies are errors in structural, mechanical or electrical
design as determined by the City.
3. Priority of Documents: In case of discrepancy or inconsistency in the terms or conditions of any
documents, the Contract Documents shall have the following order of priority, in accordance with
Subsection 105.09, such that a statement appearing in the document with the higher priority shall
control any inconsistent statement in a document of lower priority. (The following are listed from
the highest priority to the lowest priority):
a. The Agreement
b. Special Provisions
c. Drawings and any notes appearing on the drawings
d. Current edition of CDOT Standard Specifications for Road and Bridge Construction and all
supplements thereto (English Version).
e. General Provisions of the Contract for construction.
2.1.24. Care and Protection of Property
The Contractor expressly undertakes expense:
To assume full responsibility for the preservation of all public and private property, and use every
precaution necessary to prevent damage thereto. If any direct or indirect damage is done to public or
private property or on account of any act, omission, neglect or misconduct in the execution of the work on
the part of the Contractor, such property shall be restored by the Contractor, at their expense, to a
condition similar or equal to that existing before the damage was done, or the Contractor shall make good
the damage in another manner acceptable to the City. No representations are made by or on behalf of the
City concerning the conditions, locations or state of repair or existing sewers, drains, water mains and other
underground structures;
To store any apparatus, materials, supplies, and equipment in such orderly fashion at the site of the work as
will not unduly interfere with the progress of any work by themselves or any other Contractor;
To provide suitable storage facilities for all materials which are liable to injury or exposure to weather,
theft, breakage, or otherwise;
To place upon the work or any part thereof only such loads as are consistent with the safety of that portion
of the work;
To clean up frequently all refuse, rubbish, scrap materials, and debris caused by his operations, to the end
that at all times the site of the work shall present a neat, orderly and workmanlike appearance;
To fully and completely remove all utility markings generated by or as a result of the project from public
rights-of-way utilizing a method that is least destructive to the existing improvements, and which method
has been approved by the City. Should the contractor propose to remove the markings with pressure
washing, all pressure washing runoff and residue shall be contained and collected in accordance with Best
Management Practices and Wheat Ridge Ordinance Chapter 20, Stormwater Quality and Control. Removal of
all markings shall occur no later than twenty (20) days after completion of work.
To remove all surplus material, false work, temporary structures, including foundations thereof, plant of
any description and debris of every nature resulting from his operations, and to put the site in a neat,
orderly condition before final payment;
To affect all cutting, fitting or patching of his work required to make the same to conform to the Plans and
Specifications and, except with the consent of the City, not to cut or otherwise alter the work of any other
Contractor. The Contractor shall not, except after written consent from proper parties enter or occupy with
individuals, tools, materials or equipment, any privately owned land except on easements provided herein.
2.1.25. Lands for Work and Right of Way
The City will provide land, right of way and easements for all work specified in the Contract.
2.1.26. No Damages for Certain Delays
The City may delay the commencement of the work, or any part thereof, if the City shall deem it for the
best interest of the City to do so. The Contractor shall have no claim for damages on account of such delay,
but he shall be entitled to so much additional time in which to complete the whole or any portion of the
work required under this Contract as the City shall certify in writing to be just. The Contractor shall have no
claim for damages on account of any delay on the part of another Contractor. Contractor expressly
acknowledges and accepts the provisions of Section 2 4 of the Code of Laws of the City of Wheat Ridge as
controlling this Project.
2.1.27. Required Provisions Deemed Inserted
Each and every provision of law and clause required by law to be inserted in this Contract shall be deemed
to be inserted herein, and the Contract shall be read and enforced as though it were included herein, and if
through mistake or otherwise, any such provision is not inserted, or if not correctly inserted, then upon the
applications of either party, the Contract shall forthwith be physically amended to make such insertion.
2.1.28. Protection of Lives and Health
The Contractor shall take all necessary precautions for the safety of employees of the work, and shall
comply with all applicable provisions of Federal, State, and Municipal safety laws and building codes to
prevent accidents or injury to persons on, about or adjacent to the premises where the work is being
performed. He shall erect and properly maintain at all times, as required by the conditions and progress of
the work, all necessary safeguards for the protection of workmen and the public and shall post danger signs
warning against the hazards created by the construction such as protruding nails, hod hoists, well holes,
elevator hatchways, scaffolding, window openings, stairways, and failing materials.
The Contractor shall comply with the Department of Labor Safety and Health Regulations for construction
promulgated under the Occupational Safety and Health Act of 1970 (PL 91 596) and under Section 107 of the
Contract Work Hours and Safety Standards Act (PL 19 54).
2.1.29. Wage Rates
The attention of the bidder is called to the requirements and provisions of all applicable laws and any
amendments thereof or additions thereto as to the employment of labor, and to the schedule of any
minimum wage rates established in compliance with such laws. If, after the award of the Contract, it
becomes necessary to employ any person in a trade or occupation not classified in the wage determinations,
such person shall be paid at not less than such rate as shall be determined by the officials administering the
laws mentioned above.
The Contract is subject to the applicable provisions of the Contract Work Hours Standards Act. Public Law 87
581, 87th Congress. No Contractor or Subcontractor contracting for any part of the contract work shall
require or permit any laborer or mechanic to be employed on such work in excess of eight (8) hours in any
calendar day or in excess of forty (40) hours in any work week unless such laborer or mechanic received
compensation at a rate not less than one and one half times his basic rate of pay for all hours worked in
excess of eight (8) hours in any calendar day or in excess of forty (40) hours in such work week, as the case
may be.
2.1.30. Employment of Labor
The Contractor and each Subcontractor shall hire qualified workers for the project who are citizens of the
United States or legal resident aliens with first preference being given, insofar as practicable, to those
having served in the armed forces of the United States and having been honorably discharged or released
from active duty therein.
The Contractor shall employ only competent persons to do the work, and whenever requested in writing by
the City Representative, the Contractor shall discharge any person who commits trespass or is, in the
opinion of the City Representative, disorderly, dangerous, unfaithful, insubordinate, incompetent or
otherwise unsatisfactory.
2.1.31. Sanitary Precautions
Sanitary conveniences for the use of all persons employed on the work, properly screened from public
observation, shall be provided in sufficient numbers in such manner and at such points as shall be approved.
The contents shall be removed and disposed of in a satisfactory manner as the occasion requires. The
Contractor shall rigorously prohibit the committal of nuisances within, on, or about the work. Any
employees found violating these provisions shall be discharged and not again employed on the work without
the written consent of the City Representative.
The Contractor shall supply sufficient drinking water from approved sources to all employees.
The sanitary convenience specified above shall be the obligation and responsibility of the General
Contractor until the completion of the work. The facilities shall be made available to all other Contractors
and Subcontractors.
2.1.32. Sales and Use Tax
Do not include sales or use taxes in your bid. House Bill 1451 provides that Contractors shall make
application with the Colorado State Department of Revenue for a tax exempt number which will be issued
for the duration of the project. This tax exempt number is for State taxes only. The City of Wheat Ridge will
issue its own tax exempt number for local sales tax purposes. An affidavit must be signed by the General
Contractor for such project before the City tax exempt number can be issued. Please be advised that a
supplier is allowed by Colorado law (C.R.S. 39-26-703 (1) to disallow any exemption because the seller is
ultimately responsible for the tax. When a supplier exercises this right, please seek a refund of sales taxes
paid from the appropriate jurisdiction (city or state).
2.1.33. Business License
A business license is required for all Contractors performing work in the City prior to beginning work. Please
contact the City Sales Tax Division to obtain a license.
2.2. INSURANCE
The successful Proposer(s) will be required to execute Certificates of Insurance to be attached to the
executed contract documents and which shall become part of the contract as information documents only.
The certificates shall provide that the insurance shall not be cancelled or terminated prior to completion of
the work and that thirty (30) days’ notice shall be given the City prior to cancellation of policies.
The successful Proposer shall be required to maintain the following insurance coverage:
Certificate Holder:
City of Wheat Ridge
7500 West 29th Avenue
Wheat Ridge, CO 80033
Required
City of Wheat Ridge, its officers and employees must be named as an additional
insured to general liability policy.
Required
All policies as required shall provide a waiver of subrogation in favor of City of
Wheat Ridge.
Required
Workers Compensation - statutory limits provided by an insurance carrier that is
licensed to do business in Colorado. The policy shall contain a Waiver of
Subrogation on behalf of City of Wheat Ridge.
Employer’s liability:
$100,000 each accident
$500,000 disease policy limit
$100,000 disease each employee
Required
Commercial General Liability
$1,000,000 each occurrence
$2,000,000 general aggregate
$1,000,000 personal injury
$2,000,000 products and completed operation aggregate
If applicable to the scope of work, the following shall be included:
-No exclusion for abuse or molestation
-No exclusion for assault and battery
-Liquor liability
Required
Builder’s Risk – The Contractor shall insure 100% of the replacement value of the
work and materials installed and delivered, plus the replacement value of the
work or materials furnished or delivered but not yet paid for by the City, for the
life of the contract on an All-Risk basis, subject to the normal exclusions, terms,
and conditions of the standard Builder’s Risk insurance policy with an insurance
company or companies acceptable to the City. The Contractor shall be responsible
for all damage to the work under construction until acceptance of and release of
responsibility for the work to the City.
Required
Commercial Automobile Liability – including owned, hired, and non-owned
vehicles. (If autos are used in the performance of work under this agreement).
Combined single limit for bodily injury and property damage.
$1,000,000 each accident
Required
Professional Liability/Errors and Omissions
$1,000,000 each claim
$1,000,000 aggregate
Required
The insurance requirements specified by the City shall remain in effect for the full
term of the contract and/or agreement and any extension thereof. Updated
Certificates of Insurance shall be sent to the City during the full term of the
contract and/or agreement and any extension thereof.
Required
Any subcontractors must meet the same insurance requirements for the contract
or purchase order unless Procurement has approved a deviation.
Required
3. CDOT SPECIFICATIONS AND PROVISIONS
3.1. Introduction
CDOT STANDARD SPECIFICATIONS
All work required for the project shall be in accordance with the latest edition of the COLORADO
DEPARTMENT OF TRANSPORTATION (CDOT), Standard Specifications for Road and Bridge Construction, 2026
Edition, unless modified by these Specifications.
CDOT STANDARD SPECIAL PROVISIONS
The CDOT Standard Specifications are modified with the following CDOT Standard Special Provisions.
CDOT PROJECT SPECIAL PROVISIONS
The CDOT Standard Specifications and Standard Special Provisions are modified with the following CDOT
Project Special Provisions.
CITY SPECIAL PROVISIONS
The CDOT Standard Specifications, Standard Special Provisions, Project Special Provisions are modified with
the following City Special Provisions.
4. VENDOR RESPONSES
4.1. Bid Proposal
TABLE 1
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 CLEARING AND GRUBBING 1 LS
2 REMOVAL OF PIPE 15 LF
3 REMOVAL OF CONCRETE MEDIAN
COVER MATERIAL
4 SY
4 REMOVAL OF SIDEWALK 109 SY
5 REMOVAL OF CURB AND GUTTER 211 LF
6 REMOVAL OF CONCRETE CURB
RAMP
32 SY
7 REMOVAL OF CONCRETE
PAVEMENT
32 SY
8 REMOVAL OF ASPHALT MAT 171 SY
9 REMOVAL OF GROUND SIGN 2 EACH
Line Item Description Quantity Unit of
Measure
Unit Cost Total
10 REMOVAL OF SIGN PANEL 4 EACH
11 MUCK EXCAVATION 3 CY
12 POTHOLING (SPECIAL) 16 EACH
13 RESET SIGN PANEL 2 EACH
14 ADJUST MANHOLE 1 EACH
15 HOT MIX ASPHALT (PATCHING)
(ASPHALT)
10 SY
16 CONCRETE PAVEMENT (8 INCH) 7 CY
17 CAISSON (SPECIAL) 58 LF
18 12 INCH REINFORCED CONCRETE
PIPE (CIP)
12 LF
19 TYPE 13 INLET (10 FOOT) 1 EACH
20 FENCE (PLASTIC) 250 LF
21 CONCRETE SIDEWALK (6 INCH) 127 SY
22 CONCRETE CURB RAMP 61 SY
23 CURB AND GUTTER TYPE 2
(SECTION II-B)
216 LF
24 MEDIAN COVER MATERIAL (6 INCH
PATTERNED CONCRETE)
453 SF
25 3 INCH ELECTRICAL CONDUIT
(BORED)
660 LF
26 2 INCH ELECTRICAL CONDUIT
(PLASTIC)
30 LF
27 3 INCH ELECTRICAL CONDUIT
(PLASTIC)
150 LF
28 PULL BOX (24"X36"X18") 4 EACH
29 PULL BOX (30"X48"X24") 1 EACH
Line Item Description Quantity Unit of
Measure
Unit Cost Total
30 WIRING 1 LS
31 LUMINAIRE (LED) 4 EACH
32 SERVICE METER CABINET 1 EACH
33 SIGN PANEL (CLASS I) 81.3 SF
34 PEDESTRIAN SIGNAL FACE (16)
(COUNTDOWN)
8 EACH
35 TRAFFIC SIGNAL FACE (12-12-12) 16 EACH
36 TRAFFIC SIGNAL CONTROLLER AND
CABINET
1 EACH
37 PEDESTRIAN PUSH BUTTON 8 EACH
38 PEDESTRIAN PUSH BUTTON POST
ASSEMBLY
4 EACH
39 FIRE PREEMPTION UNIT AND TIMER 4 EACH
40 INTERSECTION DETECTION SYSTEM
(MIOVISION)
4 EACH
41 TRAFFIC SIGNAL-LIGHT POLE
STEEL (1-20 FOOT MAST ARM)
2 EACH
42 TRAFFIC SIGNAL-LIGHT POLE
STEEL (1-40 FOOT MAST ARM)
1 EACH
43 TRAFFIC SIGNAL-LIGHT POLE
STEEL (1-50 FOOT MAST ARM)
1 EACH
44 TRAFFIC SIGNAL PEDESTAL POLE
(ALUMINUM (10 FOOT)
2 EACH
45 TELEMETRY (FIELD) 1 EACH
46 UNINTERRUPTED POWER SUPPLY 1 EACH
47 CLOSED CIRCUIT TELEVISION
CAMERA (TRAFFIC SURVEILLANCE)
1 EACH
48 TEST FIBER OPTIC CABLE 1 LS
Line Item Description Quantity Unit of
Measure
Unit Cost Total
49 ETHERNET SWITCH 1 EACH
50 CONSTRUCTION SURVEYING 1 LS
51 MOBILIZATION 1 LS
52 MODIFIED EPOXY PAVEMENT
MARKING
5 GAL
53 PREFORMED THERMOPLASTIC
PAVEMENT MARKING (WORD-
SYMBOL)
32 SF
54 PREFORMED THERMOPLASTIC
PAVEMENT MARKING (XWALK-
STOPLINE)
762 SF
55 UNIFORMED TRAFFIC CONTROL 20 HR
56 CONSTRUCTION TRAFFIC CONTROL
(SPECIAL)
1 LS
[*] Denotes item is taxable
Sales Tax (@ 7.9998%)
TOTAL
4.2. Vendor Questionnaire
1. Bid Bond*
Please download the below documents, complete, and upload.
• BID_BOND_FORM.pdf
*Response required
2. Sample Performance Bond
To be completed by awarded vendor at time of award.
• PERFORMANCE_BOND_(1).docx
3. Sample Payment Bond
To be completed at time of award by awarded vendor.
• PAYMENT_BOND_(1).docx
4. Bond Acknowledgement*
By clicking "Please confirm", Contractor acknowledges that they need to:
1. Provide a copy of the Bid bond (uploaded to Bid Bond above), and
2. Either mail-in or drop-off the Original version of the bond to the City of Wheat Ridge
☐ Please confirm
*Response required
5. Sample Notice to Proceed
Please download the below documents for review.
• NOTICE_TO_PROCEED.docx
6. Sample Final Receipt
Please download the below documents for reference.
• FINAL_RECEIPT.docx
7. Sample Agreement
Please download the below documents, complete, and upload.
• Sample_Agreement.pdf
8. Bidder Acknowledgement Form*
Please download the below documents, complete, and upload.
• Bidder_Acknowledgement_Form...
*Response required
9. What is your FEIN/SSN?*
*Response required
10. Certification Statement for Keep Jobs in Colorado Act*
Please download the below documents, complete, and upload.
• Certification_Statement_for...
*Response required
11. Contractor's Qualification Form*
Please download the below documents, complete, and upload.
• Contractor's_Qualification_...
*Response required
12. List of Subcontractors and Amount*
Please download the below documents, complete, and upload.
• List_of_Subcontractors_and_...
*Response required
13. Non-Collusion Affidavit Confirmation*
Bidder confirms they are of lawful age, being duly sworn, on oath says that (s)he is the agent authorized by
the Bidder to submit the attached bid. Affidavit further states that the Bidder has not been a party of any
collusion among Bidders in restraint of freedom of competition by agreement to bid at a fixed price or to
refrain from bidding; or any Federal, State or Municipal official or employees as to quantity, quality, or
price in the prospective Contract, or any other items of said prospective Contract; or in any discussions
between bidders and any Federal, State or Municipal official concerning exchange of money or other thing of
value for special consideration in the letting of a Contract.
☐ Please confirm
*Response required
14. Non-Discrimintation Assurance Affidavit Title VI Regulations at 49CFR Part 21*
Title VI of the Civil Rights Act of 1964 prohibits discrimination of the basis of race, color or national origin
by any entity receiving federal financial assistance.
The City of Wheat Ridge is a recipient of Federal financial assistance and as such, it, as well as all of its
responsible agents, contractors and consultants, is required by the United States Department of
Transportation Title VI Regulations at 49 CFR Part 21 (the Regulations) to assure nondiscrimination. The City
of Wheat Ridge assures that no person shall be excluded from participation in, be denied the benefits of, or
be otherwise subjected to discrimination on the grounds of race, color, or national origin under any program
or activity conducted by the City.
All bidders are hereby notified that the City of Wheat Ridge will affirmatively ensure that disadvantaged
business enterprises will be afforded full opportunity to submit bids in response to all invitations and will
not be discriminated against on the grounds of race, color or national origin in consideration for an award.
This applies to all solicitations for bids for work or material subject to the Regulations, and for all proposals
for negotiated agreements.
The bidder, whose name and signature appear below, certifies and agrees as follows:
1. The bidder shall comply with the provisions of Title VI of the Civil Rights Act of 1964.
2. The bidder assures the City of Wheat Ridge that disadvantaged business enterprises are afforded full
opportunity to submit bids as sub-contractors or sub-consultants and will not be discriminated
against on the grounds of race, color or national origin in consideration for award.
3. The bidder shall comply with all reasonable requests made in the course of an investigation of Title
VI, the Regulations and this assurance by the Colorado Department of Transportation, the US
Department of Transportation or the City of Wheat Ridge, as a sub-recipient of Federal financial
assistance.
4. The bidder agrees that the United States has a right to seek judicial enforcement with regard to any
matter arising under Title VI, the Regulations and this assurance.
☐ Please confirm
*Response required
15. Proposal Form*
Please download the below documents, complete, and upload.
• PROPOSAL_FORM.docx
*Response required
16. Bidder Acceptance*
The Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form
included in the Contract Bid Documents, to complete all Work as specified or indicated in the Contract Bid
Documents for the Contract Sum and within the Contract time indicated in accordance with the Contract Bid
Documents.
Bidder accepts all of the terms and conditions of the Instructions to Bidders. The Bid will remain open for
sixty days after the day of Bid opening. Bidder will sign the Agreement and submit any documents required
by the Contract documents within seven (7) calendar days after notification or the designated date.
By submission of this Bid, each Bidder certifies, and in the case of a joint Bid, each party thereto certifies as
to his own organization, that this Bid has been arrived at independently without consultation, or
communication with any competitor. Every bid submitted to the City shall contain a statement certifying
that the Bidder has not participated in any collusion or taken any action in restraint of free competitive
bidding. This statement shall be in the form of an affidavit provided by the City and included in the Bid
Proposal. The Bidders proposal will be rejected if it does not contain the completed Non-collusion Affidavit.
Bidder agrees to abide by the following federal requirements:
Executive Order No. 11246 as amended, including specifically, the provisions of the Equal Opportunity
Clause, the Immigration Reform and Contract Act of 1986, and the Americans with Disabilities Act of 1991.
United States Department of Transportation Title VI Regulations at 49 CFR Part 21 the Civil Rights Act of
1964, assuring that no person shall on the grounds of race, color, or national origin be excluded from
participation in the opportunity to bid, or be discriminated against in consideration of award of this project.
The Notice to Proceed shall be issued within fourteen (14) days of the execution of the Agreement by the
Owner. Should there be reason why the Notice to Proceed cannot be issued within such period, the time
may be extended by mutual agreement between the Owner and Contractor. If the Notice to Proceed has not
been issued within the period mutually agreed upon, the Contractor may terminate the Agreement without
further liability on the part of either party.
The Owner may make such investigations as he deems necessary to determine the ability of the Bidder to
perform the Work, and the Bidder shall furnish to the Owner all such information and data for this purpose
as the Owner may request. The Owner reserves the right to reject any Bid if the evidence submitted by, or
investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the
obligations of the Agreement.
Bidder has examined the site and locality where the Work is to be performed, the legal requirements
(federal, state and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress,
or performance of the Work and has made such independent investigation as Bidder deems necessary.
Bidder will complete the Work for all accepted bid items.
☐ Please confirm
*Response required
ITEM NUMBER: 1b DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
RESOLUTION NO. 50-2026
TITLE: A RESOLUTION APPROVING A DITCH MAINTENANCE
AGREEMENT WITH THE WATROUS LATERAL DITCH COMPANY
AND AUTHORIZING THE MAYOR TO EXECUTE THE
AGREEMENT FOR IMPROVEMENTS ADJACENT TO THE
ROUTE 32 BUS STOP AT WEST 32ND AVENUE AND KIPLING
STREET
☐PUBLIC HEARING
☐BIDS/MOTIONS
☒RESOLUTIONS
☐ORDINANCES FOR 1st READING
☐ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
The City of Wheat Ridge has been working with RTD to restore bus service along W.
32nd Avenue, including service to Wheat Ridge High School. While RTD reinstated
service on September 27, several bus stop improvements along the route are still
planned.
The most complex improvement is located at the southeast corner of W. 32nd Avenue
and Kipling Street, adjacent to Crown Hill Park. This stop spans both Wheat Ridge and
unincorporated Jefferson County and crosses the Watrous Ditch.
This resolution approves an agreement with the ditch company allowing the city to build
and maintain an accessible path over the ditch to improve access to the boarding area.
It relates to the council action from August 24, 2026, which approved a separate
agreement with Jefferson County for the same bus stop improvements.
PRIOR ACTION:
For several years, the City has worked with the Regional Transportation District (RTD),
Renewal Wheat Ridge (RWR), and Evergreen Development to restore bus service to
western Wheat Ridge by constructing a bus terminal along Clear Creek Drive. As part of that project, Council approved a design contract for the bus terminal in September 2024
Council Action Form – Ditch Agreement for Route 32 bus stop improvements
October 26, 2026
Page 2
and a construction contract in October 2025. The bus terminal was completed and
opened in early summer 2026.
RTD alerted city staff to the substandard conditions of other Route 32 bus stops in late
2025, and an inter-agency staff team has been meeting monthly to resolve those
deficiencies. On August 24, 2026, City Council approved an IGA with Jefferson County
to memorialize shared costs and shared maintenance obligations of the 32nd Avenue
and Kipling Street bus stop improvements. FINANCIAL IMPACT:
The estimated cost of these bus stop improvements and the associated ADA-
accessible trail connection is approximately $22,000. Jefferson County Parks & Open Space (JCPOS) has awarded $11,000 through the 2026 Trails Partnership Program. The
City will cover the remaining project cost from the CIP budget.
BACKGROUND:
The City has been working with RTD for several years to restore transit service to
western Wheat Ridge, including direct bus service to Wheat Ridge High School, which
was previously served by Route 32. The Clear Creek Crossing Transfer Center was an
important component of this effort and was completed earlier this year through a
partnership between RTD, the City, Renewal Wheat Ridge, and Evergreen (the Clear Creek Crossing master developer).
For several years, Route 32 service has terminated at Wadsworth Boulevard. RTD has
approved extending the route west to the Clear Creek Crossing Transfer Center as part
of its September 2026 service change. Before service can be restored, several bus stops along 32nd Avenue must be upgraded to meet current ADA accessibility
requirements. RTD does not have the resources to complete these improvements and
has sought partnership from the adjacent jurisdictions.
The bus stop at West 32nd Avenue and Kipling Street is located adjacent to Crown Hill Park and presents some design and coordination challenges. The proposed
improvements include a bus boarding area and an ADA-accessible concrete connection
to the Outer Loop Trail within Crown Hill Park. Because the project crosses both City
right-of-way and County property, the City has coordinated with JCPOS and Jefferson
County to establish the necessary property access and maintenance responsibilities.
The project also crosses the Watrous Ditch which is an open-channel irrigation ditch
that parallels W. 32nd Avenue. Because there are no sidewalks along the south side of
W. 32nd Avenue, the proposed bus stop design connects the boarding zone to the paved
pathway within Crown Hill Park. Such design requires a paved sidewalk to cross the ditch, and such crossing requires approval by the Watrous Ditch company in the form of
a Ditch Maintenance Agreement. City staff have coordinated with the ditch company to
Council Action Form – Ditch Agreement for Route 32 bus stop improvements
October 26, 2026
Page 3
create this agreement and will continue coordination through the completion of design
and construction. The proposed design is attached.
If approved, the city intends to complete the improvements as quickly as possible.
Under the partnership, the City will be responsible for construction and maintenance of
the concrete improvements and for maintenance of the Watrous Ditch crossing.
Jefferson County will be responsible for ordinary maintenance of the concrete trail,
including debris removal, vegetation management, snow removal, and minor surface repairs.
RECOMMENDATIONS:
Staff recommend approval and execution of the Ditch Maintenance Agreement for the
construction and maintenance of the RTD Route 32 bus stop and ADA-accessible trail
connection at West 32nd Avenue and Kipling Street.
RECOMMENDED MOTIONS:
“I move to approve Resolution No. 50-2026, a resolution approving a Ditch Maintenance
Agreement with the Watrous Lateral Ditch Company and authorizing the Mayor to
execute the agreement for improvements adjacent to the Route 32 bus stop at West 32nd Avenue and Kipling Street.”
Or
“I move to postpone indefinitely Resolution No. 50-2026, a resolution approving a Ditch Maintenance Agreement with the Watrous Lateral Ditch Company and authorizing the
Mayor to execute the agreement for improvements adjacent to the Route 32 bus stop at
West 32nd Avenue and Kipling Street, for the following reasons…”
REPORT PREPARED/REVIEWED BY:
Lauren Mikulak, Community Development Director
Rocky Macsalka, Engineering Manager
Patrick Goff, City Manager
ATTACHMENTS:
1. Resolution 50-2026
2. Ditch Maintenance Agreement
3. Diagram of Bus Stop and Improvements
ATTACHMENT 1
CITY OF WHEAT RIDGE, COLORADO
RESOLUTION NO. 50
SERIES OF 2026
TITLE: A RESOLUTION APPROVING A DITCH MAINTENANCE
AGREEMENT WITH THE WATROUS LATERAL DITCH COMPANY AND
AUTHORIZING THE MAYOR TO EXECUTE THE AGREEMENT FOR
IMPROVEMENTS ADJACENT TO THE ROUTE 32 BUS STOP AT WEST
32ND AVENUE AND KIPLING STREET
WHEREAS, the City of Wheat Ridge (“City”) has worked with the Regional Transportation District (“RTD”) to restore Route 32 bus service to western Wheat Ridge,
including service to Wheat Ridge High School and the Clear Creek Crossing Transfer Center; and
WHEREAS, RTD approved extending Route 32 to the Clear Creek Crossing Transfer
Center, and provided such service as part of their September 2026 service change; and
WHEREAS, the extension of Route 32 warrants improvements to existing bus
stops between Wadsworth Boulevard and Youngfield Street to meet current Americans with Disabilities Act (“ADA”) accessibility standards; and
WHEREAS, the City, RTD, Jefferson County, Jefferson County Parks & Open Space,
and the Watrous Lateral Ditch Company have coordinated to develop accessibility
improvements for the Route 32 bus stop at West 32nd Avenue and Kipling Street,
adjacent to Crown Hill Park; and
WHEREAS, the proposed improvements include an accessible boarding area and
an accessible path connecting the bus stop to the Crown Hill Park trail system; and
WHEREAS, such path requires the crossing of the Watrous Lateral Ditch, requiring
an Agreement between the City and the Watrous Lateral Ditch Company to authorize the
City to access the ditch, construct the improvements, and perform applicable maintenance; and
WHEREAS, the City Council finds that approval of the Agreement is in the best
interest of the City and its residents.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF CITY OF WHEAT
RIDGE, COLORADO THAT:
ATTACHMENT 1
Section 1. The appropriate City Officials are hereby authorized to finalize and
execute the Agreement by and between the City of Wheat Ridge and the Watrous Ditch
Company regarding the ditch crossing and bus stop improvements.
Section 2. If any section, paragraph, clause, or provision of this Resolution shall
for any reason be held to be invalid or unenforceable, the invalidity or unenforceability of
any such section, paragraph, clause, or provision shall not affect any of the remaining
provisions of this Resolution.
Section 3. This Resolution shall be in full force and effect upon its passage and approval.
DONE AND RESOLVED this 26th day of October 2026.
Korey Stites, Mayor
ATTEST:
Janeece Hoppe, City Clerk
ATTACHMENT 2
DITCH MAINTENANCE AGREEMENT
THIS DITCH MAINTENANCE AGREEMENT (“Agreement") is entered into as of the 26th
day of October, 2026 by and between the Watrous Lateral Ditch Company (the “WLDC”), a
Colorado nonprofit corporation, located in Wheat Ridge, Colorado and the City of Wheat Ridge,
Colorado whose address is 7500 W. 29th Avenue, Wheat Ridge, Colorado 80033 (the “City");
together, the “Parties.”
RECITALS
A. The WLDC maintains an agricultural irrigation ditch (the “WL Ditch”) located in
part on the Crown Hill Park property (the “Park”), which ditch runs adjacent to a proposed RTD
bus stop at the northwest corner of the Park.
B. The City has agreed with Jefferson County Open Space, the owner and operator
of the Park, in connection with the City’s construction of a concrete trail segment serving the RTD
bus stop, to enclose a portion of the ditch (the “Ditch Segment A”) in a buried pipe, and to
maintain the Ditch Segment A, upon the terms and conditions set forth below.
C. The WLDC supports the installation of a culvert structure in the Ditch Segment A
that allows the water to continue to flow freely through the WL Ditch, with no financial or
maintenance burden both immediate and long term to the WLDC, while providing for access
between the concrete trail through the Park and the proposed RTD bus stop on W. 32nd Avenue.
D. The map attached hereto as Exhibit A and fully incorporated herein by this
reference depicts the area of responsibility for ditch piping and maintenance of the Ditch
Segment A imposed upon the City.
E. The City has requested WLDC’s permission to enter upon and use Ditch Segment
A for the limited purposes described in this Agreement.
NOW, THEREFORE in consideration of the mutual promises and covenants contained herein, the
sufficiency of which is acknowledged and confessed, the parties agree as follows:
1. License. WLDC grants the City and its employees, agents, contractors, consultants,
and representatives a limited, non-exclusive license to enter upon and use Ditch Segment A solely
as necessary to perform the City’s obligations under this Agreement. The rights granted under
this Agreement are a license only and do not create or convey any easement, ownership interest,
right-of-way, prescriptive right, or other interest in real property or in the WL Ditch. The City shall
not materially expand, relocate, assign, transfer, or modify its use of Ditch Segment A without
WLDC’s prior written consent.
2. Responsibilities of the City.
a. The City agrees, at its sole cost and expense, to provide a design and construct a
buried concrete pipe for that portion of the ditch shown as "Ditch Segment A" on Exhibit
-2-
A. The City shall provide the construction plans for this work to WLDC for prior review and
written approval.
b. The City shall, at its sole cost and expense, provide promptly all maintenance,
repairs and replacements of the Ditch Segment A such that the water in the WL Ditch
continues to flow freely and unimpeded. The City’s obligations under this Section shall
continue for so long as the buried pipe and related improvements remain in place.
3. Responsibilities of the WLDC.
a. The WLDC shall permit the City to perform the installation, maintenance, repairs
and replacement of the Ditch Segment A as described herein, subject to the terms of this
Agreement.
b. The WLDC shall review and provide written comments or approval of the detailed
written construction plans for the Ditch Segment A pipe construction within 7 days of the
same being provided to WLDC for review. The City agrees to review and revise such
construction plans as needed until WLDC has approved them in writing. The City agrees it
will not commence any work on Ditch Segment A until it has obtained such written approval
from WLDC.
c. The WLDC agrees to notify the City in advance of its schedule for routine
maintenance of the ditch, in recognition of the fact that such maintenance may affect the
City’s obligations with respect to the Ditch Segment A. Nothing in this Agreement shall limit
WLDC’s right to access, operate, maintain, repair, or use the WL Ditch, and the City’s rights
under this Agreement shall remain subject to WLDC’s continued ditch operations.
4. Insurance. The parties agree to continuously maintain in force adequate policies
of insurance to cover liability for their actions to be undertaken under this Agreement. Each party
shall supply a certificate of insurance to the other upon request. The parties agree that the City's
participation in the Colorado Intergovernmental Risk Sharing Agency (CIRSA) shall satisfy its
obligation to maintain insurance under this paragraph. The parties acknowledge that provisions
of this paragraph are not intended to waive any of the rights and defenses afforded the City under
the Colorado Governmental Immunity Act, Section 24-10-101, et. seq., and afforded the WLDC
under Colorado law. Each party shall be responsible for its own negligent acts and omissions.
5. Compliance with Colorado Constitution. TABOR. Colorado Constitution, Article X,
Section 20. Notwithstanding other provisions in this Agreement to the contrary, the Parties
understand and acknowledge that the City is subject to Article X, § 20 of the Colorado
Constitution ("TABOR").
a. The parties do not intend to violate the terms and requirements of TABOR by the
execution of this Agreement.
b. It is understood and agreed that this Agreement does not create a multi-fiscal year
direct or indirect debt or obligation within the meaning of TABOR and, therefore,
-3-
notwithstanding anything in this Agreement to the contrary, all payment obligations of the
City are expressly dependent and conditioned upon the continuing availability of funds
beyond the term of the City’s current fiscal period ending upon the next succeeding
December 31.
c. Financial obligations of the City payable after the current fiscal year are contingent
upon funds for that purpose being appropriated, budgeted, and otherwise made available
in accordance with ordinances and resolutions of the City and other applicable law.
d. Notwithstanding any other provision of this Agreement concerning termination,
upon the City’s failure to appropriate such funds for construction, the Agreement shall
automatically terminate.
6. Notices. All notices required or permitted pursuant to this Agreement shall be in
writing and delivered to the parties via United States Mail first class postage prepaid, or personal
hand delivery at the following addresses:
If to the City: Kent Kisselman, Director
Public Works
City of Wheat Ridge
11220 W. 45th Avenue
Wheat Ridge, CO 80033
With a copy to: Gerald Dahl, City Attorney
City of Wheat Ridge
7500 W. 29th Avenue
Wheat Ridge, CO 80033
If to the WLDC: Betsy Coppock, President
Watrous Lateral Ditch Company
_____________________________
Wheat Ridge, CO 80215
With a copy to: Gloria Harnish, Secretary / Treasurer
Watrous Lateral Ditch Company
_____________________________
Wheat Ridge, CO 80215
Either party may change its address or designated recipient for notice by providing written notice
to the other party in the manner specified above. Such change shall be effective five (5) business
days after the date of delivery of the notice.
-4-
7. Governing Law. The parties agree that the laws of the state of Colorado shall
govern the interpretation of this Agreement, and that jurisdiction and venue for any litigation
interpreting or enforcing this Agreement shall be proper and exclusive in the District Court for
Jefferson County, Colorado.
8. Entire Agreement; Amendment; Termination; Recording. This Agreement
represents the entire agreement of the parties on the subjects addressed herein. No prior or
subsequent oral or written communications between the parties shall be deemed to affect or
amend this Agreement unless reduced to writing as an amendment hereto and executed by both
parties, except as otherwise set forth in Section 6 above. This Agreement may be terminated only
upon the basis of non-appropriation by the City or breach of the terms hereof, upon written
notice from the non-breaching party to the other, who shall have 15 days to cure the breach
before termination may occur. This Agreement shall be filed for record with the Jefferson County
Clerk and Recorder for notice purposes only, and such recording shall not alter the limited license
granted under Section 1. In the event of a termination of this Agreement, the parties agree to
promptly execute and record an agreement documenting such termination, and the City agrees
to restore Ditch Segment A to its pre-Agreement condition prior to and as a condition of the
effectiveness of such termination agreement.
-5-
IN WITNESS WHEREOF the parties have executed this Agreement as of the day and year first
above written.
WATROUS LATERAL DITCH COMPANY
By:
Betsy Coppock, President
CITY OF WHEAT RIDGE, COLORADO
By:
Korey Stites, Mayor
ATTEST:
Janeece Hoppe, City Clerk
-6-
EXHIBIT A
Ditch Segment A and Vicinity
[attached]
ATTACHMENT 3 - DIAGRAM OF BUS STOP IMPROVEMENTS
PROJECT LOCATION MAP
PROPOSED BUS STOP LOCATION
ATTACHMENT 3 - DIAGRAM OF BUS STOP IMPROVEMENTS
PRE
L
I
M
I
N
A
R
Y
D
E
S
I
G
N
ITEM NUMBER: 1c
DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
RESOLUTION NO. 51-2026
TITLE: A RESOLUTION OF SUPPORT FOR AN APPLICATION TO THE
JEFFERSON COUNTY PARKS AND OPEN SPACE LAND
CONSERVATION PARTNERSHIP PROGRAM FOR THE
ACQUISITION OF 2.71-ACRES OF THE WILMORE-DAVIS
PROPERTY
☐PUBLIC HEARING ☐BIDS/MOTIONS ☒RESOLUTIONS
☐ORDINANCES FOR 1st READING ☐ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
The Parks and Recreation and Community Development Departments seek to apply for
funding from the Jefferson County Parks and Open Space (JCPOS) Land Conservation
Partnership Program to purchase the Wilmore-Davis property from Jefferson County
Public Schools.
The program will fund up to 25%, of the cost of land acquisition, (estimated at $22,500),
provided the land becomes a public park or open space area. Should the acquisition
receive county funding, a reverter will be added to the property deed which would allow
the county to take ownership of the land and preserve it as a public park if the City ever
desired to sell it.
A resolution of support is required from City Council to apply for this funding program.
PRIOR ACTION:
At the September 14, 2026, meeting, Council approved Purchase and Sale Agreements
(PSAs) to acquire the Wilmore Davis Elementary School property from Jefferson County Public Schools. The agreements allow the city to retain 2.71 acres and subsequently
sell the remainder to Spectra Centers.
Council Action Form –JCPOS Land Conservation Partnership Program Application October 26, 2026
Page 2
FINANCIAL IMPACT:
The purchase price for the land, included in the PSAs, nets to a $90,000 cost to the City
for the 2.71 acres. Other associated costs, including closing costs, fence improvements,
and broker fees are not eligible for reimbursement. The current timeline is for this transaction to close in December 2026, which is the budget year this expense would be
incurred. The Parks and Recreation Department has park acquisition funds budgeted in
2026 for this acquisition.
Upon closing, the City has also committed to funding a portion of the closing costs,
broker fees, and a fence to divide the park from the Spectra Centers facility totaling approximately an additional $210,000. These costs are not eligible for reimbursement.
If Council passes this Resolution and the grant application eventually awards the
requested $22,500 in funding, that funding would be reimbursed from the County to the
City after the acquisition closes.
Should this land be acquired, there would be additional short-term and long-term city costs. Short-term (2-5 years out) costs include community engagement about future
park amenities, designing selected amenities and ADA-compliant access, and
constructing those amenities and access routes. These amenities could include a
soccer field, playground, picnic pavilion, or other options. Longer-term costs include
maintenance of the new park both for the amenities themselves and general park maintenance.
BACKGROUND:
Jefferson County Public Schools closed Wilmore-Davis Elementary at the end of the
2022-2023 school year as part of their consolidation process. Since then, the district has worked with the City to identify potential acquisition and redevelopment partners.
Spectra Centers was selected as the preferred acquisition partner, and PSAs have been
approved by Council to acquire the Wilmore-Davis Property and subsequently sell the
building, parking lots, and approximately 4.5 acres to Spectra Centers. This retains 2.71
acres as city parkland.
Residents have consistently expressed support for the City acquiring part of the
Wilmore-Davis grounds to preserve the space as public-access parkland through the
Let’s Talk program, surveys, and City Plan and Parks and Recreation Pathway
engagement.
RECOMMENDATIONS:
Staff recommend passing this Resolution to make a Jefferson County Parks and Open
Space funding request eligible for County consideration.
Council Action Form –JCPOS Land Conservation Partnership Program Application October 26, 2026
Page 3
An alternative is to continue pursuing acquisition of this property, but without
requesting county support funding nor the associated reverter.
RECOMMENDED MOTION:
“I move to approve Resolution No. 51-2026, a Resolution of Support for an application to the Jefferson County Parks and Open Space Land Conservation Partnership Program
for the acquisition of 2.71 acres of the Wilmore Davis property.”
Or,
“I move to postpone indefinitely Resolution 51-2026, A Resolution of Support for an
Application to the Jefferson County Parks and Open Space Land Conservation Partnership Program for the acquisition of 2.71 acres of the Wilmore Davis property for
the following reason(s).”
REPORT PREPARED/REVIEWED BY:
Brandon Altenburg, Parks and Recreation Deputy Director
Lauren Mikulak, Community Development Director
Karen O’Donnell, Parks and Recreation Director
Patrick Goff, City Manager
ATTACHMENTS: 1. Resolution No. 51-2026
2. Jefferson County Parks and Open Space Land Conservation Program Flyer
3. Wilmore Davis – Aerial and Lot Size – Proposed Division (aerial image)
ATTACHMENT 1
CITY OF WHEAT RIDGE, COLORADO
RESOLUTION NO. 51
SERIES OF 2026
TITLE: A RESOLUTION OF SUPPORT FOR AN APPLICATION TO THE
JEFFERSON COUNTY PARKS AND OPEN SPACE LAND
CONSERVATION PARTNERSHIP PROGRAM FOR THE ACQUISITION
OF 2.71-ACRES OF THE WILMORE-DAVIS PROPERTY
WHEREAS, multiple recent public engagement campaigns, including the Let’s Talk program, the City Plan, and the Parks and Recreation Pathway, documented that residents
in the neighborhood surrounding Wilmore-Davis desire the preservation of the school
grounds as public parkland; and
WHEREAS, the City of Wheat Ridge, Colorado (the “City”) is in the process of
acquiring 2.71 acres of the Wilmore-Davis school grounds from Jefferson County Public Schools, with the remainder of the property being sold to Spectra Centers; and
WHEREAS, the school district is interested in selling this land to the City; and
WHEREAS, the Jefferson County Open Space Land Conservation Partnership
Program exists as a potential funding and partner resource for open space and parkland
acquisition and the City desires to submit an application to this program to request funds to potentially acquire the 2.71 acres; and
WHEREAS, City Council supports a funding application to the Jefferson County
Open Space Land Conservation Partnership Program to request funding to acquire the
2.71-acres.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF CITY OF WHEAT RIDGE, COLORADO THAT:
Section 1. The Mayor or the City Manager of the City or any other member of
the City Council and all appropriate City officers are hereby authorized and directed to
execute and deliver and the City Clerk is hereby authorized and directed to attest and
deliver such other agreements and certificates and to take such other actions as may be necessary or convenient to carry out and give effect to the Assignment and this
Resolution.
Section 2. Nothing contained in this Resolution, or the Assignment shall
constitute a debt, indebtedness, or multiple-fiscal year direct or indirect debt or other
financial obligation of the City within the meaning of the Constitution or statutes of the
ATTACHMENT 1
State or the home rule charter of any political subdivision thereof, nor give rise to a
pecuniary liability of the City or a charge against its general credit or taxing powers.
Section 3. If any section, paragraph, clause, or provision of this Resolution shall for any reason be held to be invalid or unenforceable, the invalidity or unenforceability of
any such section, paragraph, clause, or provision shall not affect any of the remaining
provisions of this Resolution.
Section 4. This Resolution shall be in full force and effect upon its passage
and approval.
DONE AND RESOLVED this 26th of October 2026
[SEAL] Korey Stites, Mayor
ATTEST:
Janeece Hoppe, City Clerk
Jefferson County Open Space (JCOS) will fund up to 25% of local or up to 50% of
regional open space, park, trail corridor, or greenway acquisition projects. All 12 cities/
towns and 12 districts that provide public park and recreation services in Jefferson
County are eligible to apply. Land Trusts, conservation organizations, and other non-
profit community group applications are considered on a case-by-case basis.
Jeffco Open Space
Land Conservation Partnership Program
PROPOSAL
PROCESS
-Serves immediate neighborhood or community
such as a neighborhood park
-Greenway Enhancements along local trails
Local Project Examples
-Public access serves more than one community or visitors from
multiple jurisdictions
-Multiple partners (two+ jurisdictions or organizations)
-Property draws visitors from larger surrounding area
-Property is a priority in multiple Master Plans
-Important habitat for a species of concern or Threatened/Endangered species
-Lands that increase access for residents within a 10-minute walk or drive
-Fee or easement acquisitions that connect to a regional trail
Regional Project Examples
1. Contact JCOS
2. Submit Proposal
3. Proposal Review
4. Notification
Discuss eligibility, readiness,
and determine if project is
local or regional.
Include project description,
maps, budget (including
requested amount and
potential and secured
match), maintenance plan,
and resolution from
governing board.
Award letter with JCOS
funding amount, due
diligence checklist, JCOS
Fund Recognition Guide,
Jeffco Open Space Reverter
Requirement, and a project
completion deadline within
two years of award date.
Applicants will be notified if
their project is not selected.
Proposals may be submitted at
anytime when the acquisition
is coming to fruition.
25%
50%
ELIGIBILITY
Hillary Merritt
Deputy Director
hmerritt@jeffco.us
303.271.5948
up to
up to
JCOS Funding
JCOS Funding
Jeffco Open Space staff
and Open Space Advisory
Committee reviews and
recommends proposals.
The Board of County
Commissioners gives
final approval.
ATTACHMENT 2
Wilmore-Davis Subdivision -24' Fire
ATTACHMENT 3
ITEM NUMBER: 2
DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
COUNCIL BILL NO. 18-2026
TITLE: AN ORDINANCE AMENDING CHAPTER 11 OF THE WHEAT
RIDGE CODE OF LAWS THROUGH ADOPTION OF A NEW
ARTICLE IV TO AUTHORIZE AND REGULATE COMMUNAL
OUTDOOR DINING AREAS
☒PUBLIC HEARING ☐BIDS/MOTIONS ☐RESOLUTIONS
☐ORDINANCES FOR 1st READING
☒ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
Wheat Ridge businesses have expressed interest in sharing outdoor dining areas where
customers may consume food and alcoholic beverages from participating
establishments. The City’s Code of Laws does not currently establish a local application process or operating standards for Communal Outdoor Dining Areas (CODAs). Council
Bill No. 18-2026 would establish this framework, including application requirements,
operating standards, public safety measures, and enforcement authority, consistent with
state law. City Council is asked to consider the ordinance on second reading. Adoption
would allow eligible businesses to seek approval for a CODA; each proposed location would require separate state and local approvals.
PRIOR ACTION:
At the September 14, 2026 Special Study Session, City Council reviewed the proposed CODA framework and provided consensus to bring the ordinance forward for formal consideration. On September 28, 2026, City Council approved this ordinance on first reading by a vote of 8-0 with a motion by Councilmember Wood and a second by
Councilmember Quinn.
FINANCIAL IMPACT:
The proposed ordinance does not establish specific CODA fee amounts. The proposed
fees are expected to be incorporated into the City’s fee schedule and adopted by
resolution as part of the 2027 budget adoption scheduled on November 23, 2026.
Council Action Form – Communal Dining Areas Date: October 26, 2026
Page 2
The proposed fee structure is intended to reasonably offset the City’s costs associated
with application review and subsequent modifications without creating an unnecessary
barrier to participation. Separate existing fees may also apply when a proposal requires
use of public property, a right-of-way permit, a special event permit, a building or fire permit, or another City approval.
BACKGROUND:
Colorado law, C.R.S. § 44-3-912, allows two or more eligible liquor licensees, including an approved sales room, to share a communal outdoor area for food and alcohol beverage
service, subject to approval by the state and local licensing authorities. Participating
licensees must receive approval to attach their liquor licenses to the CODA and modify
their licensed premises to include the shared area.
The Wheat Ridge Code of Laws does not currently establish a local application process
or operating standards for CODAs. Staff began evaluating a local framework in response
to interest from local businesses seeking a lawful mechanism for adjacent liquor
licensees to share outdoor dining space. The proposed ordinance would establish that
local framework while retaining state licensing requirements and City oversight.
Fee Type Proposed Fee Description
Initial CODA Application $150 Plan, Security and Control Plan, and other
Attachment/Modification of Premises participating Applies to each liquor licensee attaching its licensed premises to the CODA.
Material Amendment to an Approved CODA $100 boundaries, hours, security, or significant
No fee
Annual CODA Renewal No separate fee applicable annual liquor license renewal
Other Required Permits or Approvals Applicable existing fee property, special events, right-of-way,
Council Action Form – Communal Dining Areas Date: October 26, 2026
Page 3
Adoption of the ordinance would not approve any specific CODA. Each proposed CODA
would remain subject to the applicable state and local application and approval
requirements.
Application and Approval Process
Under the proposed ordinance, applicants would submit a CODA application to the City
Clerk. The application would include identification of participating licensees, a detailed Site Plan,
documentation of the right to occupy and control the proposed area, a unified Security
and Control Plan, proposed operating hours, insurance documentation, sanitation and
maintenance information, and information regarding any proposed use of public property.
Applications may be routed to appropriate City departments and reviewing agencies.
Routine applications may be handled administratively by the City Clerk on behalf of the
Local Licensing Authority. Matters involving unresolved compliance or public safety
issues, neighborhood impacts, discretionary use of public property, or other significant concerns may be referred to the Liquor License Authority for a public hearing and
determination. The City may also require notice when warranted by the circumstances of
an application.
Operating and Public Safety Requirements
Each approved CODA would operate under a unified Security and Control Plan binding on
all participating licensees and persons acting on their behalf. The plan would address
supervision, security, alcohol control, boundary control, access, signage, sanitation,
incident response, communication among participating licensees, and communication with City and emergency personnel.
The Security and Control Plan would include procedures for supervising the CODA,
controlling its boundaries, preventing alcohol beverages from leaving the CODA or
alcohol beverages purchased outside the CODA from being brought into the CODA,
addressing violations and incidents, and maintaining sanitation and cleanup procedures.
Insurance and Use of Public Property
Each participating licensee would be required to obtain insurance covering the entire
CODA before final approval and maintain that coverage while participating. The proposed
minimums are $1 million per occurrence and $2 million aggregate for commercial general liability coverage, and $1 million per occurrence or common cause and $1 million
aggregate for liquor liability coverage.
Approval of a CODA would not independently authorize the use of City-owned property or
public right-of-way. Any proposed use of public property would require separate City authorization and the City may impose conditions reasonably necessary for such use.
Council Action Form – Communal Dining Areas Date: October 26, 2026
Page 4
Enforcement The proposed ordinance provides inspection, suspension, revocation, nonrenewal, and emergency closure authority. The Liquor Licensing Authority may suspend, revoke, refuse
to renew, or impose conditions on a CODA approval. The Chief of Police or Fire Marshal
may order the immediate temporary closure or emergency suspension of all or any
portion of a CODA when necessary to address an imminent or existing threat to public
health, safety, or welfare. The City may also recover certain costs associated with closing, securing, correcting, restoring, or reopening a CODA to the extent permitted by law.
RECOMMENDATIONS:
Staff recommend approval of Council Bill No. 18-2026 on second reading.
RECOMMENDED MOTION:
“I move to approve Council Bill No. 18-2026, an ordinance amending Chapter 11 of the Wheat Ridge Code of Laws through the adoption of a new Article IV to authorize and
regulate Communal Outdoor Dining Areas, order it published on second reading to take
effect immediately.”
Or,
“I move to postpone indefinitely Council Bill No. 18-2026, an ordinance concerning
Communal Outdoor Dining Areas, for the following reasons:”
REPORT PREPARED/REVIEWED BY:
Wyatt Peterson, Assistant to the City Manager
Marianne Schilling, Deputy City Manager
Jerry Dahl, City Attorney Patrick Goff, City Manager
ATTACHMENTS:
1. Council Bill No. 18-2026
CITY OF WHEAT RIDGE, COLORADO
COUNCIL BILL NO. 18 ORDINANCE NO. 1851
Series 2026
TITLE: AN ORDINANCE AMENDING CHAPTER 11 OF THE WHEAT RIDGE CODE OF LAWS THROUGH THE ADOPTION OF A
NEW ARTICLE IV TO AUTHORIZE AND REGULATE
COMMUNAL OUTDOOR DINING AREAS
WHEREAS, the City of Wheat Ridge, Colorado (“City”), is a home rule municipality duly organized and existing under Article XX of the Colorado Constitution and the Wheat Ridge Home Rule Charter; and
WHEREAS, pursuant to its home rule authority, the City, acting through its City Council (“Council”) is authorized to adopt ordinances necessary and proper to protect and promote the public health, safety, and welfare; and
WHEREAS, C.R.S. § 44-3-912 authorizes a communal outdoor dining area to be shared by two or more persons licensed for on-premises consumption, including an approved
sales room, subject to approval by the state and local licensing authorities; and
WHEREAS, C.R.S. § 44-3-912 requires state and local licensing authority approval before a licensee may attach its liquor license to a communal outdoor dining area and modify its licensed premises to include the communal outdoor dining area; and
WHEREAS, the Council finds that communal outdoor dining areas (“CODAs”) may
support local businesses, encourage outdoor dining, promote pedestrian-oriented
commercial activity, and provide a practical tool for shared outdoor food and alcohol beverage service among eligible licensees; and
WHEREAS, the Council further finds that CODAs require clear local standards governing application review, premises control, security, alcohol service, sanitation, insurance,
signage, operations, use of public property, and enforcement; and
WHEREAS, the City Council finds and determines that adoption of regulations concerning CODAs is in the best interests of the City and necessary for the preservation and protection of the public health, safety, and welfare.
NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF WHEAT RIDGE, COLORADO:
Section 1. Chapter 11 of the Code, concerning licensing, is hereby amended through the addition of a new Article IV concerning communal outdoor dining areas, to read in its entirety as follows:
ATTACHMENT 1
ARTICLE IV. COMMUNAL OUTDOOR DINING AREAS
Sec. 11-100. - Definitions.
For purposes of this Article, the following words and phrases shall have the
meanings set forth below. Words and phrases not defined in this Article shall have the meanings set forth in the Colorado Liquor Code, the Colorado Beer Code, applicable state liquor regulations, and the Wheat Ridge Code of Laws.
Attached Licensee means an eligible Licensee whose license has been
approved by the state and Local Licensing Authorities to attach to a Communal Outdoor Dining Area and whose licensed premises have been approved by the state and Local Licensing Authorities to include the Communal Outdoor Dining Area.
Chief of Police means the Chief of Police of the City of Wheat Ridge or the
Chief’s designee.
City means the City of Wheat Ridge, Colorado.
City Clerk means the City Clerk of the City of Wheat Ridge or the City Clerk’s designee.
City Manager means the City Manager of the City of Wheat Ridge or the
City Manager’s designee.
Eligible Licensee means a person or entity licensed for on-premises consumption under Article 3 or Article 4 of Title 44, C.R.S., including an approved sales room, that is eligible under state law to attach its license to a Communal Outdoor Dining Area.
Licensee means a person or entity holding a valid state and local license or permit issued under the Colorado Liquor Code or Colorado Beer Code.
Local Licensing Authority means the City’s local Liquor Licensing Authority, including the City Clerk when acting administratively on behalf of the Local Licensing Authority and the Liquor Licensing Authority when a matter is
referred for hearing or otherwise assigned to the Liquor Licensing Authority under the Wheat Ridge Code of Laws.
Public Property means any real property, facility, street, alley, sidewalk, plaza, park, trail, right-of-way, parking area, or other property owned, leased, controlled, operated, or maintained by the City.
Security and Control Plan means the written plan approved by the state and Local Licensing Authority governing supervision, security, alcohol control, boundary control, access, signage, sanitation, communication with licensees and City and emergency personnel, and management of a Communal Outdoor Dining Area.
Site Plan means a scaled or dimensioned drawing, diagram, or exhibit, in a form acceptable to the City Clerk, depicting the proposed Communal Outdoor Dining Area and surrounding area. At a minimum, the Site Plan
shall identify the proposed boundaries of the Communal Outdoor Dining Area, adjacent Licensed Premises, entrances and exits, barriers or boundary-control measures, tables, seating, service areas, pedestrian routes, emergency access, accessible routes, sidewalks, rights-of-way, parking areas, Public Property, and any other information required by the
City to evaluate the location, operation, security, access, and public safety impacts of the proposed Communal Outdoor Dining Area.
Sec. 11-101. - Communal Outdoor Dining Area authorized, general compliance.
(a) A Communal Outdoor Dining Area may be established and operated
in the City only in accordance with C.R.S. § 44-3-912, applicable state liquor regulations, this Article, and all other conditions imposed by the Local Licensing Authority.
(b) A Communal Outdoor Dining Area may be shared by two or more Eligible Licensees, including an approved sales room, subject to approval
by the state and Local Licensing Authorities.
(c) It shall be unlawful to sell, serve, dispense, provide, or permit consumption of Alcohol Beverages in a Communal Outdoor Dining Area unless licensed pursuant to the provisions of this Article.
(d) Approval of a Communal Outdoor Dining Area does not authorize the
use of Public Property unless such use is separately and expressly approved by the City.
Sec. 11-102. - Authority of City Clerk, Liquor Licensing Authority, and Public Safety Officials.
(a) The City Clerk may refer any Communal Outdoor Dining Area
application or matter to the Liquor Licensing Authority for public hearing and determination when the City Clerk determines that the application or matter presents: (1) Unresolved compliance issues;
(2) Documented public safety concerns; (3) Neighborhood impacts; (4) Requested deviations from standard conditions; (5) Use of Public Property requiring discretionary review; (6) Unresolved Police, Fire, Public Works, Community
Development, Risk Management, or City Attorney comments; (7) Potential grounds for denial, suspension, revocation, or nonrenewal; or (8) Any other circumstance warranting hearing review.
(b) The Liquor Licensing Authority may approve, approve with conditions, deny, renew, amend, suspend, or revoke a Communal Outdoor Dining Area approval.
(c) Nothing in this Article limits the authority of the City Clerk to process applications, request additional information, determine completeness, refer matters for review, impose administrative requirements, or enforce conditions of approval.
Sec. 11-103. - Application required.
(a) A Communal Outdoor Dining Area application shall include, at a minimum:
(1) The name, address, telephone number, and email address of each proposed Attached Licensee;
(2) Copies of the current state and local liquor licenses for
each proposed Attached Licensee; (3) Submission of all required state forms; (4) Payment of all required fees; (5) Evidence that each proposed Attached Licensee is
eligible under state law to attach to a Communal Outdoor Dining Area; (6) A site plan and diagram showing the proposed Communal Outdoor Dining Area;
(7) A statement demonstrating that the Communal
Outdoor Dining Area is within one thousand feet of the permanent Licensed Premises of each proposed Attached Licensee, measured by direct pedestrian access as required by state law;
(8) A proposed Security and Control Plan in conformance
with requirements of this Article; (9) Evidence of the right to occupy and control the proposed Communal Outdoor Dining Area; (10) Proposed days and hours of operation;
(11) A description of proposed food and Alcohol Beverage
service; (12) A description of proposed supervision, staffing, security, and responsible alcohol service controls; (13) A description of proposed signage, barriers, and
boundary controls in accordance with the requirements of this
Article; (14) A description of sanitation, trash, recycling, cleaning, maintenance, snow removal, and end-of-day cleanup in conformance with section 11-109, including identification of
restroom facilities available to patrons;
(15) Evidence of insurance satisfying the requirements of this Article; (16) A description of any proposed use of Public Property;
(17) A description of how the Communal Outdoor Dining Area will comply with accessibility, fire access, emergency access, zoning, building, traffic, right-of-way, and public safety requirements; (18) A statement identifying any retail food establishments
without liquor licenses that will serve food within the Communal Outdoor Dining Area, if any; (19) A description of incident reporting procedures; (20) A twenty-four hour contact person for the Communal Outdoor Dining Area; and
(21) Any other information reasonably required by the City Clerk, Liquor Licensing Authority, City Manager, Chief of Police, Fire Marshal, Public Works Director, Community Development Director, Risk Manager, or City Attorney.
(a) Acceptance of an application for review shall not constitute approval
of the application or a determination that the application satisfies state or local requirements.
(b) The City may establish application fees, renewal fees, amendment fees, inspection fees, Public Property use fees, cost reimbursement
requirements, and other fees related to Communal Outdoor Dining Areas
through resolution of the Council.
Sec. 11-104. - Concurrent application and modification of premises.
(a) Each proposed Attached Licensee shall obtain all state and local approvals required to modify its Licensed Premises to include the Communal Outdoor Dining Area.
(b) If permitted by state law and accepted by the City Clerk, proposed Attached Licensees may submit a joint application to modify their Licensed Premises to include the Communal Outdoor Dining Area.
(c) Each proposed Attached Licensee shall be responsible for paying all
required state and local fees applicable to its modification of premises and
attachment to the Communal Outdoor Dining Area.
(d) Local approval of a Communal Outdoor Dining Area shall be conditioned upon final approval by the State Licensing Authority when state approval is required.
Sec. 11-105. - Review of application.
(a) The City Clerk may approve, approve with conditions, deny, or refer the application to the Liquor Licensing Authority.
(b) If the application is referred to the Liquor Licensing Authority, the Liquor Licensing Authority may conduct a public hearing and may approve, approve with conditions, or deny the application.
(c) The City may require notice to adjacent property owners, adjacent businesses, neighborhood organizations, or the public when the City Clerk or Liquor Licensing Authority determines that notice is appropriate due to the location, size, use of Public Property, operational characteristics, objections, or potential impacts of the proposed Communal Outdoor Dining
Area. When notice is required, the City Clerk shall determine the appropriate form, manner, recipients, and timing of notice based on the nature and potential impacts of the application. Notice may include mailed notice, posted notice, publication, electronic notice, or other reasonable means. At a minimum, the notice shall identify the proposed Communal
Outdoor Dining Area, its location, the nature of the request, the manner and deadline for submitting comments or objections, and, if applicable, the date, time, and location of any public hearing.
(d) In determining whether to approve a Communal Outdoor Dining Area, the City Clerk or Liquor Licensing Authority may consider any factor
relevant to state law, local law, the provisions and requirements of this Article, and the public health, safety, and welfare.
Sec. 11-106. - Security and Control Plan.
(a) No Communal Outdoor Dining Area may operate unless a unified Security and Control Plan has been approved by the State and City. The
Security and Control Plan shall be binding on all Attached Licensees, employees, agents, contractors, managers, security personnel, and persons acting on behalf of an Attached Licensee.
(b) The Security and Control Plan shall include, at a minimum:
(1) Identification of all Attached Licensees;
(2) A detailed site plan; (3) Days and hours of operation; (4) Procedures for supervising and controlling the Communal Outdoor Dining Area during all hours of operation;
(5) Identification of the Licensee or Licensees responsible
for providing supervision or security during each period of operation; (6) Procedures for preventing Alcohol Beverages from leaving the Communal Outdoor Dining Area;
(7) Procedures for preventing Alcohol Beverages
purchased outside the Communal Outdoor Dining Area from being brought into the Communal Outdoor Dining Area; (8) Procedures for ensuring that Alcohol Beverages are sold only by and under the control of Attached Licensees;
(9) Procedures for preventing service to persons under twenty-one years of age; (10) Procedures for preventing service to visibly intoxicated
persons; (11) Procedures for removing visibly intoxicated persons; (12) Procedures for preventing visibly intoxicated persons from remaining within the Communal Outdoor Dining Area without an acceptable purpose;
(13) Procedures for identifying and addressing violations; (14) Procedures for communicating among Attached Licensees; (15) Procedures for communicating with the Police Department, Fire District, City Clerk, and other City officials;
(16) Procedures for incidents, complaints, emergencies, disorderly conduct, medical events, and law enforcement response; (17) Procedures for removing all Alcohol Beverages from the Communal Outdoor Dining Area at the end of approved
hours of operation; (18) Signage and boundary-control requirements; (19) Sanitation, trash, recycling, restroom, maintenance, and cleanup procedures; (20) Acknowledgment by any participating retail food
establishment without a liquor license that Alcohol Beverages may be served in the Communal Outdoor Dining Area only by and under the control of the Attached Licensees; (21) Insurance information; and (22) Any other information required by the City or State.
(c) No material change to the Security and Control Plan may be made without prior approval of the City Clerk or Liquor Licensing Authority, and the State Licensing Authority when required by state law. Minor administrative changes to the Security and Control Plan may be approved by the City Clerk if the City Clerk determines that the change does not
materially affect public safety, boundaries, hours, alcohol service, security, supervision, or conditions of approval.
Sec. 11-107. - Insurance.
(a) Each Attached Licensee shall obtain and maintain insurance
covering the Communal Outdoor Dining Area in amounts and forms
acceptable to the City and the State Licensing Authorities. At a minimum, each Attached Licensee shall maintain the following insurance:
(1) Commercial general liability insurance with limits of not less than one million dollars per occurrence and two million dollars aggregate; and
(2) Liquor liability insurance with limits of not less than one million dollars per occurrence or common cause and one million dollars aggregate.
(b) Required insurance shall be endorsed to expressly include the entire Communal Outdoor Dining Area, and shall be primary; it being the intent of this requirement that each such policy shall provide coverage despite the coverage of any other policy, whether provided as a requirement of the issued Licenses, or otherwise.
(c) If any portion of the Communal Outdoor Dining Area is located on Public Property or within public right-of-way, the City of Wheat Ridge, its elected and appointed officials, officers, employees, agents, and insurers shall be named as additional insureds on the required commercial general
liability and liquor liability policies. (d) The City may require higher insurance limits, additional coverage, or additional insured endorsements when the City Clerk, City Manager, City Attorney, or the City’s risk manager determines that higher limits or
additional coverage are reasonably necessary based on the location, size, hours, occupancy, use of Public Property, public right-of-way impacts, operational characteristics, claims history, or public safety risks associated with the Communal Outdoor Dining Area.
(e) Insurance shall be maintained continuously during the term of
approval. Certificates of insurance and endorsements shall be provided to the City upon application, renewal, amendment, and request.
(f) Failure to obtain or maintain required insurance shall constitute grounds for denial, suspension, revocation, nonrenewal, or immediate
closure.
(g) To the fullest extent permitted by law, the Attached Licensees shall indemnify, defend, and hold harmless the City, its officers, elected officials, employees, agents, and insurers from and against claims, damages, liabilities, losses, costs, and expenses arising out of or related to the operation of the Communal Outdoor Dining Area, except to the extent
caused by the City’s willful and wanton conduct.
(h) Nothing in this Article shall be construed as a waiver of the Colorado Governmental Immunity Act, C.R.S. § 24-10-101 et seq., or any other immunity, defense, limitation, or protection available to the City.
Sec. 11-108. - Use of Public Property.
(a) Approval of a Communal Outdoor Dining Area does not authorize use of Public Property unless such use is expressly approved by the City. Use of Public Property may require a separate agreement, encroachment
permit, right-of-way permit, revocable license, street closure permit, park permit, special event permit, temporary use permit, or other authorization.
(b) The City may impose any conditions on the use of Public Property
that are deemed reasonably necessary by the City.
(c) The City may deny or revoke use of Public Property if the use is inconsistent with public safety, access, mobility, maintenance, infrastructure, neighborhood compatibility, or the public interest.
Sec. 11-109. - Sanitation and maintenance.
(a) Attached Licensees shall maintain the Communal Outdoor Dining
Area and any affected Public Property in a clean, safe, sanitary, and orderly condition.
(b) Attached Licensees shall provide or arrange for adequate trash receptacles, recycling receptacles, restroom facilities, cleaning, waste
removal, and end-of-day cleanup.
(c) Attached Licensees shall promptly remove all trash, litter, abandoned containers, food waste, and Alcohol Beverages from the Communal Outdoor Dining Area at the end of each operating period.
(d) The City may require additional sanitation, maintenance, or cleaning
measures if the Communal Outdoor Dining Area results in trash, odors, spills, unsanitary conditions, pests, blocked access, or other adverse impacts.
Sec. 11-110. - Suspension, revocation, emergency closure, police authority and nonrenewal.
(a) The Liquor Licensing Authority may suspend, revoke, deny, refuse to renew, or impose conditions on a Communal Outdoor Dining Area approval upon any ground authorized by state law, this Article, the provisions of Article III of this Code, or pursuant to any conditions of approval.
(b) The Chief of Police or Fire Marshal may order immediate temporary closure or emergency suspension of all or any portion of a Communal Outdoor Dining Area when necessary to address an imminent or existing threat to public health, safety, or welfare. An emergency closure or suspension may apply to the entire Communal Outdoor Dining Area, a
portion of the Communal Outdoor Dining Area, one or more access points, one or more Attached Licensees, or any activity occurring within or adjacent to the Communal Outdoor Dining Area.
(c) Upon issuance of an emergency closure or suspension order, the
Attached Licensees and any employees, agents, contractors, managers, or
security personnel acting on their behalf shall immediately comply with the order and shall take all actions directed by the issuing official.
(d) The Chief of Police or Fire Marshal is authorized to physically restrict entry to, clear, close, or secure all or part of a Communal Outdoor Dining Area when immediate action is necessary to protect public safety or when an Attached Licensee, employee, agent, contractor, manager, or security personnel fails to immediately comply with an emergency closure,
suspension, or corrective order. (e) The Chief of Police or Fire Marshal may move, remove, secure, or cause the removal of any barrier, table, chair, heater, tent, sign, fixture, vehicle, cord, or other object located within or adjacent to a Communal
Outdoor Dining Area when the object creates a hazard, obstructs emergency access, obstructs pedestrian or disability access, interferes with traffic control, interferes with public infrastructure, or prevents implementation of an emergency closure or suspension order.
(f) Notice of an emergency closure, suspension, or corrective order may be provided verbally at the scene to any Attached Licensee, employee, agent, contractor, manager, security personnel, or person apparently in control of the Communal Outdoor Dining Area. Verbal notice shall be sufficient to require immediate compliance. When an emergency closure or
suspension order is issued verbally, the issuing official, or the City Clerk on behalf of the issuing official, shall prepare a written confirmation of the order as soon as practicable, and preferably no later than the next business day. The written confirmation shall identify, to the extent practicable:
(1) The date and time of the order; (2) The official issuing the order; (3) The area affected; (4) The basis for the order; (5) The corrective actions required, if any;
(6) The conditions for reopening, if any; and (7) The process for requesting review, if applicable. (g) An emergency suspension or closure shall remain in effect until the Chief of Police or Fire Marshal entering the suspension or closure
determines that the condition requiring closure or suspension has been corrected and that reopening will not create an unreasonable risk to public health, safety, or welfare. (h) Reopening may be authorized verbally when immediate reopening is
appropriate, provided that written confirmation of reopening shall be provided as soon as practicable. The City may require inspection, corrective
action, additional security, revised barriers, revised signage, revised operations, or other conditions before reopening.
(i) The City may recover from the Attached Licensees any costs incurred by the City to close, secure, clear, correct, restore, or reopen a Communal Outdoor Dining Area, including costs related to police services, public works, barriers, traffic control, cleanup, repair, or contractor assistance, to the extent permitted by law.
(j) Except in the case of emergency suspension or immediate closure, the City shall provide notice and an opportunity to be heard before revocation or nonrenewal.
Sec. 11-111. - Prohibited acts.
It shall be unlawful for any person to violate any provision of this Article or any provision of the Colorado Liquor Code. Violations of this Article may be enforced against any Licensee, employee, agent, contractor, security personnel, patron, or other responsible person, as applicable. Each day a violation continues shall constitute a separate violation. Remedies under
this Article are cumulative and may include criminal, civil, administrative, licensing, injunctive, or other remedies available under law.
Sec. 11-112. - Inspections and records.
The City, Police Department, Fire District, Local Licensing Authority, State Licensing Authority, and other authorized officials may inspect the
Communal Outdoor Dining Area, records required by this Article, signage, barriers, security arrangements, and operations for compliance with this Article and applicable law. Attached Licensees shall maintain records necessary to demonstrate compliance with this Article. Records shall be made available to the City upon reasonable request.
Section 2. Severability, Conflicting Ordinances Repealed. If any section, subsection, or clause of this Ordinance shall be deemed to be unconstitutional or otherwise invalid, the validity of the remaining sections, subsections and clauses shall not be affected thereby. All other ordinances or parts of ordinances in conflict with the
provisions of this Ordinance are hereby repealed.
Section 3. Effective Date. This Ordinance shall take effect immediately.
INTRODUCED, READ, AND ADOPTED on first reading by a vote of 8 to 0 on this 28th day of September 2026, ordered published by title and in full on the City’s website as provided by the Home Rule Charter, and Public Hearing and consideration on final
passage set for October 26, 2026, at 6:30 p.m., as a virtual meeting and in the Council
Chambers, 7500 West 29th Avenue, Wheat Ridge, Colorado.
READ, ADOPTED AND ORDERED PUBLISHED on second and final reading by a vote of ___ to ___, this 26th day of October, 2026.
SIGNED by the Mayor on this _____ day of ____________, 2026.
_______________________________ Korey Stites, Mayor
ATTEST:
_________________________ Janeece Hoppe, City Clerk
Approved as to Form
_________________________ Gerald E. Dahl, City Attorney
First Publication: September 29, 2026
Second Publication: October 27, 2026 Effective Date: October 26, 2026 Jeffco Transcript and www.ci.wheatridge.co.us
ITEM NUMBER: 3
DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
COUNCIL BILL NO. 19-2026
TITLE: AN ORDINANCE AMENDING THE WHEAT RIDGE CODE OF LAWS
CONCERNING THE OCCUPATION TAX ON BASIC LOCAL
EXCHANGE SERVICE
☒PUBLIC HEARING ☐BIDS/MOTIONS ☐RESOLUTIONS
☐ORDINANCES FOR 1st READING
☒ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
The City imposes an occupation tax on telecommunications telephone service, which
also applies to cell phone service. This ordinance amends the relevant definition to restore it to the pre-2023 version, to be consistent with a decision in 2024 by the
Colorado Supreme Court.
PRIOR ACTION:
In 2023, the City amended the relevant definition of telephone line to better address increasing cellular and decreasing landline usage. On September 28, 2026, City Council
approved this ordinance on first reading by a vote of 8-0 with a motion by
Councilmember Okada and a second by Councilmember Ohm.
FINANCIAL IMPACT:
Annual revenue received from the telephone occupation tax, between 2020 and 2025,
has ranged from $574,382 to $876,297 and has averaged $691,933. Maintaining the
administrative pause on the city’s 2024 telecommunications occupation tax is not
expected to have a significant financial impact. Telecommunications occupation tax revenue is anticipated to gradually decline over the three-year period, with an estimated
reduction of approximately 5–10% annually.
BACKGROUND:
For decades, the City has imposed an occupation tax on telecommunications telephone
service. Originally this tax was only on landline telephones and is paid by the telephone
Council Action Form – Occupation Tax on Telecommunication Services
October 26, 2026
service providers, including AT&T, Verizon, and CenturyLink. As cell phones increasingly
replaced land lines, the method for computing the tax became less equitable. The
calculation of the tax was revised by ordinance in 2023 to better address the reality of the dominant use of cell phones.
Meanwhile, however, the City of Lakewood's tax, which is substantially similar to Wheat
Ridge's tax, was invalidated by the Colorado Supreme Court as a “new tax" which had
not been approved by the voters under the Taxpayer's Bill of Rights. Because of the
similarities between the Wheat Ridge tax and the Lakewood tax, the Finance Manager, after consulting with the City Attorney and the City's outside counsel on
telecommunications matters, placed an administrative pause on the collection of the
City’s 2024 tax, returning it to the version of tax which was in place before the 2024
amendment. This took place effective January 1, 2026.
The staff now believe this change should be made permanent. If in the future there is a basis to revise the tax in a way to make it more equitable, a revision will be brought
forward, or, alternatively, the City could put the question of the tax on the ballot.
Meanwhile, however, for administrative simplicity and to appropriately guide tax paying
businesses, this ordinance makes the administrative pause a formal change in the City's
Code.
STAFF RECOMMENDATION:
Staff recommend approval of the ordinance.
RECOMMENDED MOTION:
“I move to approve Council Bill No. 19-2026, an ordinance amending the Wheat Ridge
Code of Laws concerning the occupation tax on basic local exchange service on second
reading and that it takes effect fifteen days after final publication as provided by Section 5.11 of the Charter.”
Or,
“I move to postpone indefinitely Council Bill No. 19-2026, an ordinance amending the
Wheat Ridge Code of Laws concerning the occupation tax on basic local exchange for
the following reason(s).”
REPORT PREPARED/REVIEWED BY:
Mark Colvin, Finance Manager
Chris Molison, Administrative Services Director
Gerald Dahl, City Attorney Patrick Goff, City Manager
ATTACHMENTS:
1. Council Bill No. 19-2026
CITY OF WHEAT RIDGE, COLORADO
INTRODUCED BY COUNCIL MEMBER
Council Bill No. 19
Ordinance No. 1852
Series 2026
TITLE: AN ORDINANCE AMENDING THE WHEAT RIDGE CODE OF LAWS
CONCERNING THE OCCUPATION TAX ON BASIC LOCAL EXCHANGE
SERVICE
WHEREAS, the City of Wheat Ridge (the “City”) is a home rule municipality having
all powers conferred by Article XX of the Colorado Constitution; and
WHEREAS, pursuant to its home rule authority and C.R.S. § 31-23-101, the City,
acting through its City Council (the “Council”), is authorized to adopt ordinances for the
protection of the public health, safety or welfare; and
WHEREAS, in the exercise of this authority, the City Council has previously adopted
Article III of Chapter 22 of the Wheat Ridge Code of Laws (the “Code”) governing taxation, and in particular the levy of an occupation tax on basic local telecommunication service;
and
WHEREAS, the City amended the telecommunications tax in various particulars,
most recently in September 2023; and
WHEREAS, as a result of the decision of the current Supreme Court in Metro PCS v Lakewood in 2025, the City elected to place an administrative pause on the definition of
“line” in the City's 2024 telecommunications occupation tax; and
WHEREAS, the Council has determined that the administrative pause on the prior
application of the telecommunications tax should be made permanent until such time as
the Council chooses to adopt further amendments.
NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF WHEAT RIDGE, COLORADO:
Section 1. Section 22-121 of the Code is amended by repealing and replacing the
definition of “line" to read:
LINE SHALL MEAN A SEPARATE TELEPHONE NUMBER, EXCEPT THAT, TO THE EXTENT BASIC LOCAL TELECOMMUNICATION SERVICE IS PROVIDED THROUGH
TRUNKS, A LINE SHALL MEAN NETWORK ACCESS REGISTER OR ITS
FUNCTIONAL EQUIVALENT.
ATTACHMENT 1
Section 2. Severability, Conflicting Ordinances Repealed. If any section,
subsection or clause of this Ordinance shall be deemed to be unconstitutional or
otherwise invalid, the validity of the remaining sections, subsections and clauses shall not be affected thereby. All other ordinances or parts of ordinances in conflict with the
provisions of this Ordinance are hereby repealed.
Section 3. Effective Date. This Ordinance shall take effect fifteen (15) days
after final publication, as provided by Section 5.11 of the Charter.
INTRODUCED, READ, AND ADOPTED on first reading by a vote of 8 to 0 on this 28th day of September 2026, ordered published in full on the City’s website as provided
by the Home Rule Charter, and Public Hearing and consideration on final passage set
for October 26, 2026, at 6:30 p.m., in the Council Chambers, 7500 West 29th Avenue,
Wheat Ridge, Colorado.
READ, ADOPTED AND ORDERED PUBLISHED on second and final reading by a vote of ___ to ___, this 26th day of October 2026.
SIGNED by the Mayor on this _____ day of ____________, 2026.
Korey Stites, Mayor
ATTEST:
__________________________________________
Janeece Hoppe City Clerk
Approved as to Form:
___________________________________________
Gerald E. Dahl, City Attorney
First Publication: September 29, 2026
Second Publication: October 27, 2026
Effective Date: November 12, 2026
Published:
Jeffco Transcript and www.ci.wheatridge.co.us
ITEM NUMBER: 4 DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
COUNCIL BILL NO. 20-2026
TITLE: AN ORDINANCE AMENDING THE WHEAT RIDGE CODE OF LAWS
TO ADDRESS THE REGULATIONS OF SOCIAL CLUBS AND
MAKING CONFORMING AMENDMENTS IN CONNECTION
THEREWITH
☐PUBLIC HEARING ☐BIDS/MOTIONS ☐RESOLUTIONS
☒ORDINANCES FOR 1st READING ☐ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
The proposed ordinance makes updates to the city’s existing “social club” regulations in
Chapters 11 and 26. The ordinance repeals the existing social clubs regulations in
Chapter 11 (Licensing) and amends Chapter 26 (the zoning code) to define types of
“event venues” and to establish where event venues are permitted. Conforming amendments are required in Chapters 11, 15, and 26 to ensure appropriate enforcement
strategies are available to the city.
PRIOR ACTION:
At the June 2, 2025 Study Session, staff presented a proposal to amend the existing
social club code by reducing application requirements for “low-impact” social clubs.
City Council then directed staff to return with a proposal to eliminate the Chapter 11
social club licensing requirements altogether and establish an alternative framework for regulating event venues.
At the June 15, 2026 Study Session, staff presented a proposal to repeal the existing
social club regulations and define event venues in the zoning code (Chapter 26), thereby
establishing a zoning framework as the primary mechanism for regulating event venues. Council gave consensus to proceed with creating an outline for an ordinance to
be presented at a follow-up study session, along with additional clarification on
enforcement and communication to businesses.
At the October 5, 2026 Study Session, staff provided an update on the proposed enforcement strategies and received consensus to move forward with a combined
Council Action Form – Event Venues
October 26, 2026
zoning, licensing, and enforcement ordinance.
On October 15, 2026, Planning Commission recommended approval of the ordinance by a vote of 5 to 0.
FINANCIAL IMPACT:
The anticipated financial impact is limited. No new licensing fees are proposed; an event
venue would obtain a business license under the existing licensing framework, and if
applicable, would also pay review fees for a special use permit.
BACKGROUND:
The city’s current “social club” regulations were originally adopted in 2007 to address
potential impacts of private event venues and relies heavily on licensing for
enforcement. However, the licensing and operational requirements apply uniformly regardless of a venue’s size, frequency of use, or actual community impact. As a result,
the existing framework creates unnecessary barriers for small businesses while
providing limited flexibility to address the varying characteristics of modern event
venues. The purpose of the code amendment is to streamline event venue regulations
and to ensure proper enforcement mechanisms are available.
Because of the nature of events and event venues, Planning and Zoning staff have
coordinated closely with the city’s Licensing Division, Police Department, Liquor
Licensing, Building Division, and City Attorney on the regulatory and enforcement
approach, which resulted in conforming code amendments in Chapter 11 (Licensing) and Chapter 15 (Nuisance). A separate update to the city’s noise ordinance, which is
broader than the topic of event venues, will be coordinated by the City Attorney
separately.
Proposed Code Amendment The proposed ordinance takes a regulatory approach through the zoning code, with applicable amendments to licensing and nuisance codes to ensure that bad actors of
venues and related uses can be cited appropriately. Under the new approach, each
chapter more clearly serves its purpose:
• Chapter 26 (Zoning) determines where event-related uses are allowed and under
what land use approvals.
• Chapter 16 (Noise) regulates how outdoor events operate with respect to
amplified sound, hours, and neighborhood impacts.
• Chapter 11 (Business & Liquor Licensing) regulates what license is required for
operating a business or serving alcohol.
• Chapter 15 (Nuisance) regulates how a nuisance or other code violation is
enforced.
The city code is proposed to be amended as follows:
Council Action Form – Event Venues
October 15, 2026
• Repeal the existing “social club” regulations from Chapter 11, Article XI and
remove the definition of “social club” from Chapter 26 and its associated
permitted use charts.
• Zoning Code Regulatory Approach (Chapter 26): Create definitions for various
type of “event venues” following the four-tiered categories:
o Indoor Event Venues
Fully contained within a building
Primary use of property or tenant space
Allow in commercial, mixed-use, and industrial zones
Limit capacity in lower-intensity zones
Business license required
o Outdoor Event Venues
Outdoor only, or hybrid of indoor and outdoor
Primary use of property or tenant space
Allow in more intensive commercial, mixed-use, and industrial zones
Require Special Use Permit (SUP) or Conditional Use Permit (CUP) if
adjacent to residential use
Amplified noise permit required (if applicable)
Business license required (plus SUP/CUP if applicable)
o Accessory Outdoor Entertainment
Accessory use of a property to a primary commercial use (such as
eating/drinking establishment or retail)
Event area must be clearly delineated and on all-weather surface
Amplified noise permit required (if applicable)
Covered by primary use’s business license
o Residential/agricultural properties with Accessory Outdoor Entertainment
Accessory use of a property to a primary residential or agricultural use
Only applicable to properties of one (1) acre or greater
Require Special Use Permit (SUP) to allow public input and staff to
review site plan and business model against SUP criteria; not all
sites will be approvable
Business license required (after SUP approval)
• Zoning Conforming Amendments (Chapter 26):
o Update SUP enforcement provisions for clarity. Because SUPs are being
expanded to include some event venues, there is the need to refine some
enforcement proceedings.
• Licensing Conforming Amendments (Chapter 11):
o Sec. 11-31: Move applicable old social club language to the general business license section to expressly allow revocation of a business
license if operations continue during a period of suspension.
o Sec. 11-22: Add to violations section that it is unlawful to operate without
a liquor license if necessary for operations. This section already states it
is unlawful to operate a business without a business license.
Council Action Form – Event Venues
October 26, 2026
o Sec. 11-52: Add to liquor licensing/permit section that it is a violation to
sell alcohol beverages without the applicable liquor license/permit.
• Nuisance Conforming Amendments (Chapter 15):
o Modify definition of “Nuisance Violation” to include violations of Chapter 5
(Building Code) and Chapter 11 (Licensing).
From a practical standpoint, this approach is more straightforward for event venue
operators. The approach is also context sensitive with additional review required for
outdoor venues or those adjacent to residential uses. Council’s request to address
event venues in residential and agricultural zones has been addressed as well; these will
likely be rare and will include discretionary review. There is no regulatory change to how businesses host occasional events; the code now expressly permits this to occur where
it was previously silent. There is no impact on residential events, such as block parties
or neighborhood barbecues; this change affects commercial events.
RECOMMENDATION:
Staff recommend approval of the ordinance.
RECOMMENDED MOTION:
“I move to approve Council Bill No. 20-2026, an ordinance amending the Wheat Ridge
Code of Laws to address the regulation of social clubs and making conforming
amendments in connection therewith, order it published and public hearing set for Monday, November 9, 2026, at 6:30 p.m., as a virtual meeting and in City Council
Chambers, 7500 W. 29th Avenue.”
Or,
“I move to postpone indefinitely Council Bill No. 20-2026, an ordinance amending the
Wheat Ridge Code of Laws to address the regulation of social clubs and making
conforming amendments in connection therewith, for the following reasons: ….”
REPORT PREPARED/REVIEWED BY:
Scott Cutler, Senior Planner
Jana Easley, Planning Manager
Lauren Mikulak, Community Development Director Patrick Goff, City Manager
ATTACHMENTS:
1. Council Bill No. 20-2026
CITY OF WHEAT RIDGE, COLORADO
INTRODUCED BY COUNCIL MEMBER
Council Bill No. 20
Ordinance No. 1853
Series 2026
TITLE: AN ORDINANCE AMENDING THE WHEAT RIDGE CODE OF LAWS
TO ADDRESS THE REGULATION OF SOCIAL CLUBS AND MAKING
CONFORMING AMENDMENTS IN CONNECTION THEREWITH
WHEREAS, the City of Wheat Ridge (the “City”) is a home rule municipality having
all powers conferred by Article XX of the Colorado Constitution; and
WHEREAS, pursuant to its home rule authority and C.R.S. § 31-23-101, the City,
acting through its City Council (the “Council”), is authorized to adopt ordinances for the
protection of the public health, safety or welfare; and
WHEREAS, in the exercise of this authority, the City Council has previously adopted
Chapter 11 of the Wheat Ridge Code of Laws (“Code”) entitled licenses, permits, and miscellaneous business regulations; and
WHEREAS, the Council wishes to clarify and update specific sections of that
chapter regulating social clubs and associated business and liquor licenses; and
WHEREAS, the City Council has previously adopted regulations concerning the
definition and permitted location of social clubs, codified within Chapter 26 of the Code; and
WHEREAS, the City Council wishes to clarify and update specific sections of that
chapter to modernize and simplify regulations for businesses holding events to
coordinate Chapter 26 applicability to the underlying use of the business property.
NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF WHEAT RIDGE, COLORADO:
Section 1. Section 11-22 of the Code is amended to read as follows:
Sec. 11-22. - Violations.
It shall be a violation of the City Code to conduct business within the city
without a valid business license unless specifically exempted from the provisions of this article. Businesses which have an "economic nexus"
within the city, as defined at Code section 22-21 are exempt from the
licensing requirements of this article but must maintain a sales and or use
tax license pursuant to chapter 22, and, if necessary, a liquor license or
ATTACHMENT 1
other license required under this Code for the relevant business operation.
A business license shall be considered valid if it is current and complies
with the requirements of the City Code. Penalties for violations of this section shall be as set forth in sections 1-5 and 1-6 of the City Code. Each
day that a business is conducted in violation of the City Code shall be a
separate offense.
Section 2. Code section 11-31 is amended by the renumbering of existing
subsection (5) as (6) and the addition of a new subsection 5 to read as follows:
11-31 Suspension, conditional suspension or revocation.
A business license may be suspended, conditionally suspended or revoked by the City
Treasurer pursuant to section 11-32:
(1) . . .
(5) When a business was operated and open during a period of time when the business license was suspended.
(6) Upon any other grounds provided by this code.
Section 3. Section 11-52 of the Code is amended to read as follows, with an
updated section title and the addition of subsections:
11-52. Purpose; Violation.
(a) In pursuance of the authority conferred by C.R.S. title 44, articles 3, 4 and 5, this
chapter is enacted for the purpose of promoting the health, safety and welfare of
the present and future inhabitants of the city by regulating, controlling and
licensing the sale of malt, vinous or spirituous liquors and fermented malt beverages.
(b) No person may engage in the sale of malt, vinous, spiritus, liquors, or fermented
malt beverages (hereinafter “alcohol beverages”) within the city without first
obtaining and continuously maintaining in force a license from the liquor
licensing authority under this Article III.
(c) Any person who shall sell or attempt to sell alcohol beverages as described
herein, without the required license under this Article III is in violation of this
Article and may be charged and prosecuted in the municipal court pursuant to
Sections 1-5 and 1-6 of this Code. In addition, the alcohol beverage license of
such person may be suspended or revoked by the liquor licensing authority as
provided in this Article.
Section 4. Article XI of Chapter 11 of the Code, titled “Social Clubs,” is hereby
repealed, and the entire article listed as “Reserved”.
Section 5. Section 15-26 of the Code is amended to read:
The keeping of any dwelling, boardinghouse, rooming house or other residential
property in violation of any provision of this chapter or of chapters 5, 11 or 26, including
any violation of maximum occupancy limitations imposed by chapters 5 or 26 or any
condition of approval of the use of property imposed by action of the city, is a nuisance,
and may be enforced and abated as provided in chapter 15. A disorderly house shall also include keeping any such property in a condition or manner which generates law
enforcement calls disproportionate to other properties in the neighborhood or which
negatively affects neighboring properties and/or residents, whether by continuous or
excessive noise or by maintenance of the property in an unsightly or unwholesome
manner, noxious or offensive to others or injurious to public health, safety or welfare.
Section 6. Section 15-51 of the Code is amended to read:
Nuisance violation. Any nuisance citation issued by the Wheat Ridge Police
Department or any non-traffic conviction of the laws of, respectively, the city, county or
state, which disturbs the peace of the neighborhood or otherwise harms the health,
safety, or welfare of the residents of the city, to specifically include any and all convictions pursuant to chapters 4, 5, 8, 11, 15, 16, 21, 24, and 26 of this Code.
Section 7. Section 26-114.F of the Wheat Ridge Code of Laws, regarding
enforcement of Special Use Permit (SUP) approvals, is hereby amended as follows:
F. Enforcement. All conditions and stipulations imposed by the community development
director or city council shall be maintained during the entire term of the special use. If at any time the stipulations or conditions are not adhered to, or are if the special use is
found to have been materially altered in scope, application operation or design, the
director of community development shall investigate and, if appropriate, initiate the
following procedures: revocation proceedings which shall include the following:
1. Notice of violation following procedures as set forth, in sections 26-1005 or 26-
1006 of this Code.
1. Notice. The community development director shall provide written notice to the holder of the special use permit identifying the nature of the noncompliance, the
corrective action required, and a reasonable period for correction. The director
may establish an immediate correction period when necessary to address an
imminent threat to health, safety, or welfare.
2. Administrative authority. Following notice, the community development director is authorized to modify or supplement the conditions of the special use permit
when reasonably necessary to bring the special use into compliance with this
section or the applicable criteria for review. Any modification shall be limited to
conditions reasonably related to the special use and the impacts or
noncompliance identified in the notice. A modification of conditions by the
community development director may be appealed to the city council; such appeal
shall be made in writing within ten (10) days of such administrative decision.
2.3. City council authority. Upon appeal, or upon a finding of noncompliance after the prescribed correction date, the community development director shall schedule
a revocation public hearing before the city council. The purpose of the revocation
hearing shall be for the city council to hear evidence concerning the nature and
extent of the alleged noncompliance or material alteration with the conditions of
the special use permit. The council shall have the power, upon good cause being shown, to cancel or revoke the previously issued special use permit, to require
certain corrective measures to be taken, and/or to direct the city's agents to enter
upon the premises and take corrective measures required by the city council, and to
modify the conditions which apply to the special use permit.
4. Notice of public hearing under shall be in the manner provided in subsections 26-109.B, C and D.
Section 8. Section 26-123 of the Wheat Ridge Code of Laws, defining certain
terms applicable to Chapter 26 of the Code, is hereby amended in the appropriate
alphabetical location, as follows:
Accessory outdoor entertainment. Occasional and temporary outdoor events held
on a property containing a primary use, such as an eating or drinking establishment or
retail store.
Event venue, indoor. A nonresidential building or tenant space leased or rented for private parties and other various social or business gatherings, such as banquet
halls, reception halls, dance halls, and private event centers, and not associated with
another permitted primary use such as a hotel, school, city-owned property, or place of
worship.
Event venue, outdoor. A nonresidential building or tenant space leased or rented
for private parties and other various social or business gatherings that includes, entirely or partially, outdoor areas as part of the usable event space. This may include,
but is not limited to, outdoor patios or reception areas, outdoor amphitheaters, or
other outdoor performance spaces or stages, and not associated with another
permitted primary use such as a hotel, school, city-owned property, or place of
worship.
Social club. A business whose sole, exclusive, or principal service provided is the
leasing of space to persons or groups for private events such as parties or fundraisers.
Social clubs do not include liquor licensed establishments, private clubs or lodges,
hotels, public and private schools, colleges or universities, or churches.
Section 9. The “Table of Uses – Residential” set forth in Section 26-204 of the
Code, concerning uses in residential zone districts, is hereby amended by making the
following addition:
Residential Use with
Accessory Outdoor one (1) acre or S S S S S S S S
Section 10. The “Table of Uses – Agricultural and Public Facilities” set forth in Section 26-204 of the Code, concerning uses in agricultural and public facilities zone
districts, is hereby amended by making the following addition:
Residential or Agricultural
Use with Accessory (1) acre or greater S S S
Section 11. The “Table of Uses – Commercial and Industrial Districts” set forth in
Section 26-204 of the Code, concerning uses in commercial and industrial zone districts, is hereby amended by doing making the following additions and deletions in
the appropriate alphabetical location:
Event Venue, Indoor P P P P P
Event Venue, Outdoor
use S S S
Private clubs
lodge, social clubs,
bingo parlors and similar uses
P P P P P
Wheat Ridge Code of
Laws, Chapter 11, Article
XI
P P P
Commercial and Industrial District
Accessory Uses
Accessory outdoor entertainment Permitted on properties containing a primary use. Event area must be clearly
delineated and on all-weather surface.
Section 12. The “Permitted Uses” table set forth in Section 26-1111.B of the Code,
regarding permitted uses in the mixed-use zone districts, is hereby amended as follows:
Use Group MU-C Interstate MU-C TOD MU-N
Commercial Services and Retail
Event Venue, Indoor P P P P
Event Venue, Outdoor P P P C
Event Venue, Outdoor (if
adjacent to residential use) C C C NP
Temporary Uses
entertainment P P P P
Section 13. “Table 5: Permitted Uses Within MU-LLC Overlays and Sub-Districts”
set forth in Section 26-1410.B of the Code, regarding permitted uses in the MU-LLC zone
district, is hereby amended as follows in the appropriate alphabetical location:
Use Group
Low-
Density
Overlay
district 1
(outside of
Low-Density
Overlay)
Sub-
district 2
Sub-
district 3
district 4
(outside
of Low-Density
overlay)
Commercial Services and Retail
Event Venue, Indoor NP NP P P NP
Event Venue, Outdoor NP NP P P NP
Event Venue, Outdoor (if adjacent to residential
use)
NP NP C C NP
Temporary Uses
Accessory outdoor
entertainment NP NP P P C
Section 14. Severability, Conflicting Ordinances Repealed. If any section,
subsection or clause of this Ordinance shall be deemed to be unconstitutional or
otherwise invalid, the validity of the remaining sections, subsections and clauses shall
not be affected thereby. All other ordinances or parts of ordinances in conflict with the
provisions of this Ordinance are hereby repealed.
Section 15. Effective Date. This Ordinance shall take effect fifteen (15) days
after final publication, as provided by Section 5.11 of the Charter.
INTRODUCED, READ, AND ADOPTED on first reading by a vote of ___ to ___ on
this 26th day of October 2026, ordered published in full on the City’s website as provided
by the Home Rule Charter, and Public Hearing and consideration on final passage set for November 9, 2026, at 6:30 p.m., in the Council Chambers, 7500 West 29th Avenue,
Wheat Ridge, Colorado.
READ, ADOPTED AND ORDERED PUBLISHED on second and final reading by a
vote of ___ to ___, this _9th day of November 2026.
SIGNED by the Mayor on this _____ day of ____________, 2026.
Korey Stites, Mayor
ATTEST:
__________________________________________
Janeece Hoppe, City Clerk
Approved as to Form:
_______________________________
Gerald Dahl, City Attorney
First Publication: October 27, 2026
Second Publication: November 10, 2026
Effective Date: November 25, 2026
Published:
Jeffco Transcript and www.ci.wheatridge.co.us
ITEM NUMBER: 5 DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
COUNCIL BILL NO. 21-2026
TITLE: AN ORDINANCE AMENDING CHAPTER 26 OF THE WHEAT RIDGE
CODE OF LAWS CONCERNING SIGN AND BILLBOARD
REGULATIONS
☐PUBLIC HEARING ☐BIDS/MOTIONS ☐RESOLUTIONS
☒ORDINANCES FOR 1st READING ☐ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
This ordinance amends Chapter 26 of the Wheat Ridge Code of Laws to allow up to four
digital billboards within the city and to make general amendments to the sign code for clarity and content neutrality.
PRIOR ACTION:
City Council first considered digital billboards during a February 3, 2025 study session.
At that time, it was decided to bring the digital billboard discussion back to Council for a
separate study session.
The City Council was presented with the background on this ordinance at the February 2, 2026 study session, at which time Council provided consensus for staff to proceed
with a code amendment.
The Planning Commission reviewed the ordinance at a public hearing held on October
15, 2026, and recommended approval by a vote of 5 to 0. A copy of the draft Planning Commission minutes will be included with the Council Action Form for the second
reading.
FINANCIAL IMPACT:
The proposed ordinance is not anticipated to have a direct financial impact on the city.
BACKGROUND:
The sign code was last amended in 2023, specifically related to billboards. In response
to inquiries from the billboard industry, City Council considered digital billboards and
Council Action Form – Billboard and Sign Regulations
October 26, 2026
electronic message boards and a public-private partnership related to digital ad sales
during a February 3, 2025 study session. At that time, it was decided to bring the digital
billboard discussion back to Council for a separate study session.
At the February 2, 2026, study session, Council was asked to provide direction on the
following:
• Whether there is interest in allowing digital billboards in Wheat Ridge;
• If so, what limitations should apply (e.g., quantity, spacing, and selection
method); and
• Whether Council supports moving forward with other proposed sign code
amendments that are intended to be more business friendly.
After extensive discussion, Council reached consensus on allowing digital billboards
with the following parameters:
• 2,500-foot minimum distance between digital billboards, including
measurements from existing digital signage in adjacent jurisdictions
• Maximum of four (4) single-sided conversions (no new billboards)
• Regulations for a minimum message hold time
• Regulations for light adjustment in residential-adjacent neighborhoods • Some form of public benefit requirement to be researched by staff
• 30-day period for billboard operators to negotiate an equitable distribution of
licenses before implementing a lottery system
After the February 2026 study session, staff worked with the City Attorney to draft the
proposed regulations. Staff also consulted with CDOT and the owners of the city’s existing billboards to better understand best practice and existing regulations. The
intent of this ordinance and Council’s policy direction has been to reasonably
accommodate the billboard industry’s request for digital billboard conversations in an
equitable way. It was not possible to retain a 2,500-foot as-the-crow-flies separation and
achieve equitable distribution of the four digital billboards among the four operators.
For that reason, the final ordinance establishes a 2,500-foot line-of-sight separation
meaning no two digital billboards facing the same direction may be closer than 2,500 feet. This approach is also more customary in CDOT’s billboard regulations. Staff
believe the intent of the code amendment is upheld and recommend this approach.
Council further reached consensus to move forward with the following general sign
code amendments which were recommended by staff to allow more flexibility for local businesses:
1. Wall signs: Allow signs to face any direction rather than only public streets or
major internal drives, while maintaining the maximum total square footage.
2. Painted murals: Allow murals that include business-related imagery, addressing
content neutrality requirements.
Council Action Form – Sign Code Amendments
March 9, 2026
3. Roof signs: Allow roof signs in cases where there is no other practical alternative for signage.
4. Window signage: Allow window signs on exterior glass for spandrel windows that cannot be accessed from inside.
5. Changeable copy signs: Clarify regulations to exempt signs showing fixed
character and functional data fields (examples of these would be time,
temperature, fuel prices, and lottery amounts).
RECOMMENDATION:
Staff recommend approval of the ordinance. First reading in these cases is a procedural
action that merely sets the date for the (second reading) public hearing. No testimony is taken on first reading.
RECOMMENDED MOTION:
“I move to approve Council Bill No. 21-2026, an ordinance amending Chapter 26 of the
Wheat Ridge Code of Laws, concerning sign and billboard regulations on first reading, order it published, the public hearing set for Monday, November 9, 2026, at 6:30 p.m. as a virtual meeting and in City Council Chambers, and that it take effect immediately.” Or,
“I move to postpone indefinitely Council Bill No. 21-2026, an ordinance amending Chapter 26 of the Wheat Ridge Code of Laws, concerning sign and billboard regulations for the following reason(s): ______________________________________.”
REPORT PREPARED/REVIEWED BY:
Jana Easley, Planning Manager
Lauren Mikulak, Community Development Director
Patrick Goff, City Manager
ATTACHMENTS:
1. Council Bill No. 21-2026
CITY OF WHEAT RIDGE, COLORADO
INTRODUCED BY COUNCIL MEMBER
Council Bill No. 21
Ordinance No. 1854
Series 2026
TITLE: AN ORDINANCE AMENDING CHAPTER 26 OF THE WHEAT RIDGE
CODE OF LAWS CONCERNING SIGN AND BILLBOARD REGULATIONS
WHEREAS, the City of Wheat Ridge (the “City”) is a home rule municipality having
all powers conferred by Article XX of the Colorado Constitution; and
WHEREAS, pursuant to its home rule authority and C.R.S. § 31-23-101, the City, acting through its City Council (the “Council”), is authorized to adopt ordinances for the
protection of the public health, safety or welfare; and
WHEREAS, in the exercise of this authority, the City Council has previously adopted
Article VII of Chapter 26 of the Wheat Ridge Code of Laws (“Code”) entitled sign code;
and
WHEREAS, the Council recognizes that from time to time the City’s zoning code
needs to be updated to establish standards not included in original regulations, to include modern terms and uses, and to provide clarity to City staff and the public; and
WHEREAS, the Council wishes to modernized definitions and provide clarity to
other sections of Article VII of Chapter 26; and
WHEREAS, the Council wishes to allow a restricted number of digital billboards
within the city; and
WHEREAS, the four (4) existing billboard owners have requested a thirty (30) day
period to negotiate an equitable distribution of digital billboard licenses in lieu of an initial
lottery process.
NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF WHEAT RIDGE, COLORADO:
Section 1. Section 26-702 of the Code regarding sign-related definitions is
amended by the removal, addition, and revision of the following definitions in the
appropriate alphabetical locations:
Sec. 26-702. Definitions.
For the purposes of this article, the following words and phrases shall have the meanings respectively ascribed to them by this section:
Ambient Light Sensor (Photocell). A control device that automatically
changes the brightness of a sign based on the amount of light in the
surrounding environment (e.g., dimming the sign at sunset or during a heavy storm).
…
Artistic mural or sculpture. A freestanding statue or sculpture or a graphic
illustration or design, or an architectural design or relief applied directly to or
incorporated within a wall of a building, which does not advertise or promote a particular business, service or "branded" product.
Artistic Mural. A visual design, graphic, or image painted directly onto an
exterior wall of a structure that is clearly separate from the business name and
logo. Artistic murals are not considered signs. Business name and logo are
considered Wall signs.
Artistic Sculpture. A three-dimensional work of art, including but not
limited to statues, reliefs, or architectural installments, that is created by
shaping or combining materials such as stone, metal, wood, or glass that is
clearly separate from the business name and logo. Artistic sculptures are not
considered signs.
…
Billboard, digital. A billboard that utilizes digital display technology—
including, but not limited to, Light Emitting Diodes (LEDs), Liquid Crystal
Displays (LCDs), plasma screens, or similar electronic media—capable of
displaying static or moving images, text, or graphics, where the message is changed through electronic or remote means.
Blade sign. A sign which is affixed to any building, wall or structure and
which extends beyond the building wall more than fifteen (15) inches, and
which has a sign face that is generally perpendicular to the building façade.
Building front. The exterior wall(s) of a building facing a public street(s) or
streets or other public right-of-way other than alleys, or one (1) exterior wall
containing the primary entrance to the building if not directly facing upon a public street.
Candela (cd). The standard unit of luminous intensity. One candela is
roughly equivalent to the light produced by a single common candle.
Canopy sign. A sign mounted to a freestanding roof-like structure serving
the purpose of protecting vehicles and/or pedestrians and which may be freestanding or attached to a building, is provided with supports, and that is
open on all three (3) sides if attached and on all sides if freestanding. Signs on
a canopy structure attached to the principal building or structure are
considered Wall signs.
Changeable copy sign. A sign, either illuminated or nonilluminated, which is
designed so that the message or any part of the message may be periodically
changed, either mechanically or electronically, however, where a change in message occurs no sooner than every eight (8) seconds. This includes signs
that utilize computer-generated messages or some other electronic means of
changing copy, including displays using incandescent lamps, LEDs, LCDs or a
flipper matrix. Messages shall be static and a change in message shall be
instantaneous.
The following shall not be considered Changeable Copy Signs:
Static Data Updates: Fixed-character fields where the alphanumeric data is
updated no more than four (4) times per 24-hour period (for example, a gas
price sign).
Functional Data Fields: A single display area not exceeding two (2) square feet that provides continuous updates of numerical data (such as time or
decimal-based measurements), provided the transition is instantaneous
and contains no flashing or scrolling (for example, a digital clock).
…
Footcandle (fc). A unit of illuminance equal to one lumen per square foot. In this code, it is used to measure Light Trespass (light falling onto a
neighboring property) and Ambient Contrast (the brightness of a sign relative
to its surroundings).
…
Lot. A tract, building site, parcel or portion of land separated from other parcels or portions by description, as on a subdivision plat of record or survey
map or by metes and bounds, for the purpose of sale, lease or use.
Major interior drive. A drive aisle located on private property which
connects two (2) public streets or provides access to two (2) or more parcels of
land or developments. Where the regulations allow "one sign per major interior
drive," the intent is that the sign allowed is placed upon or facing the major
interior drive, unless specifically otherwise permitted.
Nit. A unit of measurement of luminance. One nit is equal to one candela
per square meter.
…
Off-premise sign. A commercial sign advertising a land use, business,
product or service not located or available as the primary business, product or service upon the premises whereon the sign is located.
…
Photocell (Ambient Light Sensor). A control device that automatically
changes the brightness of a sign based on the amount of light in the
surrounding environment (e.g., dimming the sign at sunset or during a heavy
storm).
…
Roof sign. A sign erected, constructed and maintained above the eaves and
attached to the roof (excluding mansard roofs) of a building.
…
Sign face. The surface of the sign upon, against, or through which the message is displayed or illustrated.
…
Street frontage. For the purpose of signage, frontage upon a street is
obtained by ownership, easement or leasehold and as determined by the city
based on a relationship between building, lot and street only if used for vehicular access to the property, or if not used for vehicular access, only if such
street frontage is at least fifty (50) feet in width. Where the regulations allow
"one sign per street frontage," the intent is that the sign allowed is placed upon
or facing the street, unless specifically otherwise permitted.
…
Size of sign. When two (2) identical sign faces are placed back to back so
that both faces cannot be viewed from any point at the same time, and are part
of the same sign structure, the sign area shall be computed as the
measurement of one (1) of the two (2) faces. For a sign which is framed,
outlined, painted or otherwise prepared and intended to provide a background for a sign display, the area and dimensions shall include the entire portion
within such background or frame. For a sign comprised of individual letters,
figures or elements on a wall of a building or surface of a structure, the area
and dimensions of the sign shall encompass a regular geometric shape
(rectangle, circle, trapezoid, triangle, etc.) or a combination of regular geometric
shapes, which form or approximate the perimeter of all elements in the display,
the frame and any applied background that is not part of the architecture of the building or structure. When separate elements are organized to form a single
sign but are separated by open space, the sign area and dimensions shall be
calculated by determining the geometric form, or the combination of forms,
which comprises all of the display areas, including the space between different
elements. For a freestanding sign, the sign area shall include the frame, if any, but shall not include the pole or other structural support unless such pole or
structural support is internally illuminated or otherwise so designed to
constitute a display, or part of a display device. Architectural features that are
either part of the building or part of a freestanding structure, and not an integral
part of the sign, and which may consist of landscaping, building, or structural
forms completing the site in general shall also not be in the sign area. May also
be referred to as Sign area.
…
Traffic control and regulatory signs. Signs, signals or markings placed or
erected by federal, state or local authority for the purpose of regulating, warning
or guiding traffic.
…
Wall sign. A sign constructed of durable materials or painted and which is permanently affixed to an exterior surface of any building, wall or structure and
which does not extend more than fifteen (15) inches beyond the building wall.,
except that sSignage placed upon awnings, marquees, or canopies attached to
the principal building or structure, or signage on mansard roofs, or awnings
shall also be considered as wall signs.
Window or door sign. Any sign or decal affixed to, painted on, applied to, or
hanging within twelve (12) inches of the interior of a window and that can be
seen through the window from the exterior of the structure, but excludes
merchandise included in a window display. Window signs also include signs
affixed to, painted on, or applied to the exterior of a window.
…
Section 2. Section 26-705 of the Code subsections D. through F. are regarding permit
required is amended to read:
Sec. 26-705. Permit required.
D. Fees for the erection of signs are assessed as part of building permit review and issuance. Permit fees and city Building use tax will be waived where a
nonconforming sign is removed and replaced by a sign conforming with
these regulations.
E. The property owner, principal lessee, or authorized agent of the platted or
otherwise recognized as legally developable parcel on which the sign will be located shall be the same person applying for the sign permit.
Documentation shall accompany the permit for verification. Building permit
applications for single tenant signs on multitenant properties shall include
property owner authorization with the building permit application.
F. A copy sign face change or copy change with no modifications to the sign
structure, support, cabinets, electricity, or other features shall be exempt
from a building permit.
Section 3. Section 26-706 is amended by the removal of subsection C. and minor
clarification:
Sec. 26-706. Nonconforming signs.
A. Nonconforming signs. …
1. …
4. Normal maintenance which does not require modification of the sign
structure, supports or members shall be permitted. A sign face change
is considered normal maintenance.
5. …
B. …
C. Nonconforming electronic changeable copy signs. Such signs which are
made nonconforming by the adoption of ordinance no. 1641 shall be brought
into conformance with the requirements of this article on or before May 11,
2019.
Section 4. Section 26-707 is amended to with edits to subsections B. and G. as
follows:
Sec. 26-707. General provisions/performance standards.
…
B. Location of signs.
1. All signs allowed by this article, except billboards, public signs, and signs permitted under the criteria in section 26-708 E. must be owned
by the property/building owner, or principal lessee of the
property/building on which the sign is placed. Refer to Sections 26-
710 and 26-711 for permitted sign locations on private property.
C. …
G. Illumination.
1. …
5. In the MU-N and MU-LLC districts, illuminated signs are encouraged to
be turned off when businesses are not in operation.
6. …
9. The nighttime illumination of changeable copy signs shall comply with
Section 26-710.F. conform with the following criteria:
a. Illumination measurement methods shall be consistent with
established city policy.
b. Illumination limits. The difference between the off and solid-
message measurements using the measurement criteria shall not
exceed 0.3 footcandles at night.
c. Dimming capabilities. All permitted changeable copy signs shall be
equipped with a sensor or other device that automatically
determines the ambient illumination and programmed to
automatically determines the ambient illumination and
programmed to automatically dim according to the ambient light conditions, or that can be adjusted to comply with the 0.3
footcandle measurements.
Section 5. Section 26-708.B.2. is amended to add clarifying language as follows:
Sec. 26-708. Miscellaneous provisions.
…
B. Signs located on bus benches and bus stop shelters.
1. Signs located on bus benches shall be in conformance with section 21-
124 of the Code.
2. Signs located on a bus stop shelter shall be in conformance with section 21-151 of the Code. Such signs shall be limited to two (2) sign
faces per shelter with a maximum sign area of twenty-four (24) square feet per face.
Section 6. Section 26-709 is amended to update Table 1 by the removal and edits
of the following rows as follows:
Table 1. Permanent Signs by Land Use
L
L
L
Section 7. Section 26-710 is amended to remove definitions from each of the
permanent sign types, renumber as needed, add a table for freestanding signs, and update language to provide clarity and consistency as follows:
Sec. 26-710. Permanent sign standards.
A. …
C. Arcade signs.
1. Definition: Any sign projecting beneath and attached to the underside of
any balcony, canopy, awning or other structural overhang or passageway.
1.2. Maximum number: one (1) per business.
2.3. Maximum size: four (4) square feet.
3.4. Height: minimum height above street frontage or sidewalk level is seem
seven (7) feet.
4.5. Location: may not extend above the bottom of eave, balcony, canopy,
awning or other structural overhang or passageway to which it is affixed.
Can extend into right-of-way with an approved right-of-way permit.
D. Barber shop poles.
1. Definition: A sign with a striped interior which may or may not rotate, which is traditionally utilized to signify the presence an establishment
within which the practice of barbering is engaged or carried out.
1.2. Maximum number: one (1) per street frontage or major interior drive.
2.3. Height: pole height cannot exceed five (5) feet in total, and may not
exceed height of building to which it is attached.
3.4. Location: must be wall mounted. May extend into the right-of-way with
an approved right-of-way permit.
E. Blade signs.
1. Definition: a sign which is affixed to any building, wall or structure and
which extends beyond the building wall more than fifteen (15) inches. The outermost edge of the sign shall project Projection shall extend no
more than forty-eight (48) inches away from the structure to which the
sign is attached.
2. …
4. Height:
a. May not extend above the top of the wall or parapet or; not to be roof
mounted. b. …
6. Additional standards:
a. Blade signs are encouraged in the traditional overlay areas, as defined by the architectural and site design manual, and in mixed-use zones.
b. … e. Blade signs are allowed for multi-unit buildings but are not allowed for
single-unit attached dwellings.
F. Canopy signs.
1. Definition: a sign mounted to a roof-like structure serving the purpose of
protecting vehicles and/or pedestrians and which may be freestanding or
attached to a building, is provided with supports, and is open on three (3) sides if attached and on all sides if freestanding.
1.2. Maximum number: one (1) per street frontage or major interior drive.
2.3. Maximum size: The total allowed square footage of all canopy signs on
a canopy structure shall be based on one-half (0.5) square foot for
every linear foot of the canopy that faces streets or major internal drives, as determined by the community development director. Canopy
signage is allowed in addition to primary building signage. canopy signs
may use up to fifty (50) percent of the allowed wall sign allowance the
size of the canopy sign is to be subtracted from the allowable wall
signage.
3. Canopy signs are permitted to be affixed to any side of a canopy.
G. Changeable copy signs.
1. Definition: a sign, either illuminated or nonilluminated, which is designed
so that the message or any part of the message may be periodically
changed, either mechanically or electronically, however, where a change in message occurs no sooner than every eight (8) seconds. This includes
signs that utilize computer-generated messages or some other
electronic means of changing copy, including displays using
incandescent lamps, electronic message centers (EMCs), LEDs, LCDs or
a flipper matrix. Messages shall be static and a change in message shall be instantaneous.
1.2. Prohibition: changeable copy signs are not be permitted in the MU-N
district, or the MU-C TOD sub-district. See section 26-1412 for
changeable copy regulations in the MU-LLC district.
2.3. Maximum number: one (1) per street frontage, but no more than two (2)
per development.
3.4. Maximum size:
a. Nonresidential uses iIn residential zone districts, a maximum of thirty-
two (32) square feet per sign.
b. Nonresidential uses iIn nonresidential zone districts, the freestanding
and wall signage size regulations (subsections 26-710 J. and 26-710
M.L.) apply.
4.5. Height:
a. In residential zone districts, a maximum of seven (7) feet.
b. In nonresidential zone districts, freestanding and wall signage height regulations (subsections 26-710 J. and 26-710 M.L.) apply.
5.6. Location: for freestanding changeable copy signs, the minimum setback
is five (5) feet from any property line.
6.7. The time lapse between changes the change in information shall not be less than eight (8) seconds.
7. The nighttime illumination of changeable copy signs shall conform with
the following criteria:
a. Illumination measurement methods shall be consistent with
established city policy. b. Illumination limits. The difference between the off and solid-message
measurements using the measurement criteria shall not exceed 0.3
footcandles at night.
c. Dimming capabilities. All permitted changeable copy signs shall be
equipped with a sensor or other device that automatically determines the ambient illumination and programmed to automatically determines
the ambient illumination and programmed to automatically dim
according to the ambient light conditions, or that can be adjusted to
comply with the 0.3 footcandle measurements.
H. Directional signs.
1. Definition: a freestanding or wall-type sign, not located within the public
street right-of-way, providing necessary directional information to motor vehicle operators or pedestrians, such as entrance, exit, parking
limitations or location of onsite buildings or facilities. Directional signs
shall be clearly incidental to the primary signage on a property, in both height and sign area.
1.2. Maximum number: no limit.
2.3. Maximum size:
a. Eight (8) square feet per side; or
b. fFour (4) square feet per side if located within a required sight distance triangle.
3.4. Height:
a. If freestanding, sShall not exceed six (6) feet in height; or
b. Shall not exceed thirty-six (36) inches in height as measured from
the flow line or edge of pavement if within a required sight distance triangle, or forty-eight (48) inches where outside of a sight distance
triangle.
I. Flag.
1. Definition: any fabric or other flexible material attached to or designed to
be flown from a flagpole or similar device.
1.2. Maximum Height: Maximum flagpole height of thirty-five (35) feet.
J. Freestanding signs.
1. Definition: a sign that is permanent and self-supporting, being
nondependent on support from a building or other structure, including signs placed upon fences or nonsupporting walls. This includes pole-
mounted or monument signs.
1.2. Owner authorization required: building permit applications for single
tenant signs on multitenant properties shall include property owner
authorization with the building permit application.
2. Sign Height. The height shall be measured from the lowest point of the
sign base to the top of the sign. In instances of significant grade difference
between the site grade and adjacent sidewalk or similar feature, as determined
by the community development director, the sign height may be measured from
the finished grade from the nearest pedestrian walk or similar feature.
3. …
4. Multiple signs: where multiple freestanding signs are permitted pursuant
to this section, the following standards shall apply:
a. Where two (2) freestanding signs are permitted by virtue of multiple
street frontages, eEach permitted sign shall be allowed to have the maximum square footage allowed as noted in this subsection. In
addition, the permitted sign area allowed may be transferred from one
(1) sign to another; provided, that no freestanding sign shall exceed four
hundred (400) square feet in sign area.
b. …
5. For low density residential uses:
a. Not permitted, except for as allowed by the home occupation regulations.
6. For multi-unit dwelling uses, including single-unit attached dwellings:
a. Maximum number: One (1) per street frontage, not to exceed two (2).
b. Maximum size: thirty-two (32) square feet.
c. Minimum setback: five (5) feet from any property line. d. Maximum height: seven (7) feet.
7. For nonresidential uses in residential zone districts:
a. Maximum number: one (1) per street frontage, not to exceed two (2).
b. Maximum size: thirty-two (32) square feet.
c. Minimum setback: five (5) feet from any property line. d. Maximum height: seven (7) feet.
8. For nonresidential uses in nonresidential zone districts:
a. Maximum number: one (1) per street frontage, not to exceed two (2). b. Maximum size: based upon table 3 below.
c. Minimum setback, based upon height and adjacent zoning:
(1) Ten (10) feet if adjacent to residentially zoned properties.
(2) Five (5) feet from ROW if under seven (7) feet tall.
(3) Ten (10) feet from ROW if seven-fifteen feet in height. (4) Thirty (30) feet for signs over fifteen (15) feet in height.
d. Maximum height: based upon zoning and location:
(1) Seven (7) feet in all mixed use zone districts.
(2) Fifty (50) feet for retail and service businesses within one quarter
(¼) mile of an interstate highway measured from the property line. (3) Fifteen (15) feet for all other freestanding signs.
5. Freestanding signs for the following uses shall comply with the
standards in Table 3:
Table 3. Freestanding Sign Standards by Use Type
Use Type Max. Number Max. Size (sf) from ROW
2
Max. Height
(ft.)
residential illuminated
1
2 sf 0 ft. 4 ft.
residential
1 per street
frontage, maximum 2
per
development
32 sf 5 ft. 7 ft.
uses in
residential 32 sf 5 ft. 7 ft.
Nonresidential
uses in nonresidential
zone districts
Per Table 4
5 ft. for signs
≤7 ft. in height;
10 ft. for signs
> 7 ft. to ≤15 ft. in height;
30 ft. for signs
> 15 ft. in
height
districts: 7 ft.
Retail/Service
business
within ¼ mile
of an interstate
highway3: 50 ft.
2. 10 ft. side/rear setback also required when adjacent to a residentially zoned property.
Table 43. Maximum sign area for freestanding signs for
nonresidential NONRESIDENTIAL uses in nonresidential zone
districts
Floor Area of Building* Single Tenant Sign Multiple Tenant Sign
0—1,500 square feet 35 square feet 60 square feet
1,501—5,000 square feet 35 square feet plus 1
square foot per each
additional 50 square feet
square foot per each
additional 40 square feet
square foot per each
additional 500 square foot
square foot per each 300
square feet of floor area
square foot per each additional 1,000 square
feet of floor area over
50,001 up to a maximum
square foot per each additional 1,000 square
feet of floor area over
50,001 up to a maximum
principal building
can be used. The floor area of any freestanding canopies or accessory structures on
the property gas station canopies and drive-thru canopies cannot be applied toward
9. Home occupations:
a. Must be in compliance with section 26-613 of the Municipal Code.
b. Must have an approved business license through the city.
c. Permitted one (1) non-illuminated sign not to exceed two (2) square feet
in size.
6.10.3D signs: three-dimensional (3D) signs, as defined in section 26-702, are permitted the sign allowances listed in this subsection multiplied by one
and seventy-five one-hundredths (1.75), as measured in cubic feet.
K. Sign oriented to a drive-through lane.
1. Definition: a freestanding or wall-mounted sign, oriented predominantly
towards a drive-through or drive-up lane, which is clearly incidental to the primary signage on a property, in both height and sign area.
1.2. Maximum size: thirty-five (35) square feet per drive-through lane
2.3. Maximum height: six (6) feet
3.4. Additional standards
a. May be illuminated by internal lighting only.
b. Must be screened from the right-of-way such that signs do not violate
subsection 26-707 D.
L. Traffic control or and regulatory signs.
1. Definition: signs, signals or markings placed or erected by federal, state or
local authority of the purpose of regulating, warning or guiding traffic
1.2. Location: may be placed by the federal, state or local authority within the
public right-of-way.
M. Wall or painted signs.
1. The purpose of these regulations is to establish a maximum size
allowance and to allow flexibility in wall sign location. Definition: a sign constructed of durable materials which is permanently affixed to an
exterior surface of any building, wall or structure or painted directly on the
exterior surface of a building, wall or structure which does not extend more than fifteen (15) inches beyond the building wall, except that signage
placed upon marquees, canopies or awnings shall be considered wall signs.
2. Maximum size:
a. Single tenant building allowance. The total allowed square footage of all wall signs on a building shall be based on one (1) square foot for every
linear foot of the walls that face streets or major internal drives, as determined by the community development director. Total size for any
single or combined wall sign is no larger than one (1) square foot for
every linear foot of the side of the building to which it is affixed. b. Multiple tenant building allowance. The total allowed square footage of
tenant signs on a multiple tenant building shall be based on one (1) square foot for every linear foot of the tenant’s space that faces streets
or major internal drives, as determined by the community development
director. c. No individual wall sign shall exceed one and one-half (1.5) the size
allowed by the length of the wall it is placed upon.
3.3. Location:
a. Signs may only be affixed to walls which face public streets or major
interior drives, as determined by the community development director
Wall signs are permitted to be affixed to any exterior wall of the building.
b. For buildings with flat roofs, wall signs shall not extend above the top of the parapet wall.
c. For buildings with mansard roofs, wall signs shall not extend above the
top of the mansard roof by more than three (3) feet., and if placed upon a
parapet or mansard shall not extend more than three (3) feet above the
deck line.
d. The community development director may approve a roof sign, in lieu of
a wall sign, in limited circumstances where there is not another visible or
practical location for a wall sign, such as on a small kiosk. e.c. For uses which have a rear entry or rear delivery door, one (1)
nonilluminated wall sign not to exceed four (4) square feet per tenant is
permitted.
4. Other: signs affixed to canopies shall be considered wall signs and shall be
calculated based upon the length of the wall to which they are attached or adjacent.
4.5. Home occupations:
a. …
5.6. Additional standards:
a. Building wWall signs shall complement the building's architecture and fit
within the architectural features of the façade so they do not overlap
windows or columns.
N. Window or door signs.
1. Definition: any sign or decal affixed to, painted on, applied to, or hanging
within twelve (12) inches of the interior of a window and that can be seen through the window from the exterior of the structure, but excludes
merchandise included in a window display.
1.2. Maximum size: sign shall not obstruct more than twenty-five (25) percent
of the door or window area
2.3. Additional standards:
a. …
c. Exterior applied window signs shall be made of durable materials
appropriate for Colorado’s climate, such as vinyl, and maintained in
good condition at all times.
d. Exterior window signs are allowed only if the interior of the window is
inaccessible by the tenant.
Section 8. Section 26-711 is amended to remove definitions within the sign types,
renumber as needed, and provide clarification as follows:
Sec. 26-711. Temporary sign standards.
A. …
B. Balloon or inflatable.
1. Definition: any sign consisting of material intended to be filled with air
or helium, or have air blown through in order to create a visual
attraction; this is inclusive of air dancers, inflatables caricatures, all
types and sizes of balloons, and similar devices.
1.2. Height: cannot exceed twenty-five (25) feet above existing grade.
2.3. Location: may not be located within the public right-of-way.
3.4. Additional standards:
a. …
C. Banner.
1. Definition: a sign or advertising display constructed of cloth, canvas,
fabric or other light material that is mounted with no enclosing
framework intended to be displayed for a short period of time.
1.2. Maximum size: …
2.3. Location: may be placed upon a building wall but shall not be attached to fencing, landscaping, freestanding posts or utility poles. Banners
may be placed only on walls facing a public street or major interior
drive.
3.4. Other: …
D. Pennant, streamer, and other similar device.
1. Definition: a sign made of flexible materials intended to create a visual
attraction through movement. This is inclusive of flutter flags.
1.2. Location: …
F. Portable.
1. Definition: any sign which is supported by one (1) or more uprights or braces upon the ground and which is of portable design, such as A-
frame or pedestal style signs.
1.2. Maximum size: …
2.3. Setback: …
3.4. Location: …
G. Signs carried by persons.
1. Definition: any sign, which is carried or worn by any person, typically in
or along the right-of-way for the purpose of attracting and directing traffic to a particular place of business.
1.2. Maximum size: …
2.3. Location: …
H. Yard—Small.
1. Definition: a temporary, ground-mounted, portable sign constructed of paper, vinyl, plastic, wood, metal or other comparable material, and
designed or intended to be displayed for a limited period of time.
1.2. Maximum number: …
2.3. Maximum size: shall not exceed four (4) square feet in size per sign.
3.4. Location: …
I. Yard—Large.
1. Definition: a temporary, ground-mounted, portable sign constructed of
paper, vinyl, plastic, wood, metal or other comparable material, and
designed or intended to be displayed for a limited period of time.
1.2. Maximum number: …
2.3. Maximum size:
a. …
c. For nonresidential uses: thirty-two (32) square feet.
3.4. Minimum setback: …
4.5. Maximum height: shall not exceed seven (7) feet in height.
5.6. Location: …
Section 9. Section 26-712 is amended to add a new subsection D. regarding regulations for digital billboards, renumbered as needed, and to clarify language therein:
Sec. 26-712. Billboards; specifications and regulations.
A. General provisions. …
2. Billboard district. For the purpose of this section, the city has one (1)
billboard district, as shown on the official billboard district zoning map of the city, Figure 26-712.1, and incorporated herein, as shown below
as the shaded area.
Official Billboard Zoning District Map
3. …
B. Maximum number of billboards permitted.
1. …
2. When a billboard is fully abandoned, as described in subsection G.F.,
below, the maximum number of billboards within the city shall
automatically be reduced accordingly.
C. Design standards.
1. …
2. Changeable copy billboard signs are not allowed.
2.3. Billboards shall be located within two hundred and fifty (250) feet of a
highway, excluding on- and off-ramps, as measured radially from the
leading edge of the billboard to the closest edge of the highway right-
of-way line.
3.4. Structure setbacks shall be as required for a principal structure in the
zoning district where the billboard is located and shall be measured
perpendicularly from the property line to the leading edge of the
billboard or structure, whichever is closest.
4.5. All replacement billboards shall be of the pedestal type, unless prohibited by soil conditions as certified by a professional engineer. As
used herein, "pedestal" type signs are freestanding signs supported by
one (1) or more columns, poles, or support structures.
5.6. The maximum sign face size for a single-sided, two-sided, or V-shaped
sign with an angle of less than sixty (60) degrees shall not exceed seven hundred fifty (750) square feet per sign face. For V-shaped signs
with greater than a 60-degree angle, the combined size of both sign
faces shall not exceed seven hundred fifty (750) square feet, and the
total length of both sign faces shall not exceed six (6) times the height
of the sign face.
6.7. The maximum height to the highest point of the billboard shall not
exceed thirty-two (32) feet.
D. Digital billboards.
1. Up to four (4) of the 15 previously permitted billboards may convert one
(1) face each to a digital billboard.
2. The size, height, orientation, and location of each converted billboard
face shall remain unchanged from its previously permitted configuration.
3. There shall be at least 2,500 feet between digital billboards oriented in
the same direction within the city, including from existing digital
billboards in adjacent jurisdictions, as measured in a straight line from
the closest point of the support structure.
4. Illumination
a. Nighttime luminance of the digital display shall not exceed 250
candelas per square meter (cd/m²), or nits, as measured at the surface of the display with a luminance meter oriented
perpendicular to the sign face. The city may request a billboard sign
owner to provide evidence this measurement is being met. b. The difference between the "off" and "solid-message"
measurements shall not exceed 0.3 footcandles when measured at a distance determined by the formula: Distance = square root of (Area
of Sign Face x 100).
c. All permitted digital billboard shall be equipped with a functional
photocell or ambient-light sensor that automatically adjusts
brightness in real-time according to ambient light conditions (e.g., sunset, heavy cloud cover).
5. Digital billboards shall use utilize shielding technology, such as
strategically placed louvers or optically down-angled LEDs, to direct illumination only toward the intended viewing audience.
6. Digital display.
a. All parts of a digital message shall remain static.
b. Messages may be changed no sooner than every ten (10) seconds.
c. Copy changes shall be instantaneous and shall not include motion, animation, flashing, fading, or any special effects.
7. Location selection process. The permitted digital billboard locations will
be determined through a lottery process, as follows:
a. If an abandonment or other event results in fewer than the maximum
permitted number of digital billboards to be located within the city
under Section 26-712.D.1, , the city shall declare that a vacancy
exists and publish notice of the vacancy on the city's website and post such notice at the city's official posting places. The
determination and declaration of a vacancy shall be in the city's sole
and absolute discretion. The notice of vacancy shall provide that
interested parties must file a preliminary application with the city
within thirty (30) days of the date of notice.
b. The city shall accept preliminary applications from interested
parties for thirty (30) days from the date of the notice of vacancy.
Preliminary applications must include, at a minimum, the following
information:
i. A letter of intent from the applicant;
ii. The proposed location of the billboard, including either
property address or assessor parcel identification number; and
iii. Written permission of the property owner to locate the billboard, if the property owner is not the named applicant.
c. The community development director will determine whether
preliminary applications are complete and proposed locations are
eligible pursuant to chapter 26 of the code of laws.
d. In the event more than one complete and eligible preliminary application is timely filed, the city shall select one preliminary
application to continue processing by lottery. All potential applicants
in the lottery shall be notified of the time and place that lots shall be
drawn and may attend and observe the process . If the city does not
receive any preliminary applications within the initial thirty (30) day response period, the city shall maintain the notice of vacancy on the
city's website. The notice of vacancy shall be amended to reflect
that the initial response period has lapsed and that preliminary
applications will now be accepted and processed by the city in the
order received . If more than one preliminary application is thereafter received by city on the same date , the lottery process set
forth above shall be used to select one application to continue
processing .
e. The sole or selected applicant must file a complete building permit
application within one hundred eighty (180) days of:
i. The date the applicant is selected by lottery, if so selected;
ii. The expiration of the initial thirty (30) day response period if the
applicant is the only party that has filed a timely letter of intent; or
iii. The date of the applicant's preliminary application if submitted
after the initial thirty (30) day response period; provided, however,
that the community development director may authorize an
extension of not more than one hundred eighty (180) additional days upon a showing by the applicant that it is making substantial
progress towards filing a complete application , as determined by
the director in his or her sole and absolute discretion .
f. An applicant's failure to meet deadlines or to timely file materials
and information necessary to comply with the permit process , as determined by the community development director in their sole and
absolute discretion , shall result in the rejection of his or her
application and the generation of a new notice of vacancy, in
accordance with paragraph (a.) above.
8. Public Service Access
a. As a condition of any permit for the conversion of a static billboard
to a digital display, the billboard owner shall enter into a public
benefit agreement with the city. This agreement shall include, but is not limited to, the following operational requirements:
i. Non-Commercial Message Slot: The billboard owner shall
provide the city with one (1) dedicated message slot within every
standard rotation loop at no cost to the city for noncommercial,
public service use.
ii. Emergency Override: The city shall have the right to immediate and
total access to the digital display for the purpose of broadcasting
emergency alerts (e.g., Amber Alerts or imminent weather
hazards). Emergency messaging shall supersede all scheduled
commercial copy for the duration of the alert.
iii. Content Management: The city’s city manager or their designee
shall provide the digital creative. The billboard owner shall upload
and display such messaging within twenty-four (24) hours of
receipt, or within one (1) hour for emergency alerts.
E.D. Maintenance. …
F.E. Temporary removal and replacement.
1. …
2. Failure to comply with any of the conditions under which temporary
removal is permitted under subsection EF.1., above, shall be
considered abandonment.
G.F. Abandonment.
1. A billboard may be deemed fully abandoned if one (1) of the following
occurs:
a. …
b. Following notice from the city based on failure of the billboard owner
to adequately maintain the sign pursuant to subsection E.D., above;
c. Following notice from the city based on repeated failure of the billboard owner to adhere to the regulations contained herein; or
d.c. Removal without following the temporary removal and replacement
process outlined in subsection F.E., above.
Section 10. Initial application process. Within thirty (30) days of the effective date of this ordinance and in lieu of an initial lottery process, the four billboard owners
within the city may submit preliminary applications proposing an equitable distribution
of digital billboard conversions that collectively meet the requirements of Section 26-
712. The contents of a preliminary application are provided in Section 26-712.D.7.b.
After this deadline, the lottery provisions of Section 26-712 shall apply. Notwithstanding
the foregoing, the city shall have final determination of the allowed locations and may at
any time open the lottery process.
Section 11. Severability, Conflicting Ordinances Repealed. If any section, subsection or clause of this Ordinance shall be deemed to be unconstitutional or
otherwise invalid, the validity of the remaining sections, subsections and clauses shall
not be affected thereby. All other ordinances or parts of ordinances in conflict with the
provisions of this Ordinance are hereby repealed.
Section 12. Effective Date. This Ordinance shall take effect immediately.
INTRODUCED, READ, AND ADOPTED on first reading by a vote of ___ to ___ on
this 26th day of October 2026, ordered published in full on the City’s website as provided
by the Home Rule Charter, and Public Hearing and consideration on final passage set
for November 9, 2026, at 6:30 p.m., in the Council Chambers, 7500 West 29th Avenue,
Wheat Ridge, Colorado.
READ, ADOPTED AND ORDERED PUBLISHED on second and final reading by a
vote of ___ to ___, this 9th day of November 2026.
SIGNED by the Mayor on this _____ day of ____________, 2026.
___________________________________
Korey Stites, Mayor
ATTEST:
____________________________
Janeece Hoppe, City Clerk
Approved as to Form:
___________________________________
Gerald Dahl, City Attorney
First Publication: October 27, 2026
Second Publication: November 10, 2026 Effective Date: November 9, 2026
Published:
Jeffco Transcript and www.ci.wheatridge.co.us
ITEM NUMBER: 6
DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
MOTION
TITLE: MOTION AWARDING A CONTRACT TO JR ENGINEERING IN
THE AMOUNT OF $1,860,448 WITH A CONTINGENCY
AMOUNT OF $186,045 FOR A TOTAL APPROVED AMOUNT
OF $2,046,493 FOR DESIGN SERVICES FOR THE 35TH
AVENUE MULTIMODAL IMPROVEMENTS PROJECT
☐PUBLIC HEARING
☒BIDS/MOTIONS
☐RESOLUTIONS
☐ORDINANCES FOR 1st READING ☐ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
Staff are seeking approval to award a professional services contract to JR Engineering
in the amount of $1,860,448 to provide design services for the 35th Avenue Multimodal
Improvement Project.
The project will extend the existing neighborhood bikeway along 35th Avenue, improve
pedestrian and bicycle connectivity, and incorporate traffic-calming measures to enhance safety for all roadway users. The project is supported by federal and state
transportation funding, with the City responsible for its applicable local funding match.
PRIOR ACTION:
The City's 2017 Bicycle and Pedestrian Master Plan identified 35th Avenue as a neighborhood bikeway and recommended improvements to bicycle and pedestrian
safety and connectivity.
In 2020, community engagement through the City's Let's Talk East Wheat Ridge
program reaffirmed the need for improvements along the corridor.
In 2022, the City initiated additional public engagement and planning for the W. 35th Avenue Street Improvements Project. More than 240 residents participated in the
engagement process, identifying concerns related to vehicle speeds, pedestrian and
bicycle safety, and the need for continuous sidewalk infrastructure.
In 2025, the City entered into an Intergovernmental Agreement with CDOT to establish
Council Action Form – 35th Avenue Multimodal Improvements October 26, 2026
Page 2
responsibilities, funding sources, and applicable requirements for the design phase of
the project.
On July 24, 2026, staff issued a Request for Proposal (RFP) for consultants to provide
design services for 35th Avenue. Staff received proposals from three consultants and
after evaluating the firm capabilities and similar work experience, the project team in charge of the project, and the firm’s approach and timeline determined that JR
Engineering was the best consultant to complete this project.
FINANCIAL IMPACT:
Funding for the 35th Avenue Multimodal Improvement Project is budgeted in the Wheat Ridge Next Chapter 2J Bond, with design services starting in 2026. Construction funding
has not yet been identified.
The total CDOT funding is $4,950,000. The project's funding includes $1,975,000 in
federal funds, $2,475,000 in state Multimodal Transportation and Mitigation Options
Fund (MMO) funds, and a City contribution of $500,000.
BACKGROUND:
The 35th Avenue Multimodal Improvements Project will establish an approximately 1.5-mile multimodal corridor between Sheridan Boulevard and Wadsworth Boulevard. The improvements will extend the existing 35th Avenue neighborhood bikeway in Denver
and provide a more continuous connection to Wheat Ridge's Wadsworth Urban Center and the surrounding regional bicycle and pedestrian network.
Existing conditions along the corridor include gaps and deficiencies in sidewalk infrastructure, limited pedestrian accessibility, and concerns about vehicle speeds and traffic safety. In some locations, the lack of adequate sidewalks forces pedestrians to
walk in the street, creating conflicts with vehicles and bicyclists. The project will address these deficiencies while considering neighborhood character, property access, on-street parking, emergency access, and snow removal.
The proposed improvements will be tailored to conditions along the corridor. Potential elements include five-foot-wide attached sidewalks, shared-lane bicycle markings
(sharrows), advisory shoulders in constrained locations, traffic-calming features, intersection and crossing improvements, signage, landscaping, and related pedestrian and bicycle infrastructure. The final design will consider community input and the physical constraints of individual roadway segments.
The project will also improve connections to nearby destinations, including Panorama
Park, Founders Park, the Wheat Ridge Active Adult Center, the Wadsworth Urban Center, and the regional trail system. The improvements are intended to provide safer access for people walking, bicycling, and using mobility aids while maintaining appropriate roadway operations and property access.
Council Action Form – 35th Avenue Multimodal Improvements October 26, 2026
Page 3
RECOMMENDATIONS:
Staff recommend awarding a contract to JR Engineering in the amount of $1,860,448
for the 35th Avenue Multimodal Improvements Project, with a contingency amount of
10% or $186,045 for a total not-to-exceed amount of $2,046,493.
RECOMMENDED MOTION:
“I move to award a contract to JR Engineering in the amount of $1,860,448 with a
contingency amount of $186,045 for a total approved amount of $2,046,493 for the 35th
Avenue Multimodal Improvements Project.”
Or,
“I move to deny award to JR Engineering in the amount of $1,860,448 with a
contingency amount of $186,045 for a total approved amount of $2,046,493 for the 35th
Avenue Multimodal Improvements Project. for the following reason(s).”
REPORT PREPARED/REVIEWED BY:
Daniel Martinez, CIP Program Manager
Kent Kisselman, Director of Public Works
Patrick Goff, City Manager
ATTACHMENTS:
1. JR Engineering Contract
35th Avenue Multimodal Improvements
26-38
THIS AGREEMENT made this Tuesday, October 6, 2026, by and between the City of Wheat Ridge, Colorado,
hereinafter referred to as the “City” or “Owner” and JR Engineering, 7200 S. Alton Way C400, Centennial,
CO 80112, hereinafter referred to as the “Consultant.”
WITNESSETH, that the City of Wheat Ridge and the Consultant agree as follows:
Article 1 - Services
The Consultant will serve as the City’s consultant and provide at a minimum all the professional services
required as per the requested scope of work (Exhibit A), as more fully described in the Vendor’s response to
the RFP (Exhibit B) incorporated herein by reference.
The Consultant agrees to support the City in shaping 35th Avenue from Sheridan Boulevard to Wadsworth
Boulevard integrating three key elements: traffic calming, bicycle infrastructure, and pedestrian amenities.
Minimally, the following services will provided:
•Project Management and Administration
•Public Engagement and Stakeholder Meetings
•Topographic Survey
•Utility Investigation
•Hydrology and Hydraulic Engineering
•Environmental Clearance to include:
o site assessment
o air quality and noise memo
o biological resources report
o Historical Investigation including SHPO submittals
o CDOT Form 128
o Materials Management Plan
•Engineering and Design
•Plan Development and Production (per CDOT standards- detailed in Exhibit A)
•Landscape Design
ATTACHMENT 1
• ROW Plan Development
• Lighting Design
• Geotechnical Investigation
• Traffic Analysis and Traffic Calming Design
• ROW Acquisition Services
• Construction Support Services
Article 2 - Term
The work to be performed under this agreement may commence promptly after receipt of a fully-executed copy
of the agreement, to the extent that the Consultant has been authorized to proceed by the City.
This agreement is intended for the work described in Article 1 and Exhibits A & B, it is not eligible for renewal.
It is anticipated the project will be completed by the end of 2028.
Article 3 - Payment and Fee Schedule
It is understood and agreed by and between the parties hereto, that the City shall pay the Consultant for
services provided, and the Consultant will accept a not-to-exceed amount of one-million, eight-hundred sixty
thousand, four-hundred forty-eight dollars ($1,860,448) as full payment for the services.
The City operates on a calendar year as its fiscal year; as such, all invoices must be received no later than
December 20, in order to be processed in the same calendar year.
1. Invoices by Task
Invoices will be submitted monthly by the Consultant for services performed and expenses incurred,
pursuant to this agreement during the prior month. Payment is then made to the Consultant within thirty
(30) days of receipt via Electronic Funds Transfer (EFT). The City may elect the alternative method of
payment by the Treasurer’s Office through proper accounting procedures.
2. Funding
There is in effect within the City of Wheat Ridge, Colorado, a provision of the City’s Code of Laws which
limits the amount for which the City shall be liable to the amount expressly appropriated by the City
Council, either through budgeted appropriation, or contract or bid award. The consultant is specifically
advised of the provisions of this portion of the Code of Laws of the City of Wheat Ridge, which was
enacted pursuant to Ordinance 787, Series of 1989, and expressly incorporated herein. This contract is
specifically subject to the provisions of said Ordinance and adopted Code Section.
Article 4 - No Damages for Delay
Pursuant to Section 2-4 of the Code of Laws, Consultant agrees to waive, release or extinguish its right to
recover costs or damages, or obtain an equitable adjustment, for delays in performing this contract if such
delay is caused in whole or in part by acts or omissions of the City or its agents, provided however an
extension of time is the Consultant's remedy for such delay.
Article 5 - Reserved.
Reserved.
Article 6 - Sales and Use Taxes
The City of Wheat Ridge is exempt from City, County, State, and Federal sales and excise taxes. Certificates
will be issued upon request. City of Wheat Ridge Sales Tax Exempt: 98-03515
Article 7 - Independent Consultant
In performing the work under this agreement, the Consultant acts as an independent consultant and is solely
responsible for necessary and adequate worker’s compensation insurance, personal injury and property
damage insurance, as well errors and omissions insurance. The Consultant, as an independent Consultant, is
obligated to pay Federal and State income tax on monies earned. The personnel employed by the Consultant
are not and shall not become employees, agents, or servants of the City because of the performance of any
work by this agreement. The Consultant warrants that it has not employed or retained any company or person,
other than a bona fide employee working solely for it, to solicit or secure this agreement, and that it has not
paid or agreed to pay any company or person—other than bona fide employees working solely for the
Consultant—any commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or
resulting from the award or making of this agreement. For breach or violation of this warranty the City will have
the right to annul this agreement without liability or in its discretion to deduct from the agreement price or
consideration, or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or
contingent fee.
Article 8 - Insurance
In accordance with Article 7 above, the Consultant shall furnish a certificate of insurance upon notification of award,
and prior to performance. Work shall not commence under this agreement until the Consultant has submitted to the
City and received approval thereof, a certificate of insurance showing compliance with the following minimum types
and coverages of insurance:
Type of Insurance Minimum Limits of Liability
Worker’s Compensation, Coverage A Statutory, including occupational disease
coverage for all employees at work site.
Employer Liability, Coverage B $500,000 per person
$500,000 per accident
$500,000 each disease
Commercial General Liability (including Premises-
Operations, Independent Contractor’s Protective,
Broad Form Property Damage, and Contractual
Liability)
• Bodily Injury
• Property Damage
$1 million per occurrence
$2 million aggregate
$1 million per occurrence
$2 million aggregate
Comprehensive Automotive Liability (owned, hired,
and non-owned vehicles)
• Bodily Injury
• Property Damage
$2 million per occurrence
$2 million per occurrence
The City of Wheat Ridge shall be named as additional insured on all liability policies. Insurance shall
include provisions preventing cancellation without 30 days prior notice by certified mail to the City.
Nothing herein shall be deemed or construed as a waiver of any of the protections to, which the agencies may be
entitled pursuant to the Colorado Governmental Immunity Act, Sections 24-10-101, CRS, as amended.
Article 9 - Indemnification
The Consultant agrees to indemnify, defend, and to hold the City, CDOT, and its agents, officials, officers and
employees harmless for, from and against any and all claims, suits, expenses, damages, or other liabilities—
including reasonable attorney fees and court costs arising out of damage or injury to persons, entities, or
property causes or sustained by any person or persons to the extent caused by the negligent, acts, omissions,
performance or failure of the Consultant to provide services pursuant to the terms of this agreement.
Article 10 - Equal Employment Opportunity
The Consultant shall not discriminate against any employee or applicant for employment because of age, race,
color, religion, sex, or national origin. The Consultant shall adhere to acceptable affirmative action guidelines in
selecting employees and shall ensure that employees are treated equally during employment, without regard to
age, race, color, religion, sex, or national origin. Such action shall include—but not be limited to the following:
employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination,
rates of pay or other forms of compensation, and selection for training—including apprenticeship. The
Consultant agrees to post in conspicuous places, available to employees and applicants for employment,
notices provided by the local public agency setting forth the provisions of this nondiscrimination clause.
The Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by
this agreement so that such provisions will be binding upon each subcontractor—provided that the foregoing
provisions shall not apply to contracts or subcontracts for standard commercial supplies or raw materials.
Article 11 - Charter, Laws, and Ordinances
The Consultant at all times during the performance of this agreement, agrees to strictly adhere to all applicable
Federal, State, and local laws, rules, regulations, and ordinances that affect or govern the work as
contemplated under this agreement.
Article 12 - Law and Venue
The laws of the State of Colorado shall govern as to the interpretation, validity, and effect of this agreement.
The parties agree that venue and jurisdiction for disputes regarding performance of this contract is with the
District Court of Jefferson County, Colorado.
Article 13 - Termination
The Consultant acknowledges that his failure to accomplish the work as described shall be considered a
material breach of the contract and entitle the City to consequential damages resulting from failures, acts, or
omissions—including, but not limited to re-procurement costs, insufficient or improper work.
The City and the Consultant agree that this agreement may be canceled for cause by either party, with a fifteen
(15) day prior written notice. The cost of completing the portion of the work which remains unperformed at the
time of such termination shall be deducted from the contract price before payment is made.
The City may terminate the agreement for its convenience, upon thirty (30) days written notice. In the event of
such termination the Consultant will be paid for all work and expenses incurred up until the time of such
termination.
All work accomplished by the Consultant prior to the date of such termination shall be recorded, and tangible
work documents shall be transferred to and become the sole property of the City, prior to payment for services
rendered.
Article 14 - Notices
Contact Information City Consultant
Name: Eric Czaikowski JR Engineering
Office Phone: 303-205-7627 303-947-0660
Email Address: eczaikowski@wheatridge.gov dsterling@jrengineering.com
Address: 7500 W 29th Ave. 7200 S. Alton Way C400
City, State, Zip
Code:
Wheat Ridge, CO 80033 Centennial, CO 80112
Article 15 - Assignment and Subcontractors
The duties and obligations of the Consultant arising hereunder cannot be assigned, delegated, nor
subcontracted except with the express written consent of the City. The subconsultants permitted by the City
shall be subject to the requirements of this agreement, and the consultant is responsible for all subcontracting
arrangements, as well as the delivery of services as set forth in this agreement. The consultant shall be
responsible for the performance of any subconsultant.
Article 16 - Severability
To the extent that the agreement may be executed and performance of the obligations of the parties may be
accomplished within the intent of the agreement, the terms of this agreement are severable. Should any term
or provision hereof be declared invalid or become inoperative for any reason, such invalidity or failure shall not
affect the validity of any other term or provision hereof. The waiver of any breach of a term hereof shall not be
construed as a waiver of any other term, or the same term upon subsequent breach.
Article 17 - Integration of Understandings
This agreement is intended as the complete integration of all understanding between the parties. No prior or
contemporaneous addition, deletion, or other amendment hereto shall have any force and effect whatsoever,
unless embodied herein in writing. No subsequent novation, renewal, addition, deletion, or other amendment
hereto shall have any force or effect unless embodied in writing and signed by an authorized representative of
the City and the consultant .
Article 18 - Ownership of Contract Products
All products produced from the awarded contract shall be the sole property of the City.
Article 19 - Personally Identifiable Information (PII) and Open Records Act
Contractors, consultants, business partners and vendors that handle, process, or work in areas where
personally identifiable information may reside in hard copy or electronic records must maintain the
confidentiality of all Personally Identifiable Information (PII). Violation may result in contractual penalties and
termination of the business relationship with the City. In extreme cases criminal punishment under Colorado
Law (C.R.S. § 24-73-101) may occur. Consultant acknowledges that the City is subject to the provisions of the
Colorado Open Records Act, CRS 24-72-201, et seq., (“The Act”) and that all documents, correspondence,
email messages and other communications between the Consultant and the City are subject to public
disclosure under the provisions of that Act, with limited exceptions for proprietary information, business
secrets, and similar information. Consultant shall identify all proprietary and confidential information on the
document or communication itself. In the event the City receives a request for disclosure of such information
under the Act, Consultant agrees to indemnify the City against any attorney fees and court costs incurred by
the City in defending its refusal to disclose such information.
Article 20 - Accessibility
Consultant(s) and solutions complies with all applicable provisions of §§24-85-101, et seq., C.R.S., [1] and the
Accessibility Standards for Individuals with a Disability, as established by the Office Of Information Technology
pursuant to Section §24-85-103(2.5). Consultant also complies with the latest version of Level AA of the Web
Content Accessibility Guidelines (WCAG), currently version 2.1, as described in State of Colorado Technical
Standard TS-OEA-002, Technology Accessibility for Web Content and Applications when developing solutions
for the state.
The Consultant agrees to indemnify, save, and hold harmless the state, its employees, agents and assignees
(collectively, the “Indemnified Parties”), against any and all costs, expenses, claims, damages, liabilities, court
awards and other amounts (including attorneys’ fees and related costs) incurred by any of the Indemnified
Parties in relation to the Consultant's failure to comply with §§24-85-101, et seq., C.R.S., or the Accessibility
Standards for Individuals with a Disability as established by the Office of Information Technology pursuant to
Section §24-85-103(2.5).
Any additional costs to add accessibility features will be the obligation of the Consultant, and any addition or
change to the Price Proposal will be disallowed.
Article 21 - Cooperative Procurement
The City of What Ridge encourages and participates in cooperative procurement endeavors undertaken by or
on behalf of other governmental agencies including the Multiple Assembly of Procurement Officials (MAPO)
and the Cooperative Educational Purchasing Council (CPEC).
Consultants are hereby advised that any member of MAPO/CPEC is permitted to avail itself of this contract at
the prices resulting from the successful award of this contract.
Article 22 - Consultant Performance Feedback
The City of Wheat Ridge has implemented a requirement for Project Managers to assess each vendor’s
performance and issue a determination as to whether the City should award the vendor future City contracts.
All contracts will need to be considered as part of the requirement. The following criteria will be evaluated
annually for renewable contracts and at contract closeout for one-time agreements:
1. Work completed on time
2. Work completed within budget
3. Work completed as per the Scope of Work
4. Future Award Recommendation
SIGNATURE PAGE TO FOLLOW
This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators,
successors, and assigns.
Each party has reviewed the items contained within this contract and recommend executing this contract to
proceed with the agreed upon Statement of Work.
PROCUREMENT MANAGER CONSULTANT
**signature_204373**
SIGNATURE
Whitney Mugford-Smith
FULL NAME
Procurement Manager
TITLE
**date_signed_204373**
DATE SIGNED
**signature_204375**
SIGNATURE
Eric Lee
FULL NAME
**date_signed_204375**
DATE SIGNED
Consultant
TITLE
PROJECT MANAGER ATTEST TO CONTRACTOR
**signature_204372**
SIGNATURE
Eric Czaikowski
FULL NAME
Infrastructure Project Manager
TITLE
**date_signed_204372**
DATE SIGNED
**signature_204364**
SIGNATURE
Daren Sterling
FULL NAME
consultant
TITLE
**date_signed_204364**
DATE SIGNED
DEPARTMENT DIRECTOR CITY OF WHEAT RIDGE
**signature_204362**
SIGNATURE
Kent Kisselman
FULL NAME
Director of Public Works
TITLE
**date_signed_204362**
DATE SIGNED
**signature_204367**
SIGNATURE
Patrick Goff
FULL NAME
City Manager
TITLE
**date_signed_204367**
DATE SIGNED
CITY ATTORNEY **signature_204361**
SIGNATURE
Onorina Maloney
FULL NAME
**date_signed_204361**
DATE SIGNED
Senior Deputy City Clerk
TITLE
**signature_204365**
SIGNATURE
Gerald Dahl
FULL NAME
**date_signed_204365**
DATE SIGNED
CITY ATTORNEY
TITLE
Exhibits List
A - Requested SOW 26-38
B - 35th Avenue FEES - JR Engineering
Exhibit A
Requested SOW 26-38
CLOSED
Awarded
35th Avenue Multimodal Improvements
Request For Proposal
Public Works
91107, 91842
Close Date: 12/31/2028 No Retention Policy
Project ID: 26-38
Release Date: Friday, July 24, 2026
Due Date: Tuesday, August 25, 2026 2:00pm
Posted Friday, July 24, 2026 3:00pm
Bid Unsealed Tuesday, August 25, 2026 2:38pm by Logan Huffaker
Pricing Unsealed Tuesday, September 15, 2026 10:39am by Logan Huffaker
All dates & times in Mountain Time - Denver
1. Introduction, Background, Scope of Work
1.1. Introduction
The City seeks the Consultant’s expert guidance in shaping a varied and context-sensitive corridor along 35th Avenue, extending the neighborhood bikeway from
Sheridan Boulevard to Wadsworth Boulevard. This project must integrate three key elements—traffic calming, bicycle infrastructure, and pedestrian
amenities—adapted to local conditions and community input.
1.2. Background
The City of Wheat Ridge (the “City”) Municipal Building is located in the northwest Denver metropolitan area, with municipal offices at 7500 W 29th Avenue, Wheat
Ridge, CO 80033. The City’s area consists of about nine square miles of rolling land adjacent to the Interstate 70 transportation corridor between Denver and the
Rocky Mountains. The topography is somewhat unique, with a natural ridge traversing the City. The City is a suburban community of approximately 33,000
residents. Wheat Ridge is a home-rule municipality with an elected mayor and eight council members, and a Council- Manager form of government. Wheat Ridge
recognizes the Best Value procurement model which allows the City to appoint suppliers that best meet the needs of the City, taking into consideration proposer
qualifications, price, products, and service capabilities and other factors relevant to the City’s policies, programs, administrative resources, and budget.
1.3. Scope of Work
1.3.1. Project Introduction, Background, and Previous Planning Efforts
INTRODUCTION
The 35th Avenue neighborhood bikeway in Denver now ends at Sheridan Boulevard, leaving a critical gap in bike infrastructure between Sheridan and Wadsworth
Boulevard. This corridor is also a key pedestrian route, providing access to amenities like Panorama Park, Founders Park, the Active Adult Center, and the Wadsworth Urban
Center. Unfortunately, many sidewalks along this stretch are inadequate or non‐existent, forcing pedestrians to walk in the street—creating dangerous conflicts with both
Create
9/23/26, 12:24 PM Project Detail
https://procurement.opengov.com/governments/2618/projects/273056/evaluation/document?phase=undefined 1/8
1.3.2. Scope of Work
cyclists and vehicles. The 35th Avenue Multimodal Improvement Project will address these issues and enhance safety and accessibility for all users.
BACKGROUND
The 35th Avenue Multimodal Improvements project will establish a 1.5-mile multimodal corridor connecting Sheridan Boulevard to Wadsworth Boulevard. This segment will
extend the existing 35th Avenue neighborhood bikeway in Denver to reach the Wadsworth Urban Center, providing essential pedestrian and bicycle accesses, especially
valuable since the east end of the current bikeway lies just blocks from both the Denver Central Business District and the 41st & Fox Transit-Oriented Development.
By bridging this gap, the project will create a vital non‑motorized connection between western and central Denver and Wheat Ridge. It enhances access to pedestrian-
focused zones near 35th & Wadsworth and lies within three blocks of the 38th & Sheridan pedestrian district. Along the route, improved multimodal access will benefit key
destinations like two parks and Wheat Ridge’s Active Adult Center.
Critically, the improvement links to the shared-use trail under construction along the east side of Wadsworth, which connects to the Clear Creek Trail—part of the broader
Peaks-to-Plains Regional Trail System. It also ties into the Pierce Street bike lanes, offering further connectivity north and south to the 32nd Avenue Regional Bikeway, 26th
Avenue bike lanes, and onward into Lakewood acppubs.com.
Nearly 24,000 residents within the project area will benefit from increased safety and improved connectivity, linking them to multiple regional multimodal routes. The corridor
enhancements also include traffic-calming features aimed at reducing speeds and prioritizing safe, shared use.
This initiative builds upon the current Denver multimodal corridor ending at Sheridan by extending infrastructure to Wadsworth and directly serving the Wadsworth Urban
Center in Wheat Ridge. Meanwhile, a shared-use path is already under construction between 35th Avenue and the Clear Creek Trail, integrating the corridor into the regional
trail network and facilitating inter-subregional access across Jefferson County and Denver.
This project will be partially funded with federal and state funds and must comply with all applicable federal guidelines and regulations.
PAST PLANNING EFFORTS
Improvements to W 35th Avenue between Sheridan Boulevard and Wadsworth Boulevard have been identified as a community priority through multiple planning and
engagement efforts over the past several years. In 2017, the city’s Bicycle and Pedestrian Master Plan designated this segment of W 35th Avenue as a Neighborhood
Bikeway and recommended improvements including pavement markings, signage, traffic calming measures, crossing enhancements, and wayfinding elements to improve
multimodal safety and connectivity.
In 2020, residents reaffirmed the need for corridor improvements through the city’s neighborhood engagement program, Let’s Talk East Wheat Ridge. Community input
gathered through that process led to the launch of the W 35th Avenue Street Improvements project in 2022, which focused on identifying neighborhood priorities and desired
corridor enhancements. More than 240 area residents participated in the engagement process. Key themes that emerged from community feedback included:
Concerns about vehicle speeds and traffic safety along the corridor
Prioritizing safer conditions for pedestrians, bicyclists, and individuals using mobility aids
A strong desire for continuous and connected sidewalk infrastructure
Most recently, the 2025 City Plan identified W 35th Avenue between Sheridan Boulevard and Teller Street as a Neighborhood Bike Connector. This designation calls for
implementation of the best feasible bicycle facility to improve east-west connectivity. Improvements may include bike lanes, traffic calming measures, shared lane markings,
signage, and related multimodal safety enhancements.
Together, these planning efforts and community engagement initiatives have established a strong foundation for the current final design process.
The City seeks the Consultant’s expert guidance in shaping a varied and context-sensitive corridor along 35th Avenue, extending the neighborhood bikeway from Sheridan
Boulevard to Wadsworth Boulevard. This project must integrate three key elements—traffic calming, bicycle infrastructure, and pedestrian amenities—adapted to
local conditions and community input.
Corridor Tailoring: Recognizing diverse conditions and feedback from residents along the route, the design will be customized. In zones with higher activity—such as
parks, major walking destinations, and higher-traffic areas, the focus will be on installing 5 foot wide attached sidewalks and sharrows (shared-lane markings).
Strategic Flexibility: In less-traveled or more constrained segments, where right-of-way or property access is sensitive, the use of advisory shoulders will be
considered. This approach preserves access to adjacent properties while promoting multimodal use and minimizing potential impacts.
0.0 PROJECT MANAGEMENT & ADMINISTRATION
a. Administer the contract per federal and state requirements
b. Prepare monthly invoices and progress reports.
9/23/26, 12:24 PM Project Detail
https://procurement.opengov.com/governments/2618/projects/273056/evaluation/document?phase=undefined 2/8
c. Schedule & conduct a project kick-off meeting with project staff and bi-weekly progress meetings with project staff and prepare meeting minutes and/or
summaries (assume 22 meetings).
d. Schedule & conduct plan deliverable review meetings with project staff after major submittals (assume 4 meetings).
e. Schedule & conduct a Scoping, FIR, and FOR meeting with CDOT Staff.
f. Prepare a meeting agenda and comment matrix to address CDOT feedback.
1.0 PUBLIC INVOLVEMENT
a. Plan, coordinate, and hold small group stakeholder meetings with properties most impacted (assume 4 separate meetings).
b. Develop materials to support City staff presentations to City Council (assume 2 presentations).
c. Plan, coordinate, and hold one public open house meeting and online engagement opportunity. Develop informational flyers & invites. City will
develop mailing list and send mailings. Provide public engagement results to staff for use on the City website.
2.0 TOPOGRAPHIC SURVEY
a. Perform UAS LiDAR survey of the entire corridor at 2-inch pixel resolution; includes Calibration, QC, and CAD Processing. Delivered as 40 Scale
Detailed Planimetric Mapping within right-of-way in Civil 3D.
b. Perform Aerial Imagery Collection of the entire corridor with 2-inch pixel resolution; includes Calibration, QC, and CAD Processing of 3D surfaces
and contours. Delivered as 40 Scale contours and surfaces in Civil 3D
c. Perform traditional detailed topographic survey of critical areas (sidewalk ramps, tie-in curb/gutter, pavement tie-in points, etc. Includes QC and CAD
Processing of line features in Civil 3D). Survey Control shall be City of Wheat Ridge Datum, Central Zone, NAD 83 US Feet.
3.0 UTILITY INVESTIGATION
a. Review existing utility reports, records, maps, and plans from study phase.
b. Perform and mark on-site designating & locating of existing UG utilities (QLC). Survey marked locations (QLB) and process into topographic survey
CAD files.
c. Develop preliminary utility plan sheets & potential locations for QLA Test Holes.
d. Perform preliminary utility coordination with up to 10 impacted utility owners. Develop preliminary utility conflict plans for up to 5 separate utility owners.
e. Verify Test Hole locations, perform up to 40 test hole excavations with survey and field reports,
f. Finalize Utility Plans with QLA information.
g. Perform final utility coordination with up to 10 impacted utility owners. Develop relocation plans for up to three utility facilities. Develop and assist the City
with executing up to 3 utility agreements.
h. Coordinate with CDOT Utilities to obtain final clearance.
4.0 HYDROLOGY AND HYDRAULIC ENGINEERING
Evaluate current stormwater infrastructure and design improvements for performance and flood mitigation. No floodplain impacts anticipated; floodplain permitting excluded.
a. Task management and coordination (internal hydraulic discipline management and stakeholder meetings).
b. H&H Modeling, Design, and Reporting
c. Update existing conditions H&H based on comments or new survey data.
a. Complete H&H drainage design including minor and major storm criteria:
i. Determine locations, sizes, and alignment based on conceptual hydraulic design. Identify locations by highway station or coordinates, as
appropriate.
ii. Determine the allowable headwater and roadway spread.
iii. Assess the degree of sediment and debris problems to be encountered
iv. Update per roadway comment and review changes after 30%, 60%, and 90% review periods.
d. Preliminary (30%) Plans
i. 30% plans will consist of general layout of the system with preliminary plan and profile sheets for the proposed drainage system. This will be used to highlight potential conflicts with ROW and Utilities.
a. 60% Plans
i. Refinements to the 30% plans will be implemented based on 30% city review comments and conflict resolution between ROW and Utilities. Major redesign
of the roadway and general layout of the system are not anticipated past the 60% design stage.
b. 90% Plans, Details, and Specifications
i. 60% city review comments will be addressed, and plans will be refined to the 90% level, minor changes to pipe elevations and alignment are included.ii. Necessary details and specifications will be provided at this stage.
c. 100% Plans, Details, and Specifications
9/23/26, 12:24 PM Project Detail
https://procurement.opengov.com/governments/2618/projects/273056/evaluation/document?phase=undefined 3/8
i. 90% city review comments will be addressed, and plans will be refined to the 100% level. Only very minor changes to pipe alignment or elevations are
anticipated at this level. Plans will be reviewed for standardization across disciplines.ii. Final refinements to the details and specifications will be provided at this stage.
5.0 ENVIRONMENTAL CLEARANCE
Prepare all necessary documents and coordinate with CDOT to obtain, what is anticipated to be, a Categorical Exclusion for the project. Includes the sampling of
groundwater for metals or other contaminants if groundwater is expected to be encountered with the project. In addition, the following properties/resources will need to
be investigated:
a. Rocky Mountain Ditch – Likely historical and/or linear resource.
b. Houses old enough to be eligible as historical residences.
c. Review the project corridor for environmental constraints, required clearances, and permit needs associated with final design and construction.
d. Investigate potential water quality impacts and identify required mitigation, best management practices, and applicable permit requirements.
e. Coordinate with Federal, State, and City staff to identify environmental requirements that may affect project design, schedule, or construction phasing.
f. Prepare or support environmental memoranda, exhibits, and supporting documentation as needed for project delivery.
g. Identify potential commitments and recommend avoidance, minimization, and best management practices to reduce impacts to adjacent properties, natural
resources, and the traveling public.
h. Incorporate applicable environmental commitments into final plans, specifications, and estimate materials.
i. Provide environmental input at key design milestones, including 30%, 60%, 90%, and 100% submittals.
j. Coordinate with CDOT to obtain final clearance.
Anticipated environmental deliverables include:
a. Phase 1 Environmental Site Assessment
b. Air Quality and Noise Memo
c. Biological Resources Report
d. Historical Investigation including SHPO submittals
e. CDOT Form 128
f. Materials Management Plan
6.0 ENGINEERING & DESIGN
a. Develop alignment and profile for roadways, curbs, and ramps.
b. Perform comprehensive 3D modeling and cross sections of the project template to develop plan sheets.
Design Criteria to be followed (in order of precedence and hierarchy):
AASHTO; A Policy on Geometric Design of Highways & Streets
AASHTO Roadside Design Guide
FHWA Manual of Uniform Traffic Control Devises (MUTCD)CDOT M&S Standards
City of Wheat Ridge Zoning and Development Code
NACTO Urban Street Design Guidelines
AASHTO Guide for the Development of Bicycle Facilities
7.0 PLAN DEVELOPMENT AND PRODUCTION (PER CDOT STANDARDS)
a. The following items are required prior to the FIR per the 2022 CDOT La desk reference manual Chapter 5.7:
Scoping, Budgeting, and Planning
Preliminary alignment data
Justification for variances
Environmental Clearance Document
Form 128 - Categorical Exclusion Determination showing clearance activities or other appropriate clearance document.
Federal-aid Highway funded project not eligible for Programmatic Categorical Exclusions require FHWA sign-off.
Traffic
Identification of detours and proposed preliminary construction phasing plan
complete traffic data, accident data, safety report, and turning movements, if required.
Materials
Soil survey should be completed
Final stabilization plan should be provided
Right of Way
The assessor's parcel maps, ownership list, old Right of Way plans, and other available Right of Way information should be prepared for review
by the ROW plans PSL-II or delegated reviewer for ROW Plans. Any property acquisition areas are needed, if possible.
The consultant selection process for Right of way Work should be initiated prior to the FIR and shortly after the scoping meeting to allow the
consultant time to complete the topographical survey and preliminary ownership map prior to the FIR. Accurate location of all existing Right of
Way and property lines cannot be provided until adequate research of public records has been completed at a minimum.
9/23/26, 12:24 PM Project Detail
https://procurement.opengov.com/governments/2618/projects/273056/evaluation/document?phase=undefined 4/8
Utilities
Existing utility information, including irrigation ditches and water rights in compliance with Senate Bill 18-167.
Hydraulics
a preliminary hydraulic report or design should be provided prior to the FIR. Requirements may be adjusted by the region depending on project
complexity.
Structures
A Structures Selection report should be provided prior to the FIR.
Wetlands
Identification and scheduling of wetlands mapping.
Survey
A complete survey, including topography, utilities, and existing monumentation should be completed and tied to CDOT's survey control network,
High Accuracy Network (HARN), if withing CDOT ROW.
If Right of Way is involved, aliquot section corners, property pins, and Right of Way markers must also be tied to CDOT's survey control network
to allow work on the ownership map to begin.
Preliminary Cost Estimate
Required on all FIR-level Plans
Scoping, budgeting, and planning
A title sheet, typical sections, general notes, plan and profile sheets with existing topography and utilities, proposed alignments,
slope catch points, profile grades, ground line, cross sections, existing Right of Way and rough structure notes, drainage plan, access plan, and detour plan.
Environmental
Mapping of any existing wetlands
Preliminary mitigation plan
Locations of environmental constraints (other than wetlands)
Initial site assessment completed, and potential hazardous materials sites identified.
Preliminary SWMP
Traffic
Traffic volume data
Conceptual construction phasing plan
Structure
Bridge general layouts and applicable plan sheets
Major structure cross-sections
Materials
Soil profile and stabilization requirements
Right of Way
Existing and proposed Right of Way shown on the design plan
Utilities
Identification of impacts to utilities shown
Names of utility companies and contact personnel
Other
Preliminary layouts of interchanges and intersections
Special details and unusual specifications
Driveways and field approaches
Desired Items – The FIR plans should contain the following items if available in time for the scheduled FIR:
Preliminary survey tabulation sheet
Preliminary survey control sheet
b. Develop 30% construction plans per CDOT standards for roadway, bicycle facilities, sidewalks, and drainage facilities to include:
Title sheet
Survey Control Diagram
Geometric Control
Typical Section
Removals
Roadway Plan & Profiles
Preliminary Intersection Details
Preliminary ADA Ramp Details
Preliminary Drainage Plan & Profiles
Preliminary Drainage Details
c. Develop 60% construction plans per CDOT standards for roadway, bicycle facilities, sidewalks, and drainage facilities to include 30% Plan elements
plus:
Standard Plans List
General Notes
SAQ & Quantity Tabulations
9/23/26, 12:24 PM Project Detail
https://procurement.opengov.com/governments/2618/projects/273056/evaluation/document?phase=undefined 5/8
Intersection Details
ADA Ramp Details indicating compliance with the latest version of CDOT “Curb Ramp” standards M-608-1
Preliminary Driveway Details
Drainage Plan & Profiles
Drainage Details
Preliminary Lighting Plans & Details
Preliminary Signing & Striping Plans, Details, and Quantities
Preliminary Construction Stormwater/Erosion Control Sheets (SWMP or ECS)
Utility Plans
Preliminary Construction Phasing/MOT Plans
d. Develop 90% construction plans per CDOT standards to include 60% Plan elements plus:
Driveway Details
Lighting Plans & Details
Signing & Striping Plans, Details, and Quantities
Construction Stormwater/Erosion Control Sheets (SWMP or ECS)
Utility Plans
Construction Phasing/MOT Plans
Miscellaneous Details
Cross Sections
The FOR plans and specifications shall be final in nature per the 2022 CDOT LA desk reference manual Chapter 5.11. The FOR is a final review of construction
plans, specifications and cost estimates for completeness and accuracy.
FOR documents shall consist of the following package:
1. Plans and specifications
Complete project plans containing all necessary tabulations and details required for construction (including an approved Storm Water
Management Plan).
Project Specifications
A listing of special provisions (project and standard special) necessary for the project, current as of the date of the FOR.
The project manual or document containing the general terms of the contract
2. Cost Estimate
An updated cost estimate of all finalized plan quantities, including planned force account work and other items chargeable to the project such as
design, Right of Way, utilities, and construction engineering.
3. System Engineering Analysis (SEA) evaluation, as applicable
4. CDOT Form 859 – Project Control Data, Construction
a. Finalize 100% PS&E construction plans per CDOT standards.
b. Develop Preliminary Construction Specifications at 60% and final Specifications at 90% and 100%. It is assumed CDOT Construction Specifications
will primarily be utilized.
c. Develop opinion of probable construction cost estimate at 30%, 60%, 90%, and 100%. CDOT bid items will be utilized in the plans and CDOT bid history
will be utilized to develop the opinion of probably cost, with adjustments based on recent City of Wheat Ridge construction projects.
d. Develop Project Manual for Advertisement and Contract
e. Provide Bid & Award Support for selection and award of construction contract.
8.0 LANDSCAPE DESIGN
a. Develop preliminary corridor streetscape design & cost estimate (per SF) for 30% plans.
b. Facilitate discussion and selection of surface water quality elements (i.e. bioswales) where feasible for 60% plans.
c. Develop detailed streetscape design and planting & irrigation quantities for 60% plans.
d. Develop detailed planting & irrigation plans, quantities, and specifications for 90% and 100% plans.
9.0 ROW PLAN DEVELOPMENT
a. Develop parcel tracking spreadsheet and calculate estimated property impact polygons (acquisition and TCE’s) for use on 30% plans and
in tracking spreadsheet (with opinion of acquisition costs).
b. Develop Preliminary ROW Plans with detailed acquisition and easement shapes (no exhibits or legal descriptions).
c. Develop Final ROW Plans with detailed acquisition and easement shapes. Develop exhibits and legal descriptions for fee acquisitions.
d. Submit to CDOT for ROW plan review, ROWPR and final ROW plan approval prior to coordination with landowners.
e. Coordinate with CDOT for ROW Clearance.
f. Perform 1-on-1 coordination with affected landowners.
9/23/26, 12:24 PM Project Detail
https://procurement.opengov.com/governments/2618/projects/273056/evaluation/document?phase=undefined 6/8
g. Field stake acquisition and easement impacts at the request of landowners. Limited to one staking per parcel; parcels will be combined and
staked in groups to minimize cost.
10.0 LIGHTING DESIGN
In general, this scope is to perform necessary lighting design for roadway projects. Gather available data and review existing lighting conditions, equipment and
delivery systems.
a. Coordinate with City staff to determine needs/desires for future corridor lighting.
b. Develop a photometric plan for review and discussion with City Staff.
c. Develop plans at 60%, 90% and Construction Documents. Plans will include the following information:
Lighting Layouts
Conduit and other electrical delivery infrastructure needs
Lighting details
Electrical connection design/details
Opinion of probably cost of equipment for each submittal
11.0 GEOTECHNICAL INVESTIGATION
In general, this scope is to perform necessary geotechnical investigations for roadway projects.
a. In consultation with the project team, develop preliminary investigation map of boreholes and soils samples, depths, and required tests.
b. Perform field investigation, including appropriate and approved traffic control and laboratory testing.
c. Perform pavement design & recommendations.
d. Develop draft and final geotechnical report with findings and recommendations.
12.0 TRAFFIC ANALYSIS & TRAFFIC CALMING DESIGN
a. Conduct existing conditions traffic analysis including speed data review, traffic volume review, crash history review, and multimodal conflict evaluation.
b. Evaluate and recommend traffic calming measures including curb extensions, mini traffic circles, raised crossings, speed cushions, median treatments,
advisory bike lanes, and intersection visibility improvements.
c. Prepare signing and striping concepts consistent with Federal and State standards.
d. Evaluate on-street parking impacts and operational considerations along the corridor.
e. Construction Traffic Control and Phasing.
13.0 ROW ACQUISITION SERVICES
In general, this scope is to perform necessary Right-Of-Way notice, negotiation, closing, and acquisition services meeting the requirements of the Uniform Act and
coordination with CDOT.
a. Perform initial property owner engagement at 60% design level.
b. Draft & send notice of intent letters to impacted property owners.
c. Perform property valuations.
d. Independent Appraisal Review Services.
e. Coordinate with CDOT to obtain Final ROW Clearance.
f. Draft & send offer letters to impacted property owners.
g. Independent Appraisal Review Services. CDOT maintains an Approved Qualified Review Appraiser List, that must be used for this service.
h. Perform negotiations.
i. Draft & send final offer letters to impacted property owners.
j. Perform closings.
k. Coordinate with CDOT to obtain Final ROW Clearance.
14.0 CONSTRUCTION SUPPORT SERVICES
a. Provide engineering support during construction including responses to RFIs, review of submittals and shop drawings, and preparation of design
clarifications.
b. Attend preconstruction meetings and periodic construction progress meetings
c. Review contractor requests for information and substitution requests.
d. Prepare plan revisions or supplemental sketches as required due to field conditions.
e. Conduct substantial completion punch list walkthrough and final acceptance review.
9/23/26, 12:24 PM Project Detail
https://procurement.opengov.com/governments/2618/projects/273056/evaluation/document?phase=undefined 7/8
9/23/26, 12:24 PM Project Detail
https://procurement.opengov.com/governments/2618/projects/273056/evaluation/document?phase=undefined 8/8
Exhibit B
35th Avenue FEES - JR Engineering
AUGUST 25, 2026
CIVIL ENGINEERING & PLANNING · CONSTRUCTION · SERVICES · LANDSCAPE ARCHITECTURE
SUE & UTILITY LOCATING · SURVEYING · TRANSPORTATION · WATER RESOURCES
FEE PROPOSAL
35TH AVENUE MUTIMODAL IMPROVEMENTS
S E R V I C E E X P E R T I S E Q U A L I T Y
PREPARED BY
FEE PROPOSAL
Sub-Direct
Consultant Expense
Technical
Manager/
Director
Project
Lead
Project
Engineer/
Surveyor
Engineer/
Surveyor
Drone
Survey
(1 Person)
SUE Locating
Crew
(1 Person)
Survey Crew
(2 Person)
$225 $175 $160 $145 $250 $165 $200 L.S.L.S.
Project Management & Administration $42,920
0.0 Project Management & Administration $42,920
0.1 Project Management (Assumed 1 Hour Per Week for 16 months)64.0 $14,400
0.2 Prepare Monthly Invoices and Progress Reports 16.0 $3,600
0.3 Attend Kickoff and Progress Meetings with City (Assumed 22 Meetings)66.0 22.0 22.0 $21,890
0.4 Design Review Meetings (30%, 60%, 90%) + Agenda and Minutes 9.0 3.0 3.0 $3,030
Public Involvement $17,150
1.0 Public Involvement $17,150
1.1 Attend and Conduct Four Property Owner Meetings (Small Group)8.0 8.0 $3,200
1.2 Develop Materials to Support 2 City Council Presentations 6.0 6.0 8.0 16.0 $6,000
1.3 Attend Two Public Meetings (1 Virtual 1 Open House) + Prepare Flyers and Exhibits 10.0 12.0 8.0 16.0 $7,950
Survey $20,840
2.0 Survey $20,840
2.1 Prepare Exhibits and Coordinate Field Work 2.0 4.0 6.0 $2,020
2.2 Perform Drone/Aerial Survey of Corridor and Processing 4.0 8.0 8.0 32.0 16.0 $12,220
2.3 Perform Topographic and Planimetric Survey + Boundary Survey at Critical Areas 2.0 2.0 4.0 8.0 20.0 $6,600
Utility Investigation $203,180
3.0 Utility Investigation $203,180
3.1 Prepare Exhibits and Coordinate SUE Field Work 0.5 1.0 4.0 $868
3.15 Perform SUE Survey and Base Map 1.0 3.0 2.0 6.0 20.0 $5,940
3.2 Utility Investigation and Designation (QL-B)0.5 6.0 40.0 $7,763
3.25 Prepare SUE Plans QL-B 6.0 8.0 48.0 $9,710
3.3 QL-A Test Holes (Assumed 80 Test Holes)(Badger)$132,000 $132,000
3.35 QL-A Test Hole Survey 1.0 1.0 4.0 88.0 $18,580
3.4 QL-A Test Hole Report 4.0 4.0 20.0 $4,500
3.45 Review Test Hole Data and Create 3D Vertical Pipe Network 4.0 4.0 24.0 $4,820
3.5 Preliminary Utility Coordination (5 Owners)4.0 20.0 50.0 $11,650
3.55 Final Utility Coordination (3 Owners) and Obtain Clearance 4.0 12.0 30.0 $7,350
Hydrology and Hydraulic Engineering $72,213
4.0 Hydrology and Hydraulic Engineering $72,213
4.1 Data Collection and Hydrology 2.0 4.0 6.0 $2,020
4.2 Hydrologic Analysis and Calculations 1.0 6.0 16.0 $3,595
4.3 Prepare Drainage Report 4.0 24.0 40.0 $10,900
4.4 Horizontal and Vertical Drainage Design 6.0 40.0 40.0 $14,750
4.5 Prepare 30% Storm Sewer Plan & Profiles 4.0 24.0 60.0 $13,800
4.6 Update 60% Storm Sewer Plans 2.0 12.0 40.0 $8,350
4.7 Update 90% Storm Sewer Plans + Prepare Drainage Specifications 1.0 12.0 24.0 $5,805
4.8 Final 100% Storm Sewer Plans + Drainage Specifications 0.5 8.0 20.0 $4,413
4.9 Water Quality Treatment Analysis and Reporting 4.0 24.0 24.0 $8,580
Environmental Services $76,722
5.0 Environmental Services $76,722
5.1 Environmental Research and Reporting(ERO)$76,722 $76,722
Engineering & Design $20,620
6.0 Engineering & Design $20,620
6.1 Develop Alignment and Profiles 4.0 20.0 20.0 $7,600
6.2 Grading, Modeling, and Cross Sections 4.0 40.0 32.0 $13,020
Plan Development and Production $132,648
7.0 30% Design (FIR)$46,818
7.01 Structure Selection report 4.0 4.0 8.0 $2,880
7.02 Prepare Cover Sheet and Standard Notes 0.5 1.0 2.0 $538
7.03 Prepare Tabulations of Quantities 0.5 1.0 2.0 $538
7.04 Prepare Typical Sections Sheets 1.0 4.0 8.0 16.0 $4,525
7.05 Prepare Survey Control Diagram and Survey Tabulation 0.5 1.0 8.0 $1,408
7.06 Prepare Demolition and Utility Plans 1.0 4.0 8.0 24.0 $5,685
7.07 Prepare Roadway Plan and Profile Sheets 1.0 8.0 16.0 16.0 $6,505
7.08 Prepare Intersection and Driveway Plan and Profile Sheets 1.0 3.0 6.0 12.0 $3,450
7.09 Prepare Curb Ramp Sheets 1.0 4.0 8.0 16.0 $4,525
7.1 Prepare Details 0.5 1.0 2.0 $538
7.11 Prepare Signing and Striping Plans 0.5 2.0 6.0 16.0 $3,743
7.12 Prepare Initial Traffic Control and Phasing Plan 2.0 4.0 8.0 12.0 $4,170
7.13 Prepare GESC / SWMP Plans 1.0 4.0 6.0 20.0 $4,785
7.14 Prepare (30%) Cost Estimate 2.0 4.0 4.0 12.0 $3,530
7.2 60% Design (DOR)$27,485
7.21 Update 30% Plans Per City Comments 4.0 16.0 36.0 96.0 $23,380
7.22 Prepare (60%) Cost Estimate and Preliminary Specifications 3.0 6.0 4.0 12.0 $4,105
7.3 90% Design (FOR)$30,950
7.31 Address 60% Comments and Prepare 90% Plans 4.0 16.0 24.0 80.0 $19,140
7.32 Prepare Earthwork Summary and Cross Sections 1.0 4.0 4.0 8.0 $2,725
7.33 Update and Finalize MOT/Phasing Plans 2.0 6.0 12.0 8.0 $4,580
7.34 Prepare (90%) Specifications 3.0 3.0 $1,200
7.35 Prepare (90%) Cost Estimate 1.0 4.0 4.0 12.0 $3,305
7.4 100 % Design (Ad/Bid Documents)$21,465
7.41 Address 90% Comments and Prepare 100% Plans 2.0 12.0 20.0 60.0 $14,450
7.42 Prepare Schedule/Form 859 4.0 6.0 4.0 $2,590
7.43 Prepare (100%) Specifications 2.0 2.0 $800
7.44 Prepare (100%) Cost Estimate 1.0 4.0 4.0 8.0 $2,725
7.45 Sign and Stamp Final Documents 4.0 $900
7.5 Bid and Award Support $5,930
7.51 Prepare Bid Addenda 2.0 2.0 4.0 6.0 $2,310
7.52 Respond to Contractor Questions 4.0 4.0 4.0 4.0 $2,820
7.53 Assist with Selection/Award 2.0 2.0 $800
Fee Schedule & Resource Allocation
City of Wheat Ridge
35th Avenue Multimodal Improvements
TotalsWORK ITEMTASKS
CITY OF WHEAT RIDGE | 35TH AVENUE MULTIMODAL IMPROVEMENTS PAGE 1
FEE PROPOSAL
Sub-Direct
Consultant Expense
Technical
Manager/
Director
Project
Lead
Project
Engineer/
Surveyor
Engineer/
Surveyor
Drone
Survey
(1 Person)
SUE Locating
Crew
(1 Person)
Survey Crew
(2 Person)
$225 $175 $160 $145 $250 $165 $200 L.S.L.S.
Fee Schedule & Resource Allocation
City of Wheat Ridge
35th Avenue Multimodal Improvements
TotalsWORK ITEMTASKS
Landscape Design $70,875
8.0 Landscape Design $70,875
8.1 Prepare Landscaping Plan(Goodbee)$70,875 $70,875
Right-of-Way Plan Development $92,593
9.0 Right-of-Way (ROW) Plan Development $92,593
9.1 Prepare Preliminary ROW Plans 6.0 16.0 24.0 40.0 $13,790
9.2 Prepare Final ROW Plans and 70 Legal Descriptions (Assumed 70 Properties)4.0 8.0 12.0 24.0 $56,000 $63,700
9.3 Staking ROW Boundary 0.5 2.0 4.0 70.0 $15,103
Lighting Design $58,652
10.0 Lighting Design $58,652
10.1 Street Light Design(Engineering for Infrastructure)$58,652 $58,652
Geotechnical Investigation $38,500
11 Geotechnical Investigation $38,500
11.1 Geotechnical Investigation and Pavement Report(AG Wassenaar)$38,500 $38,500
Traffic Analysis and Traffic Calming Design $10,210
12.0 Traffic Analysis and Traffic Calming Design $10,210
12.1 Collect and Review Existing Traffic Volumes (All Traffic Data)2.0 2.0 $1,320 $1,960
12.2 Review Existing Data 4.0 4.0 $1,280
12.3 Evaluate and Recommend Traffic Calming Measures 2.0 8.0 32.0 $6,970
Right-of-Way Acquisition Services $980,796
13.0 Right-of-Way (ROW) Acquisition Services $980,796
13.1 ROW Acquisition for 70 Properties(HC Peck)$980,796 $980,796
Construction Support Services $22,530
14.0 Design Services During Construction $22,530
14.1 Prepare DCNs and Assist with Change Orders 6.0 12.0 16.0 24.0 $9,490
14.2 Review Submittals and RFIs 4.0 4.0 4.0 4.0 $2,820
14.3 Project Meetings and Site Visits 6.0 8.0 8.0 4.0 $4,610
14.4 Review Punch List and As-builts 4.0 6.0 12.0 12.0 $5,610
DESIGN TOTAL:327 538 443 1082 16 40 198 1,358,865.50$56,000.00$$1,860,448
CITY OF WHEAT RIDGE | 35TH AVENUE MULTIMODAL IMPROVEMENTS PAGE 2
ITEM NUMBER: 7
DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
MOTION
TITLE: MOTION AWARDING A CONTRACT TO GOODLAND
CONSTRUCTION INC., IN THE AMOUNT OF $10,000,000 FOR
CONSTRUCTION OF THE SIDEWALK GAP PROJECT
☐PUBLIC HEARING
☒BIDS/MOTIONS
☐RESOLUTIONS
☐ORDINANCES FOR 1st READING ☐ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
Staff is seeking approval to award a contract to Goodland Construction, Inc in the
amount of $10,000,000 to construct various projects as part of the Sidewalk Gap Project.
The project will address gaps in the City's sidewalk network, improve pedestrian
connectivity, and provide accessible pedestrian facilities that meet applicable
accessibility requirements. The improvements are part of the City's broader
commitment to investing in transportation infrastructure through the 2J Bond Initiative.
PRIOR ACTION:
The City's 2J Next Chapter Bond Initiative supports transportation and infrastructure
improvements throughout Wheat Ridge, including sidewalk connections, accessibility
improvements, roadway improvements, and other capital projects.
At the February 9, 2026, City Council meeting, staff presented priority sidewalk gap
projects for implementation through the Sidewalk Gap Improvements Program. During
the meeting, the project list was expanded to include the I-70 Frontage Road South
segment. The identified segments include:
• Project 4: Parfet Street, 35th Avenue to 3550 Parfet Street
• Project 7: Miller Street, 45th Avenue to 47th Place
• Project 8: 26th Avenue, Oak Street to Paramount Parkway
• Project 11: Dover Street, 38th Avenue to 44th Avenue
• Project 12: Pierce Street, 29th Avenue to 44th Avenue
Council Action Form – Sidewalk Gap Project October 26, 2026
Page 2
• Project 15: Harlan Street, 32nd Avenue to 35th Avenue
• Additional Segment: I-70 Frontage Road South, Holland Street to Garrison Street
The City selected Olsson to prepare final construction documents for priority sidewalk
corridors and J&T Consulting to complete the design for Dover Street. To facilitate construction as designs are completed, the City initiated a contractor selection process
to identify a qualified contractor capable of delivering the improvements through
individual task orders.
On August 14, 2026, staff issued a Request for Proposal (RFP) for contractors to
provide construction services for the Sidewalk Gap Project. Staff received proposals from two contractors and after evaluating their capabilities and past work experience
determined that Goodland Construction Inc. was the best contractor to complete this
project based on experience and proposed project cost.
The proposal pricing was requested to establish baseline unit prices for anticipated
construction activities and provide a consistent pricing framework for future task orders. The proposed pricing is not intended to establish the final construction cost for
any individual segment. Final costs will be determined as designs are completed,
quantities and site conditions are confirmed, and individual task orders are prepared
and authorized.
The proposed contract will establish a construction services relationship with Goodland Construction, Inc., allowing the City to issue individual task orders as designs are
finalized and segments are ready for construction. This approach provides flexibility to
coordinate construction with design completion, utility coordination, easement
acquisition, and available funding.
FINANCIAL IMPACT:
Funding in the amount of $10,500,000 was budgeted for the Sidewalk Gap Project in the
Wheat Ridge Next Chapter 2J Bond Fund for 2026. The proposed contract has a
maximum value of $10,000,000.
The unit prices submitted with the proposal establish baseline pricing for future task orders and do not represent the final cost of constructing the individual segments.
Actual construction costs will be established through individual task orders as designs
are finalized and work is authorized, subject to the contract terms and available funding.
Staff expect the budgeted funding to cover construction costs for Harlen, Parfet, 26th
Ave and Dover.
BACKGROUND:
The City of Wheat Ridge is continuing to invest in transportation infrastructure to
improve safety, accessibility, and connectivity for residents and visitors. Missing
sidewalk segments can limit pedestrian access between neighborhoods, transit
Council Action Form – Sidewalk Gap Project October 26, 2026
Page 3
facilities, commercial areas, parks, and other community destinations. Constructing
these connections helps provide a more continuous pedestrian network and improves
accessibility throughout the City.
The Sidewalk Gap Improvements Program is part of the City's 2J Next Chapter Bond
Initiative. The initiative is supported by voter approval of the extended 0.5-cent sales and use tax associated with Measure 2J and funds a range of infrastructure
improvements throughout Wheat Ridge. The City's transportation action plan
specifically identifies improving sidewalk connections and installing bike lanes at
locations prioritized and funded through the 2J Bond Initiative.
Olsson is completing final design for priority sidewalk corridors, while J&T Consulting is completing design for Dover Street. The timing and sequencing of individual task orders
will depend on design completion, utility coordination, easement acquisition,
construction readiness, and available funding. The City reserves the right to adjust
project limits, sequencing, and construction packages based on these factors and other
project requirements.
Anticipated construction work may include demolition and removal of existing concrete,
asphalt, curb and gutter, sidewalks, curb ramps, and other improvements as necessary;
construction of new concrete sidewalks, curb ramps, curb and gutter, and pedestrian
facilities; roadway widening and pavement reconstruction; driveway approach
modifications; stormwater infrastructure improvements; utility coordination and adjustments; traffic and pedestrian control; erosion and sediment control; and
restoration of pavement markings, signage, landscaping, grading, and other affected
areas.
The proposal requested baseline unit pricing for anticipated construction activities.
These prices will provide a starting point for developing individual task orders but are not final construction costs for the identified segments. Final task order pricing will
reflect completed designs, actual quantities, site-specific conditions, and the applicable
contract pricing provisions.
RECOMMENDATIONS:
Staff recommend awarding a contract to Goodland Construction, Inc in the amount of
$10,000,000 for the Sidewalk Gap Project.
RECOMMENDED MOTION:
“I move to award a contract to Goodland Construction, Inc in the amount of $10,000,000 for the Sidewalk Gap Project.”
Or,
“I move to deny award to Goodland Construction, Inc in the amount of $10,000,000 for
Council Action Form – Sidewalk Gap Project October 26, 2026
Page 4
the Sidewalk Gap Project. for the following reason(s).”
REPORT PREPARED/REVIEWED BY:
Daniel Martinez, CIP Program Manager Kent Kisselman, Director of Public Works
Patrick Goff, City Manager
ATTACHMENTS:
1. Goodland Construction Inc., Contract
CITY OF WHEAT RIDGE
26-44-Sidewalk Gap Construction
AGREEMENT
THIS AGREEMENT, made this 27th day of October 2026, by and between the City of Wheat Ridge, Colorado, hereinafter
called "Owner" and Goodland Construction, Inc., 760 Nile St., Golden, CO 80401, hereinafter called "Contractor".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned the parties agree as
follows:
1. The Contractor agrees to furnish all materials, supplies, tools, equipment, labor, and other services necessary to
complete the construction of the Project titled, RFP-26-44-Sidewalk Gap Construction, in accordance with the
Contract Bid Documents.
2. The Owner has allocated up to ten-million dollars ($10,000,000) for the first phase of services. The $10,000,000
represents the maximum amount presently allowed and available for work under this Agreement and does not
constitute a guarantee that the Contractor will receive work totaling that amount. The Owner will pay only for work
specifically authorized via a Notice to Proceed and is satisfactorily completed per the scope of work. Nothing in
this Agreement obligates the Owner to appropriate additional funds, authorize additional locations, or expend any
minimum amount beyond work specifically authorized in writing.
3. The Contractor agrees to commence the Work required by the Contract Documents within Fourteen (14)
calendar days after the date of the Notice to Proceed for the prescribed location. As of the contract date, three (3)
locations are ready for construction; those sections are:
• Harlan Street (32nd Avenue to 35th Avenue)
• Parfet Street (35th Avenue to 3550 Parfet Street)
• 26th Avenue (Oak Street to Paramount Parkway)
The Owner anticipates that additional sections will become constructable during the initial term of this agreement
as design, ROW, utility coordination, permitting, and funding are completed. The Owner may authorize additional
locations that are substantially consistent with the nature and type of work competitively solicited under this
Agreement through a written Work Order, Change Order, or Amendment, as determined appropriate by the City.
3a. Future sidewalk locations may be added only when the Owner determines that the proposed work falls within the
general scope, character, and pricing framework of the original competitive solicitation. The Owner reserves the
right to procure any future project separately when the Owner determines that the work is materially different,
separate competition would be in the Owner’s best interest, or use of this Agreement would otherwise be
inappropriate.
4. The term "CONTRACT BID DOCUMENTS" means and includes the following:
A Signature Page K Agreement
B Advertisement for Bids L Payment Bond
C Information for Bidders M Performance Bond
D Contractor Qualification N Notice to Proceed
E Bid Form O Final Receipt
F Bid Schedule P Project Special Provisions
G List of Subcontractors Q General Provisions
H Non-Discrimination Assurance R Addenda
I Non-Collusion Affidavit Q Drawings/ Exhibits
J Bid Bond S Keep Jobs in Colorado
5. The Owner will pay to the Contractor in the manner and at such times as set forth in the General Conditions, such
amounts as required by the Contract Documents.
6. Section 2-3 (a) – (e) of the City's Code of Laws is presented below:
(a) Fiscal year. Fiscal year for the city shall commence on January 1 and end on December 31.
(b) Budget contains appropriations. The city council shall annually adopt a budget in a manner
consistent with the provisions of Chapter X of the Home Rule Charter of the City of Wheat Ridge.
Upon the annual adoption by the city council of each fiscal year's budget, levels of authorized
expenditures from the funds indicated within the annual budget itself and/or the adopting resolution
shall constitute the appropriation of the amounts specified therein for the purposes specified therein.
During the course of each fiscal year, approval by the city council of contracts for goods or services,
and/or approval of bids for the provision of specified goods or services, shall likewise constitute
appropriations of the amounts specified therein for the purposes specified therein.
(c) No contract to exceed appropriation. During each and any fiscal year, no contract entered into by or
on behalf of the city shall expend or contract to expend any money, or incur any liability, nor shall
any contract be entered into nor any bid be awarded by or on behalf of the city which, by its terms,
involves the expenditure of money for any of the purposes for which provision is made either in the
adopted budget or adopting resolution, including any legally authorized amendments thereto, in
excess of the amount appropriated in the budget or the approved contract or bid award. Any contract
or bid award, either verbal or written, made in violation of the provisions of this section shall be void
as to the city and no city monies from any source whatsoever shall be paid thereon.
(d) Amendments and authorized expenditures. Nothing contained herein shall preclude the city council
from adopting a supplemental appropriation in a manner consistent with the provisions of Section
10.12 of the Home Rule Charter of the city. Further, nothing contained in this section shall prevent
the making of contracts for governmental services or for capital outlay for a period exceeding one (1)
year if such contracts are otherwise allowed by the Home Rule Charter of the city; provided,
however, any contract so made shall be executory only for the amounts agreed to be paid for such
services to be rendered in succeeding fiscal years.
(e) Notice to parties contracting with the city. All persons contracting with, or selling goods or services
to, the city are hereby placed upon notice of the provisions of this section. The provisions of this
section shall become a part of the Merit System Personnel Rules and Regulations of the City of
Wheat Ridge; shall be referred to specifically in all public works bid documents and contracts; and
shall be incorporated into, and specially noted within, all other contracts entered into by or on behalf
of the city wherein city funds are used to pay for said contract.
7. Section 2-4 of the City Code of Laws is presented below:
(a) The city may, by contract, require the contractor awarded a public works contract to waive, release
or extinguish its rights to recover costs or damages, or obtain an equitable adjustment, for delays in
performing such contract if such delay is caused, in whole or in part, by acts or omissions of the city
or its agents, if the contract provides that an extension of time for completion of the work is the
contractor's remedy for such delay. Such a clause is valid and enforceable, any provision of state
law to the contrary notwithstanding.
(b) The city council, by this ordinance (Ordinance No. 812), declares its local contracting powers to be a
matter of purely local concern, and further specifically intends to supersede, pursuant to its powers
under Article XX of the Colorado Constitution, the provisions of Sections 24-91-101 and 24-91-
103.5, C.R.S., insofar as they conflict with the provisions of this section of the Code of Laws of the
City of Wheat Ridge, Colorado.
8. Any notice or communication given pursuant to this Agreement to the City shall be made in writing:
Contact Information City Contractor
Name: Dan Klenjoski Ryan Neeley
Office Phone: 303.235.2868 303.278.8100
Email Address: dklenjoski@wheatridge.gov ryan@goodlandconstruction.com
Address: 7500 W 29th Ave. 760 Nile St.
City, State, Zip Code Wheat Ridge, CO 80033 Golden, CO 80401
9. The Contractor agrees to abide by the requirements under EXECUTIVE ORDER NO. 11246 as amended,
including specifically the provisions governed by the Equal Opportunity Commission and also to abide by the
requirements of the IMMIGRATION REFORM AND CONTRACT ACT OF 1986 and the requirements of the
AMERICANS WITH DISABILITIES Act of 1991; and the United States Department of Transportation Title VI
Regulations at 49 CFR Part 21 requirements under the Civil Rights Act of 1964, assuring that no person shall on
the grounds of race, color, or national origin be excluded from participation in the opportunity to bid, or be
discriminated against in consideration of award of this project.
10. In accordance with CRS Title 24, Article 91, Section 103.6, Paragraph 2, Subparagraph a, the City of Wheat
Ridge hereby states that funds have been appropriated for this Project in an amount equal to or in excess of the
Original Contract Amount.
In accordance with CRS Title 24, Article 91, Section 103.6, Paragraph 2, Subparagraph a, the City of Wheat
Ridge hereby states that funds have been appropriated for this Project in an amount equal to or in excess of the
Original Contract Amount.
11. Vendor Performance Feedback
The City of Wheat Ridge has implemented a requirement for Project Managers to assess each vendor’s
performance and issue a determination as to whether the City should award the vendor future City contracts. All
contracts will need to be considered as part of the requirement. The following criteria will be evaluated annually
for renewable contracts and at contract closeout for one-time agreements:
a. Work completed on time
b. Work completed within budget
c. Work completed as per the Scope of Work
d. Future awards recommendation
12. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators,
successors, and assigns.
13. Each party has reviewed the items contained within this contract and recommend executing this contract to
proceed with the agreed upon Statement of Work.
______________________________________ __________
Whitney Mugford-Smith, Procurement Manager Date Signed
______________________________________ __________
Dan Klenjoski, Infrastructure Project Manager Date Signed
______________________________________ __________
Kent Kisselman, Director of Public Works Date Signed
IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this
Agreement in two (2) copies, each of which shall be deemed an original on the date first above written.
ATTEST: OWNER
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
Lucy Spalenka, Deputy City Clerk WHEAT RIDGE, C0 80033
303-234-5900
Date Patrick Goff, City Manager
APPROVED AS TO FORM: CONTRACTOR
Goodland Construction, Inc.
Gerald Dahl, City Attorney 760 Nile St.
Golden, CO 80401
ATTEST TO CONTRACTOR:
Authorized Signature
Full Name
Signature
Title
Title
Date Date
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
Goodland Construction, Inc.
(Name of Contractor)
760 Nile St., Golden, CO 80401
(Address of Contractor)
A hereinafter called "PRINCIPAL", and
(Name of Surety)
(Address of Surety)
hereinafter called "Surety", are held and firmly bound unto the City of Wheat Ridge, 7500 West 29th Avenue, Wheat
Ridge, Colorado 80033, hereinafter called "Owner", in the penal sum of dollars, ($10,000,000) in lawful money of the
United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly
and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the
Owner, dated the day of _________, 2026, a copy of which is hereto attached and made a part hereof for the
Project titled, RFP-26-44-Sidewalk Gap Construction , in accordance with the Contract Bid Documents including:
Base Bid – $2,632,878.69
Bid Alternate 1 – $7,367,121.31
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, Subcontractors and corporations
furnishing materials for or performing labor in the prosecution of the Work provided for in such contract, and any
authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and
coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such Work,
and all insurance premiums on said WORK, and for all labor performed in such work whether by Subcontractor or
otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of
time, alteration or addition to the terms of the Contract or to the Work to be performed or the Specifications accompanying
the same shall in any wise affect its obligation on this Bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the Contract or to the Work or to the Specifications.
*Insert "a corporation", "a partnership", or "an individual" as applicable.
IN WITNESS WHEREOF, this instrument is executed in one part, each of which shall be deemed an original, this the
day of , 2026
ATTEST: PRINCIPAL
CORPORATE SECRETARY PRINCIPAL
ADDRESS BY
ADDRESS
(SEAL)
SURETY
ATTEST:
SURETY
ADDRESS BY (ATTORNEY IN FACT)
ADDRESS
(SEAL)
Note: Date of Bond must not be prior to date of Contract. If Contractor is partnership, all partners should execute bond.
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular
570, as amended) and be authorized to transact business in the State of Colorado.
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: that
Goodland Construction, Inc.
(Name of Contractor)
760 Nile St., Golden, CO 80401
(Address of Contractor)
A hereinafter called "PRINCIPAL", and
(Name of Surety)
(Address of Surety)
hereinafter called "Surety", are held and firmly bound unto the City of Wheat Ridge, 7500 West 29th Avenue, Wheat
Ridge, Colorado 80033, hereinafter called "Owner", in the penal sum of dollars, ($10,000,000) in lawful money of the
United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly
and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the
Owner, dated the day of _________, 2026, a copy of which is hereto attached and made a part hereof for the
Project titled, RFP-26-44-Sidewalk Gap Construction , in accordance with the Contract Bid Documents including:
Base Bid – $2,632,878.69
Bid Alternate 1 – $7,367,121.31
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants,
terms, conditions, and agreements of said Contract during the original term thereof, and any extensions thereof which
may be granted by the Owner, with or without notice to the Surety and during the one year guarantee period, and if he
shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the Owner
from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all
outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to
remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of
time, alteration or addition to the terms of the Contract or to the Work to be performed or the Specifications accompanying
the same shall in any wise affect its obligation on this Bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the Contract or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any
beneficiary hereunder, whose claim may be unsatisfied.
*Insert "a corporation", "a partnership", or "an individual" as applicable.
IN WITNESS WHEREOF, this instrument is executed in one part, each of which shall be deemed an original, this the
day of , 2026
ATTEST: PRINCIPAL
CORPORATE SECRETARY PRINCIPAL
ADDRESS BY
ADDRESS
(SEAL)
SURETY
ATTEST:
SURETY
ADDRESS BY (ATTORNEY IN FACT)
ADDRESS
(SEAL)
Note: Date of Bond must not be prior to date of Contract. If Contractor is partnership, all partners should execute bond.
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular
570, as amended) and be authorized to transact business in the State of Colorado.
ITEM NUMBER: 8
DATE: October 26, 2026
REQUEST FOR CITY COUNCIL ACTION
MOTION
TITLE: MOTION AWARDING A CONTRACT TO MULLER
ENGINEERING COMPANY IN THE AMOUNT OF $2,645,613
WITH A CONTINGENCY AMOUNT OF $264,561 FOR A TOTAL
APPROVED AMOUNT OF $2,910,174 FOR DESIGN SERVICES
FOR THE TABOR STREET MULTIMODAL IMPROVEMENTS
PROJECT
☐PUBLIC HEARING
☒BIDS/MOTIONS
☐RESOLUTIONS
☐ORDINANCES FOR 1st READING ☐ORDINANCES FOR 2nd READING
QUASI-JUDICIAL ☐YES ☒NO
ISSUE:
Staff are seeking approval to award a professional services contract to Muller
Engineering Company in the amount of $2,645,613 to provide design services for the
Tabor Street Multimodal Improvement Project.
The project will improve multimodal connectivity along Tabor Street between Clear
Creek Trail and the West Interstate 70 Frontage Road North. The design will incorporate
pedestrian and bicycle facilities, traffic calming, drainage improvements, lighting, utility
coordination, and evaluation and design of improvements to the existing Tabor Street
bridge crossing over I-70. These improvements will support safer travel and improve connections between residential areas, employment centers, the Clear Creek Trail, and
the Ward Road G Line Station.
PRIOR ACTION:
In 2025, the City was awarded funding through the Colorado Department of Transportation (CDOT) to support construction of the Tabor Street Multimodal
Improvement Project. The funding includes federal and state sources.
On February 23, 2026, City Council approved Resolution No. 13-2026, authorizing an
Intergovernmental Agreement between the City and CDOT to establish the
responsibilities, funding sources, and applicable requirements for the project.
Council Action Form – Tabor Street Multimodal Improvements October 26, 2026
Page 2
On July 24, 2026, staff issued a Request for Proposal (RFP) for consultants to provide
design services for Tabor Street. Staff received proposals from three consultants and
after evaluating the firm capabilities and similar work experience, the project team in
charge of the project, and the firm’s approach and timeline determined that Muller
Engineering Company was the best consultant to complete this project.
FINANCIAL IMPACT:
Funding for the Tabor Street Multimodal Improvement Project is budgeted in the Wheat
Ridge Next Chapter 2J Bond, with design services starting in 2026 and construction
anticipated in 2028.
The total CDOT funding is $14,020,365. The project's funding includes $1,596,000 in
federal DRCOG funds, $8,300,000 in federal Congestion Mitigation and Air Quality
(CMAQ) funds, $2,000,000 in state Multimodal Transportation and Mitigation Options
Fund (MMO) funds, and a City contribution of $2,124,365.
BACKGROUND:
Tabor Street provides the only opportunity to cross I-70 between Ward Road and
Kipling Street and serves as an important connection between the Ward Road G Line Station, nearby residential areas, employment centers, and the Clear Creek Trail. However, existing multimodal facilities are limited south of the I-70 Frontage Road North. Tabor Street and the existing bridge over I-70 are narrow and experience truck traffic associated with the nearby truck stop. South of 44th Avenue, Tabor Street
functions largely as an alley, with limited space for vehicles and no dedicated pedestrian or bicycle facilities.
The project will improve this corridor by developing pedestrian and bicycle connections between the Clear Creek Trail and the I-70 Frontage Road North. The project also includes design of improvements to the existing Tabor Street bridge crossing over I-70
to evaluate the bridge configuration and pedestrian accommodations. Funding for construction of the bridge improvements is not included in the CDOT IGA.
The project supports the City's ongoing efforts to improve transportation safety and connectivity. The 2017 Bicycle and Pedestrian Master Plan identified the need for sidewalks and bike lanes along Tabor Street. During the City's 2023 Let's Talk North I-
70 neighborhood engagement initiative, a safe bicycle and pedestrian connection between the Ward Road RTD Station and Clear Creek was identified as a top priority. The 2025 City Plan also designated Tabor Street north of Clear Creek as a Neighborhood Bike Connector.
Muller Engineering Company will provide design services to advance the project toward
construction. The scope includes project management and coordination with City staff
and CDOT; public involvement and stakeholder coordination; topographic survey and
utility investigation; hydrologic and hydraulic engineering; environmental documentation and clearances; roadway, sidewalk, bicycle facility, drainage, lighting, and landscape
Council Action Form – Tabor Street Multimodal Improvements October 26, 2026
Page 3
design; right-of-way plan development and acquisition support; traffic analysis and
traffic calming design; geotechnical investigation; and bridge design. The consultant
will develop construction plans, specifications, and opinions of probable construction
cost at the required design milestones.
RECOMMENDATIONS:
Staff recommend awarding a contract to Muller Engineering Company in the amount of
$2,645,613 for the Tabor Street Multimodal Improvements Project, with a contingency
amount of 10% or $264,561 for a total not-to-exceed amount of $2,910,174.
RECOMMENDED MOTION:
“I move to award a contract to Muller Engineering Company in the amount of $2,645,613
with a contingency amount of $264,561 for a total approved amount of $2,910,174 for
the Tabor Street Multimodal Improvements Project.”
Or,
“I move to deny award to Muller Engineering Company in the amount of $2,645,613 with
a contingency amount of $264,561 for a total approved amount of $2,910,174 for the
Tabor Street Multimodal Improvements Project. for the following reason(s).”
REPORT PREPARED/REVIEWED BY:
Daniel Martinez, CIP Program Manager
Kent Kisselman, Director of Public Works
Patrick Goff, City Manager
ATTACHMENTS: 1. Muller Engineering Company Contract
Tabor Street Improvements
26-36
THIS AGREEMENT made this Tuesday, October 27, 2026, by and between the City of Wheat Ridge,
Colorado, hereinafter referred to as the “City” or “Owner” and Muller Engineering Company, 7245 West
Alaska Dr., Ste. 300, Lakewood, CO 80226, hereinafter referred to as the “Consultant.”
WITNESSETH, that the City of Wheat Ridge and the Consultant agree as follows:
Article 1 - Services
The Consultant will serve as the City’s consultant and provide at a minimum all the professional services
required as per the agreed upon Statement of Work (Exhibit A) incorporated herein by reference.
The Consultant agrees to perform the following tasks in support of the Tabor Street Improvements project:
•Task 1 - Project Management, Coordination and Meetings
•Task 2 - Stakeholder and Public Engagement (performed with Olsson)
•Task 3 - Data Collection and Field Investigations
•Task 4 - Concept Design and ROW Identification
•Task 5 - 30% Design
•Task 6 - 60% Design
•Task 7 - 90% Design
•Task 8 - 100% Design
•Task 9 - Environmental Documentation and Permitting
•Task 10 - ROWPR and ROW Acquisition
•Task 11 - Structural Design
•Task 12 - Construction Support Services
Article 2 - Term
The work to be performed under this agreement may commence promptly after receipt of a fully-executed copy
of the agreement, to the extent that the Consultant has been authorized to proceed by the City.
It is anticipated that work will be completed by July 31, 2027; the agreement will expire upon project
completion.
Article 3 - Payment and Fee Schedule
ATTACHMENT 1
It is understood and agreed by and between the parties hereto, that the City shall pay the Consultant for
services provided, and the Consultant will accept a not-to-exceed amount of two-million, six-hundred forty-
five thousand, six-hundred thirteen dollars as full payment for the services.
The City operates on a calendar year as its fiscal year; as such, all invoices must be received no later than
December 20, in order to be processed in the same calendar year.
1. Invoices by Task
Invoices will be submitted monthly by the Consultant for services performed and expenses incurred,
pursuant to this agreement during the prior month. Payment is then made to the Consultant within thirty
(30) days of receipt via Electronic Funds Transfer (EFT). The City may elect the alternative method of
payment by the Treasurer’s Office through proper accounting procedures.
2. Funding
There is in effect within the City of Wheat Ridge, Colorado, a provision of the City’s Code of Laws which
limits the amount for which the City shall be liable to the amount expressly appropriated by the City
Council, either through budgeted appropriation, or contract or bid award. The consultant is specifically
advised of the provisions of this portion of the Code of Laws of the City of Wheat Ridge, which was
enacted pursuant to Ordinance 787, Series of 1989, and expressly incorporated herein. This contract is
specifically subject to the provisions of said Ordinance and adopted Code Section.
Article 4 - No Damages for Delay
Pursuant to Section 2-4 of the Code of Laws, Consultant agrees to waive, release or extinguish its right to
recover costs or damages, or obtain an equitable adjustment, for delays in performing this contract if such
delay is caused in whole or in part by acts or omissions of the City or its agents, provided however an
extension of time is the Consultant's remedy for such delay.
Article 5 - Reserved.
Reserved.
Article 6 - Sales and Use Taxes
The City of Wheat Ridge is exempt from City, County, State, and Federal sales and excise taxes. Certificates
will be issued upon request. City of Wheat Ridge Sales Tax Exempt: 98-03515
Article 7 - Independent Consultant
In performing the work under this agreement, the Consultant acts as an independent consultant and is solely
responsible for necessary and adequate worker’s compensation insurance, personal injury and property
damage insurance, as well errors and omissions insurance. The Consultant, as an independent Consultant, is
obligated to pay Federal and State income tax on monies earned. The personnel employed by the Consultant
are not and shall not become employees, agents, or servants of the City because of the performance of any
work by this agreement. The Consultant warrants that it has not employed or retained any company or person,
other than a bona fide employee working solely for it, to solicit or secure this agreement, and that it has not
paid or agreed to pay any company or person—other than bona fide employees working solely for the
Consultant—any commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or
resulting from the award or making of this agreement. For breach or violation of this warranty the City will have
the right to annul this agreement without liability or in its discretion to deduct from the agreement price or
consideration, or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or
contingent fee.
Article 8 - Insurance
In accordance with Article 7 above, the Consultant shall furnish a certificate of insurance upon notification of award,
and prior to performance. Work shall not commence under this agreement until the Consultant has submitted to the
City and received approval thereof, a certificate of insurance showing compliance with the following minimum types
and coverages of insurance:
Type of Insurance Minimum Limits of Liability
Worker’s Compensation, Coverage A Statutory, including occupational disease
coverage for all employees at work site.
Employer Liability, Coverage B $500,000 per person
$500,000 per accident
$500,000 each disease
Commercial General Liability (including Premises-
Operations, Independent Contractor’s Protective,
Broad Form Property Damage, and Contractual
Liability)
• Bodily Injury
• Property Damage
$1 million per occurrence
$2 million aggregate
$1 million per occurrence
$2 million aggregate
Comprehensive Automotive Liability (owned, hired,
and non-owned vehicles)
• Bodily Injury
• Property Damage
$1 million per occurrence
$1 million per occurrence
The City of Wheat Ridge shall be named as additional insured on all liability policies. Insurance shall
include provisions preventing cancellation without 30 days prior notice by certified mail to the City.
Nothing herein shall be deemed or construed as a waiver of any of the protections to, which the agencies may be
entitled pursuant to the Colorado Governmental Immunity Act, Sections 24-10-101, CRS, as amended.
Article 9 - Indemnification
The Consultant agrees to indemnify, defend, and to hold the City, CDOT and its agents, officials, officers and
employees harmless for, from and against any and all claims, suits, expenses, damages, or other liabilities—
including reasonable attorney fees and court costs arising out of damage or injury to persons, entities, or
property causes or sustained by any person or persons to the extent caused by the negligent, acts, omissions,
performance or failure of the Consultant to provide services pursuant to the terms of this agreement. The
Consultant's indemnity shall be consistent with C.R.S. 13-50.5-102(8).
Article 10 - Equal Employment Opportunity
The Consultant shall not discriminate against any employee or applicant for employment because of age, race,
color, religion, sex, or national origin. The Consultant shall adhere to acceptable affirmative action guidelines in
selecting employees and shall ensure that employees are treated equally during employment, without regard to
age, race, color, religion, sex, or national origin. Such action shall include—but not be limited to the following:
employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination,
rates of pay or other forms of compensation, and selection for training—including apprenticeship. The
Consultant agrees to post in conspicuous places, available to employees and applicants for employment,
notices provided by the local public agency setting forth the provisions of this nondiscrimination clause.
The Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by
this agreement so that such provisions will be binding upon each subcontractor—provided that the foregoing
provisions shall not apply to contracts or subcontracts for standard commercial supplies or raw materials.
Article 11 - Charter, Laws, and Ordinances
The Consultant at all times during the performance of this agreement, agrees to strictly adhere to all applicable
Federal, State, and local laws, rules, regulations, and ordinances that affect or govern the work as
contemplated under this agreement.
Article 12 - Law and Venue
The laws of the State of Colorado shall govern as to the interpretation, validity, and effect of this agreement.
The parties agree that venue and jurisdiction for disputes regarding performance of this contract is with the
District Court of Jefferson County, Colorado. Any claim, demand, or litigation shall be brought against the Party
entities and not against any person, individual, employee, or officer.
Article 13 - Termination
The Consultant acknowledges that his failure to accomplish the work as described shall be considered a
material breach of the contract and entitle the City to consequential damages resulting from failures, acts, or
omissions—including, but not limited to re-procurement costs, insufficient or improper work.
The City and the Consultant agree that this agreement may be canceled for cause by either party, with a fifteen
(15) day prior written notice. The cost of completing the portion of the work which remains unperformed at the
time of such termination shall be deducted from the contract price before payment is made.
The City may terminate the agreement for its convenience, upon thirty (30) days written notice. In the event of
such termination the Consultant will be paid for all work and expenses incurred up until the time of such
termination.
All work accomplished by the Consultant prior to the date of such termination shall be recorded, and tangible
work documents shall be transferred to and become the sole property of the City, prior to payment for services
rendered.
Article 14 - Notices
Contact Information City Consultant
Name: Logan Huffaker Nancy Lambertson
Office Phone: (303) 205-7628 303-988-4939
Email Address: lhuffaker@wheatridge.gov nlambertson@mullereng.com
Address: 7500 W 29th Ave. 7245 West Alaska Dr., Ste. 300
City, State, Zip
Code:
Wheat Ridge, CO 80033 Lakewood, CO 80226
Article 15 - Assignment and Subcontractors
The duties and obligations of the Consultant arising hereunder cannot be assigned, delegated, nor
subcontracted except with the express written consent of the City. The subconsultants permitted by the City
shall be subject to the requirements of this agreement, and the consultant is responsible for all subcontracting
arrangements, as well as the delivery of services as set forth in this agreement. The consultant shall be
responsible for the performance of any subconsultant.
Article 16 - Severability
To the extent that the agreement may be executed and performance of the obligations of the parties may be
accomplished within the intent of the agreement, the terms of this agreement are severable. Should any term
or provision hereof be declared invalid or become inoperative for any reason, such invalidity or failure shall not
affect the validity of any other term or provision hereof. The waiver of any breach of a term hereof shall not be
construed as a waiver of any other term, or the same term upon subsequent breach.
Article 17 - Integration of Understandings
This agreement is intended as the complete integration of all understanding between the parties. No prior or
contemporaneous addition, deletion, or other amendment hereto shall have any force and effect whatsoever,
unless embodied herein in writing. No subsequent novation, renewal, addition, deletion, or other amendment
hereto shall have any force or effect unless embodied in writing and signed by an authorized representative of
the City and the consultant .
Article 18 - Ownership of Contract Products
All products produced from the awarded contract shall be the sole property of the City.
Article 19 - Personally Identifiable Information (PII) and Open Records Act
Contractors, consultants, business partners and vendors that handle, process, or work in areas where
personally identifiable information may reside in hard copy or electronic records must maintain the
confidentiality of all Personally Identifiable Information (PII). Violation may result in contractual penalties and
termination of the business relationship with the City. In extreme cases criminal punishment under Colorado
Law (C.R.S. § 24-73-101) may occur. Consultant acknowledges that the City is subject to the provisions of the
Colorado Open Records Act, CRS 24-72-201, et seq., (“The Act”) and that all documents, correspondence,
email messages and other communications between the Consultant and the City are subject to public
disclosure under the provisions of that Act, with limited exceptions for proprietary information, business
secrets, and similar information. Consultant shall identify all proprietary and confidential information on the
document or communication itself. In the event the City receives a request for disclosure of such information
under the Act, Consultant agrees to indemnify the City against any attorney fees and court costs incurred by
the City in defending its refusal to disclose such information.
Article 20 - Accessibility
Consultant(s) and solutions complies with all applicable provisions of §§24-85-101, et seq., C.R.S., [1] and the
Accessibility Standards for Individuals with a Disability, as established by the Office Of Information Technology
pursuant to Section §24-85-103(2.5). Consultant also complies with the latest version of Level AA of the Web
Content Accessibility Guidelines (WCAG), currently version 2.1, as described in State of Colorado Technical
Standard TS-OEA-002, Technology Accessibility for Web Content and Applications when developing solutions
for the state.
The Consultant agrees to indemnify, save, and hold harmless the state, its employees, agents and assignees
(collectively, the “Indemnified Parties”), against any and all costs, expenses, claims, damages, liabilities, court
awards and other amounts (including attorneys’ fees and related costs) incurred by any of the Indemnified
Parties in relation to the Consultant's failure to comply with §§24-85-101, et seq., C.R.S., or the Accessibility
Standards for Individuals with a Disability as established by the Office of Information Technology pursuant to
Section §24-85-103(2.5).
Any additional costs to add accessibility features will be the obligation of the Consultant, and any addition or
change to the Price Proposal will be disallowed.
Article 21 - Reserved.
Reserved.
Article 22 - Consultant Performance Feedback
The City of Wheat Ridge has implemented a requirement for Project Managers to assess each vendor’s
performance and issue a determination as to whether the City should award the vendor future City contracts.
All contracts will need to be considered as part of the requirement. The following criteria will be evaluated
annually for renewable contracts and at contract closeout for one-time agreements:
1. Work completed on time
2. Work completed within budget
3. Work completed as per the Scope of Work
4. Future Award Recommendation
SIGNATURE PAGE TO FOLLOW
This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators,
successors, and assigns.
Each party has reviewed the items contained within this contract and recommend executing this contract to
proceed with the agreed upon Statement of Work.
PROCUREMENT MANAGER CONSULTANT
**signature_214516**
SIGNATURE
Whitney Mugford-Smith
FULL NAME
Procurement Manager
TITLE
**date_signed_214516**
DATE SIGNED
**signature_214518**
SIGNATURE
Matthew D. Andrews
FULL NAME
**date_signed_214518**
DATE SIGNED
Consultant
TITLE
PROJECT MANAGER ATTEST TO CONSULTANT
**signature_214515**
SIGNATURE
Logan Huffaker
FULL NAME
Infrastructure Project Manager
TITLE
**date_signed_214515**
DATE SIGNED
**signature_214508**
SIGNATURE
Nancy Lambertson
FULL NAME
Principal
TITLE
**date_signed_214508**
DATE SIGNED
DEPARTMENT DIRECTOR CITY OF WHEAT RIDGE
**signature_214506**
SIGNATURE
Kent Kisselman
FULL NAME
Director of Public Works
TITLE
**date_signed_214506**
DATE SIGNED
**signature_214510**
SIGNATURE
Patrick Goff
FULL NAME
City Manager
TITLE
**date_signed_214510**
DATE SIGNED
CITY ATTORNEY **signature_214504**
SIGNATURE
Lucy Spalenka
FULL NAME
**date_signed_214504**
DATE SIGNED
Deputy City Clerk
TITLE
**signature_214507**
SIGNATURE
Gerald Dahl
FULL NAME
**date_signed_214507**
DATE SIGNED
CITY ATTORNEY
TITLE
Exhibits List
A - Tabor Street Improvements Scope of Work
Exhibit A
Tabor Street Improvements Scope of Work
SCOPE OF WORK
TABOR STREET IMPROVEMENTS
PRELIMINARY AND FINAL DESIGN SERVICES
CITY OF WHEAT RIDGE PROJECT 26-36
September 30, 2026
INTRODUCTION
Tabor Street provides the only crossing over I-70 between Ward and Kipling Streets, both of which currently
do not have adequate multimodal facilities. Multimodal facilities are non-existent south of the I-70
Frontage Road North. Tabor Street and the bridge over I-70 are narrow and used by trucks leaving the
nearby truck stop to access westbound I-70. Tabor south of 44th is essentially an alley with barely enough
width for a single vehicle.
The Tabor Street Improvements project will provide multimodal access from western Wheat Ridge (the City)
to the G Line Station and the Van Bibber Trail system in Arvada and from the rapidly developing area around
the Station to the Clear Creek Trail, which is part of the Peaks to Plains Trail System. Dedicated multimodal
facilities along Tabor Street and over I-70 will separate users from the heavy truck traffic that uses Tabor
Street to access westbound I-70 from 44th Avenue. Improvements also include evaluation and design of a
separate pedestrian bridge across I-70 adjacent to the existing vehicular.
The scope of work consists of the following tasks. Tasks will be performed by Muller Engineering Company
(Muller) except where another firm is specifically identified.
PROJECT TEAM RESPONSIBILITIES
Muller Engineering Company
Muller will serve as the Prime Consultant and will lead project management and administration, CDOT
Local Agency coordination, NEPA and environmental clearances, structural engineering, roadway and trail
design, drainage and water quality, quality control, and construction package development.
Olsson
Olsson will support project management and environmental clearances and lead multimodal planning,
public engagement, traffic operations and design, topographic survey and ROW plans, geotechnical
investigation and engineering, and lighting design.
T2 Utility Engineers
T2 will lead SUE investigation, utility coordination, and utility relocation plans.
H.C. Peck
H.C. Peck will provide ROW acquisition services.
Dig Studio
Dig Studio will provide landscape architecture and streetscape design services.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 2
TASK 1 – PROJECT MANAGEMENT, COORDINATION AND MEETINGS
Project Management involves general project management, contract administration, subconsultant
coordination, and agency coordination. Assumes project management for thirty (30) months for design and
construction.
A. Prepare Monthly Invoices and Progress Reports
B. Develop and maintain the project design schedule including timeline and critical path items.
C. Prepare a Project Management Plan with a Quality Management Plan included.
D. Meetings
a. Kick-Off Meeting – Conduct a 1-hr, virtual kick off meeting with the City. Assume attendance
by PM, Deputy PM, Principal, and discipline leads.
b. Design Scoping Meeting - Conduct a1-hr, virtual Design Scoping Meeting with CDOT and the
City. Assume attendance by PM, Deputy PM, Principal, and discipline leads.
c. Bi-Weekly Progress Meetings with the City – Thirty-six (36) 30-minute, bi-weekly virtual
meetings with City PM and Consultant PM and Deputy PM during design phase. Includes
time for agenda prep and distribution of meeting notes and actions, and attendance by
discipline leads at four meetings if needed.
d. Environmental Scoping Meeting – Conduct a 2-hr, virtual meeting with the City and CDOT
Environmental specialty units. Assume 2 Muller attendees and 2 Olsson attendees, plus
meeting prep and follow up.
e. Concept Design Workshops – Conduct two 2-hr, in-person workshops to review Concept
Design and/or Preliminary Design. Assume attendance by PM, Deputy PM, and six discipline
leads.
f. FIR/60% Design Review Meeting – Conduct a 2-hr, virtual 60% design review meeting with
the City and CDOT. Assume attendance by PM, Deputy PM, and discipline leads.
g. FOR/90% Design Review Meeting – Conduct a 3-hr, virtual 90% design review meeting with
the City and CDOT. Assume attendance by PM, Deputy PM, and discipline leads.
h. Utility Coordination Meetings - Twenty 1-hr, virtual meetings throughout the project. Assume
1 Muller, 1 Olsson, and 1 T2ue attendees.
i. Site Visits – Two 4-hr site visits, one during Data Collection phase and one after the FIR/60%
Design Review Meeting. Assume attendance by PM and 2 attendees per discipline.
Deliverables:
• Monthly Invoicing and Progress Reports
• Project Design Schedule
• Project Management/Quality Management Plan
• Meeting Agendas and meeting minutes
• Action Item and Decision Logs
Assumptions: All meetings are assumed to be virtual, unless specified otherwise. Project Team will use
OneNote and SharePoint tools for project documentation and collaboration.
Exclusions: 508 Compliance for any documentation is excluded.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 3
TASK 2 – STAKEHOLDER AND PUBLIC ENGAGEMENT – OLSSON
Public involvement efforts will focus on proactive stakeholder and community engagement through
targeted meetings with directly affected property owners, City Council coordination and presentation
support, and a combination of in-person and online public outreach to inform the public, gather feedback,
and keep the community engaged throughout the project.
A. Develop a Public and Stakeholder Engagement Plan (PSEP) to outline involvement strategy,
activities, timeline, responsibilities, key stakeholders, and performance measures.
B. Conduct public engagement and stakeholder outreach to gather community input and collect
needs from residents/businesses directly along the corridor.
Activities will include:
• Up to two (2) public engagement meetings. The public engagement meetings will
support identification of stakeholder and community priorities and preferences.
Engagement meeting summaries provided.
It is assumed these will last two (2) hours, be held near the project area in an
accessible facility, facilitated by Olsson’s Public Engagement Coordinator, attended
by up to two (2) additional Olsson staff, and attended by two (2) Muller staff. All
engagement materials, visuals, public notices, advertising, and coordination will be
managed by Olsson with review and support from Muller.
C. High Impact Stakeholder Meetings (4) - Facilitate up to four (4) in person working meetings with
most impacted properties along corridor. Meetings may be conducted with individual stakeholders
or stakeholder groups at the project team’s discretion. It is assumed these will last up to two hours,
facilitated by Olsson’s Public Engagement Coordinator, attended by up to two (2) additional Olsson
staff, and attended by two (2) Muller staff. All materials, communication, and coordination will be
managed by Olsson with review and support from Muller. Stakeholder meeting summaries
provided.
D. Support Materials for staff presentations to City Council (2) - Presentation content will be
developed for up to two (2) meetings and provided to City staff in advance of City Council briefings.
Content could include draft PowerPoint slides with provided City branding and project updates,
engagement metrics, and existing visuals and graphics. One round of review and revision by the
City is included. Attendance at the City Council meetings is not included unless specifically noted
elsewhere.
E. Online Virtual Open House (1) – Up to one (1) virtual open house up to two (2) hours in duration
facilitated to discuss design alternatives, report on survey results, share next steps, and collect
feedback from participants. Virtual Open House summary provided.
Deliverables:
• Public and Stakeholder Engagement Plan (PSEP) (1)
• Public Meeting Summaries (2)
• Presentation Materials Packets (2)
• High Impact Stakeholder Meetings Summary (1)
• Virtual Open House Summary (1)
Tabor Street Improvements Scope of Work September 30, 2026
Page | 4
Assumptions:
• City will provide or cover the cost of suitable meeting spaces for all in-person public engagement
functions including: Public Engagement Meetings, High Impact Stakeholder Meetings, and
Community Workshop. These will be held at an ADA accessible facility and could include places
like public libraries, city buildings, or school buildings. City staff will be responsible for venue
reservation and facility coordination.
• City will host project website with timeline, information, and opportunities to provide feedback.
Olsson could support up to four (4) rounds of updates including project launch, public engagement
meeting #1, public engagement meeting #2, and project closeout/final summary.
• Public notices will be distributed through the City’s standard communication channels.
• Public comments received through engagement activities will be reviewed and summarized.
Detailed response to individual comments is not anticipated.
Exclusions:
• Translation and interpretation services
• Recording or transcription of engagement activities.
• Ongoing social media management.
• Development of project branding.
• Design and maintenance of a project website.
Value Add Public Engagement Services
A. Online community needs survey (1) – online survey to collect user experience and suggestions for
improvements along Tabor Street. Distributed via flyer/QR code on signage
B. Distribution of flyers along the corridor to advertise project, survey, and subsequent engagement
opportunities – will distribute flyers to homeowners, businesses, and property owners to publicize
the survey and project URL to collect feedback.
C. Engagement signage – team will place up to ten (10) temporary signs along corridor advertising the
Tabor Street Project, survey and community touchpoints in accordance with project milestones.
Replacement of damaged or stolen signs is not included.
D. Public engagement summary – digital document of entire engagement effort, actions taken, major
themes identified and how feedback can be incorporated into design alternatives.
Deliverables:
• Online copy of survey and export of all responses/survey data
• Summary of survey responses in pdf format
• Final summary of all engagement efforts, themes identified, and recommendations for synthesis
into design
Tabor Street Improvements Scope of Work September 30, 2026
Page | 5
TASK 3 – DATA COLLECTION AND FIELD INVESTIGATIONS
Data collection and Field Investigations will include the Tabor Street corridor from the I-70 North Frontage
Road south to the Clear Creek Trail.
Right of Entry – Olsson
Prior to initiating data collection activities, the project team will identify parcels requiring access and
obtain Right of Entry (ROE) agreements from affected property owners. Work will include developing a
project-specific ROE template consistent with CDOT and City requirements, preparation of an affected
property owners list, distribution of ROE agreements, and tracking agreement status. The ROE agreement
template will be structured to provide access for the duration of the project, reducing the need for
subsequent property access requests. The ROE template and the affected properties list will be provided to
the City for review and approval prior to distribution. Multiple outreach methods may be utilized to obtain
executed agreements including email, certified mail, and hand delivery. Scope includes preparation and
distribution of ROE agreements and up to two follow-up contacts per property. The City will assist with
owner coordination as needed. The project team does not guarantee execution of ROE agreements by
affected property owners.
Executed ROE agreements will be provided to the City for project records.
Topographic Survey – Olsson
Survey Control and Design Survey
All surveying will be performed under the responsible charge of a Professional Land Surveyor licensed in
Colorado and in accordance with applicable Colorado statutes and Board rules, the current CDOT Survey
Manual, applicable portions of the CDOT Right of Way Manual, and generally accepted professional land
surveying practices.
Project Coordination and Survey Planning
Coordination with the City, the project team, and applicable CDOT Region personnel will confirm project
limits, survey requirements, and required deliverables. A survey approach will be developed to guide field
collection, data processing, quality control, and project delivery.
During the planning phase, we will coordinate with CDOT and the City to obtain a CDOT Utility/Special Use
Permit and City Right of Way Access Permit.
Project Survey Control
Existing horizontal and vertical control will be researched and recovered, and the project datum,
coordinate system, geoid model, units, and grid-to-ground relationship will be confirmed. A monumented
Primary Control network will be established and tied to accepted reference control using appropriate
GNSS observations and differential leveling methods. Static GNSS observations will be processed using
appropriate baseline-processing software, with resulting vectors evaluated for quality and incorporated
into a redundant least-squares network adjustment to establish the final horizontal control values
Tabor Street Improvements Scope of Work September 30, 2026
Page | 6
Following acceptance of the Primary Control network, Secondary Control will be established at sufficient
density to support the existing-conditions topographic survey and right-of-way retracement. Final control
will be documented through a Land Survey Control Diagram included in the Right of Way plan set described
in Task 10.
Topographic Survey
Topographic survey data will be collected within the defined project limits (as depicted below) to document
existing conditions and support project design and preparation of the right-of-way plan set. The survey will
include roadway and hardscape features, drainage facilities, utilities, structures, improvements, surface
features, grade changes, terrain shots, and breaklines necessary to prepare an accurate existing-
conditions base map and digital terrain model.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 7
Survey data will be collected using conventional survey methods and terrestrial LiDAR. Areas subject to
heavy traffic, including portions within I-70, will be collected using terrestrial LiDAR. Remote sensing
methods will allow existing conditions to be captured while minimizing survey crew exposure to active
travel lanes and eliminating impacts to traffic operations.
Documented quality assurance and quality control procedures will be applied throughout topographic data
collection and processing. Procedures will include verification of survey control and instrument setups,
redundant observations and independent check shots, daily review of field data for completeness and
accuracy, and comparison of collected elevations and features with adjacent observations.
The collected data will be processed and compiled into a coordinated three-dimensional existing-
conditions survey base suitable for project design and development of the right-of-way plan set.
ROW Research – Olsson
Right-of-Way Plan Set
Available records will be researched and compiled as necessary to establish existing property boundaries,
public right-of-way, easements, access control, and other property interests within the project limits.
Research will include applicable deeds, title commitments, subdivision plats, land survey plats,
monument records, existing right-of-way plans, acquisition documents, easements, dedications, vacation
documents, annexation records, Public Land Survey System records, and available City, County, and CDOT
project records.
The research will identify controlling documents, record conflicts, title exceptions, and other matters
affecting the existing right-of-way and proposed acquisitions.
Right-of-Way Retracement Survey
A field survey will be performed to recover and locate property, right-of-way, alignment, subdivision, and
Public Land Survey System monumentation relevant to the project corridor.
Recovered monumentation, record information, and physical evidence identified during the topographic
and retracement surveys will be evaluated to develop a professional opinion of the existing property and
right-of-way boundaries.
Ownership and Title Compilation
Current ownership information will be compiled for properties affected by the project, and available title
commitments will be reviewed for consistency with the survey and right-of-way plans. Existing title
exceptions affecting the project will be reviewed and documented as applicable.
Existing Right-of-Way and Ownership Base
Survey and research information will be compiled into an existing right-of-way and ownership base
depicting established project control, existing property lines, existing right-of-way, recorded easements,
ownership limits, relevant monumentation, and improvements affecting the proposed acquisitions.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 8
The existing right-of-way and ownership base will be coordinated with the project design and topographic
survey information and will serve as the basis for development of the Right of Way plan set described in
Task 10.
Quality Assurance and Quality Control
Documented quality assurance and quality control procedures will be implemented throughout the right-
of-way research, boundary determination, parcel development, property-description preparation, and
plan-production process. Reviews will include verification of record information, survey control,
monument evidence, boundary calculations, title and ownership information, parcel geometry, acquisition
areas, mathematical closures, plan-to-description consistency, CADD standards, and required plan
content.
The current CDOT right-of-way plan checklist, applicable review guidelines, and project-specific
requirements will be used in reviewing the plans and supporting documents. Final survey documents will
be independently checked and reviewed by the Professional Land Surveyor in responsible charge prior to
submission.
Geotechnical – Olsson
The geotechnical investigation will include review of available geologic, subsurface, and project
information, and completion of three bridge borings to depths of 50 to 65 feet, two retaining wall borings
along the bridge approaches to depths of 40 feet, and three pavement borings to depths of 10 feet. Final
boring locations and depths will be coordinated with the project team, the City, and CDOT, based on
preliminary design and project needs identified by the design team.
The investigation will include the necessary traffic control and right-of-way permitting. Groundwater levels
will be measured during and upon completion of drilling, and the borings will be backfilled with flowable fill
and pavement surfaces patched as necessary. Laboratory testing will be selected based on the materials
encountered and may include visual classification, moisture content, unit weight, Atterberg limits, fines
content or mechanical sieve analysis, one-dimensional swell/consolidation, unconfined compression, R-
value, and soil corrosivity testing.
Engineering analyses will evaluate subsurface conditions, including soil strata, groundwater, settlement
potential, and foundation support conditions. Recommendations will be provided for bridge foundations,
bridge abutments, retaining elements, approach fills, embankments, excavation, and subgrade preparation
per LRFD Specifications as required by CDOT. Analyses will also include evaluation of excavation and
shoring considerations, and identification of geotechnical constraints affecting bridge design. As a part of
the design process, global stability analysis will be performed at up to four cross sections once grading
information is known. Recommendations will be provided regarding roadway, sidewalk, and bicycle facility
design, including Mechanistic-Empirical (ME) pavement designs in accordance with CDOT criteria.
Findings and recommendations will be presented in draft and final geotechnical reports.
This scope excludes private utility locating, hydro-excavation, site restoration, and drill access
improvements. The proposed scope assumes exploration locations are accessible by a truck-mounted drill
rig, required property access will be provided, and field activities can be completed during favorable
weather conditions. Although reasonable care will be exercised during the exploration program, drilling
Tabor Street Improvements Scope of Work September 30, 2026
Page | 9
equipment may cause disturbance to site features, including pavements, landscaping, irrigation systems,
and ground surfaces.
Utility Investigation – T2
T2ue conducts utility investigations following ASCE 38-22 guidelines, meeting the requirements of
Colorado Revised Statutes 9-1.5, which outlines the proper implementation of SUE in Colorado. T2ue’s
professional engineer will make sure the SUE plans meet industry standards and regulations, reviewing and
stamping the final plans to verify their accuracy and compliance with legal and safety requirements.
Records Research
T2ue will submit an Engineering Ticket through the Colorado 811 system, as is required by C.R.S. 9-1.5, to
request records from the utility owners. T2ue will then compile utility records for all utilities in the project
area. The information collected and depicted includes utility type, ownership, material type, and size. T2ue
will document any special conditions that may impact investigating utilities.
Not all utility owners may be registered with Colorado 811, particularly irrigation and oil and gas utilities.
Additional research may be necessary to locate and identify these utilities accurately. This research may
include meeting with property owners, physically inspecting the site for utility markers, researching permit
applications for previous utility installations, and more.
Utility Designating
T2ue will utilize geophysical investigation tools and techniques to identify and designate the horizontal
position of known and undocumented utilities. If accessible, structures connected to gravity-fed systems
will be opened, and inverts will be measured. Invert information and, where accessible, pipe size/material
for the sewers will be collected at manholes/catch-basins from the surface and shown on the drawings
accordingly. The alignment of the sewer pipes will be shown on the drawing based on a combination of
record information received, results of the invert investigation, surveyed manholes/catch-basins, and
professional judgment. If chambers are full of water or confined space entry is required, extra costs will be
incurred and discussed with the Client in advance.
Utility Locating (Test Holes)
T2ue will complete up to 40 test holes utilizing hydro-assisted or air-assisted vacuum excavation at select
locations identified during conflict analysis. Information collected after exposing the utility includes the
type, size, material, and other utility or site conditions that may impact continued design or utility
coordination efforts. Test hole data is collected in T2ue’s proprietary software, Builterra, and a report is
generated conveying the attributes of the utility and the pavement type, thickness, and condition.
Completed test holes are surveyed and included in the SUE drawings. If needed, alignments of utilities
presented in the SUE plans will be adjusted to match where utilities were exposed.
Utility Coordination
T2ue’s utility coordination team will coordinate with the project team and the City throughout the project.
Utility coordination will involve identifying, coordinating, and managing all utility-related aspects to ensure
that utility services, infrastructure, and facilities are correctly identified, documented, and accommodated
within the project design and construction phases. This includes communication with utility companies,
assessment of existing utility locations and conditions, resolving conflicts between utilities and proposed
Tabor Street Improvements Scope of Work September 30, 2026
Page | 10
project elements, securing necessary contracts, and scheduling utility relocations or adjustments as
required. The scope also includes preparing utility impact reports, ensuring compliance with local
regulations, and facilitating ongoing coordination between project stakeholders to minimize delays and
disruptions related to utility systems.
SUE Project Limits
The yellow outline shown below indicates the area of QLB designation, while the orange outline indicates
the area of QL D research.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 11
Traffic Data Collection
Vehicular, Pedestrian, and Bicycle turning movement data will be collected for a 13-hour period (6:00 AM to
7:00 PM) at the following intersection(s):
1. I-70 Frontage Road and Tabor Street South
2. I-70 Frontage Road and Tabor Street North
Vehicular, Pedestrian, and Bicycle turning movement data will be collected for the typical weekday AM
(6:00 AM to 9:00 AM) and PM (3:00 PM to 6:00 PM) periods at the following intersection:
1. 44th Avenue and Tabor Street
Twenty-four-hour volume bi-directional vehicle volume and speed data will be collected at the following
locations
1. Tabor Street between Clear Creek Trail and 44th Avenue
2. Tabor Street between 44th Avenue and 46th Avenue
3. Tabor Street between 46th Avenue and Tabor Street Bridge
4. Tabor Street between I-70 Frontage Road and 49th Avenue
Traffic data will be collected during a typical weekday while local schools are in session.
Deliverables:
• Executed ROE Agreements
• Electronic Survey and ROW Data
• Draft Geotechnical and Pavement Design Report
• SUE Civil 3D CAD Model
• SUE Plan Set
• QLA Test Hole Data
• Traffic Count Data
Assumptions:
• It is assumed that ROE agreements will be needed from up to 40 parcels.
• The horizontal datum will be based on the current National Spatial Reference System,
NAD83(2011), projected to the Colorado State Plane Coordinate System of 1983, Central Zone. The
horizontal datum will be confirmed with the City of Wheat Ridge and CDOT prior to beginning work.
• The vertical datum will be NAVD88 with GNSS orthometric heights derived from GEOID18. The
vertical datum will be confirmed with the City of Wheat Ridge
• Surveying will be performed in accordance with the current applicable CDOT Survey Manual, CDOT
Right of Way Manual, CDOT CADD standards, Colorado statutes, State Board rules, and project-
specific direction from the CDOT Region Survey Coordinator.
• Topographic survey limits are based on current assumptions and will be finalized during the Pre-
Survey Conference.
• Above ground evidence of utilities will be located as part of the topographic survey.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 12
• T2ue will be responsible for all storm and sanitary structure details.
• All utility coordination meetings are assumed to be virtual (except for two field visits).
• Scope assumes permits are approved without significant modification to the proposed field
activities and within durations compatible with the project schedule.
Exclusions:
• A SUE report signed and sealed by a Professional Engineer is not included in this scope of work. A
SUE report complements the utility drawings, assists the end user in better understanding the
utility landscape and risks, and provides any metadata collected by T2ue during the SUE
investigation.
• Utility locates for geotechnical drilling will be requested through Colorado 811. Private utility
locating is excluded.
• Retaining wall design and plans. Parameters necessary for wall design to be provided in the
geotechnical report.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 13
TASK 4 – CONCEPT DESIGN AND ROW IDENTIFICATION
Concept Design Development
Concept Design will start with the development of design criteria and guidance for each discipline. These
criteria will be submitted to the City for review and approval prior to proceeding to concept development.
The project team will develop up to three (3) concepts on aerial for the Tabor Street corridor. Limits for the
concept design will extend north to 49th Avenue to inform future projects, identify ROW needs, and support
environmental clearances. Concept designs will consist of horizontal layouts with limits of grading based
on currently available GIS and LiDAR data. Concepts will be separated into the following zones and may
include interim options:
• North of I-70 bridge
• I-70 bridge south to 44th Avenue intersection
• South of 44th Avenue intersection to Clear Creek Trail connection
After concept development, the team will conduct a workshop with the City to review the initial concepts
and assess them compared to City and community goals. Changes identified in the first workshop will be
incorporated into the concepts before being reviewed by Muller and Olsson senior technical experts. These
experts will help identify risks and evaluate solutions before finalizing concepts. After concept finalization,
the project team will develop planning-level cost estimates for each concept by zone. These final concepts
and estimates will be presented and reviewed with the City in a second workshop to determine the design
that will be carried forward to 30%.
The project team will coordinate with the City to collect available drainage studies, including the
Stormwater Master Plan developed by RESPEC in 2024. The team will review available studies, FEMA
floodplain mapping, existing drainage infrastructure, and utility information to characterize existing
drainage conditions and identify key constraints that may influence concept development. Concept design
will include evaluation of existing drainage patterns and major flow paths, identification of potential
drainage improvements, development of preliminary storm drain layouts, and evaluation of applicable
water quality requirements and potential control measures. Drainage considerations will be incorporated
into the roadway concepts to identify potential impacts to roadway geometry, grading, ROW needs, and
utilities.
Concept development will include assessment of pedestrian bridge(s) versus existing bridge widening
options to provide multimodal crossing over I-70. The project team will develop a matrix comparing the
options on constructability, relative cost, future implementation, and CDOT approval. This matrix and
preferred configuration will be reviewed during one of the workshops with the City to decide on the option
to move forward to 30% design.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 14
ROW Identification
During concept design, the project team will perform an initial review of the ROW impacts (number of
parcels, ROW vs easement) to inform the City’s initial outreach to stakeholders and property owners. These
impacts will be finalized during 30% design for the ROWPR and ROW acquisition process.
Deliverables:
• Design Criteria Tables
• Concept Design Rollplots
• Roadway/Multimodal Typical Sections
• Pedestrian Bridge/Bridge Widening Matrix
• Planning Level Cost Estimates
• Existing Bridge Condition Report
Assumptions:
• Development of up to three (3) concepts per zone with up to two (2) typical sections per concept.
• Development of up to four (4) concepts for the pedestrian bridge(s) vs. existing bridge widening with
up to two (2) typical sections per concept.
• Evaluate hydraulic and floodplain constraints for up to three (3) concepts per zone and identify
potential fatal flaws and floodplain impacts that may affect concept feasibility, ROW needs, or
future design.
• Floodplain evaluation will be based on available regulatory and master planning information,
available survey and LiDAR data, and field observations. Floodplain modeling is excluded from the
Concept Design phase.
Exclusions:
• Concept design plans are not included.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 15
TASK 5 - 30% DESIGN
The project team will develop 30% design based on the Concept Design selected by the City. Draft design
reports will be developed to supplement the design plans.
Multimodal - Olsson
At the 30% design level, multimodal staff will evaluate the proposed corridor improvements from a
pedestrian, bicycle, and micromobility perspective and provide recommendations regarding facility type,
roadway crossings, accessibility, safety enhancements, and user comfort. Multimodal staff will coordinate
with the roadway design team to incorporate recommended improvements into the preliminary design and
will review the 30% plans for consistency with project goals and applicable multimodal design guidance.
Roadway - Muller
The project team will develop roadway and trail design based on the concept design selected by the City in
accordance with applicable AASHTO, FHWA, NACTO, CDOT, and City criteria. Tasks will include the
following:
• Address comments from the City during the second concept design workshop
• Establish and refine typical sections, horizontal control alignment, and vertical profile along Tabor
Street
• Refine 3D corridor modeling to determine grading limits and cut/fill lines
• Finalize ROW impacts based on the initial ROW identification performed during concept design
analysis
• Layout curb ramp and cross walk connections at W 46th Ave and the accesses at Trailor Source of
Wheat Ridge (assumed 6 curb ramps)
• Develop sidewalk connections along Tabor Street between 44th Ave and I-70
• Outline multimodal connections along Tabor Street between Clear Creek Trail and 44th Ave
• Design to existing curb ramps at 44th Ave and W 45th Pl (assumed 10 curb ramps)
• Design side street and access connections to tie into proposed Tabor Street improvements
o Design of two (2) side street connections at W 45th Place and W 46th Ave
o Design of six (6) access connections north of 44th Ave
o Design of four (4) paved access connections south of 44th Ave, assumed to be impacted by
widening to the east within public ROW
o Review and tie-in grading for five (5) gravel access connections south of 44th Ave, assumed
to be impacted by widening to the east within public ROW
• Review with the City any project design elements that may require documentation for design
decisions or variances
o Document any design decisions / design variances if applicable and provide justification
(CDOT Forms 463 and 464A)
• Develop roadway-specific quantities, pay items, and unit costs
• Develop four (4) typical section sheets, one (1) roadway rollplot depicting roadway and multimodal
improvements and Tabor St alignment/stationing, one (1) roadway profile rollplot depicting the
Tabor Street centerline profile, and roadway cross section sheets.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 16
Drainage – Muller
The project team will perform hydrologic and hydraulic analysis in accordance with applicable City,
Jefferson County, and CDOT criteria. Tasks will include:
• Hydrologic Analysis
o Perform hydrologic analysis to evaluate existing and proposed runoff for up to 30 drainage
basins for each condition using the Rational method
o Develop Existing and Proposed Drainage Basin Maps to summarizing basin characteristics
and design flows.
• Hydraulic Analysis
o Evaluate the capacity of existing pipes and culverts impacted by the proposed
improvements
o Develop preliminary layouts and hydraulic sizing for proposed inlets and storm drain
connections to existing trunklines, including inlet capacity and pipe sizing. FlowMaster and
MHFD-Inlet spreadsheets will be used for preliminary hydraulic analyses.
o Evaluate capacity of existing and proposed roadside ditches impacted by the proposed
improvements.
o Perform preliminary riprap sizing calculations for outlet protection at culvert and storm
drain outfalls
• Floodplain
o Review the proposed design relative to the Clear Creek regulator floodplain using available
floodplain information to identify potential potential floodplain impacts and constraints.
• Detention C Permanent Water Quality (PWQ)
o Review the proposed design from the Clear Creek Trail connection to 49th Avenue to
determine applicable detention and permanent water quality requirements.
o Evaluate existing site conditions and identify potential locations and control measures
(CMs) for detention and PWQ.
o Assess preliminary opportunities and constraints for incorporating detention and PWQ
measures within the project limits
o Document preliminary findings and recommendations in the Preliminary Drainage Report
• Develop preliminary drainage, detention and PWQ layout for incorporation into the 30% rollplot.
• Develop drainage-specific quantities, pay items, and unit costs.
• Prepare a Preliminary Drainage Report summarizing existing conditions, applicable design criteria,
preliminary hydrologic and hydraulic analyses, detention and PWQ evaluations, and floodplain
considerations.
Irrigation – Muller
The project team will identify irrigation infrastructure that may need to be modified or relocated as a result
of the proposed improvements and coordinate with the respective owners. South of 44th Avenue, roadway
widening, if needed, is assumed to occur along the east side of Tabor Street. Preliminary layouts for
modifications to up to four (4) irrigation facilities along the east side of Tabor Street south of 44th Avenue
will be developed for incorporation into the 30% rollplot.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 17
Traffic – Olsson
Draft Traffic Operational and Safety Analysis Report
The project team will prepare a traffic operational and safety analysis report. The report will evaluate the
existing configurations operations, and safety for the project corridor for existing year and projected future
year conditions. The report will also include analysis on the concepts proposed for this project. The report
will provide a comparative analysis between each alternative and provide recommendations and rankings
based on the performance measure outcomes.
• Crash History and Analysis – The project team will analyze five-year crash history for existing
conditions and utilize Highway Safety Manual Predictive Method for Urban and Suburban Arterials
as a baseline for expected crashes under existing conditions. Crash Modification Factors will be
applied to the HSM methodology to identify expected crashes under alternative conditions. Level of
Traffic Stress and Level of Safety Service will be incorporated to capture pedestrian and bicycle
facility improvements presented by the alternatives.
• Operational Analysis – The project team will conduct vehicular level of service and queueing
analysis for existing year scenario and future scenario for the following intersections under existing
and proposed configurations:
o I-70 Frontage Road and Tabor Street South
o I-70 Frontage Road and Tabor Street North
o 44th Avenue and Tabor Street
Capacity analysis will be performed in accordance with the Highway Capacity Manual (HCM) 7th
Edition methodologies using Synchro 12. If roundabout analysis is required, analysis shall be done
using SIDRA version 11 utilizing both HCM 7th methodology and SIDRA LOS methodologies. If
required, urban street HCS analysis will be conducted to evaluate roadway level of service and
capacity.
Traffic Operational and Safety Analysis Report Exclusions:
• Microsimulation (VISSIM)
• Travel Demand Modeling (TDM)
• Field measurement of sight distance
• Adjustments to traffic volumes for seasonality or other environmental factors
Utilities – T2ue
T2ue will contact utility owners within the project limits and collect record maps to assist field personnel in
identifying subsurface and overhead utilities. T2ue will survey the field designations and utility
appurtenances, referenced to the project survey control. Once the survey data is processed, T2ue will
process the survey data into an AutoCAD Civil 3D model deliverable and plan set for use in the 30% design
and to allow the project team to identify potential utility conflicts where QLA test holes are needed. T2ue
will concurrently perform early outreach to utility owners to make them aware of the project.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 18
Landscape Design – Dig Studio
Existing and New Tree Opportunity Assessment:
Dig will conduct an existing and new tree opportunity assessment identifying species, size, and condition
of existing trees and locations for new street trees based on landscape clearance requirements including
utilities, driveways, sight triangles, fire hydrants, lighting, etc. The City of Wheat Ridge Transportation and
Engineering, Forestry, Parks and Recreation, and CDOT design standards, guidelines, and details will be
utilized. In addition, potential strategies to support maximized soil volumes for existing and new trees will
be determined.
Planting and Materials Palette:
Building off the existing planting and materials palette along the built segments of North Avenue
streetscape improvements, we will develop a preliminary planting, materiality, and lighting palette along
with a preliminary planning-level estimate of quantities and probable cost will be included.
30% Landscape Architecture Design Drawings:
Upon verification of existing trees to remain, areas for new trees, and the planting and materials palette,
Dig Studio will prepare 30% Landscape Architecture Design Drawings for review by the City. 30% plans will
define the layout and essential materials and details of the project and will include:
• Draft Demolition Plan: Demolition plan to be developed by others. Dig will use the survey provided
and site inventory information to identify and provide soft and hardscape elements to be removed,
relocated, or protected in place prior to new construction.
• Site Layout/Materials Plan: 30% level plan of planting, lighting, and materiality including some
• layout dimensions.
• Construction Details: 30% level construction details for softscape and hardscape.
• Planting Plan: Layout and schedule communicating size, species and spacing. Plants to be shown
in groups at this level of design rather than individual plants.
Deliverables:
• FIR/30% Rollplots, including typical section and cross section sheets
• Preliminary Drainage Report
• Preliminary SAQ/Cost Estimate
• SUE CAD model and plan set
• Traffic Safety/Operations Report
• Tree Opportunity Assessment C Existing Trees to Remain (1 submittal)
• Planting and Materials Palette (1 submittal) using precedent images.
• Streetscape Renderings (Up to 2 small area views or sections,1 Draft and 1 Final of each
Assumptions:
• Limits for improvements will extend along Tabor Street from the Clear Creek Trail to W I-70 Frontage
Road intersection just north of the bridge over I-70
Tabor Street Improvements Scope of Work September 30, 2026
Page | 19
• No curb and gutter or sidewalk will be installed on Tabor Street south of 44th Ave. It is assumed that
multimodal treatment south of 44th Ave will be at grade with the roadway.
• Storm drain improvements are not anticipated south of 44th Ave. Existing drainage patterns will
generally be maintained, with roadway runoff conveyed through roadside ditches.
• Existing drainage and irrigation flows south of 44th Ave are assumed to remain combined and will
not be separated as part of the proposed improvements.
• Widening, if needed, on Tabor Street south of 44th will be limited to areas within existing public
ROW to avoid 4(f) impacts to the west. It is assumed that any widening will not impact the
floodplain. If it is decided that widening outside of ROW is required, an amendment may be needed
for additional property, irrigation, drainage, and 4(f) impacts.
• Existing curb ramps and curb returns at 44th Ave and W 45th Pl will not be redesigned but will tie into
proposed Tabor Street improvements.
• Structural design will be for a separate pedestrian bridge structure. Improvements to the existing
bridge over I-70 are not included.
• T2ue cannot guarantee all unknown, abandoned, retired, or inactive utilities will be found.
• Individual utility services to homes and buildings will include water, electricity, and natural gas.
Telephone, CATV, and sanitary services are excluded.
• Overhead utility lines will be shown as a singular line running pole to pole. T2ue will attempt to
identify both ownership C connections on the poles and incorporate this information into the plans
using pole diagrams, images, and/or spreadsheets (or some combination thereof) as best suits this
project and existing site conditions.
• The degree of success of a ground-penetrating radar (GPR) investigation is based entirely on the
soils' composition and the subsurface targets' depth and scale. Due to the unknown receptiveness
of specific site soils to the passage of radar energy, conclusive results cannot be guaranteed from
GPR.
Exclusions:
• Design for trail connection to bridge(s) outside of concept work performed
• Geometry Sheets
• Roadway Plan Sheets
• Roadway Profile Sheets
• Side Street Plan and Profile Sheets
• Intersection/Access Details
• Curb Ramp/Island Details
• Curb Return Profile Sheets
• Retrofit or modification to existing water quality or detention facilities
• Floodplain hydraulic modeling, including updates to the regulatory hydraulic model for the Clear
Creek floodplain, is not included. If floodplain modeling is determined to be necessary as the
design progresses, it may be performed under a separate task order.
• Floodplain permitting.
• Updates to the Stormwater Master Plan are not included. If updates to the Stormwater Master Plan
are determined to be necessary as the design progresses, they may be performed under a separate
task order.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 20
• Drainage Plan Sheets.
• Drainage Structure Profiles.
• SWMP and Erosion Control Plans.
• Landscaping Plans
• Lighting Plans
• Signing and Striping Plans
• Construction Phasing/MOT Plans
• Construction Traffic Control Plans
• Underground storage tanks (USTs), septic fields, traffic loop systems, thrust blocks, cathodic
protection systems, drain tiles, irrigation channels, irrigation gates, irrigation valves, irrigation
piping, irrigation headwalls, and landscape irrigation two inches in diameter or less (both public C
private) are excluded.
• No butterfly diagrams or 3D modeling (with pipe networks) will be included.
• Diagrams of the conduits within vaults are excluded.
• Pole diagrams, images, and/or spreadsheets (or some combination thereof) as best suits this
project and existing site conditions are excluded.
• Confined space entry is excluded.
• Utility vault dimensions and/or diagrams are excluded.
• Electronic/Digital Depths will not be collected as part of utility designation.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 21
TASK 6 - 60% DESIGN
The project team will advance the 30% design to a 60% level and prepare reports to support the design
plans.
Multimodal - Olsson
At the 60% design level, multimodal staff will refine proposed multimodal facility layouts and coordinate
with the roadway design team to advance design details. Preliminary layouts and detail sheets for interim
multimodal and safety improvements, including signing, striping, delineation, and other low-cost
implementation measures, will be developed as appropriate. Multimodal staff will review the 60% plans
and provide recommendations related to accessibility, operations, and user safety.
Roadway - Muller
The project team will refine and advance roadway and trail design based on the 30% design and FIR
comments provided by the City and CDOT. Tasks will include the following:
• Address comments from the City and CDOT 30% review
• Refine typical sections, horizontal control alignment, and vertical profile along Tabor Street
• Refine 3D corridor modeling, grading limits, and cut/fill lines, prioritizing design that would impact
proposed ROW/easement limits
• Finalize ROW impacts and ROW design file based on the City and CDOT 30% review for ROW plan
incorporation
• Refine curb ramp and cross walk connections, sidewalk connections, and multimodal connections
• Refine side street and access connections, including centerline and curb return profiles
o Centerline profiles will be provided at all side street and paved access connections (13
profiles)
o Curb return profiles will be provided at W 46th Ave and the accesses at Trailor Source of
Wheat Ridge (6 profiles)
• Refine design documentation based on any changes and comments from the City and CDOT 30%
review.
• Update CDOT Forms 463 and 464A, if needed
• Refine roadway-specific quantities, pay items, and unit costs
• Develop draft, roadway-specific project special provisions
• Refine typical section sheets and roadway cross sections
• Develop geometry sheets, removal plans, roadway plans (pavement hatching to be depicted on
roadway plans), roadway profile sheets, side street plans, side street profile sheets, intersection
and access detail sheets, curb ramp/island detail sheets, and curb return profile sheets
• Develop MOT/phasing plans
Tabor Street Improvements Scope of Work September 30, 2026
Page | 22
Drainage – Muller
The project team will refine and advance the drainage design and associated analyses based on the 30%
design. Tasks will include the following:
• Hydrologic Analysis
o Update hydrologic analyses, as necessary, to address review comments and design
refinements.
o Update Existing and Proposed Drainage Basin Maps.
• Hydraulic Analysis
o Advance storm drain and inlets design and update hydraulic analyses.
o Refine roadside ditch design and associated hydraulic analyses.
o Coordinate with the City to establish appropriate assumptions or baseline conditions for
connections to the existing storm drain system. New storm drain trunklines are not
anticipated.
o Refine outlet protection and associated riprap sizing.
• Floodplain
o Review design refinements relative to the Clear Creek regulatory floodplain using available
floodplain information and identify potential floodplain impacts or constraints.
• Detention C Permanent Water Quality (PWQ)
o Advance the selected detention and PWQ approach and refine sizing and layout of
proposed control measures, as applicable.
o Perform supporting calculations required for the selected detention and PWQ measures.
o Coordinate detention and PWQ improvements with roadway, utility, ROW, and drainage
design.
• Drainage Plans, Profiles, Details, and Quantities
o Develop drainage plans, profiles, and details, including hydraulic grade lines (HGLs) for
minor and major storm events, as applicable.
o Develop detention and PWQ details.
o Refine drainage specific quantities, pay items, and unit costs.
o Develop draft drainage-specific project special provisions.
• Drainage Report
o Advance the Preliminary Drainage Report to a 60% level to incorporate design refinements,
updated hydrologic and hydraulic analyses, detention and PWQ design, and floodplain
considerations.
• Stormwater Management
o Develop Stormwater Management Plans, notes, and quantities using applicable CDOT
standard notes for projects with more than one acre of disturbance.
o Show Initial and Interim Control Measures (CMs) on one plan set and Permanent Control
Measures on a separate plan set.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 23
Irrigation – Muller
The project team will refine and advance irrigation modifications based on the 30% design and review
comments. Tasks will include the following:
• Develop plans, profiles and details for up to four (4) irrigation facilities along the east side of Tabor
Street south of 44th Ave will be developed. Continued coordination with irrigation facility owners
regarding proposed modifications.
• Refine the design modifications to up to four (4) irrigation facilities along the east side of Tabor
Street, south of 44th Avenue.
• Coordinate irrigation modifications with roadway, drainage, utility, and ROW design.
• Develop irrigation profiles and details for the proposed modifications. Irrigation modifications will
be shown in the drainage plans.
• Hydraulic calculations for the proposed irrigation modifications will be developed as part of the
90% design and documented in the 90% Drainage Report.
Traffic – Olsson
Traffic Operational and Safety Analysis Report
Comments provided by the City and CDOT will be reviewed and addressed. A final report shall be
submitted with the 60% design as well as a comment response form addressing all comments provided by
stakeholders. Final report shall include final recommendations and analysis.
A completed Systems Engineering Analysis (SEA) is not anticipated to be required for this project. The SEA
form to verify that no additional ITS devices are required will be included in the report as an appendix.
Pavement Marking and Signing
The project team will provide pavement marking and signing plans for the roadway network within the
project boundaries. Pavement marking and signing will meet expected opening year traffic needs; design
will meet City, CDOT and MUTCD standards. Pavement marking and signing tabulations will be included
with the plan sheets. Outline project special provisions for pavement marking and signing, if required, will
be prepared.
Traffic Signal Modification Plan
If required, the project team will provide a traffic signal modification design for the signal at the intersection
of 44th Avenue and Tabor Street. The existing signal will be reviewed with the proposed design plans to
determine components that will be required to be removed/reset or replaced based on multimodal design
and recommendations along Tabor Street. It is anticipated that the signal modification may require removal
and resetting equipment, with minimal impact to poles. Signal design will consider current year needs as
well as future year anticipated operations. The signal plans will include basic timing parameters to operate
in “free operation” and additional multimodal focused phases.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 24
Utilities – T2ue
The project team will identify potential utility conflicts and develop a test hole plan for review and approval.
T2ue will prepare traffic control plans and obtain ROW permits for test holes exploration. Once the ROW
permits are in place, T2ue will complete up to 40 test holes utilizing hydro-assisted or air-assisted vacuum
excavation at select locations identified during conflict analysis. Information collected after exposing the
utility includes the type, size, material, depth, and other utility or site conditions that may impact continued
design or utility coordination efforts. Test hole data is collected in T2ue’s proprietary software, Builterra,
and a report is generated conveying the attributes of the utility and the pavement type, thickness, and
condition. Completed test holes are then surveyed and included in the SUE drawings.
The utility coordination team will coordinate with the project team and the City to make sure that utility
services, infrastructure, and facilities are correctly identified, documented, and accommodated within the
utility plans.
Landscape Design – Dig Studio
Dig studio anticipates two (2) document submissions: 60% Construction Documents draft for
coordination and a final submittal set. Additional revisions or submittals will be considered as additional
services. Dig Studio shall prepare working drawings and technical specifications to conform to applicable
codes and regulations of governmental bodies having jurisdiction over the work. 60% plans will include:
• Demolition Plan: Demolition plan to be developed by others. Dig will use the survey provided and
site inventory information to identify and provide soft and hardscape elements to be removed,
relocated, or protected in place prior to new construction.
• Site Layout/Materials Plan: Provide detailed and dimensioned material layout for scope areas
including planting, lighting, and materiality.
• Construction Details: Provide construction details for softscape and hardscape.
• Draft Specifications: Provide draft specifications for landscape within scope of work to meet City
specifications.
• Planting Plan: Locate and specify plant materials. Include plant schedule for planting areas with
quantities of each specified plant.
• Irrigation Plan: Hydrosystems/KDI will provide full irrigation layouts plans, including overall
mainline, sleeving and spray head locations. This plan will identify hydro zones and a include water
demand spreadsheet.
Deliverables:
• 60%/FIR Plans
• Index of anticipated Specifications (CDOT Format)
• 60% Cost Estimate
• 60% Drainage Report
• Final Pavement Design Report
• Final Foundations Report
• Utility Conflict Matrix
Tabor Street Improvements Scope of Work September 30, 2026
Page | 25
• QLA Test Hole Data
• Utility Impact Letters
• Final Traffic Safety/Operations Report
Assumptions:
• Each test hole will be excavated with the intent of finding one utility per hole. If additional utilities
are discovered within a hole, data for each additional utility will be collected and expensed. If a test
hole is proposed to expose multiple utilities, a reimbursable rate multiplied by the number of
utilities exposed will be expensed.
• If test hole locations are inaccessible due to unsuitable terrain, limited access, weather conditions,
truck limitations, safety concerns, etc., and cannot be excavated, those locations will be discussed
with the City and noted accordingly.
• The standard width for test hole excavations is 1.5’ and the standard depth is 6’. Additional width or
depth of test holes will be billed as a reimbursable expense.
• If a utility cannot be found in a standard 6’ deep and 1.5’ wide test hole, the City will be notified
before further test hole excavation activities are performed. If a utility cannot be designated, the
test hole will be excavated to a maximum depth of 6’ and maximum width of 36”.
Exclusions:
• 3D detailing of curb ramp, access, and intersection details
• Construction Traffic Control Plans
• Lighting Plans
• Irrigation design memorandum.
• Floodplain hydraulic modeling, including updates to the regulatory hydraulic model for the Clear
Creek floodplain, is not included. If floodplain modeling is determined to be necessary as the
design progresses, it may be performed under a separate task order.
• Floodplain permitting.
• Updates to the Stormwater Master Plan are not included. If updates to the Stormwater Master Plan
are determined to be necessary as the design progresses, they may be performed under a separate
task order.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 26
TASK 7 - 90% DESIGN
The project team will address and incorporate 60% review comments and prepare design details and final
construction documents.
Multimodal - Olsson
At the 90% design level, multimodal staff will finalize multimodal facility layouts and prepare final detail
sheets for interim multimodal and safety improvements. A final quality review will be completed to confirm
consistency with applicable accessibility, bicycle, pedestrian, and safety design guidance. Multimodal staff
will review multimodal-related plan sheets, details, quantities, and specifications and provide comments
prior to final plan production.
Roadway - Muller
The project team will refine and advance roadway and trail design based on the 60% design review
comments provided from the City and CDOT. Tasks will include the following:
• Address comments from the City and CDOT 60% review
• Finalize typical sections, horizontal control alignment, and vertical profile along Tabor Street
• Finalize 3D corridor modeling, grading limits, and cut/fill lines
• Finalize and detail curb ramp and cross walk connections, sidewalk connections, and multimodal
connections
• Finalize and detail side street and access connections
• Finalize design documentation based on any changes and comments from the City and CDOT 60%
review
• Finalize roadway-specific quantities, pay items, and unit costs
• Develop final, roadway-specific project special provisions
• Refine typical section sheets, roadway plans, roadway profiles, roadway cross sections, side street
plans, side street profile sheets, intersection and access detail sheets, curb ramp/island detail
sheets, and curb return profile sheets
• Refine MOT/phasing plans
Drainage - Muller
The project team will refine and advance the drainage design and associated analyses based on the 60%
design and review comments. Tasks will include the following:
• Hydrologic Analysis
o Update hydrologic analyses, as necessary, to address review comments and design
refinements.
o Update Existing and Proposed Drainage Basin Maps
• Hydraulic Analysis
o Advance the hydraulic design and updated associated analyses, as necessary, based on
review comments and design refinements.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 27
• Floodplain
o Confirm that floodplain impacts identified during previous design phases remain
unchanged based on the 90% design refinements.
• Detention C Permanent Water Quality (PWQ)
o Finalize the selected detention and PWQ design, including sizing and layout of proposed
control measures, as applicable.
o Finalize grading, inlet and outlet structures, and supporting calculations for detention and
PWQ measures.
o Document the proposed detention and PWQ design and supporting analyses in the 90%
Drainage Report.
• Drainage Plans, Profiles, Details, and Quantities
o Update drainage plans and details.
o Update drainage profiles and HGLs for minor and major storm events.
o Update detention and PWQ details and develop control point diagrams, as needed.
o Finalize drainage-specific quantities, pay items, and unit costs.
o Develop final drainage-specific project special provisions.
• Drainage Report
o Advance the Drainage Report to a 90% level to incorporate design refinements, updated
hydrologic and hydraulic analyses, detention and PWQ design, and floodplain
considerations.
• Incorporate 60% comments into Stormwater Management Notes, Plans, and Quantities.
Irrigation – Muller
The project team will finalize modifications to up to four (4) irrigation facilities along the east side of Tabor
Street, south of 44th Avenue. Tasks will include:
• Address review comments and continue coordination with irrigation facility owners.
• Finalize irrigation plans, profiles and details.
• Develop supporting hydraulic calculations for the proposed irrigation modifications for inclusions
in the 90% Drainage Report.
Traffic - Olsson
Pavement marking, signing, and lighting plans and traffic signal modification plan (if needed) will be
updated to address 60% review comments by the City and CDOT. Traffic quantities and project
specifications will also be updated for 90% submittal.
Construction Traffic Control Plans
The project team will develop detailed Construction Traffic Control/Maintenance of Traffic (MOT) plans to
support construction phasing and maintain safe access for motorists, pedestrians, bicyclists, transit users,
emergency responders, and adjacent properties throughout construction. MOT planning will be
coordinated with the City and incorporated into project design milestones to identify potential construction
constraints and maintain corridor operations. Plans will include temporary traffic control layouts,
pedestrian and bicycle accommodations, access management provisions, maintenance of traffic quantity
Tabor Street Improvements Scope of Work September 30, 2026
Page | 28
tabulations, and supporting details necessary for bidding and construction. In addition, the Traffic Control
Project Special Provision will be prepared.
Lighting Plans
The project team will design a continuous street lighting system along Tabor Street within the project
boundaries. Design will align with City and CDOT standards and specifications using the latest design
criteria, including roadway and area classification, pole mounting height, and luminaire output while also
conforming to applicable standard details, specifications, and/or materials as applicable. If required, a
photometric analysis considering illuminance and/or luminance will be prepared and submitted to City
staff to review compliance with standards.
Proposed power source locations will be reviewed with power provider and coordinated to ensure power
feed can be provided. Voltage drop and circuitry will be reviewed to determine optimum placement of
control equipment for current and future build of the public street system. All necessary information
required will be included on plans, including but not limited to lighting general notes, plan sheets,
quantification sheets, and detail sheets, as required
Utilities – T2ue
T2ue will provide QA/QC’ed deliverables including, an AutoCAD Civil 3D CAD model, plan set, and test hole
data. Additional deliverables will include a Utility Specification and a Utility Certification. T2ue will
coordinate with utility companies, perform assessment of existing utility locations and conditions,
determine resolutions between conflicts, utilities, and proposed project elements, secure necessary
contracts, and schedule utility relocations or adjustments as required.
Landscape Design – Dig Studio
After receipt of 60% Design and Cost Estimates City comments, Dig Studio will prepare 90% Landscape
Architecture Design Drawings and related technical specifications to construct the work in our scope and
for review by the City. At this time, a final budget to design to is anticipated to be provided where the
construction scope will be aligned with available design and construction funds. Locations identified for
methods to increase soil volume for existing trees and new trees will be included.
Dig Studio anticipates two (2) document submissions: 90% Construction Documents draft for coordination
and a final submittal set. Dig Studio shall prepare working drawings and technical specifications to
conform to applicable codes and regulations of governmental bodies having jurisdiction over the work.
90% plans will include:
• Demolition Plan: Demolition plan to be developed by others. Dig will use the survey provided and
site inventory information to identify and provide soft and hardscape elements to be removed,
relocated, or protected in place prior to new construction.
• Site Layout/Materials Plan: Provide detailed and dimensioned material layout for scope areas
including planting, lighting, and materiality.
• Construction Details: Provide construction details for softscape and hardscape.
• Draft Specifications: Provide draft specifications for landscape within scope of work to meet City
specifications.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 29
• Planting Plan: Locate and specify plant materials. Include plant schedule for planting areas with
quantities of each specified plant.
• Irrigation Plan: Hydrosystems/KDI will provide full irrigation layouts plans, including overall
mainline, sleeving and spray head locations. This plan will identify hydro zones and a include water
demand spreadsheet.
Deliverables:
• FOR/90% Plans
• FOR/90% Specifications (CDOT format)
• FOR/90% Cost Estimate
• 60%/FIR Review Comment Resolution Form
• Final Drainage Report
• Final Geotechnical Report
• Final Utility Relocation Plans
• Utility Specification
• Utility Certification
Assumptions:
• The City and CDOT will review and provide comments prior to the FOR/90% design review meeting.
The design review meeting will be used to resolve comments; additional meetings and/or
coordination for comment resolution are not included in the scope of work.
Exclusions:
• Temporary signal design is not anticipated and is excluded.
• Traffic modeling related specifically to construction operations is excluded.
• Floodplain hydraulic modeling and permitting.
• Updates to the Stormwater Master Plan.
• Irrigation design memorandum.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 30
TASK 8 – 100% DESIGN
The project team will incorporate FOR design review comments into the final design package. Scope
includes only one round of minor comments post-100% in preparation of construction documents for
Advertisement.
Team will provide support to the City during the bidding phase, including attendance by PM, Deputy PM,
and Roadway lead at the pre-bid conference and responses to pre-bid questions during the advertisement
period.
Deliverables:
• 100% Plans
• 100% Specifications (CDOT Format)
• Final Plans, Specifications, and Estimate Package for Advertisement
• Final Bridge Plans, Specifications, and Estimate Package for separate Advertisement
• Final Electronic Files
• FOR Comment Resolution Form
• Record Plan Sets
Assumptions:
• Up to 20 hours to answer contractor questions
• Up to 20 hours for one Revision during Advertisement
Exclusions:
• A post-100% design formal review meeting is excluded.
• Construction support services are excluded.
• Floodplain permitting.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 32
f. Recreational Resource (Muller) - Identify recreational resources within the Study Area.
Determine if any resources qualify for Section 4(f) or Section 6(f) protection.
G. Identify commitments for incorporation into the design documents and coordinate environmental
review through CDOT clearance.
Deliverables:
• Collected Field Data (geodatabase)
• Air Quality Memo (exemption)
• Traffic Noise Memo (exemption)
• Form 881 and accompanying report
• Cultural Resource Report
• Section 106 Letter/Coordination
• Biological Resource Report
• Wetland Delineation
• CDPHE Regulation No. 87 Dredge and Fill Authorization
• Section 4(f) Coordination
Exclusions:
• USACE Section 404 permitting
• SB 40 Certification
• USFWS Section 7 or 10 consultation
• Wetland finding report
• Stream/ wetland functional analysis (FACWet, CSQT)
• COR 400000 Construction Stormwater Discharge Permit
• Visual Resources – Not required for CDOT local agency project
• Section 6(f) Coordination
• Traffic Noise Analysis
Assumptions:
• CDOT Scoping Meeting – 2-hour virtual meeting plus meeting prep time; 2 Muller attendees, 2
Olsson attendees
• Field Visit – 6 hours, 2 people
• NEPA clearance for this project is anticipated to be a CDOT Categorical Exclusion (CatEx)
Tabor Street Improvements Scope of Work September 30, 2026
Page | 31
TASK 9 – ENVIRONMENTAL DOCUMENTATION AND PERMITTING – Muller/Olsson
The Project team will identify resources within the Study Area which will extend from the Clear Creek Trail
to 49th Ave. This will allow the team to assess environmental impacts, identify appropriate mitigation
measures and assist City of Wheat Ridge in obtaining National Environmental Policy Act (NEPA)
environmental clearance from CDOT. The appropriate NEPA clearance for this project is anticipated to be a
CDOT Categorical Exclusion (CatEx). Documentation will be per CDOT’s Form 128 and attached resource
reports. Tasks include:
A. Develop a Project Description and Project Location map.
B. Schedule and attend a CDOT Environmental Scoping Meeting to evaluate potentially affected
resources and confirm the required documentation.
C. Develop and maintain an ArcGIS Online web map or comparable project GIS resource to organize
available existing conditions, survey, utilities, ownership and property information, environmental
resources, design alternatives, constraints, and project decisions for internal project-team and
County use.
D. Identify material data gaps and recommend whether each gap must be filled during this
authorization or documented for the next project phase.
E. Field surveys will assess aquatic resources, raptor and migratory bird activity, threatened and
endangered species, state-listed species and species of special concern, general wildlife, and
noxious weeds. Surveys will document vegetation communities, habitat characteristics, wildlife
observations, and other indicators such as nests and burrows, with focused habitat assessments
for species with potential to occur in the Study Area. Data will be collected using a Trimble unit for
incorporation into a geodatabase.
F. Prepare environmental resource memos, determine impacts and identify appropriate mitigation
measures. For any potentially affected resources (anticipated resources are listed below) prepare a
technical memorandum documenting existing conditions and potential impacts according to
CDOT’s NEPA Manual resource descriptions.
a. Air Quality (Muller) – Prepare Air Quality Exemption Memo
b. Traffic Noise (Muller) – Additional noise impacts are not anticipated. Prepare Noise
Exemption Memo.
c. Hazardous Materials (Olsson) – Prepare CDOT Form 881 and accompanying report to
document any existing hazardous materials conditions.
d. Cultural Resources (Olsson) – Identify historic, archaeological, and paleontological
resources within the defined Study Area. If potential historic resources are identified,
prepare historic resources inventory for properties 50 years old or older; determine
eligibility for the National Historic Register and assist CDOT/County in conducting Section
106 clearance with the State Historic Preservation Office (SHPO)as required.
e. Biological Resources (Muller) – Prepare report and document biological resources
summarizing the desktop and field assessment results, potential project effects, and
recommended avoidance and minimization measures. If potential effects to biological
resources are identified, the report will outline applicable federal, state, or local resource
agency permitting and consultation requirements.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 33
TASK 10 – ROWPR AND ROW ACQUISITION
Right-of-Way Plan Review Process - Olsson
Right-of-Way Plan Preparation
A Local Agency right-of-way plan set will be prepared in accordance with the current CDOT Right of Way
Manual, Chapter 2: Right of Way Plans, applicable CDOT templates and CADD standards, Colorado
surveying requirements, and project-specific direction from the City and CDOT.
Property Descriptions and Parcel Exhibits
Once property impacts are substantially established, property descriptions and parcel exhibits will be
prepared for the proposed acquisitions and easements identified in the right-of-way plan set.
Right of Way Plan Review
Final comments and revisions will be incorporated into the plan set in preparation for the Right of Way Plan
Review (ROWPR). After submittal of the initial ROWPR plans, the team will attend a ROWPR meeting with
the City and CDOT (assume 2 Olsson and 2 Muller attendees for a 2-hr, virtual meeting). ROWPR
comments will be documented and addressed, authorized revisions incorporated and required ROWPR
documentation completed to support right-of-way plan approval and authorization.
Final Right-of-Way Deliverables
Approved right-of-way plans and supporting survey documents will be provided in the formats required by
the City and CDOT. Final deliverables will include, as applicable:
• Title Sheet
• Tabulation of Properties
• Land Survey Control Diagram
• Monumentation Sheets
• Plan Sheets
• Ownership Map
• Final parcel and easement calculations.
• Property descriptions
• Right-of-way survey base and CADD model.
• FIR, FOR, and ROWPR comment responses.
Supporting research and survey documentation required for the project file.
Final Right of Way Monumentation
Following completion and recording of the property acquisitions, the right-of-way monuments designated
for setting in the approved final CDOT Local Agency Right of Way Plan Set will be established under the
responsible charge of the Professional Land Surveyor.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 34
ROW Acquisition – H.C. Peck
H.C. Peck will supply title work in support of the surveying and plans effort. Once ROW plans are
authorized, H.C. Peck will initiate the acquisition process, all of which will be prosecuted pursuant to the
CDOT Right-of-Way Manual. Tasks include:
• Project Administration, which includes: project meetings; creation, maintenance, and distribution
project scheduling information of all land activities to show progress of each parcel; coordination
the appraisal and appraisal review process and other project-related tasks with the project team,
CDOT, landowners/legal counsel and others involved in the project; and providing assistance with
the CDOT ROW clearance and reimbursement protocols.
• Prepare twenty (20) title commitments with two (2) updates each.
• Prepare fifteen (15) narrative appraisals per the CDOT Manual.
• Review appraisals - assume 15 City and 15 landowner at $3500 for each pair.
• Prepare/process five (5) Waiver Valuations (based on project appraisal data).
• Prepare/send/distribute: Notices of intent, offer letters, and final offer letter packets and any
additional correspondence with property owners.
• Conduct negotiations with each owner for the acquisition of the property to be acquired based on
the approved fair market value.
• Obtain tax prorations, partial releases and/or subordinations of financial encumbrances.
• QA/QC-File Closeout and distribution
• Estimate of Reimbursable Expenses
Deliverables:
• Final ROW Plans and Legal Descriptions
• Right-of-Way Acquisition Files
Assumptions:
• H.C. Peck initial scope is for 20 acquisitions/parcels. This assumption may change once design has
progressed to the point where impacts are known.
• The scope includes participation in one FIR, one FOR, and one ROWPR, with one consolidated
comment-response and revision cycle following each review.
• The scope includes one plan-authorization review and one consolidated correction cycle for
survey-related comments.
• Assumed quantity of legal descriptions is 35, and a scope amendment will be required if this
amount is exceeded.
• Right-of-way plan preparation will be performed in accordance with the current applicable CDOT
Survey Manual, CDOT Right of Way Manual, CDOT CADD standards, Colorado statutes, State Board
rules, and project-specific direction from the CDOT Region Survey Coordinator.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 35
TASK 11 – STRUCTURAL DESIGN - Muller
Design of the pedestrian bridge and associated walls will be separated from the Tabor Street corridor
design after the Concept Design phase. Bridge plans, specifications, and estimate will be delivered as a
separate construction package that will be bid when construction funding is obtained. Schedule for this
task will be determined with the City after Concept Design.
Meetings
Structures team will schedule separate design review meetings from the overall corridor design.
A. FIR Design Review Meeting – Conduct a 2-hr, virtual 30% design review meeting with the City and
CDOT. Assume attendance by PM, Structures lead, and Structures project engineer.
B. FOR Design Review Meeting – Conduct a 2-hr, virtual 90% design review meeting with the City and
CDOT. Assume attendance by PM, Structures lead, and Structures project engineer.
30% Design
The project team will develop a Structure Selection Report (SSR) and a preferred structure layout for the FIR
deliverables. The SSR and FIR plans will be developed for a pedestrian crossing of I-70. An additional
Structure Selection Memo (SSM) layout will be developed for retaining walls required along the approaches
for the multimodal facilities. The memo will be an abbreviated version of a full SSR and focus mainly on the
cost comparison of two feasible wall types. The development will include the following tasks:
• Coordination with the geotechnical engineer on the boring locations
• Review of the foundation recommendation from the Draft Geotechnical Report
• Development and coordination of feasible alternatives
• Preparation of a draft Pedestrian Bridge SSR and Wall SSM for internal QA/QC
• Submittal of the Bridge SSR and Wall SSM for Staff Bridge Review prior to the FIR
• Update of the Bridge SSR and Wall SSM based on feedback from Staff Bridge as required prior to
submittal of the FIR deliverables
G0% Design
The project team will advance the structural calculations, bridge geometry, foundation design, abutment
and pier details, prefabricated-truss performance requirements, approach interfaces, support-restraint
details, quantities, specifications, and construction considerations. Comments received during the Bridge
SSR, Wall SSM, and FIR reviews will be incorporated and tracked through a consolidated comment-
resolution matrix.
The 90% design will advance the project-specific requirements that will be provided to the prefabricated
truss manufacturer, including geometry, design loads, maintenance-vehicle requirements, deflection and
vibration criteria, fatigue and fracture requirements, railing and fencing loads, bearing reactions, corrosion
protection, drainage, utilities, erection requirements, and support-restraint criteria.
At the 90% (FOR) Level, structural plans will incorporate comments from the FIR review and include final
details for the retaining walls and bridge structural elements. Project specifications and bid tabulations will
be included for the structural elements for a complete review by the City and CDOT specialty units.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 36
Deliverables will include the following tasks and plan sheet details:
• Incorporate by reference the aesthetic designs for the walls and pedestrian bridge (details by
landscape architect)
• Incorporate by reference the lighting designs for the walls and pedestrian bridge (details by lighting
engineer)
• Finalize structural design calculations and quantities
• Finalize plan layout and details for foundations, substructures, and retaining walls (superstructure
design by prefabricated bridge manufacturer per project specifications)
• Finalize project special specifications for a prefabricated pedestrian bridge
• Perform an Independent Design Check (IDC) for the retaining walls and bridge substructure
designs. This will also include independent quantity calculations.
100% Design
The project team will incorporate FOR design review comments into the final design package. Scope
includes only one round of minor comments post-100% in preparation of final construction documents.
Deliverables:
• Final Structure Selection Report
• 100% Plans, Specifications, and Estimate
• Final Structural Plans, Specifications, and Estimate Package
• Final Electronic Files
• IDC and Field Calc packages
• FOR Comment Resolution Form
• Record Plan Sets
Assumptions:
• Structural design assumes design of one (1) pedestrian bridge across I-70. If another alternative is
chosen, scope and hours may be renegotiated.
• Structural plans assume two (2) walls for approaches to pedestrian bridge
• Design for sidewalk/trail approaches to pedestrian bridge are included in the Roadway subtasks.
Exclusions:
• Advertisement/bidding support services are excluded.
• Construction support services are excluded.
Tabor Street Improvements Scope of Work September 30, 2026
Page | 37
TASK 12 – CONSTRUCTION SUPPORT SERVICES
The design team will provide the following construction support services to the City for the corridor
roadway design package. A construction schedule of twelve (12) months is assumed.
Meetings
A. Attend 1-hr, in-person pre-construction meeting. Assumes attendance by PM, Deputy PM, Roadway
lead, and Drainage lead. Document questions and prepare minutes.
B. Attend bi-weekly OEC meetings in person (1-hr meeting, 1-hr travel). Assumes two attendees for up
to 25 meetings: PM (50% of the meetings), Deputy PM (50% of the meetings), Roadway lead (50% of
the meetings), and Drainage lead (50% of the meetings)
C. Attend 4-hr, in-person Substantial Completion Walk-through. Assumes attendance by PM, Deputy
PM, Roadway lead, and Drainage lead.
Technical Assistance
The design team will coordinate and provide technical assistance to construction personnel on an as
needed basis. Four (4) hours per week across disciplines are assumed, for a total of 100 hours.
Design Changes during Construction
The design team will provide minor design revisions and adjustments as requested by the City during
construction. Up to 200 hours across disciplines are assumed for this work.
Requests for Information (RFIs)
The design team will review RFIs not handled by the construction management team. Forty (40) RFIs with
up to 4 hours for each RFI review are assumed.
Submittals
The design team will review submittals for general compliance with the construction documents and
provide comments/responses to the construction management team. Forty (40) submittals with up to 4
hours for each submittal review are assumed.
Deliverables:
• Minutes for pre-construction meeting
Assumptions:
The design team will only be responsible for the tasks listed above. The construction management team
will be responsible for day-to-day construction management and administration.
Exclusions:
• Construction observations/inspections and associated documentation
• Permits and permit application fees
• OEC and walk-through meeting minutes
• Public information services during construction
Tabor Street Improvements Scope of Work September 30, 2026
Page | 38
• RFI and submittal tracking logs
• Materials testing and records
• Erosion control inspections
• Design of temporary works (falsework, shoring, etc.)
• MHT development and/or review
• PE in responsible charge certification for CDOT or other public agencies
• Construction staking and as-built surveys
• Project as-built and record drawings
• Additional design, environmental, survey, geotechnical or other work not included in the scope
tasks listed above.
25375703 9/30/2026
MULLER ENGINEERING COMPANY
Tabor Street Improvements
PROJECT #: P 26-028.01 CLIENT PM:City of Wheat Ridge DATE: 30-Sep-2026
SUMMARY
Fully Burdened Labor Costs
Total Muller Labor
$1,376,572.00
Direct Costs
Equipment and Materials $0.00
Travel $380.00
Direct Cost Total $380.00
Subconsultant Costs
Olsson $623,551.00
T2ue $188,835.00
H.C. Peck $394,320.00
Dig Studio $61,955.00
Subconsultant 5 $0.00
Subconsultant 6 $0.00
Subconsultant 7 $0.00
Subconsultant 8 $0.00
Subconsultant Total $1,268,661.00
TOTAL FEE
25375703 9/30/2026
MULLER ENGINEERING COMPANY
PROJECT #: P 26-028.01 CLIENT PM: : City of Wheat Ridge
TASK BREAKDOWN
Personnel Classification Total Hours Total Cost
Personnel
Classification
Total Hours Total Cost PM PE DE DES CAD Admin
PROJECT MANAGEMENT 260 0 0 0 0 104 364 $83,870.00 PM 1820 $454,804.00
22 0 138 82 0 0 242 $38,330.00 PE 1181 $247,782.00
DESIGN 98 104 214 0 58 0 474 $88,172.00 DE 2785 $426,862.00
ROADWAY DESIGN 14 134 280 0 82 0 510 $86,236.00 DES 134 $21,284.00
ROADWAY DESIGN 20 169 318 0 461 24 992 $155,050.00 CAD 1519 $203,546.00
ROADWAY DESIGN 21 122 244 0 348 24 759 $118,718.00 Admin 175 $22,294.00
STRUCTURAL DESIGN 112 124 112 0 106 0 454 $78,626.00
STRUCTURAL DESIGN 293 184 284 0 184 0 945 $168,989.00
DRAINAGE DESIGN & IRRIGATION 193 0 281 20 14 0 508 $97,211.00
DRAINAGE DESIGN & IRRIGATION 196 0 335 14 120 0 665 $120,292.00
DRAINAGE DESIGN & IRRIGATION 116 0 186 18 50 0 370 $68,012.00
DESIGN 49 50 74 0 52 4 229 $42,022.00
SUPPORT SERVICES 206 143 216 0 24 2 591 $119,495.00
AND ROW ACQUISITION 10 58 48 0 20 0 136 $25,544.00
COLLECTION AND FIELD INVESTIGATIONS 16 16 32 0 0 0 64 $12,606.00
194 77 23 0 0 17 311 $73,399.00
Totals 1820 1181 2785 134 1519 175 7614 $1,376,572.00 Totals 7614 $1,376,572.00